HomeMy WebLinkAboutORD 2015-058 2014-2016COUNTY OF HAWAII
PART II
CAPITAL BUDGET AND SIX-YEAR
CAPITAL IMPROVEMENTS PROGRAM
FY 2015 - 2016
ORDINANCE NO. 15-58
COUNTY OF HAWAII
STATE OF HAWAII
BILL NO. 29
ORDINANCE NO. 15 5S (DRAFT 4
AN ORDINANCE RELATING TO PUBLIC IMPROVEMENTS AND FINANCING THEREOF FOR THE FISCAL
YEAR JULY 1, 2015 TO JUNE 30, 2016.
BE IT ORDAINED BY THE COUNCIL OF THE COUNTY OF HAWAII:
SECTION 1. The following amounts to be received from the sale of general obligation bonds,
and other sources are hereby appropriated to the projects and for the purposes designated in
Section 2.
CAPITAL PROJECTS FUND
Funding Source
Federal Grants Receivable
State Revolving Loan Fund
General Obligation Bonds, Capital Projects
Fund Balance and/or Other Source
Private (Grants)
Fair Share Contributions
Total
Amount
$34,400,000
$25,232,000
$134,445,000
$500,000
$1,000,000
$195,577,000
Section 2. The monies to be provided from the sources specified in Section 1 shall be
appropriated for the purposes and in the amounts as follows:
[The remainder of this page is intentionally left blank]
FY NO.
PROJECTS
APPROPRIATIONS
(in thousands)
FEDERAL GRANTS RECEIVABLE
2015048 1
Upper Waianuenue Avenue Road Safety and Drainage Control
34,400
Subtotal
34,400
STATE REVOLVING LOAN FUND
2015003
Kealakehe Effluent Reuse - Makai
2,000
2015006
Na'alehu Wastewater System (Reapp. 5698.22)
4,485
2015007
Pahala Wastewater System (Reapp. 5698.23 and 5698.24)
12,000
2015008
North Kona Sewer (Reapp. 5696.44)
3,104
2015009
North Kona Effluent Reuse (Reapp. 5696.45)
3,643
Subtotal
25,232
GENERAL OBLIGATION BONDS, CAPITAL PROJECTS
FUND BALANCE AND/OR OTHER SOURCES
2015001
Lower Puna Community Relief Center (Reapp. 5190.06)
200
2015002
Repair Hilo Outfall (Reapp. 5691.83)
1,000
2015003
Kealakehe Effluent Reuse - Makai
3,850
2015004
Repair/Replacement of Wastewater Facilities
2,000
2015005
Lono Kona Improvement District (Reapp. 5696.47)
1,140
2015007
Pahala Wastewater System (Reapp. 5698.23 and 5698.24)
700
2015010
Hilo Coating Rehabilitation (Reapp. 5694.84)
400
2015011
Repair Hilo Digesters (Reapp. 5691.85)
500
2015012
Repair Pua Wet Well (Reapp. 5691.86)
400
2015013
Rural Transfer Station Replacement/Enhancement
2,000
2015014
Landfill Gas Collection and Control System at the WHSL
(Reapp. 5696.49)
2,200
2015015
South Hilo Landfill Closure (Reapp. 5691.82)
750
2015016
DPR ADA Compliance
5,000
2015017
DPR Repairs/Improvements to Facilities
10,000
2015018
Holding cell improvements (Reapp. 5299.77)
600
2015019
South Kona Police Station (Reapp. 5296.94)
4,600
2015020
East Hawaii Firing Range (Reapp. 5292.83)
600
2015021
DPW Facilities ADA Compliance
750
2015022
DPW Road Repair & Maintenance
6,000
2015024
DPW Facilities Renovation
600
2015025
East Hawaii Traffic Facility Repair/Renovation (Reapp.
5191.53)
200
2015026
Komohana Street Reconstruction
1,500
2015027
Kilauea-Keawe Street Resurfacing (Ponahawai St. to
Waianuenue Ave.)
2,000
2015028
Mamalahoa Highway (Route 19) Improvements
1,800
FY NO.
PROJECTS
APPROPRIATIONS
(in thousands)
2015029
DPW Facilities Repair & Maintenance
2,000
2015030
DPW Facilities Hardening
800
2015031
DPW Facilities Hazardous Materials Mitigation
100
2015032
West Hawai'i Traffic Calming Improvements (Reapp. 5389.04)
250
2015033
East Hawai'i Traffic Calming Improvements (Reapp. 5389.05)
250
2015034
Ali'i Drive Shoulder Improvements
800
2015035
DPW Facilities Energy Efficiency
1,300
2015036
Land Acquisition for DPW Facilities
100
2015037
La'aloa Avenue Extension
1,635
2015038
West Hawai'i Traffic Signal Improvements
100
2015039
Street Light Installations, Islandwide
2,000
2015040
Micro-Unit Housing for the Chronic Homeless in West Hawai'i
650
2015041
Ulu Wini Park
100
2015042
Kamakoa Nui
4,750
2015043
Ouili'Ekahi Improvement
400
2015044
Waimea Transit Hub
500
2015045
Hualani Park Improvements
2,245
2015046
Kalaniana'ole Avenue Improvements
2,500
2015047
Hawai'i Island Mass Transit Master Plan
500
2015048
Upper Waianuenue Avenue Road Safety and Drainage Control
8,600
2015049
Kaipalaoa Landing Park Improvements
500
2015050
Island-Wide Tennis Facilities Installation and Improvements
3,000
2015051
Henry Street Reconstruction (Palani Rd to Queen Ka'ahumanu
Hwy)
3,500
2015052
Parking Improvements and Construction
20,000
2015053
South Kopua Road Extension
1,000
2015054
Haina Park New Comfort Station & Improvements
750
2015055
Honoka'a Tennis Courts Improvements
500
2015056
Island-Wide Elderly Activities Facilities
4,000
2015057
Kukuihaele Park Improvements
2,500
2015058
Laupahoehoe Swimming Pool Solar Heating System
750
2015059
Papa'aloa Park Repairs & Improvements
750
2015060
DPR Hokulani Street New Park Development
750
2015061
DPR Mauna Kea Park
1,500
2015062
Hilo Municipal Golf Course Renovations
10,000
2015063
DPR Honaunau Rodeo Arena Improvements
3,000
2015064
DPR Waimea District Park Master Plan Implementation
3,000
2015065
Lindsey Road Extension Bikeway and Pedestrian Way
75
2015066
Paniolo Avenue Extension to Kawaihae Road
500
Subtotal
134,445
FY NO.
PROJECTS
APPROPRIATIONS
(in thousands)
PRIVATE (GRANTS)
2015022
Mohouli Senior Housing Traffic Signal (Reapp. 5381.15)
500
Subtotal
500
FAIR SHARE CONTRIBUTIONS
2015038
West Hawai'i Traffic Signal Improvements
1,000
Subtotal
1,000
Grand Total
195,577
SECTION 3. The Director of Finance shall open appropriate accounts for each project, make
monies available, and expend funds for the projects listed herein.
SECTION 4. The appropriation and authorization in Section 2 includes land purchase, plans,
site preparation, equipment purchase, improvements to land, and construction.
SECTION 5. The Mayor shall initiate authorized projects taking into consideration the factors of
public need, general financial condition of the general fund, highway fund, sewer fund, parking meter
fund, bikeway fund, beautification fund, vehicle disposal fund, solid waste fund, golf course fund,
geothermal relocation revolving fund, housing fund, and fair share contributions as well as the
County's general economic conditions.
SECTION 6. Severability. If any provision of this ordinance or the application thereof is held
invalid, such invalidity shall not affect other provisions or applications of the ordinance which can be
given effect without the invalid provision or application, and to this end, the provisions of this
ordinance are declared to be severable.
4
SECTION 7. As required by Section 10-6(a) of the Hawai'i County Charter, the estimated cost
of each capital improvement pending or proposed to be undertaken, the estimated operating cost,
and the pending or proposed method of financing are set forth in the attached Project Data and/or
Financial Impact Statement sheets.
SECTION 8. This ordinance shall take effect on July 1, 2015.
Hilo, Hawaii
Date of Introduction: May 18, 2015
Date of 1st Reading: May 18, 2015
Date of 2nd Reading: June 1, 2015
Effective Date: July 12 2015
REFERENCE Comm..._ 14
4.30
INTRODUCED BY:
COUNCIL MEMBER, COUNTY OF HAWAII
5
(This Page Intentionally Left Blank)
CIVIL DEFENSE AGENCY
DARRYL OLIVEIRA, ADMINISTRATOR
(This Page Intentionally Left Blank)
Department: Civil Defense
SUMMARY OF DEPARTMENT REQUESTS
SIX YEAR CAPITAL IMPROVEMENTS PROGRAM
FISCAL YEAR 2015-2016
2015-16 FY FUNDING
FUNDING FORECAST BY FISCAL YEAR
(in thousands)
(in thousands)
TOTAL
ESTIMATED
Prior
funding
Beyond 6
PROJECT
PRIORITY
PROJECT
County
State
Federal
Private*
CBA**
received
2015-16
2016-17
2017-18
2018-19
2019-20
2020-21
years
COST
1
Lower Puna Community Relief Center (Reapp. 5190.06)
200
200
1,000
1,200
2
3
4
5
6
7
8
9
10
TOTAL
1
1 200
200
1,000
1,200
(This Page Intentionally Left Blank)
10
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 to 2016
1. DEPARTMENT AND DIVISION: Civil Defense 2. DATE: 4/14/2015
3. PROJECT NAME: Lower Puna Community Relief Center (Reapp. 5190.06) 4. SUBMITTER: D. Oliveira
S. COUNCIL BENEFIT DISTRICT(S): 4 6. TMK/JUDICIAL: (3) 1-3-036:039, 043, and 048/ Puna
7. LOCATION (COUNCIL DISTRICT): 4 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $200,000
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Infrastructure improvement, New buildings/structures
10. PROJECT/PROGRAM DESCRIPTION: Design, development, and construction of anew multi -functional facility to support emergency and disaster response and recovery operations in the lower Puna
area. The facility should serve as a base of operations, command post, staging area for response operations and accomodate recovery operations to include but not limited to serving as an evacuation
center, point of distribution, and congregate care facility.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): ADDRESS PUBLIC HEALTH AND SAFETY; INADEQUATE SERVICE; ENHANCES QUALITY OF LIFE; The facility could serve as a civil defense
community relief center during disaster events or other emergency situations as well as support emergency operations.
12. LONG RANGE PLANS/COMMUNITY VALUES: Conforms to the County's mandate to protect public health and welfare. Supports the community's capacity to interface with appropriate agencies and to
manage local resources in the event of an emergency.
13. COUNTY MATCHING FUNDS REQ'D? (Y/N) No DESCRIBE:
14. LEGAL MANDATE? (Y/N) No DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: Developing a new facility will result in increased maintenance costs, future repairs, and ongoing utility costs; however, costs may be shared as part of the
community partnership as well as'ustified for the enhanced services and functions.
16. SUSTAINABILITY FOCUS (List all that apply): STRENGTHENS AND SUSTAINS OUR COMMUNITY, PROMOTES HEALTH AND SAFETY.
17. PROJECT READINESS (List all that apply): The Leilani Community Association Board and CERT members are committed to assist with the project. Negotiations between the Leilani Community
Association and the County with regards to site control and facility design and use will be necessary to initiate the project.
nor un s
118.
Allotted
This FY 15-16 Beyond 6
EXPENDITURE PHASING (X $1000):
(not lapsed)
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
50 $50
Land Acquisition
50 $50
Design/Survey
100 $100
Construction
1,000 $1,000
TOTAL:
$200 1 $1,000 I $1,200
19. O & M COSTS (x $1000):
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond/Other
200 1,000 $1,200
State Revolving Fund
State CIP
Federal (including ARRA-Stimulus)
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
TOTAL:
�
$200 1 $1,000 1 $1,200
(This Page Intentionally Left Blank)
12
DEPARTMENT OF
ENVIRONMENTAL
MANAGEMENT
BOBBY JEAN LEITHEAD - TODD,
DIRECTOR
13
(This Page Intentionally Left Blank)
14
Department: Environmental Management
SUMMARY OF DEPARTMENT REQUESTS
SIX YEAR CAPITAL IMPROVEMENTS PROGRAM
FISCAL YEAR 2015-2016
15
2015-16 FY FUNDING
FUNDING FORECAST BY FISCAL YEAR
(in thousands)
(in thousands)
TOTAL
ESTIMATED
Prior
Funds
Beyond 6
PROJECT
PRIORITY
PROJECT
County
State
Federal
Private*
CBA**
Allotted
2015-16
2016-17
2017-18
2018-19
2019-20
2020-21
years
COST
1
Repair Hilo Outfall (Reapp. 5691.83)
1,000
1,000
1,000
2
Kealakehe Effluent Reuse - Makai
3,850
2,000
5,850
29,000
20,000
54,850
3
Repair/Replacement of Wastewater Facilities
2,000
5,000
2,000
2,000
2,000
2,000
2,000
2,000
17,000
4
Lono Kona Improvement District (Reapp. 5696.47)
1,140
1,140
1,140
5
Na'alehu Wastewater System (Reapp. 5698.22)
4,485
3,087
4,485
550
8,122
6
Pahala Wastewater System (Reapp. 5698.23 and 5698.24)
700
12,000
252
12,700
12,952
7
North Kona Sewer (Reapp. 5696.44)
3,104
2,151
3,104
2,824
14,177
22,256
8
North Kona Effluent Reuse (Reapp. 5696.45)
3,643
2,455
3,643
612
3,000
9,710
9
Hilo Coating Rehabilitation (Reapp. 5691.84)
400
400
6,000
6,400
10
Repair Hilo Digesters (Reapp. 5691.85)
500
500
5,000
5,500
11
Repair Pua Wet Well (Reapp. 5691.86)
400
400
4,000
4,400
12
Rural Transfer Station Replacement/Enhancement
2,000
9,831
2,000
2,000
2,000
2,000
2,000
2,000
21,831
13
Landfill Gas Collection and Control System at the WHSL (Reapp. 5696.49)
2,200
1,800
2,200
2,000
8,000
14,000
14
South Hilo Landfill Closure (Reapp. 5691.82)
750
750
4,000
5,000
5,000
14,750
15
Replace Pua Odor Control System
1,500
1,500
16
Primary Sludge Pump and DAFT Retrofit
3,000
3,000
17
West Hawai' I Materials Recovery Facility (MRF)
5,000
5,000
18
Kaumana Gardens Collector Sewer
750
5,000
5,750
19
Alnako Aina Nani Collector Sewer
600
4,000
4,600
20
Alnako Interceptor Sewer Phase 2
600
3,000
3,600
21
Kalanianaole Collector Sewer Phase 11
600
4,000
4,600
22
Renovate P19 SPS
1,800
1,800
23
Modify HWWTP Digester
1,680
8,400
10,080
24
Lanihau Upgrade and FM Replacement
3,000
3,000
25
Abandon Keopu and Modify Collection System
3,600
3,600
26
Paukaa New Force Main
360
2,400
2,760
27
Renovate Onekahakaha SPS and Dual Force Main
660
4,400
5,060
28
Renovate Kolea SPS and Dual Force Main
275
2,000
2,275
TOTAL
14,940
25,232
24,576
40,172
17,550
59,686
52,377
1 13,400
1 17,575
25,200
250,536
15
Y. h
Onekahakaha PS
Pua PS
KUNG
Bay
CAPP—
wyan PS
January 9, 2015
FY 15-16 CIP Request
Hilo Ocean Outfall
16
1:16,888
0 0.125 0.25 0.5 mi
0 0.225 0.45 0.9 km
Sources: Esri, HERE, DeLorme. USGS, Intermap, increment P Corp.,
N2CAN, Esri Japan, MET, Esri China (Hong Kung), Erin (Thailand).
TomTom. MapnyIndia, ® OpenStreetMap contrbulors, and the GIS User
Community
OOINTYOF HAWAII • WASTEWATER DIVISION
January 9, 2015
o"'
0
of
0
1 7 4 00
8 072
k ,lakehe WWTP
V o WT?�.
0
r
r
r
ti
1
l
r
7-4-008:002
7-4-020007
Old MSM*%Ooa Srr
1 4 020 p27
r
J 00S
001 r
Kealakehe PS
Pro PS
Lanihau PS
Kona Bay Este PS. Ke
FY 15-16 CIP Request
Kealakehe Effluent Reuse - Makai
18
02�
r 1 g,0
03
Ot
PS
O
Hale Halawai PS
1:23,150
0 0.2 0.4 0.8 mi
0 0.3 0.6 1.2 km
Sources: Esri, HERE, DeLoane, USGS, Inteanap, increment P Corp., NRCAN,
Esri Japan, MET[, Esri China (Hong Kengl Est (Thailand), TomTom,
Mepmylndia, 0OperStreAMapcontributors, and theGISUser Community
COUNTYOF HAWAII -WASTEWATER DNISION
0
0
4
G
n:
V
�•
DO 07
O
G
J
1�
O
O3
O
5�
r
J 00S
001 r
Kealakehe PS
Pro PS
Lanihau PS
Kona Bay Este PS. Ke
FY 15-16 CIP Request
Kealakehe Effluent Reuse - Makai
18
02�
r 1 g,0
03
Ot
PS
O
Hale Halawai PS
1:23,150
0 0.2 0.4 0.8 mi
0 0.3 0.6 1.2 km
Sources: Esri, HERE, DeLoane, USGS, Inteanap, increment P Corp., NRCAN,
Esri Japan, MET[, Esri China (Hong Kengl Est (Thailand), TomTom,
Mepmylndia, 0OperStreAMapcontributors, and theGISUser Community
COUNTYOF HAWAII -WASTEWATER DNISION
County of Hawal'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Environmental Management - Wastewater Division 2. DATE: 1/8/2015
3. PROJECT NAME: Kealakehe Effluent Reuse - Makai 4. SUBMITTER: Dora Beck
S. COUNCIL BENEFIT DISTRICT(S): 7,8 6. TMK/JUDICIAL: (3) 7-4-008:002, (3) 7-5-0056, 083/North Kona
7. LOCATION (COUNCIL DISTRICT): 8 S. TOTAL COUNTY FUNDS NEEDED THIS FY: $3,850,000
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Land acquisition; Infrastructure improvement; Planning, feasibility, engineering, or design studies
10. PROJECT/PROGRAM DESCRIPTION: Upgrade the Kealakehe Wastewater Treatment Plant to support the effluent reuse for the island. Project is intended to further treat the effluent to R-1 quality and
make it available for irrigation to users at nearby areas including the perimeter of the wastewater treatment plant, Old Kailua Airport (Kailua Park) and areas along the way to the park. Project also includes
installation of a distribution system necessary to convey the effluent for reuse.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses public health & safety; Improves operational efficiency; Enhances quality of life; Service improvement as it supports the
Department's effluent reuse program; lessens the dependency on potable water for irrigation.
12. LONG RANGE PLANS/COMMUNITY VALUES: Meets the Department's vision, mission, goals in being stewards of the environment and supports the Department's effluent reuse program; Meets the vision
of the Kona Community Development Plan by providing reuse water; and meets the planning documents that indicate the intent to use R-1 quality effluent for irrigating the Kailua Park.
13. COUNTY MATCHING FUNDS REQ'D? (Y/N) �N DESCRIBE:
14. LEGAL MANDATE? (Y/N) 0 DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: Additional operations and maintenance expenses associated with the reuse system and distribution system is expected to be offset in part by recycled water rates.
16. SUSTAINABILITY FOCUS (List all that apply): Preserves & protects our natural environment; Strengthens & sustains our community; Promotes health & safety; Fosters inter -departmental collaboration &
cross -sector implementation
17. PROJECT READINESS (List all that apply): Portions previously appropriated; Staff available to manage project; Can encumber funds within 3 years
18. EXPENDITURE PHASING (X $1000):
rior un s
Allotted
Fot lapsed)
This FY 15-16 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
1,150 $1,150
4,700 $4,700
29,000 20,000 $49,000
TOTAL:
$5,850 $29,000 $20,0001 1 1 $54,850
19. O & M COSTS (x $1000):
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond/Other
3,850 13,000 20,000 $36,850
State Revolving Fund
2,000 16,000 $18,000
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
TOTAL:�J
$5,850 1 $29,000 1 $20,000 1 $54,850
19
(This Page Intentionally Left Blank)
20
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Environmental Management - Wastewater Division 2. DATE: 1/8/2015
3. PROJECT NAME: Repair/Replacement of Wastewater Facilities 4. SUBMITTER: Dora Beck
5. COUNCIL BENEFIT DISTRICT(S): 1,2,3,4,7,8 6. TMK/JUDICIAL: (3)2-1/S Hilo (3)7-3 (3)7-4/N Kona (3)2-7 (3)2-8/S Hilo (3)3-5/N Hilo
7. LOCATION (COUNCIL DISTRICT): 1,3,8 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $2,000,000
9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Infrastructure improvement; Nonrecurring rehabilitation or deferred maintenance of infrastructure and buildings
30. PROJECT/PROGRAM DESCRIPTION: Major repairs and/or replacement of wastewater facilities at various locations to ensure compliance with regulations under HAR 11-62, Wastewater Systems; HAR
11-54, State Water Quality Standards; HAR 11-55, State Water Pollution Control; and Environmental Protection Agency.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses public health & safety; Improves operational efficiency; Repair/Maintenance of infrastructure; Enhances quality of life
12. LONG RANGE PLANS/COMMUNITY VALUES: Meets Department's vision, mission, and goals of protecting the environment; Maintains existing assets
13. COUNTY MATCHING FUNDS REQ'D?(Y/N) ® DESCRIBE:
14. LEGAL MADATE? (Y/N) 0 DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: None
16. SUSTAINABILITY FOCUS (List all that apply): Preserves & protects our natural environment; Promotes health & safety
17. PROJECT READINESS (List all that apply): Staff available to manage project
18. EXPENDITURE PHASING (X $1000):
nor un s
Allotted
(not lapsed)
This FY 15-16 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
Land Acquisition
Design/Survey
400
200 200 200 200 200 200 $1,600
Construction
4,600
1,800 1,800 1,800 1,800 1,800 1,800 $15,400
TOTAL:
$5,000
$2,000 $2,000 $2,000 $2,000 $2,000 $2,000 $17,000
19. O & M COSTS (x $1000):
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond/Other
5,000
2,000 2,000 2,000 2,000 2,000 2,000 $17,000
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
----TOTALIF
$5,000
$2,000 $2,000 $2,000 $2,000 $2,000 $2,000 $17,000
M
Ovo�4 7.5-0OA 007 ,�
10•-
8"
LONO KONA Subd
krr. Keopu PS 6,
6.,
9 • n 10..
January 9, 2015
ISI
O05 -
�B"003 _
41ALUCAN1 GARDEN d
'7 -5.003 p2 3
k j�•'n.
t�
7 5 003 022 a O�
00.
5-0 1 0 015
O,
HNeHilimmPS 7-5 010 013
r
FY 15-16 CIP Request
Lono Kona Subdivision
22
1 003 02A
-5
7 5.°
1
1.5+010.01A
x_5-010 p5A
KONAHEIGH7S )U'bd
ALOHA KONA'Subd
1:5,787
0 0.05 0.1 0.2 mi
0 0.075 0.15 0.3 km
Sources: Esn, HERE, DeLonne, USGS, Irneanap, increment P Corp., NRCAN,
Esri Japan, IYETI, Esri CHna (Hong Kongo Esn (Thailand), Tam Tam,
Ma pmylyd ia, 0 0penStreeMbp conlributors, and the G IS User Commurdy
OD LINTY O F HAWAII - WASTE WATER DIVISION
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Environmental Management - Wastewater Division 2. DATE: 4/10/2015
3. PROJECT NAME: Lono Kona Improvement District (Reapp. 5696.47) 4. SUBMITTER: Dora Beck
S. COUNCIL BENEFIT DISTRICT(S): 7,8 6. TMK/JUDICIAL: (3)7-5-003, 004, 022/North Kona
7. LOCATION (COUNCIL DISTRICT): 8 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $1,140,000
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Infrastructure Improvement; Planning, feasibility, engineering, or design studies
10. PROJECT/PROGRAM DESCRIPTION: Extend the County sewer system to the Lono Kona Subdivision by means of an Improvement District. Sewer will be provided to approximately 110 parcels within
the project area. Sewage will be conveyed to the Kealakehe Wastewater Treatment Plant. Project follows County Council Resolution No. 120-11. Results in closure of existing Large Capacity Cesspools
in the Subdivision thereby assisting property owners in their compliance with EPA's mandate of LCC closures.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses public health & safety; Enhances quality of life; Service improvements.
12. LONG RANGE PLANS/COMMUNITY VALUES: Meets Department's vision, mission, and goals of protecting the environment; Meets the Kona Community Development Plan by providing wastewater
service to areas close to shoreline.
13. COUNTY MATCHING FUNDS REQ'D[DESCRIBE:
14. LEGAL MANDATE? (Y/N) �N DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: None
16. SUSTAINABILITY FOCUS (List all that apply): Preserves & protects our natural environment; Promotes health & safety; Fosters inter -departmental collaboration & cross -sector implementation
17. PROJECT READINESS (List all that apply): Project underway; Some funds allotted; Planning portion of project is complete; Can encumber funds in a contract within 3 years
18. EXPENDITURE PHASING (X $1000):
rior iruncis
Allotted
(not lapsed)
This FY 15-16 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
1,140 $1,140
TOTAL:
$1,140 $1,140
19. O & M COSTS (x $1000):
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond/Other
1,140 $1,140
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
11 TOTAL:
$1,140 $1,140
23
January 9, 2015
9-5-012 011
ti
O
h O
Q
O
9 '-i-008 01 0 �
Of O
h �
O
of N
w
O
v'
t4
LT - o
0
� or
9
i
G
i
s, ` k) , i 2 I�h1
k
O
906 9.5.'Dog
0
O� 3ru � 001
X - P30
FY CIP Request
Na'alehu Wastewater System
24
1:5,787
0 0.05 0.1 0.2 mi
0 0.075 0.15 0.3 km
Sources: Esd, HERE, DeLonne, USGS, Iraeenap, increment P Corp.. NRCAN,
Esri Japan, METI, Esri Chna (Hong Kong} Esd (Thailand), Tom Tom,
Ma pmylydia, 0 OpenStreet Ma P oortibutors. and the GIS User Community
COUNTYOF HAWAII -WASTEWATER DMSION
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Environmental Management - Wastewater Division 2. DATE: 1/8/2015
3. PROJECT NAME: Na'alehu Wastewater System (Reapp. 5698.22) 4. SUBMITTER: Dora Beck
5. COUNCIL BENEFIT DISTRICT(S): 6 6. TMK/JUDICIAL: (3) 9-5/Ka'u
7. LOCATION (COUNCIL DISTRICT): 6 S. TOTAL COUNTY FUNDS NEEDED THIS FY:
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Infrastructure Improvement; Planning, feasibility, engineering, or design studies
10. PROJECT/PROGRAM DESCRIPTION: New treatment and disposal system to replace C. Brewer plantation sewer system including three (3) existing Large Capacity Cesspools all currently owned by the
County of Hawaii.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses public health & safety; Inadequate service or facility; Improves operational efficiency; Replaces a deteriorated facility;
Repair/Maintenance of infrastructure; Enhances quality of life; Service improvements
12. LONG RANGE PLANS/COMMUNITY VALUES: Meets Department's vision, mission, and goals of protecting the environment; Mayoral directive from previous administration
13. COUNTY MATCHING FUNDS REQ'D? DESCRIBE: EPA grant of $1,843,000
14. LEGAL MANDATE? (Y/N) E DESCRIBE: EPA mandate to close all Large Capacity Cesspools as of 2005
15. IMPACT ON OPERATIONAL BUDGET: To be offset by user charges
16. SUSTAINABILITY FOCUS (List all that apply): Promotes economic vitality; Preserves & protects our natural environment; Promotes health & safety; Fosters inter -departmental collaboration & cross -sector
implementation
17. PROJECT READINESS (List all that apply): Funds previously allotted for collection system design which is near completion; Planning of treatment system begun; Staff available to manage project
18. EXPENDITURE PHASING (X $1000):
Prior Funs
Allotted
(not lapsed)
This FY 15-16 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
Land Acquisition
100
$100
Design/Survey
1,144
$1,144
Construction
1,843
4,485 550
$6,878
TOTAL:
$3,087
$4,485 $550
$8,122
19. O & M COSTS (x $1000):
20. FUNDING SOURCE (x $1000):
<:
Cty G.O. Bond/Other
1,244
$1,244
State Revolving Fund
4,485 550
$5,035
State CIP
Federal
1,843
$1,843
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
TOTAL -
$4,485 $550
$8,122
25
9.6-01" t0
00, tf4� O o
1 � O
t� a ti
0 e
0
s.00 1
003
9-6-005 008
X)
O
January 9, 2015
C
0
1 T
r
4 E
!Pahala
s _ Owlaz6.0 w 4wo
Cen%r Oq
9
h
N
`` Odd
4' 0
3 n
Y � t2n u
r 'F
6
O
Off'
9 60
OP-
00� �
5
G
G
5 �
9-6-002 044
a
CA
FY 15-16 CIP Request
Pahala Wastewater System
26
0
rn
1:8,444
0 0.05 0.1 0.2 mi
�IyIyI�I�I�r�
0 0.1 0.2 0.4 km
Sources: Esn, HERE, DeLorrre, USGS, Intermap. increment P Corp.,
NRCAN. Esh Japan, MET, Earl China (Hong Kongo Esd (Thailand),
TomTorn, Mapr ylndia, ® OpenStreetMap oontrbutors. and the GIS tber
Community
COtNTYOF HAWAII -WASTEWATER DIVISION
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Environmental Management - Wastewater Division 2. DATE: 1/8/2015
3. PROJECT NAME: Pahala Wastewater System (Reapp. 5698.23 and 5698.24) 4. SUBMITTER: Dora Beck
S. COUNCIL BENEFIT DISTRICT(S): 6 6. TMK/JUDICIAL: (3) 9-5/Ka'u
7. LOCATION (COUNCIL DISTRICT): 6 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $700,000
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Land acquisition; Infrastructure Improvement; Planning, feasibility, engineering, or design studies
30. PROJECT/PROGRAM DESCRIPTION: New collection and treatment and disposal system to replace C.Brewer plantation sewer system including two (2) existing Large Capacity Cesspools all currently
owned by the County of Hawai'i.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses public health & safety; Inadequate service or facility; Improves operational efficiency; Replaces a deteriorated facility;
Repair/Maintenance of infrastructure; Enhances quality of life; Service improvements
12. LONG RANGE PLANS/COMMUNITY VALUES: Meets Department's vision, mission, and goals of protecting the environment; Mayoral directive from previous administration
13. COUNTY MATCHING FUNDS REQ'D? (Y/N) 1EPA grant of $1,843,000
14. LEGAL MANDATE? (Y/N) �Y DESCRIBE: EPA mandate to close all Large Capacity Cesspools as of 2005
15. IMPACT ON OPERATIONAL BUDGET: To be offset by user charges
16. SUSTAINABILITY FOCUS (List all that apply): Promotes economic vitality; Preserves & protects our natural environment; Promotes health & safety; Fosters inter -departmental collaboration & cross -sector
implementation
17. PROJECT READINESS (List all that apply): Previously appropriated; Staff available to manage project
18. EXPENDITURE PHASING (X $1000):
Prior Fun s
Allotted
(not lapsed)
This FY 15-16 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
Land Acquisition
Design/Survey
252
700 $952
Construction
12,000 $12,000
TOTAL:
$252
$12,7001 $12,952
19. O & M COSTS (x $1000):
20. FUNDING SOURCE (x $1000):
LEE
700 $952
Cty G.O. Bond/Other
252
State Revolving Fund
12,000 $12,000
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
TOTAL:
$252
1 $12,700 $12,952
27
4
7.3,0 3, 00d 007 3 '
Lam_ -`t ALA— 010 010 0
06
jjj 3,
700
O
7-3-009. 005
7-3-009 004
7-3-009:013
7.3
0p9- 017
r
009
a Nw K 310K'
0
KabkD-H01.11ohau
Nat I H ml Park
4.008 0
fO
Hcirokor.a:
Bay
January 9, 2015
FY 15-16 CIP Request
North Kona Sewer and Reuse
28
-'I �'.Q6
�U
7..4.0
07.4-0p 08)
7-4-020 022
7-4-008.002
1:33,776
0 0.275 0.55 1.1 mi
0 0.45 0.9 18 km
Sources: Esri, HERE, DeLorme, USGS, Intermap, increment P Corp.,
NRCAN, Esn Japan, METI, Esri Chna (Hong KongZ Esri (Thailand),
TomTom, Maprrylndda, ® OpenStreetMap contrbUors. and the GIS User
Community
COUNTY OF HAWAII -WASTEWATER DIVISION
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Environmental Management -Wastewater Division 2. DATE: 1/8/2015
3. PROJECT NAME: North Kona Sewer (Reapp. 5696.44) 4. SUBMITTER: Dora Beck
S. COUNCIL BENEFIT DISTRICT(S): 7,8 6. TMK/JUDICIAL: (3) 7-3, (3) 7-4/North Kona
7. LOCATION (COUNCIL DISTRICT): 8 8. TOTAL COUNTY FUNDS NEEDED THIS FY:
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Infrastructure Improvement; Planning, feasibility, engineering, or design studies
10. PROJECT/PROGRAM DESCRIPTION: New sewer infrastructure between Hina Lani St. & Kealakehe Parkway to serve properties makai and mauka of Queen Kaahumanu Highway. Infrastructure will tie int
new sewage pump station and force main leading to KWWTP all to be done under another phase of the project.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses public health & safety; Enhances quality of life; Service improvements
12. LONG RANGE PLANS/COMMUNITY VALUES: Meets Department's vision, mission, and goals of protecting the environment; Meets the vision of the Kona Community Development Plan by providing sewe
service north of Kealakehe Parkway to minimize impact to shoreline waters.
13. COUNTY MATCHING FUNDS REQ'D? (Y/N) ®DESCRIBE:
14. LEGAL MANDATE? (Y/N) �N DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: Additional expenses to be offset by sewer user charges.
16. SUSTAINABILITY FOCUS (List all that apply): Promotes economic vitality; Preserves & protects our natural environment; Promotes health & safety; Fosters inter -departmental collaboration & cross -sector
implementation
17. PROJECT READINESS (List all that apply): Funds encumbered; Planning of project completed and awaiting State DOT to begin the Queen Kaahumanu Highway Widening phase II design -build project; Staff
available to manage project
18. EXPENDITURE PHASING (X $1000):
Prior unas
Allotted
(not lapsed)
This FY 15-16 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
Land Acquisition
Design/Survey
562
2,824 $3,386
Construction
1,589
3,104 14,177 $18,870
TOTAL:
$2,151
$3,104 1 1 $2,8241 $14,177 1 $22,256
19. O & M COSTS (x $1000):
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond/Other
2,151
2,824 14,177 $19,152
State Revolving Fund
3,104 $3,104
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
TOTAL:
$2,151
$3,104 $2,8241 $14,177 $22,25611
29
January 9, 2015
010,O07 ?'j, 01
0' 006
i -s-009.005
7-3.009-013
to
0
c,
O
O
h
Ff. L 7-3.009. 017 ? 9 009' 025 �•
'LA
O
00
_ O
00 ;Y
1�1 a Nu+KalokO s t,.. ~ 009 -OAT
Kabko4eiokohau
Narl Hirst Park oa:y Rd
Asti tr �
00& s
�. 0 0pd
9.008 0 00J
10
rfrnpkohav �"'',
Ba}
0120
7-4-008 072 Gly 00
G
9
GG
8
O� 7-4-020' 022
1
7-4-008.002
FY 15-16 CIP Request
North Kona Sewer and Reuse
1:33,776
0 0.275 0.55 1.1 mi
0 0.45 0.9 1.8 km
Sources: Esn, HERE, DeLame. USGS. Irterrrap, increment P Corp.,
N2CAN, Esri Japan, METI, Esri China (Hong Kongo Esri (Thailand),
TomTan, Maprrylnria, ® Open StreetMap contrbutors, and the GIS User
Community
CDLNTYOF HAWAII -WASTEWATER MASON
30
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Environmental Management - Wastewater Division 2. DATE: 1/8/2015
3. PROJECT NAME: North Kona Effluent Reuse (Reapp. 5696.45) 4. SUBMITTER: Dora Beck
S. COUNCIL BENEFIT DISTRICT(S): 7,8 6. TMK/JUDICIAL: (3) 7-3, (3) 7-4/North Kona
7. LOCATION (COUNCIL DISTRICT): 8 8. TOTAL COUNTY FUNDS NEEDED THIS FY:
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Infrastructure Improvement; Planning, feasibility, engineering, or design studies
10. PROJECT/PROGRAM DESCRIPTION: New effluent reuse infrastructure between Kohanaiki Industrial area & Kealakehe Parkway to serve properties makai and mauka of Queen Kaahumanu Highway.
Infrastructure will tie into new effluent reuse infrastructure leading to KWWTP all to be done under another phase of the project.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses public health & safety; Enhances quality of life; Service improvements
12. LONG RANGE PLANS/COMMUNITY VALUES: Meets Department's vision, mission, and goals of protecting the environment; Meets the vision of the Kona Community Development Plan by providing reuse
water to users in the area.
13. COUNTY MATCHING FUNDS REQ'D? (Y/N) �N DESCRIBE:
14. LEGAL MANDATE? (Y/N) DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: Additional expenses to be offset by recycled water user charges.
16. SUSTAINABILITY FOCUS (List all that apply): Promotes economic vitality; Preserves & protects our natural environment; Promotes health & safety; Fosters inter -departmental collaboration & cross -sector
implementation
17. PROJECT READINESS (List all that apply): Funds encumbered; Planning of project completed and awaiting State DOT to begin the Queen Kaahumanu Highway Widening phase II design -build project; Staff
available to manage project
18. EXPENDITURE PHASING (X $1000):
Prior Funds
Allotted
(not lapsed)
This FY 15-16 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
Land Acquisition
Design/Survey
590
612 $1,202
Construction
1,865
3,643 3,000 $8,508
TOTAL:
$2,455
$3,643 $612 1 $3,0001 $9,710
19. O & M COSTS (x $1000):
20. FUNDING SOURCE(x$1000):
Cty G.O. Bond/Other
2,455
612 3,000 $6,067
State Revolving Fund
3,643 $3,643
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
TOTAL:
$2,455]1
$3,643 1 $612 1 $3,000 1 $9,710
31
January 9, 2015
v
N
N
w �
ti
Hilo WWTP
■
002
FY 15-16 CIP Request
Hilo Coating Rehabilitation and Repair Hilo Digesters
32
1:2,894
0 0.0225 0.045 0.09 mi
0 0.0375 0.075 0.15 km
Sources: Esri, HERE, Detnnne, USGS, Intertnap, ircremert P Corp., NRCAN,
Esri Japan, WETI, Esri Chna (Hong Kongo Esri (Thailand), TomTom,
KUpmylydia, ® OpenStreetMepcorOibutors, and the GIS User Community
00 LINTY O F HAWAII -WASTEWATER DMSION
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Environmental Management- Wastewater Division 2. DATE: 1/8/2015
3. PROJECT NAME: Hilo Coating Rehabilitation (Reapp. 5691.84) 4. SUBMITTER: Dora Beck
S. COUNCIL BENEFIT DISTRICT(S): 1,2,3 6. TMK/JUDICIAL: (3) 2-1-013/South Hilo
7. LOCATION (COUNCIL DISTRICT): 3 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $400,000
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Infrastructure Improvement; Nonrecurring rehabilitation or deferred maintenance of infrastructure and buildings
10. PROJECT/PROGRAM DESCRIPTION: Repair Hilo Wastewater Treatment Plant Headworks from effects of hydrogen sulfide corrosion causing deterioration of concrete structures.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses public health & safety; Improves operational efficiency; Repair/Maintenance of infrastructure; Enhances quality of life
r6NG RANGE PLANS/COMMUNITY VALUES: Meets Department's vision, mission, and goals of protecting the environment and maintaining assets.
13. COUNTY MATCHING FUNDS REQ'D? (Y/N)
®DESCRIBE:
14. LEGAL MANDATE? (Y/N)
_::��[:�J15.
���
While not currently a legal mandate, failure of the headworks would likely result in enforcement action and the
possibility of raising issues pertaining to the maintenance of facilities in accordance with Grant Conditions.
IMPACT ON OPERATIONAL BUDGET: None
16. SUSTAINABILITY FOCUS (List all that apply): Preserves & protects our natural environment; Promotes health & safety
17. PROJECT READINESS (List all that apply): Staff available to manage project
18. EXPENDITURE PHASING (X $1000):
Prior Fun s
Allotted
(not lapsed)
This FY 15-16 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
400 $400
1 6,000 1 $6,000
TOTAL:
$400 $6,000 $6,400
19. O & M COSTS (x $1000):
20. FUNDING SOURCE (x $1000):
-• 'ti`
Cty G.O. Bond/Other
400 6,000 $6,400
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
TOTAL:
$400 $6,000 $6,400
33
January 9, 2015
v
N
Q
'7
O fV
� d
ti
Hilo WWTP
■
3 Opt
01
FY 15-16 CIP Request
Hilo Coating Rehabilitation and Repair Hilo Digesters
34
1:2,894
0 0.0225 0.045 0.09 mi
0 0.0375 0.075 0.15 km
Sowces: Esri, HERE, Delnnne, USGS, Irtennap, increment P Corp., NRCAN,
Esh Japan, AETI, Esri China (Hong Kongo Esri (Thaland), TomTom,
W pmylnd ia, ®Ope nSbeat Po6p contributors, and the G IS User ConTnunity
ODUNTYOF HAWAII -WASTEWATER DMSION
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Environmental Management - Wastewater Division 2. DATE: 1/8/2015
3. PROJECT NAME: Repair Hilo Digesters (Reapp. 5691.85) 4. SUBMITTER: Dora Beck
S. COUNCIL BENEFIT DISTRICT(S): 1,2,3 6. TMK/JUDICIAL: (3) 2-1-013/South Hilo
7. LOCATION (COUNCIL DISTRICT): 3 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $500,000
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Infrastructure Improvement; Nonrecurring rehabilitation or deferred maintenance of infrastructure and buildings
10. PROJECT/PROGRAM DESCRIPTION: Remove debris from digesters, replace inoperable valves, replace deteriorated pipes and repair existing digester covers.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses public health & safety; Improves operational efficiency; Repair/Maintenance of infrastructure; Enhances quality of life
12. LONG RANGE PLANS/COMMUNITY VALUES: Meets Department's vision, mission, and goals of protecting the environment and maintaining assets.
13. COUNTY MATCHING FUNDS REQ'D? (Y/N)
®DESCRIBE:
14. LEGAL MANDATE? (Y/N)
DESCRIBE:
While not currently a legal mandate, failure of the headworks would likely result in enforcement action and the
possibility of raising issues pertaining to the maintenance of facilities in.accordance with Grant Conditions.
15. IMPACT ON OPERATIONAL BUDGET: None
16. SUSTAINABILITY FOCUS (List all that apply): Preserves & protects our natural environment; Promotes health & safety
17. PROJECT READINESS (List all that apply): Staff available to manage project
18. EXPENDITURE PHASING (X $1000):
Prior Funds
Allotted
(not lapsed)
This FY 15-16 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
500 $500
5,000 $5,000
TOTAL:
$500 1 $5,000 $5,500
19. O & M COSTS (x $1000):
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond/Other
500 5,000 $5,500
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
TOTAL:
$500 $5,000 $5,500
35
January 9, 2015
O1'
o1
o Z1"
PLia PS o
r' �O• 2-1,011:005
0.-
a A
O N
O �•
V,
,s
a
a
A; O
r, a
A2 �� o
a °• o
° O
Ir
� o
99 O O
;PO, v
O 1R> > '°
° o
2-1-02o-061 ;per 00 2-1-020100
s
FY 15-16 CIP Request
Repair Pua Wet Well
36
1:1,447
0 0.01 0.02 0.04 mi
0 0.0175 0.035 0.07 km
Sources: Esri, HERE, DeLoane, USGS, Inteenap, increment P Corp., NRCAN,
Esri Japan, b£TI, Esri CHna (Hong Kong), Esri (Thailand), TomTan,
Mapmylndia, ® OpenStreet W p cortributors, and the G IS User Community
OO UNTV O F FN WAII - WASTE WATER DNI SION
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Environmental Management - Wastewater Division 2. DATE: 1/8/2015
3. PROJECT NAME: Repair Pua Wet Well (Reapp. 5691.86) 4. SUBMITTER: Dora Beck
S. COUNCIL BENEFIT DISTRICT(S): 1,2,3 6. TMK/JUDICIAL: (3) 2-1-011:010/South Hilo
7. LOCATION (COUNCIL DISTRICT): 3 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $400,000
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Infrastructure Improvement; Nonrecurring rehabilitation or deferred maintenance of infrastructure and buildings
10. PROJECT/PROGRAM DESCRIPTION: Repair wet well from effects of hydrogen sulfide corrosion causing deterioration of concrete structure.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses public health & safety; Improves operational efficiency; Repair/Maintenance of infrastructure; Enhances quality of life
12. LONG RANGE PLANS/COMMUNITY VALUES: Meets Department's vision, mission, and goals of protecting the environment and maintaining assets.
13. COUNTY MATCHING FUNDSREQ'D? (Y/N)
®DESCRIBE:
14. LEGAL MANDATE? (Y/N)
=
DESCRIBE:
While not currently a legal mandate, failure of the headworks would likely result in enforcement action and the
possibility of raising issues pertaining to the maintenance of facilities in accordance with Grant Conditions.
15. IMPACT ON OPERATIONAL BUDGET: None
16. SUSTAINABILITY FOCUS (List all that apply): Preserves & protects our natural environment; Promotes health & safety
17. PROJECT READINESS (List all that apply): Staff available to manage project
18. EXPENDITURE PHASING (X $1000):
Prior Funds
Allotted
(not lapsed)
This FY 15-16 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
400 $400
4,000 $4,000
TOTAL:
$400 $4,000 $4,400
19. 0 & M COSTS (x $1000):
20. FUNDING SOURCE (x $1000):
"J^`
Cty G.O. Bond/Other
4,000 $4,400
State Revolving Fund
P400
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
TOTAL:
=�J
$400 $4,000 $4,400
37
(This Page Intentionally Left Blank)
38
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Environmental Management - Solid Waste Division 2. DATE: 1/9/2015
3. PROJECT NAME: Rural Transfer Station Replacement/Enhancement 4. SUBMITTER: Greg Goodale
S. COUNCIL BENEFIT DISTRICT(S): All (1-9) 6. TMK/JUDICIAL: Various
7. LOCATION (COUNCIL DISTRICT): Various 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $2,000,000
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Infrastructure Improvement; New structures; Planning, Engineering, and Design
30. PROJECT/PROGRAM DESCRIPTION: This project is intended to address public health and safety risks and is required to ensure compliance with State (HAR-58.1) regulations as they relate to solid waste
transfer systems. This project consists of major repairs and replacement at various transfer stations.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses Public health and safety, Inadequate service or facility, Improves operational efficiency, Replaces a deteriorated facility, Repair
infrastructure, Enhances Quality of Life, Service Improvement.
12. LONG RANGE PLANS/COMMUNITY VALUES: Meets our Department's vision and is in compliance with State and Federal requirements and permits. Protecting the public health and the environment are
in accordance with the County of Hawai'i General Plan.
13. COUNTY MATCHING FUNDS REQ'D? (Y/N) N� DESCRIBE:
14. LEGAL MANDATE? (Y/N) N� DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: No impact on operational budget.
16. SUSTAINABILITY FOCUS (List all that apply): Promotes Economic Vitality, Preserves and Protects Our Natural Environment, Strengthens and Sustains our Community, Promotes Health and Safety
17. PROJECT READINESS (List all that apply): Conceptual designs for many sites have been completed, Staff available to manage project Ryan Dixon.
18. EXPENDITURE PHASING (X $1000):
Prior Funds
Allotted
(not lapsed)
This FY 15-16 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
Land Acquisition
Design/Survey
834
$834
Construction
8,997
2,000 2,000 2,000 2,000 2,000 2,000 $20,997
TOTAL:
$9,831
$2,000 $2,000 $2,000 $2,000 $2,000 $2,000 $21,831
19. O & M COSTS (x $1000):
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond/Other
9,831
2,000 2,000 2,000 2,000 2,000 2,000 $21,831
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
TOTAL:1
$2,000 $2,000 $2,000 1 $2,000 1 $2,000 $2,000 $21,831
39
(This Page Intentionally Left Blank)
40
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Environmental Management - Solid Waste Division 2. DATE: 1/9/2015
3. PROJECT NAME: Landfill Gas Collection and Control System at the WHSL (Reapp. 5696.49) 4. SUBMITTER: Greg Goodale
S. COUNCIL BENEFIT DISTRICT(S): 1,6,7, 8 &9 6. TMK/JUDICIAL: (3) 7-1-03:001/ North Kona
7. LOCATION (COUNCIL DISTRICT): 8 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $2,200,000
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Infrastructure Improvement
10. PROJECT/PROGRAM DESCRIPTION: Installation of a Landfill Gas Collection and Control System (GCCS) for the West Hawaii Sanitary Landfill at Pu'uanahulu. This system is required for the landfill to stay i
compliance with 40CFR part 60 which regulates landfill gas emissions. This system will extract landfill gas which is being produced at the WHSL through a system of gas wells and piping and burn the gas in a
flare system. This request is a reappropriation to continue the first of an estimated six phases that will be required over the life of the landfill as new cells are constructed.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses Public Health and Safety, Enhances Quality of Life. Installation of this GCCS is required by both Federal and State laws. Failure to
install this system would cause the County to be in violation of these laws and could result in large punitive fines to the County.
12. LONG RANGE PLANS/COMMUNITY VALUES: Meets Department's Vision on protecting environment, meets County General Plan.
13. COUNTY MATCHING FUNDS REQ'D? (Y/N) ®DESCRIBE:
14. LEGAL MANDATE? (Y/N) 0 DESCRIBE: Allows County to comply with EPA and DOH Requirements for Operating Facility.
15. IMPACT ON OPERATIONAL BUDGET: The operating budget will be increased by the cost to operate and maintain the GCCS which is estimated at $222,000 per year.
16. SUSTAINABILITY FOCUS (List all that apply): Preserves and Protects Natural Environment, Promotes Health and Safety
17. PROJECT READINESS (List all that apply): Design and initial construction is complete, installationadditionalof wells and other work will berequired overtime.
18. EXPENDITURE PHASING (X $1000):
nor Funds
Allotted
(not lapsed)
This FY 15-16 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
1,800
2,200 2,000 8,000 $14,000
TOTAL:
1 $2,2001 1 $2,0001 1 1 1 $8,000 1 $14,000
19. O & M COSTS (x $1000):
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond/Other
1,800
2,200 2,000 8,000 $14,000
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
TOTAL:
$1,800j
$2,200 1 1 $2,0001 1 1 1 $8,000 $14,000
41
(This Page Intentionally Left Blank)
42
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Environmental Management - Solid Waste Division 2. DATE: 1/9/2015
3. PROJECT NAME: South Hilo Landfill Closure (Reapp. 5691.82) 4. SUBMITTER: Greg Goodale
S. COUNCIL BENEFIT DISTRICT(S): 1,2,3,4,5,6 6. TMK/JUDICIAL: 2-1-13:152,156,162/ South Hilo
7. LOCATION (COUNCIL DISTRICT): 3 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $750,000
r!AP ITAL PROJECT ELIGIBILITY (List Criteria): Infrastructure Improvement
10. PROJECT/PROGRAM DESCRIPTION: Design of a final closure system for the portions of the South Hilo Landfill that are at their final fill capacity. This design will take into consideration a multi phase
closure process for this site.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses Public health and safety, Enhances Quality of Life, addresses Department of Health concerns regarding the closure of an unlined
landfill site.
12. LONG RANGE PLANS/COMMUNITY VALUES: Meets Department's vision, mission, goals, in accordance with the County of Hawai'i General Plan, in compliance with State and Federal requirements and
permits.
13. COUNTY MATCHING FUNDS REQ'D? (Y/N) ® DESCRIBE:
14. LEGAL MANDATE? (Y/N) 0 DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: Future impacts to operational budget due to on going need for maintenance of the site.
16. SUSTAINABILITY FOCUS (List all that apply): Preserves and Protects Our Natural Environment, Promotes Health and Safety
17. PROJECT READINESS (List all that apply): Closure for portions of this site have been evaluated for this site for several years; Staff is available to manage project - Ryan Dixon.
18. EXPENDITURE PHASING (X $1000):
Prior un s
Allotted
(not lapsed)
This FY 15-16 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
750 $750
4,000 5,000 5,000 $14,000
TOTAL:
$750 $4,000 $5,000 $5,000 $14,750
19. O & M COSTS (x $1000):
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond/Other
750 4,000 5,000 5,000 $14,750
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
TOTAL:
$750 $4,000 $5,000 $5,000 $14,750
43
(This Page Intentionally Left Blank)
44
( 'a
DEPARTMENT OF PARKS
AND RECREATION
CLAYTON S. HONMA, DIRECTOR
45
(This Page Intentionally Left Blank)
46
Department: Parks and Recreation
SUMMARY OF DEPARTMENT REQUESTS
SIX YEAR CAPITAL IMPROVEMENTS PROGRAM
FISCAL YEAR 2015-2016
47
2015-16 FY FUNDING
FUNDING FORECAST BY FISCAL YEAR
(in thousands)
(in thousands)
TOTAL
ESTIMATED
Prior -
Funds
Beyond 6
PROJECT
PRIORITY
PROJECT
County
State
Federal
Private*
CBA**
Allotted
2015-16
2016-17
2017-18
2018-19
2019-20
2020-21
years
COST
1
DPR ADA Compliance
5,000
33,507
5,000
5,000
43,507
2
DPR Repairs/Improvements to Facilities
10,000
15,917
10,000
10,000
10,000
10,000
10,000
10,000
75,917
3
Hualani Park Improvements
2,245
2,245
2,245
4
Kaipalaoa Landing Park Improvements
500
Soo
Soo
5
Island -Wide Tennis Facilities Installation and Improvements
3,000
3,000
3,000
6
Haina Park New Comfort Station & Improvements
750
750
750
7
Honoka'a Tennis Courts Improvements
500
500
500
8
Island -Wide Elderly Activities Facilities
4,000
4,000
4,000
9
Kukuihaele Park Improvements
2,500
2,500
2,500
10
Laupahoehoe Swimming Pool Solar Heating System
750
750
750
11
Papa'aloa Park Repairs & Improvements
750
750
750
12
DPR Hokulani Street New Park Development
750
35
750
785
13
DPR Mauna Kea Park
1,500
1,500
1,500
14
Hilo Municipal Golf Course Renovations
10,000
10,000
10,000
SS
DPR H6naunau Rodeo Arena Improvements
3,000
3,000
3,000
16
DPR Waimea District Park Master Plan Implementation
3,000
2,889
3,000
5,889
TOTAL
48,245
1 52,348
1 49,2451
15,0001
10,000
1 10,000
1 10,000
1 10,000
1155,593
47
(This Page Intentionally Left Blank)
48
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Parks and Recreation 2. DATE: 1/9/2015
3. PROJECT NAME: DPR ADA Compliance 4. SUBMITTER: James Komata, Park Planner
5. COUNCIL BENEFIT DISTRICT(S): All 6. TMK/JUDICIAL: Varies
7. LOCATION (COUNCIL DISTRICT): All B. TOTAL COUNTY FUNDS NEEDED THIS FY: $5,000,000
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Infrastructure improvement; New buildings or structures or addition to a building; Nonrecurring rehabilitation or deferred maintenance of infrastructure
and buildings.
10. PROJECT/PROGRAM DESCRIPTION:
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses public health and safety; Inadequate service or facility; Improves operational efficiency; Replaces a deteriorated facility,
Repair/Maintenance of infrastructure or building; Enhances quality of life; Services improvements.
12. LONG RANGE PLANS/COMMUNITY VALUES: Projects conforms to the department's strategic plan, mission and goals; the County's General Plan; is supported by the community.
13. COUNTY MATCHING FUNDS REQ'D? (Y/N) NF DESCRIBE:
14. LEGAL MANDATE? (Y/N) 0 DESCRIBE: ADA Act (1990), Title 28, CFR 35.150; COH's Consent Decree U.S.D.C. Civil No. 97-01102SPK -June 4, 1998
15. IMPACT ON OPERATIONAL BUDGET: The project will reduce impacts to the department's operational budget by reducing/eliminating immediate maintenance/repair needs.
16. SUSTAINABILITY FOCUS (List all that apply): The project Promotes economic vitality; Strengthens and sustains our community; Enhances education, culture and the arts; Promotes health and safety.
17. PROJECT READINESS (List all that apply): The project is currently in progress, funds were previously appropriated, staff is available to manage the project, and the funds can realistically be
encumbered in a contract within three years.
18. EXPENDITURE PHASING (X $1000):
nor FUn s
Allotted
(not lapsed)
This FY 15-16 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
Land Acquisition
Design/Survey
1,936
750 750
$3,436
Construction
31,571
4,250 4,250
$40,071
TOTAL:F
S33.50771
$5,000 1 $5,000 1 1
$43,507
19. O & M COSTS (x $1000):
20. FUNDING SOURCE (x $1000):`"
Cty G.O. Bond/Other
18,968
5,000 5,000
$28,968
State Revolving Fund
State CIP
Federal
14,539
$14,539
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
TOTAQF
$33,507
$5,000 $5,000
$43,507
49
(This Page Intentionally Left Blank)
50
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Parks and Recreation 2. DATE: 1/9/2015
3. PROJECT NAME: DPR Repairs/Improvements to Facilities 4. SUBMITTER: James Komata, Park Planner
S. COUNCIL BENEFIT DISTRICT(S): All 6. TMK/JUDICIAL: Varies
7. LOCATION (COUNCIL DISTRICT): All 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $10,000,000
19. CAPITAL PROJECT ELIGIBILITY (List Criteria): Infrastructure improvement; New buildings or structures or addition to a building; Nonrecurring rehabilitation or deferred maintenance of infrastructure
and buildings.
10. PROJECT/PROGRAM DESCRIPTION: The repair, renovation, upgrade, addition, modification, alteration, improvement, demolition, landscaping, development, etc. of park sites, facilities, amenities,
infrastructure, utilities, components, etc. necessary to facilitate and support safe use thereof and to address the needs of department staff, programs, activities, communities, recreational groups to fully
or best utilize the department's inventory of land and recreational developments to support the needs of the public.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses public health and safety; Inadequate service or facility; Improves operational efficiency; Replaces a deteriorated facility;
Repair/Maintenance of infrastructure or building; Enhances quality of life; Services improvements.
12. LONG RANGE PLANS/COMMUNITY VALUES: Projects conforms to the department's strategic plan, mission and goals; the County's General Plan; is supported by the community; and is a mayoral
directive.
13. COUNTY MATCHING FUNDS REQ'D? (Y/N) 0 DESCRIBE:
14. LEGAL MANDATE? (Y/N) 0 DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: The project will reduce impacts to the department's operational budget by reducing/eliminating immediate maintenance/repair needs.
16. SUSTAINABILITY FOCUS (List all that apply): The project Promotes economic vitality; Preserves and protects our natural environment; Strengthens and sustains our community; Promotes health and
safety.
17. PROJECT READINESS (List all that apply): The project is currently in progress, funds were previously appropriated, staff is available to manage the project, and the funds can realistically be
encumbered in a contract within three years.
18. EXPENDITURE PHASING (X $1000):
nor un s
Allotted
(not lapsed)
This FY 15-16 Beyond 6
Request I FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
Land Acquisition
Design/Survey
1,339
1,000 1,000 1,000 1,000 11000 1,000 on-going $7,339
Construction
14,578
9,000 9,000 9,000 9,000 9,000 9,000 on-going $68,578
TOTALIF
$15,9171
$10,000 1 $10,000 1 $10,000 1 $10,000 I $10,000 1 $10,000 1 $75,917
19. O & M COSTS (X$1000):.
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond/Other
15,917
10,000 10,000 10,000 10,000 10,000 10,000 $75,917
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
11 TOTALIF
$15,917
$10,000 1 $10,000 $10,000 $10,000 $10,000 $10,000 $75,917
51
Project Location Map
Hualani Park, Keaukaha S
Improvements
S� e PPJ
e
�a�a�\a�ao\e para\
o-
m,�
N
�L
� Je
c � e`lun0 P
a
Project Location
Je �
O y
L
N
m
� e
e vy�a
PJ
J
� PJe
AN 0 0.1
Miles 52 ��
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015-2016
1. DEPARTMENT AND DIVISION: Parks and Recreation 2. DATE: 5/6/2015
3. PROJECT NAME: Hualani Park Improvements 4. SUBMITTER: Dennis "Fresh" Onishi
S. COUNCIL BENEFIT DISTRICT(S): 3 6. TMK: 2-1-023: 120
7. LOCATION (COUNCIL DISTRICT): 3 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $2,245,000
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Infrastructure Improvement.
10. PROJECT/PROGRAM DESCRIPTION: Replace current lighting and add additional lighting to the south-west portions of Hualani Park; purchase and replcaement of a small backstop at C Diamond and a large
backstop at B Diamond; and purchase and installation of a storage shed.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Repair/maintenance of infrastructure, addresses public health and safety, enhances quality of lighting for the entire field, and service improvements.
Currently, only one (A Diamond) of four baseball fields are operational after the hours of 6:00 p.m. due to poor lighting. The current backstops are in deplorable condition and a storage shed will help secure outdoor
equipment.
12. LONG RANGE PLANS/COMMUNITY VALUES: Consistent with General Plan Policy 12.3(b): Improve existing public facilities for optimum usage.
13. COUNTY MATCHING FUNDS REQ'D? NO DESCRIBE:
14. LEGAL MANDATE? NO DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: Will reduce maintenance costs.
16. SUSTAINABILITY FOCUS (List all that apply): Recreation provides an avenue for the fulfillment of social, cultural, physical, and educational needs of people through leisure experiences.
17. PROJECT READINESS (List all that apply): Can realistically encumber funds in a contract prior to June 30, 2016.
18. EXPENDITURE PHASING (X $1000):
PrioFunds
[(.All'otted
ot lapsed)
This FY 15-16
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Beyond 6 Years TOTAL:
Planning
Land Acquisition
Design/Survey
100
$100
Construction
2,145
$2,145
TOTAL:
$2,245
$2,245
19. O & M COSTS (x$1000):
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond/Other
2,245
$2,245
State Revolving Fund
State CIP
Federal (including ARRA-Stimulus)
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
11 TOTAL:
�
$2,245 E==
$2,24511
53
v.na+a
r<to eiLN
��••--•• �`
�. t a seal
.<.» Q
1n'�• +./ev-+'7'
R
y
.ede.• e./, v1 � U
lS >A
b.ca)
4 Wm
j I I
O
i
4 l
VNktd
Wq/L UKV R/1E
4YA/L Ulru -5
or.r.
•Rf.3>r �
S rY/RM AN 57
1WR/A NUENUE AVE.
PLAT 03
54
2
.<.» Q
1n'�• +./ev-+'7'
/.. I
.ede.• e./, v1 � U
�/Reeh^en�Ln•Ied °
b.ca)
l i
j I I
O
r
i.,., q._.
j n.ecfe
i I x
O
I�
a
a>
e ,:�f
F
i
1WR/A NUENUE AVE.
PLAT 03
54
2
77—
. Hlrr�..url
7 DVA,. ":" F'[
TH,RP OIVISI.
{e v
2 c d4
<O
r
y
r
�9y
O
i.,., q._.
O
I�
Q i
F
i
a
t
jfh{
1+
77—
. Hlrr�..url
7 DVA,. ":" F'[
TH,RP OIVISI.
{e v
2 c d4
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Dept. of Parks and Recreation 2. DATE: 5/8/2015
3. PROJECT NAME: Kaipalaoa Landing Park Improvements 4. SUBMITTER: Aaron Chung
S. COUNCIL BENEFIT DISTRICT(S): All 6. TMK/JUDICIAL: (3)2-3-003:001, 004, 027; 2-3-004:001
7. LOCATION (COUNCIL DISTRICT): 2 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $500,000
9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Infrastructure improvements.
10. PROJECT/PROGRAM DESCRIPTION: Kaipalaoa Landing is located at the base of Waianuenue Avenue. This site is approximately half an acre in size and is home to an active U.S. Coast Guard
lighthouse and a wastewater pump station. Improvements will include accessibility improvements, showers, walkways and paths, low stone seat walls, picnic tables, signage, landscaping, and other
features to make this a safe and inviting recreational area. Applicable review and permits will need to be prepared, including SSV, SMA, & EIS. Other improvements requiring inter -governmental
collaboration include construction of a crosswalk and enhanced signalization by State Department of Transportation.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Kaipalaoa Landing is frequented by fishermen, surfers, tourists, families, and other residents. Historical significance is extensive. It was a
favored camping ground of King Kamehameha I. It is the site where King Kamehameha I issued the Law of the Splintered Paddle, regarding protection and treatment of civilians. It was also a port of call
for cargo and passenger ships. The goal is to protect the site and enhance its cultural and historical significance and improve the recreational value of this addition to the Hilo Bayfront Park.
12. LONG RANGE PLANS/COMMUNITY VALUES: Envision Downtown Hilo 2025.
13. COUNTY MATCHING FUNDS REQ'D? (Y/N) No
DESCRIBE:
14. LEGAL MADATE? (Y/N) No
DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: Minimal impact. Malama Kaipalaoa is a citizen volunteer group willing to partner with the County to clean and enhance the Landing.
16. SUSTAINABILITY FOCUS (List all that apply): 1) Promotes economic viability; 2) Preserves and protects our natural environment; 3) Strengthens and sustains our community, promotes health and
safety; and 4) Fosters inter -departmental collaboration and cross -sector implementation.
17. PROJECT READINESS (List all that apply): Dept. of Parks and Recreation has received an Executive Order from the State DLNR for Kaipalaoa. Malama Kaipalaoa, a citizens volunteer group, has
"adopted" the park and will perform clean-ups and develop plans to ensure the park is protected and enhanced. Preliminary concept drawings for the park have been prepared.
Prior Funds
Allotted
This FY 15-16 Beyond 6
18. EXPENDITURE PHASING (X $1000):
(not lapsed)
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
500 $500
TOTAL:
$500 $500
19. O & M COSTS (x $1000):
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond/Other
500 $500
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
11 TOTAL:
$500 $500
55
(This Page Intentionally Left Blank)
56
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Dept. of Parks & Recreation 2. DATE: 5/12/2015
3. PROJECT NAME: Island -Wide Tennis Facilities Installation and Improvements 4. SUBMITTER: Aaron Chung
S. COUNCIL BENEFIT DISTRICT(S): Island -Wide 6. TMK/JUDICIAL: Various
7. LOCATION (COUNCIL DISTRICT): Island -Wide 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $3,000,000
9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Land acquisition for new facilities; infrastructure improvements including lighting, restrooms, parking, and other necessary improvements; construction of
new buildings and structures, possibly construct additions to existing facilities; nonrecurring rehabilitation or.deferred maintenance of infrastructure and buildings including resurfacing existing courts,
repair or replace backboards and fencing, and other necessary rehabilitation of existing facilities; and planning, feasibility, engineering, and design studies will need to be completed.
10. PROJECT/PROGRAM DESCRIPTION: Tennis facilities around the island are inadequate to meet the needs of our growing population. Existing facilities and infrastructure need improvements and
rehabilitation beyond the scope of regular maintenance, such as resurfacing, lighting, restrooms, parking, covered viewing areas, ADA accessibility, and other amenities as are found in most sports
facilities. New facilities need to be planned and constructed to provide users with reasonable access to tennis facilities.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Project will upgrade existing facilities to meet current standards and will repair or replace broken, hazardous and/or outdated
equipment. Will allow facilities to be rehabilitated or constructed to meet the needs of a growing and underserved population. Will provide safe facilities for users. Enhanced facilities will encourage
more users to pursue the sport and will provide healthy benefits for users. Dedicated tennis facilities will eliminate the time spent to continuously reconfigure existing multi -use facilities. Study is
needed to determine if existing facilities need to be repaired, rehabilitated or replaced. Improved facilities and additional facilities will enhance the quality of life for young and old, residents and
visitors. Improved facilities may increase the desirability to hold statewide, national, and international tournaments and other activities on our island, which will strengthen our reputation & economy.
12. LONG RANGE PLANS/COMMUNITY VALUES: Providing more facilities will increase the options for residents and others of healthy lifestyle activities. Will encourage healthy socialization and
activities for a greater segment of the population. Enhances Hawai'i County as a desirable place to live, work and play.
13. COUNTY MATCHING FUNDS REQ'D? (Y/N)
No
DESCRIBE:
14. LEGAL MADATE? (Y/N)
No
DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: Will require maintenance, however, it is possible that community groups may choose to participate in "adopt -a -park" agreements.
16. SUSTAINABILITY FOCUS (List all that apply): 1) Promotes economic viability; 2) Preserves and protects our natural environment; 3) Strengthens and sustains our community; 4) Promotes health and
safety; 5) Fosters inter -departmental collaboration and cross -sector implementation; and 6) Enhances education.
17. PROJECT READINESS (List all that apply): The resurfacing of the Edith Kanaka'ole Tennis Stadium project has begun. A list of necessary repairs and rehabilitation projects is being developed.
18. EXPENDITURE PHASING (X $1000):
Prior Funds
Allotted
(not lapsed)
This FY 15-16 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
250 $250
Land Acquisition
Design/Survey
250 $250
Construction
2,500 $2,500
TOTAL:
$3,000 $3,000
19. O & M COSTS (x $1000):
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond/Other
3,000 $3,000
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
IL
i
11 TOTAL:
�
$3,0001 $3,00011
57
U
0 290
r
'1
i
580 870 1160 ft
1� -INL!•
Parcel: 450020490000 Acres: 3.55
COUNTY OF HAWAII 154200
45-363 LEHUA STREET 0
154200
.... 0
Hawaii
'Hawaii County makes every effort to produce the most accurate information possible No warranties, expressed or implied. are provided for the data
herein. its use or interpretation. The assessment information is from the last certified taxroll All data is subject to change before the next certified
taxroll The 'parcels' layer is intended to be used for visual purposes only and should not be used for boundary interpretations or other spatial analysis
beyond the limitations of the data The 'parcels' data layer does not contain metes and bounds described accuracy therefore please use caution when
viewing this data Overlaying this layei witli Mimi my niLcit hiaVte U5ued this I yet as a base ryr3T7TUt-prUD'UU"r
imagery data will not overlay exactly 58
Date printed: 05/01/15 : 17:41:21
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Parks and Recreation 2. DATE: 5/21/2015
3. PROJECT NAME: Haina Park New Comfort Station & Improvements 4. SUBMITTER: Valerie T. Poindexter/James Komata, Park Planner
S. COUNCIL BENEFIT DISTRICT(S): 1 6. TMK/JUDICIAL: (3)4-5-002:049
7. LOCATION (COUNCIL DISTRICT): 1 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $750,000
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Infrastructure improvement; new buildings or structures or addition to a building; and nonrecurring rehabilitation or deferred maintenance of
infrastructure and buildings.
10. PROJECT/PROGRAM DESCRIPTION: The existing park, which consists primarily of a softball/youth baseball field, is regularly used by seniors for recreation purposes and frequently used by the
community as a gathering place where family parties, public activites and community events are hosted. The park needs a safe, accessible and suitable restroom facility to support these uses and ensure
the basic needs of park users are addressed. The project will also address accessible routes linking existing amenities and repair/replace/improve existing improvements as needed.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses public health and safety; inadequate service or facility; improves operational efficiency; replaces a deteriorated facility;
repair/maintenance of infrastructure or building; enhances quality of life; and service improvements.
12. LONG RANGE PLANS/COMMUNITY VALUES: Project conforms to the department's strategic plan, mission and goals; the County's General Plan; and is supported by the community.
13. COUNTY MATCHING FUNDS REQ'D? (Y/N) ®DESCRIBE:
14. LEGAL MANDATE? (Y/N) ®DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: The project will result in immediate and short-term reduction to the department's operational budget by reducing/eliminating immediate maintenance/repair
needs. The project will require minimal additional operating funds for utilities and will contribute to increased pressures on the department's maintenance resources.
16. SUSTAINABILITY FOCUS (List all that apply): The project promotes economic vitality; preserves and protects our natural environment; strengthens and sustains our community; and promotes health
and safety.
17. PROJECT READINESS (List all.that apply): The project is currently in progress, staff is available to manage the project, and the funds can realistically be encumbered in a contract within three years.
18. EXPENDITURE PHASING (X $1000):
rior Funds
Allotted
(not lapsed)
This FY 15-16 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
150 $150
600 $600
TOTAL:
$750 $750
19. O & M COSTS (x $1000):
$1 $1 $1 $1 $1 on-going $5
20. FUNDING SOURCE (x$1000):
Cty G.O. Bond/Other
750 $750
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
11 TOTAL:
$750 $750
59
D....,.te p,..., , ...- ---.._,1T37 3 -7"3-0-..,
arinted...- ..05/01/15..
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Parks and Recreation 2. DATE: 5/21/2015
3. PROJECT NAME: Honoka'a Tennis Courts Improvements 4. SUBMITTER: Valerie T. Poindexter/James Komata, Park Planner
S. COUNCIL BENEFIT DISTRICT(S): 1 6. TMK/JUDICIAL: (3)4-5-010:079
7. LOCATION (COUNCIL DISTRICT): 1 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $500,000
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Infrastructure improvement; nonrecurring rehabilitation or deferred maintenance of infrastructure and buildings.
10. PROJECT/PROGRAM DESCRIPTION: The project will replace the existng plastic sport -court tile playing surface over deteriorated asphaltic concrete subsurface with a reinforced concrete surface
topped with an acrylic tennis court surfacing system. Tennis court net, stanchions, foundations, and anchors will be replaced and related amenities provided, improved or replaced.
31. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses public health and safety; inadequate service or facility; improves operational efficiency; replaces a deteriorated facility;
repair/maintenance of infrastructure or building; enhances quality of life; and service improvements.
12. LONG RANGE PLANS/COMMUNITY VALUES: Project conforms to the department's strategic plan, mission and goals; the County's General Plan; and is supported by the community.
13. COUNTY MATCHING FUNDS REQ'D? (Y/N) 0 DESCRIBE:
14. LEGAL MANDATE? (Y/N) 0 DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: The project will result in immediate and short-term reduction to the department's operational budget by reducing/eliminating immediate maintenance/repair
needs. The project will not require additional operating funds for utilities and will eventually require maintenance support in the long term Q+ years).
16. SUSTAINABILITY FOCUS (List all that apply): The project strengthens and sustains our community and promotes health and safety.
17. PROJECT READINESS (List all that apply): The project is currently in progress, staff is available to manage the project, and the funds can realistically be encumbered in a contract within three years.
18. EXPENDITURE PHASING (X $1000):
F—Prior Funds
Allotted
(not lapsed)
This FY 15-16 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
Land Acquisition
Design/Survey
50 $50
Construction
450 $450
TOTAL:
$500 $500
19. O & M COSTS (x $1000):
20. FUNDING SOURCE (x $1000):
.:
Cty G.O. Bond/Other
500 $500
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
11 TOTAL:
$500 $500
61
(This Page Intentionally Left Blank)
62
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Dept. of Parks and Recreation 2. DATE: 5/21/2015
3. PROJECT NAME: Island -Wide Elderly Activities Facilities 4. SUBMITTER: Aaron Chung
5. COUNCIL BENEFIT DISTRICT(S): Island -Wide 6. TMK/JUDICIAL: Various
7. LOCATION (COUNCIL DISTRICT): Island -Wide S. TOTAL COUNTY FUNDS NEEDED THIS FY: $4,000,000
9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Land acquisition for new facilities; infrastructure improvements including air conditioning, classrooms, parking, lighting, and other necessary
improvements; construction of new structures; nonrecurring rehabilitation or deferred maintenance of existing facilities, clearing vegetation and invasive species to install gardens and other health -
oriented outdoors aces and other necessarV rehabilitation of existing facilities; and planning, feasibility, engineering and design studies will need to be completed for new facilities.
10. PROJECT/PROGRAM DESCRIPTION: The burgeoning elder population has put a strain on existing facilities. Elderly activity facilities around the island are inadequate to meet the needs of our
growing population. Existing facilities and infrastructure need improvements and rehabilitation beyond the scope of regular maintenance, such as photovoltaic systems, lighting, and improved ADA
accessibility. New facilities island -wide need to be planned and constructed to provide users with reasonable access to programs and services for the elderly.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Project will upgrade existing facilities and plan, design and construct new facilities throughout the County. Will allow facilities to be
rehabilitated or constructed to meet the needs of growing and underserved population. Will provide safe facilities for users. Study is needed to determine the types of facilties needed and where to
place new facilities. Improved facilities and additional facilities will enhance the quality of life for young and old, residents and visitors, and will allow the physically challenged to go out and about in the
community. Improved facilities may increase the desirability to hold statewide, national and international events and activities on our island, which will strengthen our reputation and economy.
12. LONG RANGE PLANS/COMMUNITY VALUES: Providing more facilities and improving existing facilities will encourage residents, visitors and other consumers to pursue healthy activies and to
socialize and remain vibrant.
13. COUNTY MATCHING FUNDS REQ'D? (Y/N) No DESCRIBE:
14. LEGAL MANDATE? (Y/N) No DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: Will require maintenance.
16. SUSTAINABILITY FOCUS (List all that apply): 1) Promotes economic viability, 2) preserves and protects our natural environment; 3) strengthens and sustains our community; 4) promotes health and
safety; and 5) fosters inter -departmental collaboration and cross -sector implementation.
17. PROJECT READINESS (List all that apply): Scattered plans and studies have been done, such as the Envision 2025 Plan, the General Plan and the various Community Development Plans, all of which
indicate the need for more of this type of facility in all areas of the County, however the plans are not site specific
nor un s
Allotted
This FY 15-16 Beyond 6
18. EXPENDITURE PHASING (X $1000):
(not lapsed)
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
500 $500
Land Acquisition
1,000 $1,000
Design/Survey
500 $500
Construction
2,000 $2,000
TOTAL:1
$4,000 $4,000
19. O & M COSTS (x $1000):
20. FUNDING SOURCE (x$1000):
Cty G.O. Bond/Other
4,000 $4,000
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
TOTAL:
$4,000 $4,000
63
r-'
�W �
0 140 280 420
Parcel: 480060100000 Acres: 3.968
STATE OF HAWAII
48-5350 KUKUIHAELE ROAD
278700
2800
281500
0
Hawaii
560 ft
I � —
*Hawaii County makes every effort to produce the most accurate information possible. No warranties, expressed or implied, are provided for the data
herein, its use or interpretation The assessment information is from the last certified taxroll All data is subject to change before the next certified
taxroll The 'parcels' layer is Intended to be used for visual purposes only and should not be used for boundary interpretations or other spatial analysis
beyond the limitations of the data The 'parcels' data layer does not contain metes and bounds described accuracy therefore, please use caution when
ith othici data layefs that may n iave used this layer ab a 1713513 May nutpioduce piecis PS arid
imagery data will not overlay exactly
Date printed 05/21/15 21 07:09
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Department of Parks and Recreation 2. DATE: 5/21/2015
3. PROJECT NAME: Kukuihaele Park Improvements 4. SUBMITTER: Valerie T. Poindexter/James Komata, Park Planner
S. COUNCIL BENEFIT DISTRICT(S): 1 6. TMK/JUDICIAL: (3)4-8-006:014
7. LOCATION (COUNCIL DISTRICT): 1 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $2,500,000
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Infrastructure improvement; new buildings or structures or addition to a building; nonrecurring rehabilitation or deferred maintenance of infrastructure
and buildings.
10. PROJECT/PROGRAM DESCRIPTION: Improvements to existing underdeveloped park site to consist of on-site parking, pavilion for community activites, a comfort station and utilities, accessible
walkways, etc. Reconstruction of existing play court, and other related park amenities.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses public health and safety, inadequate service or facility, enhances quality of life, and service improvements.
12. LONG RANGE PLANS/COMMUNITY VALUES: Department's vision, mission or goals; County General Plan; community value or desirability.
13. COUNTY MATCHING FUNDS REQ'D? (Y/N) 0 DESCRIBE:
14. LEGAL MADATE? (Y/N) ®DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: Initial and short term increases in utility costs and service needs associated with pavilion and comfort station; longer term (30+ years) maintenance impacts on
buildings and flat work repair and maintenance.
16. SUSTAINABILITY FOCUS (List all that apply): Preserves and protects our natural environment; strengthens and sustains our community; enhances eduation, culture and the arts; and promotes health
and safety.
17. PROJECT READINESS (List all that apply): The department has sufficient in-house staff to manage and facilitate this effort ensuring funds will be encumbered and expended responsibly by June 30,
2016.
18. EXPENDITURE PHASING (X $1000):
nor un s
Allotted
(not lapsed)
This FY 15-16 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
200 $200
2,300 $2,300
TOTAL:
$2,500 1 $2,500
19. O & M COSTS (x $1000):
$5 $5 $5 $5 $5 on-going $25
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond/Other
2,500 $2,500
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
11 TOTAL:
�
$2,500 1 1 1 1 1 $2,500
65
undyeriy udtd wni nUi wci iay cnawiy
Date printed 05/01/15 17 4312
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Parks and Recreation 2. DATE: 5/21/2015
3. PROJECT NAME: Laupahoehoe Swimming Pool Solar Heating System 4. SUBMITTER: Valerie T. Poindexter/James Komata, Park Planner
5. COUNCIL BENEFIT DISTRICT(S): 1 6. TMK/JUDICIAL: (3)3-5-004:059
7. LOCATION (COUNCIL DISTRICT): 1 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $750,000
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Infrastructure improvement; new buildings or structures or addition to a building.
10. PROJECT/PROGRAM DESCRIPTION: Provision of a new rooftop solar heating system intended to heat the swimming pool water to a comfortable temperature for comfortable, year-round swimming.
Requires the addition of shelter structures over portions of the existing pool deck that will also benefit pool users and spectators as a shade device in order to increase the total roof area available to
mount rooftop solar panels. Includes the necessary enhancements/modifications to the existing pool circulation system and controls to integrate the heating circulation system and will take
opportunities to repair/modify/improve existing pool components as needed.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses public health and safety; inadequate service or facility; improves operational efficiency; enhances quality of life; and service
improvements.
12. LONG RANGE PLANS/COMMUNITY VALUES: Project conforms to the department's strategic plan, mission and goals; the County's General Plan; and is supported by the community.
13. COUNTY MATCHING FUNDS REQ'D[DESCRIBE:
14. LEGAL MANDATE? (Y/N) 0 DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: May indirectly increase operational costs of the pool as water temperature will encourage additional patronage throughout the year causing increased usage of
water and electricity. Improvements will place additional demands on maintenance staff, especially as the systems age and eventually require replacement.
16. SUSTAINABILITY FOCUS (List all that apply): The project promotes economic vitality; preserves and protects our natural environment; strengthens and sustains our community; enhances education,
culture and the arts; promotes health and safety; manages growth; fosters inter -departmental collaboration and cross -sector implementation.
17. PROJECT READINESS (List all that apply): The project is currently in progress, staff is available to manage the project, and the funds can realistically be encumbered in a contract within three years.
18. EXPENDITURE PHASING (X $1000):
rior un s
Allotted
(not lapsed)
This FY 15-16 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
150 $150
600 $600
1$750 1 1 $750
19. O & M COSTS (x $1000):
$1 $1 $1 $1 $1 on-going I$5
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond/Other
750 $750
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
TOTAL:
$750 I $750
IIIIdyVjy Udtd WIII IIUI V -1-Y --Ilr
Date printed 05/01/15 17 44 38
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Parks and Recreation 2. DATE: 5/22/2015
3. PROJECT NAME: Papa`aloa Park Repairs & Improvements 4. SUBMITTER: Valerie Poindexter/James Komata, Park Planner
S. COUNCIL BENEFIT DI5TRICT(S): 1 6. TMK/JUDICIAL: (3)3-5-003:088
7. LOCATION (COUNCIL DISTRICT): 1 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $750,000
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Infrastructure improvement; new buildings or structures or addition to a building; and nonrecurring rehabilitation or deferred maintenance of
infrastructure and buildings.
30. PROJECT/PROGRAM DESCRIPTION: The project will address the re -roofing and repainting (interior and exterior) of the gym and annex buildings, reconstruction of the tennis courts, and
miscellaneous repairs, modifications and improvements to the park's amenities to ensure its safe use and long term integrity.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses public health and safety; inadequate service or facility, improves operational efficiency; replaces a deteriorated facility;
repair/maintenance of infrastructure or building; enhances quality of life; and service improvements.
12. LONG RANGE PLANS/COMMUNITY VALUES: Project conforms to the department's strategic plan, mission and goals; the County's General Plan; and is supported by the community.
13. COUNTY MATCHING FUNDS REQ'D. (Y/N) ®DESCRIBE:
14. LEGAL MANDATE? (Y/N) 0 DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: The project will result in immediate and short-term reduction to the department's operational budget by reducing/eliminating immediate maintenance/repair
needs. The project will require minimal additional operating funds for utilities and will contribute to increased pressures on the department's maintenance resources.
16. SUSTAINABILITY FOCUS (List all that apply): The project promotes economic vitality; preserves and protects our natural environment; strengthens and sustains our community, enhances education,
culture and the arts; and promotes health and safety.
17. PROJECT READINESS (List all that apply): The project is currently in progress, staff is available to manage the project, and the funds can realistically be encumbered in a contract within three years.
18. EXPENDITURE PHASING (X $1000):
nor un s
Allotted
(not lapsed)
This FY 15-16 Beyond 6
Request I FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
Land Acquisition
Design/Survey
50 $50
Construction
700 $700
TOTAL:
$750 $750
19. O & M COSTS (x $1000):
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond/Other
750 $750
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
TOTAL:1
$750 1 $750
69
Project Location Map
Hokulani Street
New Park Development
P�NP�� 9`92
HALELOKE ST
G HIHIO RD
O U)
Project a
Site
ti �F o P
q�� ST ti9�O P\�JO� QP�v
Mq<
qMq
A�
cyozc ,�Gy/`
sT o
0o q44
F�
CO
A
�PPJPO JPO�� �P POS QP
s
VJ P1AAV AO S
4oJr��.OtN�»'
0 500
70
Feet A
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Department of Parks and Recreation 2. DATE: 5/22/2015
3. PROJECT NAME: DPR Hokulani Street New Park Development 4. SUBMITTER: Aaron Chung
S. COUNCIL BENEFIT DISTRICT(S): 2&3 6. TMK/JUDICIAL: (3)2-5-060:007
7. LOCATION (COUNCIL DISTRICT): 2 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $750,000
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Infrastructure improvement; new buildings or structures or addition to a building.
10. PROJECT/PROGRAM DESCRIPTION: Initial phase of development for new park in an existing subdivision that will begin as a passive park site inclusive of clearing, grading, grubbing and landscaping,
a perimeter fence, and walkway system, as well as future improvements such as a pavilion with restrooms, parking lot, playground, outdoor court, and ballfield.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses public health and safety, inadequate service or facility, replaces a deteriorated facility, repair/maintenance of infrastructure
and buildings, enhances quality of life, and service improvements.
12. LONG RANGE PLANS/COMMUNITY VALUES: Department's vision, mission or goals; County General Plan; and community value or desirability.
13. COUNTY MATCHING FUNDS REQ'DDESCRIBE:
14. LEGAL MADATE? (Y/N) ®DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: Short-term impacts consist of mowing and weed control should be relatively small. Future development phases will have a greater impact on long-term
operational costs.
16. SUSTAINABILITY FOCUS (List all that apply): Preserves and protects our natrual environment; strengthens and sustains our community; enhances eduation, culture and the arts; and promotes health
and safety.
17. PROJECT READINESS (List all that apply): The department has sufficient in-house staff to manage and facilitate this effort ensuring funds will be encumbered and expended responsibly by June 30,
2016.
18. EXPENDITURE PHASING (X $1000):
nor Funds
Allotted
(not lapsed)
This FY 15-16 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
Land Acquisition
Design/Survey
35
$35
Construction
750 $750
TOTAL:
$35
$750 $785
19. O & M COSTS (x$1000):
$2 $2 1 $2 $2 $2 on-going $10
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond/Other
35
750 $785
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
11 TOTAL:
$35
$750 1 1 $785
FR
Project Location Map
Mauna Kea Park
N
O
G
�a 2
7
1m
7
70
C�
NN
�Q
Project Location
KEP�PKO\-U FtD
DANIEL K INOUYE HWY
Co
W
U
U
Q
O
J
aZ Y q q j
�>ar •ri ��•• .N� Q 2
72 Miles
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Department of Parks and Recreation 2. DATE: 5/22/2015
3. PROJECT NAME: DPR Mauna Kea Park 4. SUBMITTER: Aaron Chung
S. COUNCIL BENEFIT DISTRICT(S): Islandwide 6. TMK/JUDICIAL: (3)4-4-016:003 por.
7. LOCATION (COUNCIL DISTRICT): 2 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $1,500,000
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Infrastructure improvement; new buildings or structures or addition to a building; and nonrecurring rehabilitation or deferred maintenance of
infrastructure and buildings.
10. PROJECT/PROGRAM DESCRIPTION: Repairs and improvements to existing park amenities, facilities and infrastructure and the enhancement of recreational opportunities through the addition of
new improvements or enhancements to existing ones. Increases existing appropriation currently without an assigned appropriation number.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses public health and safety, inadequate service or facility, replaces a deteriorated facility, repair/maintenance of infrastructure
and buildings, enhances quality of life, and service improvements.
12. LONG RANGE PLANS/COMMUNITY VALUES: Department's vision, mission or goals; County General Plan; and community value or desirability.
13. COUNTY MATCHING FUNDS REQ'D? (Y/N)
®
DESCRIBE.
14. LEGAL MADATE? (Y/N)
®DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: Acquisition of the park is in process so addressing repairs deferred by the State is in the best interest of minimizing ongoing maintenance and repair needs.
However, as the facilities age, they will require greater efforts and resources to upkeep and repair. Modifications to the buildings will postively impact energy efficiency to minimize costs.
16. SUSTAINABILITY FOCUS (List all that apply): Preserves and protects our natural environment; strengthens and sustains our community; enhances eduation, culture and the arts; and promotes health
and safety.
17. PROJECT READINESS (List all that apply): The department has sufficient in-house staff to manage and facilitate this effort ensuring funds will be encumbered and expended responsibly by June 30,
2016.
18. EXPENDITURE PHASING (X $1000):
Prior Fun s
Allotted
(not lapsed)
This FY 15-16 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
1,500 $1,500
TOTAL:
$1,500 $1,500
19. O & M COSTS (x $1000):
$25 $25 $25 $25 $25 $25 on-going $150
20. FUNDING SOURCE (x $1000):
,
Cty G.O. Bond/Other
1,500 $1,500
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
TOTAL:
I $1,500 I $1,500
73
Project Location Map
Hilo Municiple Golf Course
Renovations z m
Z
D
o o
m z z
DNi (A Z
-i D
U) O
.
O
W PALAI ST
C
z_
CP
r O
z Or
N m
cn
m Project Location
r
D
Zcn1
D
S
rn
D
N
HAIHAI ST
D
r
O
2 = r
D � O
C C N
D O = T—
-�
D C � C
--I cn
D m Z Z (OJT{Y OF FI;G�y�'
(n
N w..
-) f
0 50
4jk'�Ot HpJ?i
eet 74a,s^
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Parks & Recreation 2. DATE: 5/22/2015
3. PROJECT NAME: Hilo Municipal Golf Course Renovations 4. SUBMITTER: Dennis "Fresh" Onishi
S. COUNCIL BENEFIT DISTRICT(S): 1, 2, 3, 4, 5 6. TMK/JUDICIAL: 2-4-02:001, 129, 130 & 016:001
7. LOCATION (COUNCIL DISTRICT): 3 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $10,000,000
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Infrastructure improvement, new buildings or structures, and nonrecurring rehabilitation or deferred maintenance of infrastructure and buildings.
10. PROJECT/PROGRAM DESCRIPTION: Development of a new, expanded and enhanced clubhouse; replacement of existing cart storage and equipment sheds; redesign and expansion of the practice
putting green and chipping areas; improvements to parking lot and driveways; security enhancements, etc.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses public health and safety, inadequate service or facility, improves operational efficiency, replaces deteriorated facilities,
repair/maintenance of infrastructure and buildings, enhances quality of life, and service improvement.
12. LONG RANGE PLANS/COMMUNITY VALUES: Consistent with department's vision, mission and goals, the County General Plan, and valued/desired by the community.
13. COUNTY MATCHING FUNDS REQ'D?
[DESCRIBE:
14. LEGAL MADATE? (Y/N)
®DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: Negligible net impact as new facilities would eliminate need for constant, increasing maintenance and repairs that would likely offset the nominal increase in
utility costs due to expanded facility square footage.
16. SUSTAINABILITY FOCUS (List all that apply): Promotes economic vitality, preserves and protects our natural environment, strengthens and sustains our community, enhances education, culture and
the arts, and promotes health and safety.
17. PROJECT READINESS (List all that apply): The department has sufficient in-house staff to manage and facilitate this effort ensuring funds will be encumbered and expended responsibly by June 30,
2016. There are no related operating budget needs associated with this work.
18. EXPENDITURE PHASING (X $1000):
Prior Funds
Allotted
(not lapsed)
This FY 15-16 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
10,000 $10,000
TOTAL:
$10,000 $10,000
19. O & M COSTS (x $1000):
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond/Other
10,000 $10,000
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
TOTAL:
�
$10,000 1 1 1 $10,000
75
A 0 500
D Feet 76
v
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Department of Parks and Recreation 2. DATE: 5/22/2015
3. PROJECT NAME: DPR Honaunau Rodeo Arena Improvements 4. SUBMITTER: Maile David/James Komata, Park Planner
S. COUNCIL BENEFIT DISTRICT(S): 6,7 & 8 6. TMK/JUDICIAL: (3)8-4-008:002
7. LOCATION (COUNCIL DISTRICT): 6 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $3,000,000
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Infrastructure improvement; new buildings or structures or addition to a building; and nonrecurring rehabilitation or deferred maintenance of
infrastructure and buildings.
30. PROJECT/PROGRAM DESCRIPTION: Construction of new covering structures for spectator area; new pavilion and concession stand, and development of a new water system (on-site) to support
minimum event water demands; replacement of bleachers, judges' stand and comfort station; expansion of parking area and improvement for truck and trailer access; and accessibility improvements.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses public health and safety, inadequate service or facility, replaces a deteriorated facility, repair/maintenance of infrastructure
and buildings, enhances quality of life, and service improvements.
12. LONG RANGE PLANS/COMMUNITY VALUES: Department's vision, mission or goals; County General Plan; and community value or desirability.
13. COUNTY MATCHING FUNDS REQ'D? (Y/N) 0 DESCRIBE:
14. LEGAL MADATE? (Y/N) DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: Expected to have little to no impact on operational costs where new facilities eliminate current repair and maintenance requirements for existing structures. As
new improvements age they are expected to require same levels (or slightly more) of attention as current facilities.
16. SUSTAINABILITY FOCUS (List all that apply): Preserves and protects our natural environment; strengthens and sustains our community; enhances education, culture and the arts; and promotes
health and safety.
17. PROJECT READINESS (List all that apply): The department has sufficient in-house staff to manage and facilitate this effort ensuring funds will be encumbered and expended responsibly by June 30,
2016.
18. EXPENDITURE PHASING (X $1000):
nor Funds
Allotted
(not lapsed)
This FY 15-16 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
Land Acquisition
Design/Survey
250 $250
Construction
2,750 $2,750
TOTAL:1
$3,000 $3,000
19. O & M COSTS (x $1000):
$1 $1 $1 $1 $1 on-going $5
20. FUNDING SOURCE (x $1000):
-
Cty G.O. Bond/Other
3,000 $3,000
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
11 TOTAL:
$3,000 $3,000
77
367002062367003020 ��• ♦♦♦1 N
3670 r 99 367002 36♦7�A
660.73 ■I■�■■x.11•••• P ••♦1♦♦♦♦1
•••••�■�����• •j• 1♦111
• II
660 5019 ••• ♦♦♦♦♦♦♦♦
• 11
•
•••i APPROXIMATE
367002017 ♦♦♦� PROJECT
66 05999 ♦♦1 LIMITS
1
6 05001 ♦♦ ♦♦ ♦♦♦♦11
� ♦1 ♦1
8001030
67001999
367001025
I
PROJECT
VICINITY
y,
I
f.
367001008
367001039
reparea: tuiouo«J
DISCLAIMER: Background aerial imagery
may not accurately align with other information
represented and is provided for reference only. WAIMEA DISTRICT PARK
500 250 0 500 1,000
Feet7$
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Parks & Recreation 2. DATE: 5/22/2015
3. PROJECT NAME: DPR Waimea District Park Master Plan Implementation 4. SUBMITTER: James Komata, Park Planner
S. COUNCIL BENEFIT DISTRICT(S): 1, 8, 9 6. TMK/JUDICIAL: To be determined
7. LOCATION (COUNCIL DISTRICT): 9 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $3,000,000
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Infrastructure improvement, new buildings and facilities, and planning.
10. PROJECT/PROGRAM DESCRIPTION: Site investigation, master planning and preliminary design of a new district park for South Kohala at/near Waimea town.
31. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): The district of South Kohala is in need of additional recreational facilities at the scale of a district park that would provide a centralized
area for multiple concurrent use, ball fields and additional recreational facilities that could possibly include a gymnasium, pool, community recreation center or similar. This project is intended to utilize
land owed the County by Parker Ranch for the purposes of a district park and there is considerable community support for and active participation in the pursuit of this project.
12. LONG RANGE PLANS/COMMUNITY VALUES: Conforms to the department's approved strategic plan.
13. COUNTY MATCHING FUNDS REQ'D? (Y/N) 0 DESCRIBE: State contributed$6,500,000 on a 1:1 match obligation approved by the Council.
14. LEGAL MADATE? (Y/N) E DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: There will be new costs associated with care and maintenance of the new district park (staffing, materials and equipment) as well as new utility costs.
16. SUSTAINABILITY FOCUS (List all that apply): Strengthens and sustains our community, enhances education and culture and the arts, promotes health and safety, and manages growth.
17. PROJECT READINESS (List all that apply): The department has sufficient in-house staff to manage and facilitate this effort ensuring funds will be encumbered and expended responsibly by June 30,
2016. There are no related operating budget needs associated with this work.
18. EXPENDITURE PHASING (X $1000):
nor Funds
Allotted
(not lapsed)
This FY 15-16 Beyond 6
Request I FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
389
$389
Land Acquisition
Design/Surrey
1,000
$1,000
Construction
1,500
3,000
$4,500
TOTAL:
$2,889
$3,000 1
$5,889
19. O & M COSTS (x$1000):
$150 $150 $150 $150 $150 $150 on-going
$900
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond/Other
2,889
3,000
$5,889
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
11 TOTAL:F_____$2,88911
$3,000 1
$5,889
79
POLICE DEPARTMENT
HARRY KUROJIRI, POLICE CHIEF
81
(This Page Intentionally Left Blank)
82
Department: Police
SUMMARY OF DEPARTMENT REQUESTS
SIX YEAR CAPITAL IMPROVEMENTS PROGRAM
FISCAL YEAR 2015-2016
83
2015-16 FY FUNDING
FUNDING FORECAST BY FISCAL YEAR
(in thousands)
(in thousands)
TOTAL
ESTIMATED
Prior
Beyond 6
PROJECT
PRIORITY
PROJECT
County
State
Federal
Private*
CBA**
Funds
Allotted
2015-16
2016-17
2017-18
2018-19
2019-20
2020-21
years
COST
1
Holding cell improvements (reapp. 5299.77)
600
600
600
2
South Kona Police Station (reapp. 5296.94)
4,600
1,400
4,600
1,000
7,000
3
East Hawaii Firing Range (reapp. 5292.83)
600
600
6,000
6,600
TOTAL
5,800
1 1,4001
5,800
1 7,000
14,200
83
(This Page Intentionally Left Blank)
84
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Police 2. DATE: 1/8/2015
3. PROJECT NAME: Holding cell improvements (reapp. 522.99.77) 4. SUBMITTER: Assistant Chief Marshall Kanehailua
5. COUNCIL BENEFIT DISTRICT(S): All 6. TMK/JUDICIAL: Various
7. LOCATION (COUNCIL DISTRICT): Various S. TOTAL COUNTY FUNDS NEEDED THIS FY: $600,000
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): New building or structures or additions to a building.
10. PROJECT/PROGRAM DESCRIPTION: Planning, design, and construction to modify existing temporary detention facilities in the Hilo, Kona, Puna, and North and South Kohala districts, to comply with
the Commission on Accreditation for Law Enforcement Agencies (CALEA) Standards, Chapters 71 and 72.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): The Hawaii Police Department recently received full Accreditation from CALEA and will be seeking Reaccreditation in three years. One
Standard, 72.5.3, requires separating males, females, and/or juveniles that are detained at the same time. Their holding areas shall be separated from each other by sight and sound. With these cell
block improvements, the Hawaii Police Department will enhance the ability of the staff to promote conditions that contribute positively to the health and security of the detainee and the safety of
others.
12. LONG RANGE PLANS/COMMUNITY VALUES: In line with the Hawaii Police Department's Vision and Mission Statement of providing the highest quality of police service.
13. COUNTY MATCHING FUNDS REQ -D? (Y/N)No DESCRIBE:
14. LEGAL MANDATE? (Y/N) Yes DESCRIBE: Separation for juveniles is mandated, and CALEA Standard 72.5.3. includes females.
15. IMPACT ON OPERATIONAL BUDGET: The modification will have a positive impact on our operational budget. Currently officers are required to transport detainees to another facility or provide
constant supervision until the facility is ready to accommodate that detainee.
16. SUSTAINABILITY FOCUS (List all that apply): This process will enhance the ability of the staff to promote conditions that contribute positively to the health and security of the detainee, to the safety
of others.
17. PROJECT READINESS (List all that apply):
18. EXPENDITURE PHASING (X $1000):
nor Funds
Allotted
(not lapsed)
This FY 15-16 1 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
600 $600
TOTAL:1
$600 $600
19. O & M COSTS (x $1000):
20. FUNDING SOURCE (x $1000):'_;�
,_ ; ,
_ : ;� ..
Cty G.O. Bond/Other
600 $600
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
TOTAL:
$600 $600
85
(This Page Intentionally Left Blank)
86
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Police 2. DATE: 1/8/2015
3. PROJECT NAME: South Kona Police Station (reapp. 5296-94) 4. SUBMITTER: Assistant Chief Marshall Kanehailua
5. COUNCIL BENEFIT DISTRICT(S): 7 6. TMK/JUDICIAL: (3) 8-1-001-084/ South Kona
7. LOCATION (COUNCIL DISTRICT): 6,7 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $4,600,000
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): New Facility
10. PROJECT/PROGRAM DESCRIPTION: Construction of a new South Kona Police Station including a refueling station and a radio tower. Funds are being sought during this Fiscal Year to continue the
process to construction.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Currently the personnel at the Kealakehe Police Station provide police services to the communities located in South Kona District. As a
result, response time to emergencies may be delayed at times due to travel time from Kailua-Kona area to the communities located in South Kona. As the population increases in this area due to
affordability and availability of land, the issue of having adequate and timely police services will also increase. This project will address both the current and future needs for improved public safety in
the South Kona area.
12. LONG RANGE PLANS/COMMUNITY VALUES: In line with the Hawaii Police Department's Vision and Mission Statement of providing the highest quality of police service.
13. COUNTY MATCHING FUNDS REQ'D? (Y/N) NO DESCRIBE:
14. LEGAL MANDATE? (Y/N) NO DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: This project will have an impact on our operational budget by an increase in utility cost and general maintenance. In addition to general utility and maintenance
cost, additional positions will need to be created to adequately staff that facility full time.
16. SUSTAINABILITY FOCUS (List all that apply): Will enhance the ability to promote the health and safety of the South Kona community.
17. PROJECT READINESS (List all that apply): Previously appropriated
18. EXPENDITURE PHASING (X $1000):
F—Prior Funds
Allotted
(not lapsed)
This FY 15-16 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
Land Acquisition
Design/Survey
1,400
$1,400
Construction
4,600 1,000 $5,600
TOTAL:
$1,400
$4,600 $1,000 $7,000
19. O & M COSTS (x $1000):
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond/Other
1,400
4,600 1,000 $7,000
State Revolving Fund
State CIP
Federal (including ARRA-Stimulus)
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
TOTAL:
$1,400J
$4,600 1 $1,000$7,000
87
(This Page Intentionally Left Blank)
88
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Hawaii Police Department 2. DATE: 1/8/2015
3. PROJECT NAME: East Hawaii Firing Range (reapprop.5292.83) 4. SUBMITTER: Assistant Chief Marshall Kanehailua
S. COUNCIL BENEFIT DISTRICT(S): All 6. TMK/JUDICIAL: (3) 2-4-25:28/ South Hilo
7. LOCATION (COUNCIL DISTRICT): 2 B. TOTAL COUNTY FUNDS NEEDED THIS FY: $600,000
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): New building consisting of multiple lanes utilized for firearms training and qualifications. Building to also include a training room and locker/shower facility.
30. PROJECT/PROGRAM DESCRIPTION: Planning, design and construction of a new firing range and training room complex. Funds being sought during this fiscal year will initiate the process in this
project.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Currently all firearms training for our Police Recruits and in-service sworn personnel is being conducted either on private lands located in
Kamuela, the Pohakuloa Military Training Area, and our in -door firing range consisting of only four lanes. Access to private lands will eventually be disallowed and gaining access to Military training
areas are becoming increasingly difficult, which will result in our personnel being trained in our inadequate three -stall in -door range. Due to litigious issues involved in ensuring our officers are properly
trained and qualified in the use of their firearms it will become imperative in the future to have a facility that allows for large scaled training.
12. LONG RANGE PLANS/COMMUNITY VALUES: In line with the Hawaii Police Department's Vision and Mission Statement of providing the highest quality of police service.
13. COUNTY MATCHING FUNDS REQ'D? (Y/N) IPT5 DESCRIBE:
14. LEGAL MANDATE? (Y/N) NO DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: This project will have an impact on our operational budget by an increase in utility cost and general maintenance. However, we currently rent passenger vans at
a cost of $160 13 scheduled training days) per day to transport recruits to Kamuela and Volcano. This cost and increased overtime earned by instructors, would be eliminated with the construction of
16. SUSTAINABILITY FOCUS (List all that apply): Preserves and protects our natural environment by reducing the amount of projectile waste deposited at the outdoor ranges currently in use by our
department. It also promotes Health and Safety benefits through properly a ventilated facility.
17. PROJECT READINESS (List all that apply): Previously appropriated.
18. EXPENDITURE PHASING (X $1000):
Prior Funds
Allotted
(not lapsed)
This FY 15-16 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
600 $600
6,000 $6,000
TOTAL:
$600 $6,000 1 $6,600
19. O & M COSTS (x $1000):
20. FUNDING SOURCE (x $1000):
3
Cty G.O. Bond/Other
600 6,000 $6,600
State Revolving Fund
State CIP
Federal (including ARRA-Stimulus)
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
11 TOTAL:
�
$600 $6,000 1 $6,600
89
(This Page Intentionally Left Blank)
90
DEPARTMENT OF PUBLIC
WORKS
Warren H.W. Lee, P. E., DIRECTOR
91
(This Page Intentionally Left Blank)
92
Department: Public Works
SUMMARY OF DEPARTMENT REQUESTS
SIX YEAR CAPITAL IMPROVEMENTS PROGRAM
FISCAL YEAR 2015-2016
93
2015-16 FY FUNDING
FUNDING FORECAST BY FISCAL YEAR
(in thousands)
(in thousands)
TOTAL
ESTIMATED
Prior
Funds
Beyond 6
PROJECT
PRIORITY
PROJECT
Count
County
State
Federal
Private*
CBA**
Allotted
2015-16
2016-17
2017-18
2018-19
2019-20
2020-21
years
COST
1
DPW Facilities ADA Compliance
750
7,420
750
750
750
-
-
-
-
9,670
2
DPW Road Repair & Maintenance
6,000
11,700
6,000
4,000
3,000
2,000
2,000
2,000
30,700
3
Mohouli Senior Housing Traffic Signal (Reapp. 5381.15)
500
500
500
1,000
4
DPW Facilities Renovation
600
8,637
600
500
500
500
500
500
2,500
14,237
5
East Hawaii Traffic Facility Repair/Renovation (Reapp. 5191.53)
200
140
200
340
6
Komohana Street Reconstruction
1,500
4,000
1,500
5,500
7
Kilauea-Keawe Street Resurfacing (Ponahawai St. to Waianuenue Ave.)
2,000
1,000
2,000
3,000
8
Mamalahoa Highway (Route 19) Improvements
1,800
1,500
1,800
3,300
9
DPW Facilities Repair & Maintenance
2,000
15,128
2,000
2,000
2,000
1,500
1,500
1,500
1,500
27,128
10
DPW Facilities Hardening
800
2,279
800
800
-
-
-
-
-
3,879
it
DPW Facilities Hazardous Materials Mitigation
100
1,828
100
100
100
50
50
50
370
2,648
12
West Hawaii Traffic Calming Improvements (Reapp. 5389.04)
250
6
250
256
13
East Hawai'i Traffic Calming Improvements (Reapp. 5389.05)
250
42
250
292
14
Alii Drive Shoulder Improvements
800
-
800
800
15
DPW Facilities Energy Efficiency
1,300
4,743
1,300
Soo
500
500
500
500
2,500
11,043
16
Land Acquisition for DPW Facilities
100
100
100
100
100
100
100
100
100
800
17
La'aloa Avenue Extension
1,635
14,000
1,635
15,635
18
West Hawaii Traffic Signal Improvements
100
1,000
-
1,100
1,100
19
Street Light Installations, Islandwide
2,000
2,000
2,000
4,000
20
Kalaniana'ole Avenue Improvements
2,500
2,500
2,500
21
Upper Waianuenue Avenue Road Safety and Drainage Control
8,600
34,400
43,000
43,000
22
Henry Street Reconstruction (Palani Rd to Queen Ka'ahumanu Hwy)
3,500
3,500
3,500
23
Parking Improvements and Construction
20,000
20,000
20,000
24
South Kopua Road Extension
1,000
1,000
1,000
25
Lindsey Road Extension Bikeway and Pedestrian Way
75
75
175
250
26
Paniolo Avenue Extension to Kawaihae Road
500
500
3,500
20,000
10,000
34,000
TOTAL
58,360
1 -
1 34,400
1 500
1 1,000
1 75,023
1 94,260
1 12,425
1 26,950
1 14,650
1 4,650
4,650
6,970
239,578
93
(This Page Intentionally Left Blank)
94
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Public Works - Building Division 2. DATE: 12/11/2014
3. PROJECT NAME: DPW Facilities ADA Compliance 4. SUBMITTER: David Yamamoto
5. COUNCIL BENEFIT DISTRICT(S): Various 6. TMK/JUDICIAL: Various
7. LOCATION (COUNCIL DISTRICT): Various B. TOTAL COUNTY FUNDS NEEDED THIS FY: $750,000
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): 4) Nonrecurring rehabilitation or deferred maintenance of infrastructure and building(s)
10. PROJECT/PROGRAM DESCRIPTION: ADA compliance requirements in address of Architectural Barrier Identification and Cost Report prepared by court appointed consultant
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): 1) Addresses Public Health and Safety; 2) Inadequate service or facility; 6) Enhances Quality of Life; 7) Service Improvement
12. LONG RANGE PLANS/COMMUNITY VALUES: 1) Department's Vision, Mission, or Goal -Hawaii County Code Section 2-39, "The director of public works shall be charged with the supervision,
direction, and control of: (1) The construction, repair, maintenance, and operation of all County buildings, structures, and grounds, not otherwise delegated to any other department of the County.
13. COUNTY MATCHING FUNDS REQ'D? (Y/N) No DESCRIBE:
14. LEGAL MANDATE? (Y/N) Yes DESCRIBE: Russell, et al., vs. County of Hawaii, Civ. No. 97-01102 SPK
15. IMPACT ON OPERATIONAL BUDGET: No impact. Annual operating repair and maintenance budgets are designated for small scaled projects performed by County workforce.
16. SUSTAINABILITY FOCUS (List all that apply): 1) Promotes Economic Vitality; 3) Strengthens and Sustains Our Community; 5) Promotes Health and Safety.
17. PROJECT READINESS (List all that apply): 1) Currently underway; 3) Previously Appropriated; 4) Staff available to manage project; 6) can realistically encumber funds in a contract within three years.
18. EXPENDITURE PHASING (X $1000):
nor Funds
Allotted
(not lapsed)
This FY 15-16 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
Land Acquisition
Design/Survey
652
50 50 50
$802
Construction
6,768
700 700 700
$8,868
TOTALIF
$7,420
$750 1 $750 1 $750 1 1 1$9,670
19. O & M COSTS (x $1000):
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond/Other
7,420
750 750 750
$9,670
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication,
11 TOTAL:
F $7,420
F $750 $750 $750 1 1 1
$9,670
95
(This Page Intentionally Left Blank)
96
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Public Works
3. PROJECT NAME: DPW Road Repair and Maintenance
S. COUNCIL BENEFIT DISTRICT(S): All
7. LOCATION (COUNCIL DISTRICT): All
2. DATE: 12/18/2014
4. SUBMITTER: Warren Lee
6. TMK/JUDICIAL: Various
8. TOTAL COUNTY FUNDS NEEDED THIS FY:
$6,000,000
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Infrastructure improvement (roads, drainage, curbs, etc.)
30. PROJECT/PROGRAM DESCRIPTION: Large scale repair, maintenance, and improvement to existing major and minor collector roads to include pavement preservation, shoulders, drainage facilities,
curb -gutters -sidewalks, lighting, signage, and striping.
31. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Repair/Maintenance of infrastructure.
12. LONG RANGE PLANS/COMMUNITY VALUES: Department's vision, mission, core values, and goals.
13. COUNTY MATCHING FUNDS REQ'D? (Y/N) No DESCRIBE:
14. LEGAL MANDATE? (Y/N) No DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET:
16. SUSTAINABILITY FOCUS (List all that apply): Promote health and safety.
17. PROJECT READINESS (List all that apply):
18. EXPENDITURE PHASING (X $1000):
Prior Fun s
Allotted
(not lapsed)
This FY 1S-16
Request FY 16-17 FY 17-18
Beyond 6
FY 18-19 FY 19-20 FY 20-21 Years
TOTAL:
Planning
$0
Land Acquisition
$0
Design/Survey
$0
Construction
11,700
6,000 4,000 3,000
2,000 2,000 2,000
$30,700
TOTAL:
19. O & M COSTS (x $1000):
$6,000 $4,0001 $3,000 $2,000 $2,000 $2,000 $0 $30,700
$0
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond/Other
11,700
6,000 4,000 3,000
2,000 2,000 2,000
$30,700
State Revolving Fund
$0
State CIP
$0
Federal
$0
Private (Grants)
$0
CBA (Fair Share, Park Dedication, etc.)
$0
TOTAL1
$11,700
$6,000 $4,000 $3,000
$2,000 $2,000 $2,000 $0
$30,700
97
T - i . 4rJ V
;4
0 4VP
�ap 6 a a '•s+�'�i3 .~y � .r �, _� �•rra� rT t!s Y ��..i
�,,. ,, 4 ) �. ♦ :t ;� M - r w f �_ _:r=y.�c •4��.,�w...11yiR R` -`^' -: .... .. w�� , :�
y ..� .vr ,D t. f;•ti •fir ^t�. e� r _ �'!.` YR
Project Site
•%, •'�
i
ti r.1 Vii; 1 {.ry 11:! 'g'� •' `^... A! �, s.'
rA-
?-,fe
Ip 200200 11
SOU m ll
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Public Works, Traffic Division 2. DATE: 1/13/2015
3. PROJECT NAME: Mohouli Senior Housing Traffic Signal (Reapp. 5381.15) 4. SUBMITTER: Ronald L. Thiel, P.E.
S. COUNCIL BENEFIT DISTRICT(S): 2 6. TMK/JUDICIAL: (3) 2-4-001:999/ South Hilo
7. LOCATION (COUNCIL DISTRICT): 2 S. TOTAL COUNTY FUNDS NEEDED THIS FY:
$0
9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Infrastructure Improvement
10. PROJECT/PROGRAM DESCRIPTION: Design and Construction of the traffic signal near Mohouli Senior Housing, S. Hilo (Re -appropriation 5381.15)
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses Public health and safety. Enhances Quality of life. Service improvements.
12. LONG RANGE PLANS/COMMUNITY VALUES: Community Development Plan. Traffic Signal to accommodate Senior residents in Mohouli Senior Housing complex.
13. COUNTY MATCHING FUNDS REQ'D? (Y/N) NO DESCRIBE:
14. LEGAL MADATE? (Y/N) NO DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: Increased utility costs, on average energy and maintenance costs are $10K annually.
16. SUSTAINABILITY FOCUS (List all that apply): Strengthens and sustains our community. Promotes health and safety.
17. PROJECT READINESS (List all that apply): External funds/resources available to proceed.
18. EXPENDITURE PHASING (X $1000):
Prior Fun s
Allotted
(not lapsed)
This FY 15-16 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years
TOTAL:
Planning
$0
Land Acquisition
$0
Design/Survey
10
10
$20
Construction
490
490
$980
TOTAL:
$500
$500 $01 $0 I $0
$1,00
19. O & M COSTS (X$1000):
20. FUNDING SOURCE (x $1000):
$0
Cty G.O. Bond/Other
$0
State Revolving Fund
$0
State CIP
$0
Federal
$0
Private (Grants)
500
500
$1,000
CBA (Fair Share, Park Dedication, etc.)
$0
11 TOTAL:
$500
$500 $0 sol $0 1 $01 $0 I $0 I
$1100
4*7
(This Page Intentionally Left Blank)
100
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENTAND DIVISION: Public Works - Building Division 2. DATE: 12/11/2014
3. PROJECT NAME: DPW Facilities Renovation 4. SUBMITTER: David Yamamoto
S. COUNCIL BENEFIT DISTRICT(S): Various 6. TMK/JUDICIAL: Various
7. LOCATION (COUNCIL DISTRICT): Various 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $600,000
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): New buildings or structures or additions to a building; 4) Nonrecurring rehabilitation or deferred maintenance of infrastructure and building(s)
30. PROJECT/PROGRAM DESCRIPTION: Large to medium scale renovation projects. 51% of DPW's 75 existing facilities are more than 30 years old. Departments regularly request renovation of existing
facilities or lease space to address increasing number of employees, increasing electrical/data communication demand, and changes in service program requirements.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): 1) Addresses Public Health and Safety; 2) Inadequate service or facility; 6) Enhances Quality of Life; 7) Service Improvement
12. LONG RANGE PLANS/COMMUNITY VALUES: 1) Department's Vision, Mission or Goals -Hawaii County Code Section 2-39, "The director of public works shall be charged with the supervision,
direction, and control of: (1) The construction, repair, maintenance, and operation of all County buildings, structures, and grounds, not otherwise delegated to any other department of the County.
13. COUNTY MATCHING FUNDS REQ'D? (Y/N) No DESCRIBE:
14. LEGAL MANDATE? (Y/N) Potentially DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: No impact. Annual operating repair and maintenance budgets are designated for small scaled projects performed by County workforce.
16. SUSTAINABILITY FOCUS (List all that apply): 1) Promotes Economic Vitality; 3) Strengthens and Sustains Our Community; 5) Promotes Health and Safety.
17. PROJECT READINESS (List all that apply): 1) Currently underway; 3) Previously Appropriated; 4) Staff available to manage project; 6) can realistically encumber funds in a contract prior to June 30.
2017.
18. EXPENDITURE PHASING (X $1000):
or un s
llotted
F(nrctlapsed)
This FY 15-16 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
$0
Land Acquisition
$0
Design/Survey
1,120
50 50 50 50 50 Sol 2501
$1,670
Construction
7,517
550 450 450 450 450 1 4501 2,2501
$12,567
TOTAL:
$8,637
$600 $500 $500 $500 $500 $500 $2,500
$14,237
19. O & M COSTS (x $1000):
$0
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond/Other
8,637
600 500 500 500 500 500 2,500
$14,237
State Revolving Fund
$0
State CIP
$0
Federal
$0
Private (Grants)
$0
CBA (Fair Share, Park Dedication, etc.)
$0
TOTAL:
$8,637
$600 1 $500 1 $500 1 $500 1 $500 1 $500 1 $2,500 1
$14,237
101
(This Page Intentionally Left Blank)
102
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENTAND DIVISION: Public Works, Traffic Division 2. DATE: 12/10/2014
3. PROJECT NAME: East Hawaii Traffic Facility Repairs/Renovations (Reapp. 5191.53) 4. SUBMITTER: Ronald L. Thiel, P.E.
5. COUNCIL BENEFIT DISTRICT(S): 3 6. TMK/JUDICIAL: (3) 2-2-058-018/ South Hilo
7. LOCATION (COUNCIL DISTRICT): 3 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $200,000
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Nonrecurring rehabilitation or deferred maintenance of infrastructure and buildings
10. PROJECT/PROGRAM DESCRIPTION: Signal and Signs & Marking Buildings. Repair, renovation and increasing storage areas to existing Quonset, multi-level structure, and shared Quonset storage.
(Reappropriation 5191.53)
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Need provisions to store sensitive materials in controlled temperatures to prolong shelf life prior to installation. Also need to improve and
increase storage and work areas for additional maintenance & manpower.
12. LONG RANGE PLANS/COMMUNITY VALUES: Department goal to properly maintain all existing facilities.
13. COUNTY MATCHING FUNDS REQ'D? (Y/N) NO DESCRIBE:
14. LEGAL MANDATE? (Y/N) NO DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: Materials are subject to deterioration when stored in normal conditions and shelf life is reduced which causes early replacement and additional expense.
Additional work stations will accommodate increased manpower maintenance capabilities.
16. SUSTAINABILITY FOCUS (List all that apply):
17. PROJECT READINESS (List all that apply): Previously appropriated.
18. EXPENDITURE PHASING (X $1000):
Prior�un(sAllThis
(not I
FY 15-16 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
$0
Land Acquisition
$0
Design/Survey
$0
Construction
140
200
$340
TOTAL:
19. 0 & M COSTS (x $1000):
$140
$200 $0 $0 $0 $340
$0
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond/Other
140
200
$340
State Revolving Fund
$0
State CIP
0
Federal
$0
Private (Grants)
$0
CBA (Fair Share, Park Dedication, etc.)
$0
TOTAL:
$1401
$200 $0 $0 $0 $0 $0 $0
$340
103
hwTm
N
r r G ?
SOUTH )
arcaa KCHAU '
�I HAYAKUA �NONM _j
HIM
r
j PROJECT
«E,E ; ! w M C� '1 LOCATION
NORTH KORA
Plu. gFEAI,�
Ki.'.Hm �
' o_ K'.MU.MI Pf
PMINA
SMIH Y4AP
KOKA
KAU �
08LaM[D CF UI/ia111/4".Yll
`J
\ D
9
c
N
s
s ywwi R.d*k pc
A alts
S♦
d
1 5
cy w
S♦ Ly v°S
b
v
� 9fy MdvJ� PM
5♦ L"i
KOMOHANA STREET RECONSTRUCTION
104
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Public Works, Engineering Division 2. DATE: 12/9/2014
3. PROJECT NAME: Komohana Street Reconstruction 4. SUBMITTER: Pacheco, Kason
S. COUNCIL BENEFIT DISTRICT(S): 2&3 6. TMK/JUDICIAL: (3) 2-3-035:999/ South Hilo
7. LOCATION (COUNCIL DISTRICT): 2 B. TOTAL COUNTY FUNDS NEEDED THIS FY:
$1,500,000
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Engineering, infrastructure improvement, nonrecurring rehabilitation or deferred maintenance of infrastructure.
10. PROJECT/PROGRAM DESCRIPTION: Reconstruction of roadway, re -striping, and traffic signal upgrades from Waianuenue Ave. to Kukuau St.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses public health and safety, enhances quality of life, service improvements.
12. LONG RANGE PLANS/COMMUNITY VALUES:
13. COUNTY MATCHING FUNDS REQ'D? (Y/N) No DESCRIBE:
14. LEGAL MANDATE? (Y/N) No DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: Reduce maintenance
16. SUSTAINABILITY FOCUS (List all that apply): Promotes health and safety.
17. PROJECT READINESS (List all that apply): Design and preparing bid package
18. EXPENDITURE PHASING (X $1000):
Prior Funds
Allotted
(not lapsed)
This FY 15-16
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20
Beyond 6
FY 20-21 Years
TOTAL:
Planning
$0
Land Acquisition
$0
Design/Survey
$0
Construction
4,000
1,500
$5,500
TOTAL:
$4,000
$1,500 $0 $0 $0
$5,500
19. O & M COSTS (x $1000):
$0
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond/Other
4,000
1,500
$5,500
State Revolving Fund
$0
State CIP
0
Federal
$0
Private (Grants)100
CBA (Fair Share, Park Dedication, etc.)
TOTAL:
$4,000
$1,500 $0 $0 $0 $0
I $0 1 $01
$5,500
105
VALIE".
C
G
O
AMAUUW RD. p •
St•
I OC;ATION PI AN
I DEPARTMENT OF PUBLIC WORKS, COUNTY OF HAWAII I
ENGINEERING DIVISION HILO, HAWAII
KILAUEA - KEAWE
(PONAHAWAI STREET
106
STREET RESURFACING
TO WAIANUENUE AVENUE)
JOB NO: E-4254
DISTRICT OF SOUTH HILO
ISLAND OF HAWAII
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Public Works, Engineering Division 2. DATE: 1/13/2015
3. PROJECT NAME: Kilauea-Keawe Street Resurfacing (Ponahawai St. to Waianuenue Ave.) 4. SUBMITTER: Casey Yanagihara
S. COUNCIL BENEFIT DISTRICT(S): Island Wide 6. TMK/JUDICIAL: (3) 2-3-04, 05, 06, 07,08 & 09 / South Hilo
7. LOCATION (COUNCIL DISTRICT): 2 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $2,000,000
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Infrastructure improvement, Planning, Feasibility, Engineering, Design and Construction.
10. PROJECT/PROGRAM DESCRIPTION: Perform the necessary engineering design for pavement resurfacing of roadway, along with any necessary drainage improvements.
11. PROJECTJUSTI FICATION & OUTCOME(S) (List all that apply): The existing roadway is structurally deficient and in very poor condition. There may also be some necessary drainage improvements
required.
12. LONG RANGE PLANS/COMMUNITY VALUES: Department vision, mission, core values and goals; and community value and desirability.
13. COUNTY MATCHING FUNDS REQ'D? (Y/N) DESCRIBE:
14. LEGAL MANDATE? (Y/N) DDESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: Highway Maintenance Division and Traffic Division will have less to maintain this new roadway pavement and markings in the future.
16. SUSTAINABILITY FOCUS (List all that apply): This project will provide improved pedestrian, bicycle and vehicular traffic safety in the area.
17. PROJECT READINESS (List all that apply): For engineering and construction.
EXPENDITURE PHASING (X $1000):
Prior �umsAlloThis
(not l
FY 15-16 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
$0
Land Acquisition
$0
Design/Survey
$0
Construction
1,000
2,000
$3,000
TOTAL:
$1,000
$2,000 $0 $0 $0
$3,000
19. O & M COSTS (x $1000):
$0
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond/Other
1,000
2,000
$3,000
State Revolving Fund
$0
State CIP
$0
Federal
$0
Private (Grants)
$0
CBA (Fair Share, Park Dedication, etc.)
$0
11 TOTAL:
$1,0001
$2,000 1 $0 I $0 $0 I $0 I $0 I $0 I
$3,000
107
��� 1 IJLNINU Vr r/-\vvmII
108
ENTS
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Public Works, Engineering Division 2. DATE: 12/24/2014
3. PROJECT NAME: Mamalahoa Highway (Route 19) Improvements 4. SUBMITTER: Casey Yanagihara
S. COUNCIL BENEFIT DISTRICT(S): Island Wide 6. TMK/JUDICIAL: (3) 6-4-01 /South Kohala
7. LOCATION (COUNCIL DISTRICT): 9 8. TOTAL COUNTY FUNDS NEEDED THIS FY:
$1,800,000
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Infrastructure improvement, Planning, Feasibility, Engineering, Design and Construction.
10. PROJECT/PROGRAM DESCRIPTION: Roadway (travel lane) improvements on the Mamalahoa Highway between Kamamalu Street to Iona Court. Work includes the travel lane structural pavement
reconstruction along the Mamalahoa Highway; i.e., asphalt paving, base and sub base reconstruction.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): This project seeks to improve the distressed travel lane pavement, which will improve vehicular and pedestrian safety.
12. LONG RANGE PLANS/COMMUNITY VALUES: Department vision, mission, core values and goals; and community value and desirability.
13. COUNTY MATCHING FUNDS REQ'D? (Y/N) N/A DESCRIBE:
14. LEGAL MANDATE? (Y/N) 0 DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: Highway Maintenance Division and Traffic Division will have less to maintain this new roadway pavement and markings in the future.
16. SUSTAINABILITY FOCUS (List all that apply): This project will provide improved pedestrian, bicycle and vehicular traffic safety in the area.
17. PROJECT READINESS (List all that apply): For engineering and construction.
18. EXPENDITURE PHASING (X $1000):
Prior Funds
Allotted
(not lapsed)
This FY 15-16 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years
TOTAL:
Planning
$0
Land Acquisition
$0
Design/Survey
$0
Construction
1,500
1,800
$3,300
TOTAL:
$1,500
$1,800 $0 $01 $0 1
$3,300
19. O & M COSTS (x $1000):
$0
20. FUNDING SOURCE (x$1000):
A
Cty G.O. Bond/Other
1,500
1,800
$3,300
State Revolving Fund
$0
State CIP
0
Federal
$0
Private (Grants)
$0
CBA (Fair Share, Park Dedication, etc.)
$0
TOTAL:
$1,500
$1,800 1 $0 I $0 I $0 I $0 $01 $0 I$3,300
109
(This Page Intentionally Left Blank)
Me
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Public Works - Building Division 2. DATE: 12/11/2014
3. PROJECT NAME: DPW Facilities Repair and Maintenance 4. SUBMITTER: David Yamamoto
S. COUNCIL BENEFIT DISTRICT(S): Various 6. TMK/JUDICIAL: Various
7. LOCATION (COUNCIL DISTRICT): Various 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $2,000,000
PROJECT ELIGIBILITY (List Criteria): 4) Nonrecurring rehabilitation or deferred maintenance of infrastructure and building(s)
rrA`
10. PROJECT/PROGRAM DESCRIPTION: Large to medium scale periodic and emergency repair and maintenance of current 75 existing DPW facilities. Repairs and/or replacement of damaged and/or
deteriorated foundation, roof, wall, asphalt concrete pavement, paint, utilities, electrical equipment, mechanical equipment, security systems, etc. 51% of DPW's 75 existing facilities are more than 30
years old and require repair and maintenance. Due to budgetary constraints, scheduled repair and maintenance of DPW faculties were deferred in past years resulting in facilities requiring major repair
and maintenance. Annual operating budget allowances were determined inadequate to address large to medium scale projects.
11. PROJECT JUSTIFICATION & OUTCOME'S) (List all that apply): 1) Addresses Public Health and Safety; 3) Improves operational efficiency; 5) Repair/Maintenance of infrastructure or facility; 6)
Enhances Quality of Life;
12. LONG RANGE PLANS/COMMUNITY VALUES: 1) Department's Vision, Mission, or Goals - Hawaii County Code Section 2-39, "The director of public works shall be charged with the supervision,
direction, and control of: (1) The construction, repair, maintenance, and operation of all County buildings, structures, and grounds, not otherwise delegated to any other department of the County.
13. COUNTY MATCHING FUNDS REQ'D? (Y/N) No DESCRIBE:
14. LEGAL MANDATE? (Y/N) Potentially DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: No impact. Annual operating repair and maintenance budgets are designated for small scaled projects performed by County workforce.
16. SUSTAINABILITY FOCUS (List all that apply): 3) Strengthens and Sustains Our Community; 5) Promotes Health and Safety.
17. PROJECT READINESS (List all that apply): 1) Currently underway; 3) Previously Appropriated; 4) Staff available to manage project; 6) can realistically encumber funds in a contract prior to June 30.
2017.
18. EXPENDITURE PHASING (X $1000):
nor un s
Allotted
(not lapsed)
This FY 15-16 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
$0
Land Acquisition
$0
Design/Survey
678
100 100 100 100 100 100 100 $1,378
Construction
14,450
1,900 1,900 1,900 1,400 1,400 1,400 1,400 $25,750
TOTAL:
$15,1281
$2,000-1 $2,000 1 $2,000 1 $1,500 1 $1,500 1 $1,500 1 $1,500 F 327,128
19. O & M COSTS (x $1000):
$0
20. FUNDING SOURCE (x$1000):
Cty G.O. Bond/Other
15,128
2,000 2,000 2,000 1,500 1,500 1,500 1,500 $27,128
State Revolving Fund
$0
State CIP
$0
Federal
$0
Private (Grants)
$0
CBA (Fair Share, Park Dedication,
TOTALIF
$15,128
$2,000 $2,000 $2,000 $1,500 $1,500 $1,500 $1,500 $27,128
111
(This Page Intentionally Left Blank)
112
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Public Works - Building Division 2. DATE: 12/11/2014
3. PROJECT NAME: DPW Facilities Hardening 4. SUBMITTER: David Yamamoto
5. COUNCIL BENEFIT DISTRICT(S): Various 6. TMK/JUDICIAL: Various
7. LOCATION (COUNCIL DISTRICT): Various 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $800,000
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): 2) Infrastructure improvement; 4) Nonrecurring rehabilitation or deferred maintenance of infrastructure and building(s)
10. PROJECT/PROGRAM DESCRIPTION: Retrofit existing DPW Facilities (Administration, Civil Defense, Fire, Police, Maintenance Baseyard, Fuel Depot, etc.) to better survive and/or quickly recover from
natural and man made disasters.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): 1) Addresses Public Health and Safety; 2) Inadequate service or facility; 6) Enhances Quality of Life; 7) Service Improvement
12. LONG RANGE PLANS/COMMUNITY VALUES: 1) Department's Vision, Mission or Goals - Hawaii County Code Section 2-39, "The director of public works shall be charged with the supervision,
direction, and control of: (1) The construction, repair, maintenance, and operation of all County buildings, structures, and grounds, not otherwise delegated to any other department of the County.
13. COUNTY MATCHING FUNDS REQ'D? (Y/N) No DESCRIBE:
14. LEGAL MANDATE? (Y/N) No DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: No impact. Annual operating repair and maintenance budgets are designated for small scaled projects performed by County workforce.
16. SUSTAINABILITY FOCUS (List all that apply): 5) Promotes Health and Safety.
17. PROJECT READINESS (List all that apply): 1) Currently underway; 3) Previously Appropriated; 4) Staff available to manage project; 6) can realistically encumber funds in a contract prior to June 30.
2017.
18. EXPENDITURE PHASING (X $1000):
rior Funds
Allotted
(not lapsed)
This FY 15-16 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
$0
Land Acquisition
$0
Design/Survey
100
50 50
$200
Construction
2,179
750 750
$3,679
TOTAL:
$2,279
$800 $800 $0 I $0 I $0 I $0 1 $0
$3,879
19. O & M COSTS (x $1000):
1 1 1
$0
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond/Other
2,279
800 800
$3,879
State Revolving Fund
$0
State CIP
0
Federal
$0
Private (Grants)
$0
CBA (Fair Share, Park Dedication, etc.)
$0
TOTAL:
$2,279
$800 1 $800 $0 I $0 I $0 $0 $0
$3,879
113
(This Page Intentionally Left Blank)
114
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Public Works - Building Division 2. DATE: 12/11/2014
3. PROJECT NAME: DPW Facilities Hazardous Materials Mitigation 4. SUBMITTER: David Yamamoto
S. COUNCIL BENEFIT DISTRICT(S): Various 6. TMK/JUDICIAL: Various
7. LOCATION (COUNCIL DISTRICT): Various 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $100,000
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): 4) Nonrecurring rehabilitation or deferred maintenance of infrastructure and building(s)
10. PROJECT/PROGRAM DESCRIPTION: Remove hazardous building materials as required prior to proceeding with maintenance, renovation and repair of facilities. The National Emissions Standards
Hazardous Air Pollutants (NESHAP) 1973 Act requires hazardous material demolition and repair/maintenance work to be properly performed by trained and certified worker(s), and a minimum 30 day
notification to the EPA of any hazardous material abatement work.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): 1) Addresses Public Health and Safety; 5) Repair/Maintenance of infrastructure or building.
12. LONG RANGE PLANS/COMMUNITY VALUES: 1) Department's Vision, Mission, or Goals -Hawaii County Code Section 2-39, "The director of public works shall be charged with the supervision,
direction, and control of: (1) The construction, repair, maintenance, and operation of all County buildings, structures, and grounds, not otherwise delegated to any other department of the County.
13. COUNTY MATCHING FUNDS REQ'D? (Y/N) No DESCRIBE:
14. LEGAL MANDATE? (Y/N) Yes DESCRIBE: NESHAP 1973 Act
15. IMPACT ON OPERATIONAL BUDGET: No impact. Annual operating repair and maintenance budgets are designated for small scaled projects performed by County workforce.
16. SUSTAINABILITY FOCUS (List all that apply): 5) Promotes Health and Safety.
17. PROJECT READINESS (List all that apply): 1) Currently underway; 3) Previously Appropriated; 4) Staff available to manage project; 6) can realistically encumber funds in a contract prior to June 30.
2017.
18. EXPENDITURE PHASING (X $1000):
nor un s
Allotted
(not lapsed)
This FY 15-16 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
$0
Land Acquisition
$0
Design/Survey
865
20 20 20 10 10 10 70
$1,025
Construction
963
80 80 80 40 40 40 300
$1,623
TOTAL:
$1,828
$100 $100 $100 $50 $50 $50 $370
$2,648
19. O & M COSTS (x $1000):
$0
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond/Other
1,828
100 100 100 50 50 50 370
$2,648
State Revolving Fund
$0
State CIP
$0
Federal
$0
Private (Grants)
$0
CBA (Fair Share, Park Dedication, etc.)
$0
TOTAL:
$1,828
$100 $100 $100 $50 $50 $50 $370
$2,648
115
(This Page Intentionally Left Blank)
116
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Public Works, Traffic Division 2. DATE: 12/10/2014
3. PROJECT NAME: West Hawai'i Traffic Calming Improvements (Reapp. 5389.04) 4. SUBMITTER: Ronald L. Thiel, P.E.
S. COUNCIL BENEFIT DISTRICT(S): 6, 7, 8, 9 6. TMK/JUDICIAL: Various
7. LOCATION (COUNCIL DISTRICT): 6, 7, 8, 9 8. TOTAL COUNTY FUNDS NEEDED THIS FY:
$250,000
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Infrastructure improvement
10. PROJECT/PROGRAM DESCRIPTION: Construction of various Traffic Calming Improvements to include signs, striping, smart (speed display) signs, speed humps and speed tables, roundabouts, chicanes,
chokers, geometrics alterations, etc. Reference will be made but not limited to the "Traffic Calming Guidelines for the County of Hawai'i" to provide a means to slow down traffic in residential areas at
various locations. Work may also include upgrading and/or repairing existing road components, such as shoulders and drainage. (Re -appropriation 5389.04)
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Projects will serve to slow traffic speed and reduce the danger of motorists that speed through residential neighborhoods. Projects will
also provide for a more efficient flow of traffic through intersections and reduce conflicts between drivers and pedestrians.
12. LONG RANGE PLANS/COMMUNITY VALUES: Addresses Public health and safety. Enhances quality of life. Service improvement.
13. COUNTY MATCHING FUNDS REQ'D? (Y/N) NO DESCRIBE:
14. LEGAL MANDATE? (Y/N) NO DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: Projects will reduce the severity and number of pedestrian and vehicle crashes due to speeding and risky driver behavior. This reduction in crashes will reduce
operational costs associated with a Police and EMS response, as well as costs associated with potential law suits against the County.
16. SUSTAINABILITY FOCUS (List all that apply): Promotes Health and Safety
17. PROJECT READINESS (List all that apply): Previously appropriated.
18. EXPENDITURE PHASING (X $1000):
Prior�nsAlloThis
(not l
FY 15-16 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years
TOTAL:
Planning
$0
Land Acquisition
$0
Design/Survey
50
$50
Construction
6
200
$206
TOTAL:
$6
$250 $0 $0 $0
$256
19. O & M COSTS (x $1000):
$0
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond/Other
6
250
$256
State Revolving Fund
$0
State CIP
$0
Federal
$0
Private (Grants)
$0
CBA (Fair Share, Park Dedication, etc.)
$0
11 TOTAL:
$6
$250 I $0 I $0 I $0 I $0 I $0 I $0 1
$256
117
(This Page Intentionally Left Blank)
118
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Public Works, Traffic Division 2. DATE: 12/10/2014
3. PROJECT NAME: East Hawai'i Traffic Calming Improvements (Reapp. 5389.05) 4. SUBMITTER: Ronald L. Thiel, P.E.
S. COUNCIL BENEFIT DISTRICT(S): 1, 2, 3, 4, 5 6. TMK/JUDICIAL: Various
7. LOCATION (COUNCIL DISTRICT): 1, 2, 3, 4, 5 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $250,000
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Nonrecurring rehabilitation of infrastructure and buildings.
10. PROJECT/PROGRAM DESCRIPTION: Construction of various Traffic Calming Improvements to include signs, striping, smart (speed display) signs, speed humps and speed tables, roundabouts, chicanes,
chokers, geometrics alterations, etc. Reference will be made but not limited to the "Traffic Calming Guidelines for the County of Hawai'i" to provide a means to slowdown traffic in residential areas at
various locations. Work may also include upgrading and/or repairing existing road components, such as shoulders and drainage. (Re -appropriation 5389.05)
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Projects will serve to slow traffic speed and reduce the danger of motorists that speed through residential neighborhoods. Projects will
also provide for a more efficient flow of traffic through intersections and reduce conflicts between drivers and pedestrians.
12. LONG RANGE PLANS/COMMUNITY VALUES: Addresses Public health and safety. Enhances quality of life. Service improvement.
13. COUNTY MATCHING FUNDS REQ'D? (Y/N) NO DESCRIBE:
14. LEGAL MANDATE? (Y/N) NO DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: Projects will reduce the severity and number of pedestrian and vehicle crashes due to speeding and risky driver behavior. This reduction in crashes will reduce
operational costs associated with a Police and EMS response, as well as costs associated with potential law suits against the County.
16. SUSTAINABILITY FOCUS (List all that apply): Promotes Health and Safety.
17. PROJECT READINESS (List all that apply): Previously appropriated.
18. EXPENDITURE PHASING (X $1000):
Prior Fun s
Allotted
(not lapsed)
This FY 15-16 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
$0
Land Acquisition
$0
Design/Survey
50 $50
Construction
42
200 $242
TOTAL:
$42
$250 $0 $0 $0 $292
19. O & M COSTS (x $1000):
20. FUNDING SOURCE (x $1000):
$0
Cty G.O. Bond/Other
42
250 $292
State Revolving Fund
$0
State CIP
$0
Federal
$0
Private (Grants)
$0
CBA (Fair Share, Park Dedication, etc.)
$0
TOTAL:
$42i
$250 1 $0 I $0 I $0 I $0 I $0 I $0 1 $292
119
Figure la Location Ma
I y�r� 4 •y • rKAILLIA♦~
.A _-
Project Location
P h.
MAL, basl ;if r_• 'rr+�= .e.. .M.
M�, �•`� K / Y
i.
R.w.I p U 4 P U
Project —0— K.e, In i;f:� '+.^ \
Location
155'594"'.N ISS'S9'10' W ISS- 58'40' W WG584 155`5750• W
1z�� eft �.z.i is �i_iiy MRtE
Mmp erected a1& IOPO' i C_ U\YY JGeogaph¢layswoonakTrograpisc-cam IMO
ouumc. nawal 1 1-ounry Kea1 rroperty i ax Maps, portion of Plat Map (3)-7-5-8. Some labels added.
Ali `i Drive Shoulder Improvements in the Vicinity of Islander Inn Environmental Assessment
2
120
Figure 2 TMK Ma
--
s mabrnelana
CAu�-�...
w„
�
�d
..�,,,, �� ,,;
Project
Kona •,•�aIJ
Site
Corridor
Iskander '•w�- ...,
Inn � �•YI
C T
s
2
K -on 4Y
AIF I E t. .
L *.,Vk
/9IfB .. ..
PO
ouumc. nawal 1 1-ounry Kea1 rroperty i ax Maps, portion of Plat Map (3)-7-5-8. Some labels added.
Ali `i Drive Shoulder Improvements in the Vicinity of Islander Inn Environmental Assessment
2
120
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENTAND DIVISION: Public Works, Engineering Division Z. DATE: 12/13/2014
3. PROJECT NAME: Ali'i Drive Shoulder Improvements 4. SUBMITTER: Ben Ishii
S. COUNCIL BENEFIT DISTRICT(S): 7 6. TMK/JUDICIAL: (3) 7-5-8:por 1&3/ North Kona
7. LOCATION (COUNCIL DISTRICT): 7 8. TOTAL COUNTY FUNDS NEEDED THIS FY:
$800,000
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Land Acquisition and Infrastructure improvements
30. PROJECT/PROGRAM DESCRIPTION: Land acquisition and construction for the widening of the mauka side shoulder on Ali'i Drive fronting Kona Islander Inn.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): To improve pedestrian, and bicycle traffic circulation in this area.
12. LONG RANGE PLANS/COMMUNITY VALUES: Improvement of pedestrian and bicycle facilities.
13. COUNTY MATCHING FUNDS REQ'D? (Y/N) No DESCRIBE:
14. LEGAL MANDATE? (Y/N) No DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: Maintenance of additional paved shoulders
16. SUSTAINABILITY FOCUS (List all that apply): Promotes health and safety.
17. PROJECT READINESS (List all that apply): Environmental Assessment complete.
18. EXPENDITURE PHASING (X $1000):
Prior Funs
Allotted
(not lapsed)
This FY 15-16 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 2041 Years
TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
200
600
$0
$200
$0
$600
TOTAL:
$0
$800 $0 $0 $0
$800
19. O & M COSTS (x $1000):
20. FUNDING SOURCE (x $1000):
1 $0
Cty G.O. Bond/Other
800
$800
State Revolving Fund
$0
State CIP
$0
Federal
$0
Private (Grants)
$0
CBA (Fair Share, Park Dedication, etc.)
$0
TOTAL:
$0
$800 $0 $0 $0 $0 $0 $0
$800
121
(This Page Intentionally Left Blank)
122
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Public Works - Building Division 2. DATE: 12/11/2014
3. PROJECT NAME: DPW Facilities Energy Efficiency 4. SUBMITTER: David Yamamoto
5. COUNCIL BENEFIT DISTRICT(S): Various 6. TMK/JUDICIAL: Various
7. LOCATION (COUNCIL DISTRICT): Various 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $1,300,000
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): 2) Infrastructure improvement; 4) Nonrecurring rehabilitation or deferred maintenance of infrastructure and building(s)
10. PROJECT/PROGRAM DESCRIPTION: Retrofit DPW facilities with solar energy systems, high efficiency equipment replacement, lighting, insulation, and other building energy saving systems.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): 3) Improves operational efficiency; 6) Enhances Quality of Life;
12. LONG RANGE PLANS/COMMUNITY VALUES: 1) Department's Vision, Mission, or Goals - Hawaii County Code Section 2-39, "The director of public works shall be charged with the supervision,
direction, and control of: (1) The construction, repair, maintenance, and operation of all County buildings, structures, and grounds, not otherwise delegated to any other department of the County.
13. COUNTY MATCHING FUNDS REQ'D? (Y/N) No DESCRIBE:
14. LEGAL MADATE? (Y/N) Na DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: Reduce annual operating budgets through reduced grid power demand and consumption.
16. SUSTAINABILITY FOCUS (List all that apply): 1) Promotes Economic Vitality; 2) Preserves and Protects Our Natural Environment; 5) Promotes Health and Safety.
17. PROJECT READINESS (List all that apply): 1) Currently underway; 3) Previously Appropriated; 4) Staff available to manage project; 6) can realistically encumber funds in a contract prior to June 30.
2017.
18. EXPENDITURE PHASING (X $1000):
F—Pri un s
Allotted
(not lapsed)
This FY 15-16 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
---J
Planning
$0
Land Acquisition
$0
Design/Survey
150 50 50 50 50 50 250
$650
Construction
4,743
1,150 450 450 450 450 450 2,250
$10,393
TOTAL:
$4,743
$1,300 $500 $500 $500 $500 $500 $2,500 1
$11,043
19. O & M COSTS (x $1000):
$0
20. FUNDING SOURCE (x$1000):
Cty G.O. Bond/Other
4,743
1,300 500 500 500 500 500 2,500
$11,043
State Revolving Fund
$0
State CIP
$0
Federal
$0
Private (Grants)
$0
CBA (Fair Share, Park Dedication, etc.)
$0
11 TOTAL:
$4,743
$1,300 $500 $500 $500 $500 1 $500 $2,500
$11,043
123
(This Page Intentionally Left Blank)
124
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Public Works, Engineering Division 2. DATE: 12/4/2014
3. PROJECT NAME: Land Acquisition for DPW Facilities 4. SUBMITTER: Ben Ishii
S. COUNCIL BENEFIT DISTRICT(S): All 6. TMK/JUDICIAL: Various
7. LOCATION (COUNCIL DISTRICT): All B. TOTAL COUNTY FUNDS NEEDED THIS FY: $100,000
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Land Acquisition
10. PROJECT/PROGRAM DESCRIPTION: Purchase of land to resolve existing roadway or drainage facility encroachments into private property and other land acquisitions related to small roadway or
drainage improvements. Funds to be also used for all related activities such as title search, appraisal and parcel map preparation.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Land purchase would eliminate the need to relocate the existing roadway or drainage facility and therefore reduce capital costs.
12. LONG RANGE PLANS/COMMUNITY VALUES: Department goal to properly maintain all existing facilities.
13. COUNTY MATCHING FUNDS TE 47 (Y/N) DESCRIBE:
14. LEGAL MANDATE? (Y/N) 0 DESCRIBE: Encroachments into private property are illegal
15. IMPACT ON OPERATIONAL BUDGET: None
16. SUSTAINABILITY FOCUS (List all that apply):
17. PROJECT READINESS (List all that apply): Funding needs are normally complaint related. Once a decision is made to purchase land, funds can be expended relatively quickly.
18. EXPENDITURE PHASING (X $1000):
Pnor Fun s
Allotted
(not lapsed)est
Y 15-16 Beyond 6
FRequFY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
$0
Land Acquisition
100
100 100 100 100 100 100 100
$800
Design/Survey
$0
Construction
$0
TOTAL:
19. O & M COSTS (x $1000):
$1001
$100 1 $100 1 $100 $100 1 $100 1 $100 1 $100 $800
$0
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond/Other
100
100 100 100 100 100 100 100
$800
State Revolving Fund
$0
State CIP
$0
Federal
$0
Private (Grants)
$0
CBA (Fair Share, Park Dedication, etc.)
$0
TOTAL:
$100
$100 $100 1 $100 1 $100 1 $100 $100 $100 r
$800
125
-W� - I
PHASE 1
BEGINNING OF
PROJECT
AL 51+60.00
126
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Public Works, Engineering Division 2. DATE: 12/15/2014
3. PROJECT NAME: La'aloa Avenue Extension 4. SUBMITTER: Natalie Toevs
S. COUNCIL BENEFIT DISTRICT(S): 7&8 6. TMK/JUDICIAL: (3) 7-7-008/ North Kona
7. LOCATION (COUNCIL DISTRICT): 7 8. TOTAL COUNTY FUNDS NEEDED THIS FY:
$1,635,000
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Infrastructure improvements
30. PROJECT/PROGRAM DESCRIPTION: Project includes connecting the existing La'aloa Avenue with Kuakini Highway and making roadway and drainage improvements to the lower La'aloa Avenue from
Ali'i Drive to the existing terminus of La'aloa Avenue.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): To improve vehicular, pedestrian, and bicycle traffic circulation in this area. Improvements are needed forthe connection to Kuakini
Highway.
12. LONG RANGE PLANS/COMMUNITY VALUES: Connection of La'aloa Avenue to Kuakini Highway is included in the Kona Community Development Plan. The Hawaii County General Plan recognized the
crucial need for mauka-makai connectors.
13. COUNTY MATCHING FUNDS REQ'D? (Y/N) No DESCRIBE:
14. LEGAL MADATE? (Y/N) No DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: Reduce maintenance
16. SUSTAINABILITY FOCUS (List all that apply): Promotes health and safety.
17. PROJECT READINESS (List all that apply): Design and preparing bid package
[18. EXPENDITURE PHASING (X $1000):
PnorFun s
Allotted
(not lapsed)
This FY 15-16 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years
TOTAL:
Planning
$0
Land Acquisition
$0
Design/Survey
$0
Construction
14,000
1,635
$15,635
TOTAL:
19. O & M COSTS (x $1000):
$14,0001
$1,635 $0 $0 $0 $15,635
$0
20. FUNDING SOURCE (x $1000):
--
Cty G.O. Bond/Other
14,000
1,635
$15,635
State Revolving Fund
$0
State CIP
$0
Federal
$0
Private (Grants)
$0
CBA (Fair Share, Park Dedication, etc.)
$0
TOTAL:
$14,0001
$1,635 $0 $0 $0 $0 $0 $0
$15,635
127
(This Page Intentionally Left Blank)
128
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Public Works, Traffic Division Z. DATE: 3/19/2015
3. PROJECT NAME: West Hawai'i Traffic Signal Improvements 4. SUBMITTER: Ronald L. Thiel, P.E.
S. COUNCIL BENEFIT DISTRICT(S): 6, 7, 8, 9 6. TMK/JUDICIAL: Various
7. LOCATION (COUNCIL DISTRICT): 6, 7, 8, 9 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $1,100,000
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Infrastructure improvement
30. PROJECT/PROGRAM DESCRIPTION: Construction of various Traffic Signal Improvements in West Hawai'i.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Projects will provide for a more efficient flow of traffic through intersections and reduce conflicts between drivers and pedestrians.
12. LONG RANGE PLANS/COMMUNITY VALUES: Addresses Public health and safety. Enhances quality of life. Service improvement.
13. COUNTY MATCHING FUNDS REQ'D? (Y/N) NO DESCRIBE:
14. LEGAL MANDATE? (Y/N) NO DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: Projects will reduce the severity and number of pedestrian and vehicle crashes at intersections. Reduction in crashes will reduce operational costs associated with
a Police and EMS response, as well as costs associated with potential law suits against the County.
16. SUSTAINABILITY FOCUS (List all that apply): Promotes Health and Safety
17. PROJECT READINESS (List all that apply):
18. EXPENDITURE PHASING (X $1000):
Prior Fun s
Allotted
(not lapsed)
This FY 15-16 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
100
1,000
$0
$0
$100
$1,000
TOTAL:
19. O & M COSTS (x $1000):
$0
$1,100 $0 $0 $0 $1,100
$0
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond/Other
100
$100
State Revolving Fund
$0
State CIP
$0
Federal
$0
Private (Grants)
$0
CBA (Fair Share, Park Dedication, etc.)
1,000
$1,000
II TOTAL:
�
$1,100 1 $0 I $0 $0 I $0 I $0 I $0 1
$1,100
129
(This Page Intentionally Left Blank)
130
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: DPW/Traffic Division 2. DATE: 3/23/2015
3. PROJECT NAME: Street Light Installation, Islandwide 4. SUBMITTER: Ronald L. Thiel, P.E.
S. COUNCIL BENEFIT DISTRICT(S): All 6. TMK/JUDICIAL: Various
7. LOCATION (COUNCIL DISTRICT): Islandwide 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $2,000,000
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Infrastructure improvement
30. PROJECT/PROGRAM DESCRIPTION: Installation of Street Lights and upgrade of existing street lights islandwide.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses Public health and safety; Improves operational efficiency; Enhances Quality of life; and Service Improvements.
12. LONG RANGE PLANS/COMMUNITY VALUES: Department's Vision, Mission, or Goals.
13. COUNTY MATCHING FUNDS REQ'D? (Y/N) 0 DESCRIBE:
14. LEGAL MANDATE? (Y/N) 0 DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: The funds for these Street Light installation requests covers all costs except for ongoing energy charges.
16. SUSTAINABILITY FOCUS (List all that apply): Promotes Economic Vitality; Strengthens and Sustains our Community; and Promote Health and Safety.
17. PROJECT READINESS (List all that apply): Currently underway; Staff available to manage project; and Operating budget needs have been identified and requested.
F18. EXPENDITURE PHASING (X $1000):
nor un s
Allotted
(not lapsed)
This FY 15-16 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FV 20-21 Years TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
2,000
2,000 1 1 $4,000
TOTAL:
$2,0001
$2,000 1 1 $4,000
19. O & M COSTS (x $1000):
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond/Other
2,000
2,000 $4,000
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
11 TOTAL:
1 $2,000 1 $4,000
131
Project Location Map
Kalaniana`oleAvenue Improvements
Banyan Wayto KauhaneAvenue
J �
( deo
Project Location Pye
.. ra�ea co
Na
0
e� Ot � � Oesra Pie
J` +
oyan y co
m ao�e
a �
,soda
� Y
Kameh
Kuawa St
(D >
in < Q
o o
C L -FU Of -
CD
�M�v or M
4•: 4 .
Y 0O erationsStCU
rvice St
0 0.25 ''►:'o:'�►''�
Miles 132
County of HawaN
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015-2016
1. DEPARTMENTANDDIVISION: Public Works- Highways Maintenance Z. DATE: 5/6/2015
3. PROJECT NAME: Kalaniana'ole Avenue Improvements 4. SUBMITTER: Dennis "Fresh" Onishi
S. COUNCIL BENEFIT DISTRICT(S): 3 6. TMK: 2-1-006; 2-1-007; 2-1-008; 2-1-009; 2-1-010
7. LOCATION (COUNCIL DISTRICT): 3 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $2,500,000
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): Infrastructure Improvement.
30. PROJECT/PROGRAM DESCRIPTION: Roadway resurfacing and restriping of Kalaniana'ole Avenue from Banyan Way intersection to Kauhane Avenue intersection, a distance of about 4,500 ft, and the addition of
20 drywells, sidewalks, and bike lanes in both directions.
11. PROJECT JUSTIFICATION & OUTCOME(5) (List all that apply): Repair/maintenance of infrastructure, addresses public health and safety, enhances quality of life, and service improvements. Kalaniana'ole Avenue
is a critical, heavily traveled area that is the only connection between Hilo and the communities of Keaukaha, Leleiwi, and Kings Landing. It sees heavy traffic from Hilo Harbor and the road is frequented by both
tourists and residents visiting the many beaches and ocean parks.
12. LONG RANGE PLANS/COMMUNITY VALUES: Consistent with General Plan Goal 13.2.2(a): Provide a system of roadways for the safe, efficient, and comfortable movement of people and goods; General Plan
Policy 13.2.3(a): Encourage the programmed improvement of existing roadways by both public and private sectors; and General Plan Profile 13.2.5.2.1, which states that portions of Kalaniana'ole Avenue is
inadequate to accomodate the existing uses.
13. COUNTY MATCHING FUNDS REQ'D? NO DESCRIBE:
14. LEGAL MANDATE? NO DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: Will reduce maintenance costs.
16. SUSTAINABILITY FOCUS (List all that apply): Promotes health and safety.
17. PROJECT READINESS (List all that apply): Can realistically encumber funds in a contract prior to June 30, 2016.
18. EXPENDITURE PHASING (X $1000):
Prior Funds
Allotted
(not lapsed)
This FY 15-16
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Beyond 6 Years TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
2,500 $2,500
TOTAL:
$2,500 $2,500
19. 0 & M COSTS (x $1000):
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond/Other
21500 $2,500
State Revolving Fund
State CIP
Federal (including ARRA-Stimulus)
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
TOTAL:
$2,500 $2,500
133
Project Location Map
Upper Waianuenue Avenue
Road
Safety and Drainage Control
D
D
C
O
�m
cn
NT
Project Location
tiG.y
a%
✓r
"'
'a
PIE.,,,/'i,.•,"�
�.:--
p
KILIKINAST
a
O
Y
m
m
NUJ J
Q
Y
O
C
r
=
DC
m
D D
=
5.
m
z
D
z
�
�
NEAUKA p
LAHI ST
t
Q
O
y
�
A
'QgST
APOKE ST
Om
�O�
�9 S,T
f
0
AINAKO AVE
�9
ST
,,ty�Y Oi yn
A 0
500
Feet
134
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Department of Public Works 2. DATE: 5/7/2015
3. PROJECT NAME: Upper Waianuenue Avenue Road Safety and Drainage Control 4. SUBMITTER: Aaron Chung
S. COUNCIL BENEFIT DISTRICT(S): County -wide 6. TMK/JUDICIAL: Portions of Plat Map 2-28
7. LOCATION (COUNCIL DISTRICT): 2 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $43,000,000
9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Infrastructure improvements; land acquisition; and planning, feasibility, engineering, and design studies.
10. PROJECT/PROGRAM DESCRIPTION: Currently, there are no walkways or sidewalks on Waianuenue Avenue above Gilbert Carvalho Park. This forces pedestrians, bicyclists, wheelchair users, and
other non -vehicular traffic to compete with vehicular traffic using the roadway. This lack of safe access creates a hazard for the non -vehicular as well as the vehicular traffic. The hazard is particularly
pronounced in the area of Waianuenue above Waiau Street. The narrow and winding roadway has no shoulders, instead is flanked on either side by open ditches which serve as a conduit for water
running off of the roadway as well as from areas above. Improving the drainage system, covering the ditches, and using the reclaimed area for a walkway/sidewalk will provide for improved road
conditions, safe non -vehicular access, and will alleviate drainage overflow and flooding. Clearing the invasive species and other overgrown vegetation that is encroaching in the County right-of-way will
also improve public health and safety.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): To address improved quality of life, improved public health and safety, improved road and walkway/sidewalk for traffic and pedestrian
safety, and alleviates property damage due to flooding.
12. LONG RANGE PLANS/COMMUNITY VALUES: Will provide for safe non -vehicular access and traffic, enhancing and improving the quality of life for residents, visitors and others who frequent this
heavily used roadway. Improving drainage and covering the ditches will also prevent serious accidents (vehicular and non -vehicular) and will channel the excess water in a pre -determined route rather
than random flooding that fluctuates depending on where overgrown vegetation, fallen trees and other obstacles block the downward flow of water.
13. COUNTY MATCHING FUNDS REQ'D? (Y/N) Yes
DESCRIBE:
Federal Funding (80%) will be sought for all phases of project
14. LEGAL MADATE? (Y/N) Yes
DESCRIBE:
ADA accessibility
15. IMPACT ON OPERATIONAL BUDGET: Regular road maintenance is already ongoing. Removing invasive species and other overgrown vegetation will eliminate claims against the County for damages
caused by falling trees and other vegetation.
16. SUSTAINABILITY FOCUS (List all that apply): Promotes permanent traffic and pedestrian safety, drainage improvements, strengthens and sustains community, and promotes health and safety.
17. PROJECT READINESS (List all that apply): Will need to hire a consultant for design and planning.
Prior Funds
Allotted
This FY 15-16 Beyond 6
18. EXPENDITURE PHASING (X $1000):
(not lapsed)
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
1,000 $1,000
Land Acquisition
1,000 $1,000
Design/Survey
1,000 $1,000
Construction
40,000 $40,000
TOTAL:
1 $43,000 1$43,000
19. O & M COSTS (x $1000):
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond/Other
8,600 $8,600
State Revolving Fund
State CIP
Federal
34,400 $34,400
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
1 $43,000 1 1 $43,000
1[61.'7
Project Location Map
Henry Street Reconstruction
Palani Road to Queen Kaahumanu Highway
VF
m
Z
,10
s
yr
�-o
�IPA MPS J�PN�pFi
/ Ja Y OF yq�
500
=i Feet
136
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Public Works - Engineering Division 2. DATE: 5/15/2015
3. PROJECT NAME: Henry Street Reconstruction (Palani Rd to Queen Ka'ahumanu Hwy) 4. SUBMITTER: Karen Eoff
S. COUNCIL BENEFIT DISTRICT(S): 7,8 6. TMK/JUDICIAL: 7-4-020; 7-5-004
7. LOCATION (COUNCIL DISTRICT): 8 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $3,500,000
9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Infrastructure improvement.
10. PROJECT/PROGRAM DESCRIPTION: Reconstruction of Henry Street from Palani Road to Queen Ka'ahumanu Hwy intersection, a distance of about 2,000 ft, and the addition of a left turn lane at
Palani Road intersection.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses public health and safety, enhances quality of life, service improvements, and replaces a deteriorated facility.
12. LONG RANGE PLANS/COMMUNITY VALUES: Consistent with General Plan Goal 13.2.2(a): Provide a system of roadways for the safe, efficient, and comfortable movement of people and goods.
13. COUNTY MATCHING FUNDS REQ'D? (Y/N)No
DESCRIBE:
14. LEGAL MADATE? (Y/N)
No
DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: Will reduce maintenance costs.
16. SUSTAINABILITY FOCUS (List all that apply): Promotes health and safety.
17. PROJECT READINESS (List all that apply): Topographic survey completed.
18. EXPENDITURE PHASING (X $1000):
Prior Funds
Allotted
(not lapsed)
This FY 15-16 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
3,500 $3,500
TOTAL:
$3,500 $3,500
19. O & M COSTS (x $1000):
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond/Other
3,500 $3,500
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
TOTAL:
$3,500 $3,500
137
(This Page Intentionally Left Blank)
138
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Dept. of Public Works 2. DATE: 5/20/2015
3. PROJECT NAME: Parking Improvements and Construction 4. SUBMITTER: Aaron Chung
5. COUNCIL BENEFIT DISTRICT(S): Island -Wide 6. TMK/JUDICIAL: Various
7. LOCATION (COUNCIL DISTRICT): Island -Wide 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $20,000,000
9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Land acquisition for new facilities; infrastructure improvements including lighting and other necessary improvements; construction of new structures;
nonrecurring rehabilitation or deferred maintenance of existing parking including resurfacing parking lots, clearing vegetation and invasive species, install, repair or replace parking meters, and other
necessary rehabilitation of existing facilitiesplanning, feasibility, engineering, and design studies will need to be completed for new facilities.
10. PROJECT/PROGRAM DESCRIPTION: Parking facilities around the island are inadequate to meet the needs of our growing population. Existing facilities and infrastructure need improvements and
rehabilitation beyond the scope of regular maintenance, such as resurfacing, lighting, and ADA accessibility. New facilities island -wide need to be planned and constructed to provide users with
reasonable access to commercial areas and other venues that require parking.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Project will upgrade existing facilities and plan, design and construct new facilities throughout the County. Will allow facilities to be
rehabilitated or constructed to meet the needs of growing and underserved population. Will provide safe facilities for users. Study will need to be done to determine the types of facilties needed and
where to place new facilities. Improved facilities and additional facilities will enhance the quality of life for young and old, residents and visitors, and will allow the physically challenged to go out and
about in the community. Improved facilities may increase the desirability to hold statewide, national and international events/activities on our island, which will strengthen our reputation and economy.
12. LONG RANGE PLANS/COMMUNITY VALUES: Providing more facilities and improving existing facilities will alleviate congestion on urban streets and will encourage residents, visitors and other
consumers to patronize merchants and other venues.
13. COUNTY MATCHING FUNDS REQ'D? (Y/N) No DESCRIBE:
14. LEGAL MANDATE? (Y/N) No DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: Will require maintenance.
16. SUSTAINABILITY FOCUS (List all that apply): 1) Promotes economic viability; 2) Preserves and protects our natural environment; 3) Strengthens and sustains our community; 4) Promotes health and
safety; and 5) Fosters inter -departmental collaboration and cross -sector implementation.
17. PROJECT READINESS (List all that apply): Scattered plans and studies have been done, targeting specific areas such as the EnVision2025 Plan and a Mobility Plan have been developed by the
Planning Department, both targeting the downtown Hilo area. The Kona CDP addresses broad stroke concerns for the Kona area. The Kailua Business Improvement District is developing a parking plan
for the Kailua-Kona area. Other Community Development Plans have discussed where the parking needs are the greatest.
nor un s
Allotted
This FY 15-16 Beyond 6
18. EXPENDITURE PHASING (X $1000):
(not lapsed)
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
1,000 $1,000
Land Acquisition
9,000 $9,000
Design/Survey
1,000 $1,000
Construction
9,000 $9,000
TOTAL:
$20,000 $20,000
19. O & M COSTS (x $1000):
20. FUNDING SOURCE (x$1000):
Cty G.O. Bond/Other
20,000 $20,000
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
TOTAL:
$20,000 1 $20,000
139
ti
Project Location Map
South Kopua Road Extension
�A
S�
C,�22� �Ir
yG
s
s�
OA
G9
�O
CO
�P
�P
QJ
y
sA Project Location
6`O�' OGN
CO
�aji! OF fj4(i,\ �v
• s _ ri �� �Oo N
0 1,000
140 'Ao Fee
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 to 2016
1. DEPARTMENT AND DIVISION: Department of Public Works 2. DATE: 5/20/2015
3. PROJECT NAME: South Kopua Road Extension 4. SUBMITTER: Daniel Paleka
S. COUNCIL BENEFIT DISTRICT(S): 5 6. TMK/JUDICIAL: 1-8-004
7. LOCATION (COUNCIL DISTRICT): 5 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $1,000,000
9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Infrastructure improvements.
10. PROJECT/PROGRAM DESCRIPTION: Creates a much needed connectivity route by utilizing the existing South Kopua Road to connect Fern Acres Subdivision with Kopua Farm Lots. Creates a safe
roadway which will allow community members greater access to densely populated communities.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Addresses public health and safety, enhances quality of life, and creates a much needed alternative route for residents. Accommodates
the district's increased population by alleviating congestion on the roadways, provides safe alternate routes onto the highway, and decreases travel time for commuters in the area.
12. LONG RANGE PLANS/COMMUNITY VALUES: Consistent with the department's vision, mission, core values and goals as well as the County's General Plan.
13. COUNTY MATCHING FUNDS REQ'D? (Y/N) No DESCRIBE:
14. LEGAL MANDATE? (Y/N) No DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: Indeterminate.
16. SUSTAINABILITY FOCUS (List all that apply): Promotes economic vitality, strengthens and sustains our community, promotes health and safety, alleviates traffic congestion on existing routes,
strengthens and sustains our community, and manages growth.
17. PROJECT READINESS (List all that apply): The department has sufficient in-house staff to manage and facilitate this project.
18. EXPENDITURE PHASING (X $1000):
Prior Funds
Allotted
(not lapsed)
This FY 15-16 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
1,000
$1,000
TOTAL:
1$1,000
$1,000
19. O & M COSTS (x $1000):
20. FUNDING SOURCE (x $1000):-
Cty G.O. Bond/Other
1,000
$1,000
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
TOTAL:!F------]l
$1,000 1
$1,000
141
ll�
- - - ',�,' "„, 14 ""', ��� ” , ,, ".
,.-..,��,�, -�.,_'.'� ...". �� " �.-"� � -.� , ,
" v-,-, - I , .4r),'l-,--l. r -�,, � , " , " 0�� �,, ,; �,v,,,, , � .,. I , , "
.� , , , � , ", -, � 1-1, " ,
11 , ��, "---
,� � x .1 , ..,'. � ", , " '�,,.;.,�,: 1, , - - ;,� , , ,,, � , . — ,�' §,', �'; -, 'S'-, , , �'�--�,l- I",
---- -- - `,�,
.
. " - , -- .. I , ,
� ', � , ,k�" " , , � k
� , � � , -t:� .,-�-,, , 4 "', - " ,,, ,"
-
� �10" �- L i�- �
_g -, _ ,, ,�;, � - �;, ��,, ,
� - - -
�
.11, �.. I , ,�, — I
1.
, -
, , ,:,,,�,��2,',-,;e��, " �. � ,,,I 1. - "I: � , `�
� ,W , � - � , . � ',--�,, -- ." :� , ___',
" �1,1� A11'3�1:ftm I", :-.- , , , , , , � , v e- I I
� � , � � �; I �,,�:,;
"' , "', I 1� e� - ,�,:-,�,'., " , 11 - I
*�, .-,- " , , , ��- - " "T" 1. . .. I - '-�',,�- - - >,�,,,��*',f", �, -� ,,� - �-- '-� � _��'�,��;",-� ",�'�, ,,;i�",-I�,�,�"',��-, I �"-,;��t��' ,
T � , I * ,,,--��,,,�, �,.",�-. ,)l 1,�I , I "�1'1'11-1, "'� '.. ,,, �'-,Ms, I -,� - wy-, -i" ., � '1� k� �l 1, I I I I
., - ,_�--i�:, � , I ,
4 " , ,� �-' I
, � -. � 1, , I -w �- 1 ; , " , - - 1. , ,, � J, 1.11 - "I �
.-�-V, -�- " ,�,--.l ,,, xv, - - ,'� ,-, L
i �- � �, " w , � � ft, " I- , - 1.
-'� I , I �
- -6, .
,
,,
,
,,`,.' .... �
.. 11 11.1 , , - :,", "
,,,, ,�- ,;
, Ir� �-,� I , � � , . , �,ftl. �6 - , - - .' ol.l
�, . -: ,1-1-6 I<e ,
, . -, I . , , . w �,- lt,�,IZMI p 1�' � � ,,��;, .J.M"'."',�,�', -, " -: .-1 - ,
,
`` ,�`�,�',,!-,-- "" , . , - - � 1- ", C � � , I ; � , --, �, ,� � �' -. I I
I - - � I- - V11 ,��- I;" - -1 - I �: , " '. ;,-, � ,,, ,
, ''I -�, , -,�' *)�,� -, , - ,-.,-, - 1, . �. I I I I,;", ,,-',-i, � , 1,�,4, - � � 'l- 5�:� �- �,�-,:- 1'�'; - , 7 , , ", -
, , _ " , z'� , "; , - "I . ,, , I � � I � , - - ,,, , ,,,
, , 1. , -.. , , - -1 �;,��� � � " , -,'� �'� �., : � , ,- o�,,'- - " 1'11'11� - ,
-1, ,,, 4M,,� � � '11( I .''. , , - " . " , �- k, . .�. I , , . ��"-,-.��,�- : � - ,
,;�k- , � , -. ,.,�, t �� , ,
I 'a�,&- ,4, - ll,� _,�� -,�z, ,,�-. -- �
, , - . " �11 —1, � , t - -�,, !
, , ..'., " � Z� � - � ll,�� , I I , , ,;e- , I I I , ,�, -�
I , . "
I I " �, - , �,4,` '11'r . - t , � - - , , . � " �-- - - , � I., ,,�, , ,Z- - � � "��- - "": " - � � , "
� 1, I I
, - 1, .., -:� , I , � 11 i
��,:.l N , " I I ,,, '. � _.,� -, , , ,,, ,-., ," , ""', � , . ,�I'- , - �-,,-, � - .
" ,- N -�, . ��'l �� I ��, � " �U�, ", � ,.'�'
" � , � - . . "', �C' ", - � , � -, ��
� ,,-�,�,-�-.,'-, �,`,�,,,--,�,?-� as -+ , , - ;� � , , " . - " , , - �
- ,
11 . "
, - I .
, 0 4 11 - , 'I" �
�
�
r
,
1.
, - h,,NR--- �,11, I
" , I , - ,�,-�,A,,�- I � I I e ,
I ., ,,, , - ? e:, - , " ��, �;.� , I 1� - - � ,,
, -
11
" - -
". -� , , 'r-, - - , , , - I e, i" lcll-k 1, " "IV, �,,Jv , ";!, -- ','��,` 1. "!S. � - �,,--, - I . � ,,��-,,,-i'��, I , , . ,��`,-,',w,' � ,�,�,�
I iz, le, ".-.- ...... . . , , , , � z-,, ,,��z,- I
-.•
, - ";��,�111,4 ;--,�,-� �11 "' � .,% :,�, - � ."', �'';W-��. � K-,,�,�-,��;'-"':�,�,-,;
.1 41 �4e� " - I , � �,,f$.-. , ,x", �0�, ,�, , �,,�, e,��, , ll,I 11, I 1'� ; �
� "I'l 11 � , , , , � � , �� ,
�,TlK I -,,,,-,,,�v,R- ,I � ",
11 , '�, ,� ", ,:,; � , �' , --&, ��,,? - " , " I.."
x�l � -
" "P,
-
, , , -,
kl ",'III' 1; ,
.-� -11 ,1�i<
I N
"I � ,
1. Ile f1l"„,,,
I ,�,.� '.;,
W, --'�,w' --g- ; -1,v , ” 11 -, .� -- , -
-< wv--��,^ , I � (i, " ,�,::-�' � " � ,., "', `,`��, -4 � q %�,:""', ll'- ll,-�r- -,'-
,,� ----," :, I ", 'y " , � 1111'1�.�`lll - ',�--,.�--,�,-,.-', --,�_' ---�.�o '4��",:.-,- �,,,�-,�,,,� I -�-11; -1 I W " ,
, S�r I
� I -, . - , x
� � ,;, , �fflc � 1 --,
I " - ,� ". �,#.$: , , ". � � �, - - , I I I 1�.l k
- ,t'l '* '.' `k,', �,' ,
l `�`��> i-4 � . S- I 0 , , , � ,
, -
- > ✓� - 1, � '. -, ,., �1, - � .- �- � - 4" --�, , J'�; , , -11 -, 11 .z r , ,, � , ,�,>,� ,
, �'.,.',,'*--�.-,-"-,- �, .
,
I � 4 `'-'',',�',' �� ,� ,.,,�� - , -- , --,�', � , - , " -_, '.- I , -
- -%- ., -:,,- 4r" ,
,., � , , "If
-1 , NO �e; ,
, - - , ,�,- ,
� " . � x - �,
-,� �
..
01� "'1% "'FA - ": , -
- ft, "I �ft,
�-P�,,,,�,� ;,,W�
,
,?>, T,�,
, . ,
I- , �,'-
- , � , T`-1 - , 11 , I . _� ,
, , , ".;* 11 , I
, - I � � ��, ,c V, . - ,,
- - - , , 7 t -I' -lljr%��- , ,,, P. 11 , , .. � ." " :�, -
Sl^r -,�,-�. ; "", .11 - .... ;A ;�
1-�'* ,4 '* , I � I , , "
� " i IIIE3 - � ,-4 " , , - � � , �-.... I,, , -
I -�, ,�."., : �:�,� I - I 1: �:• ;� �
N 1��--% ll -la I 11 -,�,' -112, �, ,� � , � "", �,! --"��,�u�
R i ,� I I , "", I -, I I I �
11 ,� �,�. . L. � ,", � �-1 r , ,.I, c 1'1� , ,, . "', , "I'll
-��,, �, , ,� ,�l I ,� "�: - , � , , - ,
_71 o" 1,�, 1,7,✓
- #71 ',�A--"" %,": , - , , 14
"
. , . .z - -�,V-ll �; . ,- I'll - � - I - ;' -��- , , `* , \ -, , "', , - - -
-� , ,;� ,,, -��'.J,,�,,,,-� �, , ��, � .
, ,;� ,,,
- � ,;� ,,, -
1. . "" lit"T I ,;� ,,, , . .
�',M,
"
, , - , - , I -�-
, " , �',- . - , ,
I - I - .� ".
� -
�
i` -��'lll", %
� ,
11-1 I � - :111 I
� 1, �:. ,., - , - , � ,., ,
,,,,.,',',',,�'�i,�,�,,�,V"�l,'�,�":,�,S,-""�',',�,�";,
, , , " ,q 1-1.11�rx��, " I
.,v �'lllp� -� - , ". , i'��,F I I ., - - , I'll I "Fl. 11 I I I - "', - - Z�- , -
,, , W ,� � ,,,
1, q x,,�� ,-, - I
, - , I �, - - -,;, , --1 - ',
c M, I `� ". W11, " � ,s- " � , �
, ", 1, %, " 1;, ,�*, ,7 11 �,;-ll �11,11-,'�-,,��,',
� - R � Not ,
�--�� 1��O',��4 , - 111.11� 11.11 �-
,
a�j`--", --K,�,', ��U*c I ., I '� j" -, ,
w W, " , , 71111" i,' �o
- , - , I - v I -,��- I - ,,�,,��p',.,,-,,', �-�,4,- -, - , , "A"
1, W -, , - � -,:�,.:::., , , , K';�,,��'.:;.; , " � , - ,
,, -�, i4PI'll - I , ,� -� � - - - ��,,,�, ,;'�,'-•
, QN, � `,�� ,-�',,A -, 5e �,e,,�t I , �,,`�, N� , I I � , -
,:-rte 'low C, - -, " ,,, -.,- �,, -�,,�,`.,�'l , �., , �l I -
- ��
,
,- , " , ,-�_�, -p- ,
- - � , ... � ;
�'CHN ,,- , I ,�',
' 11, /1.
- A
,
-,
.. �', I ,�, 11-1 ,,,.,,,,, - I - , , �,l � � �,�'6'.- , I ,
',, ," , �Mu I'll. -, ;4 ... ... . I - , �i � ,�, .' , �,
bi'l -1. 1711 ��-- , , � , Akll,��- I , " �i � .
; A � , .I..", � I I , , --s,, �,�,-% 1-.'/ A
I � " ". , ...... � --���;-,-,��,:�!,W: �', ��'2 , ,
-z�7-, --, , �,., 'r, - �
- 43, 111;
.. I " V
:� %
,*I lin, I -1k, - I , �-- ': �j,: � ,,, � - --, ,,, , ,. �-�l ,-, � � I ll�` - ;'k,", -�-..- , ", , � I., I � %', -., �',.l � ,. , , ,
.. , " — , :;! , ,- -,,I 1 , , ,
,�- " ; " , "�,!! ��-- -� � �, , ,
'01t, �1'1! . � ,� -
� �A ,Z,,,�,' �;I':A,O7--,,� Z�,� I ,�,- ,, ,
- � m ,��,Z'-`1'41�� i". �'P- ", ,x -,� " � �, , ',-',�, � : 1� " , � - �%,-"l - �."- �,;,l �- -, ,,, -; - N
- , - -�z ... Iz,�, ';`�,, � - - " ___1-1 �,- -.
- , ,,�',��. -4 ,� -
I �l .1 X-l'.j" � ,", , �e , - - , , - , " ,," � �,-;,,, > �"gk,-,-
, N %� 'y-, , - i4- ��,t"--,,4 , - ., '--'7--M--,,-,,- �-'!'.,�,:�'--,-� -,,:,�:��:�- , .
... �� .�-1K��. -, I ..,� -� � 1 -,
-, ill , , " �,7 " i�,4 � %, - - .
�l ,� , 4g' - . I - ., - - , -'el . ,- ,:" - . ., ., -, I . - ,-� '4
riF ,-,; "', , 1, 1 �4� , . � , �, -, ,� ;� �,- �,
, , .1 , - , ��,-. , ". ". 5" - , . � � - , ,�'.',',,� -, , ",4..,I ,
'�- - �?��";, :��':'�_.. " , - �'
I , , *-W'.--'�, " - ,, '17,, � I I I � z "'. , " � �- - , �
I I . , .-I - , , ;
14 - ,z.2;,,,,,> �� ��&�,`,,`l -'- , ". , " - �-,, ,�: ,�'I� , ,� �� ,
- , ,- , , , " - � ,,,, ,I�� , , i 1�1 `��$ , ,'�,-ll i�� , �"3 ,,, -,,I� -,�� , �-� � ,,, ,; ,,, " ,-,_`�'-�' , , , ," �W I - I , - �j
� ; I I'll, � 11 It �� I I 9�t -," , , y ,;, . "" -, � -�1.111 I I "'.." ',�-':" `,<I,�-- -. -',,; ""..''�l'.11l.-t"--,W-"";�t�i
- ,.,,, 111IX , -� ,
- � , N,l .��ke4W,�',�'-,' "I., �,,-,�)-�,,, , /'l , - C� ;�",�,,---",,
L I OW1, ", � 4 1 �' I , , I -
,
, , , -:� ,�, , ,,,1. "�-,--�,',-� ,',,J�-',,� t .... .. -,�� � � ;-, �m "
� , , , ." , �,- - � >� ,�
mik"I 4 � ,�,
, ; � �; , ,, . , , , �
j", �:, I , , - , I M.5� , ,,, �. - . , " , ,� ,
) , , � �r � I - 1� ,, - -, , -:� � . -11 "ll'i J�,, ,gr,
,q�- ., - , �, , , - -',�.-,.�;,_' --o-,R--,-,,j
" - , ,,, ., , ,-,,,:�4, , ,�� �l "M , W,,;�,11,
- V. -Z .'6i,>� , , 1� -- , " , ,,-,,% " , � I
--.. I S" - � , 1z, , -•�� - - ,
-1 , ii�� , w7sx ll� i ,I , : �:�,� ", , �
- -� � � >T '.f .1, � - , ,- -. ,-,.�, <,, , ", ,,,,, ,��- ,� -,
� ,,� - -�,- , I" �'ll ",.f`-, ", ,,,-V ^�M��l ,III',',, If 3-X, -'��,,', "��,,-,,�
- ,
, I- " - - -
" -11.v ,, . ,�" ,�,,�X- . - � ", '' " �4
. �
, I �.W-5�� " '! � I , � . � , .�,',�'��,'� ,�,, , Q 11 &', I'll 11
i ,
, 11-11, �� -,P --��; " '��',�,` -,;
�l I 1;1�1 , -,, R 1, AR I , ,
'T � ,,,,, ,, � ,
�
-
IZV �, -1, -1 .
, � V,
,", - - ,,, .17, I'- 44,r,'!�A �-, �t
,
I.. - e�' A - , �- " � ,�,,,,��, I , "' '' , ,,.,., �;;, '' �l I,, �� -�N�,*-;- ", �, , ,
� - - - -�,%��,� � , , " , , - � - , ,& ,
-1 , -p , "t4l I , I \ 11 " :11 ", � - , ,
I, � -X, , , 11 I z I I , , I "
X , ". . " ,� .I �� I., I - I , - , i , � , 11 , ,
� , p
q � I I
, I -.,,,�. ,'.'--`--- �-, , ", � ,.,-, , �, , � � , ," - - � -�" , , -, ,"'ll �' ..q-
" "', - , � I ll� -\ 11 ,� , 4, ,
�n,,� I I.. -, , ..,l - , , ,
,,�, , , , , - � � ,
"o ... � �., AW v � I - I , , �. , - - . 11, : ,,,,�--,-,'M .11 I - - -
- " ,,, --,� ,
, , , I , g" ,
, I I - � - .� � -
i , 1�'�,,l , , , ��,- I , - �`�`, �,, , , I
11.1-71111 �,�- � - 1. . I , - -
, -
, - �---,
I W-I�M- -'-- -- - . I -�-�`,.."-",."".-- I ;, , *(, �;,�,;� -1
.1 ". , ; Ir7l
, �� A�,: 1. ,x I
"I , , N) , - , I ,
" , �,' . � -,-;��-& ,,�- - , , , ,�
" Z N � �,&, *41, .,'��ll - . I - , ,,;�_---� , � , I �, I
, , `�`llv _ � ,VZN'�,�,IO , �l
, ,,, -4$�"*,:-�� � �,,,,,�;,`.',�� , ,"Z. , , - �,�
, .,-,-,. " , � � "' " , � ,,�,7�. ", . ", , -W!,'
,- iy, " '�--,; �l - ,.. , � �,�, ��l r, �, ---`:, �A,:-,� I . , , , ,,�� "' - - - , , - - g 'i!
w �� 4� h � , �
I ; ....... Vl . - �l P;,"rr, � � . . . . . . , ��'. I "�. !. III �i I '11711 -- ". � ,
,
� -�5�. , ; , �,�,, 'C', , , I , I' .4��',�, , . ,, ::, I , �',-'�',�-'. ,-Z-'',i,�_`,:,� " �,,;, '' .. � , � " ,,, , ,�-�-t, �' -,-� ->��'.!
�� -� , , . � -41'; I , �-�'�-. ♦, '.
, �;�,;, I - " -- "', -- ,vl� " ,� r. /. - ... 11-111, �,,-, -, ,Z I -
,# - , � , . " , , '. i , . >�
I I I I -., , , , , -7 - . " �,I . . -, � �� . V:", �- 1,,' -,
. �,-�,-, , , - . - , 'k � j A 11 1, , 4, , , -'-��`-.---, -,�� , - �� , 4',
I . . .1 . I I I . � ,
- - - - , . I q�ot�,
IN7 ." -,'.' -� " N , I - I .. , - . -
, ',C:11,�'; 4";` 1,;�� ;l - . . ., - - - I .i A" -,l
I
. -. �i-�,, 44e I
, , �
" ; i. 1� I '_'�'� " '50 ,�hv,,--- - '—,-, � I , "- � I - I �1-11.1��,
� -Z . ", 11 . ;- , _ , ;
1. I �� 4 � , - . " , . , - , � - I - ,� . '-'�-.'�',�\�' ':`_',",�, , , ,✓ , , "I, il
I..- � I I , I � I., , -
1,
, , , ,,, Ki, s, , " -,;,:'j,, . , . � x "I ,�N V
XI,111:,� . Z- ` .... PlIt, -,` �A�l, , ;'-, - Z" - -, - ,� , . I , -�. �, " ,--l-, - , , " ,, � �
,t , - - � ,--- I 11 , � , � ,
, , , - -- " , ".
.:� -)��- ,j ,
,
,
,
'...'T I ,,, - "IT, - , , 'I", � ,
, -, " ., I -"� � ,o- :1 "ll,
, , - ]--� � - � , �,'�- , �,�,�� �" I -
-�,� � � x �.v
I
I I - � , , " . 1. 11 , ,kl'YA7,;-
�,.:�l -- " , . ... - �.- I -': -,", -, _4I� 1
1-9
- 't , ,
7 - , �11'11 ". � ,��l ". , 14, , XI ,, , g � :;'I�l , ,-, ,-,.s "'k, , M -
""� z , , , - � , , , , ,�-:�',',�' - ; � � 1, � -,� .
, ,%, ,� " . , ", , - -, , - , " � , , " -,-�.- �:,-,��,� , "", ,�,, ", ,,-. -,a�,-,�-,�,---j
I I -1-1�11 11- -J-�', , ,�- , � , -�-,- 1- ,
I 11% ,
,, , ;, , � �� . ,, v -,c,�� I . -�- "'.. I " �-,
� .
,
,
, �,',!�'�,-��, ,
, - '1-1�•-, �, , , I 1�; , , -" ,
, " "A
-.;--�w - , �, , --�� .,""'-, ea, - �': ", ��*� - " , I, ,�,, �4��,�,-""" ,,,, 11 � ,-- . ,,, ., � �, .:. Z�;� ,',� �,�', ,i�
, v - - , -, "
, " , 11 . :�. , H , V � -�, , 11 'i z �,k,,� � "x ., ", , , � 174, 1-11 � 11
I I - -- -
11 - - . _
,
, I � � w - .�
,Xw�,.; -� I
,
. , I -.1 ... " ,., -'W, . 1-1-1 1� � � � ,. 1, � I I .,A,-, " ,,,,� � ',-- I �
- I - , - ll�
,
�l - ... � . " It " A I , - '**:' , '-Ull"�,-` I'll I � - 1, '. v 4 , - I
,
, � I , " " - ... 1: ': . . V,�"dW,- ,
I
,-�, � 4 ;-1 ,� �,l 1, km� - -," �� ", - r�J.A �',,� � -, `�?', �,-��, - 11 " ' . ' , ' - , ,
I I . I ,-- " '
1 - , - ,
t,,, 1�,'-Z- , , �f�, <"� � .111 - - -l- -",,e� , �, .;f �q"N, , 6 , ,,�,' -, , , - 2, � , 1�' 1. ,
- � . 1.-��'7� J,,ti;/-"��,g-��N,�, 'i I --,-��,i-�,� " -
'T,--,'v-,�"-,g � It 41 1 %4 , - I " ��
. A "I'l- le I :�, ", "�
, , , -
V-- , . �r "' ,1'�;�� T'�.'
, - � , ,� ,,,, ,
I . . . -1 -�,� I .
'A.;,, WA,,&, > I ',l&',l.l . '! ,", " , ., - .", , 11'..: "
-tlw WIR , '. , :, , , �' - - � , " -,' ��A, ; �, � -,'���- ; , ,,, � 1, ,i, ',- .--.*, ,
- ,,, , , , , , ��:;, : . � . 4� - �->;" �, `� �. 1, I , � "I'll ,� ,
' , � , , I - , 5; I I
, p , , � , ,,, --- Q &, 4 XV �, .j�, , � , , � " i 14, 1.1'� " - .�,� I .
. � I' - � �n ,>,�-,�-;L'-,�� , I �, I - I --, � , I -.,
. . , .11k,
�'11�1�.i.* - 4 "'I . 01
, �, ', I 1� �'l " , , ��,1-�11-1'1, I - - , I - t _� � �---, - ,,�,� ,-��_- I
, ., : �, �4,.�,,-�.�,�e�,, I 1. -,-":.%"�5,',-,'�'
--'1-51;-�� ;��17 : , . , " ,,,, , , -�- , - �:, , 1--)"', , -'-'.' �111'�, , , � �
� , 5W, 4 I 011\�;Z �l
t , ,
, .- . "I �l 1. - , , . . , , , �/�, � I 1�1,1�, -vj�,T ,��, � , x-�'k.-�,.,, �,, ,; '�' . 1�,„: '?V:� ,�s,,,�”,
- � ,;� , ,;� - , - -�-, w- -,,� x . - -
,,��, - I 'm I
, -
.... a ,� , � , �,4'1 1 ,
lrl4-11.T--.�4zv - � - - , I - �1'11 - , -11 - � ..
- , - " K'T
,
. If -,��
-�,:." , %�', ','�
, ., 4�w 1 �l
1:,
_ � 11 . I , ,
, - 14; i'l "., . , �,�'r
,
,� I , I I I - , , ,,,, .,-. -1 �>.>� � " �,,�t:
_,f�,�"',��,""�,�,�',,
I , . , ,
,
" � I ., "
.. , , `� 1111'11�
. . - � -, , . -',�,'i,� :� , 7k, -�r ,
-- — �,'. ��O,�-,, N1 ��,,� �,, � �, � -1- � ZA
S"', ,P� .. ... .. I 1- ,�01;"-��,-�.�,-,�-4"�,�=� ,
. I.. �04`41-51N 1.111" , t 1� ,z - ,I --.�
1�1'
11.7k ,il%�,,lli
-V Q t7-,-7, 1, ��4-�-�,�
--ll ... ". . `�,1'4 . - - ,� , ,, ,
- F. , " � ': ", " �
wz�Uv� I " . � - d, A
lxl,,��,�, ��: """M - , 11 , ,
< - - -,�,�- --�,`-,,�,�.' ;� I ,
, -- I
K - 111'1 7,
I , - , , I I
-, ", . ---', ,.,"<, - --I --�,N-,� �!V",�`,,,�-�-,;,,��I- ,", p,
, - I -, , , . , .. ��- I x " ,"� � " , 1� r,- ," - - I .,��- 1,"�,��111; , ,
, ,, � m - - - 11 ,
�
, �1. , I X, �: V lg.,o. ,',- , , , , - -� I" , ,,;� -�, �--,�--�,:��' - I , ,�
� 7��,��,��,-,�:� , , , , , - 11 -- ,j ,�,.:',* ,,, � I . 411" , , -
, .11 - � " I I I" -1 I ��i��,, . , , � ",��, 1, 1.11 e �,�Il,�-, , ";` �'-- "w" --�&' , A - ,
, , 11 ,Z,,
11 vlwll�ol- �-'�,�` , 1,111.1., � 'a gyp" ,, I I I -1 I
I
-"� '�' , �I,li� � I , � -, - �,�'-� -,-, -lto�-,�,,�-,
A -,
--,,� ,-� -,��, i , -�� � -,�_,,, ,.; " . � -1w, �,:-."- �,�, � - e�,',�'i'��,,I,:"��y ,- �j
"Wk, I'll 11 - 11 ��11'-1 . "', , , I ,41 I I , , - - , ,
. I.- . , -, -. - , , , - liolak .0,R"IE--t",�"-;, ,.�'�' -
� , '�,` --- �, ;- ,,,,,,,,, 4�
, , �, � ��,- :
- � I , oa - - ,� ,,, , ,
-t�z ,-�,, �/ -11, �� :.. '. : - ",:��,,- , '- I I � ,�, � � `11� ;- � 1, I I � . ,
'I'�l,�",��lt,�',"�,',�;". 1-t� , � �;i,� - , , , � � - ll�WA17,wlll,�
, , I
- �,.. . --.- - . I., - �
. * . -'� ., --, I M,
I , I , " �
: � . - " I I I
- � , � I
61
, ,j-
1.
'.
-
, -
IV
V��,
M
,
,
-,, . I �, ," ,,,,,� ` , I - "I �
,
j;k 11'1� I ., I -� ': -l'- ""I'l ,.0 1� I I I 14 -11 I #�,v
�, ., ,, -4 * -�' , , `,`,�' � !4, 1,�--�", ��,,�'��,��'>,,.�� "
... ;-, - . ;��, , - 7 * � , ,
. " - � % Ill' -d' -, ,le I I "', ;
,-, C,Z, , ,�' " �l , -�T-.��,O, ,�,"�.i . '. -A-111
I J,�Y,,
, , , V', ,t- -, " �, �.,,, "
,
" !�..Z','�.' " ", -1�e�,��',' �, , - -- ..- , , � A'S� ,��.l �, , > ,,�?'�,, ", - j� - ,
jw".,;� 1-1 f,N*',-�---,- "", -'Yl
, " -y',&';">��J,f: ,-,Z,�' , �, ;',,�T',�W;, , - '� , R I
,
, �-- . * , , , ,-, 4
-, ,. , 4
* " � 1� -; r" , , , ,�, - - ` li�` I i'" W1,
" x ", ,,- �l `�� ,�,, , , �,� ,,,��,',, " . "". - . �,-�,��,,k ,x, I,,' I - � � � I
,
z ,-�;�.:,g:,r&',-'- , /� 11 ,,w,k*,��e, ,; , , ,A- ,� , , � - , " , ,�; I.I.-I , lt,Kll,
x,-, ��^,,'���,:���,,,-.',,"",q, '! ", � , ". " � - � Z,,-,�-. �` , � . �. " - ,4v 1, 1
, �� . � ;.-,�.-- , " , ff, , ,
- , , "' - - � �, , ,, � . ll� �,--,"! ��y ,
, -:,V, , - " I, �,-�4`,� �! - , , - ;',�,�, % -- -�,X,,', , , l;l'll
,�� , ;W 11 -�ir � " , -,"7
, !, ,�" -_, �,,;-,k,��'
, , ,,, ,g,��, ��,Ar'4
I 1 4 ,�� Y, - I I -, - I - , � " I I
P k " , i I C,
-111. � -W �, � , 11 ,�,, ,�",�
- -11 11 . W, ", 3 i - - . ,,,��, i
-� -, .... �-�� ��"",:�;,� ,�-��,��M`V ,"3" 9��. . , X, � ,�, I � � -'. ,Z`l � lill". , 1
. I ,,�� -�-,,�.,,,' ,x, I I gq- -,-";,, I � I
- �;-� " " �
- 11 .1. � - ,,,,l.;,�-,,'��',�,'�,:,��',',� V - �-,�� -
"' " I I , ft- , -
�� , �1,1,,�,,�'-_�,o � """, ""
;, ,� --l' " ,'�,,,',',,:�;�,,�-,,�,�,,:� �,', --f ,
., -k�,,-�-,-,��,��,;, , �- " ,�;-;,, ,-;��,�, �',-., �-. , - -, , -'W ,,, ,',,� .11--� 4
, - ,,,, , �-1 1. �
- �- * T �'- �F",�,,� ��_'� �I� - " , ?19 I I , I Ki 11 ",��. .1
- A ", �, , ,�'l -
� ", ,
, ,�� , I , '4�� ��, _ _
, -, --w" ,,, - I - I I -1
,- ,
"�' ,
,
-, ,-�
-1
� I �,
�-,�
I �
�
I
'I- I I
1,
I
11" "
,
11
- I
�-
�
"
"
,
,
11
1 i4
io-
�i�
�7�-
�
11 - �,,?�-� 1`1'1�
� , .1. ""!.'s�-, _1 ll�,i IT, �w "
; , I, , �' . — .;
i I " I -- - , I 1�11 1.17.11-11NV� ,
I I
t ,.-
, � 1, - 11
, - - Ill.z. I I I . -�-- -- t� ..... --i
t-. Yl � I I�41'1 �
, , , I , 3 -11 ,
,
"'. �l ,
.... I - , "4m,f� �:•1- . af �11 : ','�11,1 - -
� � "' ,:'I- ',�
, , . , I gl,ol --- -,: - -�5 e, /I !I'l -.:',�l ;�,; �-�,'�.�,
!: �v ,�,!�",�,",'�:,�`,.' " ',,-"� -; """" " 44a
,
,
11 - 1. I -,,�- ,l , '-""�,,��lI -
- � , I
,11 �,��,�, -�� , -+';k
,x - -�
z 2,
- , -,`-&�F- .1 -',�'
I A '.I, �- � rlI � -� � ./ -;4%,
0 . 6, ��- " � �., , '', . I 2 , --,*-- -p g -w -f,,"
,
--W-m4w,Nw , --�ll 1: "r , 1-0
- I J7
, �.',�,
, - 11 " �'l ". " ,
� - i.. 'I'll � "
: ,�,�z'' 1� . , I., " ��- '�,�,)r", , :, ;v ,�,, �111 % ", ,
- I - I.- - -�-, �l I I I ��:"<",O: �.,.-, �� I-_ I - '�� - � 4 : 1 1 1--,
�
,
N ,
-k � _., . " . 1 , .
j4�t�j��,, 4'- �,, , , - �, I ;-: ., .. . 'O "...", �
. I I —, il : "', � I �`-- , 1 1
"',eM' , - , ;..!��, I 1�
I � �`%-. � � -", , " . , I 11. - 11
, ,' , ,�, , , � �t'�, ,A,,�, I I -�, Z, " . 1. � ,�5 , ,- �.-- ,�,-'
I , ,�-, - � 11 , 11 - �-- - -
, I �Ll:'llll :�,�. ll� 2, I ,,�� " -Al'.X--l',-' .. - - 11
I -` 1, ". � , - I � I
- -- I , " I'll , I 4 ti� , � -
,
, , - -i-I � , I ��-,�x.-�:,�Q�- .- - �f� — ,
1: � , -
- �
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Department of Public Works 2. DATE: 5/28/2015
3. PROJECT NAME: Lindsey Road Extension Bikeway and Pedestrian Way 4. SUBMITTER: Margaret Wille
S. COUNCIL BENEFIT DISTRICT(S): 9 6. TMK/JUDICIAL: 6-7-02 & 6-7-08 South Kohala
7. LOCATION (COUNCIL DISTRICT): 9 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $75,000
9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Infrastructure improvements, planning and engineering studies.
10. PROJECT/PROGRAM DESCRIPTION: Design and construct a bike/pedestrian way from the existing Lindsey Road to Ala 'Ohi'a Road (Parker Ranch Connector).
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Health and quality of life. Provides alternative non -vehicular access from the center of Waimea to Ala 'Ohi'a Road (where new District
Park is scheduled to open in 2016).
12. LONG RANGE PLANS/COMMUNITY VALUES: Consistent with the Waimea Traffic Circulation Study, the South Kohala Community Development Plan, and the Blue Zone Initiative.
13. COUNTY MATCHING FUNDS REQ'D? (Y/N) IF N0 DESCRIBE:
14. LEGAL MADATE? (Y/N) No DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: Use Bikeway and Beautification Funds and other funds that may be availabe.
16. SUSTAINABILITY FOCUS (List all that apply): Promotes health and safety and economic vitality.
17. PROJECT READINESS (List all that apply): Bikeway and Beautification Funds are currently available.
18. EXPENDITURE PHASING (X $1000):
nor un s
Allotted
(not lapsed)
This FY 15-16 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
75
75
100
$75
$75
$100
TOTAL:
$75 $175
$250
19. O & M COSTS (x $1000):
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond/Other
75 175
$250
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
TOTAL:
0
$75 $175
$250
143
Paniolo Avenue Extension to Kawaihae Road
• �0
KaVI[a1fitae.Ro ',,.R} 'r• _ TI ,• `••
PU A K_--
IKOLOA
Jfr
144
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Department of Public Works 2. DATE: 5/28/2015
3. PROJECT NAME: Paniolo Avenue Extension to Kawaihae Road 4. SUBMITTER: Margaret Wille
S. COUNCIL BENEFIT DISTRICT(S): 9 6. TMK/JUDICIAL: Various
7. LOCATION (COUNCIL DISTRICT): 9 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $500,000
9. CAPITAL PROJECT ELIGIBIILTY (List Criteria): Infrastructure improvements, planning and engineering studies.
10. PROJECT/PROGRAM DESCRIPTION: Design and construct five miles of Paniolo Avenue Extension in a North\North East direction to intersect with Kawaihae Road.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): Safety and quality of life. Reduce traffic congestion through Waikoloa Village by providing alternate transportation routes and
improvements. Allows a second Waikoloa Village entrance and exit that would improve overall regional traffic circulation. This is important given the State Department of Transportation's deletion of
the promised Kawaihae\Waimea bypass.
12. LONG RANGE PLANS/COMMUNITY VALUES: Consistent with the South Kohala Community Development Plan and the Hawai'i State Highways Strategic Safety Plan. Would connect to Waikoloa
Village Association's future land donation for a district school.
13. COUNTY MATCHING FUNDS REQ'D? (Y/N) No DESCRIBE:
14. LEGAL MADATE? (Y/N) No DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: Additional road to maintain.
16. SUSTAINABILITY FOCUS (List all that apply): Manages growth, promotes health and safety, and economic vitality.
17. PROJECT READINESS (List all that apply): In additon to County bond funds, would expect to request Federal and State funding.
18. EXPENDITURE PHASING (X $1000):
rior Funds
Allotted
(not lapsed)
This FY 15-16 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
500 $500
500 $500
3,000 20,000 10,000 $33,000
TOTAL:
$500 $3,500 $20,000 $10,000 1$34,000
19. O & M COSTS (x $1000):
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond/Other
500 3,500 20,000 10,000 $34,000
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
TOTAL:
�
$500 $3,500 $20,000 $10,000 $34,000
145
(This Page Intentionally Left Blank)
146
OFFICE OF HOUSING AND
COMMUNITY DEVELOPMENT
SUSAN K. AKIYAMA,
HOUSING ADMINISTRATOR
147
(This Page Intentionally Left Blank)
148
SUMMARY OF DEPARTMENT REQUESTS
SIX YEAR CAPITAL IMPROVEMENTS PROGRAM
Department: Office of Housing and Community Development FISCAL YEAR 2015-2016
149
2015-16 FY FUNDING
FUNDING FORECAST BY FISCAL YEAR
(in thousands)
(in thousands)
TOTAL
ESTIMATED
Prior
Funds
Beyond 6
PROJECT
PRIORITY
PROJECT
County
State
Federal
Private'
CBA"
Allotted
2015-16
2016-17
2017-18
2018-19
2019-20
2020-21
years
COST
1
Micro -Unit Housing for the Chronic Homeless in West Hawai'i
650
650
650
2
Ulu Wini Park
100
100
100
3
Kamakoa Nui
4,750
55,287
4,750
60,037
4
Ouili'Ekahi Cottages Improvement
400
400
400
5
6
7
8
9
30
TOTAL
1
1 5,900
55,287
I 5,900
61,187
149
(This Page Intentionally Left Blank)
150
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENTAND DIVISION: Office of Housing & Community Development, Community Development Div. 2. DATE: 1/9/2015
3. PROJECT NAME: Micro -Unit Housing for Chronic Homeless in West Hawai'i 4. SUBMITTER: Kaloa R.N. Robinson
S. COUNCIL BENEFIT DISTRICT(S): 6, 7, 8 6. TMK/JUDICIAL: (3) 7-4-010:020/ North Kona
7. LOCATION (COUNCIL DISTRICT): 7 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $650,000
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): 3 (new buildings)
10. PROJECT/PROGRAM DESCRIPTION: Prepare parcel and acquire 32 micro housing units to provide permanent, long-term housing for the chronic homeless in Kailua-Kona. This proposal provides a
plan to develop a County site, acquire and install micro housing units, and attempt to implement a best practice mode of care using Housing First as the proposed model. The focus is to provide micro -
unit housing for chronic homeless individuals to not only provide housing stability, but to also allow access of service providers to homeless clients.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): 2 (Inadequate service or facility) - this project will provide permanent long-term micro -unit housing for chronic homeless individuals. The
level of service standard will be to provide a client -centered care team consisting of behavioral, substance, oral, and primary care providers for homeless clients, and will follow a Housing First model as
a guide. 6 (Enhances Quality of life) - This project will assist in providing housing for chronic homeless individuals, to provide housing stability, and enable clients to recover from ailments. 7(Service
Improvements) -This project will be the first micro -unit housing project on Hawai'i island. It will be focused on serving the neediest of the homeless population: the chronic homeless.
12. LONG RANGE PLANS/COMMUNITY VALUES: 1. The Hawai'i County Office of Housing & Community Development (OHCD) is responsible for the planning, administration and operation of all of the
County of Hawai'i's housing programs such as the Section 8 rental assistance for qualified families. Its overall goal is to provide for the development of viable communities in Hawai'i County by providing
decent housing, suitable living environments and expanding economic opportunities. 2. County General Plan, Sec. 9), 3. Kona Community Development Plan, 4. County Consolidated Plan, 2010-2014, S.
State Consolidated Plan 2010-2014.
13. COUNTY MATCHING FUNDS REQ'D? (Y/N) No DESCRIBE: n/a
14. LEGAL MANDATE? (Y/N) No DESCRIBE: n/a
15. IMPACT ON OPERATIONAL BUDGET: This project will be administered without the need for additional staff or operating funds.
16. SUSTAINABILITY FOCUS (List all that apply): 1, 3, 5, 6 - This Micro -Unit Housing for Chronic Homeless project will provide long-term, permanent housing for the chronic homeless. The OHCD also
anticipates the lessening of emergency care through this effort. Chronically homeless adults with severe alcohol problems are disproportionately burdened with health-care problems and are high
utilizers of emergency medical services (EMS).
17. PROJECT READINESS (List all that apply): 2, 4, 6 - This Micro -Unit Housing for Chronic Homeless project has been a topic of discussion with the West Hawai'i Chronic Homelessness Intervention and
Rehabilitation Project work group, which is comprised of area service providers and various County Depts. involved in assisting the homeless. A County parcel being proposed is available with access to
County utilities.
Prior Funds
Allotted
This FY 15-16 Beyond 6
18. EXPENDITURE PHASING (X $1000):
(not lapsed)
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
n/a
Land Acquisition
280 $280
Design/Survey
27 $27
Construction
343 $343
TOTAL:1
$650 $650
19. O & M COSTS (x $1000):
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond/Other
650 $650
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
TOTAL:1
$650 _$650
151
(This Page Intentionally Left Blank)
152
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Housing & Community Development, Community Development Division 2. DATE: 4/10/2015
3. PROJECT NAME: Ulu Wini Park 4. SUBMITTER: Susan K. Akiyama, Housing Administrator
5. COUNCIL BENEFIT DISTRICT(S): 8 6. TMK/JUDICIAL: (3) 7-3-009:055/ North Kona
7. LOCATION (COUNCIL DISTRICT): 8 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $100,000
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): 2. Infrastructure improvement
10. PROJECT/PROGRAM DESCRIPTION: The Ulu Wini Park is the last phase of improvements made to enhance and improve the quality of life for the tenants and children of Na Kahua Hale O Ulu Wini.
This project will include landscaping with grass and shade trees to provide green space, fencing for the areas near the Waste Water Treatment Plant, and grubbing, gravel fill, asphalt for the paving of
nearby parking and any other related costs necessary to complete the project. In addition, the park is to have a basketball and volleyball court, using the same court but with line differentiation. A water
fountain is also needed in the area.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): 1(Addresses Public health and Safety) The Ulu Wini Park will provide a safe play and recreational area for the children and young adults
of Ulu Wini. Green space is vital to the project, which is near a large industrial area, and the surrounding areas are void of public recreational activities. 2 (Inadequate service or facility) These families are
grateful for the transitional and affordable rental units in which they reside, and the addition of this park will further add to the quality of life for the children of the tenants, who have limited incomes. 6
(Enhances Quality of Life) The Ulu Wini Park wholeheartedly adds to the quality of life by providing a safe recreational area where tenants and their children can make healthy lifestyle choices through
healthy activities. 7 (Service Improvements) The Ulu Wini Park will enhance a newly developed play area near the project's Community Center, add much needed green space, and provide a recreational
area besides the parking areas of the proiect.
12. LONG RANGE PLANS/COMMUNITY VALUES: The Hawai'i County Office of Housing & Community Development (OHCD) is responsible for the planning, administration and operation of all of the
County of Hawai!'s housing programs. 2: County General Plan Sections 9.5.7 and 12.5.7; 3: Kona Community Development Plan; 4: County Consolidate Plan, 2010-2014, and 5: State Consolidated Plan,
13. COUNTY MATCHING FUNDS REQ'D? (Y/N) N� DESCRIBE: N/A
14. LEGAL MANDATE? (Y/N) NDESCRIBE: N/A
15. IMPACT ON OPERATIONAL BUDGET: The operation and management of the park will be part of the contracted services of the management company overseeing the Ulu Win! project. There will be no
need for additional staff or operating funds.
16. SUSTAINABILITY FOCUS (List all that apply): 2, 3, 4, 5 - The Ulu Wini Park will provide a vital park and green space for residents of the Ulu Wini project, enhance quality of life, and promote healthy
lifestyles amongst tenants.
17. PROJECT READINESS (List all that apply): 2, 3, 4, 6. The Ulu Wini Park has some CIP funds from CIP FY 2013-14 budget that will be utilized this year, and needs these additional funds to complete a
,quality recreational area.
Prior Funds
Allotted
This FY 15-16 Beyond 6
18. EXPENDITURE PHASING (X $1000):
(not lapsed)
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
100 $100
TOTAL:
$100 $100
19. 0 & M COSTS (x $1000):
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond/Other
100 $100
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
TOTAL:
$100 $100
153
(This Page Intentionally Left Blank)
154
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENTAND DIVISION: Housing & Community Development, Community Development Division 2. DATE: 4/10/2015
3. PROJECT NAME: Kamakoa Nui Workforce Housing Community Development 4. SUBMITTER: Susan K. Akiyama, Housing Administrator
S. COUNCIL BENEFIT DISTRICT(S): 9 6. TMK/JUDICIAL: (3) 6-8-42:1-21 & (3) 6-8-30:181-252 / South Kohala
7. LOCATION (COUNCIL DISTRICT): 9 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $4,750,000
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): 3 (new buildings)
10. PROJECT/PROGRAM DESCRIPTION: Kamakoa Nui Community is a long awaited development serving the local workforce population with affordable homes for purchase. The Kamakoa Nui Community is
Master Planned Community with a possibility of approximately 1,100 homes to be provided in the future. The current phase consists of a total of 91 units. All site work and infrastructure is completed. The
funds would be used for the physical vertical construction of 16 homes that were not part of the original contract, and any other related costs necessary to complete the project.
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): 6 (Enhances quality of life) - The County of Hawaii is successfully positioned to market and sell the workforce homes to families working in th
proximity to the Community as the real estate market improves and to meet the continued growth on the Big Island as forecasted. The Hawaii State Department of Business, Economic Development, and
Tourism has projected resident populations by County from 2005 - 2035. Hawaii County exhibits the highest projected growth rates statewide from 2010 - 2035. The annual growth rate from 2005 - 2010 wa
1.4% while from 2010 - 2015 it is projected to be 2.5%. Growth continues from 2015 - 2020 at a rate of 2.1%. The intent is to meet the needs of our local workforce sector comprised of employees within the
Resorts, School Systems, Emergency personnel, Public Sector, and the local Service personnel. The Community is intended to price the homes to meet and serve the needs of these workforce employees with
income levels from 80% - 140% of Average Median Incomes. The majority of the employees within this income level travel great distances to work daily and it is also the intent of this Community to help to
raise the quality of life for the workforce employees by reducing their travel time.
12. LONG RANGE PLANS/COMMUNITY VALUES: 1, 2 (County General Plan Sections 2.4.6, 2.4.6.2 (d) and 9.5.6, 9.5.6.2 (d)), 3 (South Kohala Community Plan), 4 (South Kohala Land Use Pattern Allocation Guid
(LUPAG))
13. COUNTY MATCHING FUNDS REQ'D? (Y/N) ® DESCRIBE: N/A
14. LEGALMANDATE? (Y/N) ®DESCRIBE: N/A
15. IMPACT ON OPERATIONAL BUDGET: There will continue to be operating costs for two model homes (e.g. janitorial services, utilities, security monitoring).
16. SUSTAINABILITY FOCUS (List all that apply): 1, 2, 3, 7 - Kamakoa Nui Workforce Community will provide affordable workforce housing close to employment centers of the residents.
17. PROJECT READINESS (List all that apply): 1, 2 (more than half completed of Phase 4), 3, 4, 6, 7 - Site and infrastructure is completed and homes can be built as soon as funding becomes available.
18. EXPENDITURE PHASING (X $1000):
Prior Funds
Allotted
(not lapsed)
This FY 15-16 Beyond6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
12,216
$12,216
Land Acquisition
$0
Design/Survey
1,698
80 $1,778
Construction
41,373
4,670 $46,043
TOTAL:
19. 0 & M COSTS (x $1000):
$55,287
$12
$4,750 $0 1 $01 $0 I I 1 1 $60,037
$12
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond/Other
55,287
4,750 $60,037
State Revolving Fund
$0
State CIP
$0
Federal
$0
Private (Grants)
$0
CBA (Fair Share, Park Dedication, etc)
$0
TOTAL:
$55,287
$4,7501 $0 I $0 I $0 1 $01 $0 I $0 1 $60,037
155
(This Page Intentionally Left Blank)
156
County of Hawaii
PROJECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 - 2016
1. DEPARTMENT AND DIVISION: Office of Housing & Community Development, Community Development Div. 2. DATE: 4/10/2015
3. PROJECT NAME: Ouili'Ekahi Cottages Improvement 4. SUBMITTER: Sharon Hirota/Susan Akiyama
S. COUNCIL BENEFIT DISTRICT(S): 9 6. TMK/JUDICIAL: (3) 6-2-001:085 / South Kohala
7. LOCATION (COUNCIL DISTRICT): 9 8. TOTAL COUNTY FUNDS NEEDED THIS FY: $400,000
9. CAPITAL PROJECT ELIGIBILITY (List Criteria): 4 (Deferred maintenance of infrastructure or buildings)
10. PROJECT/PROGRAM DESCRIPTION: The'Ouili'Ekahi Cottages ("'Ouili") is a 33 unit permanent rental housing (2 bedroom units) community for families with children earning less than 50% of the
County's adjusted median income. Management of the community is provided by Hawai'i Affordable Properties.
31. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply): 1,2,3,4,5,6,7 By upgrading the roofs, updating paint and improving the sewer treatment plant, health and safety of the residents will be
maintained. Total project costs included any and all cost related to the completion of this project. In addition, substantial costly repairs will be avoided in the future. Improvements made will extend the
life of the 'Ouili by 20 years - providing 660 months of affordability serving approximately 462 families with children.
12. LONG RANGE PLANS/COMMUNITY VALUES: 1,2 (County General Plan, Section 9), 3 (South Kohala Community Development Plan), 7
13. COUNTY MATCHING FUNDS REQ'D?(Y/N) No DESCRIBE: n/a
14. LEGAL MANDATE? (Y/N) No DESCRIBE: n/a
15. IMPACT ON OPERATIONAL BUDGET: This project will be administered without the need for additional staff or operating funds.
16. SUSTAINABILITY FOCUS (List all that apply): 1.3.5 -'Ouili provides affordable, permanent rental housing in close proximity to employment centers.
17. PROJECT READINESS (List all that apply): 2,4 (Existing staff to manage the project), 6,7 (Existing staff to manage the project)
EXPENDITURE PHASING (X $1000):
nor Funds
lotted
FAI
ot lapsed)
This FY15-16 Beyond 6
Request FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
Land Acquisition
Design/Survey
Construction
400 $400
TOTAL:
$400 1 $400
19. O & M COSTS (x $1000):
20. FUNDING SOURCE (x $1000):
Cty G.O. Bond/Other
400 $400
State Revolving Fund
State CIP
Federal
Private (Grants)
CBA (Fair Share, Park Dedication, etc)
II TOTAL:
0
$400 1 $400
157
(This Page Intentionally Left Blank)
158
MASS TRANSIT AGENCY
TIFFANY KAI, ADMINISTRATOR
159
(This Page Intentionally Left Blank)
160
Department: Mass Transit
SUMMARY OF DEPARTMENT REQUESTS
SIX YEAR CAPITAL IMPROVEMENTS PROGRAM
FISCAL YEAR 2015-2016
161
2015-16 FY FUNDING
FUNDING FORECAST BY FISCAL YEAR
(in thousands)
(In thousands)
TOTAL
ESTIMATED
Prior
funding
Beyond 6
PROJECT
PRIORITY
PROJECT
County
State
Federal
Private
CBA-
received
2015-16
2016-17
2017-18
2018-19
2019-20
2020-21
years
COST
1
Waimea Transit Hub
500
500
2,000
2,500
2
Hawai'i Island Mass Transit Master Plan
500
500
500
3
4
5
6
7
8
9
10
TOTAL
1,000
1,000
2,000
3,000
161
(This Page Intentionally Left Blank)
Wj
County of iffr iY
PRO/ECT DATA/FINANCIAL IMPACT STATEMENT
Fiscal Year 2015 to 2016
1. DEPARTMENT AND DIVISION: Mass Transit Agency 2. DATE: 4/10/2015
3. PROJECT NAME: Waimea Transit Hub 4. SUBMITTER: Tffany Kai
S. COUNCIL BENEFIT DISTRICT(S): 9 6. TMK/IUDICIAL: TO Be Determined/ South Kobale
L LOCATION (COUNCIL DISTRICT(: 9 S. TOTAL COUNTY FUNDS NEEDED THIS FY:
$500,00o
9. CAPITAL PROJECT ELIGIBILITY (List Criteria(o Infrastructure improvement, New buildings and Facility
30. PROJER/PROGRAM DESCRIPTION: Planning, design and construction of a Waimea Transit Hub,
11. PROJECT JUSTIFICATION & OUTCOME(S) (List all that apply(: A transit hub in Waimea is necessary as the area i$ the midway between Hilo and
acifities antl parking is limited This will provide Saralee improvements, and connectivity, while addressing public safety.
Kailua-Nona. Current bus stops does net have adequate
12. LONG RANGE PIANS/COMMUNITY VALUES: Consistent with the community's values and the South Kohala Traffic Safety Committee.
13. COUNTY MATCHING FUNDS REO'Di p/Ni
Na IDESCRIBE:
14. LEGALMANDATE? ry/NI 0
NO DESCRIBE:
15. IMPACT ON OPERATIONAL BUDGET: Moderate. New costs associated with operation and maintenance of the facility.
16. SUSTAINABILITY FOCUS (List all that apply(: Promotes ecoromk vitality, strengthens and sustains our community, promotes health and safety.
Reducescarson the road.
17. PROJECT READINESS (List all that apply(: The agency i5 ready to initiate the site selection upon funds being available.
111.1 on
AIIO[tetl s
18. EXPENDITURE PHASING(K$100(U (not lapsed(
This FY 1546
Request FY 16-12 FY T2-18 Fyl&19 Fy 1930
Beyond 6
FY 20-21 Years
TOTAL:
Planning
100
$10
Used Acquisition
Design/Survey
400
540
Construction
2,000
$2.000
TOTAL :O
$500 52,00 1
$2,500
19. 0 & M COSTS (x $1000(:
20. FUNDING SOURCE (x$100o):
Cry G.O. Bond/other
500 2,000
525GO
State Revolving Fund
State CIP
federal linAutling ARRA-Stimulus(
Private (Grants)
CBA (Fair Share, Park Dedication, etd
TOTAL:
$500 1 $2,000
$2,500
163
(This Page Intentionally Left Blank)
164
County of Hawai'i
PROJECT DATA/FINANCIAL IMPACTSTATEMENT
Fiscal Year 1015 to 1016
1. DEPARTMENT AND DIVISION: Mass Transit Agency 2. DATE: 5/6/2()35
3. PROJECT NAME: Hawagi Island Mass Transit Master Plan 4. SUBMITTER: Daniel Paleka
5. COUNCIL BENEFIT DISTRICTS): All 6. TMX/JUDICIAL: Vanma,/AII
7. LOCATION (COUNCIL DISTRICT): All B. TOTAL COUNTY FUNDS NEEDED THIS FY: $500,000
9. CAPITALPROJECr ELIGIBULTY(List Criteria): Planning or design studies.
10. PROTECT/PROGMM DESCRIPTION: Prepare a county -wide Mass Transit Master Plan to provide an overall framework for transit improvements, while incorporating user Input from each of the
districts and CDP's. The Master Plan should include timelines, criteria, administrative procedures, and legal guidelines for the projected infrastructure needs both in the shortand long term. This Master
Plan should consider transit aRernanes such as hub and spoke systems, infrastructure needs in a primarily rural environment, improved schedules and stop locationls), and ADA upgrades. The Master
Plan should also include an action and financing strategy, along with an implementation program and timeline.
11. PROJECT JUSTIFICATION& OUTCOME(S)(List all that apply): With higher demands on the County's Mass Transit system, the Master Plan will provide enhanced transit options islandeede,compliment
the development of town centers, encourage less dependency on the authomobile, and provide more transportation opportunities that enhance social equality.
12. LONG RANGE PLANS/COMMUNITY VALUES: General Plan, Sec. 13.4.2(a), 13.4.3(a) and 15.1; Puna CDP, Sec. 4.2.3 a through k.
13. COUNTY MATCHING FUNDS REQ'D? (Y/NI Np DESCRIBE:
14. LEGAL MANDATE? (Y/Nn an.DESCRIBE:
15. IMPACTONOPEMTIONALBUDGET: Minor to moderate impact on Mass Transit Agency's personnel.
15. SUSTAINABILITY FOCUS 1List all that apply): Promotes economic vitality, strengthens and sustains our community, promotes health and safety, and reduces the amount of automobiles on the road.
17. PROJECT READINESS (List all that apply): The agency is ready to initiate the consultant selection and contract process upon funds being available.
18. EXPENDITURE P9ASING(X$1000):
Prior Fun s
Allotted
(notlapsed)
This FY 15-16 Beyond 6
Request FY 16-17 FY 1T-18 FY 18-19 FY 19-20 FY 20-21 Years TOTAL:
Planning
500 $500
land Acquisition
Design/Survey
Construction
11 TOTAL:
$500 $500
19. O & M COSTS fi. $1000):
20. FUNDING SOURCE(x$1000):
Cry G.O. Bond/Other
500 $500
State Revolving Fund
State CIP
Federal (including ARRA-Stimulus)
Private (Grams)
CM (Fair Share, Park Dedication, etc)
TOTAL:
$500 $500
165
(This Page Intentionally Lek Blank)
166
OFFICE OF THE COUNTY CLERK
County of Hawaii
Hilo, Hawaii
Introduced By: Karen Eoff
Date Introduced: May 18, 2015
First Reading: May 18, 2015
Published: May 29, 2 015
REMARKS.'
April 14, 2015 — Public Hearing
Second Reading: June
1, 2015
To Mayor:
June
8,
2015
Returned:
June
17,
2015
Effective:
July
1,
2015
Published:
June
24,
2015
PITON 417M
(Draft 3)
. cn
;-'; o c-)
ROLL CALL VOTE " -' C—
AYES
NOES
A43,9
EX
Chung
X
_ o
David
X_
m
Eoff
X
•-`
Ilagan
X .
0•
Kanuha
X
Onishi
X
X
Paleka
X
Poindexter
X
Wille
X
8
0
1
0
(Draft 4)
ROLL CALL VOTE
AYES
NOES
ABS
EX
Chung
X
David
X
Eoff
X
Ilagan
X
Kanuha
X
Onishi
X
Paleka
X
Poindexter
X
Wille
X
9
0
0
0
I DO HEREBY CERTIFY that the foregoing BILL was adopted by the County Council published as
indicated above. _.___.___
Approve Disapproved this ' ` day
Of—
f -; , 20 167
MAYOR, COUNTYOFHAWAI7
iCOU2NCILCH,4iE
NTY CLERK
Bill No.:
29 (Draft 4)
Reference: C-144.30/FC-26
Ord No.: IS 58