DATE: June 7, 1999
TO: Mr. James Y. Arakaki
Council Chairman
FROM: Jiro Sumad
Deputy Chie i er
RE: Bill 45, Comm. 177.153 - 177.155
In response to Communications 177.153, 177.154 and 177.155, we submit the
attached memos from the affected Divisions, outlining their concerns and the impact
of proposed budget changes.
Comm. Na / / ~ 7
File No. a U ~
Ref. To: P~6seafsd C
Ref, llate ~8
~
COUNTY OF HAWAII
DEPARTMENT OF PUBLIC WORKS
HIGHWAY MAINTENANCE DIVISION
630 E LANIKAULA ST
HILO, HAWAII 96720
PH: (808)961-8349 FAX: (808)961-8633
MEMORANDUM
DATE: June 7, 1999
T0: Jiro Sumada
Deputy Chief Engine r
FROM: Stanley Nakasone
Highway Maintenance Superintendent
SUBJECT: Budget -Equipment and Positions
Our Highways Division has prepared ourselves since 1994 in anticipation of the
poor economical condition our County of Hawaii was faced with.
I have gone to each Baseyard throughout the island asking our employees to do
a little more. Our plan was not to fill the 30 plus vacant positions in our
Division. We were to plan more wisely, assist each other, share equipment,
organize the best we can with the intent that no one will be laid off due to
insufficient funds. We also antidpated the many fires, storms, flooding, etc.
that this island frequently experienced.
In 1995 we took on an additional workload of resurfacing our roadways. This
was a great task and I think we have met the challenge in a positive way. We
have done more than what is expected of us with no increase in staff for the
past 30 plus years and each year we have additional roads added to our
workload by the development of new sub-divisions. Weibok pride in trying to
survive these tough times and maintain our present service to the public.
We have filled the vacancies in a timely manner and now have 12 vacancies.
We have every need of our positions and have looked at relocating positions to
fit the need of our Division. We have every intend to fill these positions when
the economical situation improves.
Jiro Sumada
Page 2
June 7, 1999
Several years ago, our Highways Division reduced our equipment inventory by
37%, an estimate of 45 pieces of equipment. We have established an
equipment replacement list to be more efficient in our work. We replace
equipment because there is a need to. The funds that are available to purchase
this equipment is by our efforts in each District.
We have sacrificed and done our work to keep our division operating the best
way we can. Now to learn that our efforts to care for our division may be taken
away is very discouraging.
If funds for our positional and equipment will be taken away, then the
resurfacing project should be given back to the Engineering Division. We will
not be able to up keep our regular maintenance. We will have to re-plan with
the 13 positions not available, and vehicles not being replaced.
Positions Distri
Equipment Operator I Kona X
Equipment Operator I Hilo X
Equipment Operator III Hilo X
Equipment Operator III Hilo 0
Equipment Operator III Hilo 0
Lead Mason Hilo X
Equipment Operator I Puna X
Equipment Operator II Puna X
Equipment Operator II N/S Kohala 0
Senior Account Clerk N/S Kohala 0
Equipment Operator II Hamakua X
Driver Trainer Admin X
Civil Engineer Admin 0
Eauipment
6 Pass Puna 'h T Pick up Hilo
6 Pass Puna 3/a T Hilo
6 Pass N/S Kohala Utility Vehicle Admin
~/z T Pick Up N/S Kohala
Jiro Sumada
Page 3
June 7, 1999
Our efforts will be maintenance only and very light construction.
All the paper work has been done to have eight of the positions filled. The
other five positions will be studied to see what our needs are.
SN/aa
Attachment (Impact to our Division)
cc: File
All Overseers
IMPACT TO OUR DNISION
1. The Safety and Driver Improvement Coordinator position is very vital to
our operations. This position ensures that the Public Works Department
complies with the OSHA regulations and procedures. It also ensures:
A. Proper training is provided in compliance with OSHA Standards.
B. Proper training to our Equipment Operators and Laborers
We have made a commitment to OSHA to fill this position. Failure to do
so will result in our Division being fined $70,000.00. This was part of our
negotiations with OSHA.
Failure to fill this position may result in non-compliance to OSHA
requirements and the possibility of fines. Training of our employees will
be neglected and safety on the job will be of great concern to our
employees and the Public.
2. Equipment Operators I, II, III
Currently these positions are used daily on Temporary Assignments to
accomplish our workloads. We use the funds from these positions for
payments to employees for Temporary Assignments and overtime.
Overtime is necessary for our resurfacing program as we assist each
other in various Districts. Overtime payment is used also for the many
emergencies on our Highways and islands. Such as oil spills, flooding,
fallen trees and rocks, high seas, etc.
Failure to fill these positions would definitely require our division to alter our
programs and how we do our maintenance work. We would concentrate on our
regular maintenance such as, grass cutting, shoulder work, patching, weed
control, cutting overhangs, guardrails, ditches, drywells, culverts, complaints,
etc. Our resurfacing program will have to be looked at very carefully and see if
we would do this program. It is, without a doubt, impossible to maintain our
present resurfacing schedule. I would request that all major resurfacing
programs be returned back to the Engineering Division to have this work
contracted out. Our Highways Division will do sectional type of resurfacing only.
Any questions please call me.
SN/aa
cc: All Overseers
File
" WASTEWATER. DI~~ISION
~ _ D¢partment Of Pni7(iC 1'l~o rjiS Mailing Address: 25 Aupuni Street, Rm. 202
x=~_'= 108 Railroad Avenue -Hilo, Hawaii 96720 Hilo, Hawaii 96720-4252
- (808) 961-8338 -Fax (808) 961-8644
F+
June 7, 1999
Memorandum:
To: Jiro Sumada, Deputy Chief Engineer
From: Peter Boucher, Division Chief
Subject: BILL N0.45, DRAFT 2
I have reviewed the letter dated 5/27/99 from Dominic Yagong to Chairman James Arakaki which proposes
amendments to the referenced Bill. The Wastewater Division has serious concerns regarding the proposal which
would defund vacant positions and place a portion of our user fees into a contingency fund. The fund, according
to Mr. Yagong, would be used for private sewer connections.
From a legal perspective, the County has certified in each of it's State Revolving Fund (SRF) loan applications
that it will "operate and maintain the publicly owned treatment works in accordance with the minimum
standards as required by the cognizant Federal, State and local agencies...". The County has further agreed on
numerous occasions to the standard clause in the final SRF loan agreements which reads, `The County
guarantees that revenues from the User Charge System will be set aside for operation and maintenance
(including replacement) and not used for other purposes." Placement of the user fees into a contingency fund
as suggested by Councilman Yagong would be in clear violation of these agreements.
Notwithstanding the above, the funding and filling of the vacant positions is critical to the successful operation
of our facilities. As you may be aware, we have recently received our annual operation and maintenance
inspection report for the Hilo Wastewater Facility. For the first time, the report gave our facility an
"unacceptable" rating and cited us for lack of maintenance on various equipment. We do not deny the claims.
The report stated "Staff vacancies have impacted preventive and corrective maintenance work...", and that the
"sewer user charge appears inadequate to cover annual operation and maintenance costs of the facility". The
report also questions zero disbursement for equipment replacement in the FY97/98 budget. The basic reasons
for the above are the failure of the County to fill the vacant positions and the postponing of necessary equipment
replacement in order to conserve funds for basic operations. Our only hope for reversing the decline of our
facilities is to fill the existing vacant positions as soon as possible and consider raising the sewer rates to fund
additional positions.
Councilman Yagong's plan to transfer funding from equipment to the contingency fund would also violate the
SRF loan agreements and impact our ability to adequately maintain our facilities. The large dump truck in
particular was planned for purchase in order to eliminate several sludge hauling trips to the landfill per day in
order to better utilize or limited manpower.
The DOH summarizes their report by stating "Continual breakdowns in plant equipment must be addressed by
the County before the facility experiences serious effluent violations." We agree. These violations could lead
to fines and judicial action which would far exceed any short-term savings currently being considered. I
recommend that DPW strongly oppose the proposed amendments.
ENGINEERING BUBGET REDUCTION
1\~AY 27. 1 SSA YAGONG PROPOSAL
OVERTIME:
Should a shortage occur in this account we will take the following actions in the following order:
1. We will no longer service the Planning Commission, Water Commission or any other federal,
state or county agency, commission or committee, including the County Counci l beyond normal
working hours or days. We will provide services if overtime costs as borne by the requesting
agency, commission or committee.
2. We will no longer attend community meetings scheduled beyond normal working hours or days.
3. We will not schedule any public meetings or hearings beyond normal working hours or days.
4. Overtime will be used for emergency purposes only.
TELEPHONE:
It is our understanding that our fax modem lines will no longer be paid by this Division as they were
converted to the Centranet system. Should this occur we have no objections to this reduction. Ifnot,
we will terminate our cell phone services as necessary. Although the cell phones aze under Design
& Investigation, for practical reasons our inspectors are using the phones. However, if needed the
phones maybe reassigned to engineers during emergencies, etc.
MISC. MATERIALS AND SUPPLIES:
Should a shortage occur in this account we will take the following actions in the following order:
1. We will not provide survey services to agencies outside the Department unless survey supplies
are provided by the requesting agencies.
2. We will not provide design drafting or copying services to agencies outside the Department
unless drafting supplies are provided by the requesting agencies.
EQUIPMENT REPA7It/MAINTENANCE:
We object to the budget reduction. The budget in this account was increased to allow for scheduled
maintenance of our survey crew's electronic surveying equipment. We had failed to account for this
in previous budgets and have fallen behind schedule. With electronic surveying equipment we have
reduced the size of our survey crew by one man and yet increased production. We need funds to
properly maintain our surveying equipment to insure accuracy, efficiency and production.
Page 1 of 2
VACA.~'C'IE,S:
The Senior Construction Inspector and the Assistant Construction Inspector vacancies are in our
West Hawaii office. We presently have a Civil Engineer V, a Drafting Technician II, a Construction
Inspector and an Assistant Construction Inspector in our Vl'est Hawaii office. The inspectors in West
Hawaii provide inspectional services from North Kohala to portions of Kau. Their work includes
inspectional services for work within County Roads, grading/grubbing/stockpiltng work, Department
of Public Works and Parks and Recreation projects.
Should we fail to fill the vacancies we must limit inspectional work for Departmental CIP projects
and will not provide any services for Parks and Recreation. We must also limit our Federal Aid
work to having only one project under construction at a time. Though we may contract
inspection construction management services, it will increases demands on the Civil Engineer.
Further, as there will be no supervisor for the inspectors, the Civil Engineer must fill this role. These
additional duties will limit the Civil Engineer's ability to remain in the office to service the public
and to act as the division representative in Kona.
With such a limited amount of employees in West Hawaii, we probably cannot address labor
shortages due to sick leave, vacation, training and other absences. Having one inspector to service
all of West Hawaii is obviously unreasonable. We would have no choice but to supplement West
personnel with East Hawaii personnel. During these periods, besides financial impacts associated
with travel costs, we must also reduce inspectiona] services in East Hawaii.
Page 2 of 2
COUNTY OF HAWAII
DEPARTMENT OF PUBLIC WORKS
Office of the Chief Engineer
25 Aupuni Street ~ Room 202 ~ Hilo, Hawau 96720
Phone (808) 961-8321 ? Fax (808) 961-8630
~~~~~e~r~`~~~
DATE: June 4, 1999
TO: Jiro Sumada & Nancy Crawford
FROM: Pam Mizuno
RE: COMMENTS TO MR YAGONG'S PROPOSED BUDGET CUTS
Although the proposed budget cuts for the Chief Engineers Office appear to be minimal,
we may be impacted by the cuts in the supply room budget. A 10% cut in our budget
seems reasonable based on our history of actual costs for materials and supplies. But
because the proposal identifies a 10% cut in the $215,000 storeroom budget, the
storeroom itself may not be able to stock a sufficient amount of goods for the entire fiscal
yeaz.
If storeroom runs out of funding for their purchases next yeaz, we would be responsible
for our own material and supply purchases. At that point, we would need every available
dollaz to purchase necessities such as copy paper, pens, folders, etc. All the items which
we normally count on storeroom to supply, and therefore do not budget for purchase.
I think this proves that the effect and relationship that the various Department budgets
have on one another needs to be scrutinized more closely. The effect of azbitrary cuts is
not only irresponsible, but also dangerous.
COUNTY OF HAWAII
DEPARTMENT OF PUBLIC WORKS
25 AUPUNI STREET, ROOM 202
HILO HI 96720-4245
TELEPHONE: (808) 961-8321 FAX (808) 961-8630
MEMORANDUM
DATE: June 7, 1998
TO: Nancy Crawford
Business Manager
FROM: Walter Lucas NJ~'
Automotive Equipment Superintendent
RE: Budget
Item 177 - 010-181-5181.52-102
OCE Automotive Division -Public Works Telephone
We have upgraded three of our automated fueling system lines at $473 per line.
We have been paying for our South Kohala system since July 1998. Our Kau
system went on line and our first billing was dated December 1998. Our North
Kohala system (a FY '98-'99 building project) has just gone on line and we will
be receiving our first billing shortly. We need the full $4880.00 for bill paying of
all the Automotive Division's facilities.
Item 178 - 010-181-5181.61-449 Public Works -Motor Vehicle
A. 4x4 Truck - CH1050
Delete from budget - We will not replace this vehicle at this time.
B. 2x4 Truck - CH 1726
Delete from budget - We will defer from replacing this truck for
another two years.
Item 179 - 010-181-5181.61-480
Automotive Division Eqpt Public Works Misc. Equipment
Diagnostic Digital Oscilloscope
Currently the equipment that we are using to repair the vehicles and equipment
are old and obsolete. With all of the electronics built within the vehicles'
systems, it is almost impossible to repair the vehicles without the use of this
updated diagnostic tester. We need to purchase this equipment to keep up with
the rapid changes of technology in the automotive field. Without proper
equipment our mechanics will not be able to repair equipment.
Position No: 1152 -Automotive Mechanic II
This position was just vacated in December 1998. We haven't had time to
replace the employee.