Loading...
HomeMy WebLinkAboutCOM 0132.009 1996-1998 r My Name is Paul Goodrich. I am a resident of Kona Scenic Subdivision and my home is on Halekii Street. I have read Oceanside 1( 50's preliminary development plan for this application. Page 9~ states that Haleki'i Street will provide access to the project site until the completion of the Mamalahoa Highway Bypass. We are opposed to Haleki'i Street being used to provide access to any stage of this development until the entire Mamalahoa Bypass Highway has been completed. We pushed hard to have the requirement for a break-away gate at the bottom of Haleki'i Street made part of the previous zoning approvals for this development. We feel just as strong about it now as we did then. I don't feel that the results of the traffic study quoted in this report gives a true picture of the potential impact to our neighborhood. Not only do they plan to build a lodge but also there will be a golf course, club house and eating facility. I imagine there will be some sort of sales office where their house lot sales will be promoted. In addition, this road will serve as the shore line access for public use. I wouldn't even be surprised if people are brought in right off the Japan Airlines flights, for that matter. On top of everything, when the first half of the Bypass has been built, what is to prevent people from driving down Haleki'i Street and up the Bypass to Keauhou and the other way around? We will take what ever steps are necessary to make sure that our residential street is not open prior to the completion of the entire bypass, as we were promised in the past. With Oceanside 1250 giving out keys to the gate, and since they paved their road to the shore, traffic down our residential street has already increased substantially. Sincerely, k: C~,' ED Time-'------ - gY'------'-•--.•.•. t - Date.----------- -~-fr- -~Z--------•-^^^° County Council f Q- S~ Paul Goodrich P.O. Box 945 Kealakekua, HI 96750 / ~ z ~ O Comm. So. File N~. PLG Presented P C sP~.-.•I lief. Tof _JAN 2 g 1'999 agricultural lot development, are available. Drainage Svstems 53. A Preliminary Engineering Study for Sewage and Drainage Infrastructure Systems was performed by R.M. Towill Corporation in January 1992 for the Villages at Hokukano EIS. According to the study, onsite drainage systems will consist primarily of drywells to dispose of runoff generated from roads. Siltation basins will be constructed, as required, to control runoff and maintain water qualiry, and may be incorporated into the adjacent golf course design. No offsite drainage improvements are anticipated. The proposed development and drainage improvements will be designed so that the carrying capacity of storm flows within the existing drainage way will not be affected. Public Facilities and Services 5'4. Access to the project site, until completion of the Mamalahoa Highway Bypass, will be provided from Haleki'i Street, an 80-foot wide right-of--way that links the property with Mamalahoa Highway. At the intersection with Mamalahoa Highway, Haleki'i Street has a channelized "T" intersection with separate left and right turn lanes. Haleki'i Street will be extended into the project site to the vicinity of the associated golf course clubhouse and proposed lodge. Improvements, including signalization of the Haleki'i Street/Mamalahoa Highway intersection is planned in conjunction with the opening of the adjacent golf clubhouse. 55. A traffic study prepared by Parsons Brinckerhoff Quade & Douglas (PBQ&D) forecasted that, even at build out, only 17 "in trips" and 11 "out trips" during the peak a.m. hour and 15 "in trips" and 26 "out trips" during the peak p.m. hours are expected from development of the members' lodge. These trip estimates assume an average 85 percent occupancy level and include both guest and employee traffic. Since the traffic study was based on a lodge program of 100 units, impacts are expected to be reduced proportionally with the down scaling of the proposed ]odge to 80 units. 56. Future traffic conditions in this area will be relieved by the proposed construction of the Mamalahoa Highway bypass which is to be constructed with the first small lot subdivision of the proposed Villages at Hokukano project. The proposed alignment is -14-