HomeMy WebLinkAboutCOM 0091.003 2016-2018 Harry Kim JttII-
t N4w4i1111 Darren J. Rosario
Mayor , Fire Chief
l�:
- -- _. ; Renwick J. Victorino
I� - .� Deputy Fire Chief
l' ,.;44��.
,„,„„,____-
County of Jauai'i
HAWAII FIRE DEPARTMENT
25 Aupuni Street•Suite 2501•Hilo,Hawaii 96720
(808)932-2900•Fax(808)932-2928
C")
Memorandum 75 �_
cp a—‹
TO : Valerie T. Poindexter, Council Chair """in
and Members of the Hawaii County Council sr-
w �'c
FROM : Darren J. Rosario, Fire Chief o
w ""
DATE April 10, 2017
SUBJECT : Hawai`i Fire Department Presentation Material;
Departmental Budget& Program Reviews for FY 2017-2018
The purpose of this transmittal is to submit material that will be presented by the Hawai`i
Fire Department during the Departmental Budget and Program Reviews of the Operating
and Capital Budgets for the 2017-2018 Fiscal Year.
Special Finance Committee Meeting on Tuesday, April 11, 2017 at 1:30 p.m.
Thank you.
CAL>
Attachment: Presentation Material
Comm. 3 N
Ref. To. ,• \_
Ref. Date 1 =`1
1011 �-►
Hawai'i County is an Equal Opportunity Provider and Employer.
Equipment Replacement Schedule(Leases) 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
lease
Payment Monthly
Equipment(Budget Year) Initial Year Equipment Assignment Payment Months Payment lett Months Payment left Months Payment left Months Payment left Months Payment left Months Payment left Months Payment left Months Payment left Months Payment left Months Payment len
TWO Pumpers(2012) 2013 Kawailani and Kaumana 21,744.81 6 150,039.19 54 12 260,937.72 42 12_260 937.72 30 12 260,937.72 18 12 260,937.72 6 6_ 130,468.86 -
TWO Pumpers(2013) 2014 Waimea and North Kabala 17,722.68 10 177,226.80 50 12 212,672.16 38 12 212,672.16 26 12 212,672.16 14 12 212,672.16 2 2 35,445.36 -
TWO Pumpers(2014) 2015 Honoka'a and Kea'au 19,680.35 3 59,041.05 57 12 236,164.20 45 12 236,164.20 33 12 236,164.20 21 12 236,164.20 9 9 177,123.15 -
ONE TANKER(2014) 2015 West Hawaii 7,147.21 _ 11 78,619.31 49 12 85,766.52 37 12 85,766.52 25 12 85,766.52 13 12 85,766.52 1 1 7,147.21 -
TWO Pumpers(2015) 2017 Central and Paradise Park 22,241.00 8 177,928.00 52_ 12 266,892.00 40 12 266,892.00 28 12 266,892.00 16 12 266,892.00 4 , 4 88,964.00 N
ONE TANKER(2015) 2017 Central 7,593.29 12 91,119.48 48 12 91,119.48 36 12 91,119.48 24 12 91,119.48 12 12 91,119.48 -
ONE Pumper(2016) 2018 Waikoloa(Cancelled)
ONE TANKER(2016) 2018 North Kohala(Cancelled)
ONE TANKER(2017) 2018 Waimea 8,000.00 2 16,000.00 58 12 96,000.00 46 12 96,000.00 34 12 96,000.00 22 12 96,000.00 10_ 10 80,000.00 q
150,039.19 260,937.72 438,164.52 611,270.24 1,080,588.08 1,119,083.22 988,614.36 811,387.56 638,281.84 168,964.00
CDBG
PURCHASE Equipment Assignment CDBG Funding County Total Cost
2010 Pahala Tanker $218,582 $0 $218,582
2011 Pahoa Tanker $298,733 $0 $298,733
2012 Pahoa Pumper $598,394 $0 $598,394
2013 Waiakea ladder $800,000 $22,271 $822,271
2014 Pahala Brush Truck $220,236 $0 I $220,236
2015 Pahoa Brush Truck $235,000 $8,020 $243,020
2016 Pahala Pumper $565,000 $119,084 $684,084
Total Assistance so far $2,935,945 $149,375 $3,085,321
Max Year Estimated
Station Type Current Year Model Replacement Cost
Central Pumper 2017 2037
Tanker 2017 2037
Waiakea ladder 2014 2034
Heavy Rescue 2009 2029
light Rescue 2009 2029
Kawailani Pumper 2012 2032
Kaumana Pumper 2012 2032
Hazmat 1997
Keaau Pumper 2015 2035
Brushtruck 2001 2021
Captain Cook Pumper 2007 2027
Kailua-Kona Pumper 2001 2021
Heavy Rescue 2009 2029
Light Rescue 2009 2029
Honokaa Pumper 2015 2035
Brushtruck 2001 2021
Waimea Pumper 2014 2034
Tanker 2017 2037
Pahoa Pumper 2012 2032
Tanker 2013 2033
Brushtruck 2016 2036
Kau Pumper 2018 2038
Tanker 2011 2031
Brushtruck 2015 2035
Keauhou Pumper 1997
S.Kohala ladder 2008 2028
N.Kohala Pumper 2014 2034
Tanker 2006 2026
Waikoloa Pumper 1991
Tanker 2015 2035
Laupahoehoe Pumper 1997
Volcano Pumper 2006 2026
HOVE Pumper 2003 2023
Makalei Pumper 2006 2026
Hazmat 2005 2025
HAWAII FIRE DEPARTMENT
BUDGET CONSIDERATIONS FOR FY 17/18
OVERTIME FUNDING
Requesting restoration of funding in the amount of$2,500,000
1. 5221.01.021, Fire Protection S&W, Overtime S&W funding was reduced
significantly
a. Overtime Salary & Wages reduced from $802,000 to $319,256
i. Results in available overtime funding of only $700 per applicable
position for the entire fiscal year.
ii. Overtime earned here is for recall to emergency incidents requiring
additional personnel (Large Fires, Search and Rescue, etc.), filling of
critical on-duty shortages, attendance at mandatory training.
b. Rank for Rank Contract provision funding reduced from $2,012,256 to $0
i. Contractual requirement.
ii. Mayor plans to meet with Union President to discuss. If Union does
not agree to forego this provision, it needs to be funded.
APPARATUS REPLACEMENT PROGRAM
Requesting funding amount of$20,000
1. 5221.02.111, Fire Protection-OCE, Rental/Lease of Equipment
a. Please refer to attached spreadsheet
b. Replacement apparatus for Waikoloa was approved for FY 16/17 but approval
cancelled by Finance Department due to funding issues for FY 16/17. HFD
Informed to resubmit for FY 17/18.
c. Supplemental Budget Request for Waikoloa and Keauhou Apparatus not in
current FY 17/18 budget.
i. Requires only one month of funding on the line item to allow HFD
to place it out to Bid. Apparatus takes 1 year for build.
ii. HFD Not asking for any additional funding. Payments from the
2012 lease will end in 2017. HFD Requesting funding be kept in
budget from 2012 lease to start new lease in 2018.
iii. Delaying program another year will result in larger bulk purchases
being needed in very near future.
HAZMAT EQUIPMENT REQUEST
Requesting funding amount of$82,000
1. 5221.02.231, Fire Protection-OCE, Public Safety Supplies
a. Hazmat Response suits are due for replacement.
i. 10 year usability lifespan for entry. Suits expire in 2018
ii. Require 10 Class A and 10 Class B entry suits.
iii. Refer to attached informational sheets
FIREWORKS ENFORCEMENT
1. 5222.02.341, Fireworks enforcement-OCE Misc, Charges, Public Display
c. In light of budgetary cuts, Department does not support the use of$30,000 for
fireworks display.
i. Fireworks show is funded through Fireworks permitting fees.
ii. Fireworks show funding is not a mandated use of fireworks fee
revenue.
iii. Primary need should be to purchase equipment for Fireworks
enforcement.
�I
i. 1
k
i
!K Kappler. ,.
i'
F
t
I
...„,....,,,,,.. i
„2,,. }
Know What You're Getting Into. �-_,... 1,
P.O. Box 490
Guntersville, AL 35976 U.S.A. ` ;h.
T 800.600.4019 , .
F 256.505.4151 , �:` �4 ,,. ��
www.kappler.com .;WI;:k•
u"
:;Litt47‘
+' t
''.7 . i'39 si,
Product Specification
of .� *`k„.,, y
14 rmi., Gc.
Frontlme®500 f f: � ;
Y
NFPA 1991-2005 Edition - .,..:; n
Style: F5H58099 .4411 0. ;
leiv fol*
Design Requirements
Z
1. The garment shall be constructed from a multiple layer film based composite material comprised of a fire
retardant treated non-woven fabric laminated on the outside with a metallized polyester chemical barrier film and
laminated on the inside with an additional chemical barrier film.A heat blocking and fire retardant adhesive is
used on the outside lamination and a fire retardant adhesive is used on the inside lamination.The garment is 4
reflective silver in color.
li
2. All seams shall be stitched with nylon thread and covered with high visibility orange heat sealed seam tape on
outside of the seam and another layer of white tape on the inside.The seam tape used to cover the seams shall
be of a similar composition as the films used in the base fabric and offer the same chemical resistance as the
fabric.
r
3. The garment shall be a front entry, expanded back design with a 48"gas tight PVC zipper. The zipper shall have E'
heavy-duty metal teeth. Overlapping double storm flaps to be made of the base fabric shall cover the zipper. li
storm flaps shall have hook and loop closure. p pp . The f
4. The expanded backpack of the garment shall be sized to accommodate an SCBA.
h
5. The expanded view visor shall be made of a 40 mil FR PVC lens,with 5 mil FEP overlay. !-
6. The garment shall be constructed with sock boots made from Zytron®500 chemical barrier fabric to improve
comfort and fit with a chemical over boot.The boot area shall be covered by a splash guard made of the suit
material.
7. The garment shall have knee reinforcements
8. The garment shall be constructed with sleeves designed such as to allow the worker to easily remove his hands
into the inside of the suit, but without excessive material under the arms which can catch on sharp objects.
Page I of 2
a
is
• I
9. The 2N1TM glove system shall consist of an integrated nylon film liner glove inside a 35mil butyl glove attached to
the garment with a ring and clamp. The outer glove is Kevlar.
10. The garment shall contain an internal 2"waist belt system for support and improved fit.
11. The garment shall be constructed with two(2),one-way exhalation valves.The exhaust valve flappers shall be of
a ridged design.The exhalation valves shall contain a special molded cover to improve vapor intrusion resistance.
Valves shall be protected from splash by valve covers made of the suit material.
12. Garments are packed one per case. Garments must be packaged in reusable storage bags with carrying handles.
Bags shall have zipper closures and marked with Kappler logo.
13. Sizes:XS-5X Combination sized garment
Weights: 151bs16.80kg to 21Ibs/9,53kg
Performance Requirements
1. Garment shall be certified to NFPA 1991, Standard on Vapor-Protective Ensembles for Hazardous Materials
Emergencies,2005 Edition,including optional liquefied gas and chemical flash fire protection.
2. Garment shall be tested to ASTM F 1930, Test Method for Evaluation of Flame Resistant Clothing for Protection
Against Flash Fire Simulations Using an Instrumented Manikin,and exhibit zero percent body burn during a six
second exposure.
3. Garment fabric shall be tested to ISO 17492, Clothing for Protection against Heat and Flame, and exhibit a
thermal protective performance(TPP)value of thirty two.
4. Garment fabric shall be tested to ASTM F 739, Standard Test Method for Resistance of Protective Clothing
Materials to Permeation by Liquids or Gases Under Conditions of Continuous Contact,and exhibit no
breakthrough for at least eight hours against a minimum of 150 chemicals.
Service Requirements
1. The manufacturer shall have the HazMatchc technical information support system that includes an online and
app based software selection program. (.
2. The garments shall have a breast logo that includes the ChemScanTM QR code that provides real time access to
chemical test data for the fabrics.
3. The garments shall be manufactured in the USA,
4. The manufacturer shall have a 24 hour emergency contact number for special response need.
Warning:This information is based on technical data that Kappler believes to be reliable.It is subject to revision as additional knowledge and experience are gained.
The website will contain Kappler's most upto dateproduct information,and customers who receive
pp pamphlets,brochures or other literature should be aware that such •:
"hard copy"information may not be as current as the information on Kappler's website.Customers should also recognize that there are uses,environments and
chemicals for which Kappler products,garments and/or fabrics are unsuitable.It is the responsibility of the user to review available data and verify that standards.Also,
the customer should review all available information on the website to understand the uses-and limitations-on ALL products,gannents and fabrics which Kappler
makes available.
CAUTION:Do not use for fire protection.Avoid open flame or intense heat.
Kappler Inc,•Technical Services Department•Post Office Box 490(Shipping:55 Grimes Dr.)Guntersville,AL 35976
•Toll Free 1-800-600-4019. 1-256-505-4005•Fax 1-256-505-4151
•Email:customerservice@kappler.com
Page 2 of 2
. e,
. [4: Kap
i
's„w-_ ":;55"i5,
,
, xIi
Know What You're Getting Into.
P.O. sox 490
Guntersville, AL 35976 U.S.A. �A .
T 800.600.4019 imp ,.
F 256.505.4151 Y
www.kappler.com I:
i
Product Specification k -
Y 'on°3 00
NFPA Certified 1992/2012 Edition t
Style: Z3H43792 -.
Liquid Splash Protective Garment '
Design Requirements
1. The garment shall be constructed from a multiple layer film based treated to provide anti-stat properties,
composite material comprised of a 2.0oz/yd2 non-woven substrate laminated on one side with a five layer barrier
film.Available in Tan. •
2. All seams shall be stitched with nylon thread and covered with heat sealed seam tape on outside of the seam.
The seam tape used to cover the seams shall be of a similar composition as the films used in the base fabric and
offer the same chemical resistance as the fabric. ,
3. The garment shall be a front entry coverall with the 48”zipper located diagonally from the left hip to the right
shoulder. The zipper shall be a urethane coated cloth and open from the bottom to the top. Overlapping double i
storm flaps made of the base fabric shall cover the zipper. The storm flaps shall have hook and loop closure,
4. The garment shall have an elastic hood opening with special design for better fit against the respirator.
5. The garment shall have attached single neoprene gloves permanently adhered to sleeves.
6. The garment shall have sock boots with Splash Guards. Boot splash guards shall have elastic edge.
7. The garment shall be packaged 6 suits per case.
8. Sizes:XS-5X Combination sized garment
Weight: 9lbs/4.1 kg
*Actual garment weight may vary .
ii
Page 1 of 2
Performance Requirements
1. Garment shall be certified to NFPA 1992—2012 Edition.
2. Garment fabric shall be tested to ASTM F 739, Standard Test Method for Resistance of Protective Clothing
Materials to Permeation by Liquids or Gases Under Conditions of Continuous Contact, and exhibit no
breakthrough for at least eight hours against a minimum of'150 chemicals.
3. Garment fabric shall be tested in accordance with NFPA 1994, Standard on Protective Ensembles for First
Responders to CBRN Terrorism Incidents,and show no breakthrough for eight hours against mustard(HD), sarin
(GB), nerve(VX)chemical warfare agents.
Service Requirements
1. The manufacturer shall have the HazMatch®technical information support system that includes an online and
app based software selection program.
2. The garments shall have a breast logo that includes the ChemScanTM QR code that provides real time access to
chemical test data for the fabrics.
•
3. The garments shall be manufactured in the USA.
4. The manufacturer shall have a 24 hour emergency contact number for special response need.
Warning:This information is based on technical data that Kappler believes to be reliable.It is subject to revision as additional knowledge and experience are gained.
The website will contain Kappler's most up to date product information,and customers who receive pamphlets,brochures or other literature should be aware that such
"hard is
hard copy,.information may not be as current as the information on Kappler's website.Customers should also recognize that there are uses,environments and
chemicals for which Kappler products,garments and/or fabrics are unsuitable.It is the responsibility of the user to review available data and verify that standards.Also,
the customer should review all available information on the website to understand the uses-and limitations-on ALL products,garments and fabrics which Kappler
makes available. if
CAUTION:Do not use for fire protection.Avoid open flame or intense heat.
Kappler Inc,•Technical Services Department•Post Office Box 490(Shipping:55 Grimes Dr.)Guntersville,AL 35976
•Toll Free 1-800-600-4019. 1-256-505-4005•Fax 1-256-505-4151
•Email:customerservice@kappler.com
Page 2 of 2