Loading...
HomeMy WebLinkAboutRES 567 Draft 01 1969-1972County of Hawaii—State of Hawall Resolution No. 567 RESOLUTION APPROVING, ADOPTING, AND RATIFYING .THE FINAL REPORT OF THE CHIEF ENGINEER RELATING TO IMPROVEMENT DISTRICT NUMBER TWELVE, KAUILA STREET SEWERS, PUUEO, HILO, HAWAII, UNDER THE TERMS OF RESOLUTION NO. 556, AND AUTHORIZING THE CHIEF ENGINEER OF THE DEPARTMENT OF PUBLIC WORKS TO CALL FOR BIDS ON THE BASIS THEREOF. WHEREAS, in accordance with the law, the County Council of the County of Hawaii, by Resolution No. 556, adopted September 27, 1972, created, defined and established IMPROVEMENT DISTRICT NUMBER TWELVE, KAU ILA STREET SEWERS, Puueo, South Hilo, Hawaii, and further, defined the kind, extent, and general details of the proposed improvement and materials to be used, and requested the Mayor to direct the Chief Engineer of the Department of Public Works of the said County of Hawaii to prepare an Assessment Map and Assessment Roll of the improve- ment district showing the area therein to be improved and the exact location of the improvements, together with final plans, details, and specifications for the work, all in such form as will readily permit and encourage genuine competition among contractors insofar as the material specified will permit of such competi- tion; and WHEREAS, in compliance with the direction of said Council and of said Resolution No. 556, adopted September 27, 1972, the Chief Engineer has submitted his final report, dated October 29 1972, consisting of construction plans, details, and specifications, and including forms of proposal, contract, and bond, for the work of installing sewers in said Improvement District Number twelve; and WHEREAS, the report as aforesaid and the matters therein contained have now been further and fully considered by this Council: 1. That the said final report of the Chief Engineer relating to said IMPROVEMENT DISTRICT TWELVE, Puueo, South Hilo, Hawaii, dated October 21 1972, together with detailed plans and specifications, forms of proposal, contract, and bond for said Improvement District Twelve, be and the same is hereby approved, adopted, and ratified as presented and is now on file with the County Clerk, the same being incorporated herein by reference. 2. That the Chief Engineer of the Department of Public Works, on behalf of said Council and of said County, and in the manner prescribed by law, be and he is hereby authorized and directed to issue a call for tenders upon the aforesaid work to be done within said Improvement District Twelve on the basis of the Chief Engineer's Final Report and Proposal, all bids to be submitted and bidding to be closed by 2:00 p.m. November 22, 1972, being more than two (2) weeks after the date of the first publication of the call as aforesaid, including Sunday and Holidays. INTRODUCED BY: Ile, Zeo ,/,.--/ounqjlman,, County Hawaii Hilo, Hawaii COUNTY COUNCIL County of Hawaii Hilo, Hawaii I hereby certify that the foregoing RESOLUTION was by the vote indicated to the right hereof adopted by the COUNCIL of the County of Hawaii on. ATTEST: Tadashi Suzuki COUNTY CLERK ............�ctober 25...._1?2............................. ..... ---• 1 -ER ROLL CALL VOTE AYES NOES A/E Carpenter x De Luz x Edwards x Greenwell x Hisaoka x Souza x Yadao x Yamada Chr. Matavoshi Y 1 7 1 2 ( o l Reference. ...C.-16 01..._ 101PWC — Cep M.B. No...`." ". �?`�./............................................... RESOLUTION NO.567 ............................................... COUNTY OF HAWAII DEPARTMENT OF PUBLIC WORKS BUREAU OF SEWERS & SANITATION IMPROVEMENT DISTRICT NO. 12 JOB NO. S-1870 PROPOSAL AND SPECIFICATIONS FOR KAUILA STREET SEWERS PUUEO, SOUTH HILO, HAWAII COUNTY AND STATE OF HAWAII TABLE OF CONTENTS NO. OF PAGES INVITATION TO BIDDERS NOTICETO CONTRACTORS0000o000000000000000000000000000000 2 PROPOSAL0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0. 0 0 0 0 0 0 4 STATE WAGE RATE SCHEDULEo.000000000000000000000000000000 SPECIAL PROVISIONS0 O. 00 0 0 0 0 0 0 0 0 0 0 0 0 0 00 00 0 0 0 0 0 0 0 0 0 0 0 O O 0 0 0 8 GENERAL REQUIREMENTS AND COVENANTS (July, 1972) (Not physically Included bu-L made a Part of these Specifications by Reference; copies are available at the County Clerk's Office) . 0 0 ..............0.....0 . DETAILED SPECIFICATIONS:ODa.oO.o....0000oDooDoO.....oDaa 28 SECTION: 1 Trench Excavation... .................. 3 2 Trench Backfillo.............o........ 3 3 Gradin and Bedding Mate rials........... 1 4 Vitrif ied Clay Sewer Pipe andAppurtenances ................... 00 6 5 Sewer Manholes ....................o... 4 6 ConcYe`e and Mortaroo...............o. 8 7 Painting and Waterproofing............ 2 8 Restof ing Pavements and Other Improvements.,,,,..............Da 1 INVITATION TO BIDDERS NOTICE TO CONTFAcTORS ADVERT I S EMEN F FOR BIDS .) JOB NO. S-1870 SEALED PROPOSALS for furnishing all tools, equipment, materials and labor necessary for the CONSTRUCTION OF KAUILA STREET SEWERS, Puueo, South Hilo, Hawaii, will be received by the Chief Engineer at Hilo, Hawaii, until there publicly opened and read aloud. , at 2:00 P. m., and then and Bids received after the time fixed for opening will not be considered, The plans and specifications may be examined by the Contractors at the Office of the Chief Department of Public Works, Hilo, Engineer, Hawaii, and a set of said plans and specifications and_ forms may be obtained at the office of the Chief Engineer upon deposit of TWENTY-FIVE DOLLARS ($25.00) per set, in the form of a certified check made payable to the Department of Public Works, Hilo, Hawaii, which will be refunded upon the return of Said plans and specifications within a period of thirty (30) days after the opening date of the proposals. In the event the plans and specifications are not returned within the thirty (30) calendar day period, the deposit shall be deemed payment for the purchase of the plans and specifications and refund will not be made. Prospective bidders must file with the Chief Engineer their "Intent to Bid" not later than six (6) days prior to the time advertised for opening of bids. The Bidder's attention is directed to Sections 103-41 through 103-48, Hawaii Revised Statutes and the Rules and Regulations amended December 26, 1969, which provides preference for Hawaii Products. The Hawaii Product List may be examined at the Office of the Chief Engineer, County of Hawaii, or at the Comptroller's Office, State Office Building, Honolulu. The Chief Engineer reserves the right to reject any or all bids and to waive informalities. No Bidder may withdraw his bid after the hour *`1 Ma set for the opening thereof, or before the award of the contract, unless said award is delayed for a period exceeding ninety (90) days. EDWARD HARADA, Chief Engineer DEPARTMENT OF PUBLIC WORKS COUNTY OF HAWAII NOTICE TO CONTRACTORS The Honorable Shunichi Kimura Mayor, County of Hawaii Hilo, Hawaii S it PROPOSAL CONSTRUCTION OF KAUILA STREET SEWERS PUUEO, SOUTH HILO JOB NO. S-1870 The undersigned hereby proposes to furnish and pay for all materials, labor, transportation, equipment, labor and other incidental work necessary to properly construct and to complete in place IIKAUILA STREET SEWERS rt, Job No. S-1870, Puueo, South Hilo, Hawaii, County and State of Hawaii, together with equipment and all necessary appurtenances and work incidental thereto in accordance with the true intent and meaning of the plans, invitation to 3idders, Proposal, Special Provi- sions, Wage Schedule, General Specifications and Detail Specifications; and General Requirements and Covenants of the Department of Public Works,, County of Hawaii (July, 1972), made a part of these specifications by reference, and any other form of pertinent proposed contract documents which have been attached herein and hereby made a part of the project specifications and contract documents, which are on file in the office of the Chief Engineer, City of Hilo, County and State of Hawaii, for the total basic bid of: DOLLARS ($ The undersigned agrees to complete the same within 75 consecutive working days from and including the date of commencement as specified in a written order by the Chief Engineer of the County of Hawaii. The following unit prices (to be filled in by the bidder) will be used in making monthly estimates and for determining the cost of omissions, deductions and additions due to authorized increase or decrease from the quantities herein given or in adapting the bid to the appropriation, PROPOSAL - 1 - ITEM ESTIMATED UNIT TOTAL NO. pU&UUTY DESCRIPTION PRICE PRICE l0 420 Cu. yds. Unclassified Excavation for sewer mains and appurtenances, including back f ill. Per Cu. Yd. $ $ 2. 640 Lin. f t . 81E V. C. Sewer Pipe and appurtenances, including crushed rock cradle. Per Lino Ft. $ $ 3. 3 only ^oncrete Manhole Base for Standard Manhole including necessary labor, material and equipment in place complete. Each $ $ 4. 15.8 Lin. ft. Brick, Precast Concrete or Cast -in -Place Concrete Manhole Walls for Standard Manhole including all incidentals necessary to complete the work in place complete. Per Lin. Ft. $ $ 5. 3 only Frame and Cover, Type "SA", including necessary labor, material and equipment in place complete. Each $ $ 6. 1 only 6" V. C. Sewer Lateral, Type "A" (6 -ft. minimum depth at property line), including all incidentals necessary to complete the work in place complete. Each $ $ 7. 1 only 6" V. C. Sewer Lateral, Type "B" Double (3 -ft. minimum depth at property line), including all CD incidentals necessary to complete the work in place complete. Each $ $ 8. 13 only 611-V. C. Sewer .Lateral, Type "B" Single (3 --ft . minimum depth at property line), including all incidentals necessary to complete the work in place complete. Each $ $ TOTAL SUM BID PROPOSAL -2- ca It is understood and agreed that the liquidated damages shall be as set forth in the General Conditions. It is understood and agreed that the Chief Engineer reserves the right to accept or reject any bid and waive all defects and informalities as may be deemed best for the interest of the County of Hawaii. It is understood and agreed that the award of the contract hereunder shall be conditioned upon the Chief Engineer having the right to hold all bids for a period of ninety (90) days from the opening hereunder unless otherwise required by law, during w1hich time no bid may be withdrawn. The undersigned hereby agrees that if he is awarded this contract, he will enter into and execute the same within ten (10) days from the date of the notice of award and furnish a bond in the amount and character required within the time specified by the specifications; Section 103-34, Hawaii Revised Statutes. The undersigned further agrees that if awarded the contract and if he FAILS to enter into and execute the contract and furnish the required bond within the specified time, the County may determine that the bidder has abandoned the contract and thereupon forfeiture of the security accompanying his proposal shall operate and the same become property of the County of Hawaii. Enclosed herewith is: CROSS 1. Lega l' Tender OUT 2. Certificate of Deposit THREE 3. Certified Check 4. Surety Bond according to Sections 103-28 and 103-35, Hawaii Revised Statutes, for the sum of DOLLARS ($ ) PROPOSAL _3_ being. not less than the sum required under Section 103-28, Hawaii Revised Statutes, payable to Shunichi Kimura, Mayor, County of Hawaii. Respectfully submitted, Bidder Office Address Telephone No. PROPOSAL -4- 6f by Individual) I.ddress (If by Partner) Name Address Dame of Firm (If by Corporation) Name of Company Presideut* Address of Company (SEAL) *Please attach to this page evidence of the authority of this officer to submit bid oa behalf of the company, olvin-, also his address and the names 41;1 0 and addresses of the Vice -President and Secretary. VOTE: Fill in all blank spaces with the, in-f-ormat-ion asked for or bid may be invalidated. Reference is made to Article 2.7 (Preparation of Proposal) of the General Requiremen.4'--s and Covenants (July, 114"72) FWFOSAL LISTING OF SUBCONTRACTORS In compliance witti the provisions of Act 185, S.L.H. 1963, the Bidder shall include in his bid the names of each person or firm to be engaged by the Bidder as a joint contractor or subcontractor in the performance of the public work construction contract. The bid shall also indicate the nature and scope of the work to be performed by such joint contractor or subcontractor. All bids which do not comply with the requirement shall be rejected. Name of Joint Contractor or S-zbcontractor (Complete Firm Name and Contractor's License Number) (Attach additional sheets as necessary.) PROPOSAL Nature and Scope of Work Pursuant to Act 124, Session Laws Of Hawaii 1963, providing pre- ference for Hawaiian 'Products, the Bidder must complete the follow- ing form to enable the Engineer to determine the low Bidder as required by said Act : Total 14ate- Description Preference Requested Hawaiian -Product rial Cost of (Indicate bv check Class (Indic -ate 2 (FOB fob Item mark} i Class I, II or JIT) Site All Bidders must fill in the preceding form. If a Bidder uses Hawaiian products, he shall so indicate with a T -P 'here is no check mark Wili check mark in this column U I it be assumed that the Bidder is not claiming pr' eference in accord- ance with Act 1242 SIH 1963* 21f a Bidder uses a Hawaiian product, he shall indicate the Class in this col UMn, Should there be a discrepancy between the Class status shown by the Bidder and that Class status assigned by the State Comptroller, the classification.deter - mined by the State Comptroller shall prevail. Bidders utilizing any of the above listed approved Hawaiian Products and who desires to claim preference, must so indicate in the above chart including the Class and Total ,Taterial Cost of the particular ite.m. The material cost of all items listed will be the total cost F.O.B. Jobsite, which cost must be shown regardless of whether preference is requested or not. Failure to complete the above form will be just cause for rejection of the entire bid, The low bid will be determined by taking into consideration the preferences indicated in the above Hawaii Products List; how, - ever, the awarded contract will be the amount of the bid offered, exclusive of any preferences, PROPOSU State of Ha7waii DEPART!,01T Cr LABOR, AND INDUSTRIAL RELATIONS 825 Mililani Street 1972 SEEP 2G, P 4 1 2 Honolulu, Hawaii 96313 BULLETIN :ATO. 261 - September 18, 1972 — CLEPK The following changes effective September 182 1972 have been approved by the Director of Labor and. Industrial Relations to be prevailing on public construction work for the purposes of Chapter loo, Hawaii Revised Statutes. This schedule includes wage and fringe benefit increases contained in collective bargain-"Lng agreements which have been approved by the Construction Industry Stabili= ion Committee. Addenda will be issued as this department receives notification of other approvals granted by the Stabilization Committee. Questions on this schedule should be referred to the Research and Statistics Office at 548-7627. The next regular schedule will be issued on or about November 15, 1972. Fringe Benefit Hourly Rate for l/ Basic Hourly Health Paid Appren . - Classification Rate Welfare Pension Vacation Tr-�o • Glazier $6.70 53� 320 53� U 1/ Fringe benefit rate is only applicable to non -overtime hours. However, th- s does not preclude a contrs.ctor from complying with provisions of a collective bargaining agreement which requires payment on all hours worked including overtime. ✓� v �t ROBERT K. H•ASEGXgA Director of Labor and Industrial Relations Classification Asbestos worker if it imurover 1st year 2nd year 3rd year 4th year Batching plant, concrete: Bunker. an Operator B of le rr. al-_ e r -b lack s i -,i th " " helper Carper -ter Ce.-ment 'II"'i-A.. i s h`r . Cement finisher Trowel machine operator Diver (aqua It. ( 11 t1 s tandby ) Diver (hard h;�:t ) " ( " " standby) D ry-vr a 11 ins taller Electricr 11i re -L :» Cable splicer Lineman Line Elevator constr-ac for " helper Elevator constr':,c for p rob - t i or . ry y r WAGE RATZ SCHEDiM BULLETI:-, 110.. 260 - Augu ;t 15, 1972 Fringe Benefit Hourly Rate fort/ Basic F,ourly Health 8: P,atc I Welfare 6.20 3.72 4.34 x+.96 5.58 4.165 4.92 7.00 5.60 6.43 5.81 5.91 10.21 6.95 8i. 65 :(Daily rate) i a/ 6.53 7.28 8.01 7.28 6.84 7.67 ' 5.37 3.835 t 23� 23d, 23� 23� 23¢ S 5.7 , 1D14.3�, F 16.4 r S 5.7I- m 16y 18¢ 18� 250 22� 22�,, 434, 43� � 3�, i ' 4 3� 25w 25�4 25 25k . 25� f lg • 5`'{ i 19.5:'` a/ Standby receives 25Y more der ':our than the rate of the hig�iest classification e= emplo;;!ee bcing worked w-ILth e 1/) 2/) See nage j for explanations. 3/) " f ) WAGE RAT',.'I ; � �j:�L L . Pai d Appren .'- Pension Vacation Trn�• 50 i — 2� 50¢ — 2� 50� - 2¢ 506 - 2, 5N - 20 25� - — 25� — — 3N — 3 30¢ — 3� 35� — 2¢ 30 f — 2 3N - 2 701, 2 5 �, ? / 15 7N 25�,? 1 15 7N 252/ -5 ' 70,E =1 + 25621 _ 15 i 35� � — 1 7� ` X1.77 522/ :1.86 58,x?/ log $1.77 20 - - l 2N 1 -- . - a/ Standby receives 25Y more der ':our than the rate of the hig�iest classification e= emplo;;!ee bcing worked w-ILth e 1/) 2/) See nage j for explanations. 3/) " f ) WAGE RAT',.'I ; � �j:�L L . ***WAGE RAIT, SCH`EDUL1,'4 (I.'-'ontinued) Classification Equipment Operator: (See subclasses) *Group, 1 Group 2 Group 3 Group 4 Group 5 Group 6 Group 7 Group 8 Group 9 Group 9 A Group 10 Group 10 A Group 3-1 Group 12 Fence erector (Chain-link type) Floor layer (carpet, linolean, and soft tile) Glazier Gunite operator Helicopter Work: Airborne Hoist .Operator Co -Pi lot Pilot Eigh scale., struCturall rein forcin Laborer I (See subclasses) Laborer II Laborer III Lather 14ach ini s t 'Marble setter(i,.Rite.tics or Mason: Mason , b r i ck-1 a. er, cement blocklayer Mason tender: Less than 30 days experienc, 30 days to 60 days exrcrience gore tliaii 60 days experience 1 1w r i &h It Miner It helper Painter .: to spray Patent scaffold erector (lb ft - !z over) Piledriverman Fringe Benefit Hourly Rate for!/ Basic Hourly Health & Rate We 1. f are $5.20 43� 5.31 43� 5.48 43� 5.75 43� 6.06 43� 6.41 43� 6.73 43� 6.84 43� 6.95 43� 7.18 43� 7.24 43 7.39 43� 7.54 43� 7.90 43�, 3.33 - 6.o0 S 5-7�5 14 16�4,-Y- 6.50 43� 5.86 25� 8.76 43� 8.90 43� 9.07 43�` 5.81 25� 7.00 S }-,i 11 7.00 5.56 11 25 5.36i25�5.2625� 7.55 2I}` 6.39 'S 5 3 F 15�* 6.11 .12. 1 22 6.11 22�,, Paid jAppren.- Pension lVacation I Trnrr. 70� 70� 7N 7N 7N 7N 7N 70� 70�, 7N 70� 70� 7N 70,41, 1504 35� 7N 70' 7N 35� 451;41 35Y 35� 6o� 30 30;;", 3N 5.26 250" 35� 5.30 25� 35(/, 5.39 250 35,� 6.58 25 35" 5.96 25� 3544, 5.61 25� 35� 5.95 3N 25� 6.30 25�, 6. 43 25� 35� 6.43 25� 35� 25�2/ 25�2/ 254/ 25W 25� 2/ -25�2/ 25W 25�?./ 2 5�V 25�2/ 2 5�,, V 25�2/ 25�2 / 25�2/ 1N 43� 25�2/ 25�2/ 25�2/ AGE RATE -b- 15� 15� 15� 15� 15� 15w 15� 15¢ 15� 15� -15� 15� 15¢ 15d, I 4� 8 2 15� 15 2 2 2� 2� 2 2 2 2� 2 (�A 2c 2 WA 2� 2¢ 4 � 2 SCIIEDUI nu RATE, SCHEDULE, (Continued) Classification Plasterer 11 mortar mixer it hod carrier Plumber & pipe fitter Pneumatic nailer Pointer -caulker Powderman Power sav operator (2 h . p . & abo-ve) Refrigeration mechanic, Rigger Roofer (shingles, tile, built-up roof." -"ng) is helper temporary employ( ,'_ (3 months) Roofer (coal tar pitch) ft ( it it is ) helper if ) temporary employee (3 rant hs Sheet-netal worker Sprinkler fitter Steam fit ter Stonemason: Stonemason . rr.a"..'D le set ter, curb settler, precast sill setter, precast panel setter, manhole builder Taper Termite '­,-ater Terrazzo setter 11 helper 0 calendar days, -. he', per base flcoryr,achine r-rircier Tile set t e i - c e -- e: ot i c , hard ti 1e; helper (1st CO ca_leri4,.ar days expe-riencke, (61 to 90 cal end -c-" .days expe--rience-) ft it (after 90 calendar days experience) Basic Hourly Rate 7.05 5.71 5.51 7.30 6.43 6.11 6.o6 6.58 7.30 6.39 6.20 5.40 4.03 b/ b/ 7. TIO 7.30 7.30 6.11 Fringe Benefit Hourly Rate fort/ Health & We 1 f are 45� 25o 25o 290 25o 22� 25o 25o 2 9 rk' S 5� r, 15o 350, 35o 35o 35o 35� 35� 35o 29� 29 22 Pension 600 35� 35o go� 35o 30o 35o 35o 9N 30o 250 250 25o 2 51, 25o 25o 9 0 � goo 900 30o 6.6o 306 3.67 18.2 10' 6.15 20� 30o 4.75 20o 30o, 5.05 C_ no� 301 5.35 20 r 30 5.05 i 20001 3 6.1-5 20� 3N, 4.75 2N, 30 o 4.85 20o 3W 5.05 2N 30o Paid j Appren . - Vacction i Trng. 15� Roofer and helper (coal tar pitch) , double employees regular rate of pay. Temporary employees. 65e' of rate of nay. 2¢ WAGE RATE SCHEDULE -c- 16o 2¢ - 2o 58.40 5� 20 20 20 - 20 58.40 50 20 20 2 20 20 2� 60W IN 58.4 5 58.4o 5,11', 2o 15� Roofer and helper (coal tar pitch) , double employees regular rate of pay. Temporary employees. 65e' of rate of nay. 2¢ WAGE RATE SCHEDULE -c- WAGE RATE, SCHEDULE (.".ontinued) Classification Truck driver: Asphalt distributor Concrete TP 4A.. x Flatbed, utility, etc. Dump truck., 8 yds. aid under (water level) Water truck (up to and including 1500 gallons) Water truck (over 1100 gal-lons) 'Tandem, septi -trailer, or semi -du.= Slip -in or Rock cans End dumps, unlicensed (Euclids, Mack, Catf.rpillar, cr similar) Tractor trailer (Hauling Equir-men-t- well diL7iller helper Welder: Same.vage scale as crai"-'t C) to which welling is incidental. EQUIPIj 'IN'T OPERATOR Paving Grcu­a: Asphalt Raker Asp+:'.alt Foller Asphalt Sn.reader Basic Hourly Rate $6.24 4.775 5.48 5.75 5.75 6.o6 6.41 6.73 6.84 6.84 4.72 4.63 5.92 6.6o 6 - 9 J3 Fringe Benefit Hourly Rate forl/ Health 94 Welfare Pension 43� 7N S 5.V, m 16� 25� 43� 7N 430 7N 43� 7N 430 7N 430 700, 43� 7UP 43� 7N 43� 7N 25� 350 25� 35� 43 43, 43 7N 7N 70� IPaid IVacation 25�2/ 25��S' n/ 25�2/ 25W 252/ 252/ 2521 25¢2/ 50'. .5� 0'- .5� Appren.- Trn rr,. 15� 15� 15� 15� 15� 15� 15� 15� 20 2� WAGE, RAV' SMIEMULE - Cl, - Classification Basic Basic 'Hourly Hourly. Rate C 1 as s i fi c, -jt i on Rate Laborer 1 $5.56 (Health C welfare: 25� hr. Pension Fund: 351 hr. Training: 2(11, hr. Sub .-'.asses: Asphalt ironer Barko and similar type tamper Buggymobile Chainsaw, faller, logloader and. bucker Concrete and magnesite mixer under 1/2 yd. Conc.r.ete grinder Concrete r.` -_n work Concrete saw (walking or hand type) Cribber Cut granite curb setter Form raiser Header board Mortar mixer (block -brick -masonry) Jackh=_= one rat or Jackson and sir ilar type co-,-.ripactor Lagging, sheeting, t-.,haljing bracing, trench -jacking, hand -guided tD r:y Lagging ha.TiLmer 1_11ag'ie,-i't..e eand riastic �-rcrkzer (j.,Tet O.L- dry Mechanical driller not covered else -.,here breaker Pipclwyc-,.,, cau-1-ker, banker er, kettleman, pot-nian and man a-n_-,)Lvin- lay-Kold creos.:te cand similar -4-t r =L iiaterLal Pos'ZI hold dic-c-,-r (hand held gas, r & e ec' r4 c) s-t'-.cncpCaver & roolk.-slinger ir_-%_1urIinr:; Pl_ncinc; of sacked co-111cre'uC (wct or di -j) 2otn.r� scarifier RCj.-tC4-i le_ Tanlc cloanel- Tree cli:�`,)er Vita ra­screed (bull Illoat in connec- tion with laborer's work) V ib r v t o r Lab orcr 11 $5.36 (Health F- are: 25¢ hr. Pension Fund: 35;, hr., Training: 2� hr. Subclasses: Asphalt shoveler Cement dizTrn e r Cholze-setter & rigr,-,e-- (clearing work) Concrete chipping Concrete laborer (wet or dry) including bi.,,---ket tender for concrete Driller's helper, check tender, I outside nipper Guinea chaser (stakem.-,n) HiE,:'-i pressure nozzleman-hydraulic n,,Dnitor (ove-- 1100vu Pres sure ) excluding levee work Loading and un.-I-oading, carrying and h,indling of all rods and materials fDr use in reinforcing concrCte const ruc.t i on Mucker (undergrou-nd) S _-oip-r All pneumatic, cras & electric t--)o"Is C.3 not. listed in GrouD I. Burning, weld.-ing,, signallin*rr & rigging 5 -I in connection i-orith laborer's w-ork Lab o r -1 r JIT $5.26 (Hea-Ith 8; .-Te."Ifare: 251 hr. Pension Fund: 3556 hr.,, Training: 2w b r . Subclasses: All clean -u -o war'!<_- of debris I Erounds and buildings Bridge laborer Construction 1ECoorer D-Lt.pm,-;In Fla ;rain Gardener, horticultural and landscarer 1,aborer General laborer Lir.berl, brush loader -.nd piler Maintenance repair (track and roadbeds) WAGE RATE' SCII,rv1.DUTE' -e- WAG!-'# RATI-l' SCHEDULE ( Cont jnurd) Clas s i f i. c tat j- on EQUIFNENT OPE-RATOR** Olealth & welfare: 113hr., Pension Fund: 70,,i hr. , Vacation: 25� hr. 2% Ai)r-,,-en- ticeship-training: 15 � hr. Groun 1 Part s -,r, an Repairman He-1per Basic Hourly R at e $5.20 G+ou-j 2 $5.31 Compressor, electric aLly, diesel or gas pow-ered, etc. Hydraulic T."onitor Material Loc *-_-.,- and/or Conveyor Operator ('H'a.nd1J-_.nE_ building material ) Mlixer Box, CP e rator (Ccn.crete Plait} Pump Operator Spreader Box ,-m (7-,rith screeds) Tax Pot Fire -man ("!Po-...er aE;it-atE_,d) Groun 3 $5.48 A-ssistan,t to Engineer (Oiler, Firem.an, Sig n -:.t 1 r� a. n , BraT� �-cklnaind, Tar Pot kemann Box Locolnlo tive un, o and inc1 u,_-11 ng 30 tons Rodman Roller (5 tons. F-nd- und-_--,--r) S.-reed-I.I.-an (e scent* aos-phait­ic 4. 4 a c h --; n Group It 75 Boo -,21 or dur_�_' ru-n.,osc-- Ilp"If L Fra-M,i- Din kv OiPe-ratlor Fork Lill"t or Lu::iber StacKer 1411citcrial ;foist (1 druz-,i) Straddle '2rucl.;. Ross Carrier and similar Basic Hourly Clas s i fi c at J. on Pat 0 I EQUIP" ''.'TT OPT -,-'4 I It AT 0 R (Health & welfare: 43A hr., Pension Fund: 70 p hr. ^ Vacation: 25� hr .-2 1 , Appren- ticeship -training: 15� hr.) Groun 5 $6.06 Agri --Cat (rini-cat) Connrete 'i-lixe.r (up to 2 yards) Concrete Piz-,-�Os or Pixmincretpe Guns Generators . r;. s7g,soline or diesel driven 0400 k.Yr. ) Lubrication and Service Engineer (_'Iobile- and Grease rack) Towermobile Welding rIachines (gasoline or diesel) Group 6 $6.4! Combination Loader and Backhoe including HD-ptc d(11-r� to and nc i JU(14 -n- . FM 4- S Concrete Batch F! - (-..Te,, or dry) Concrete and/or G-y-inder (sel- rrope D ri 111' n (not. '..-.o an-filY to Nre,uerliners, wa` on drills o--,- -1 C-LClr h e r s ' J gn y al-nan Loader (un to ,5e -,d includina 2-1/2 cu. yd. Lull al) %Til� 1, !'afrirnnis lInternal Full S..L !-`l e_ c h _n c a i -, h c o n&- C "All et ___11 C-1-ary, Toinscn Bric""re neck or similar tv,/­ces Mobile ri Porgy. r,, -. sh e i - s Fo,,.-.rer Jumlbc Operator (setting sl -i -a loans I) e4- �� c in tunnels) Rollers (over 5 tons) C, Self Con.,pactol' (singe engine) Slip :'errs Pwips (power driven b% hydraulic, electric, air, gas, etc. , lifting device for concrete .1,171_1 U C)I'S Trenicher (111) -to and incluiLling WAGE 1-bV1'1"j .`:)' CIf t I I -f- WAGE RATE SCIIEDULE !Continued) k Classification EQUIP�IEIIT OPERATOR** (Health & welfare: hr. Pension Fund: 70(,` Vacation: 25� hr.0-, Appren- ticeship -training: 15� hr.) Basic Basic Hourly Hourly Rate C latin i f i c at icon Ratc EQUIPfIIENT OPETUTOR** Grq.yR 7 $6.73 Crusher Plant Engineer Dual Drum !Aixer Gradesetter (mechanical, or otherwise) Hoist (2 drums) Loader (over 2-1/2 cu. yds. up CLS to and includinL", 5 cu. Y' - ) Mechanical Finishers or Spread-er Machine Asphalt I 3arbber Greene and si-railar) Mine or Sli-zlft Hoist Mixermobile (ov`r 5 tons) D-L,-C,her, Truck 110 -u-n t e d with Conore7tsor Combintition, _I.J".*.i,i.-_nt Erecaker with ComnDination (ope-r.,.tes 3. or 2) Pipe Clelaninz, (tr(actor and rnlnnont r,= Pipe Wra-ppinr- 11 U C_ ;.0 or pr opelled and supported) 1. Pipe 1,1-achii-Oc', (pipe lines on Self Elevating Grade Plane Slusher C'oerator n Small Tractor (with boom D-6, or similar) Trencher (over 6 feet) Water (pulled by -7-juclids , T --Pulls , D'1-10, 205 21, or similar) Group 8 $6.84 Boring 111achine Operator Cast -in- -.:Iace Pipe Laying; Machine Concreto Batch Plant (multiple units) Combination loader and hydraulic backhoe (over 112 yd. to and includin" 3/4 yd.) Conveyor Operator (tunnel) Olealth & welfare: 41.1 hr.. Pension Fund: 704',, h/r., , 2 Vacation: 25(,, hi. , Appren— ticeship-training: 15� hr'.) Grog 8 (continued) $6.84 Engincer, Locomotive (over 30 tons up to and including 100 tons) Finishing Machine Operator Hydraulic baclzhoe (over 1/2 yd, to caid including 3/4 yd.) Irolman Loader C Flechmical 'brench Shield Muckuin[j,, Kcachine No -Joint Pipe Laying Machine Portable Cru-shing and Screening Plants Saurrian 15�y-jpe Dragline. (under 5 Yds.) Self --propelled Boom Type Liftin- Davice b Station r} Pipe Wrap 'i ping Cle-euii,-g and Bc-ndinr- I`achine L_> I Surf aice 1171t.,,ater nand Pl,,)jit Ov-nrator Tri -Ba .ch Paver Tunnel Group 0 *6-095 Boom Tl ,e B,,). c J* 1 i n 6; 1,1 eC h i n c Cc,*, -,b -in cAG ion fixer m -,d Ccm-pressor ( C_ un ite ) Do -,'.'or Loa6er End Adams FleCrader _* _ T t j3 -:I_j. a Lull 11 0211 OW, R ub b e r Tir-,-d h'ar+h1z0-.,rinr; 0 (up to 12 cu. yus'. Wheel Trencl-ler (over 6 ft.) Group 9 A ve,-7- Dozers Heavy Duty Repairman or Welder Push Cats Scrapers Self-Propzl1-.7 Compactor with DoZer Sheep Foot Tractors Tractors (with boom, larger than D-6, and simil-or) WAGE RATE SCIIEDULE-4 "9- WAGE RATE SCHEDULE (Continued) Basic Basic Hourly Hourly Classification Rate Class:fi.cati.on Rate EQUIP ►: ''. T OPERATOR',* x (Health & welfare: 43,4� hr. , Pension Fund: 7C�. �r. , Vacation: 25" hr._... , .Appren- ticeship -training: 15w hr.) Grouu 10 $7.24 Chicago Boom Hoist (3 d runn ) Koehring Skooper Loader (over 5 yds. up to and including 12 Yds. ) Locomotive (over 100 tons) (single or, multiple units) Power Blade, Operator ( less than 6 ft . ) Rubber Tired Earthmoving Equipment Oap to and including; 35 cu. yds. , Euclids , T --Pulls, D'1-10, 20, 21 and similar) Saur:ran `,� pe Dragli ne (5 yd_s . 0 0Vnr) Soil Stat ili zer (P & H or equal) Sub -Grader (Gurrles or other c`llit o` :1 C v yp,--) ra.c?,-!,a�,ri g .yre T'arth '�o i. g Machine (sir_g1e ens -,ine ,ri_th Tande?l Scrar_er, , Tractor, Gor:pressor, Drill ccLbi �ati.on Tractor (".a.ncie Scraper} Tract -ors (D-9 or equivalent) Grou;) 10 I $7.39 C rap., s (� o vc r 2 5 t o: s) Power Shovels , ClaT:isliells , Draglines , :Ba.ckhces , Gradealls (uio to �:-id iric luding 1 cu. yd. ) Group 11 $7.54 Automatic Slip corn Paver (co_lcrei;e cr a si?halt ) Cranes ( over 25 tons) If. -I-10, 20, etc. (Tandem) Earth -1 ovine "•`achines (multiple pronulsio:: power units and two. or more Scra.ners) (up to and 35 cu. yds. s t ruc_c" m. r. c. ) EQUIP .FSDIT OPERKrOR* x (Health & -welfare: 43�, hr. , Pension Fund: 70� hr. Vacation: 256 hr.— , Appren- ticeship -training: 15�, hr.) Group 11 (continued) $7.54 H& ,line Cable -tray Lift Slab Machine Loader ( over 12 yds.) Power Shovels, Clamshells, Draglines, Backhoes , Gradeallr, ( over 1 yd. and un to 7 yds. ) Power Blade Oi)erator (16 ft. or over) Pre -stress Mire �•1ra.pping Machina Self-propelled Compactor (with multiple propulsion po,-rer uniz,s ) Single Engine Rubber Tired Earth r10 g ,,!ach ine (,�rith Tandem Scraper) Tande,a r -at - Tower Cranes, T,. ob it -e Tre.,cher (pullin7 attached shield) Uni :*ersa.l , Tbher, Lin den and similar t.;rp,�es of to;,er cra?}es Wheel 1_.'Yca--, a,tor (un to and. including 75;,-) cu. yds. r.er� hour) Grol.r) 12 $7.90 Bann Wagon (in con unction with e.1�eel Excavator) Derricks Drill F.� igs Multi--U,-a:xzls�.o : Earth .'ovine, ac in s or (over 35 cu. "struck" II?. r- c. ) Power Shcv^}_s and Drai;lines (7 cu. yds. m.r.c. and over) Rubber sired Earthmoving auirn_nr, over 35 cu. Yds. (L"uclids , T -^calls , D.4 -10, 20, 21 and sir:�il�r) I•Tneel Excavator ( over 750 cu. yds. per hour) WAGS. P,ATE.�r.���;�T�T,J -h- �IACE RXPE SCHEDULE (Continued) Operators, Assistants to Engineer, and Ii:dentured Apprentices on cranes with booms of eighty feet or more, i.ncludinU lib, shall receive additional premium according to the following Schedule: (not applicable to cl-imbing tower cranes) Per hour Booms of 80 feet un to, but not including 130 feet $ .20 Booms of 130 feet uv to, but not including 180 feet .35 Booms of 180 feet and over .50 In the application of the above, the length of the boon shall be measured From. the center of the heel pin to the center of the head sheave pin. WAGE RATE. SCHELUL,-E -- i - WAGE WTI- SCHEDULE (Continued) Classific3.tion WATER FRONT COIN STRUCT ION (DREDGING) Hydraulic Suction Dred Assistant engineer ( steam or electric) Deckhand (can operate anchor sco-T under direction of de ckmat e ) De clumat o Fireman Leveem-nn Leve rman Oiler Welder (and/or heavy duty repairman) Win chman (stern winch on dredge ) Fringe Benefit Hourly Rate fort/ Basic Hourly Health & � Paid 1lppren. - R^te Tr'el.fax•c Pension �lacatien Trnr,,. $7.46 5.64 6.93 5.92 5.47 7.76 5.64 7.39 43fi 4 3 � 43�, 3-; 't 43 43 43 43� 4?(�4 7N 25 2/ 15 70¢ 70 7N 70� 70� 7N 7N 70�` i f �5�2/ 252/ 25 ?2/ �5�,V 252/ 252/ 15� 15^ 15Y 1 J .- 15 15� 15, 15c BargemaY. 5.47 431, 70� 2562' 15i" 1^.. Bare mate (searroing) 6.9 , J }� , 70� , 25,,2/ .'_ ! I r' 1 �ic�Cit.R3:!d 5.64 4� 70�' i 25T�?/�} Deckmate 6.93 4 3� ,� E 70�;- i 25,52 i , y -- I , 11. FirE�rr,a.n 5.92 ,� 3� .,0� � t �- � 25 2/ i : Levarl.a.n 7.76 �� 3- , roe y 2 � i �-�- Oiler 5.64 I�3r 70 25 —2/ ; _Jr W tch engineer. 7.46 I*3 70 X5 2/ Boat Operators: Boat deckhand 5.64, 3 706 ( 25 2 5 + 'or,a£ir 7.39 1 J r�` ` 1 7� �. ? / l 5 •. Masteri Cc3 t mor 7.5S) ��3' 1 700 ' 25, � _ 1 Pe rri ck : I 1 t Uec'_Khandi 5.64 43Y R }70' i 2>2/ l5� Fire::1an 5.92 I}3 70�6 + 25:2 Oiler 5.64 *3� 704 �5tA Operator : derri c'_: , piledriver , crane 7.76 11 7N 25�V 15 i Ij Fringe benefit rate is only app? icable to -non -o-vertime hours . flo-,.!ever, ttlis does not preclude a contractor from coinpl.ying •,ii.th provisions of a collective ba,rVa� 4 .==U agreement irhicll requires payrent, on all Bouts worked incl.udin r- ovcrtirie. .. S =- si.:16-1 e ; 'I - lna.rr- Jt; F = .'a -roily; D = dcpcndt_r.Is . WAGE RATE S CH -" T- �i- �.Pl'pT�i;T:I C Sr�;C'U11L�: The apprentice prevailin,; minimu-1 ���cr''n .'aye is the full frim;^ benefits furnish -ed plus the applicable perccnt'a -: of the journe .� an's basic hourly rate. Apprentices must be registered with the State Department of Labor and Indu:;tri a]_ Relations. Craft Interval 1st 2nd 3rd lith 5th 6th 7th 8th 9th 101.-1h Asbestos Worker 2000 "I: -"s. 60 70% 80`. 905 Boi1ermaIf"er 6 months 60`f7 65% 706" 75% 80°'' 85"' 90% 950 Bricklayer 1000 hrs . 55`5 655 70/ 80'/') 855 95` 5; �,�. Carpenter 1000 r�rs. 60 651 70� 75% 80'/0 85' 90 950 Cement finysner_1/ 1000 hrs. 55� 55% 705 80% 85`� 950 70 Elect ri ci s.n 1000 h► rs . 555 60°l 65 7 C,f 755 80% 850 90% Floor layer (caret, rJS:: 70,E TS,� 80;. 85:" linoleum and s o ft tile)1/ 100=0 hrs. 6o`, 65% 70`" 75% 800 855Glazier-_ 1000 hrs. 55°' 601 70% 75% 80% 85% 901a 95% Grading & r avi n E, Equip. 4perator2/ 1000 hrs. . 80`' fi5� 90 950 IronT-ror'_ier (Reinforcing) / 1250 hrs. 62-55 7' 81.5i" 915 I ron'wo rke r .90" (St ructu_ al) 1000 hrs . 6o5 70� � 750 80 85 Lather ( 500 hrs.) 55 y 0`3,350 .� 2 / Pil.edr ��c� 0► ers,,or_ 10,..0: rs a r. • Pips fi ;Jl.zr 1000 hrs . Pias teres -1000 h rs . PllLn�ber 1000 h --s. Refri e'_a';on T`chanic 1000 hrs - Roof er 700 hrs . Sbee erne a.l vor':�:er 1.000 hrs • S4 -eel Eoui .. OoerE_-'Z ort-/ 1000 fl I -s . S-tor.e -a3 on 1000 i_rs . r 1 .•t1 •/. =.I 70:' 750 8a°, 851 900 6o5 65 70 75;� 800 85 90 950 501; (1000 hrs.) Machihist 1000 h -A s . 14echanic 750 (gas or dies. -1) 1=000 hrs . Painters � 1000 }ars. .� 2 / Pil.edr ��c� 0► ers,,or_ 10,..0: rs a r. • Pips fi ;Jl.zr 1000 hrs . Pias teres -1000 h rs . PllLn�ber 1000 h --s. Refri e'_a';on T`chanic 1000 hrs - Roof er 700 hrs . Sbee erne a.l vor':�:er 1.000 hrs • S4 -eel Eoui .. OoerE_-'Z ort-/ 1000 fl I -s . S-tor.e -a3 on 1000 i_rs . r 1 .•t1 •/. =.I 70:' 750 8a°, 851 900 6o5 65 70 75;� 800 85 90 950 501; 550 6o l 650 700 750 800 85� 80 c 5 90� 455 55 � 65 c 755 40" 85"" E�.s;� a5,I 70,E 55.E „0�.,rf 5;= (�.�: - 5; �,�. 45 50 � 5;:� 60,E 6> 7,0 75 ' 801 cv .� .- 4 6o5 6 01.E 755 80 70 7 80 c5 - 0:01 f' 4 5� 50;� 55 60 rJS:: 70,E TS,� 80;. 85:" 1_, CrC, L, 90� 9. 5i� �'�, 70, 0'J p: :0> 7=0 75 80 c 5 90� 1000 i�rs 90 95w l/ T'?lis a_)i)-cn Lice sched-,Lle cn--mlies on!,, to ! rem Sept--n-LJ _-r 1, 'r'i` e Y'..l l i r� '. r:'�1" l- ^:� 1'1 "1 -� 1� 1 1 r '�• r n '] l 1 A C 19057 . �__� r_Z_v�ous 1 -MU C:7,tice- sc c'luie s�.�__es t_, all c.r.ael a�j .ren�,�c��. :i:�.JO'� J.1 l �ir' Li; r -�• �� -� '} �� E - '1r pro `J. 2/ _ cen .�. tile e, l jt1 tsi,- :ourl { ra.t sr.e cl ' e 1 for =.tiZ:I^,, It ._ �, Gro.i.. r-,, less 110 ce::ts ^er sour. 3/ This schedule of feces az, Yr r_ti ens i.ncicr_ttired or seine. t lated after January- 1, Apprentices indentured -)rior to January 1, 1968 are ei i Fible under the r: :-e I in effect at the ti^►e of i.1ident ure. Those paha have terminated for ��ilit L'~;,• '_""`=-." t ., .. _. ,i 1. ... . `' ! .. i.. . .. n • ^^ t �y/ \~. ti �'`�r � �' �iV i11 `r l•.. �. i12• 1 1 Q"" h i 1 t � e •C l..\!~ .. .��., .. t .4`7 f� sn.�l�. cc�:��.ir.tl to t.se 1_, :i.nterva..1 for their step L.-icreases . WAGE RAT_"C �k r The trainee prevailing minimurn w4: --e rate is the full frirq;e benefits furnished rlus the applicable percentage of to-. ourneyman's basic hourly rate. Trainees must be registered with the State Depart: ant of Labor and Industrial Relations. Craft Interval lst 2nd 3rd 4th 5th 6th 7th 8th Drywall installer 1000 hrs . 60;' 70% 80% 90% Marble setter (imitation or synthetic) 500 hrs. _ 6o5 65% 7012 75% 80% 85% 90% 95A Pointer -caulker 500 hrs . 60 70% 80;1 90% Taper 1000 hrs .55% 709,,85% r - Truck Operato/ 1000 hrs . 80% 90% l/ Based on the percentage of the basic hourly rate paid to the Truck Driver, (Tandem, Semi -Trailer, or Semi -D= -p) less 40 cents per hour. WAGE RATE, 'ED State of Hwraii I 'T r1Tj1--"R JAL RELATIOIiS DEPARTIME11T OF UIOR LIM " j_/ 0 -1 J 825 Mililzal-ni Street 1912 SE P 2— 0 RN �o 112 Honolulu, Hawaii 906313 TY BULLETIN 1110. 261 --September 18, 1972 The following changes effective September 18, 1972 have been approved by the Director of Labor and Industrial Relations to be prevailing on public C-) construction work for the purposes of Chapter 104, Hawaii Revised Statutes. This schedule includes wane and fringe beriefit increases contained in -vh*3.ch have been approved by the Construction collective bargaining agreements Industry Stabiliza:,.;ion C=Ittee. Addenda be issued as this departmeni receives notification of other approvals granted by the Stabilization Committee. Questions on this schedule should be refeired to the Research and Statistics Office at 548-7027. The next regular schedule will be issued on or about November 15, 1972. Fringe Benefit 11.ourly Rate for l/ Basic Hourly Health & Paid App ren. - Classification Classification Rate IV -Te I f a r e Pension Vacation Glazier $6.70 53w 32� 5 3 � U A Fringe benefit rate is only applicable to non -overtime hours. However, -4-- hi s does not preclude a contr-nctor from witn pro-,.ris- ions of a co-11—lective bargaining agreement which requires payment on all hours worke-d including overtime. ROBERT K. Director of Labor and Industrial Relations 1. SPECIAL PROVISIONS LOCATION AND DESCRIPTION OF WORK The work is located entirely within the City of Hilo, County of Hawaii, and is designated as "KAUILA STREET SEWERS", and consists essentially of the following work: Kauila Street Sewer: Construction of a gravity sewer line along Kauila Street from Sta. 0+00 (Puueo Street) to Sta. 6+40. 2. PERMITS The cost of obtaining permits and all other similar incidental costs shall be borne by the Contractor. 3. EXPLOSIVES The Contractor shall transport explosives to the site of the work and store, distribute and handle same in accordance with the safety provisions of the Manual of Accident Prevention in Construction published by the: Associated General Contractors of America. When the use of explosives is necessary for the prosecution of the work, the Contrpctor shall use the utmost care not to endanger life or property. No blasting operations will be permitted on Saturdays, Sundays, legal, National or State holidays. Blasting on the permitted days shall be CD restricted to the following hours: 11 a. m. to mid-day and 3 p. m, to 4 p. mo, and shell be limited to heaving or loosening and not for the purpose of shattering. No charge shall exceed 1/2 lb. of commercial gelamite per hole, and in no instance shall the number of shots exceed 10 in any one permitted period or.be closer in frequency than 5 seconds apart. The Contractor shall keep a daily record of all explosives used, the number of shots, time and the location thereof on a set of the co-.-i- struc t ion plans, and shall keep the Engineer fully informed on a day-to-day basis of any and all complaints received in respect to the said blasting operations. The Engineer reserves the right in consultation with the Contractor, to modify or expand in any way he considers desirable the foregoing provisions in regard to blasting operations. The storage and use of explosives shall be in accordance with the provisions of Chapter 376, Hawaii Revised Statutes, and statutes amendatory thereto, and these shall rule in the event of conflict with the above provisions. 4. SAFETY REGULATIONS All machinery, equipment, etc., and other hazards shall be properly guarded in accordance with the safety regulations of the State of Hawaii and provisions of the Manual of Accident Prevention in Con- struction published by the Associated General Contractors of America insofar as they are applicable. SFECIAL PnOVISI0yS l� 5. PROGRESS SCHEDULE M 7. Immediately after execution and delivery of the contract, and before the first partial payment is made, the Contractor shall deliver to the Engineer six (6) copies of a construction progress schedule in a form satisfactory to the Engineer showing the approximate proposed dates of commencement and completion of each of the various sub- divisions of the work. PUBLIC CONVENIENCE AND SAFETY The Contractor shall so arrange his work as to cause a minimum of inconvenience to traffic on the highway and roads, as well as into private property. In any case, the road) or highway shall be kept open to permit at least one-way traffic. The Contractor shall provide proper bridges where necessary, so that at least one traffic lane shall be accessible at all times. Bridges shall also be pro- vided where construction work interferes with access to and from private property. Bridges shall also be provided_to allow access to private driveways when trenches cross said driveways. The cost of such bridges shall be distributed to such bid items of the proposal as the Contractor may prefer. Traffic bridges shall be constructed so that their decks are flush with the pavement, in accordance with standard practice, and shall be maintained free from projecting nails, splinters or rough edges. UNDERGROUND UTILITIES The Contractor must understand that the location of all underground utility pipes and conduits shown on the plans are approximate only, and it will be assumed that the Co_ztracter has made a personal inves- tigation and inspection of the records of the utilities concerned, supplemented by actual digging in the field if necessary, to determine the actual location of such utilities with their branch and service lines, Vaether indicated on the plans or not, before submitting his bid.. The Contractor will be held responsible for the support, pro- tection, relocation or reconstruction, when damaged, of any utility pipes or conduits, including street light cables and their appur- tenances, and no claim against the County will be allowed for damages or extra work caused or occasioned by his relying solely on the CD information on the drawings for these utilities. All damage, however slight, shall be reported immediately to the Engineer and the appro- priate Agency and no repair or reconstruction of any utility pipe, conduit or installation shall be commenced or continued without the respective authorization. CONTRACTOR'S RESPONSIBILITY FOR MATERIAL (a) Responsibility for material furnish the Contractor: The Contractor shall be responsible for all material furnished by him. All such material which is defective in manufacture or has been damaged in transit or has been damaged after delivery, shall be replaced by the Contractor at his expense. (b) Responsibiliy for safe storage: The Contractor shall be responsible for the safe storage of all material furnished to or by him and accepted by him until it has been incorporated in the completed project. S'L LCIAL Pr -LJ Okj0 -2 9. SANITARY PROV*,=SIONS The Contractor shall provide and maintain in a neat, sanitary condition, properly secluded, such accommodations required by his employees as may be deemed necessary. The facilities shall comply with the requirements and regulations of the State Depart- ment of Health. 10. FIELD OFFICE The Contractor shall maintain a field office at or within easy reach of the job -site as directed by the Engineer. Approximate size shall be 101 x 101 and shall be for the exclusive use of the Contractor' -0 C) Project Engineer, the Engineer, and the County Inspectors. The office shall be furnished with a telephone, wall table for inspection of plans, and two Chairs. The Engineer shall have free use of the telephone for local calls during normal working hours. 11. AGENCIES HAVING JURISDICTION All of the work provided for herein shall be subject to inspection and approval, to the extent of their interest, by the Hilo Electric Light Co., Ltd., the Hilo Gas Coo - Division of the Honolulu Gas Co., Ltd., the Hawaiian Telephone Company, the U. So Public Health Service, State Department of Transportation, the County of Hawaii, and the State Health Department. Where trenching crosses the utilities of th,� afore-ment-ionred agencies, the Contractor shall coordinate his work with the affected agencies. 12. GAS AND OIL AND OTHER LINES The Contractor shall make all necessary inquiries in order to establish the location and ownership of all gas, oil, fuel, water and other lines which might parallel or .traverse the site of the work, irrespective of any such information as is shown on the plans. Before any work is commenced under this contract, the Contractor shall first exhibit a copy of the plans and the applicable portions of the contract documents to the owners of the various utilities involved, and make all necessary arrangements whereby an authorized representative of each of the said owners shall be present at all times during the work of excavation, pipe laying and backfill in the immediate vicinity of such utilities involved. 13. CONTRACT The complete contract documents shall consist of the CONTRACTOR'S PROPOSAL; the CONTRACT; the complete SPECIFICATIONS: the SPECIAL PROVISIONS; the GENERAL PROVISINS; the PLANS; and the BONDS; including all modification and supplementation thereof incorporated in the contract documents before their execution. 14. PAYMENT At the end of each calendar month, the Contractor shall prepare and submit to the Engineer for review and approval an estimate of the quantities of material placed in the work during the completed CD month, together with the corresponding monetary value of the stated quantities. The Engineer shall make due payment of the SPECIAL PROVISIONS progress estimated, to the extent of his approval, within a period of 15 days from the date of receipt tt,.ereof, and shall pay the Contractor ninety per cent (90%) of the value of the estimate, less previous payments. When all of the work provided in the contract has been performed and completed in accordance with the Plans and Specifications and to the satisfaction of the Engineer, C:) the Engineer shall forthwith issue a Certificate of Completion setting forth the date of completion, the amount of work done and the value thereof, and shall forward a copy of said Certificate to the Contractor, who shall forthwith submit his written agreement, or otherwise thereto. Within ten (10) days from the receipt of said written agreement, the Owner shall pay the Contractor the total value of the work performed as stated in the said Certificate of Completion, less previous payments. 15. FINAL INSPECTION AND ACCEPTANCE Upon the expiration of one (1) year from the date of completion of the work as stated in the Engineer's Certificate of Completion, the County shall notify the Contractor of its intention to make pre -final inspection of the work performed under this contract as stated in said Certificate, and which said inspection shall be attended by the Contractor or his authorized representative. The County shall thereupon furnish the Contractor with a written notification of all work or material which may have proved defective as a result of normal usage for which the work or material was intended, and the Contractor shall Thereupon take im-nediate steps to reinstate the defective work or material, and remove the cause thereof, in accordance with the Plans and Specifications, to the approval of the Engineer, and without ccst to the County. In the case of dispute as to what constitutes "defective" work or material, the County shall make due allowance for normal wear and tear having regard to the generally accepted measure of the effective life of such item of work or material, and in all other respects the decisioncf the County shall be final and binding upon the Contractor. Upon completion of tha required work, the County shall make a final inspection thereof for the purpose of verification in company with theContractoror his authorized representative. At this inspection the County shall waive the right to introduce any other factor, complaint or request other than those covered by the pre -final inspection and the subsequent written notification of defective work or material. Subject to the satisfactory completion of the required work and to the prior receipt by the Engineer of satisfactory evidence of approval of the work under this contract by all Agencies having jurisdiction over the work as set forth herein, the County shall forthwith, and with the written consent of the Surety or Sureties on the Contractor's Labor and Material Bond, make a formal written Final Acceptance of the work under this contract, and shall finally release the Contractor and the Surety or Sureties from all obligation thereunder. The Final Acceptance and release by the County, upon formal written acknowledgment thereof by the Contractor, or, if it should remain without formal acknowledgment in writing for a period exceeding ten (10) days from the date thereof, shall constitute an absolute and complete release of the County from any claim by the Contractor, and vice versa, whatever the validity of such claim. 16. WORK COMENCENMENT1 The Contractor shall commence work within ten (10 days after receipt of a written notice to proceed from the Engineer. SPECIAL PROVISIONS 17. 18. WAGE DETERMINATION (Federa 1 & WAGE RATE SCHEDULE (State of Hawaii) Where a conflict occurs in the Wage Determination and Amendment thereto and the Wage Rate Schedule and Amendment thereto regarding the rates of wages to be paid for the various categories of work, it shall be mandatory for the Contractor to pay the higher rate of wage in each and every case of conflict. Copies of both the Wage Determination and the Wage Rate Schedule and the respective Amend- ments thereto shall be posted by the Contractor in a prominent and easily accessible place at the job site, and a copy of such Determi- nation and Schedule and the respective Amendments thereto required to be posted, shall be given to each laborer and mechanic employed under the contract by the Contractor at the time he is employed (Act 93 S. L. 1959) . The Contractor shall comply with all provi- sions of the "LABOR STANDARDS", ETC. (4 pages) ; the "Contract Work Hours Standard Act" of 1962, and any other pertinent require- ments and legislation, whether or not the same are incorporated in the contract documents. DRAWINGS TO BE FURNISHED BY CONTRACTOR A. The Contractor shall make and supply such working or shop drawings a.c may be necessary or -as may be required by the Engineer to adequately control the work called for by the approved plans or any additional plans which the Engineer may issue in supplementing the approved plans. Such drawings shall be finished plans, neat, legible and drawn to scale. B. Within 30 days after being given the notice to proceed and before using any working or shop drawings, or commencing any work or delivering any equipment or material covered by such drawings, the Contractor shall submit six prints thereof for the approval of the Engineer. The Engineer shall approve or disapprove the same or require corrections or additions to be made thereon. If additions or corrections are required, the Engineer shall return one of the six prints submitted and the Contractor shall make the corrections or additions sho-.qn thereon to be made. He shall re -submit six prints showing the drawing corrected as required. Each drawing shall be corrected as required until the approval of the Engineer is obtained. If his drawings are disapproved by the Engineer, the Contractor shall submit new drawings until the approval of the Engineer is obtained. C. As soon as approval has been given to any working or shop drawing or shop bill, the Contractor shall within five days send to the Engineer six prints. After approval no change will be permitted unless approved in writing by the Engineer. In case of assembled electrical and :mechanical units, catalogue cuts or similar reproductions may be substituted. for working or shop drawings provided that, in the opinion of the Engineer, they show sufficient information. If such substitution is permitted, nine copies of such catalogue cuts or similar reproductions shall be furnished to the Engineer. D. It is expressly understood, however, that approval by the Engineer of the Contractor's working or shop drawings does not relieve the Contractor of his full responsibility for accuracy of dimensions and details, for agreement and con- formity of such drawings with the approved plans and specifi- cations, pecifi- cations, for performance and completion of the work in SPECIAL PROVISIONS -5- accordance with the plans and specifications and other contract documents nor will such approval be the basis for any increase or change in payment for any item or items of work. Full compensation for furnishing all working and shop drawings shall cD be considered as included in the prices paid for the various contract items of work and no additional allowance will be made therefor. 19. COORDINATION OF PLANS, SPECIFICATIONS AND SPECIAL PROVISIONS These specifications, the plans, special provisions and all supple- mentary documents are essential parts of the contract, and a requirement occurring in one is as binding as though occurring in all. They are intended to be cooperative, to describe and provide for a complete work. Notwithstanding any provision in the contract documents to the contrary, the plans shall govern over Specifications; Special Provisions shall govern over both Specifications and Plans. In the event of any discrepancy between any drawing and the figures thereon, the figures shall govern. 20. DECISION OF ENGINEER Any question or dispute which may arise concerning the provisions of the contract or relating in any manner to any work being performed or to be performed under any of the provisions of this contract or payment therefor, or which may arise between the parties touching, concerning or in any -manner arising out of this contract shall be referred to and decided by the Engineer. The Engineer's decision shall be conclusive, final and binding upon all parties and shall be a condition precedent to the Contr6l'.-Aor's right to claim and the County's liability to pay any money or other compensation in connection with any such question or dispute. 21. AS -BUILT DRAWINGS The.Contractor shall maintain a separate set of plans for the special purpose of showing thereon in clear, legible and dimensioned markings all changes, substitutions, deletions, and additions that have occurred changes, the prosecution of the work from Whatever cause or authorization. The Contractor shall produce this set of plans for inspection upon request of the Engineer, and deposit same with the Engineer immediately after final completion of the work under this contract. 22. PRODUCTS MADE IN STATE OF HAWAII The Contractor shall give preference to -products manufactured or assembled in the State of Hawaii, provided that at all times such preference shall not a. result in an increase in the cost of the work to be performed under this contract; b. conflict with the intent of the contract documents in regard to quality of products; the installation thereof, and the provisions of the "or equal" clauses incorporated therein. SPECAL PROVISIONS 2 3 . STAKEOUT Construction stakeout shall be the responsibility of the Contractor. No separate payment will be made for this item but shall be incidental to and included in the various items of the proposal. 24. DUST CONTROL 25. The Contractor's attention is called to the strict enforcement of dust control for the duration of this project. The Contractor shall maintain the control of dust caused by his work to the complete satisfaction of the Engineer. TEMPORARY PAVING OF TRENCHES Where existing pavements are disturbed by the Contractor under this project, temporary asphaltic concrete paving shall be provided and placed over the compacted trench backfill to provide a smooth riding surface. The Contractor shall replace the temporary paving with base course and asphaltic concrete to match the existing pa-�v-ement when directed by and to the complete satisfaction of the Enginee --. No separate payment will be made for temporary paving Vnich steal' be incidental to and included in "Restoring Pavements and Other Improvements". SPECIAL PROVISIONS -7- 26 o GENERAL REQUIREMENTS AND COVENANTS The General Requirements and Covenants of the Department of Public Works, County of Hawaii (July, 1972) shall be read by the contractor, as they form a part of the agreement to be entered into between the Contractor and the State of Hawaii. The GENERAL REQUIREMENTS AND COVENANTS are not physically included in these specifications, but are included by reference. Copies are available at the County Clerk's office. 27. NOTICE CONCERNING ECONOMIC STABILIZATION ACT OF 1970 AS AMENDED The bidder is reminded that mandatory provision of federal measures promulgated under authorit of the Economic Stabilization Act of 1970 (P.L. 91-379 84 Stat. 799) includin•? Executive Orders of the President 5 b 7 amendments thereto, and rules and regulations issued thereunder may be applicable to invitations to bid, bid proposals and contracts,, In addition, all bid proposals, submitted shall, to the best of the bidder's k-nowledge and belief, be in accordance ;with applicable man- datory provisicns of measures promulgated by authority of the Economic Stabilization A^t of 1970, and w1here any provision of the contract specifications is inconsistent, such mandatory provisions shall control. SPECIAL PROVISIONS -$- SEWER SYSTEM SECTION 1: TRENCH EXCAVATION 1.1 DESCRIPTION. Work includes sheeting, shoring, unwatering, excavating, extra excavation, backfilling, hauling and disposing of materials, labor, materials, tools, equipment and all work necessary to complete the excavation for sewer lines, including manholes and appurtenances. 1.2 MATERIALS. All excavation materials shall be unclassified regardless of their composition, whether earth, solid rock, boulders, coral, asphalt pavement, concrete, rubbish or other material. 1.3 DETAILS A. General 1. Work within County of Hawaii streets and highways shall be in accordance wi--h County standards and regulation. 2. Work within Federal -Aid Highways shall be in accordance with: a. Chapter 111, Revised Laws of Hawaii, 1955, as amended, relating to the Federal -Aid Highways b. State Transportation Department's "Specification for Installation of Pipelines and Other Under- ground Installations on Federal -Aid Highways", and all subsequent amendments thereto. 3. Work on State Highways shall conform to the State's Standard Specifications. B. Excavation 1. Width and depth of trenches shall be as shown on the drawings. Where pipes are to be encased in a concrete jacket, the width and depth of the trench shall be increased as required by the jacket details. The Contractor may at his own expense excavate a wider trench, but not greater than the outside diameter of the pipe plus four feet 2. No "jumps or spaces" will be permitted unless approved. 3. No trench shall be opened more than 300 feet in advance of installed pipe without approval of the Engineer. C. Overexcavation. Any part of the trench excavated below grade by the Contractor shall be backfilled with crushed rock as specified in Section 3.2 at no cost to the Owner. SECT ION 1 TRENCH EXCAVATION -1- D. Excavated Material to Storing of excavated material alongside the trench shall be kept to a minimum and in such a manner as not to obstruct traffic or storm water runoff 2. The placing of large unbalanced concentrated loads, such as large stockpiles of excavated materials adjacent to the trench excavation shall be prohibited. Construction shall be scheduled in small increments and trenches should be backfilled as soon as possible. 3. Whenever proper storage of excavated material cannot be made alongside the trench, the material shall be hauled away from the site and stored at suitable locations at the Contractor's expense. 4. All surplus material not disposed of within the project shall become the property of the Contractor and shall be removed from the site of work at his expense. E. Sheeti 1. Wherever necessary, the Contractor shall properly sheet and brace all open trench to render it secure and shall remove all such sheeting and bracing before c3mpleting the backfill. Excavation and sheeting shall be done simultaneously. The placing of pre- fabricated panels after portions of the excavation have been completed will not be permitted. 2. Wherever sheeting is necessary, the width of the trench shall be widened beyond the widths stipulated to allow adequate clearance for the proper instal- lation and inspection of pipes It is understood and agreed that the quantity of excavation required to install sheeting will not be retarded as additional excavation to be paid for under the unit price bid _ for_Ex_cavation and that all costs incurred for performing this excavation and installing sheeting shall be included in the unit price bid for Excavation. F. 'Extra Excavation 1. If mud, or other undesirable material which does not afford a sufficiently solid foundation is encountered at the subgrade of the trench, the trench shall be excavated to such depth and width, as directed by the Engineer and refilled with crushed rock. G. Unwaterina. The Contractor shall provide proper facilities for discharging all pumped water. No water shall be dis- charged into street gutters without approval of the Engineer. The Contractor shall make his own arranbements for the disposal of water on, over or through private Property. SECTION 1 TRENCH EXCAVATION .._2- 1.4 MEASUREMENT A. The number of cubic yards of material to be paid for shall be based on the trench width specified for the size of pipe installed and the actual depth of trench required to secure the proper grade for the pipe. B. Depths of trenches for measurement of excavation quantities will be measured from the natural ground. C. The number of cubic yards of material to be paid for extra excavation shall be based on the trench width specified for the size of pipe installed and the depth and extent ordered by the Engineer. D. Excavation for sheeting, belling out, pumping, backfill, blocking, disposing of excavated material, etc., shall be considered as incidental to Trench Excavation and shall not be measured or paid for directly. 1.5 PAYMENT A. Payment for Trench Excavation as measured above will be made at the unit price bid per cubic yard and shall be full compensation for completing the excavation to the required depth and backfilling the trench. B. Payment for Extra Excavation including backfill with crushed rock will be made at the unit price bid per cubic yard for .Extra Trench Excavation, -which shall be full compensation for the work completed. SECTION 1 TRENCH EXCAVATION -3- SECTION 2: TRENCH BACKFILL 2.1 DESCRIPTION., Work includes placing and consolidating backfill material in pipe trenches. 2.2 MATERIALS A. Up to 12 inches after proper compaction) above the pipe shall be: 1. Finely graded coral which will pass through a one - inch square mesh screen and is free of all deleterious substances, or 2. Earth or sandy materials Uhich do not contain adobe, or fragments of rock, coral, lumps of earth, etc., larger than 1 inch in diameter, and is free of all deleterious substances. B. From 12 inches above the pipe to 12 inches below the surface of therind shall not contain: to More than 50 percent rock. 2. Rock larger than 8 inches in its longest dimension. 3. Deleterious matter. 4. Adobe or other material o a similar nature unless otherwise permitted by the Engineer. When removal from the project of unsuitable materials creates shortage of backfill material, the Contractor shall furnish suitable material, satisfactory to the Engineer. C. For the tom 12 inches shall be: to In existing streets and private driveways: Graded rock not larger than 3 inches. 2. In la wn : The top 6 inches shall be filled with topsoil. 2.3 DETAILS A. General 1. After the pipe has been laid, tested and approved by the Engineer, the Contractor shall promptly backfill the trench. SECTION 2 TRENCH BACKFILL —4— n 2. Where sheeting is used and pulled out, all cavities shall be solidly filled and tamped. 3. The Contractor shall make his own arrangements for water required for use in backfilling. 4. The Contractor shall uncover the pipe at his own expense to ascertain that it was not displaced or damaged by such causes as a heavy object falling into the trench trench cave-ins, or trench flooding. 5 C� The Contractor shall replace the displaced or damaged pipe at his own expense. B. Placing is" Up to 12 inches. Material shall be placed in the trench by hand shoveling. b. The material shall be compacted to a relative ca,-npaction of not less than 95 percent. 2. From 12 inches above the pipe to 12 inches below the surface of the ground. a. Material shall be placed in not greater than 6 -inch layers in pavement and shoulder areas and co.npacted to a relative compaction of not less than 90 percent. b. Material shall be plated in not greater than 12 -inch layers in areas outside of the roadway and compacted to a relative compaction of not less than 85 percent. 3. For the top 12 inches a. In existing streets and private driveways. (1) The material shall be thoroughly compacted to a relative compaction of not less than 95 percent. (2) Before any pavement is laid, the street shall be opened to traffic approximately 7 days, with the trench area kept in a smooth riding condition. b. In lawn areas: SECTION /2" TRENCH BACKFILL (1) Fill material shall be thoroughly tamped. (2) Surface shall be carefully raked and smoothed. (3) Grass, plants and shrubs shall be replanted where necessary and watered for 7 days. ..5- C. Compaction of Backfill. In general the Contractor may use any suitable means to properly compact and consolidate the backfill to achieve the specified relative compaction. In all cases each layer of backfill material shall be satisfactorily compacted before the next layer is placed thereon. Maxim -am density at optimum moisture content will be determined by AASHO Method T 180-57, Method D, modified. 2.4 MEASUREMENT AND PAYMENT. Trench Backfill will not be measured nor paid for directly, but shall be considered incidental and included in the price bid for Trench Excavation. SECTION 2 TRENCH BACKFILL IM 0 v SECTION 3: CRADLE AND BEDDING MATERIALS 3.1 DESCRIPTION,, Pipe cradle and structural bedding shall consist of furnishing, placing and compacting crushed rock materials on 'a prepared subgrade . This material is intended for, but not restricted to a cradle and bedding course for pipe, jackets, and structures and is to be placed as shown on the plans or as requested by the Engineer. 3.2 MATERIALS. The crushed rock for the cradle shall range in size from 3/8 to 2 inches with 20 to 55 percent passing 1 -inch square openings. The aggregates shall be sound and durable. Coral, as or sand acceptable by the Engineer may be used in lieu of crushed rock. 3.3 DETAILS. The material shall be placed and spread in uniform layers not to exceed 8 inches. Each layer shall be compacted with a vibratory compactor to a relative compaction of not less than 95 percent. 3.4 MEASUREMENT AND PAYMENT. Cradle material shall not be measured nor paid for directly, but shall be considered incidental and included in the price bid for pipes and structures. SECTION 3 CRADLE AND BEDDING MATERIALS -7- ri SECTION 4: VITRIFIED CLAY SEWER PIPE AND APPURTENANCES 4.1 DESCRIPTION, Vitrified clay sewer pipe and appurtenances shall be installed in accordance with these Specifications to the lines and grades shown on the Plans or as ordered by the Engineer. 4.2 MATERIALS A. Vitrified Clay Pipe and Fittings la Classes and uality: Vitrified clay pipe and fittings shall be Extra Strength, first quality, durable, sound well -burned clay throughout its entire thickness, and shall give a clear metallic ring when struck with a hammer. Pipe may be either glazed or unglazed. 2. : Pipe ends shall be square with the longitudinal axis, and sockets shall be true, circular, and con- centric with thQ bore of the pipe. The pipe shall be bell and spigot pipe unless other specified. The ends of the pipe shall be so formed that, when the pipes are laid together and the joints made, they shall con- stitute a continuous and uniform line of pipe, and shall have a smooth and regular interior surface. 3. Identification Marks: All pipes and fittings shall be clearly marked with the name of the manufacturer, or with his trademark. The manufacturer shall stamp or paint clearly on each pipe cr fitting a mark indicating the class of pipe. 4. Length, Dimensions, Permissible Variations: Length, dimensions, permissible variations of vitrified clay pipes and fittings shall conform to standards of the Western Region of the National Clay Pipe Institute. 5. Imperfections : The following imperfections in a pipe or fitting will be considered injurious and cause for rejection: a. A single crack in the barrel of the pipe extending through the entire thickness, regardless of the length of such crack. A single crack which extends through one-fifth of the barrel thickness and is over three (3) inches long. Any surface fire crack which is more than 1/32 inch wide at its widest point. b. Lumps, blisters, pits or flakes on the interior surface of a pipe or fitting. c. When the spigot or the socket of the pipe varies from a true circle more than 3 percent of its nominal diameter. SECTION 4 VITRIFIED CLAY SEWER PIPE AND �`,pp[JgTEN�^rTrE^ 10 • d. When a pipe or fitting exhibits a deviation from a straight line greater than 1/16 inch per linear foot. The deviation shall be measured from a straight edge on the concave side. e. Any piece broken from the spigot and which extends through the barrel. f. When the dimension exceeds the permissible variation as called for by the. Western Region Specifications of the National Clay Pipe Institute. g. Tramp clays, grog, or other foreign matter that have fused permanently to the exterior or interior surface of the pipe or fittinCDgs. 6. Stoppers and Branches: Stoppers shall be used with a7_1 branch pipes that are to be left unconnected. Stoppers for branch pipes having flexible compression joints may be either clay discs with flexible com- pression joints, factory applied, that will mate with the branch joint; or, a resilient material of con- trolled design and dimensions for mating with the 0 CD branch pipe to which it is to be applied. Branches are to be furnished with connectio-ns of the sizes specified, securely and permanently fastened to the barrel of the pipe in the process of manufacture. T --branches shall have their axes perpendicular to the longitudinal axis of the pipe. Y -branches shall have their axes approximately 45 degrees from the longi- tudinal axis of the pipe measured from the socket end. All branches shall terminate in socket ends. The barrel of the branch shall be of sufficient length to permit making a proper joint Vaen the connecting pipe is inserted in the branch soCket. 7. Certification: The Contractor shall furnish a certi- fication from the pipe manufacturer that the pipe complies with the following: a. Hydrostatic pressure test requirements as outlined by the Western Region Specifications of the National Clay Pipe Institute. b. 3 -Edge bearing test strength in accordance with CD the Western Region Specifications of the National Clay Pipe Institute. B. Compression Joints 1. All vitrified clay pipes shall be furnished with an approved type of interlocking, resilient mechanical CD compression join, -4 - conforming to ASTM C425 -53T. The joint shall be made of plasticol (polyvinyl) or other approved material to specifications established by the ational Clay PipeInstitute. 2. The joint components shall be factory applied. SECTION 4 VITRIFIED CLAY SEWER PIPE AND A P P U R T E N A:,,', kC Er' S In 0 4.3 DETAILS A. Installation of Vitrif ied Clay 1. Laying of pipe shall commence at the lowest point, the spigots f acing in the direction of flow. 2. Pipe shall be fitted together and matched so that when laid in the work it will form a sewer with a smooth and uniform invert. 3. The mating flexible joint surfaces shall be wiped clean of dirt and foreign matter. An approved lubricant shall then be applied to the joint surfaces. 4. With the join` surfaces properly lubricated, the spigot shall be positioned inside the bell and the joint shoved home until the mating surfaces are in tight contact with each other. For small diameter pipe, this operation may be done by hand, but on large diameter pipe, a lever attachment or bar cushioned with a wooden block shall be used to shove the joint into place. Care shall be taken to prevent damage to the pipe. 5. The interior of the sewer pipe shall be cleaned of all dirt and superfluous or foreign matter as the work progresses. At the end of each working day, exposed ends of sewers shall be closed with approved temporary covers to prevent earth and debris fro�Lm entering the pipe. 6. Pipes wjzich become submerged in water during the night shall be carefully checked each morning, and pipes found "floated" from their proper positions shall be re-laid by the Contractor at his own expense. 7. Contractor may, at his option, lay sewers "in the wet" (without unwatering the trench) provided that the tests specified herein are satisfied and by a method approved by the Engineer. B. Leakage Tests for Sewers 1. The maximum amount of leakage in any w'zole, continuous portion of sewer under test shall not exceed the rate of O.004 gallons/hour/foo-/inch diameter. 2. The Contractor shall repair all visible leaks, regard- less of the limits of the leakage tests, before any leakage tests are made 3. In order to facilitate the local leakage tests between manholes, the pro; edure shall be as follows: a. Sewers and sewer manholes which are located above the ground water table. SECTION 4 VITRIFIED CLAY SE+dER PIPE AND AFF L �T INA: CES -10- As soon as the -Ape laying has been completed and before any jacket or backfill is installed, the upper manhole shall be promptly construc- ted to the finished elevation of the manhole. However, should the Contractor desire to delay the building of the manhole, he may, at his option, use a barrel of the bank to provide the necessary pressure required for testing. (2) The Contractor shall place a suitable plug in the pipe at the lower manhole and then fill the pipe and upper manhole or barrel with water to an elevation of at least 4.0 feet above the invert at the mid -point of the line; but, in any case, not less than one foot above the high end of the highest house connection on the line being tested. When the head on the sewer exceeds four (4) feet, the leakage allowance of 0.004 gallons/ hour/foot/inch d-'-ameter shall be increased by 10 percent fo-- each two (2) feet that the actual head exceeds the four (4) foot head, up to a maximum of 30 percent. The total head on the invert of the pipe at the lower end of the line shall be limited to twenty-five (25) feet. (3) The Contractor shall then repair any visible leaks with a concrete or mortar jacket at least 3 inches thick, except wA"Ien the Engineer directs that the defective pipes be replaced because of unsoundness. (4) The sewer shall remain under test for two hours after all visible leaks have been repaired. After the first hour, the barrel or upper manhole shall be refilled and the level of water measured and marked. After the second hour, the water level shall again be measured or marked and the difference in level of water recorded and converted to gallons. If the line fails to meet the test, remedial measures shall be taken and the test repeated until the line passes the leakage test. b. Sewers w1zich are located below the ground water table. (1) After the pipe has been laid and connectin,:), manholes have been completed, the pipe trench shall be backfilled sufficiently to prevent any "floating" of the pipe. (2) The upper end of the sewer line shall be plugged.. SECTION 4 VITRIFIED CLAY SEWER PIPE AND APPURTENANCES -11- I (3) A measuring device shall be installed at the lower end of the sewer line. (4) The ground water shall be allowed to rise to its natural level and remain for 2 hours. (5) The Contractor shall then repair any visible leaks with a concrete or mortar jacket at least 3 inches thick, except when the Engineer directs that the defective pipe be replaced because of unsoundness. (6) If the line fails to meet the test during the two-hour period, remedial measures shall be taken and the test repeated until the line passes the leakage test. 4. Upon completion of the leakage test, the line shall be emptied and the cradles and jackets placed. 5. No backfilling shall be done between any two adjacent manholes until the pipe shall have passed the leakage test, unless approved by the Engineer in writing. SECTION 4 VITRIFIED CLAY SEWER PIPE AND APPURTENANCES -12- 0 C. Wyes and Bends Wyes and bends shall be installed where shown on the Plans or as ordered by the Engineer° D. Measurement. The lengths of sewers measured for payment shall be the actual number of linear feet of pipe, of each size, installed in place as determined by horizontal measurement. where the grades exceed 10 percent, the actual length of pipe installed will be measured. However, at drop manholes, measurement for sewer mains shall be made to the outside face of the drop as shown on the Plans. E. Pg_)Lment . Payment for vitrified clay sewer pipe as measured above, will be made at the unit price bid and shall be full compensation for all sewer pipe in place complete, including cradling, concrete jacketing and repaving. SECTION 4 VITRIFIED CLAY SEWER PIPE AND APPORTENANCES SECTION 5: SEWER MANHOLES 5.1 DESCRIPTION, Sewer manholes shall be constructed in accordance with these Specifications and to the details shown on the Plans. Precast concrete manholes conforming to these Speci- fications shall be approved for installation in lieu of brick or cast -in-place concrete manholes. 5.2 MATERIALS A. Brick and Cast -in -Place Concrete Manholes 1. Concrete: Concrete shall be Class "B -S" conforming to the requirements of Section 6, CONCRETE AND MORTAR 2. Reinforcing Steel: Reinforcing steel shall conform to the requirements of Section 6, CONCRETE AND MORTAR. 3. Bricks: Bricks shall be red brick conforming to the requirements of ASTM Designation C32-63, Grade MA, or locally ma-zufactured lava or cinder brick conforming to ASTM Designation C55 -64T, Grade A. B. Precast Concrete Manholes 1. Concrete: Concrete for precast reinforced concrete riser sections and tapered sections shall be Class 11AA-S o" Concrete for cast -in-place concrete manhole walls shall be Class "A -S-11 All other concrete shall be Class "B—So" All the foregoing classes of concrete shall conform to the requirements of Section 6, CON- CRETE AND MORTAR 2. Precast Reinforced Cone rete _Manhole Riser Sections and Tapered Sections : Precast reinforced concrete manhole riser sections and tapered sections shall conform to ASTM Designation C478 -64T. Concrete shall be Class "AA -So" Tapered sections shall be truncated concentric cones. Minimum wall thickness shall be 4 inches. C. All Manholes 1. Mortar: Mortar shall conform to the requirements of Section 6, CONCRETE AND MORTAR 2. Frames and Covers: Cast iron frames and covers shall conform to the requirements for Gray Iron Castings , ASTM Designation A48-64, Class No. 30 and shall be cast to pattern with appropriate markings as shorwa on the detail drawings, free from blowholes and other imperfections. The bearing faces of the frames and covers shall be machined and fitted together to prevent rocking . All cast inns shall be thoroughly cleaned and painted with one coat of Inertol Standard or approved equal before leaving the shop. SECTION 5 SEWER MANHOLES -14- r] 3. Manhole Runts. a. TynenSA manhole rungs shall be fabricated as detailed from round wrought iron bars conforming to ASTM Des ignat ion A207 -63T and shall be cadmium plated or hot dipped galvanized after fabrication. b. Type SB run,. -;),s shall be cast as detailed from cast iron conforming to ASTM Designation A48-64 Rungs shall be thoroughly cleaned and painted with one coat asphaltum before leaving the shop. 5.3 DETAILS A. Brick and -Cast -in -Place Concrete Manholes 1. Concrete Work: Concrete base of the manhole shall be constructed as detailed, and allowed to set for at least 24 hours before additional work is construc- ted on this base. Concret2 walls shall then be constructed and cured in accordance with the provi- sions of Section 6, CONCREICE AND MORTAR 2. Brick work: a. Clean, sound bricks shall be dipped in water or otherwise thoroughly soaked before being laid in a full bed and joints of mortar. The joints on the inside of the brick manholes shall be neatly struck. b. The inside of the brick manhole shall be bagged or plastered to a smooth finish. c. The outside of the brick portion of sewer manholes shall be plastered with 1 -inch thick layer of cement mortar. d. Manholes vinich are 10 feet deep or less from the invert to the top of the frame, may be made entirely of brick from the concrete base upwards, provided that the invert is not below the ground water table and the manhole is located in a relatively dry area, B. Precast Concrete Manholes 1. Precast concrete manholes shall be constructed as shown on the Plans. The Contractor shall submit details of the riser and tapered sections and the joints to the Engineer for approval. 2. Precast concrete manholes may be used in locations below the ground water level after conducting leakage tests to demonstrate the water -tightness of the manhole to the satisfaction of the Engineer and receiving his approval SECTION 5 SEWER MANHOLES -15- ri 3. Precast concrete manhole may be used in sidehill locations after demonstrEl-ting the stability of the C) manhole at the particular location and receiving the approval of the Engineer. 4. Precast concrete manholes shall not be used except where they are accessible to construction equipment and vehicles and the use is approved by the Engineer. The Engineer may req-jire that certain portions of the manhole be constructed with bricks or cast -in-place concrete. C. All Manholes. Excavation shall be in accordance with Section 1, TRENCH EXCAVATION. Backfill shall be in accordance with Sect ion 2, TRENCH BACKFILL. Upon comp le - tion, manholes shall be thoroughly cleaned of all debris. Cast iron frames, covers and steps shall be painted with one coat of coal tar paint. 5.4 MEASUREMENTS A. Bases. The number of manhole bases to be paid for shall be the actual number constructed and accepted. B. Walls. Walls for all types of manholes shall be measured for payment in linear feet of walls constructed and accepted as measured from the top of the manhole base to the bottom of the manhole frame. C. Frames and Covers. Manhole frames and covers measured for payment shall be the actin 'l number installed and accept -ed. D. Drop Connections. Drop connections shall be measured I � —() for payment in linear feet of drop installed and accepted as measured from invert to invert. E. Manhole Chirmneys. Manhole chimneys shall be measured for payment in linear feet as measured from the bottom face of the, top slab of the open drop to the bol,. --tom of the chimney cast iron frame. F. Chimney Frames and Covers. Chimney frames and covers measured for payment shall be the actual number installed and accepted. 5.5 PAYME,,z-r. Payment will be made only for manholes fully com- pleted and ready for use. A. Bases. Payment for manhole bases as measured above will be made at the unit price bid and shall be full compen- sation for the work in place, complete. B. Walls. Payment for manhole walls as measured above, will be made at the unit price bid a;. -id shall be full compen- sation for all walls in place, complete, and with rungs. SECTION 5 SEWER MANHOLES 9"0 11 wi C. Frames and Cqyers. 'Payment for frames and covers as measured above will be made at the unit price bid and shall be full compensation for all work in place, complete. D. Drop Connections. Payment for drop connections as measured abo-,ie, will be mad---- at the unit price bid and shall be full compensation for all work in place, complete. E. Manhole Chimne_ys. Payment for manhole chimneys as measi-ired above will be made at the unit price bid, and shall be full compensation for all work in place, complete. F. Chimney Frames a -.--e Covers. Payment for chimney frames and covers as measured above will be made at the unit price bid and sh.allbe full compensation for all work in place, complete. SECTION 5 SEWER MANHOLES -1-7- 0 SECTION 6: CONCRETE AND MORTAR 6.1 DESCRIPTION,, Concrete shall be composed of a mixture of Portland Cement, fine and coarse aggregate, and water. Mortar shall be composed of Portland Cement, fine aggregate and water. 6.2 MATERIALS A. Standards 1. All cement shall conform to the requirements of the current "Standard Specifications for Portland Cement," ASTM Designation C150, Type I, unless some other type is specified. 2. Water shall be clean and free from injurious amounts of oil, acid, salt, alkali, organic matter or other deleterious substances. 3. Concrete aggre,,,;,at es shall conform to the "Specifi- cations Specifi- cations for Concrete Aggregates" ASTM Designation C33. However, other aggregates wiz ich have been shown by test or actual service to produce concrete of the required qualities may be used w1hen authorized by the Engineer. The maximum size aggregate for all mixes shall be one inch thick except for walls which are less than 6 inches thick. The maximum size for such walls shall be 3/4 inch. 4. No admixtures of any kind shall be used without the written consent of the Engineer, unless otherwise specified. B. Storage o` Materials. Cement and aggregates shall be stored in a manner to prevent d'eteriorat ion. or the intrusion of foreign matter. Any material which has deteriorated or has been damaged shall be immediately and completely removed from the work C. Concrete alitY and Consiste c 1. Proportions : All concrete mixtures shall be designed to satisfy the requirements of the following table: Classifi- Maximum Minimum Minimum cation net water cement co-:rnpres sive gallons content, strength at per bag bags per 28 days of cement cu. xd, lbs, sic. . AA, AA -S 5.25 700 45000 A, A -S 6.25 600 35000 B, B -S 7.0 5.2 25500 C 800 4.5 25000 Note: Unless otherwise called for in the Proposal, Plans or Specifications, all concrete shall be Class B or BS. SECTION 6 CONCRETE AND MORTAR F3 The Contractor shall submit to the Engineer the mix he intends to use, wtiich shall be proved by preliminary cylinder tests at least 14 days before the actual concrete pouring operation. 2. Concrete for Seweraae Structures: The above classifi- cations, AA -S. A -S and B -S, shall contain no coral sand. A set -retarding admixture, approved by the Ena,ineer, shall be added to the mixture at the rate recommended by the supplier. Where concrete in any structure is to come in direct contact with sewage or sewage gases, and w1here otherwise required by these C) Specifications or on the Drawings, the concrete shall satisfy the requirements of Class AA -S, Class A -S, or Class B -S. 3. Concrete S : The consistency of the concrete shall be determined by the slump test made in accordance with the current "Standard Method of Slump Test for Consistency of Portland Cement Concrete," ASTM Designation C143. The slump for the different types of con2rete structures shall not be greater than that specified in the following table unless otherwise specified or directed by the Engineer. TYPES OF CONSTRUCTION Maximum Slum Concrete Paving . a 0 0 0 -9 0 2 inches Reinforced Concrete Struc-',---ures: Heavy Sections . . . . * * * 0 *'* 3 inches Thin Sections and Columns . . . . . 4 inches Concrete Placed Under Water: not less than . a 0 * 6 inches not more than. . . . 0 8 inches D. Mortar 1. Cement mortar used in floors, trunk sewers and manholes, conduits, stone masonry, foundations and all underground and other construction, unless otherwise specified, shall, be composed of one part (by volume) cement and 3 parts (by volume) fine aggregate. Where the mortar is to co=ne in direct contact with sewage or sewage gases, the fine aggregate shall contain no coral sand. A water - reducing and plasticizing admixture approved by C:> C� the Engineer, shall be added in accordance with the manufacturer's recommendations. SECTION 6 CONCRETE AND MLOR'rAR E. Reini=orcinteel to Bar Reinforcement: Bar reinforcement shall be deformed, intermediate grade Steel Bars for Concrete Reinforcement conforming to the Specifications of the ASTM Designation A15-65 and A -305-56T 2. Mesh Reinforcement : Mesh reinforcement shall conform to the requirements of the ASTM Designation A185-64. The gage of the wire and the dimensions of the mesh will be as shown on the Plans. 6.3 DETAILS A. Mixin4 and P la c in 1. lixinl: The concrete shall be mixed until there is a uniform distribution of the materials and shall be completely discharged before the mixer is recharged. a. Job Mixed Concrete: For job mixed concrete, the mixer shall be rotated at a speed recon-nended by the manufacturer and mixing shall be continued for at least two minutes after all materials are in the mixer. b. Read; Mixed Concrete: Ready mixed concrete shall be mixed and delivered in accordance with the requirements set forth in the "Standard Speci- fications for Ready Mixed Concrete," ASTM Desig- nation esig- nation C94'. 2. Conveying: Concrete shall be conveyed from the mixer to the place of final deposit by methods vinich will prevent the separation or loss of the materials. Equipment for chut ing , pumping and pneumatically conveying concrete shall be of such size and design as to insure a practically continuous flow of concrete at the point of delivery and without segregation of the materials. All equipment aid methods used for conveying shall be subject to she approval of the CD Engineer. 3. Depositingy Concrete_: Concrete shall be deposited as nearly as practicable in its final position so as to avoid segregation of the materials and the displace- ment of the reinforcement. No concrete shall be poured in the absence of an inspector. as No concrete shall be used which does not reach its final position in the forms within o-m=A-half hour after water is first added to the mix. However, when the concrete is continually agitated, the time may be extended to one and one-half hours. No concrete that has partially hardened or 'has been contaminated by foreign material shall be deposited on the work, nor shall retempered concrete be used. SECTION 6 CONCRETE AND MORTAR -20- b. Open troughs and chutes shall be of metal or metal lined, and shall be kept clean and free from coatings of hardened concrete. c. Concrete shall not be dropped a distance of more than S feet unless approved in writing by the Engineer. d. Slab and beam stems shall be poured in one operation. e. Concrete columns and walls shall be allowed to set at least 3 hours before a floor system is poured. f. After initial set of the concrete, the forms shall not be jarred and no strain shall be placed on the ends of projecting reinforcement. g. All concrete shall be thoroughly compacted by suitable means during the operation of placing and shall be thoroughly worked around reinforce- ment, embedded fixtures, and into the corners of the forms . h. When less than a complete layer of concrete is placed in one operation, it shall be terminated in a vertical bulkhead and in areas of minimum shear as approved by the Engineer. 4. Construction Joints: Construction joints shall be so made and co --Ls tructed as to least impair the strength of the structure, and only at the locations shown on the Drawings or as approved by the Engineer. a. Construction joints for structures, when a water- tight joint is required, shall be made with the provision for interlocking with the succeeding layers . Keys shall be made by the embedment of saturated wooden blocks or strips beve led so that they can be easily removed. b. Where a joint is to be made, the surface of the previously poured concrete shall be thoroughly cleaned of all laitance and other foreign matter, chipped with picks or pneumatic tools and wire brushed until an entire new concrete surface is secured: PICK MARKS AT RANDOM WILL NOT BE ACCEPTED Before resuming concreting, the concrete already placed shall be thoroughly wetted by washing with a hose and covered with a 2 -inch layer of cement mortar made of one part Portland Cement and 3 parts of fine aggregate (without coral sand_ in seweraZe structures before placing additional co-ncrete . SECTION 6 CONCRETE AND MORTAR -21- e B. Forms 1. Construction: a. Forms shall conform to the shape, lines and dimensions of the members as called for on the Plans, and shall be substantial and sufficiently tight to prevent leakage of mortar. They shall be properly supported, braced, or tied together so as to maintain position and shape and shall be constructed so that they may be removed without ca,.jsing any overstressing of the concrete. The Contractor shall be responsible for the adequacy of the forms and form supports. b. Either steel or wood forms may be used. Surfaces of metal forms shall be free from irregularities, dents or sags. Knot holes and broken places in wooden forms shall be covered with metal pieces. All lumber in contact with the concrete shall be surfaced s 1ap__or T. & G. or, plywood form lum, ber. . All exposed surfaces shall be^formed with new plywood forms or better. c. All form work shall be clean and -free from dirt and construction debris, and shall be thoroughly wet with water or oiled with a non -staining oil before the placing of concrete. 2. Removal of Forms: a. Forms shall not be disturbed until the concrete has adequately hardened and shall no-,-- be removed until the concrete has attained the necessary strength to support its own weight and any construction live loads. b. Wall forms shall not be removed until 48 hours after concrete placement, C. Forms and their supports shall not be removed without the approval of the Engineer. d. A method of form removal likely to cause over- stressing of the concrete shall not be used. In general, th` forms shall be removed from the bottom upwards. Supports shall be removed in such a manner as to permit the concrete to uniformly and gradually take the stresses due to its ow�a weight, The Contractor shall be responsible for safe practice in removing forms and shoring and for placing adequate reshores . e. After the forms are removed from any concrete work, the Contractor shall immediately cut off all wire a.rr-I nails at a point at least 1/2 inch inside the concrete surface and fill the result- ing voids with mortar of the same class as the concrete used. SECTION 6 CONCRETE AND MORTAR -22- No extra compensation will be allowed for forms; their cost shall be included in the -prices bid for the various items of work in the Proposal. C., Slots, Recesses and Anchors. The Contractor shall set all inserts, anthers, ties, and hangers required to secure the work of other trades. D. Reinforcin; Steel 1. Bending reinforcing_steel: Reinforcinb steel shall conform accurately to the dimensions shown on the Plans. Bars shall not be bent or straightened in a manner that will injure the material. Bars with kinks or bends shall not be used. Hooks shall conform to the Manual of Standard Practice of the American Concrete Ingitute 2. Placid einforcing Steel: a. Reinforcing bars shall be placed as shown on the Plans and shall be firmly and securely held in position by wiring all intersections with No, 14 or No. 16 wire and by using concrete or metal chairs, spacers, metal hangers, supporting wires , and other approved d c vices of sufficient strength to resist crushing under full load. Such wires, chairs, and other supporting devices shall be furnished by and at the expense of the Contractor. Metal supports which extend to the surface of the concrete, except where showvia on the Plans, and wooden supports shall not be used. Placing bars on layers of fresh concrete as the work progresses and adjus ting bars during the placing of concrete will not be permitted b. Bars shall be accurately spaced as shown on the Plans. In no case shall the clear distance . between parallel bars be less than 2-1/2 diameters of the bar with a minimum of two (2) inches c. Wire mesh used for reinforcement shall be rolled flat before placing concrete, unless otherwise shown on the Plans. Mesh reinforcement shall be held firmly in place against vertical or transverse movement by means of devices satisfactory to the Engineer. Pulling up of CD wire mesh into position during placing of concrete will not be permitted 3. Splicing rReinforcing_Steel: Wnere bars are spliced, they shall be lapped at least 30 diameters, except where otherwise shown on the Plans E. Protection and Curi n� 1. Concrete shall be adequately protected from injurious action by the sun, rain, flowing water, and mechanical SECTION 6 CONCRETE AND M01ITAR -23- on injury, and shall be kep.-_ moist from the time it is placed until the expiration of 5 calendar days. For high early strength concrete, most curing shall be provided for at least the first two days. Water shall be used for curing, except that when permitted by the Engineer, concrete surfaces may be cured by spraying with a liquid membrane -forming compound complying with ASTM C155-65 2. No wheeling, working, or walking on finished surfaces will be allowed for 48 hours after the concrete is deposited. F. Finishing Concrete Surfaces Concrete surface finishes shall be in accordance with the requirements of this subsection and shall be of the type of finish required by the Plans or as specified. 1. Normal Finish: Immediately following the removal of forms, all fins and irregular projections shall be removed from all surfaces. The cavities produced by form ties and all other holes, honeycomb spots, broken corners and edges and all other defects shall be carefully pointed up with a mortar of cement and fine aggregate mixed in proportions used in the particular class of concrete being finished. The concrete shall then show true, even faces with no depressions or bulges, large fins or other unsightly defects. Unless otherwise called for in the Drawings or in the Specifications, all exposed surfaces of concrete shall have a Normal Finish. 2. Finishin- of top, surface of all floor slabs, side- walk, slabs�_Sutters, bride decks,—mss of culverts and other similar surfaces: After the concrete has been placed and compacted, the surface shall be struck off with a strike board,, After striking off, the surface shall be floated, not less than 2 times with wood floats, until all excess water is removed. After the concrete has hardened sufficiently a final finish with a steel trowel or other finish as specified in the Plans or Specifications shall be applied. G. Mortar Mixing The ingredients must be proportioned by measurement and not be estimation, a bag of cement being taken to contain one cubic foot. They must be thoroughly dry mixed in a suitable tigh� box, after which the proper quantity of clean water shall be gradually added and then worked until a uniform mixture is secured. No greater quantity of mortar is to be prepared than is required for immediate use, and any mortar that has set shall not be retempered or used in any way. Hydrated lime shall be added to any of the above mixes when specified. SECTION 6 CONCRETE AND MORTAR t -24- I 6.4 PAYMENT, Payment for all concrete and mortar work shall be made under the appropriate items in the Proposal. SECTION 6 CONCRETE AND MOIRTAR -25- 0 W SECTION 7: PAINTING AND WATERPROOFING, 7.1 MATERIALS A, Paints: 1. Coal -tar epoxy coating shall have 72% nonvolatile content by volume and shall be applied at the rate of 135 square feet per gallon. Minimum dry thick- ness per coat shall be 7 mils Z. Oil, alkyd -resin coating shall have a 50% nonvolatile content by volume and shall be applied at the rate of 450 square feet per gallon. Minimum dry thickness per coat shall be 1.4 mils. B. Primers, Sealers and Thinners shall be as recommendEd by the Manufacturer of the coat in€ . C. Certification: All materials shall be delivered to the project site in unbroken original containers plainly marked with the name of the Manufacturer, Brand name and analysis of the product. D. Color: Colors, except otherwise specified, shall be as selected by the Engineer. E. Submi s s ions : The Cont ra: t or s�.a l l submit to the Eno ineer , for his approval, a list of all coatings, primers, sealers and thinners, together with color samples, to be used on the project before ordering the materials. 7.2 DETAILS A. Preparation of Surfaces: All surfaces to be coated shall be cleaned of all rust, dust, scales, oil, curing compounds and other foreign matter. Wood surfaces shall have all cracks and holes filled and smoothed. B. Ap-lication of Paint: All work shall be performed under favorable conditions by skilled painters and in strict accordance ;with the procedures outlined by the pain-,-- manufacturer. aintmanufacturer. All coating shall be brushed out to a smooth, even surface without runs or sags. Each coat of paint shall be thoroughly dried before the next CD coat is applied. Finished surface shall be uniform in gloss, finish and color, free from flash spots and brush marks. C. Galvanized Surfaces: Galvanized surfaces shall be treated with Inertol metalconditionerbefore application of primer. D. Inorganic Zinc Surfaces: Coatings applied to inorganic zinc surfaces shall be as recommended by the manufacturer. SECTION 7 PAINTING AND WATERPROOFING -26- F1 E. Paintin{ Schedule: Surface 1. Exposed Pipes Product Oil, alkyd -resin No. Coats Color 2 Dark Green 323 2. Sewer Manhole Coal -tar epoxy 2 Black Covers and "SB" Rungs 7.3 MEASUREMENT AND PAYMENT: Painting and waterproofing shall not be measured nor paid for directly, but shall be considered incidental to and included in the price bid for the various items in the Proposal SECTION 7 PAINTING AND WATERPROOFING -27- SECTION 8: RESTORING PAVEMENTS AND 01HER IMPROVEMENTS 8.1 DESCRIPTION. All pavements and improvements such as driveways, sidewalks, curbs, or gutters destroyed, disturbed, undermined or removed by the Contractor, or as a result of his operations shall be satisfactorily reconstructed or replaced in kind by the Contractor, except as herein specified, in accordance with the Revised Ordinances of Hawaii, 1942, as amended thereafter, and with Chapter 111, Revised Laws of Hawaii, 1955, as amended, relating to Federal -Aid Highways. 8.2 MATERIALS. All materials used for restoration work shall match exi s t ing work. 8.3 DETAILS A. The Contractor shall make all necessary arrangements with the County or the State Departrient of Transportation for the restoration of the above-mentioned work. B. Pavements 1. Before proceeding with repaving, the edges of existing C:) pavement shall be trimmed back sufficiently to provide a clean, solid, vertical joint. Edges of concrete pavement shall be wire brushed and washed with water. 2. Additional pavement outside the limits of the excavation or damaged pavement shall be removed or replaced as may be necessary to insure pioper match with the existing pavement and to insure construction of the new pavement along regular lines which shall be parallel to or at right angles to the street centerline. C. Where curbs, gutters, driveways, or sidewalks are replaced, junctions with the existing improvement shall be made along straight lines. In the case of sidewalks and concrete driveways, the junction shall be made at the regular slab or rectangle markings. 8.4 MEASUREMENT AND PAYMENT,, Pavement restoration and other improve- ments shall not be measured nor paid for directly, but shall be incidental to the various sizes of pipes, jackets and structures. SECTION 8 RESTORING PAVEMENTS AND OTHER IMPROVEMENTS Keahole Pt, N Kumukahi VA. PREPARED BY HILO ENGINEERING INC* 11 465 KINOOLE ST. HILO Im"AWAll PROJECT SITE M(,)Uu m CIO\, \o"() MAYOR, COUNTY OF HAWAII CFS F ENGINEER, ISE PARTMENT OF PUBLIC WORKS MANAGER,D RTMENT OF WATER SUPPLY b ING DEPARTMENT iot-C-T6, - R -1 -, P` L- A- ------ N"N 4 ---- -------------- 'EXECUTIVE OFFICER, ENVIRONMENTAL HEALTH DIVISION DEPARTMENT OF HEALTH DAT DATE DATE DATE 72 DATE SHEET I OF 2 SHEETS- AOL N Kumukahi VA. PREPARED BY HILO ENGINEERING INC* 11 465 KINOOLE ST. HILO Im"AWAll PROJECT SITE M(,)Uu m CIO\, \o"() MAYOR, COUNTY OF HAWAII CFS F ENGINEER, ISE PARTMENT OF PUBLIC WORKS MANAGER,D RTMENT OF WATER SUPPLY b ING DEPARTMENT iot-C-T6, - R -1 -, P` L- A- ------ N"N 4 ---- -------------- 'EXECUTIVE OFFICER, ENVIRONMENTAL HEALTH DIVISION DEPARTMENT OF HEALTH DAT DATE DATE DATE 72 DATE SHEET I OF 2 SHEETS-