HomeMy WebLinkAboutCOM 0032.001 2018-2020 Susan L.K. Lee Loy :°•'� t- �,��;.: Office: (808)961-8396
'�
Council Member :i �5 '• Fax: (808)965-8912
District 3 Email: sue.leeloy@hawaiicounty.gov
• TE Of.104
HAWAII COUNTY COUNCIL
25 Aupuni Street,Hilo,Hawai`i 96720
C7.
MEMORANDUM
1
Pry c
DATE: January 4, 2019 --�
l
TO: Aaron S.Y. Chung, Council Chair s r
and Members of the Hawai`i County Council
FROM: L Susan L.K. Lee Loy, Council Member
SUBJECT: Communication No. 32—Presentation from the Department of Public Works.
Attached is a copy of the PowerPoint presentation that the Department of Public Works will be
presenting in the Public Works and Mass Transit Committee on January 8, 2019.
Please distribute copies of this presentation for the presentation and discussion regarding
Communication No. 32.
SL:ps
Att.
Comm. Ng. 32.-
Ref.To: *f PIN MT
Ref. Date JAN ® 8.2 0 19
Hawai'i County Is an Equal Opportunity Provider And Employer
Planning and Permitting System : -
IMPROVING THE BUILDING
PERMIT PROCESS
Jan, 2019 � \
Overview of Presentation
• Current challenges
• Proposed changes
• Next steps
Current Challenges
1) Manpower- our County has the worst ratio of number of applications to
number of plan reviewers among the four counties
2) Incomplete submittals- e.g., missing required documents, Proof of
Ownership, SHPD Form, IWS Approval Form, DCAB, Solar Water Variance,
etc.
3) Incomplete response to comments— resubmittals do not accurately
address all of comments resulting in several subsequent
resubmissions FY2016-2017 (1860 permits)
First review 50% passed
2nd review - additional 20%
3rd review - additional 13%
Remainder passed
4t"-7t" review
ane°mp,e
moon
:iMNom-
y:x"
Current challenges- sequential review by multiple agencies
NON-RESIDENTIAL REVIEWERS RESIDENTIAL REVIEWERS
BUILDING BUILDING
i
PLANNING PLANNING
��411
ENGINEERING
DEM SW ENGINEERING DOH SAN
i DEM W� DOH WW
�EM WW FIRE DOH WW
DEM SW
PLUMBING /
ELECTRICAL STRUCTURAL MECHANICAL
4
Proposed changes
• More efficient intake— Return building permit intake from Planning Department to the
Building Division at DPW with an improved checklist
• More efficient and accountable processing through EnerGov
• Administratively change from a three permit system (building, electrical, plumbing) to a
"One Permit" System
• Streamline procedures through proposed code amendment
• Implement affordable housing initiatives
K
EnerGov Permitting Software
• A scalable solution that will initially be used for the building
permit system and all planning permits, with capability to later
add other permits
• Improve productivity and customer experience
• Enhanced customer service: web-based, self-service capabilities
to apply, monitor status, schedule inspections, and pay
• Accountable agency reviews: automated workflows to improve
workforce processes, accountability, efficiency, and transparency
• More efficient plan reviews: electronic plan review capabilities
for concurrent agency reviews and digital commenting
Building Division Administrative Code
• Purpose of the proposed new code chapter: to consolidate the administrative and
enforcement provisions from the existing Building (Chapter 5), Electricity (Chapter
9), and Plumbing (Chapter 17) codes
• Proposed amendments include:
• Fees for electrical and plumbing to be based on valuation instead of itemized circuits and fixtures to
reduce plan resubmittals and fee recalculations.
• Non-refundable Plan Review fee to be credited to the final permit fee to reduce frivolous permit
submittals,
• Introduce a resubmittal fee after the third submittal to encourage a complete permit application
submittal, and complete responses by the applicant to all plan review comments.
• Language to accommodate and encourage online electronic plan submittals
• Expiration of applications and permits to clear inactive projects
Building Division Administrative Code
• Article 3: Permits • Article 6: Permit Application
• Separate building permit required • A nonrefundable Plan review fee applied to permit fee
• Emergency work (% of estimated building permit fee)
• Building Permit fees including Electrical/Plumbing
• Temporary permit required (valuation based)
• Permit resubmittal fee
• Article 4: Permit Application
• Requirements of Property Owner Affidavit • Article 9: Violations and Penalty
• Application made prior to subsequent • Correction Notice
ordinances or regulations (permitted work that requires correction)
• Cancellation of applications • Stop Work Order
(allows for inspectors to Stop unpermitted
work and freeing up for required inspections
• Article 5: Permit Application instead of N.O.V. investigations)
• Transfer of permits
MOM
• Expiration of permit
Next Steps
• Public and Community Outreach
• Outreach to Professional Communities
• Outreach to Contractor Communities
• Outreach to business communities and various community chambers
• Adoption of Building Division Administrative Code Changes - April 2019
• One Permit System - April 2019
• Energov - Go-live target date 2nd Quarter 2019
• Code Updates
• Adoption and Amendments of various model codes (i.e. Energy Code, Electrical
Code)
• Adopt amendments to the International Existing Building Code
• Affordable housing initiatives
• Adopt amended provisions to pre-approved package homes and pre manufactured
homes
• Adopt provisions to relax requirements to permit Tiny House
County Council Involvement And Support
• Identify other stakeholders for outreach
• Help advocate with us the necessary amendments to:
• Adoption of the Building Division Administrative Code
• Adoption of model codes and respective amendments
• Adoption of additional provisions of code language that
support affordable housing
• Help advocate and communicate with constituents our
collective and holistic goal of improving the building permit
process
i w
w
KAREN EOFF pN C �'e �. \. Zlow
_r
v
l
n M 1