Loading...
HomeMy WebLinkAboutCOM 0017.007 2018-2020 NtV OF N+L Harry Kim +;, :. David Yamamoto,P.E. 1 favor Director Wil Okabe >•�r�" Allan G.Simeon,P.E. ,1 longing Director Deputy Director Cruufv `C DEPARTMENT OF PUBLIC WORKS COUNTY CLERK Aupuni Center COUNTY OF HAWAII I 101 Pauahi Street,Suite 7 Hilo,Ha%vai'i 96720-4224 RECEIVED (808)961-8321 •Fax(808)961-8630 Time LLy��M By public works ihawaiicounty.gov Date zolg MAY zo Date: May 20, 2019 To: Aaron Chung, Council Chair and Council Members Via: Kay Oshiro, Controller From: David Yamamoto, Director of Public Works RE: Notification of Grant Award Compliance with Ordinance No. 18-68, Section 7(1) Name of Grant Program: Transportation Alternative Program Grantor: United States Department of Transportation, Federal Highway Administration County Grantee Department or Agency: Department of Public Works Grant No. (IF KNOWN): TAP-0100(080), CFDA 20.205 Amount of Grant: $120,000 Amount of County Match: $30,000 County Revenue & Expenditure Account Numbers: Revenue 010.3309.38, Expenditure 010.173.5173.34 Grant Period (Commencement & Completion): 3/15/19— 12/17/19 Purpose of Grant: To expand the existing Hawaii Island Bikeshare System in Kailua-Kona, Is final report required by grantor? ❑X Yes❑ No Notification attached: o Yes❑ No, because Comm. No. Ref.To: '® County of Hawaii is an Equal Opportunity Provider and Employer. Ref. Date JUN 1 7 2019 HWY-SM 2.9424 2/14/2019 From: HAWAII DEPARTMENT OF TRANSPORTATION REQUEST FOR PROJECT AUTHORIZATION, HIGHWAYS DIVISION AGREEMENT,AND/OR MODIFICATION To: FEDERAL HIGHWAY ADMINISTRATION Authorization Modified Project Agreement HAWAII DIVISION OFFICE X Project Agreement Modification No, "In accordance withHDOTIFHWAStewardshipOversightAgreement" Tile state g that xax ronaaionwPayment onhernderal+„ndsomBaled,aaxceynandw,arnmorya9rnme agreem nt P'a 1 n s t fnrfn in 2,1 If H 530;and its skgna lure cnn'titnt 'he making of Ihrte"ilo nes. FEDERAL PROJECT NO. RECIPIENT PROJECT NO, HOOT ITEM NO. DUNS COUNTY 0100080 TAP-0100(080) 19008 168818466 Hawaii County Period of Performance End Date: INDIRECT COST RATE(%) STIP RFFFRFNCF. POD) CFDA Number 12/17/2019 not applicable 2019 HC6 ❑ Yes (JJ No 20.205 Project Title: Hi Cnty-Purchase of Bikeshare Stations and Bikes for Kailua-Kana Project Description(2000 characters max): Transportation alternatives program-purchasing of bikeshare stations and bicycles, AUTHORIZED TO PROCEED WITH THE WORK CHECKED BELOW: PRELIMINARY ENGINEERING(PE1)-Preliminary Design and NEPA CONSTRUCTION-Advertise for Receipt of Bids PRELIMINARY ENGINEERING(PE2)-final Design CONSTRUCTION Proceed on an agreed price and/or force account basis PRELIMINARY RIGHT-OF--WAV OTHER(R&D,specify) ACQUISITION OF RIGHT-OF-WAY FUNDING DATE(MM/DD/YY) TOTAL ESTIMATE FEDERAL PARTICIPATION FEDERAL FUNDSS) PGM RATIO(%) PROJECT COST(s) AMOUNT($) CODE PREVIOUS AUTHORIZATIONS THIS AUTHORIZATION $1S0,000.00 $150,000.00 $120,000.00 M302 80% PROGRAM CODE $150,000.00 $150,000,00 $120,000.00 M302 80% TOTALS GRAND TOTAL $150,000.00 $150,000.00 $120,000.00 Remarks/Reason for Project Agreement Modification STATE COMMENTS: FHWA COMMENTS: Project includes the purchasing and delivery of equipment. Installation is not covered under this project. Subaward Period of Performance(POP)End Date=9/15/2019 (Final date for reimb.req.to HDOT). Project Agreement POP End Date=12/17/2019. This agreement is subject to the following award terms: http://edocket.access.gpo.gov/2010/pdf/2010-22705.pdf and See FHWA Division remarks in FMIS r-. http://edocket.access.gpo.gov/2010/pdf/2010-22706.pdf. By signature of its authorized signatory herein,the County of Hawaii hereby affirms its agreement to the terms herein as a subagreement between the State of C Hawaii and the County of Hawaii in accordance with o and set forth in Agreement Modification No.001 of u the STATE-COUNTY AGREEMENT OF FEDERAL In HIGHWAY PROJECTS AND PROGRAM. t 1 y �. � ,,f e. .._y7 F H H W D Electronically signed in FMIS A See FIMRS for si tures 0 Authorized by Date Authorized by Date T (lit This 1240 3 Revised 1/11/2018) HAWAII DEPARTMENT OF TRANSPORTATION HIGHWAYS DIVISION DETAIL ESTIMATE FOR A FEDERAL-AID PROJECT AGREEMENT FOR Purchase of Bikeshare Stations and Bikes Federal-Aid Project No. TAP-0100(080) 02/08/19 FEDERAL TOTAL PAR SHARE COUNTY OTHER COST COST 10%1 SHARE SHARE PRG CODE: M302 @ 80% -TAP-Areas Pop 5K-200K 28 Facilities for Pedestrians and Bicycles $150,000.00 $150,000.00 $120,000.00 $30,000.00 $0.00 Breakdown: Equipment Puchase $128,000.00 $128,000.00 $102,400.00 $25,600.00 $0.00 c Shipping/Delivery $22,000.00 $22,000.00 $17,600.00 $4,400.00 $0.00 Total: $150,000.00 $150,000.00 $120,000.00 $30,000.00 $0.00 Remarks: Project HC6 on the 2019 STIP, Big Island Bikeshare Expansion. ii Schedule: Estimated FHWA obligation date 03/15/19 Estimated advertisement date 04/15/19 Estimated award date 05/15/19 Estimated receipt of equipment/material 06/15/19 Estimated submittal of final reimbursement req.to HDOT 09/15/19 Review/process of reimbursement request and bill FHWA 12/17/19 Project No.TAP-0100(080), Purchase of Bikeshare Stations and Bikes for Kailua-Kona Description of work scope The scope of the proposed project is to expand the existing Hawaii Island Bikeshare system in Kailua- Kona from 3 stations and 32 bikes to 6 stations and 59 bikes.This project applies$150,000 in project funds to the purchase and shipping of 3 stations and 27 bikes to contribute to the expansion of the Kona system towards its optimal size.This proposal requests $120,000 in federal funding(80%of available federal match available under the TAP program, and 80%of the total proposed project budget) and requires$30,000 in local matching funds(20%of the total budget).The County of Hawaii will provide the local matching funds required to release the TAP federal funding.The scope of the project includes the purchase and shipping of equipment, but does not include the cost of installation or operations. The proposed project is ready to be expanded and equipment can be ordered and shipped as soon as funding allows. Additionally,the scope of this project is flexible to meet the program objectives of the Transportation Alternative Program and the funds available. If awarded,the purchase of bikeshare stations and bikes as proposed in this project will make a meaningful contribution to enhancing the surface transportation system,while also making a positive impact on the social,economic,environmental, and health systems within Kailua-Kona. This project relates to the surface transportation in Kailua-Kona by improving non-driver access to public transportation and enhanced mobility, improving community health and air quality, and increasing environmental mitigation through the reduction of fossil fuel usage. Froil tand rear lights improve Adjustable sty+ts allow w visibility during day and night for quick cuing ;t Basket for purse or bags Map.Includes nearby .:riders txotect rides-, stations,relevant ( ' in rues tiaeather ? Solar panel destination points,and additional wayfinding elcuteuls I POS Kiosk _ r--- ( t tv°itlt ar� T Sturdy tires and wheels fo:urban riding throe h Multiple gears allow users to Ste P 9 frame F adjust effort for a variety of provides a universal fit 7C1°r3" li terrain and traffK conditions Docking Point ; r R 1?!V a 111 Cost Estimate i The unit costs and anticipated shipping are based on estimates provided in the Honolulu Bikeshare Organizational Study referenced above.Actual purchase numbers may vary as unit costs and shipping costs may vary by vendor. Project Budget(Criteria 3,4): Provide the budget for all phases of the project and indicate where TAP funds are requested. Federal Funds Project Phase- Total Match, TAP Other Planning Design Right of Way(ROW) Equipment $150,000 $120,000 $30,000 Purchase/Delivery TOTAL $1501000 $30,000 1, i' i, c; F t% Location Map Phase 2 of Bikeshare Hawaii Island's program will include an initial service area spanning Alii Drive, Kuakini Highway and Makala Blvd. zs (I' Schedule and Implementation Plan 10/10/2018-locations determined 3/15/2019-Anticipated FHWA obligation i; G= 4/15/2019-Anticipated Advertisement date 5/15/2019—Anticipated Award date 6/15/2019-Anticipated receipt of materials/equipment(subject to NTP) 6/30/2019-Anticipated installation (subject to NTP) 7/30/2019- Estimated end of project { 0o <f- N a z ti v; OW F .cd F x z KI ( m co oa k C 2 cd x = W G 0o p C CJ z O O " .• m o ..-9 - f i o o o O s V O O I I E Hi 64 t- p 0 p