TESTI NY ONBILL NO. 126 (2019)—Hawaii County Energy Code Bill
To Committee Chair Lee, Loy,Vice Chair aneah'i- leinfelder and members of the Committee-
The
o mittee-The Mason Contractors Association of:l Jawaii (MCAH)represents the mason contractors in the ;Mate
of Ilawaii,
Thank you for the opportunity to testify in SUPPORT of the Hawaii County Energy Code Bili No.
126. The Mason Contractors Association of Hawaii supports the intent of Bill No. 126 and would life
to request minor clarifying amendments.
°I`o be consistent with Section 31 and to provide further claritcation ofction21, amend.Tonle
R402.1.2 of the International l Ener r - Conservation Code as attached to this testimony.
Bill 126 will ensure that the sustainability and safety benefits of mass wall construction are recognized
in the revisions of the Hawaii County energy Codes, as these revisions will.help to create codes that are
tailored.to Hawaii. County's unique climate, resulting in greater energy efficiency and cost savings.
Thank you for the opportunity to testify.
Respectfully,
Mason Contractors Association of Hawaii
Comm. N
Ref.To: Ftpwmx
Ref. Plate DEC 1 7 2019
1 21 OF nc RA "a I"kEW
--d
"J"' On, FAJ 'LE
Tux'R,�E',
AlH0', 1`,,,STrVATI0N
GLAZED WOOD MASS EASE SPIT" SLAB' CRAWL SPACE'
CLIMATE FENESTRATION el(YLIGHT� CEILING FLOOR
ZONE FENESTRATION FRAME WALL WALL WALL R-VALUE WALL
U-FACTORb U-FACTOR R-VALUE R-VALUE DEPTH R-VALUE
SHGe", R-VALUE R-VALUV R-VALUE &
�;,7,e% 13 0 0 0
lL25 -10
0,40 0,65 0,25 38 13 4/6 13 0
0.35 0.5S 0,25 34 2O or 1345h 8/13 19 5n-V 0 543
4xNcit 031 0,55 0,40 49 20 or 13+511 S113 19 10/13 10,2 ft 1f3113
5 and
Marine 4 0.32 0.55 NR 49 20 or 13--5* 13/17 311 1§==`19 M 2 ft 15119
NR 49 20+5 or 13+10, 15/20 30; 1511,19 IOAft 15/19
7 and 19 032 145 1Nle 49 20+5 or 13+1 Os I IL/V 381 15'I 9 10 X111 I I5 19
For SI: I Foot=304.8 rom,
a.R-Value";are minimu!"Is. U-factors and SHGC are ma%irnums.VVhen insulation is installed in a eavity which is less than the label or design
thickness of the
insulation,the installed P-Valuc of the insulation shall not be less than the R-value specified in the table.
b�TIT.,fenestration C!-factor column e=ludes skyhghts.The-NGC column applies to all glazed fenestration.Exception:Skylights may be
excluded iron glazed
anasvadon SHGC requirements in climate..ones I through 3-where,the SHCjC for snob skylights docs not-exceed 0+30,
C.'15/19"means R-I 5 continuous insulation on the interior or exterior of the home or R-19 cavity insulation at the interior of the basement wall.
'15/1W'shall
be P"'rrnitiod to be met with R-13 cavity insulation on the interior of the basement wall plus R-5 continuous insulation on the interior or exterior
of the itUnw-
"10/13"nwani R-10 continuous insulation on the interior or exterior of the borne of R-13 cavity insulation it the interior of the basement wall.
d,R-5 shill be added to the required slab edge R-YahleS for heated slabs,insulation depth shall be the depth of the,footing or 2 feet,whichever is
less in clinlale
Zoites I th-wuggh 3 for heated slabs,
e Fhete are no 811GC requirements in the Marine Zone.
?.I?asernent-+gall it?sulatioti is clot required in swarm-humid locations as de0ned lay 1 figure R3(}I.I ancl'1'able R3QI.1.
M_Or insulation sufficient to fill the framing cavity,R-19 unIuMen.
The first value i>cavity insulation,the second value is continuous insulation,so`'13'x'5"means R-1'3 cavity insulation plus.R-5 continuous
insulation.
i The-ecnnd R-,aluc applies-when more than half the insulation is on the interior ofthe mass wall, "3,14"
... ...... uu