Loading...
HomeMy WebLinkAboutCOM 0646.010 2018-2020 P/Coins( HAWAII I:ABOR l;RS-E PI,OYERS COOPERATION AND IEd U1'CFI )N TRUST 650 Buse Road, Suite 285 11°€1011111 HI 96817 Phone: 808-845-32-38 • fix. 808-845-8300 January 6,2020 HAWAII COUNTY COUNCIL County of Hawaii Hawaii County Building .,:, r ... 25 Aupuni Street Hilo,Hawaii <- ' DATE: Wednesday,January 8,2020 TIME: 9:00 a.m. TESTIMONY ON BILL NO. 126(2019)—Hawaii County Energy Code Bill To Council Chair Chung,Vice Chair Eoff and members of the Hawaii County Council: Hawaii LECET is a labor-management partnership between the Hawaii Laborers' International Union of North America, Local 368, its' 5000+members and its' 250+unionized contractors. The Laborers' International Union of North America is the largest construction union in the United States. Mahalo for the opportunity to testify in SUPPORT of the Hawaii County Energy Code Bill No. 126. Hawaii LECET supports the intent of Bill No. 126 and would like to request minor clarifying amendments. To be consistent with section(31)and to provide further clarification in section(29), amend TABLE R402.1.2 of the International Energy Conservation Code as attached to this testimony. Bill 126 will ensure that the sustainability and safety benefits of mass wall construction are recognized in the revisions of the Hawaii County Energy Codes, as these revisions will help to create codes that are tailored to Hawaii County's unique climate, resulting in greater energy efficiency and cost savings. Mahalo for the opportunity to testify. With respect, Hawaii Laborers-Employers Cooperation& Education Trust Comm. Ilk Ref.To: VL� Ref. pate JAN - 8 2020,. etartONO • • Amending TABLE 8402,1.2. Addition of note"j"in TABLE k402.1.2 of International Energy Conservation Code to read as follows: TABLE R402.1.2 INSULATION AND FENESTRATION REQUIREMENTS BYCOMPONENTa GLAZED WOOD MASS BASEMENT° SLAB" CRAWL CLIMATE FENESTRATION SKYLIGHT° CEILING FLOOR SPACE° ZONE U-FACTOR° U-FACTOR FENESTRATION R-VALUE FRAME WALL WALL R-VALUE WALL R-VALUE WALL SHGC°,` R-VALUE R-VALUE' • R-VALUE &DEPTH R-VALUE 1 NR 0.75 0.25 30 13 3/4 or NR 1 13 0 I 0 p 2 0.40 0.65 _ 0.25 38 • 13 4/6 13 _ 0 0 0 3 0.35 ' 0,55. 0.25 38 20 or 13+51' 8/13 19 5113r 0 5/13 -!except 0.35. 0.55 0.40 49 20 or 13+5h 8/13 '19 10/13 10,2 ft 10/13 Marine 5 and 0.32 0.55 NR 49 20 or 13+5k 13/17 30s 15/19 10,2 ft .15119 Maxine 4 6 0.32 0.55 NR 49 20+5 or 13+10h 15/20 30s 15/19 10,4 ft 15/19 7 and 8 0.32 0.55 NR 49 20+5 or 13+10h 19/21 3$5 15/19 10,4 ft 15/19 • ForSli I foot=304.8 mm. a.R-values are minimums.U-factors and SHGC are maximums.When insulation is installed in a cavity which is less than the label or design thickness of the insulation,the installed R-value of the insulation shall not be less than the R-value specified in the table. h.The fenestration U-factor column excludes skylights.The SHGC column applies to all glazed fenestration.Exception:Skylights may be excluded from glazed fenestration SHGC requirements in climate zones 1 through 3 where the SHGC for such skylights does not exceed 0,30. c."15/19"means R-I5 continuous insulation on the interior or exterior of the home or R-19 cavity insulation at the interinr of the basement wall. "I5/19"shall be permitted to be met with R-13 cavity insulation on the interior of the basement wall plus R-5 continuous insulation on the interior or exterior of the home. "10113"means R-10 continuous insulation on the interior or exterior of the home or R-13 cavity insulation al the interior of the basement wall. d.R-5 shall be added to the required slab edge R-values for heated slabs.Insulation depth shall be the depth of the footing or 2 feet,whichever is less in Climate Zones I through 3 for heated slabs. e.There arc no SHGC requirements in the Marine Zone. E Basement wall insulation is not required in wami-humid locations as defined by Figure 8301.1 and Table 8301.1 g.Or insulation sufficient to fill the framing cavity;R-I9 minimum. h.The first value is cavity insulation,the second value is continuous insulation,so"13+5"means R-13 cavity insulation plus R-5 continuous insulation. i.The second R-vuluc applies when more than half the insulation is on the interior of the mass wall-,so"3/4"means R-4 cavity insulation applies when more than half the insulation is on the interior of the mass wall, • Exception:R-value for mass walls are not required if MUSS walls meet one of the following requirements:(1)have a re fleet nce>0.64,121 have oy rh rrtl,�_�tth o..or9lecttor c.ior?,6 3_,fiale,_:6._inct_ic5 i4t ttlicknegs, .Ius/ificotion - The/77-O,2OSC:i atiletklmeni of 1l402.1.2 flit insulation I'F;cjltfl'eltlt?PNS are based oil the :lit:e/}.Sed ttml Proposal of.Hawaii Amendments to die 2015 International Energy( rmJ5, i i.'Cation (:'ode 2