HomeMy WebLinkAboutMIN PWMTC 2020/02/18 2018-2020 Committee on Public Works and Mass Transit
19th Session
West Hawaii Civic Center
74-5044 Ane Keohokalole Highway, Building A
Kailua-Kona, Hawai i
February 18, 2020
CALL TO The regular meeting of the Committee on Public Works and Mass Transit was
ORDER: called to order at 2:34 p.m. in the Council Chambers, Kailua-Kona, by
Ms. Susan L. K. Lee Loy, Chair.
ROLL CALL:
Present: Ms. Susan L. K. Lee Loy, Chair
Mr. Matt Kaneali`i-Kleinfelder, Vice Chair
Mr. Aaron S. Y. Chung, Member
Ms. Maile Medeiros David, Member
Ms. Ashley L. Kierkiewicz, Member
Ms. Valerie T. Poindexter, Member
Mr. Herbert M "Tim" Richards, III, Member
Ms. Rebecca Villegas, Member
Absent& Excused: Ms. Karen Eoff, Member
STATEMENTS Chair David directed the Committee to proceed to the next order of business,
FROM THE Statements from the Public on Agenda Items.
PUBLIC ON
AGENDA ITEMS: The Chair called Chris Krueger, who registered to comment in regards to
Comm. 769, and came forward when called.
Change Order As directed by the Chair and with no objection from the Council Members,
of Business: the following item was taken out of order:
Res. 489-20: GRANTS A VARIANCE FROM CHAPTER 3, SECTION 3-6(b)(3) AND
3-11(a)(2)(A)(ii) HAWAII COUNTY CODE 1983(2016 EDITION, AS
AMENDED), TO ALLOW AN ADDITIONAL GROUND SIGN, MOUNTED
IN EXCESS OF MAXIMUM ABOVE GROUND LIMITATIONS ON 74-5035
QUEEN KA`AHUMANU HIGHWAY, TAX MAP KEY: 7-4-008:055
(ZONED ML-3a)
Mid Pacific Petroleum requests a sign variance for construction of a second
ground sign at the subject parcel to advertise fuel prices.
Reference: Comm. 742
Intr. by: Ms. Lee Loy (B/R)
PWMTC-19 February 18,2020
CHR. LEE LOY: Thank you, Clerk. I need a motion to send a favorable
recommendation of Resolution 489-20 to the Council.
Motion to Approve: Mr. Richards moved to recommend adoption of
Res. 489-20. Seconded by Mr. Kaneali`i-Kleinfelder.
CHR. LEE LOY: With that if it's okay, Robyn, if you don't mind coming
forward. I also believe the applicant, Mr. Zendo Kern, is in our Kona office.
MR. HENRICKS: Yes, he is Madam Chair. He's coming to the table as we
speak.
(Note: At this time, Acting Building Division Chief Robyn Matsumoto
and representative for applicant Zendo Kern, Planning Consultant, came
forward to address the members of the Committee.)
CHR. LEE LOY: Perfect. By the way, Clerk, thank you for providing that
camera up front so we could actually see the testifiers and not the back of their
heads. So thank you so much for making that adjustment.
Mr. Kern, if you don't mind, go ahead. This was a variance application that you
put forward. If you could provide this body with a background. Thank you.
MR. KERN: Sure. Good afternoon, Madam Chair, members of the Committee.
Good to see you again today. Zendo Kern here representing the applicant. So
this was a relatively straight forward variance application. It's kind of a long time
in getting here. Went through various processes. But I'll leave that for another
conversation.
This is to allow basically a sign to post the gas station prices along the highway
there. Currently, this gas station was a Tesoro gas station and there was actually a
sign there. When these folks went in there to basically get all their permits and
everything proper, they were like, "Oh, actually you know what,there was
another ground sign and that sign shouldn't have been allowed there. So you
need to do a sign variance." So then they contacted me to help walk through the
sign variance. And about nine months later, here we are.
So on that property there's a small marques sign on the corner, most of you are
probably very familiar with it. The marquee sign kind of blends in there. It's
maybe about six feet tall and it basically lists the businesses that are there. And
then this sign is to actually post the gas station prices there. So Chapter 3 only
allows for one ground sign. Thus, we have to do the variance to allow for this.
There is a signage on the actual gas station itself. But however, right in that area
there are some coconut trees. There's some nice, you know, greenery around
there. So having the sign there where actually people could see it I think would
Page 2
PWMTC-19 February 18,2020
help improve safety, public health, et cetera; and not having to rubberneck around
the side to actually see what gas station prices might be pushed back further on
the property. And that's where if you can see on the exhibit, Figure 2, it says to
actually replace, remove and replace existing cabinet signs. And existing
meaning that the Tesoro signs were the original ones that were there. And so
these will be the new gas station. I'll be happy to answer any questions.
CHR. LEE LOY: Thank you, Mr. Kern. Robyn, any follow up?
MS. MATSUMOTO: Good afternoon. My name is Robyn Matsumoto, Acting
Building Chief. So this is just one of those standard variance requests because
they already have an existing on our books. So they have to request a variance.
Unfortunately, due to the timing it's not going to happen before we amend the
current Sign Code.
CHR. LEE LOY: Thanks, Robyn. I'm going to open it up to the rest of the
Council Members if they have any questions. Ms. Kierkiewicz, go ahead.
MS. KIERKIEWICZ: Thank you. I have a question for Public Works because,
you know, I'm deeply concerned that this is very reminiscent to a conversation we
had last year about Holiday Inn and their quest in getting a sign variance which
took about five years. And so, I'm going through these background materials and
there's a plan review comments letter here from August 2018. And so,just
looking for some clarity from Public Works around why it took so long to get this
done.
MS. MATSUMOTO: So basically, you know, we submitted the documentation
and it had to be returned a few times to go back and forth due to corrections and
errors. And at one point it was somewhat left on the side before we could get it
back onto the agenda.
MS. KIERKIEWICZ: Thank you, Robyn. Mr. Kern, is that a pretty accurate
assessment?
MR. KERN: Yes. There definitely some back and forth at the beginning and it
got misplaced for a little while, for a few months. And then we got it back on
track and then we had to do some back and forth and some clean up. You know,
it was a process. Once we got it going back on track it was basically doing what
we could to get it together. And it's also somewhat confusing just how the whole
makeup of the ordinance is with posting of the notices and what not. So I think
what you folks are working on to streamline it will be extremely helpful to all
parties.
MS. KIERKIEWICZ: Okay. Thank you. Yes, you know, kudos to
Councilwoman Lee Loy for spearheading that. You know, I just want
government to work properly. And so, there's a lot of room for improvement.
Page 3
PWMTC-19 February 18,2020
And I hope that we can have another conversation about how we can better refine
some of our processes. Thank you, Chair. I yield.
CHR. LEE LOY: Thank you, Ms. Kierkiewicz. Any other Council Members?
Alright, well seeing none—and thank you, yes, Mr. Kern, there was a bit back and
forth. And I'm actually glad you brought this forward because we were able to
work with the department and begin to realign some of that process. And as
Robyn mentioned, we're going to be adjusting that section of the code. And so
it's my hope that we're actually managing better expectations on individuals who
have to move sign variance applications forward and a better bright line of
process. So with that, all those in favor to send Resolution 489-20 to the Council
with a positive recommendation please say "aye."
Vote on Res. 489-20: The motion to recommend adoption of Res. 489-20 was
(Approved) carried by the following voice vote:
Ayes: Committee Members Chung, David,
Kaneali`i-Kleinfelder, Kierkiewicz,
Poindexter, Richards, Villegas, and
Chair Lee Loy–8.
Noes: None.
Absent: Committee Member Eoff– 1.
Excused: None.
MR. KERN: Thank you all very much for your support and have a wonderful
rest of your day.
CHR. LEE LOY: Thank you, Zendo. Thank you, Robyn. Alright, Mr. Clerk if
we could please read in Communication 769?
Return to Order The Chair directed the Committee to return to the order of business.
of Business:
COMMUNI- The Chair directed the Committee to proceed to the next order of business,
CATIONS: Communications.
Comm. 769: REQUESTS A DISCUSSION WITH A REPRESENTATIVE OF THE
DEPARTMENT OF PUBLIC WORKS REGARDING ISLAND-WIDE
TRAFFIC SIGNAL ISSUES
From Council Member Matt Kaneali`i-Kleinfelder, dated January 7, 2020.
Motion to Close File: Mr. Kaneali`i-Kleinfelder moved to close file on
Comm. 769. Seconded by Mr. Richards.
CHR. LEE LOY: Mr. Kaneali`i-Kleinfelder, please lead our discussion.
Page 4
PWMTC-19 February 18,2020
MR. KANEALI`I-KLEINFELDER: Thank you, Chair. Just in my own district
I've got a few issues that we've worked with DPW (Department of Public Works)
with, Mr. Takaba. I just wanted to do some follow up and some questions on how
we deal, what is our process, and kind of go from there. Thank you for coming
today. State your name.
(Note: At this time, Traffic Division Chief Aaron Takaba came forward to
address the members of the Committee.)
MR. TAKABA: My name is Aaron Takaba. I work at the County of Hawai i
Traffic Division, the Division Chief.
MR. KANEALI`I-KLEINFELDER: I just want to do some background. I had to
learn this. So what are the job duties of the Traffic Control Department that you
run?
MR. TAKABA: Our duties are to operate and maintain all of the traffic signals
for the entire island at this point. That includes the State signals and street lights.
We also are responsible for the operations and maintenance of the signs and
markings for the County roads.
MR. KANEALI`I-KLEINFELDER: Okay. And then how many do we have
across the island that we control right now?
MR. TAKABA: Signals, there's a little over 100. And street lights, there's about
between 10,000-11,000 street lights.
MR. KANEALI`I-KLEINFELDER: Okay. And then whose job is it in the
department to fix traffic signals?
MR. TAKABA: Well there's varying levels of expertise. So I guess you could
say there's the engineer's like myself and Kason (Pacheco) behind me and there's
also the technicians and electricians also, and inspectors also too. And each have
different responsibilities.
MR. KANEALI`I-KLEINFELDER: So when it comes to—we have a lot of
discussions about the intersection of 130 and Highway 11, which is a State
highway Intersection but we run the traffic signals. So in that case, whose job
was it to fix that traffic signal?
MR. TAKABA: Well particularly when it's related to maintenance and maybe
small adjustments I think that's where the County would come in. But if it's
going to be something bigger or it's going to be a design change or maybe a
bigger project such as coordination of the entire corridor, then probably it would
involve the State's buy-in or participation in that part. But we're looking at, for
that particular problem, was something that we can probably handle with the
Page 5
PWMTC-19 February 18,2020
exception of the delineators or the channelized—or that one idea you had about
separating, keeping the lanes, us, delineated.
MR. KANEALI`I-KLEINFELDER: Okay. And then in your department the
people who handle traffic signal, traffic light issues are going to be one group or
is going to be spread out?
MR. TAKABA: Well we have one group of a Technician, an Engineer, and an
Electrical Engineer also that wea Civil Engineer and an Electrical Engineer, we
go out and we observe traffic, make notes of the things that we see whether it be
how traffic's backing up or the performance of the intersection. And from there
they make recommendations to how we could possibly adjust the signal.
In this case, we noticed that there was a time of day program in the morning that
was put into place, and it actually made the left turns turning from Hilo to the
bypass a little longer than it needed to be. So our idea was to take that out and we
reduced it by 20 seconds. So it's a little quicker to go around the entire cycle.
But at this point we're still monitoring to see if that's working or if we need to
make further adjustments.
MR. KANEALI`I-KLEINFELDER: So coming from my past field, there is jobs
that were for certain people and not for others. So do electricians in your
department do the work as well or are they separate?
MR. TAKABA: Yes. The electricians they deal mainly with the maintenance.
They're also on standby when particularly electrical problems occur with the
equipment, if there's knockdowns, things of that nature. When it comes time to
make decisions about making a change like with timing or things of that nature,
they have to refer to the technicians or the engineers.
MR. KANEALI`I-KLEINFELDER: Okay. Because it's their job to make sure
timing is right and everything is upkept the way it's supposed to and the signals
working properly.
MR. TAKABA: Yeah.
MR. KANEALI`I-KLEINFELDER: Okay. Do we outsource signal work as
well?
MR. TAKABA: Yes. We do have—we had a consultant in the past and we have
one currently trying to do timing adjustments coordination. In East Hawaii we
finished already. And also we're in the process of doing West Hawaii.
MR. KANEALI`I-KLEINFELDER: As far as?
Page 6
PWMTC-19 February 18,2020
MR. TAKABA: Timing coordination, where you sync the signals so they kind of
work together during certain times of the day. So in that case it gives priority to
the main street. So you're going to see cars moving on the highway pretty well
but it's going to back up a little bit on the side streets. So there's a little bit of a
longer wait in those cases on the side streets. But it's mainly to get traffic moving
in the morning and in the afternoon.
MR. KANEALI`I-KLEINFELDER: And why are we outsourcing that work
when we have a department that can do it.
MR. TAKABA: Well that one was a project that was started before I was in my
position. But I think maybe because it was a bigger project that maybe required a
little bit more expertise and dedicated attention. So I think that's probably what it
was. I think that was a good route personally because sometimes we have to rely
on people, like in the profession, I mean from the private industry to help with
some of that stuff.
MR. KANEALI`I-KLEINFELDER: Okay. And then what capabilities do we
have in viewing and making real time changes to traffic signals?
MR. TAKABA: Yes. We have what's called Centrax. It's a program that you
can actually view the signals from the office. And they need communications and
certain electronics at each intersection. So not all of them are at this point on the
system. But for the most part they are and the goal list to actually get all of them
connected that way. So we can remotely make those kind of changes with timing
or that type of adjustments.
MR. KANEALI`I-KLEINFELDER: So you can remotely change from the office
some of the programing on some of the traffic signals that we have?
MR. TAKABA: Yeah.
MR. KANEALI`I-KLEINFELDER: Without even visiting the site.
MR. TAKABA: Yeah. Personally I like to actually go on site and do some of
that stuff. Part of it is because I don't like the idea of doing it remotely without
actually seeing what's actually happening. But I think there's people that
couple of the technicians that we have they do more of the remote access stuff.
So it is a convenience thing and it can be used in a good way because you don't
have to drive two hours to, say, Kona to make the change in the field.
MR. KANEALI`I-KLEINFELDER: So you can actually see the intersection?
MR. TAKABA: Well, that's a different system. You can see—we have cameras
that you can surveil or view the intersection to see how traffic is moving. And
Page 7
PWMTC-19 February 18,2020
then we also have a system that can actually access the controller or the computer
that runs the signal and actually make the changes from the office.
MR. KANEALI`I-KLEINFELDER: So if we had a problem we could actually
address it potentially by seeing the intersection in real time and then making slight
changes to the programming?
MR. TAKABA: Yeah. We can do it that way.
MR. KANEALI`I-KLEINFELDER: If needed.
MR. TAKABA: If needed. And I think though, depending on the view that the
camera allows, we still might need to go out and observe traffic. Like if there's a
back-up on Highway 11, say Highway 130, maybe it's beyond the view of the
cameras. Maybe in those cases we might have to actually do both and go out in
the field but also have the ability to view from the office and make changes there.
MR. KANEALI`I-KLEINFELDER: So some of the cameras on my restaurant we
can actually move around, what are they called like PTZ (Pan Tilt Zoom)
cameras?
MR. TAKABA: Yeah.
MR. KANEALI`I-KLEINFELDER: You can actually move them. Do you have
those up there too? So like the ones I have, are those the ones you have on the
light posts?
MR. TAKABA: Yeah. The PTZ camera, those are the surveillance cameras that
you can kind of move around as you need to.
MR. KANEALI`I-KLEINFELDER: They have a pretty good range, yeah?
MR. TAKABA: Yeah. Pretty decent. They're getting better, for sure.
MR. KANEALI`I-KLEINFELDER: I understand the quality is good too.
MR. TAKABA: Yeah. And some of the other cameras that you see are detection
cameras. So they're meant to be moved around necessarily but they're meant for
detecting cars. So that's another type of camera that you might see on the signal
poles.
MR. KANEALI`I-KLEINFELDER: Okay. And all of this gives us a better
control over our system?
MR. TAKABA: Yes.
Page 8
PWMTC-19 February 18,2020
MR. KANEALI`I-KLEINFELDER: And then how far, I mean, is there a
technology that is better than what we have or are we behind the scene? Not
behind the same but are we behind, you know, what we could have?
MR. TAKABA: I wouldn't say we're behind necessarily. There's stuff that they
have out there that may be more advanced, but I wouldn't say necessarily we're
behind. And I think too, right now,just to give you an idea of what we're dealing
with. We have some problems that we're trying to address with detection. I
might've mentioned that on the phone with you before. So there's some things
that we're trying to work on. In addition to improving efficiency, we also have to
address just getting it running, making sure it's running properly. So that's part of
the equation as well.
MR. KANEALI`I-KLEINFELDER: Okay. But overall, your department's well-
staffed. And from what I'm getting we should expect a fairly quick response.
from Traffic Department when we have a signal issue.
MR. TAKABA: Well, yeah, we're trying our best. I mean there's a lot of ground
to cover and some of the stuff we do takes time to really make good decisions.
But we're definitely not neglecting to try and address those things. And some of
it, like I just mentioned earlier, to fix a timing issue we probably have to first
make sure the detection is working, which is actually what we did at Highway 11
and 130. We had to fix the detection first before we can really try and make the
thing operate or flow better.
MR. KANEALI`I-KLEINFELDER: Okay.
MR. TAKABA: But yeah, we're doing the best that we can with what we have.
MR. KANEALI`I-KLEINFELDER: So I really appreciate what you guys did at
Route 130 and Route 11. But the intersection services about 48,000 vehicles a
day. That's roughly about 2,500 vehicles, if I did the math from the paperwork
you gave me correctly because it was a little bit confusing the paperwork, but I
tried. During peak demand per hour I think about 2,500 vehicles an hour. So I
recorded that in October 2019 and it was fixed last week. So that's almost four
months. So what was the total time required to fix that signal?
MR. TAKABA: Well yeah, that one we first had to do our observations. We're
also trying to get the detection fixed. We're planning to reinstall the loops which
is the permanent detection. And we just had some problems with permitting from
the State so that took a little while. And so we made the decision at the end, you
know what, we might as well just get cameras up there because the cameras were
considered a temporary detection. So we decided just last week I believe, to put
those cameras up. And at the same time we made the timing adjustment. So it
just took that long. Maybe we could've done it a little quicker. But I think it's
just that we were relying on getting that permit and getting things permanent,
Page 9
PWMTC-19 February 18,2020
instead of doing this interim measure of doing the temporary cameras for
detection first.
MR. KANEALI`I-KLEINFELDER: I like the line of logic there. But we had, I
mean I'm one of them, but 48,000 vehicles a day coming through spending an
extra 10-20 minutes a day in traffic when we can adjust the programing and the
timing by computer from a room and view the intersections. So now you can see
the problems that are happening across the island, including my intersection or
our intersection, but you can actually make changes to it from there. And a fix
that took a few hours and a little bit of visiting at the site you're saving 48,000
vehicles 10-20 minutes a day in their normal daily commute. That's, you mean,
for the people that sit in that traffic, myself included, that's huge.
So I guess in hindsight I think maybe we could've worked a little bit quicker to
get it done faster and then worked on the long-term solution which was your
sensors in the road. Did anyone in your department know that remedy could've
been applied earlier on? So we could've had that instant kind of temporary fix
while we find a long-term solution.
MR. TAKABA: Yeah. Maybe that's something that we can learn from I guess. I
don't know if—yeah, to me it's just a learning experience I guess. But we had
good intentions. It just maybe took longer than most of maybe you would want or
other people would want. But we still continue to monitor it. We're not done yet.
But we just tried to—last week we decided we have to get something at least
fixed and try to move forward, you know. So it's something that we're still
looking at.
MR. KANEALI`I-KLEINFELDER: Well as one of the people who drives that
road to and from work every day waiting in school traffic every morning, I am
extremely happy with the changes that you made in the last week. And I'm
guessing that the other 48,000 vehicles are as well.
MR. TAKABA: Great.
MR. KANEALI`I-KLEINFELDER: And I've had many phone calls and a lot of
emails and other come up. Can these types of fixes be applied across the island to
alleviate ongoing traffic issues at peak traffic times? Is that something that we
can look at doing as well?
MR. TAKABA: Yeah. The plan with the group that mentioned, their job with
the technician and a couple engineers, their tasked with addressing efficiency. So
the goal is to actually go around and try to address those types of problems to try
to make things run better. So that's the plan.
Page 10
PWMTC-19 February 18,2020
MR. KANEALI`I-KLEINFELDER: Okay. And then, Kamehameha Schools
intersection, before we're off the subject, I'm from the area. Is that intersection
working properly?
MR. TAKABA: That's another one we changed. We just finished changing the
detection. And this Sunday we're going to go out and change the controller and
the cabinet. We're hoping that should fix all the problems we've been getting.
We've been a lot of calls with that one. Callers from the public and stuff. So we
hope by Sunday that should get done and addressed.
MR. KANEALI`I-KLEINFELDER: That is wonderful. Thank you. I yield and
thank you very much for coming today. Thank you.
MR. TAKABA: No problem. Thank you.
CHR. LEE LOY: Thank you, Mr. Kaneali`i-Kleinfelder. Anyone in Kona?
MS. VILLEGAS: Yes please, Chair.
CHR. LEE LOY: Go ahead, Ms. Villegas.
MS. VILLEGAS: Thank you. Aloha, Aaron. Thank you for being here today.
MR. TAKABA: Hi.
MS. VILLEGAS: Hey. Mahalo for your attendance and for sharing some of your
insights on these issues. I, myself, happen to represent the Kailua-Kona district,
District 7, which at certain hours of the day might as well be complete gridlock.
My cellphone, email, office line is consistently on fire with comments. As the
testifier who came here earlier today, there is extreme need and disappointment in
this community with the traffic congestion. Now I know, believe me, I'm one of
the first ones to say it's kind of part of the irony of our economy doing well and
having lots of visitors being here which means we have more of the snowbirds on
the roads and their cars coming out of their garages and driveways and visitors
here alike. However, I have to believe there are communities not only in the State
but nationally and globally that have fewer roads than we have and more traffic
and that operate more efficiently than ours do. Just in doing some research into
adaptive technologies, Mr. Takaba, are you familiar with the adaptive signal
control technologies?
MR. TAKABA: A little bit. We're just starting to look into that right now. But
we're not at the point where we want to get to far into that until we can address
some of the operational problems that we have. But yes, I have heard of it
somewhat.
Page 11
PWMTC-19 February 18,2020
MS. VILLEGAS: Okay. Well in just doing a quick couple minute search I came
up with the U.S. Department of Transportation's website for the Federal Highway
Administration, in which they have vast information about how these
technologies and resources can be used to improve our traffic flow, how they
respond faster to traffic conditions, and how they can help to cut costs. One of the
statistics listed here is that according to the Texas Transportation Institute, the
cost of traffic congestion is $87.2 billion in wasted fuel and lost productivity.
That translates to $750 per traveler. And mind you this data was last modified in
September of 2017. However, in my mind outdated signals are seriously affecting
our County, our community, and personnel and people trying to get to and from
work or their homes.
When we're not meeting the needs of our travelers by making sure that our
roadways are connected with the technologies available to allow for a more
succinct communications strategy with them and we have people sitting at lights
with no traffic on one side and sitting there in idle. It's just really frustrating as
I'm sure you can understand. I know it takes time for some of these things to
come to fruition. However, it's taking too long.
I just really want to urge you to think outside the box or think inside the box of
what our federal highway administration is utilizing and some of the technologies
that are already there. We do not have to reinvent the wheel. If this is going to
take some financial investment I firmly believe that it would be worth it. I don't
think the cost is going to be prohibitive. But to continually cost our community
and visitors and everyone as much money as we do in idling in traffic—although I
will say every time I get frustrated in traffic I try to take the time and be grateful
that where I'm sitting in traffic is as beautiful as it is, and we are as blessed as we
are to live here.
The other thing I want to comment on is, doing just another quick search on this
U.S. Department of Transportation website, it looks like there's a state
transportation incentive projects, some grant money that was given to the State of
Hawaii between 2014 and 2019, $100,000 for workshop strategies, and $200,000
for implementation in a localized area. In your experience, has any of that been
allocated to the Big Island, to the County of Hawaii and have any of your staff
been associated with any of that training or resources?
MR. TAKABA: I don't believe we were involved with that,to my knowledge.
MS. VILLEGAS: Okay. My other question comes with I met with David
Yamamoto when I first got into office last year and talked to him about the
potential for some of these new technologies to be implemented in order to kind
of leap frog some of the issues we have and get straight to a technology that might
be able to more efficiently and effectively allow for all of our streets and
streetlights to coordinate better. I was told that was planned to happen last fall
after they finished some of the timing of the lights on the east side. However, I
Page 12
PWMTC-19 February 18,2020
guess it didn't happen then. And then I've asked for an update and was given a
list of all the streetlights and traffic signal optimization. But I'm wondering if
you can catch me up to what has been done. Has anything been done? Where are
we in this process? And what can—you know, I as representative of this district
with thousands of people extremely concerned and frustratedI wish the job
came with a magic wand and we could just have more roads. But historically it's
my understanding that when you build more roads you actually end up with more
traffic. So I'd like to see the roads that we do have operating more effectively.
MR. TAKABA: Yes. To clarify I think what you were talking about before was
our coordination project that I mentioned earlier. We concluded the east side
fairly recently and currently working on the west side and that involves
coordination of the signals. And I know I can get you a more detailed update.
But I know right now we're in the process of updating the timing for Highway 11
from Henry Street to Kamehameha III Road. So that's the first area we're
looking at. And also I believe Kuakini Highway, the lower road is also being
looked at for a coordination timing update.
MS. VILLEGAS: Thank you. That's really great news especially with Alii
Drive being one-way due to the sinkhole. It is really—and it being our peak
visitor's season. I guess that I would like to ask for continued updates if you
could, on this process and where we're at. And also kind of, you know, I don't
know if it's appropriate to ask for a commitment, but that we could be looking, to
these more innovative technologies in order to better serve our community
because we don't have the resources to broaden. You know, we don't have the
STIP (Statewide Transportation Improvements Program) finances right now to
broaden Highway 11 between Henry Street and Kamehameha III. But getting
those lights timed, it's priceless.
MR. TAKABA: Yes. We'll continue to look at it—look into these new
technologies. I believe in the spring there's going to be a demo or a project on
Oahu that we're going to try and look at and see how that works. But it will be a
good indication of what we try here in the future.
MS. VILLEGAS: Okay. I just want to encourage you. The future is now. It's
costing us hundreds of thousands of dollars. And in a current global community
where we're facing issues with carbon emissions to have so many cars idling on
the road is kind of aif this is one of the things that we can do more effectively
and more efficiently to help reduce our carbon emissions. I think that it's a great
investment. And if I can encourage and inspire some sense of urgency for action
on the west side of the Big Island and taking the steps necessary to improve the
flow of our traffic and our roads over here, I just would great appreciate that. And
we'll probably just keep in touch and let me know if there's anything I can do to
help support this process as we continue to navigate the solutions to our traffic
congestion.
Page 13
PWMTC-19 February 18,2020
MR. TAKABA: Alright. Sounds good. Thank you.
MS. VILLEGAS: I yield.
CHR. LEE LOY: Any others in Kona? Alright, hearing none I have a couple of
follow-up questions, Mr. Takaba. Has any thought been given to the last six
months of traffic impact just island-wide as it relates to our Mass Transit system
going down? Okay. I can see it on your face. It wasn't considered.
MR. TAKABA: Maybe I didn't quite understand the question.
CHR. LEE LOY: Well, over the last six months we really struggled with
providing Mass Transit Systems island-wide. And we really went from a fleet of
close to 40 down to a handful. And I'm just trying to look at that holistic
approach that, you know, everything is impacting traffic. And so as the Chair and
Mr. Kaneali`i as the Vice Chair, we're standing in kind of the crosshairs of Public
Works and Mass Transit. And so we're trying to lean on our skillsets to
understand this better holistic approach. One, to improve our roadways, right?
But also our Mass Transit system that impacts our roadway systems. So I'm
asking you, from the Traffic Division, was any consideration given over the last
six months to understand the impacts on traffic in general while our Mass Transit
system was failing?
MR. TAKABA: Yeah, that's a good point. We didn't specifically think about
that. But I think that would definitely have an impact because when you have less
people using alternate transportation they're going to use vehicles, regular
vehicles. So I think that would have an impact on the traffic congestion or traffic
in general.
CHR. LEE LOY: In addition to that we have a number of change of zone
applications that often come forward. And there's always a TIAR, a Traffic
Impact Analysis Report. Has the department used some of the data being
collected throughout these various change of zone applications or environmental
impact statements or environmental assessments in hope to begin to measure the
trend of traffic so that we can, as a Chair and a Vice Chair, begin to plan for
future traffic loads, not just the roadway systems, but the signalization?
MR. TAKABA: Yes. I think that would be good to consider that because in the
TIAR's they make recommendations with respect to what they project traffic to
be, what kind of improvements should be done relating to timing or additional
lanes. So I think that's something that should be considered.
CHR. LEE LOY: Thanks, Aaron. You know, because I mean thank you,
Mr. Kaneali`i- Kleinfelder for bringing this forward. It's a bigger holistic
approach, right? Not only walking pedestrian paths, all these other things, more
fuel-efficient cars. But it's just everything that we have coming forward. I'm just
Page 14
PWMTC-19 February 18,2020
hopeful that we can look at maybe a three to five year horizon and then begin to
implement that with some forward-faced and funding, right,to help improve, you
know,just the quality of life. And maybe just kind of rethink that approach.
Thanks.
MR. TAKABA: Sounds good.
CHR. LEE LOY: Yeah. Thanks, Mr. Takaba.
MR. TAKABA: Thank you.
MS. VILLEGAS: Chair?
CHR. LEE LOY: Okay.
MS. VILLEGAS: My apologies, Chair. I just had one more thing I was hoping
to add in.
CHR. LEE LOY: Sure, go ahead.
MS. VILLEGAS: Great. Mr. Takaba, I just wanted to throw out there I know
that you guys are working on 11,000 LED (Light-Emitting Diode) streetlights and
getting those replaced. I just would put in my suggestion that getting our
streetlights timed and running accurately and efficiently is a greater priority. I
know that the streetlight's out in front of my house, but when I drive down the
road to get on the highway and it is back to back traffic at any time of day, that is
more important to me, and to the constituents of District 7,than a streetlight being
out at this point. So if I could just put that suggestion and recommendation I
would be so grateful if the prioritization might be focused on our stoplights.
Thank you. Aloha. I yield.
CHR. LEE LOY: Alright. Thank you. Did you want to respond, Mr. Takaba?
MR. TAKABA: Well, I just wanted to mention that I agree to a point that the
signals are important because it does affect the driving public and efficiency. The
streetlights, however, have a differentI mean there's people that want the
streetlights improved. So we're kind of balancing our workload and trying to do
the best we can. But what's good for one may not be good for—people's
priorities might be different. So we're being asked to do things from different
places. Maybe to put it that way. But yes, I agree the signals are important and
we have to look at that for efficiency sake. Thank you.
CHR. LEE LOY: Thanks, Mr. Takaba. Go ahead, Mr.
Page 15
PWMTC-19 February 18,2020
MR. KANEALI`I-KLEINFELDER: I have a follow-up question? What is our
priority right now? Because your department is streetlights and stoplights and
traffic signals, correct?
MR. TAKABA: Correct.
MR. KANEALI`I-KLEINFELDER: So what is your priority and who gave you
the priority to do what right now?
MR. TAKABA: Well the certain signal problems, if it's safety related or even it
could a streetlight if there's a knockdown or something safety related, those are
going to get tended to first over something that might just be for, say, convenience
or something that could maybe wait a little longer. So emergencies come first.
Efficiency fits in there probably high too,towards the top. And then maintenance
is probablyI mean they're all important but I think maintenance maybe can be
step down because if it's something that can wait a day or so or wait a little bit,
we can maybe wait. But we have to remember that what needs to be maintained
today, if it's not maintained the next day it becomes a safety issue or it becomes
an efficiency issue. So everything's important. But I think emergencies first,
efficiency, maintenance, and the change outs of the LED's would probably be—if
I could prioritize, that would be probably fourth on the list.
MR. KANEALI`I-KLEINFELDER: So signals first, efficiency accross traffic
and then at the very bottom you have lights? Or somewhere near the bottom you
have LED conversions.
MR. TAKABA: Yeah. That's where I would put it.
MR. KANEALI`I-KLEINFELDER: I agree with that. Is there someone that
disagrees with you on that?
MR. TAKABA: Well, it was an effort that the Mayor wanted, to be honest. And
he wanted the light. He said it's just dark everywhere. So it was something that
when I came on we had and we had to fix. I mean, some of the lights were
actually failing too, so we need to actually address it for that reason. But he just
wanted things brighter. Yeah. He wanted more lights. He wanted it brighter. So
we're balancing that with everything else. So we're doing what we can.
MR. KANEALI`I-KLEINFELDER: Yeah. There's always going to be that
priority balance. I was wondering where it was coming from, the decision. I
think in this case we're actually dealing with, we're actually shedding light on
something that is saving time.
MR. TAKABA: Yes.
Page 16
PWMTC-19 February 18,2020
MR. KANEALI`I-KLEINFELDER: We're really talking about, Aaron, is
peoples time every day. Ten minutes in traffic when it could be—actually that's
just ten minutes extra. My normal drive is 10-15 minutes. Normal traffic time is
30, 40, 50 minutes depending on what's going on. So that one traffic light, every
day, ten minutes, you cannot give me back my life. But if you can decrease my
time in traffic you're giving me 10-20 minutes of my life, which at the end of one
of these days feels like a lot. So whatever you can do to increase to the good
people in these islands, traffic ability to get through town and be efficient, then
please make that a priority. And it sounds like you already are. So yes, please,
and thank you.
MR. TAKABA: Okay. Thank you.
MR. KANEALI`I-KLEINFELDER: Thank you.
CHR. LEE LOY: Thank you, Mr. Kaneali`i-Kleinfelder. And, you know, to
follow-up on that one, with the LED's I know that was another approach to
actually reduce the energy cost when we were switching out the LED's. So there
was an opportunity for funding for that, maybe prior to you, or just as there was a
transition to you. So some of this was actually already in motion. But thank you,
Mr. Takaba, for providing such great insight to your job
MR. TAKABA: You're welcome.
CHR. LEE LOY: And I think the biggest take away is your job has an incredible
impact on our community. And so, we do appreciate what you're trying to do to
balance all of that. And it's not fun getting scolding's or yelling's all the time.
Alright.
MR. TAKABA: You're welcome. No problem.
CHR. LEE LOY: With that, Council Members, anyone else? We have a motion
to close file on Communication 769, all those in favor?
Vote on Comm. 769: The motion to close file on Comm. 769 was carried by the
Filed following voice vote:
Ayes: Committee Members Chung, David,
Kaneali`i-Kleinfelder, Kierkiewicz,
Poindexter, Richards, Villegas, and
Chair Lee Loy—8.
Noes: None.
Absent: Committee Member Eoff— 1.
Excused: None.
CHR. LEE LOY: Thank you. Motion to adjourn, please?
Page 17
PWMTC-19 February 18,2020
ADJOURN- There being no further business, at 2:54 p.m., Ms. David moved to adjourn the
MENT: meeting. Seconded by Mr. Richards and carried by the following voice vote:
Ayes: Committee Members Chung, David,
Kaneali`i-Kleinfelder, Kierkiewicz,
Poindexter, Richards, Villegas, and
Chair Lee Loy— 8.
Noes: None.
Absent: Committee Member Eoff— 1.
Excused: None.
CHR. LEE LOY: This meeting is adjourned. Mr. Clerk, I have 2:54 p.m. Thank
you everyone.
i
I
I
i
a
i
i
i
a. K. Lee Loy, Chair (Date)
s and Mass Transit Comm, ee
SLltk
Page 18