HomeMy WebLinkAbout2019-06-25 Water Board AgendaDEPARTMENT OF WATER SUPPLY
COUNTY OF HAWAII
WATER BOARD MEETING
AGENDA
MEETING DATE: June 25, 2019
TIME: 10:00 a.m.
PLACE: Department of Water Supply, Hilo Operations Center Conference Room,
889 Leilam Street, Hilo, Hawaii
1) CALL TO ORDER — 10:00 a.m. (please turn cell phones off or set to silent)
2) STATEMENTS FROM THE PUBLIC
3) APPROVAL OF MINUTES — Minutes of the May 28, 2019, Public Hearing on the Power Cost Charge
and the May 28, 2019, Minutes of the Regular Water Board Meeting
4) APPROVAL OF ADDENDUM AND/OR SUPPLEMENTAL AGENDA (if necessary)
(Note: Roll Call Required)
5) SOUTH HILO:
A. JOB NO. 2019-1115, PANA`EWA WELL A REPAIR:
This project consists of furnishing all labor, materials, tools and equipment necessary to remove the
existing pump, motor, and column assembly; replace all column assembly bearings; install the
existing line shaft pump and motor, column assembly, sounding tubes, and all appurtenant materials;
chlorinate the well and pumping assembly; and complete efficiency test; in accordance with the
specifications.
Bids for this project were opened on June 13, 2019, at 2:00 p.m., and the following are the bid results:
Bidder Bid Amount
Derrick's Well Drilling & Pump Services, LLC $98,000.00
Be lik Drilling & Pump Service, Inc. $107,450.00
Project Costs:
1) Low Bidder (Derrick's Well Drilling & Pump Services, LLC) $98,000.00
2) Contingencies (-10.0%) $9,800.00
Total Cost: X107,800.00
Funding for this project will be from DWS's CIP Budget under Deepwell Pump Replacement. The
contractor will have 100 calendar days to complete this project. The Engineering estimate for this
project was $80,000.00.
Page 1 of 6 June 25, 2019, Water Board Agenda
Well History:
Pana`ewa Well A:
Original Installation: March 1964
Repaired: September 1999
Last Repaired: September 2016 — Final Contract Amount $145,000.00
Mitigation Measures:
This project will implement the mitigation measure of conducting a borehole alignment survey.
RECOMMENDATION: It is recommended that the Board award the contract for JOB
NO. 2019-1115, PANA`EWA WELL A REPAIR, to the lowest responsible bidder, Derrick's Well
Drilling & Pump Services, LLC, for their bid amount of $98,000.00, plus $9,800.00 for contingencies,
for a total contract amount of $107,800.00. It is further recommended that either the Chairperson or
the Vice -Chairperson be authorized to sign the contract, subject to review as to form and legality by
Corporation Counsel.
B. JOB NO. 2018-1081, PI`IHONUA #1 DEEPWELL C REPAIR — REQUEST FOR TIME
EXTENSION:
The contractor, Derrick's Well Drilling & Pump Services, LLC, is requesting a contract time
extension of 353 calendar days. The contractor experienced delays caused by the pump manufacturer
and issues securing a test facility. These delays were beyond the control of the contractor.
Staff reviewed the request for contract time extension and the accompanying supporting
documentation and founded that only 290 calendar days of the requested time can be considered
justified.
Note: There are no additional costs associated with this time extension.
1st time extension — 290 calendar days
RECOMMENDATION: It is recommended that the Board approve a contract time extension of 290
calendar days to Derrick's Well Drilling & Pump Services, LLC, for JOB NO. 2018-1081,
PI`IHONUA # 1 DEEPWELL C REPAIR. If approved, the contract completion date will be revised
from July 31, 2018, to May 17, 2019.
6) SOUTH KOHALA:
A. JOB NO. 2018-1085, PARKER #1 DEEPWELL REPAIR — CHANGE ORDER REQUEST:
The contractor, Beylik Drilling & Pump Service, Inc., is requesting a contract change order for the
additional work in association with the furnishing of four (4) additional positive seal check valves.
The description of additional work and associated fees are as follows (see attached):
ITEM DESCRIPTION AMOUNT
1. Furnish four (4) additional positive seal check valves $56,920.00
TOTAL $56,920.00
Page 2 of 6 June 25, 2019, Water Board Agenda
Original Contract Amount: $83,200.00
Original Contingency amount: $8,300.00
1st Additional Contingency request: $48,620.00
Total Revised Contract Amount: $140,120.00
The contractor, Beylik Drilling & Pump Service, Inc., is also requesting a contract time extension of
61 calendar days. The Department requested a change in the scope of work to add four (4) positive
seal check valves based on recommendation from our consultant. These delays were beyond the
control of the contractor.
1St time extension — 61 calendar days
RECOMMENDATION: It is recommended that the Board approve an increase in contingency of
$48,620.00 to Beylik Drilling & Pump Service, Inc., for a total project cost of $140,120.00, and
approve a contract time extension of 61 calendar days for JOB NO. 2018-1085, PARKER # 1
DEEPWELL REPAIR. If approved, the contract completion date will be revised from June 30, 2019,
to August 30, 2019.
B. JOB NO. 2018-1089, LALAMILO D DEEPWELL REPAIR — REQUEST FOR TIME
EXTENSION:
The contractor, Beylik Drilling & Pump Service, Inc., is requesting a contract time extension of 122
calendar days. The Department requested a change in the scope of work to add three (3) positive seal
check valves based on recommendation from consultant. These delays were beyond the control of the
contractor.
Note: There are additional costs of$10,860.00 associated with this time extension. These associated
costs are within the original contingency of $25,900.00 for this project.
1St time extension — 122 calendar days
RECOMMENDATION: It is recommended that the Board approve a contract time extension of 122
calendar days to Beylik Drilling & Pump Service, Inc., for JOB NO. 2018-1089, LALAMILO D
DEEPWELL REPAIR. If approved, the contract completion date will be revised from May 31, 2019,
to September 30, 2019.
7) SOUTH KONA:
A. JOB NO. 2019-1114, KE`EI C DEEPWELL AND BOOSTERS A & B REPAIR:
This project consists of furnishing all labor, materials, tools and equipment necessary to remove the
existing pump, motor and column assembly; install a Contractor supplied submersible pump, motor,
column assembly, power cable, sounding tube, and all appurtenant materials; well rehabilitation;
borehole alignment survey; remove the existing booster pumps, discharge heads, and motors; install
the Contractor supplied booster pumps, discharge heads, motors, and suction can liners; refurbishing
suction cans; electrical work; chlorinate the well and pumping assembly; and complete an efficiency
test; in accordance with the specifications.
Bids for this project were opened on June 13, 2019, at 1:30 p.m., and the following are the bid results:
Page 3 of 6 June 25, 2019, Water Board Agenda
Bidder Bid Amount
Beylik Drilling & Pump Service, Inc. $857,120.00
Derrick's Well Drilling & Pump Services, LLC $900,463.24
Project Costs:
1) Low Bidder (Beylik Drilling & Pump Service, Inc.) $857,120.00
2) Contingencies (-10.0%) $84,880.00
Total Cost: �942000.00
Funding for this project will be from DWS's CIP Budget under Deepwell Pump Replacement. The
contractor will have 135 calendar days to complete this project. The Engineering estimate for this
project was $688,700.00.
Well History:
Ke`ei C DeenWell:
Original Installation
Repaired:
Repaired:
Repaired:
Repaired:
Repaired:
Repaired:
Repaired:
Last Repaired:
Mitigation Measures:
June 1964
January 1979
April 1986
August 1986
May 1988
April 1990
November 1994 — Final Contract Amount $28,755.00
December 1997 — Final Contract Amount $46,302.00
April 1999 —Final Contract Amount $45,161.00
This project will implement the mitigation measure of conducting a borehole alignment survey.
RECOMMENDATION: It is recommended that the Board award the contract for JOB
NO. 2019-1114, KE`EI C DEEPWELL AND BOOSTERS A & B REPAIR, to the lowest responsible
bidder, Beylik Drilling & Pump Service, Inc., for their bid amount of $857,120.00, plus $84,880.00
for contingencies, for a total contract amount of $942,000.00. It is further recommended that either
the Chairperson or the Vice -Chairperson be authorized to sign the contract, subject to review as to
form and legality by Corporation Counsel.
8) NORTH KONA:
A. JOB NO. 2017-1077 (REBID), HUALALAI DEEPWELL REPAIR — REQUEST FOR TIME
EXTENSION:
The contractor, Beylik Drilling & Pump Service, Inc., is requesting a contract time extension of 273
calendar days. The contractor experienced delays caused by the pump manufacturer and the
Department requested a change in the scope of work to replace the existing power cable after it was
determined to be defective. These delays were beyond the control of the contractor.
Note: There are no additional costs associated with this time extension.
1st time extension — 273 calendar days
Page 4 of 6 June 25, 2019, Water Board Agenda
RECOMMENDATION: It is recommended that the Board approve a contract time extension of 273
calendar days to Beylik Drilling & Pump Service, Inc., for JOB NO. 2017-1077 (REBID),
HUALALAI DEEPWELL REPAIR. If approved, the contract completion date will be revised from
November 15, 2018, to August 15, 2019.
9) MISCELLANEOUS:
A. DEDICATIONS:
We received the following document for action by the Water Board. The water system has been
constructed in accordance with the Department's standards and is in acceptable condition for
dedication.
Grant of Easement and Bill of Sale
Grantors: Chun -Kai Huang, Hsin-Yi Huang, Dien -Jung Lin and Chris Brilhante
Subdivision No.: 15-001539
Tax Map Key: (3) 2-2-043:029
Facilities Charge: $16,500.00 Date Paid: 1/4/2019
Final Inspection Date: 1/2/2019
Water System Cost: $16,150.00
RECOMMENDATION: It is recommended that the Water Board accept this document subject to the
approval of the Corporation Counsel and that either the Chairperson or the Vice -Chairperson be
authorized to sign the document.
B. MONTHLY PROGRESS REPORT:
Submission of Progress Report of Projects by the Department. Department personnel will be
available to respond to questions by the Board regarding the status/progress of any project.
C. REVIEW OF MONTHLY FINANCIAL STATEMENTS:
Submission of financial statements and information relating to the financial status of the Department.
Department personnel will be available to respond to questions by the Board relating to the financial
status of the Department.
D. MANAGER -CHIEF ENGINEER'S REPORT:
The Manager -Chief Engineer to provide an update on the following:
1. North Kona Wells
E. EXECUTIVE SESSION: REGARDING OPEN LITIGATION:
The Board anticipates convening an executive meeting for the purposes of discussing the legal rights,
duties and liabilities of the Board concerning open litigation against the Board, as authorized by
Hawaii County Charter Section 74.6 and Hawai'i Revised Statutes ("HRS"), Section 92-4 and 92-
5(a)(4). The Board wishes to have its attorney present, in order to consult with the board's attorney
on its questions and issues pertaining to the board's powers, duties, privileges, immunities, and
liabilities pursuant to HRS Section 92-5(a)(4). A two-thirds vote of the members present, pursuant to
HRS Section 92-4, is necessary to hold an executive meeting, provided that the affirmative vote
constitutes a majority of the board.
Page 5 of 6 June 25, 2019, Water Board Agenda
F. CHAIRPERSON'S REPORT:
Chairperson to report on matters of interest to the Board.
10) ANNOUNCEMENTS:
1. Next Regular Meeting:
The next meeting of the Water Board will be July 23, 2019, 10:00 a.m., in the Department of Water
Supply, Operations Center Conference Room; 889 Leilam Street, Hilo, Hawaii.
2. Following Meeting:
The following meeting of the Water Board will be August 27, 2019, 10:00 a.m., at the West Hawaii
Civic Center, Community Meeting Hale, Building G; 74-5044 Ane Keohokalole Highway,
Kailua-Kona, Hawaii.
11) ADJOURNMENT
Anyone requiring an accommodation or auxiliary aid and/or services to participate in this
meeting (i.e. sign language, interpreter, large print), please contact the Board Secretary, at
961-8050 as soon as possible, but no later than five days before the scheduled meeting.
Notice to Lobbyists: If you are a lobbyist, you must register with the Hawaii County Clerk within five
days of becoming a lobbyist. {Article 15, Section 2-91.3(b), Hawaii County Code} A lobbyist means
any individual engaged for pay or other consideration who spends more than five hours in any month
or $275 in any six-month period for the purpose of attempting to influence legislative or administrative
action by communicating or urging others to communicate with public officials." {Article 15,
Section 2-91.3(a)(6), Hawaii County Code} Registration forms and expenditure report documents are
available at the Office of the County Clerk -Council, Hilo, Hawaii.
Page 6 of 6 June 25, 2019, Water Board Agenda