Laserfiche WebLink
CHAPTER 21 <br />SEWERS <br />Article 1. General Provisions. <br />Section 21-1. Intent of chapter. <br />Section 21-2. Definitions. <br />Section 21-3. Tampering with public sewers. <br />Section 21-4. Sealing disconnected sewers. <br />Article 2. Public Sewers. <br />Section 21-5. Connection to sewer required. <br />Section 21-6. Subdivisions. <br />Section 21-7. Industrial wastes of unusual strength. <br />Section 21-8. Drainage of storm water and unpolluted water into sewers. <br />Section 21-9. Prohibited wastes. <br />Section 21-10. Volume and rate of discharge; additional flow beyond capacity. <br />Article 3. Sewage Works and Connections. <br />Division 1. General Provisions. <br />Section 21-11. Disposal of sewage into natural outlet; treatment and disposal <br />plan required. <br />Section 21-12. Pumping stations. <br />Section 21-13. Sewer mains. <br />Section 21-14. Laterals. <br />Section 21-15. Construction standards. <br />Section 21-16. <br />Section 21-17. <br />Section 21-18. <br />Section 21-19. <br />Division 2. Subdivisions. <br />Cost of construction. <br />Approval of plans required; time limit for beginning work. <br />Inspections during construction required; costs. <br />Acceptance of sewage works and treatment facilities. <br />Division 3. Laterals. <br />Section 21-20. Application. <br />Section 21-21. Location. <br />Section 21-22. Construction specifications. <br />Section 21-23. Deposit required; inadequate deposit; refunds. <br />i <br />