HomeMy WebLinkAbout2019-12-17 Water Board Meeting MinutesMINUTES
DEPARTMENT OF WATER SUPPLY
COUNTY OF HAWAII
WATER BOARD MEETING
December 17, 2019
Hilo Operations Center Conference Room, 889 Leilani Street, Hilo, Hawaii
MEMBERS PRESENT: Mr. William Boswell, Jr., Chairperson
Mr. Eric Scicchitano, Vice -Chairperson
Mr. Bryant Balog
Mr. David De Luz, Jr.
Mr. Nestorio Domingo
Mr. Leningrad Elarionoff
Ms. Julie Hugo (10:25 a.m.)
Mr. Keith K. Okamoto, Manager -Chief Engineer, Department of Water
Supply (ex -officio member)
ABSENT: Mr. Zendo Kern, Water Board Member
Mr. Kenneth Sugai, Water Board Member
Director, Planning Department (ex -officio member)
Director, Department of Public Works (ex -officio member)
OTHERS PRESENT: Ms. Diana Mellon -Lacey, Deputy Corporation Counsel
Mr. Kelly Kimball, Brown and Caldwell
Mr. Dean Nakano, Brown and Caldwell
Ms. Michele Sorensen, Brown and Caldwell
Mr. Kaleo Salvador, Jas. W. Glover, Ltd.
Mr. Michael Chung, Heide & Cook
Mr. Shane Vasconcellos, Heide & Cook
Mr. Riley Smith
Mr. Benjamin Ney
Mr. Fred Camero, Beylik Drilling
Mr. Jeff Zimpfer, National Park Service (10:02 a.m.)
DEPARTMENT OF
WATER SUPPLY STAFF: Mr. Kawika Uyehara, Deputy
Mr. Kurt Inaba, Engineering Division Head
Mr. Richard Sumada, Waterworks Controller
Mr. Daryl Ikeda, Chief of Operations
Mr. Clyde Young, Operations Division
Mr. Eric Takamoto, Operations Division
Mr. Warren Ching, Energy Management Analyst
1) CALL TO ORDER — Chairperson Boswell called the meeting to order at 10:00 a.m.
2) STATEMENTS FROM THE PUBLIC - None
Page 1 of 18 December 17, 2019, Water Board Minutes
3) APPROVAL OF MINUTES
The Secretary announced a change to be made to Page 8, 6' paragraph down, where it begins
"Mr. Ching continued... " Cross out "and the difference and goes into" and after "internal use,"
insert the words "which is."
Chairperson Boswell noted that the Minutes would be amended to read as follows: "Mr. Ching
continued his report with regard to water loss. The diagram shows overall production,
consumption, internal use, which is authorized but not metered on the customer side, and
then real losses (leaks)."
ACTION: Mr. De Luz so moved for approval of the Minutes, as amended; seconded by
Mr. Scicchitano and carried unanimously.
4) APPROVAL OF ADDENDUM AND/OR SUPPLEMENTAL AGENDA - None
5) POWER COST CHARGE:
Departmental power costs from all power sources decreased since the last Power Cost Charge rate
was determined. The Department proposes to decrease the Power Cost Charge from $2.00 to $1.90
per thousand gallons as a result of this decrease. Power cost charges over the past two years were
as follows:
Effective
PCC
October 1, 2019
$2.00
June 1, 2019
$1.96
February 1, 2019
$1.89
August 1, 2018
$1.94
April 1, 2018
$1.88
December 1, 2017
$1.62
Before the Power Cost Charge is changed, a Public Hearing should be scheduled to accept public
testimony.
The Manager -Chief Engineer recommended that the Board approve holding a Public Hearing on
January 28, 2020, at 9:45 a.m., to receive testimony on decreasing the Power Cost Charge from
$2.00 to $1.90 effective February 1, 2020.
ACTION: Mr. De Luz moved for approval of the recommendation; seconded by Mr. Scicchitano
and carried unanimously by voice vote.
6) PRESENTATION BY BROWN AND CALDWELL ON JOB NO. 2017-1061, POWER
SYSTEM STUDIES:
Brown and Caldwell did a presentation of their findings to date for North Kona high level water
deepwells.
Mr. Kelly Kimball, P.E., of Brown and Caldwell introduced their technical advisors, Ms. Michele
Sorensen, P.E., and Mr. Dean Nakano, and went through a follow-up presentation related to the
North Kona well assessments.
Page 2 of 18 December 17, 2019, Water Board Minutes
They had two different people working on this. One was a subject matter expert in Denver and
another in Davis, California, and other mechanical and electrical personnel contributed.
Ms. Sorensen is based in Waimea, and Mr. Nakano and Mr. Peter Ono are both on Oahu.
Scope of Services: They were charged to look at seven different sites in the North Kona area:
Honokohau, Hualalai, Keopu, QLT, Wai`aha, Palam, and Kalaoa, to look at the wells from the
standpoint of determining the likely causes of failure for the systems. The expected outcome was
addressing these likely causes of failure to promote increased service life for the existing
equipment, which was a very iterative process of elimination and improvement.
Mechanical Findings: There were four different major findings and failure modes, essentially
bearings, seals, well casing drift, and hydraulic transient. He showed a slide of a deepwell
submersible pump. The top is the pump assembly, essentially rotating parts that physically move
the water to the surface. In the middle, you have a suction inlet. There is a coupling that couples
the upper pump assembly to the motor assembly, and then the thrust bearing. The submersible
motor itself sits at the bottom of the well; and the thrust bearing, which is essentially a compensator
for force, sits at the bottom.
Major mechanical failure points that were observed: There were some cases with seal failures.
There are two major seals on the motor assembly itself. One is the motor shaft seal which prevents
environmental factors from getting into the motor such as sand and dirt. There is a cable seal on the
upper portion which essentially is the electrical connection and keeps water and other
environmental things out. The second part is bearing failure. The major element, as mentioned
previously, is the thrust bearing that sits at the bottom of the pump assembly. What a thrust bearing
does is it is essentially a compensator for when the motor spins up and the pump assembly spins up
to pump water to the surface. These pump assemblies are anywhere from 1,500 to 2,000 feet deep
in the North Kona area. The thrust bearing operates with a stationary pivot shoe that sits on the
bottom with a rotating element on top. As it spins up very quickly, it hydroplanes so there is a
water cushion between the two devices. As it pumps these tons of water to the surface, it is
compensating for the forces that are being exerted on it. It is a major piece of equipment. One of
the major failure modes for thrust bearings is the boiling of the water wedge, so essentially if your
pump and motor assembly get too hot, it can boil the water which causes no cushion, carbon discs
grind together, and catastrophic failure results. Motor overheating: Shown in the presentation is a
diagram of the motor and pump assembly and the well casing. Typically, there is a blank casing
section and then a perforation section of the casing itself. In a correct cooling mode, typically the
motor would be set above the perforations in the well casing. What that allows is groundwater to
enter horizontally and then it passes by the motor which cools it by convection. Sometimes it is
required to put the pump and motor assembly in the perforations because standing water levels
change over time. That puts you in a situation where water is entering the perforations horizontally
to the suction inlet and is not being passed by the motor, resulting in reduced cooling effects.
Mr. De Luz asked if there is a sensor that would indicate when the level of the water changes and if
there is a capacity to move it up or down.
Mr. Kimball asked Mr. Inaba if there was a permanent device installed down -hole.
Mr. Inaba replied there was but it had to be pulled out to read it. There are regular water level
sensors. The level does not move that quickly.
Page 3 of 18 December 17, 2019, Water Board Minutes
The Manager -Chief Engineer added that it only moves quickly during actual pumping when there is
drawdown. His understanding is every time there is a pump repair, the water level is verified so
that when equipment is put back down, we know that it is down deep enough below static water
level and that accounts for the historical drawdown. Basically we are not pumping air when we
turn it on.
Mr. De Luz asked if there is any technology that is part of the casing that has some type of sensor in
it to measure the water levels.
The Manager -Chief Engineer replied that there are water level indicators --whether it be pressure
transducers or the old school air bubbler. The air bubbler is basically a tool but it gets brittle over
time causing it to break apart and fall down the hole. Transducers carry a similar risk. If the casing
is not perfectly straight, it might get abraded as it goes down. There are transducers on some of the
wells.
Mr. Kimball stated that there is some additional instrumentation and devices they recommend to be
installed down hole to give better data about changing conditions, motor temperature, etc.
Chairperson Boswell asked if the diagram shown on the right (in the Motor Overheating slide) was
the optimal installation and the condition after the fact would be the one on the left.
Mr. Kimball replied that it is not always possible to be in the correct cooling mode, but there are
some things you can do to help alleviate it if you find yourself in that situation. He continued
discussion on flow inducer shrouds. They can be installed around the motor if it needs to be
installed in the perforation section. This is a sheath that goes around the pump itself and allows
groundwater to intake horizontally, vertically down to the bottom, around the shroud, past the
motor, and into the suction inlet. It creates a uniform cooling flow and also provides a centralizer,
making sure the pump is centered in the well casing and allows it to be installed in the perforations.
Mr. Domingo thought it was a good design; however, it is a known fact that if the flow is not fully
developed, it will not able to remove heat efficiently. You have to have sufficient clearance
between the motor and the shroud so that you can totally develop flow, whereby removing the heat
and ensuring efficiency.
Mr. Kimball stated that you would be looking for a couple of different things. You are looking for
a minimum and maximum flow velocity on the water itself as it passes across and by the
convection, the water is heating up, going past the motor, and is being carried away. If it is too fast,
you do not get enough time for the heat transfer. If it is too slow, you are not carrying the heat
away from the motor and pump assembly itself. It is correct that you do need the proper standing
water levels in order for there to be sufficient passing of water in the well.
Mr. Domingo stated that inducing the flow is not sufficient to take away the heat. He would say it
is still substandard.
Mr. Kimball stated that there is another way which would be essentially measuring the motor
temperature directly via some additional instrumentation so that regardless of whether you are
achieving that uniform cooling flow, you know what is happening in the motor. That was
something that was observed during one of the wells' replacement very early on almost before
Brown and Caldwell were involved. The temperature was spiking in the motor assembly itself.
That is usually indicative of a number of things, which start with how straight the well is. In a
Page 4 of 18 December 17, 2019, Water Board Minutes
number of these wells, there was a standard practice that had been used for about six years to
measure well drift, or how straight the well is. No wells are perfectly plumb and straight and there
is some drift that still meets national standards in terms of acceptability. There is a new technology
called a gyroscopic well survey which essentially maps the well at certain increments in order to
have a solid understanding of how plumb the well is. When the well is not plumb, you get into
situations where you may have proper cooling water flowing past one side of the motor but not on
the other side because it is not centralized in the well casing. The second piece to that can also lead
to radial bearing failure because you are essentially putting uneven pressure on the motor because it
is kinked and jammed in the hole, thus causing the motor to work harder.
Chairperson Boswell asked how much deviation you can get in the couplings on the column pipe.
In the picture shown, the well casing looks perfectly plumb but actually it is more likely that the
casing is not plumb and the motor is trying to be straight.
Mr. Kimball stated that the physical dimensions shown for Honokohau well, which is the first one
that was looked at in terms of measuring the outside diameter of the motor itself and then the well
casing was that one side of the motor was probably not achieving the proper water cooling flow. It
could be uneven pressure on the motor itself, and you need that surface area with the water in order
to carry the heat away. The biggest killer of mechanical and electrical assemblies in submersible
pump systems is usually heat.
Mr. Domingo asked how you mitigate centralizing it.
Mr. Kimball replied that flow inducer shrouds have a tendency to do that pretty well, but there are
some trade-offs. When you do a flow inducer shroud, obviously, you need to have a smaller motor
which means you have limited pumping capacity to the surface. If your demand is really high and
you are trying to keep up with the demand and you install a smaller pump with a flow inducer
shroud, your capacity to the surface is limited. The flow inducer shroud helps align it. Even if the
flow inducer shroud is touching the walls, it is still maintaining the proper spacing around the motor
itself such that you are getting cool water flow past the motor into the suction end. You could use a
flow inducer shroud even if you are not putting it in the perforations if the intent is to just centralize
the motor itself.
Mr. Domingo asked if it is still free to move about laterally.
Mr. Kimball replied there might still be some play, depending on the spacing, pump selection, and
the flow inducer shroud; but he was not sure if the play is a major concern.
Mr. De Luz suggested what the Department might want to do is a cost benefit analysis when
replacing pumps, comparing that to conservation and mitigation for storage, so the Board can
understand when someone questions why equipment is being replaced. Future Board members can
go back and say the initial cost versus benefit was looked at and the decision was made based on
that. Maybe storage was prohibited but the well still needed to be pumped from. You have to get
something for something.
The Manager -Chief Engineer thought that as this presentation progresses, the Board will see the
findings as well as the Department's experiences over the past several years. Each case is different.
There is no smoking gun or no one solution to one problem. Holistically, those challenges will be
identified such as where capacity needs to be maintained versus de -rating in certain areas. In the
long term, it will feed into some of the long-term CIP projects.
Page 5 of 18 December 17, 2019, Water Board Minutes
Mr. Kimball stated that one major point is that these findings are covered in general for all of the
wells discussed. The report is going into much more detail, but they are specific to the well that
was looked at.
Mr. Domingo felt that we should be able to incorporate some kind of restraint to keep the pump and
motor from having play inside the casing.
Mr. Young mentioned that 3D modelling is being looked into to look at all of the loads created on
the pump, the motor, and the couplings. That will be coming and will address some of his
questions.
Chairperson Boswell suggested that the Board hold comments until after Mr. Kimball was finished
with his presentation.
Mr. Kimball continued with other reasons for mechanical failure. One is water hammer, which is
large shifts in water movement from the pump starting or stopping. Above the pump assembly in
the column pipe, there is a series of check valves that go all the way to the surface. The intent of
the check valve is to help with abrupt changes in the fluid movement when you start pumping or
stop pumping and there can be a couple tons of water in that column pipe that are pushing back
down. We are trying not to damage the motor and pump assembly itself by that pressure of
vacuums that are created by abrupt changes in pumping. The check valves compensate for this.
One item to note, back to what Mr. Young said, is each of the motor manufacturers has a different
take on it. They looked at five different motor manufacturers and they had five different answers
on what type of check valves to use, what the spacing is, and how they are expected to operate. He
went on to cover some of the electrical findings. Motor overheating was talked about from a
mechanical standpoint, thrust bearing failures, and systems heating up. This is more of an outcome
of typical overheating of the system which can be a variety of different factors that were talked
about. Essentially, insufficient cooling water can leave the motor burned out. He showed a picture
of melted motor windings at Hualalai Well. Those motors are a series of copper wires that are
wrapped around a stator and they have a thin insulation so if you get them too hot, they melt and
burn out. Motor binding is uneven pressure on the pump system assembly itself which causes the
motor to work a lot harder than it is supposed to which can heat the motor up and cause premature
motor failure. Poor power quality is another contributor to reduced service life. If you have a
voltage sag on the incoming line from HELCO, it usually manifests itself in a higher electrical
current needed by the motor to operate, which then heats the motor up and can burn it out. The
next piece is electrical system settings. Each one of the reduced voltage starters, or variable
frequency drives essentially drive these pump assemblies anywhere from 300 to 600 different
settings on them that are designed to protect the equipment itself. They took an in depth look at all
of the settings for each one of the devices for all seven wells and there were only two major
findings --one was in some of the cases, the overload setting, which is essentially how hard you
allow the motor to work before turning it off, was set slightly higher than recommended by the
manufacturer. They do know that if you have motor binding or other mechanical type features that
are working on the pump system itself, the motor does need to work harder. Having the Overload
Setting (FLA) higher is something you would expect to see if you want to pump water for that
system. There were other settings, but only minor adjustments not worthy of mentioning. The last
piece was the power quality analysis, which is essentially how good the power quality is coming in
from the utility. They looked at four of the sites--Hualalai, Honok6hau, QLT, and Keopu and
installed their own metering systems anywhere from 10 days to three months, depending on
operational limitations of getting the devices installed. They reported the incoming power from
Page 6 of 18 December 17, 2019, Water Board Minutes
HELCO and measured the power quality going directly to the submersible motor itself. Three of
the four sites were pretty much okay. On the fourth site, there were some issues with current
imbalances coming in from the utility; but the tariff agreement with HELCO is about 10% current
imbalance. The motor manufacturer says do not get outside of 5% so now you have this gray area
between five and ten percent where HELCO can deliver something that is within their tariff to you,
but it is not recommended by the motor manufacturer. What to do in those types of situations is,
first, say the meter was only installed for about 14 days at Keopu, he would say install power
monitoring equipment that can monitor and trend it over a long period of time. If the issue persists,
consider taking the next step which would be some type of power conditioning equipment such as a
UPS or isolation transformer that could help fix that. The findings showed it was about 5.9%
versus 5% so it was a contributor to reduced service life but not something that would cause
catastrophic failure.
Recommendations for increased service life: These are for all of the wells but the reports go in
detail and have other recommendations as well, but they are minor. The first one is motor and
pump overheating. Where applicable, install a smaller diameter pump and motor, use flow inducer
shrouds, ensure proper unit responsibility, which is essentially considering the motor manufacturer,
the pump manufacturer, and the person installing the motor cables and other devices one entity, so
when it fails, DWS would go back and say there was unit responsibility, it is a three-year warranty,
please replace, repair, and fix the situation. Two, perform a transient pressure analysis, which feeds
back into what type of check valves should be used, where should they be spaced, and it will tell
you elements of that nature. Three, do a gyroscopic survey, figure out how straight the well is, and
then perform a 3D model and maybe do a finite element analysis to figure out the pressures on the
devices. That will tell you check valve location and undue stresses on the motor. Four, install
permanent power quality meters to trend and monitor where power quality issues persist and are
more concerning, and it will evaluate power conditioning equipment. The fifth recommendation is
adjustments to the electrical settings. They recommend looking at the settings in detail to make
sure the equipment is properly protected.
In 2018, shortly after Brown and Caldwell were on board, there were some standards for all new
wells that were issued or recommended from the DWS staff. Almost all of the recommendations
covered today are in line with the findings. There was one major difference where the
recommendation was to possibly go with two 700-gpm wells at new sites instead of one larger
1,400-gpm well. That gives more reliability and redundancy. One of the wells that received the
majority of the betterments was the Hualalai Well, which is currently up and running. It received a
shroud and slimline motor. A gyroscopic alignment was done, and the well was extremely crooked.
There were permanent power quality meters installed that are being trended. There was a fair
amount of down -hole instrumentation installed so motor temperature and pressure are being
monitored. The electrical settings were adjusted and there was a change -out of the type of motor
cable that was used for the installation. The only thing that has not been done yet was the transient
pressure analysis and the major limitation there was that DWS needed to get the well up and
running to get out of the situation where conservation measures were in place and could not wait for
the transient pressure analysis. There are three major things. One was the question posed whether
there is a single cause of reduction in use and service life. Unfortunately, there is no one single
cause. There were some things that should be applied broadly; but in looking at all seven wells,
there was no single smoking gun issue. They are essentially playing doctor, whereby if they see
symptoms that are exhibited by the pump system itself, they try to address them and do better next
time; but they are essentially trying to eliminate or mitigate those one by one. This concluded Mr.
Kimball's presentation.
Page 7 of 18 December 17, 2019, Water Board Minutes
The Manager -Chief Engineer added that for Hualalai Well, because of its history, the Department
tried to pursue the unit warranty situation so the pump, motor, and cable are all supplied by the
same manufacturer, in this case, Centrilift. Not in all applications will a slim line be utilized
because there have been challenges in the past with slim lines; however, there have been challenges
with whatever is put down the hole. The Department will do what makes sense, based on the
findings, in its strategies moving forward.
Mr. Kimball stated there were a number of these recommendations that say "where appropriate" so
you still have to apply some good engineering and business.] udgment when considering them.
Mr. Domingo thought that the major thing to address is the issue of overheating. If the overheating
issue is not mitigated, you will still have that problem.
Mr. Kimball stated that they are in the process of eliminating and mitigating each one of the
potential likely causes of failure found and are moving through the list, starting with the pump and
motor. The recommendations one through five are not in a prioritized manner. It is a shopping list
for the Department.
Mr. Domingo thought there should be some other studies or alternatives done.
Mr. Kimball stated that there are not a lot of options for pump and motor systems in a submersible
fashion because they are installed so deep. The "belt and suspenders" approach is to use a smaller
diameter motor with a flow inducer shroud. You could go in a different direction with installing a
smaller motor, as long as you can validate the water levels. Maybe that is balanced with what was
mentioned earlier about maintaining capacity based on demand where you might not be able to use
a flow inducer shroud.
Mr. Scicchitano commented that it sounds like a triage approach.
Mr. Kimball agreed. It is a mitigative strategy to eliminate each one of the likely causes and
symptoms of what was observed and what those fixes look like.
Mr. Elarionoff asked what sets the consultant apart as far as qualifications where the Department's
engineers could not do this work themselves.
Mr. Kimball replied that they have a national pump expert who used to be on the research and
development team for three different pump manufacturers. That expert understands these systems
much better than he does. Also, the Department does not have an electrical engineer on staff that
could look into this level of detail. Although he was originally an electrical engineer, Brown &
Caldwell has a national expert who comes from an oil and gas background, where they have similar
installations --just a different type of application.
Mr. Elarionoff stated that the reason he asked was that he noticed Mr. Kimball asking questions of
staff during the presentation which lead him to believe that if they could answer, why could they
not do the job.
Mr. Kimball replied that over the last two years, they have been in close communication with DWS
staff about a variety of things. He did not want to misspeak when it comes to an operational or
business type decision.
Page 8 of 18 December 17, 2019, Water Board Minutes
Chairperson Boswell asked what, in oil and gas, is used for the column pipe --whether it was steel
pipe.
Mr. Kimball replied he believed it was steel pipe.
Chairperson Boswell stated that he asked that because of their tendency to go down in horizontal;
and if it is, then it is just down a large sweeping radius. He added that he had worked on oil
platforms offshore and had seen what appeared to be column pipe, but that was 35 years ago, and is
now trying to put two and two together.
Mr. Kimball stated that they have a tendency to use more Reda or Centrilift systems so they almost
exclusively go with slimline motors. Slimline motors are typically about two-thirds of the outer
diameter but are two-thirds taller, so you have to have a much straighter well. They had to search
far and wide for others with similar situations such as depth, and found some in Albuquerque.
Chairperson Boswell asked what the casing size would be.
Mr. Inaba replied they are looking at a 20 -inch casing, at a maximum, without getting into extreme
costs.
The Manager -Chief Engineer noted that in the past, the Department would accept different types of
set-ups from developers that would be turned over to the Department. Moving forward, these
requirements will be made a part of developer agreements.
Mr. Elarionoff asked if, when Mr. Kimball referred to tons of water, it was a figure of speech or if
he was referring to actual tons.
Mr. Kimball replied he was referring to actual tons. There can be about 40 tons of water in the
column pipe.
Chairperson Boswell added that the weight of the pump and motor would be on top of that.
Mr. Kimball stated that it relates to the pressure analysis. It was disturbing to him to hear that five
different manufacturers all have different recommendations. It leads him to wonder if they really
understand. Regardless of what they are saying, it comes down to what makes sense to the
Department of Water Supply.
Mr. De Luz commented that what Mr. Elarionoff had mentioned earlier was a good point. Perhaps
a credentials page prior to the presentation, including why the consultant was selected and the
timeframe of the study, would be beneficial for newer Board Members to understand.
Brown and Caldwell's presentation concluded at 10:50 a.m.
7) SOUTH HILO:
A. JOB NO. 2019-1115, PANA`EWA WELL A REPAIR — REQUEST FOR
ADDITIONAL FUNDS:
The contractor, Derrick's Well Drilling & Pump Services, LLC, is requesting a contract change
order for additional work in association with the installation of the Pana`ewa Well A for the
amount of $12,174.81. The description of additional work and associated fees are attached.
Page 9 of 18 December 17, 2019, Water Board Minutes
Original Contract Amount: $ 98,000.00
Original Contingency Amount: $9,800.00
1st Additional Contingency Request: $8,003.05
1st Change Order: $250.64
2nd Change Order: $5,377.60
Total Revised Contract Amount: $115,803.05
The Manager -Chief Engineer recommended that the Board approve an increase in contingency
of $8,003.05 to Derrick's Well Drilling & Pump Services, LLC, for JOB NO. 2019-1115,
PANA`EWA WELL A REPAIR. If approved, the total revised contract amount shall be
$115,803.05.
MOTION: Mr. Elarionoff moved for approval of the recommendation; seconded by Mr. Balog.
Mr. Young showed photographs of the motor and discharge head which showed a large crack in
the top portion of the assembly that failed. It is made of cast iron. The failure could have been
due to fatigue or corrosion. The unit is a 15 -year old line shaft.
ACTION: Motion was carried unanimously by voice vote.
B. JOB NO. 2012-983, KA`IE`IE MAUKA FACILITY IMPROVEMENTS —
REQUEST FOR TIME EXTENSION:
The contractor, Isemoto Contracting Co., Ltd., is requesting a contract time extension of 56
calendar days. This time extension request will allow the contractor to complete the project
after experiencing a delay in the issuance of a building permit for this project. The delay was
beyond the control of the contractor.
Staff reviewed the request for a contract time extension and finds the 56 calendar days justified.
Note: There are no additional costs associated with this time extension.
1st time extension — 56 calendar days
The Manager -Chief Engineer recommended that the Board approve a contract time extension of
56 calendar days to Isemoto Contracting Co., Ltd., for JOB NO. 2012-983, KA`IE`IE MAUKA
FACILITY IMPROVEMENTS. If approved, the contract completion date will be extended
from December 13, 2019, to February 7, 2020.
MOTION: Mr. Elarionoff moved for approval of the recommendation; seconded by
Mr. Scicchitano.
Mr. Inaba stated that staff did a follow up with the Building Division. Because it was under
review by other agencies, the Department followed up with those agencies to speed up the
process. In the meantime, the contractor had contacted DWS for the time extension.
ACTION: Motion was carried unanimously by voice vote.
Page 10 of 18 December 17, 2019, Water Board Minutes
RECESS: Mr. Scicchitano moved for a 5 -minute recess at the request of the Secretary in order
to check the audio recording; seconded by Mr. De Luz and carried unanimously by voice vote.
Meeting resumed at 11:00 a.m.
8) SOUTH KOHALA:
A. JOB NO. 2018-1085, PARKER #1 DEEPWELL REPAIR — REQUEST FOR
TIME EXTENSION:
The contractor, Beylik Drilling & Pump Service, Inc., is requesting a contract time extension of
91 calendar days. The contractor encountered fit -up issues with the spare pump and motor
equipment furnished by the Department of Water Supply (DWS), which are currently being
addressed by the suppling vendor. These delays were beyond the control of the contractor.
Staff reviewed the request for a contract time extension and found that only 62 calendar days of
the requested time can be considered.] ustified. Note: There are no additional cost associated
with this time extension.
Ist time extension — 61 calendar days (Due to replacement check valves)
2nd time extension — 92 calendar days (Due to replacement discharge case)
3rd time extension — 62 calendar days
The Manager -Chief Engineer recommended that the Board approve a contract time extension of
62 calendar days to Beylik Drilling & Pump Service, Inc., for JOB NO. 2018-1085, PARKER
91 DEEPWELL REPAIR. If approved, the contract completion date will be revised from
November 30, 2019, to January 31, 2020.
MOTION: Mr. Elarionoff moved for approval of the recommendation; seconded by
Mr. Scicchitano.
In response to Mr. Elarionoffs question of what fit -up issues meant, Chairperson Boswell
replied that it is where the components are bolted together.
ACTION: Motion was carried unanimously by voice vote.
B. JOB NO. 2011-970, WAIKOLOA RESERVOIR NO. 1 EARTHQUAKE REPAIRS —
CONTRACT TIME EXTENSION:
The contractor, Henry's Equipment Rental & Sales, Inc., is requesting a contract time extension
of 344 calendar days to compensate for the unworkable days caused by the DWS request to
suspend construction activities in July 2019.
The DWS issued the July 2019 work suspension because it was necessary to modify some of
the Reservoir repair and improvements design details due to the discovery of unforeseen
conditions of the existing reservoir (structure, concrete panel lining, north and northeast facing
exterior embankments and rain runoff accumulation at the west side of the reservoir).
The DWS recommends a 30 -calendar day extension to the January 5, 2020, contract completion
date.
Page 11 of 18 December 17, 2019, Water Board Minutes
The 30 calendar days will allow time for the State of Hawaii, Department of Land and Natural
Resources (DLNR), Dam Safety Program, to complete its review and approval of the design
modifications of the reservoir repairs and improvements; for the DWS to analyze construction
cost estimates associated with the design modifications; and for the DWS to review a revised
construction schedule to accurately reflect the time necessary to complete the modified scope of
work.
As the reviews and approvals progress, the DWS will be better able to determine a reasonable
contract time extension and a cost estimate to complete the modified project scope of work.
Staff reviewed the request for the contract time extension and found that an extension of 30
calendar days is justified. Note: There are no additional costs associated with this time
extension.
1st time extension - 30 calendar days.
The Manager -Chief Engineer recommended that the Board approve a contract time extension of
30 calendar days to Henry's Equipment Rental & Sales, Inc., for JOB NO. 2011-970,
WAIKOLOA RESERVOIR NO. 1 EARTHQUAKE REPAIRS. If approved, the contract
completion date will be revised from January 5, 2020, to February 4, 2020.
MOTION: Mr. Elarionoff moved for approval of the recommendation; seconded by
Mr. Domingo.
Mr. De Luz stated that he would like to recuse himself from voting on this item because he has
had various transactions with this contractor in the personal sector.
The Manager -Chief Engineer clarified that the pro] ect will not be completed by February 4,
2020. This is to get it past the completion date in early January. Hopefully, by that time, the
Department will have an indication from DLNR Dam Safety on how this will move forward.
Chairperson Boswell noted that they have to approve the plans before the contractor can move
forward. He asked if any work is going on at this time or if they have been able to mobilize
their equipment out there.
Mr. Inaba replied that in order to prevent additional costs to have equipment out there, the
Department put a stop to the project.
Chairperson Boswell asked if the ramifications for the time extension will be adjusted with the
new pricing, if there are any increase in prices of materials along the way, it would be repriced
based on new plans.
The Manager -Chief Engineer replied that could happen. If it is within contingency, it probably
will not need to come before the Board. If it goes beyond the contingency, it will; but the
Department will update the Board either way.
ACTION: Motion was carried by voice vote (Ayes: 6 — Ms. Hugo, Messrs. Balog, Domingo,
Elarionoff, Scicchitano, and Chairperson Boswell; 1 Recusal Mr. De Luz; and 2 Absent:
Messrs. Kern and Sugai.)
Page 12 of 18 December 17, 2019, Water Board Minutes
9) NORTH KONA:
A. JOB NO. 2018-1098, PALANI DEEPWELL A REPAIR — REQUEST FOR
TIME EXTENSION:
The contractor, Derrick's Well Drilling & Pump Services, LLC, is requesting a contract time
extension of 10 calendar days. Logistical issues associated with the vendor furnishing and
delivering the shroud delayed the delivery of the shroud. These delays were beyond the control
of the contractor. Note: There are no additional costs associated with this time extension.
1St time extension — 60 calendar days (due to failure of motor manufacturer's lamination machine)
2nd time extension — 40 calendar days (due to incorrect motor lead length and shroud)
3rd time extension — 10 calendar days
The Manager -Chief Engineer recommended that the Board approve a contract time extension of
10 calendar days to Derrick's Well Drilling & Pump Services, LLC, for JOB NO. 2018-1098,
PALANI DEEPWELL A REPAIR. If approved, the contract completion date will be revised
from December 1, 2019, to December 11, 2019.
MOTION: Mr. Elarionoff moved for approval of the recommendation; seconded by
Mr. De Luz.
The Manager -Chief Engineer noted that it is past December I I and the project is not completed
yet. Mr. Takamoto has followed up with the contractor to get a better timeframe; but at this
point, the Department is considering them beyond the contract completed date and anything
past that will be subject to liquidated damages. Completion is anticipated in January 2020
(Mr. Takamoto confirmed). They have the material. It is a matter of getting it down the hole.
Chairperson Boswell asked where it goes from here --whether the Board approves this ten days
and then additional days are requested down the road.
The Manager -Chief Engineer replied that all they have justified from staff are the days up to
December 11, 2019. Anything beyond that will be liquidated damages.
Mr. Takamoto stated that they may be submitting something down the road; but at this point,
until staff sees it, it is as the recommendation shows.
ACTION: Motion was carried unanimously by voice vote.
B. JOB NO. 2016-1043, WAI`AHA WATER SYSTEM IMPROVEMENTS -
TRANSMISSION — REQUEST FOR TIME EXTENSION:
This time extension is to allow contractor to complete the waterline work on the three stream
crossings. The designs of the crossings were revised to address Department of Public Works
concerns and to eliminate impacting the profile of flood waters at the crossings. These
concerns and redesigns occurred after the job was bid out. The contractor could not construct
the stream crossings while doing other critical path work, hence the stream crossings are now
the critical path items. The contractor will need more time to complete the work and is
requesting for 210 calendar days to complete the redesigned stream crossings.
Page 13 of 18 December 17, 2019, Water Board Minutes
Staff has reviewed the request and finds that the time extension request is justified to complete
the work required for the project. Note: There are no additional costs associated with this time
extension.
1st time extension — 210 calendar days
The Manager -Chief Engineer recommended that the Board grant this extension of contract
time, of two hundred ten (210) calendar days, to Isemoto Contracting Co., Ltd., for JOB
NO. 2016-1043, WAI`AHA WATER SYSTEM IMPROVEMENTS — TRANSMISSION. If
approved, the contract completion date will be revised from November 1, 2019, to May 28,
2020.
MOTION: Mr. Elarionoff moved for approval of the recommendation; seconded by
Mr. De Luz.
The Manager -Chief Engineer noted that this was his fault because he pushed staff to bid out the
project because of the need for it; however, the final approval was not received from the
Department of Public Works (DPW). It was thought that their concerns could be addressed
after the award. Their concerns were to have DWS place the pipeline underneath the culvert
crossings and DWS did not think that was a prudent solution so the consultant and staff worked
with DPW to come up with a solution that was acceptable to them and kept it on the culvert
crossings, nearer to the surface. To go under the stream crossings would have made it hard for
DWS as far as maintenance. Mr. Inaba added that some of the items on the stream crossings,
because it is now above -ground, had to be fabricated, such as the brackets and hangers, and
resulted in long lead times as they could not get the materials in on time.
Mr. Elarionoff asked if there was additional charge for all of this work.
Mr. Inaba replied that it was just time requested by the contractor and there were no additional
charges.
The Manager -Chief Engineer felt that it was very gracious of them.
Chairperson Boswell stated that it would likely be a reduction in cost versus additional costs.
ACTION: Motion was carried unanimously by voice vote.
C. JOB NO. 2017-1063, SOURCE WATER ASSESSMENT — NORTH KONA MID-LEVEL
MONITORING WELL:
The contractor, Derrick's Well Drilling & Pump Services, LLC, is requesting a contract time
extension of 365 calendar days. The contractor experienced delays caused by the Department
unable to obtain a Conservation District Use Application permit prior to securing the Well
Construction Permit. During this period to obtain the permit, the project was put on hold and
no activity occurred.
The Office of Conservation and Coastal Lands (OCCL) determined that, before granting a
Conservation District Use Application (CDUA) for the proposed monitoring well, the
unpermitted status of the project parcel's subdivision of Tax Map Key No. 7-3-009:027 from its
original Tax Map Key No. 7-3-009:017, must be addressed first. This permit and the Site Plan
Page 14 of 18 December 17, 2019, Water Board Minutes
have been approved as of December 2, 2019. The contractor may now begin work at the site.
These delays were beyond the control of the contractor.
Staff reviewed the request for contract time extension and the accompanying supporting
documentation and found that only 305 calendar days of the requested time can be considered
justified. Note: There are no additional costs associated with this time extension.
1st time extension — 305 calendar days
The Manager -Chief Engineer recommended that the Board approve a contract time extension of
305 calendar days to Derrick's Well Drilling & Pump Services, LLC, for JOB NO. 2017-1063,
SOURCE WATER ASSESSMENT — NORTH KONA MID-LEVEL MONITORING WELL.
If approved, the contract completion date will be revised from October 27, 2019, to August 27,
2020.
MOTION: Mr. Elarionoff moved to approve the recommendation; seconded by Mr. De Luz.
The Manager -Chief Engineer noted that it was not realized until after award, and the contractor
had gone for their well drilling permit, that the Conservation District Use Application (CDUA)
was not taken care of, even from when the parcel was subdivided out. The process that took
place to get this application submitted and approved is what this item is about.
ACTION: Motion was carried unanimously by voice vote.
D. ASSIGNMENT OF WATER UNITS — WELL DEVELOPMENT AGREEMENT —
LANIHAU PROPERTIES, LLC, WEST HAWAII BUSINESS PARK, LLC, AND
PALANI RANCH COMPANY, INC.
The Developer of the subject agreement is assigning four (4) Water Units from their allotment
to Tax Map Key (3) 7-4-008:057, subject to the approval of the Water Board. DWS staff has
reviewed the assignment of units and finds that it is consistent with the intent of the First
Supplemental Well Development Agreement (Section 4.d. — Assignment of Equivalent Units),
which is to another property of the Owner, that is in the process of being sold.
The Manager -Chief Engineer recommended that the Water Board approve the assignment of
four (4) Water Units from the WELL DEVELOPMENT AGREEMENT and the FIRST
SUPPLEMENTAL WELL DEVELOPMENT AGREEMENT (Palam Well) from the receiving
parcel, Tax Map Key (3) 7-4-008:005 to Tax Map Key (3) 7-4-008:057.
MOTION: Mr. Elarionoff moved to approve the recommendation; seconded by Mr. Balog.
Mr. Domingo asked how water units are defined.
Mr. Inaba replied that one water unit equals 400 gallons per day. DWS issues water units to a
property or assigns a number of units to a certain meter.
Chairperson Boswell noted that when they sold the small portion off, the water units went with
that portion.
ACTION: Motion was carried unanimously by voice vote.
Page 15 of 18 December 17, 2019, Water Board Minutes
10) MISCELLANEOUS:
A. MONTHLY PROGRESS REPORT:
Job No. 2013-989, Kahalu`u Shaft Inclined Lift Replacement
Mr. Inaba reviewed the work on this project. The contractor, Jas. W. Glover, Ltd., and their
subcontractor, Heide & Cook, were present to answer questions. In December of 2018, the
order for the cart was placed, and everything had to be manufactured and shipped to the factory
where the cart and assembly were being put together. A test track was built to make sure they
could test the cart under load. He showed some photos of the frame for the cart being built.
There was a concern about the rollers because of their wear on the track. The rollers sit on the
track, and there is another roller underneath the guide so it does not allow roller movement.
They have very tight tolerances, which was a concern in terms of trying to replace sections of
the track. They needed a smooth transition to the new dimensions of the material they were
able to find. He showed a photo of the actual cart and the cage which can carry equipment.
There is a counter weight that sits within the higher "H" beams, which is a critical component
because it does carry a load. In August, they had replicated a test track, tested it, and reported
on the tolerances. Everything now has been shipped and received by the contractor. He
showed a photo of what the cart will look like once it is on the track. The contractor did have a
concern about the track that needs to be addressed, which has to do with alignment and
corrosion.
In response to Mr. De Luz's question of whether this new engineering would have more
capacity for repair, Mr. Inaba replied it would. Mr. Inaba continued with photos of how the
braking assembly works. Mr. Salvador of Jas. W. Glover, Ltd., noted it was a challenging
pro] ect because it is at a 30 -degree slope and the track is very long.
Job No. 2016-1043, Wai`aha Water System Improvements - Transmission
Mr. Inaba stated that because of the delay where the contractor will not be on site, they did a
hot mix patch on the road yesterday to improve road conditions. It is still a temporary patch.
The first patch was done with cold mix material.
Chairperson Boswell noted that asphalt availability in Kona can be a challenge.
Mr. Inaba stated that the contractor was planning to do the hot mix on a particular day and had
gotten cancelled that morning without warning. Grace Pacific was closed which delayed it
further.
B. REVIEW OF MONTHLY FINANCIAL STATEMENTS:
Mr. Elarionoff asked about Page 4 at the top under "Operating Revenues," where it was noted
that water sales dropped by $1 million. He asked why it was listed as unfavorable.
Mr. Sumada replied it is unfavorable only because it is less than last year. If it had been more
than last year, it would be favorable.
Mr. Elarionoff thought that for Power Cost Charges, it should be favorable if it dropped. He
asked if it was the goal to sell more water or to just provide water.
Mr. Sumada replied that was a different question that is not represented in this report.
Page 16 of 18 December 17, 2019, Water Board Minutes
Mr. De Luz asked if it was correct that this was just representing the variance.
Mr. Sumada replied that was correct. It is not desirable or undesirable but whether it was more
or less than the previous year.
C. MANAGER -CHIEF ENGINEER'S REPORT:
The Manager -Chief Engineer to provide an update on the following:
Kapulena Well — The Deputy reported that last week, the Department of Health issued a
press release regarding a new well that was brought online March of this year. Per the
Environmental Protection Agency (EPA), and Department of Health (DOH)
requirements, the Department does initial quarterly monitoring. The water samples
detected trace low levels of Atrazine, which is a regulated chemical, attributed to
herbicides, probably from the plantation era. The water is safe to drink and is way below
the maximum contaminant level. The water meets all EPA and DOH requirements.
Chairperson Boswell stated that he read the DOH's response and thought it was worded
better than not. You do not want to see it at all, but they were clear it was nowhere near
an advisory.
Mr. De Luz asked if this well addresses the long-term issue in that area.
Deputy Uyehara replied that was correct. It is part of the master plan. Prior to that, the
Department had a spring source which had low production.
Mr. Elarionoff asked the one question that people in the area might ask and that is if you
would drink the water too.
The Manager -Chief Engineer and Deputy Uyehara replied yes.
The Manager -Chief Engineer added, for clarification, that he did not quite agree with the
need for the Department of Health to issue this press release. It has been documented in
that system for decades because of the historical use during the plantation time. It has
always been below the maximum contaminant level (MCL). When EPA sets MCL's, it is
a list of dozens of chemical, biological, and radiological compounds. Anything below the
MCL is safe and acceptable to drink. He added that if his family lived in that area, he
would have no concerns about drinking the water. He added that if anyone has concerns,
they can contact the Department and it can be explained in more detail. The level has
been slowly declining over time but is not zero. To be proactive, the Deputy worked on a
response, which was sent out to elected officials, providing additional background. It
was not felt that our own press release was needed.
Deputy Uyehara stated that there will be additional monitoring going forward. A system
of this size requires one sample every three years; but because of the new detection, it
will be done annually for the next three years.
2. North Kona Wells — the Deputy stated that status the same for the wells. Four are still
offline: Holualoa, Palam, Wai`aha, and Makalei. For Makalei, the developer's engineer
Page 17 of 18 December 17, 2019, Water Board Minutes
is working on the redesign and still projecting early 2020 for bidding out. For Wai`aha,
there is a litigative hold; therefore, no comment on that. For Holualoa, the January 31,
2020, deadline is still current; and for Palam Well, the time extension granted today takes
it to December 11.
Retirees of the Department - the Deputy announced that after 23 years with the
Department, Mr. Daryl Ikeda was retiring. He started out as a Civil Engineer IV in
October 1996, and became Chief of Operations in August of 2005. We are sad to see him
go but glad he has this opportunity. He has been very dependable, can always be counted
on, and was a good bridge between management and Operations staff. He has the largest
division with almost 100 employees island wide.
The Manager -Chief Engineer stated that he and Mr. Ikeda started at DWS in the same
year. He respects him for all he has done in interacting as the bridge for his 100 or so
personnel. Basically, the water keeps flowing because of all the work the personnel do in
the field. Whenever there is a situation such as a main break, he is always on it at
whatever time of day. He is one of those silent but effective types and will be missed.
Mr. Ikeda stated that he is not the only retiree this month. Mr. Inaba has a retiree from
Engineering who wanted to remain anonymous, and he has one in Operations who also
wants to remain anonymous; but he also has one who is a Lead Electrician in Waimea,
Mr. Curtis Kawamoto. He has been working with the Department for a number of years
and is retiring at the end of this year. He joked that Mr. Kawamoto will be missed more
than himself.
D. CHAIRPERSON'S REPORT:
Chairperson Boswell announced that this month, Mr. Leningrad Elarionoff and Mr. Bryant
Balog are in their last month on the Board. They have served their five-year term, and their
service is appreciated. They will be missed.
11) ANNOUNCEMENTS:
1. Next Regular Meeting: - January 28, 2020, 10:00 a.m.; Department of Water Supply, Hilo
Operations Center Conference Room, 889 Leilani Street, Hilo, Hawaii.
2. Following Meeting: - February 25, 2020, 10:00 a.m.; Department of Water Supply, Hilo
Operations Center Conference Room, 889 Leilani Street, Hilo, Hawaii.
8) ADJOURNMENT
ACTION: Ms. Hugo moved to adjourn the meeting; seconded by Mr. De Luz and carried
unanimously by voice vote.
(Meeting adjourned at 11:50 a.m.)
Recording Secretary (MINUTES APPROVED AT 1/28/2020 WATER BOARD MEETING)
Page 18 of 18 December 17, 2019, Water Board Minutes