HomeMy WebLinkAboutUSE_18PLANNING COMMISSION
Planning Department
County of Hawaii
Hilo, Hawaii
APPLICATION FOR USE PERMIT
by )
KEAUHOU KAI VENTURES )
from }
MAXIMUM ALLOWABLE
HEIGHT LIMITS }
in )
Keauhou, North Kona, Hawaii )
USE PERMIT
USE PERMIT NO. 18
The County of Hawaii Planning Commission at a duly held public
hearing on June 27, 1979, and at its regular meetings of July 12,
1979 and July 25, 1979, considered the application of KEAUHOU KAI
VENTURES for a Use Permit in accordance with Article 5, Section 4
of Chapter 8 (Zoning Code) of the Hawaii County Code, as amended,
to allow the construction of a 4 -story condominium structure in
lieu of the maximum allowable height limit of three (3) stories
as stipulated within the Multiple Residential (RM) zoned district.
The property involved is located along the west or makai side of
Kam III Road, approximately 145 feet south of the Kam III Road-
Holua Road intersection, Keauhou, North Kona, Hawaii, Tax Map
Key 7-8-12:32.
The Commission has found:
That the proposed development is not anticipated to
have any substantial adverse environmental or ecological
effects. The purpose of the subject requests is to allow
a condominium building containing eighteen (18) units.
The proposed development also includes recreational facil-
ities, landscaping, parking and other related improvements.
The proposed building will be broken down into three (3)
elements at different elevations which will help in
visually integrating it with the natural slope. A greater
portion of the property has already been graded; therefore,
any further grading to the property will not be of a
substantial nature as to disrupt the present topography
of the land. The subject property is located approximately
450 feet from the shoreline. Since the subject site is
not situated along the shoreline, it is felt that the
proposed development will not interfere with the natural
shoreline processes. Thus, the impact on the shoreline
is expected to be minimal. Further, the proposed develop-
ment will not interfere with publicly owned or used recrea-
tional areas, with any natural areas or with public accesses
to the shoreline.
There are also no known rare or endangered species of
plants or animals or unique landforms on the subject property.
Although an archaeological survey did indicate that
some archaeological remains were found on the property,
any concerns will be mitigated through conditions of approval
of the permits.
In regards to the disposal of sewage, connection will
be made to the existing County system; otherwise, the peti-
tioner would have to provide its own on-site sewerage
treatment system.
All other essential utilities, including a 12 -inch
waterline, are or will be made available to the subject
property. In this regard, the proposed development will
complement the Multiple Residential element of the General
Plan which encourages the development of multiple family
units in areas zoned for such use and serviced by existing
facilities.
In regards to the Use Permit request for the
additional story, it is determined that the condomin-
ium building proposed to be constructed at a height
of four (4) stories and forty-four (44) feet does
meet the criteria established for an additional story
Use Permit as stipulated within the Multiple Family
(RM) zoned district. The primary criteria used in
determining whether a Use Permit should be granted
for an additional story and height is if "'..the
taller building will not dominate the landscape."
Although a Use Permit is being requested for
the additional story, only a portion of the building
will be affected. Further, that portion of the
building which will be four (4) stories in height
will not exceed the maximum allowable limit in terms
of feet. The proposed forty-four (44) foot building
will be within the height limit (in feet) established
within the RM zoned district. The building is designed
in such a manner that one (1) section of the building
would have an appearance of being three (3) stories
in height, and will be approximately thirty-seven (37)
feet in height. No living units are being proposed
for the first floor. It will primarily be used for
parking and other non -habitable uses, i.e. lobby, etc.
since the subject property is situated within the
potential tsunami inundation area.
At the location where the proposed building will be
sited, there is a difference in elevation of approx-
imately twelve (12) feet. That section of the building
which will be situated on the north or Kailua side of
the property will be sited at an elevation of approx-
imately fifty (50) feet. The Ka'u or southern portion
-2-
of the building will be constructed at an elevation of
thirty-eight (38) feet. Based on the design of the
building in relationship to the sloping terrain running
in a north -south direction, the building from a north -
south view would have an appearance of a three (3)
story building. Therefore, the viewplanes from a
north -south orientation will not be significantly
impeded. Since the proposed building will be terraced
in relationship to the topography and slope of the
land, the additional story will not be pronounced.
Furthermore, the effect of the building will also
be softened by the existing and proposed landscaping
of the area. It is determined that the existing land-
scape, which includes trees which are higher than the
proposed building, will soften the impact.
Based on the design of the building and its proposed
improvements, including landscaping, it is felt that the
building will not detract nor have an adverse impact on
the surrounding buildings and landscape. As such, the
proposed building does conform to the criteria for
granting of a Use Permit as it will not significantly
dominate the landscape of the immediate area.
Therefore, the Commission hereby grants to the applicant a Use
Permit to allow the construction of a 4 -story condominium struc-
ture in lieu of the maximum allowable height limit of three (3)
stories as stipulated within the Multiple Residential (RM) zoned
district. The property involved is located along the west or
makai side of Kam III Road, approximately 145 feet south of the
Kam III Road-Holua Road intersection, Keauhou, North Kona, Hawaii,
Tax Map Key 7-8-12:32, pursuant to the authority vested in it by
Article 1, Section 8 of Chapter 8 (Zoning Code) of the Hawaii
County Code, as amended, subject to the following conditions:
1. That the proposed development conform substantially
to the plans submitted and representations made by
the petitioner, except as may be necessary or required
in order to comply with any other conditions of
approval and/or subsequent actions.
2. That the petitioner, or its authorized representative,
shall submit plans and secure final plan approval
within one (1) year from the effective date of ap-
proval of the permits.
3. That construction commence within one () year from
the date of receipt of final plan approval and be
completed within two (2) years thereafter.
4. That the height of the building shall not exceed
forty-five (45) feet.
5. No living units shall be allowed on the first floor.
-3-
6. That a detailed landscaping plan be submitted for
review and approval by the Planning Director. The
landscaping plan should also include the use of
taller trees along the front portion of the building.
7. That the archaeological report prepared by Lloyd
Soehren shall be submitted prior to the issuance
of any grading or grubbing permit and final plan
approval. Further, if any other archaeological
remains are found during land preparation activ-
ities, work shall immediately cease and the
Petitioner/representative shall immediately no-
tify the Planning Department. Work shall not be
resumed until a review and clearance is obtained
from the Planning Department.
8. That the method of sewage disposal shall meet with
the requirements and approval of the County Department
of Public Works and State Department of Health.
9 That only one (1) access be permitted from the Kam
III Road. The location of the access shall meet with
the approval of the County Department of Public Works.
10. That the petitioner shall dedicate to the County an
area of approximately 856 square feet along the Kam
III Road for additional improvements to the stated
roadway. The land area requested for dedication is
on file with the Department of Public Works. ;Further,
the petitioner shall construct a sidewalk along the
roadway fronting its property, meeting with the
approval of the Department of Public Works. Such
improvements shall be constructed prior to the
issuance of the occupancy permit of the proposed
building.
11. That all other applicable rules, regulations and
requirements, including those of the Department of
Water Supply, shall be complied with,
Should any of the foregoing conditions not be met, the
Use Permit may be deemed null and void by the Planning Commission.
The effective date of this permit shall be from July 25, 1979.
Dated at Hilo, Hawaii, this 13th day of September f 1979.
APPROVED AS TO FORM
AND LEGALITY:_'P4 4
TZ_Z�5�A
DEPUTY CORPORATION COUNSEL
COUNTY OF HAWAII
Date: AUG 27 1979
�4�
WILLIAM F. MIELCKE
Chairman, Planning Commission