HomeMy WebLinkAbout93_014i
Stephen K. Yamashiro
Mayor
CERTIFIED MAIL
January 27, 1994
%twunfg of pufunii
PLANNING COMMISSION
25 Aupuni Street, Room 109 • Hilo, Hawaii 96720.4252
(808) 961-8288 Fax (808) 961.9615
Puna United Church of Christ
c/o Ms. Sharon Wickersham
RR 3, Box 192
Pahoa, HI 96778
Dear Ms. Wickersham:
Use Permit Application (USE 93-14)
Applicant: Puna United Church of Christ
Request: Establish a Church with School, Temporary Hostel -Type
Housings, Residences and Recreation Center
Tax Map Key: 1-6-3:95. formerly 1-6-3:Portion of 11
The Planning Commission at its duly held public hearing on
January 20, 1994, voted to approve the above -referenced application.
Use Permit No. 120 is hereby issued to establish a church with
school, temporary hostel -type housings, residences and recreation
center on approximately 4.949 acres of land within the Single Family
Residential -10,000 square foot (RS -10) district. The project site
is located on the southwest (Pahoa) side of the Old Volcano Road at
its intersection with the Volcano Highway, Keaau, Puna, Hawaii.
Approval of this request is based on the following:
(A) The proposed use will still be consistent with the general
purpose of the zoned district, the intent and purpose of
this chapter, and the County General Plan;
(B) The proposed use will not be materially detrimental to the
public welfare nor cause substantial, adverse impact to the
community's character or to surrounding properties;
(C) The proposed use will not adversely affect similar or
related existing uses within the surrounding area,
community or region; and
(D) The proposed use will not unreasonably burden public
agencies to provide roads and streets, sewer, water,
7 1994
Puna United Church of Christ
January 27, 1994
Page 2
drainage, schools, police and fire protection and other
related infrastructure.
The proposed church use will still be consistent with the
general purpose of the zoned district, the intent and purpose of
the Zoning Code, and the County General Plan. The establishment
of a church and related improvements in the County's
Single -Family Residential -10,000 sq. ft. (RS -10) zoned district
and the State Land Use Urban District may be allowed through the
granting of a Use Permit. The General Plan designates the area
for Low Density Urban which is single family residential in
character and may allow for ancillary community and public uses
and convenience type commercial uses. Surrounding areas are
designated Low and Medium Density Urban and Urban Expansion.
Thus the proposed use will be consistent with the planning for
the area which would allow for a range of uses.
The proposed development will complement the following
goals and policies of the Land Use Element of the General Plan
which state:
* Designate and allocate land uses in appropriate
proportions and mix and in keeping with the social,
cultural, and physical environments of the County.
* Promote and encourage the rehabilitation and use of
urban and rural areas which are serviced by basic
community facilities and utilities.
* The county shall encourage the development and
maintenance of communities meeting the needs of its
residents in balance with the physical and social
environment.
The granting of the proposed use will not be materially
detrimental to the public welfare nor cause substantial, adverse
impact to the community's character or to surrounding
properties. The proposed church will replace an existing
church, adjacent to the Keaau Town Center, located approximately
1,500 ft. northeast of the proposed development, also along the
Old Volcano Road. The owner, W.H. Shipman, Ltd. is
discontinuing the lease in order to allow expansion of the
adjacent Keaau Town Center onto the existing church site. The
character of the immediate community is presently residential
and commercial in nature. The General Plan LUPAG Map defines
the subject property and surrounding areas in the vicinity of
the Keaau Town Center for Low and Medium Density Urban uses and
Urban Expansion. The Keaau Town Center has served as an anchor
Puna United Church of Christ
January 27, 1994
Page 3
as a urban/commercial core for this section of Puna. It is
expected that further growth and development will continue to
occur in this area. Therefore, the proposed church and related
uses are not expected to cause substantial adverse impact to the
community's character or to surrounding properties. To ensure
noise and visual impacts from the church and related uses are
adequately addressed, a condition is being proposed to require
that a landscaping buffer be required along the perimeter
boundaries of the project site. Landscaping as well as all
parking and setback requirements shall be reviewed during Plan
Approval review.
The granting of the proposed use will not adversely affect
similar or related existing uses within the surrounding area,
community or region. Although, the proposed multipurpose
center, church, hostel, classrooms, recreation center and
related improvements will be substantially greater in size and
scope than the existing church use, it is not anticipated to
adversely affect similar uses within the surrounding community
or region. The development of the church complex over a period
of 15-20 years, within the urban/commercial core of Keaau, will
allow for a gradual acceptance of the proposal as development
continues to occur in the Keaau region as a whole. Based on the
diversity of the proposed development, services offered by the
church will continue to supplement existing religious and
charitable services in the region and not expected to adversely
impact other churches in the area. The granting of the proposed
use will not unreasonably burden public agencies to provide
roads and streets, sewer, water, drainage, schools, police and
fire protection and other related infrastructure. Access to the
church would be from the Old Volcano Road which has a pavement
width of 20 feet and can accommodate two way traffic. As the
subject property is located within close proximity of a
commercial center and within an area that has a potential for
urban expansion, it is recommended that a 5 -foot road widening
setback fronting the subject property be designated on all
plans. This would allow for the widening of the Old Volcano
Road to commercial standards, should the need arise. since
development plans and roadway improvements are not definite for
the surrounding area, rather than impose improvement
requirements, a condition is also included to also require the
applicant to participate in an improvement district should one
be implemented. Plans submitted indicate a service road running
along the entire perimeter of the subject property, with two
access driveways for ingress and egress. A condition is also
being recommended to require that all driveways and parking
areas be paved with asphalt or asphalt -concrete and that a
second access be constructed prior the construction phase for
Puna United Church of Christ
January 27, 1994
Page 4
the school. All other services and utilities are or shall be
made available to the subject property. In addition, agencies
had no objections to the proposed church.
Approval of this request is subject to the following conditions:
1. The applicant, successors or assigns shall comply with all
of the stated conditions of approval.
2. The applicant, its successors or assigns shall indemnify
and hold the County of Hawaii harmless from and against any
loss, liability, claim or demand for the property damage,
personal injury and death arising out of any act or
omission of the applicant, its successors or assigns,
officers, employees, contractors and agents under this
permit or relating to or connected with the granting of
this permit.
Final Plan Approval, pursuant to Section 25-242 of the
Zoning Code, for each phase of the church and its related
improvements shall be secured from the Planning Director.
Plans shall identify existing and proposed structures, fire
protection measures, paved driveways and paved parking
stalls (asphalt or asphalt -concrete), and landscaping
associated with the proposed uses. Parking for all
functions shall be maintained on the subject property and
comply with the requirements of Chapter 25 (Zoning Code).
Detailed landscaping plans shall include landscaping
buffers along the perimeter boundaries of the project site.
Plans shall also indicate a 5 -foot road widening setback
along the Volcano Road frontage of the subject property.
Construction of the proposed church complex shall be
completed and all certificates of occupancy issued within
fifteen (15) years from the effective date of this Use
Permit.
The applicant shall complete the proposed project in
substantial compliance with the representations made before
the Planning Commission. Any proposed changes contrary to
this shall be submitted to the Planning Commission as an
amendment to this permit.
6. All driveway accesses shall meet with the approval of the
Department of Public Works. A second access shall be
constructed prior to the issuance of a certificate of
occupancy for the school or Phase IV of the proposed
development.
Puna United Church of Christ
January 27, 1994
Page 5
7. The applicant shall provide fire protection standards
meeting with the approval of the Fire Department.
8. Should an improvement district or similar arrangement be
initiated in the future for curb, gutter, sidewalk,
drainage and related improvements to the Old Volcano Road,
the property owner(s) shall participate automatically in
such an arrangement. Written assurance for implementation
of this condition, in the form of a deed covenant, shall be
submitted to the Planning Director prior to the start of
construction for Phase I.
9. Should any unanticipated archaeological or cultural sites
or features be uncovered during land preparation
activities, work with the affected area shall immediately
cease and the Planning Director notified. No work within
the affected area shall resume dntil clearance is obtained
from the Planning Director.
lo. All other applicable laws, rules, regulations and
requirements shall be complied with, including the
Department of Health, Department of Water Supply and
Department of Public Works.
11. The applicant shall submit a status report, in writing to
the Planning Director, every three (3) years from the
effective date of this permit.
12. An extension of time for the performance of conditions of
the permit, with the exception of Condition No. 4, may be
granted by the Planning Director upon the following
circumstances: 1) the non-performance is the result of
conditions that could not have been foreseen or are beyond
the control of the applicant, successors or assigns, and
that are not the result of their fault or negligence;
b) granting of the time extension would not be contrary to
the General Plan or the Zoning Code; c) granting of the
extension would not be contrary to the original reasons for
the granting of the permit; and d) the time extension
granted shall be for a period not to exceed the period
originally granted for performance (i.e., a condition to be
performed within one year may be extended for up to one
additional year). Further, should any of the conditions
not be met or substantially complied with in a timely
fashion, the Director shall initiate procedures to revoke
the permit.
Puna United Church of Christ
January 27, 1994
Page 6
This approval does not, however, sanction the specific plans
submitted with the application as they may be subject to change given
specific code and regulatory requirements of the affected agencies.
Should you have any questions, please feel free to contact Rodney
Nakano or Susan Gagorik of the Planning Department at 961-8288.
Sincerely,
i
Donald L. Manalili, Chairman
Planning Commission
RKN:jdk
LPunaU01.PC
xc: Honorable Stephen K. Yamashiro, Mayor
Planning Director
Department of Public Works
Department of Water Supply
County Real Property Tax Division - Hilo
Fire Department
Department of Health
Plan Approval Section