HomeMy WebLinkAbout00_005Harry Kim
Mayor
County of Hawaii
PLANNING COMMISSION
25 Aupuni Street,Room t09 •Hila,Hawaii 96720·4252
(808)961-8288 •Fax (808)961-8742
CERTIFIED MAIL
7000 0600 002429042350
MAY il 4.2Gt\:j
Mr.Lee Sichter
Belt Collins Hawaii Ltd.
680 Ala Moana Boulevard,Suite 100
Honolulu,HI 96813
Dear Mr.Sichter:
Special Management Area Use Permit Application (SMA 00-014)
Use Permit Application (USE 00-005)Ii
Request:Development of an 18-Hole Golf Course,Clubhouse,Related
Facilities and Infrastructure
Applicant:White Sand.Beach Limited Partnership
Tax Map Key:6-8-1 :Portion of22
The Planning Commission at its duly held public hearing on April 6,2001,voted to approve the
above-referenced applications.Special Management Area (SMA)Use Permit No.415 and Use
Permit No.184 are hereby issued for the development of an 18-hole golf course,driving range,
clubhouse,parking area,pump house,related maintenance support facilities,a small lake,and
associate improvements and infrastructure.The project area is located within the Mauna Lani
Resort area,Waikoloa,South Kohala,Hawaii.
Approval of this request is based on the following:
Special Management Area Use Permit
The purpose of Chapter 205A,Hawaii Revised Statutes (HRS),and Special
Management Area Rules and Regulations of the County of Hawaii,is to preserve,protect,
and where possible,to restore the natural resources ofthe coastal zone areas.Therefore,
special controls on development within an area along the shoreline are necessary to avoid
permanent loss of valuable resources and the foreclosure of management options.
38'03
U ii.
Mr.Lee Sichter
Page 2
The proposed development of a I8-hole golf course,driving range,clubhouse and
other related facilities and improvements on the project site will not have any substantial
adverse environmental or ecological effect,except as such adverse effect is minimized to
the extent practicable and clearly outweighed by public health,safety,or compelling
public interest.Such adverse effect shall include,but not be limited to,the potential
cumulative impact of individual developments,each one of which taken in itself might
not have a substantial adverse effect and elimination ofplanning options.
The proposed development is consistent with the County General Plan and Zoning
Code.The proposed project does conform to the General Plan Land Use Pattern
Allocation Guide (LUPAG)Map,which designates this area for Urban Expansion.
Urban Expansion allows for a mix of high density,medinm density,low density,
industrial and/or open designations in areas where new settlements may be desirable,but
where the specific settlement pattern and mix of uses have not yet been determined.
Within areas designated fQ,r development as resorts,portions of the resort area may be
included in the Urban Expansion Area.While not typical of urban types of use due to its
extensive,structured landscaping and minimal amount of structures,a golf course does
provide direct support ofresort uses.Its proximity to existing resort areas at Mauna Lani
is essential for it provides a much-desired recreational amenity for both tourists and
residents alike.
The project site is located approximately one-quarter of a mile from the shoreline.
The distance ofthe project site from the shoreline would preclude any substantial adverse
impacts the proposed development may have upon coastal recreational and visual
resources,public access to and along the shoreline,or upon the coastal ecosystem.The
proposed development will not severely interfere with the coastal view plane.The
General Plan does identify the viewplane from the Queen Kaahumanu Highway looking
both mauka and makai as an example of natural beauty.The project site is situated makai
of the Queen Kaahumanu Highway.The open space characteristics of the proposed golf
course will not significantly impact the viewplane from the Queen Kaahumanu Highway.
The proposed golf course will add diversity to the coastal viewplane by providing a green
oasis amongst the relatively stark lava landscape that defines this section of South
Kohala.In addition,the location of the project site approximately one-quarter mile from
the shoreline would also preclude any visual impacts along the shoreline.The proj ect site
is situated makai of the Queen Kaahumanu Highway on lands that are relatively flat (4 to
6%slope).The two proposed structures (golf clubhouse and maintenance building)will
not exceed a maximum height of28 feet.With existing vegetation and proposed golf
course landscaping, the proposed development is not anticipated to generate a significant
adverse impact to coastal viewplanes from the Queen Kaahumanu Highway.Figures 5
and 6 ofthe Applicant's Special Management Area Use Permit Application dated
Mr.Lee Sichter
Page 3
August 4,2000,graphically illustrates the limited visual characteristics of the proposed
golf course clubhouse and maintenance facilities buildings,respectively.
There are no known public access facilities or easements within the proj ect site
that provides access to coastal areas.While there currently is an emergency evacuation
road from the Puako Beach Lots Subdivision through the project site,this roadway is not
dedicated towards providing coastal access.Public shoreline access is available at the
nearby Mauna Lani Resort and the Orchid at Mauna Lani complexes.Puako Beach
Drive,situated to the north ofthe project site,also provides access to coastal areas.The
location ofthe project site from the shoreline and the availability of other existing public
shoreline accesses in the vicinity will ensure that public access to and along the shoreline
will not be affected by the proposed golf course development.The applicant has
indicated that an existing emergency evacuation road from the Puako Beach Lots
Subdivision to the existing Mauna Lani Resort maintenance roadway will be relocated to
accommodate the proposed project.Preservation of this emergency evacuation roadway
is viewed as essential to t1~e residents ofPuako Beach Lots Subdivision.Therefore,the
Director recommends that the relocated emergency evacuation roadway be shown on
plans submitted for plan approval review as well as ensure that its construction is
completed prior to the elimination of its existing alignment.
The application ofpesticides and herbicides during construction and maintenance
of the golf course will be done so in compliance with Best Management Practices as will
be prescribed in an Integrated Pest Management Program (IPMP)being developed by the
applicant.This IPMP,to be approved by the Planning Director in consultation with the
Department ofHealth,will be required as a condition of this approval recommendation.
The implementation of this approved program will minimize any adverse impact to
groundwater and coastal marine water resources within the affected area.The applicant
has agreed to cooperate with Protect Puako to develop an assessment/study of
groundwater hydrology in the Puako area that will assist both the applicant and Protect
Puako in understanding the quality and quantity of groundwater available for golf course
irrigation purposes.The applicant has also agreed to an ongoing groundwater and
nearshore water quality monitoring program for which the applicant will assume the costs
associated with such a monitoring program for a period of two years from the effective
date ofthis Special Management Area Use Pennit and the accompanying Use Pennit.
Finally,the applicant has agreed to register the proposed golf course under the Audubon's
International Gold Signature Program and will strive to achieve Gold Certification upon
completion ofthe golf course.These agreements will be incorporated into conditions of
this approval recommendation.
In response to recommendations received from the State Department of Health
regarding the implementation of appropriate management measures to control potential
sources of nonpoint pollution resulting from the construction and operation of the
Mr.Lee Sichter
Page 4
proposed golf course,the Director recommends that the applicant comply with the "Golf
Course Management Measures"contained in the "Hawaii's Coastal Nonpoint Pollution
Control Program Management Plan."The goal of these management measures is to
minimize and prevent the migration of nonpoint source pollutants from golf courses into
ground,surface,and coastal waters.The applicant shall also comply with the Department
of Health's "Guidelines Applicable to Golf Courses in Hawai'i"(June 2000).These
guidelines are intended to promote,protect and enhance environmental quality and public
health.These recommendations cover measures that could prevent groundwater and
surface water pollution,soil contamination,chemical spills,and noise and solid waste
nuisances.
A Botanical Resources Assessment of the project site was prepared by Char and
Associates in May 2000.No federal or state listed threatened or endangered species of
plants were identified within the project site.In general,the project site consisted of
kiawe forest and buffel grass.Lava areas include some native species such as 'ilima and
'uhaloa.Portions of the pJ:oject site also included maintained vegetation as part ofthe
Mauna Lani Resort development and included a variety of ornamentals and weedy
species.
A Survey ofAvian and Mammalian Species was conducted by Mr.Reginald
David of Ran a Productions,Ltd.between April 30 and May 1,2000.A total of676
individual birds ofl5 species,representing 10 separate families were identified within the
project site.Fourteen of these identified species were alien to the islands.The
indigenous migratory Pacific golden plover was detected within the project site.
Mammals within the proj ect site included dogs,cats,and mongoose.It is assumed that
rats and mice also inhabit the site.The Hawaiian Hoary Bat,an endemic mammal,may
overfly the project site as may the endangered Dark Rumped Petrel.The study concluded
that the project site "does not provide resources necessary for the sustenance or nesting
ofnative avian species."In summary,the project site does not provide a habitat for any
endangered species of plant or animal.
An archaeological inventory survey of the project site was conducted in
April 2000 by Paul H.Rosendahl,Ph.D.,Inc.(PHRI).The survey identified 14
archaeological sites and 30 component features of these individual sites.PHRI
recommended no further archaeological work and no preservation of these sites.The 14
sites consisted of 10 single feature sites that included walls,mounds,marine shell
concentrations,a possible cart path,and modified crop with cultural deposits.The 14
sites also included four complexes consisting of remnants of a historic/modem cattle
ranch,another consisting of two enclosures, a third comprising an enclosure and mound,
and the last consisting of three overhangs.By letter to the Planning Director dated
September 14,2000,the Department of Land and Natural Resources-Historic
Preservation Division (SHPD )has concurred with the findings of the survey and agreed
Mr.Lee Sichter
PageS
that all sites were adequately described and that none of the sites merit preservation.
SHPD then determined that the proposed golf course development with have no effect
upon significant historic sites.Should archaeological features be discovered during
construction,a condition ofthis approval requires the applicant to contact the State
Department of Land and Natural Resources and secure their clearance prior to continuing
with any development activities.There are no air quality monitoring stations in the West
Hawaii Region.The principle source of short-term air quality impacts will be associated
with the construction of the proposed golf course and related facilities.Mitigative
measures to preserve air quality during the course of construction of the golf course will
be implemented in accordance with existing government regulations and modern
construction practices.These practices may include limiting the area under construction
at any given time and the application ofmulching or chemical stabilizers to inactive
construction areas.Noise generated by construction activities upon surrounding areas,
especially the Puako Beach Lots community,will also be of concern.The applicant will
limit construction activities during daylight hours as well as use of mufflers on
construction equipment when possible.Given the relatively short duration of
construction activities,the Director anticipates that long-term adverse impacts to air
quality and noise will be minimal.The very nature and popularity of golf as a
recreational activity is based upon the maintenance of a tranquil environment.Any noise
that could adversely affect surrounding properties during golf course operation will
definitely affect the quality ofplay.
Wastewater generated by the proposed development will be accommodated by the
existing Mauna Lani wastewater treatment plant.Any potential runoff or discharge
which could reach ocean waters can be handled by on-site improvements provided in
accordance with existing County regulations.Likewise,any impacts from soil erosion
and runoff during site preparation and construction phases can be adequately mitigated
through compliance with existing County erosion and sedimentation control regulations
as well as standard construction practices.
The proj ect site is not situated within an area that may be impacted by coastal
flooding hazards due to its distance from the shoreline.However,approximately three-
fourths of the project site is situated within the IOO-year flood area (Zone AO).An area
within the northern portion of the project site is also designated within a flood area
(Zone AE).Remaining areas outside ofthese flood areas are Zone X (areas outside of the
SOO-year flood area).The Department of Public Works (DPW)is recommending that a
drainage study be prepared for the project site and a recommended drainage system
installed meeting with their approval.If deemed necessary by the DPW,the applicant
will be required to prepare a flood study for submittal to the Federal Emergency
Management Agency (FEMA).These recommendations from the DPW will be made a
condition of this approval recommendation.With the implementation of all flood and
drainage improvements as may be required by the Department of Public Works,we find
Mr.Lee Sichter
Page 6
that the proposed project will not have a significant adverse impact to the County's
drainage systems.
With these precautionary measures in place,the proposed development is not
anticipated to have any substantial adverse effects upon the coastal resources or
environment.
As discussed in detail above,the Planning Director finds that the proposed
development is consistent with the objectives and policies as provided by Chapter 205A,
HRS,and Special Management Area guidelines contained in Rule No.9 of the Planning
Commission Rules of Practice and Procedure.
Based on the above findings,it is determined that the proposed development will
not have any substantial adverse impacts on the surrounding area,nor will its approval be
contrary to the objectives and policies of Chapter 205A,HRS,relating to Coastal Zone
Management and Rule No,9 of the Planning Commission relating to the Special
Management Area.
Approval of this request is subject to the following conditions.Should any of the conditions not
be met or substantially complied with in a timely fashion,the Director may initiate procedures to
revoke this permit.
1.The applicant,its successor or assigns shall be responsible for complying with all
stated conditions of approval.
2.Construction ofthe proposed development shall be completed within five (5)
years from the effective date of this permit.
3.Final Plan Approval for the proposed golf course,clubhouse,driving range,
ground maintenance facilities and related improvements shall be secured from the
Planning Director.Plans shall identify the proposed structures,vehicular traffic,
paved driveway access and parking stalls associated with the proposed use.
4.The applicant shall preserve the potential use ofthe existing emergency
evacuation roadway traversing through the project site until such time the
applicant has completed construction of a realigned emergency evacuation
roadway in a location approved by the Planning Director.The closure of the
existing emergency evacuation roadway and use ofthe new,realigned emergency
evacuation roadway will occur with the written approval of the Planning Director.
Mr.Lee Sichter
Page 7
5.A detailed drainage study shall be prepared by the applicant for review and
approval by the Department ofPublic Works prior to submittal of plans for Final
Plan Approval review for the golf course and/or clubhouse,whichever is
submitted first.A drainage system shall be installed meeting with the approval of
the Department of Public Works,prior to issuance of a certificate of occupancy
for the golf clubhouse or opening ofthe golf course,whichever occurs first.
6.As may be deemed necessary by the Department of Public Works,the applicant
shall prepare a flood study for submittal to the Federal Emergency Management
Agency (FEMA)for a Letter of Map Revision (LOMR),if required.prior to the
submittal of plans for Plan Approval Review and/or prior to the commencement
of any land alteration activities. A Conditional Letter of Map Revision (CLOMR)
from FEMA may be necessary before development may proceed on portions of
the proposed development.Should a flood study be required,issuance of Final
Plan Approval of the proposed golf course development,or any portion thereof,
will be subject to concurrence by the Department of Public Works.
7.The applicant shall develop an Integrated Pest Management Program (IPMP)for
the review and approval of the Plarming Director,in consultation with the State
Department of Health,prior to the issuance of Final Plan Approval for the golf
course or any of its related components and facilities.
8.The applicant shall cooperate with Protect Puako in the development of a
groundwater hydrology study/assessment that will assist both parties in the
understanding of groundwater quality and quantities within the affected area that
are available for golf course irrigation.The scope of the study/assessment and its
participants and costs shall be agreed upon by both the applicant and Protect
Puako,prior to the submittal ofplans for Plan Approval Review for any portion of
the proposed golf course development.In the event the parties are unable to reach
agreement,the terms of the proposed study/assessment shall be approved by the
Plarming Department in consultation with the Department of Water Supply,the
Commission on Water Resource Management,and the Puako Community
Association.
Mr.Lee Sichter
Page 8
9.The applicant shall conduct a groundwater and nearshore water quality monitoring
program within the affected area for a period of two (2)years from the date of
issuance of this permit.The scope of the monitoring program,which shall be
consistent with accepted monitoring standards and sufficient to detect and assess
changes to groundwater and the nearshore marine environment in the vicinity of
the project site,shall be approved by the Planning Director,in consultation with
the Department of Health,prior to the issuance of Final Plan Approval for the golf
course clubhouse or the opening of the golf course,whichever comes first.
10.The applicant shall register the proposed golf course with the Audubon
International's Gold Signature Program prior to the opening of the golf course and
shall use its best efforts to obtain and continue Gold Certification.
11.The applicant shall comply with the Department of Health's "Guidelines
Applicable to Golf Courses in Hawai'i"dated June 2000,and the "Golf Course
Management Meaqures"contained in the "Hawaii's Coastal Nonpoint Pollution
Control Program Management Plan."
12.A Solid Waste Management Plan shall be prepared and submitted for approval to
the Department ofPublic Works prior to submitting plans for Final Plan
Approval.Approved recommendations and mitigation measures shall be
implemented in a manner meeting with the approval of the Department ofPublic
Works.
13.Wastewater generated by the proposed development shall be disposed of in a
manner meeting with the approval ofthe Department of Health.
14.During construction,best effort measures shall be taken to minimize the potential
of both fugitive dust and runoff sedimentation.Such best effort measures shall be
in compliance with construction industry standards and practices utilized during
construction proj ects of the State of Hawaii.
15.The use of pesticides and herbicides in conjunction with all phases of the golf
course operation shall conform with the applicable regulations of appropriate
governmental agencies.
16.Should any unidentified sites or remains such as artifacts,shell,bone,or charcoal
deposits,human burials,rock or coral alignments,pavings or walls be
encountered,work in the immediate area shall cease and the Department of Land
and Natural Resources-Historic Preservation Division (DLNR-HPD)shall be
immediately notified.Subsequent work shall proceed upon an archaeological
Mr.Lee Sichter
Page 9
clearance from the DLNR-HPD when it finds that sufficient mitigative measures
have been taken.
17.Comply with all other applicable laws,rules,regulations and requirements of
affected agencies for approval ofthe proposed development within the subject
property.
18.An annual progress report shall be submitted to the Planning Director prior to
each anniversary date ofthe approval of this permit.This condition shall remain
in effect until all of the conditions of approval have been complied with and the
Director acknowledges that further reports are not required.
19.An initial extension of time for the performance of conditions within the permit
may be granted by the Planning Director upon the following circumstances:
(A)The non-pe[formance is the result of conditions that could not have been
foreseen or are beyond the control of the applicant,successors or assigns,
and that are not the result of their fault or negligence.
(B)Granting ofthe time extension would not be contrary to the General Plan
or Zoning Code.
(C)Granting of the time extension would not be contrary to the original
reasons for the granting of the permit.
(D)The time extension granted shall be for a period not to exceed the period
originally granted for performance (i.e.,a condition to be performed
within one year may be extended for up to one additional year).
Use Permit
Rule 7 (Use Permits)ofthe Planning Commission's Rules of Practice and
Procedure states that the Planning Commission may approve a use permit based on
certain criteria.Section 7-6,Criteria for Granting a Use Permit,states:
"The Commission may approve a use permit upon finding that:
"(a)The granting ofthe proposed use shall be consistent with the general purpose of
the zoning district,the intent and purpose of the Zoning Code,and the County
General Plan;
Mr.Lee Sichter
Page 10
"(b)The granting ofthe proposed use shall not be materially detrimental to the public
welfare nor cause substantial,adverse impact to the community's character or to
surrounding properties;and
"(c)The granting of the proposed use shall not unreasonably burden public agencies to
provide roads and streets,sewer,water,drainage,schools,police and fire
protection and other related infrastructure."
The granting of the request for a Use Permit will be consistent with the general
purpose of the zoned district,the intent and purpose of the Zoning Code and the County
General Plan.The establishment of a golf course,driving range,clubhouse,water
features and other related improvements and facilities,on a project site located within the
State Land Use Agricultural District and zoned Agricultural-5 acre (A-5a)by the County
is a permitted use through the Use Permit review process,provided that the Land Study
Bureau's Detailed Classification System classifies the project site as having a master
productivity rating of C,~or E.The Use Permit process provides an avenue to review
and analyze a proposed project on a case-by-case basis relative to infrastructure and
impacts on surrounding properties and existing uses as well as the goals and policies of
the General Plan.The intent and purpose of the Zoning Code is to promote health,safety,
morals or the general welfare of the community through regulations and restrictions
relative to the location and use of buildings,off-street parking,the percentage oflots that
may be occupied,the density of population and land for trade,industry,residence or other
purposes.
The General Plan Land Use Pattern Allocation Guide (LUPAG)Map designates
the subject area for Urban Expansion,which allows for a mix of high,medium and low
density urban uses,industrial and/or open designations in areas where new settlements
may be desirable,but where specific settlement patterns and mix of uses have not yet
been determined.The Land Study Bureau's Detailed Land Classification System
classifies soils within the project area having an overalI.master productivity rating for
agricultural use of "E"or "Very Poor."
Mindful ofthe type of service and opportunities the applicant will provide to the
residents of West Hawaii,the proposed project will compliment the following goals,
policies and standards of the Land Use Elements of the General Plan:
Land Use
•Designate and allocate land areas in appropriate proportions and mix and in
keeping with the social,cultural,and physical enviromnents of the County.
Mr.Lee Sichter
Page 11
•The county shall encourage the development and maintenance of communities
meeting the needs of its residents in balance with the physical and social
environment.
The proposed request would also complement the following goals and policies of
the Recreational,Environmental Quality,Natural Resources and Shorelines,and Natural
Beauty Elements of the General Plan.
Recreational
•Provide a wide variety ofrecreational opportunities for the residents and visitors
ofthe County.
•Maintain the natural beauty of recreation areas.
•Provide a diversity;of environments for active and passive pursuits.
Environmental Quality
•Maintain,and if feasible,improve the existing environmental quality of the island.
•Encourage the concept ofrecycling agricultural and municipal waste material.
The proposed use would also conform to the following:
Natural Resources and Shorelines
•Protect and conserve the natural resources ofthe County of Hawaii from undue
exploitation,encroachment and damage.
•Provide opportunities for the public to fulfill recreational,economic,and
educational needs without despoiling or endangering natural resources.
•Protect and promote the prudent use of Hawaii's unique,fragile and significant
environmental and natural resources.
•Protect rare or endangered species and habitants native to Hawaii.
•Protect and effectively manage Hawaii's open space,watersheds,and natural
areas.
Mr.Lee Sichter
Page 12
•Ensure that alterations to existing land fonns and vegetation,except crops,and
construction of structures cause minimum adverse effect to water resources,and
scenic and recreational amenities and minimum danger offIoods,landslides,
erosion,siltation,or failure in the event of earthquake.
•The County of Hawaii should require users of natural resources to conduct their
activities in a manner that avoids or minimizes adverse effects on the
environment.
•Encourage the use of native plants for screening and landscaping.
Natural Beauty
•Protect,preserve and enhance the quality of areas endowed with natural beauty,
including the quality of coastal scenic resources.
\
•Protect scenic vistas and view planes from becoming obstructed.
•The County shall consider structural setback from major thoroughfares and
highways and shall establish development and design guidelines to protect
important view planes.
The proposed use would also confonn to the following goals and policies ofthe
Economic Element goals and policies of the General Plan.
Economic
•Provide residents with opportunities to improve their quality oflife.
•Economic development and improvement shall be in balance with the physical
and social environments ofthe island ofHawaii.
•The County of Hawaii shall strive for an economic climate which provides its
residents an opportunity for choice of occupation.
•The County of Hawaii shall strive for diversification of its economy by
strengthening existing industries and attracting new endeavors.
The desired use will not be materially detrimental to the public welfare nor cause
substantial adverse impact to the community's character or surrounding properties.The
project site and surrounding area is identified as a Major Resort Area by the General Plan.
Mr.Lee Sichter
Page 13
The proposed proj ect will allow the applicant to develop a golf course that can be
integrated as part of nearby Mauna Lani Resort area.While the project site and its
immediately surrounding area consist primarily undeveloped lands,the Mauna Lani
Resort area itself is a mixture of resort,multiple family and single family residential
developments.Approval ofthe applicant's requests will allow them to provide a
recreational amenity that is typically found in major resort areas.Furthermore,a golf
course can be defined as another form of open space use,which will not severely detract
from its current undeveloped and open character.
An archaeological inventory survey of the project site was conducted by the
applicant and found a total of 14 archaeological sites consisting of 30 component
features.The applicant's consulting archaeologist recommended that no further
archaeological work be required with no preservation of any of these sites.By letter to
the Planning Director dated September 14,2000,the Department ofLand and Natural
Resources concurred with the findings and recommendation ofthe consulting
archaeologist and determi\led that the proposed project will not have an adverse effect
upon significant archaeological sites.
The desired use will not unreasonably burden public agencies to provide roads
and streets,sewers,water,drainage,school improvements,police and fire protection,and
other related infrastructure.Water will be made available to the project site via water
commitments issued to Mauna Lani Resort.Potable water will be provided by the
County via an 8-inch waterline that connects to a 24-inch water main located along the
Mauna Lani Resort main entrance road.Estimated demand for potable water is 14,050
gallons per day.Irrigation water will be obtained from two wells which will provide
water to the proposed irrigation lake through a new 8-inch transmission line to be
installed by the applicant.From this location,water will then be distributed throughout
the proposed golf course.The applicant anticipates that projected irrigation requirements
at 310,000 gallons per day.The Department of Water Supply has issued a conditional
approval for water service to the proposed project upon satisfaction of all applicable
requirements,such as the construction of all necessary water system improvements that
will support the proposed project.Satisfaction of these requirements by the applicant will
be made a condition of this approval recommendation.
Access to the golf course site from the Queen Kaahumanu Highway will be along
the privately-maintained Mauna Lani Drive.From Mauna Lani Drive, access will
continue along an existing maintenance road that maintains a pavement width of 30 feet
within a 80-foot wide right-of-way.The final segment of this access will be along a new
golf course entry road that will be constructed with a pavement width of24 to 30 feet.
The Department of Public Works had no objections regarding access to the project site.
The State Department of Transportation did offer several recommendations regarding the
proposed proj ect.Most significant of these recommendations was the preparation of a
Mr.Lee Sichter
Page 14
traffic impact analysis report to assess whether any improvements were required to the
Queen Kaahumanu Highway-Mauna Lani Drive intersection.The need for a TIAR will
not be included as part of this approval recommendation since the proposed golf course is
not anticipated to generate a significant adverse impact to traffic conditions at the Queen
Kaahumanu Highway-Mauna Lani Drive intersection.
Wastewater disposal will be accommodated at the existing and privately-operated
Mauna Lani Resort wastewater treatment facility for treatment and disposal.The
applicant anticipates that the proposed golf course development will generate
approximately 14,370 gallons ofwastewater per day.This wastewater generated
throughout the golf course will be transported to the proposed golf clubhouse via a
collection network and central pump station.From this pump station,the wastewater will
be transported to the treatment facility.
Due to the location of the proj ect site approximately one-quarter of a mile from
the shoreline,coastal flooding concerns are not an issue.However,as recommended by
the Department of Public Works,a drainage study of the project site will be required and
drainage system improvement(s)meeting with the approval of the Department of Public
Works (DPW)must be installed prior to commencing operations of the golf course.
Approximately three-fourths ofthe project site is situated within the 100-year flood area.
If deemed necessary by the DPW,the applicant will be required to prepare a flood study
for submittal to the Federal Emergency Management Agency (FEMA).These
recommendations from the DPW will be made a condition of this approval
recommendation.With the implementation of all flood and drainage improvements as
may be required by the Department of Public Works,we find that the proposed project
will not have a significant adverse impact to the County's drainage systems.
The applicant has indicated that an existing emergency evacuation road from the
Puako Beach Lots Subdivision to the existing Mauna Lani Resort maintenance roadway
will be relocated to accommodate the proposed project.,Preservation of this emergency
evacuation roadway is viewed as essential to the residents ofPuako Beach Lots
Subdivision.Therefore,the Director recommends that the relocated emergency
evacuation roadway be shown on plans submitted for plan approval review as well as
ensure that its construction is completed prior to the elimination of its existing alignment.
Other public utilities,facilities and services required to support the proposed golf
course project are or will be made available.These utilities,facilities and services
already support the nearby Mauna Lani Resort and can therefore be easily directed in
support of the proposed golf course development.Therefore,it has been determined that
any impacts generated from the proposed development will not be substantial nor
negatively impact upon the surrounding area nor upon existing infrastructural systems.
Mr.Lee Sichter
Page 15
The applicant has agreed to cooperate with Protect Puako to develop an
assessment/study of groundwater hydrology in the Puako area that will assist both the
applicant and Protect Puako in understanding the quality and quantity of groundwater
available for golf course irrigation purposes.The applicant has also agreed to an ongoing
groundwater and nearshore water quality monitoring program for which the applicant will
assume the costs associated with such a monitoring program for a period oftwo years
from the effective date ofthis Use Permit and the accompanying Special Management
Area Use Permit.Finally,the applicant has agreed to register the proposed golf course
under the Audubon's International Gold Signature Program and will strive to achieve
Gold Certification upon completion of the golf course.These agreements will be
incorporated into conditions ofthis approval recommendation.
In response to recommendations received from the State Department of Health
regarding the implementation of appropriate management measures to control potential
sources of nonpoint pollution resulting from the construction and operation ofthe
proposed golf course,the J?irector recommends that the applicant comply with the "Golf
Course Management Measures"contained in the "Hawaii's Coastal Nonpoint Pollution
Control Program Management Plan."The goal of these management measures is to
minimize and prevent the migration of nonpoint source pollutants from golf courses into
ground,surface,and coastal waters.The applicant shall also comply with the Department
of Health's "Guidelines Applicable to Golf Courses in Hawai'i"(June 2000).These
guidelines are intended to promote,protect and enhance enviromnental quality and public
health.These recommendations cover measures that could prevent groundwater and
surface water pollution,soil contamination,chemical spills,and noise and solid waste
nUIsances.
Approval of this request is subject to the following conditions.Should any of the conditions not
be met or substantially complied with in a timely fashion,the Director may initiate procedures to
revoke this permit.
1.The applicant,its successor or assigns shall be responsible for complying with all
stated conditions of approval.
2.The applicant shall comply with the requirements of the Department of Water
Supply prior to the issuance of a certificate of occupancy for the golf course
clubhouse or the opening ofthe golf course,whichever comes first.These
requirements shall include the construction of all necessary water system
improvements as may be required by the Department of Water Supply to support
the proposed golf course development.
Mr.Lee Sichter
Page 16
3.Final Plan Approval for the proposed golf course,clubhouse,driving range,and
its related improvements and facilities shall be secured from the Planning
Director.Plans shall identify the proposed structures,landscaping,paved
driveway access and parking stalls associated with the proposed use.Plans shall
also indicate the alignment of the relocated emergency evacuation roadway.
4.Construction ofthe proposed development shall be completed within five (5)
years from the effective date ofthis permit.
5.The applicant shall cooperate with Protect Puako in the development of a
groundwater hydrology study/assessment that will assist both parties in the
understanding of groundwater quality and quantities within the affected area that
are available for golf course irrigation.The scope of the study/assessment and its
participants and costs shall be agreed upon by both the applicant and Protect
Puako,prior to the submittal ofplans for Plan Approval Review for any portion of
the proposed golf ~ourse development.In the event the parties are unable to reach
agreement,the terms of the proposed study/assessment shall be approved by the
Planning Department in consultation with the Department of Water Supply,the
Commission on Water Resource Management,and the Puako Community
Association.
6.The applicant shall conduct a groundwater and nearshore water quality monitoring
program within the affected area for a period of two (2)years from the date of
issuance.ofthis permit.The scope of the monitoring program,which shall be
consistent with accepted monitoring standards and sufficient to detect and assess
changes to groundwater and the nearshore marine environment in the vicinity of
the project site,shall be approved by the Planning Director,in consultation with
the Department ofHealth,prior to the issuance ofFinal Plan Approval for the golf
course clubhouse or the opening of the golf course,whichever comes first.
7.The applicant shall register the proposed golf course with the Audubon
International's Gold Signature Program prior to the opening of the golf course and
shall use its best efforts to obtain and continue Gold Certification.
8.The applicant shall comply with the Department of Health's "Guidelines
Applicable to Golf Courses in Hawai'i"dated June 2000,and the "Golf Course
Management Measures"contained in the "Hawaii's Coastal Nonpoint Pollution
Control Program Management Plan."
9.The applicant shall preserve the potential use ofthe existing emergency
evacuation roadway traversing through the project site until such time the
applicant has completed construction of a realigned emergency evacuation
Mr.Lee Sichter
Page 17
roadway in a location approved by the Planning Director.The closure of the
existing emergency evacuation roadway and use of the new,realigned emergency
evacuation roadway will occur with the written approval of the Planning Director.
10.A drainage study shall be prepared by the applicant for review and approval by
the Department of Public Works prior to submittal ofplans for Final Plan
Approval review for the golf course and/or clubhouse,whichever is submitted
first.A drainage system,if required,shall be installed meeting with the approval
of the Department of Public Works,prior to issuance of a certificate of occupancy
for the golf clubhouse or opening of the golf course,whichever occurs first.
II.As may be deemed necessary by the Department of Public Works,the applicant
shall prepare a flood study for submittal to the Federal Emergency Management
Agency (FEMA)for a Letter of Map Revision (LOMR),ifrequired,prior to the
submittal ofplans for Plan Approval Review and/or prior to the commencement
of any land alterat~on activities.A Conditional Letter of Map Revision (CLOMR)
from FEMA may be necessary before development may proceed on portions of
the proposed development.Should a flood study be required,issuance of Final
Plan Approval of the proposed golf course development,or any portion thereof,
will be subject to concurrence by the Department of Public Works.
12.The applicant shall develop an Integrated Pest Management Program (IPMP)for
the review and approval of the Planning Director,in consultation with the State
Department ofHealth,prior to the issuance of Final Plan Approval for the golf
course or any of its related components and facilities.
13.A Solid Waste Management Plan shall be prepared and submitted for approval to
the Department of Public Works prior to submitting plans for Final Plan
Approval.Approved recommendations and mitigation measures shall be
implemented in a manner meeting with the approval of the Department of Public
Works.
14.Wastewater generated by the proposed development shall be disposed of in a
manner meeting with the approval of the Department of Health.
15.Prior to construction,the applicant shall demonstrate to the satisfaction of the
Planning Department that all proposed off-site construction material such as
topsoil or sand are being supplied from an approved quarry or recourse site.
16.During construction,best effort measures shall be taken to minimize the potential
of both fugitive dust and runoff sedimentation.Such best effort measures shall be
Mr.Lee Sichter
Page 18
in compliance with constmction industry standards and practices utilized during
constmction projects of the State of Hawaii.
17.The use ofpesticides and herbicides in conjunction with all phases of the golf
course operation shall conform with the applicable regulations of appropriate
governmental agencies.
18.Should any unidentified sites or remains such as artifacts,shell,bone,or charcoal
deposits,human burials,rock or coral alignments,pavings or walls be
encountered,work in the immediate area shall cease and the Department of Land
and Natural Resources-Historic Preservation Division (DLNR-HPD)shall be
immediately notified.Subsequent work shall proceed upon an archaeological
clearance from the DLNR-HPD when it finds that sufficient mitigative measures
have been taken.
19.Comply with all o~her applicable laws,mles,regulations and requirements of
affected agencies for approval of the proposed development within the subject
property.
20.An annual progress report shall be submitted to the Planning Director prior to
each anniversary date of the approval ofthis Use Permit.This condition shall
remain in effect until all ofthe conditions of approval have been complied with
and the Director acknowledges that further reports are not required.
21.An initial extension of time for the performance of conditions within the permit
may be granted by the Planning Director upon the following circumstances:
(A)The non-performance is the result ofconditions that could not have been
foreseen or are beyond the control of the applicant,successors or assigns,
and that are not the result of their fault or negligence.
(B)Granting ofthe time extension would not be contrary to the General Plan
or Zoning Code.
(C)Granting of the time extension would not be contrary to the original
reasons for the granting of the permit.
(D)The time extension granted shall be for a period not to exceed the period
originally granted for performance (i.e.,a condition to be performed
within one year may be extended for up to one additional year).
Mr.Lee Sichter
Page 19
These approvals do not,however,sanction the specific plans submitted with the application as
they may be subject to change given specific code and regulatory requirements ofthe affected
agencies.
Should you have any questions,please contact Daryn Arai of the Planning Department West
Hawaii Office at 327-3510 or Alice Kawaha of the Planning Department Hilo Office at 961-8288.
Sincerely,
~U/~tt,~
Geraldine M.Giffin.,Chairman
Planning Commission
LwhitesandsmausePC
cc:Department ofPublic Works
Department of Water Supply
County Real Property Tax Division
West Hawaii Office
Office of Planning,CZM Program (w/Background)
Department of Land and Natural Resources
Brian Minaai,Director/DOT-Highways,Honolulu
Mr.Norman Hayashi
Mr.Jeffrey Darrow
Plan Approval Section
Mr.Paul B.Fay,Esq.