COUNTY OF HAWAII PLANNING DEPARTMENT
BACKGROUND REPORT
SAINT MICHAEL THE ARCHANGEL CHURCH
SPECIAL MANAGEMENT AREA USE PERMIT (SMA 10-44)
SAINT MICHAEL THE ARCHANGEL CHURCH is requesting an amendment to
Condition No. 3 (time to complete construction) of Special Management Area Use Permit
No. 10-000044, which was issued in 2010 to allow the construction of a church, rectory, parish
hall and related improvements to replace the former Saint Michael the Archangel Church that
was damaged during the 2006 earthquake. The approximately 3.19-acre property is located on
the northeast(mauka) side of Alii Drive, approximately 330 feet south of the intersection with
Hualalai Road, Hienaloli 2nd,North Kona, Hawai`i, TMK: 7-5-008:006.
REQUEST
1. Proposed Development: The applicant is requesting a five-year time extension to
comply with Condition No. 3 (time to complete construction) of Special Management
Area Use Permit No. 10-000044,which was issued in 2010 to allow the reconstruction of
Saint Michael the Archangel Church and related improvements on approximately 3.19
acres of land within the Special Management Area. The applicant has significantly
reduced the overall scope and size of the proposed buildings, however, the original
project consisted of the following:
• A church that is 9,455 square feet in size with a 1,468-square foot attic.
• Bell tower and cross, which is proposed to be 73 feet in height.
• A two-story Parrish Hall that is 11,030 square feet in size with a 2,902-square foot
exit balcony.
• A parish ministries/rectory structure that is 5,635 square feet in size.
• Parking.
• Landscaping.
(Planning Department Exhibit 1—Application to Amend Special Management Area
Use Permit 10-000044)
2. Reasons for the Request: According to the applicant, the original church, which was
-1-
constructed in 1850, was demolished after sustaining significant structural damage during
the October 15, 2006 earthquake. Following approval of SMA Use Permit
No. 10-000044, construction of the new church began in December 2012. The first phase
of construction included the main church building,parish hall foundation, surrounding
landscaping and parking. This initial phase was completed in early February 2015. The
first mass in the newly constructed church was held on March 15, 2015. The second
phase of construction was postponed allowing the parish to work on fundraising to pay
off the initial debt. Unanticipated delays prolonged debt reduction efforts, though the debt
was eventually paid off. Subsequently, the parish decided to reduce the scope of the
second phase of construction as follows:
• Reduce the height of the Parish Hall from 2-stories to 1-story, while maintaining
the design and appearance of the existing church building.
• Eliminate the Rectory Building initially proposed to be located in the northwest
corner of the subject property, to be replaced with additional parking.
• Eliminate the second driveway entering/exiting the subject property.
The applicant states that the overall appearance of the project will result in a significantly
reduced version compared to the original proposal. Landscaping and the coral shrine
grotto that was completed in the first phase will remain. To expedite the start of
construction, the applicant has begun acquiring the required building permits for the
project. Currently the parish has received the approved foundation permit and is waiting
for final approval of the vertical building permit. According to the applicant, they are
currently working on finalizing contract negotiations with a local General Contractor for
the project.
3. Landowner: The landowner of the property is the Roman Catholic Church.
BACKGROUND INFORMATION
1. October 14, 2010: Effective date of approval of SMA No. 10-000044 to allow the
construction of a church, rectory, and parish hall and related improvements. (Planning
Department Exhibit 2—SMA No. 10-000044,Approved on September 30, 2010)
2. July 21,2015: The Planning Director grants an administrative 5-year time extension or
until October 14, 2020 to comply with Condition No. 3 (time to complete construction).
-2-
3. October 8,2019: Effective date of Final Plan Approval for a new Parish Hall.
(Planning Department Exhibit 3—Final Plan Approval dated October 8,2019)
STATE AND COUNTY PLANS
4. General Plan LUPAG Map: Resort Node.
5. State Land Use Designation: Urban.
6. County Zoning: Resort-Hotel (V-.75).
7. Kona Community Development Plan (CDP): According to the Kona CDP, which was
adopted by Ordinance No. 08 131, the property is located within the Kona Urban Area
and within the Kailua Village Redevelopment Regional Center TOD.
8. Kailua Village Special District: The property is located within the Kailua Village
Special District.
9. Special Management Area: The property is located in the County's Special
Management Area(SMA). The SMA is a part of the Coastal Zone Management Program
regulated by the County. The property is approximately 150 feet from the nearest
coastline.
DESCRIPTION OF PROJECT SITE AND SURROUNDING AREA
10. Project Site: The project site is approximately 3.19 acres in size and is roughly
rectangular in shape. The property has been used for religious activities since the mid
1800's. The earthquake that occurred on October 15, 2006 damaged the church and the
rectory. Currently,there are several structures located on the property and church
services are being conducted in the newly constructed church building.
11. Surrounding Zoning and Land Uses: Surrounding properties are zoned Resort-Hotel
(V-.75), Open(0) and Village Commercial (CV-7.5). Surrounding land uses in the
immediate vicinity include the County's Hale Halawai Park facility and the Waterfront
Row shopping mall to the east across Alii Drive, the Kailua Public Library to the north,
the 6-story Kailua Village apartment complex to the west, and the Kealaokamalamalama
Church and the Kona Insider Inn &Hotel to the south.
12. ALISH: Existing Urban Development.
13. Land Study Bureau's Productivity Rating: Existing Urban Development.
14. FIRM: The project site is located Flood Zone"AE" and floodway. The project site is
-3-
located within the Tsunami Evacuation Zone. According to the Department of Public
Works, Engineering Division, the Applicant has obtained a LOMR and FEMA approval
in order to proceed with construction.
15. Flora/Fauna Resources: The applicant submitted a biological survey of the property
dated January 2009, which was prepared by Reginald E. David of Rana Productions, Ltd.
The biological survey included a botanical survey, an avian survey and a mammalian
survey. According to the survey, there are no native botanical resources present on the
property. The vegetation on the site is made up of ornamental and landscaping plants that
are considered to be alien to the Hawaiian Islands. There were 13-avian species detected
during the course of the surveys that are considered to be alien to the Hawaiian Islands.
Two mammalian species were detected during the course of the survey, one cat and two
dogs. The endangered Hawaiian hoary bat was not detected. The survey concluded that
the modification of the current habitat on the church's property and the construction and
operation of a replacement church is not expected to result in significant impacts to any
avian or mammalian species currently listed as threatened, endangered or proposed for
listing under either the Federal, or State of Hawai`i endangered species programs.
16. Archaeological and Historical Resources: According to the applicant, an
Archaeological Inventory Survey was conducted of the subject parcel in 2008 by
Archaeological Consultants of the Pacific, Inc. (ACP), which identified two previously
undocumented sites of historical significance. The first being the Church and its ancillary
components, including an active cemetery. The second site is the burial of Father
Joachim Marechal whose remains were interred beneath the floor of the Church. Because
of the presence of human remains on the subject property, a Burial Treatment Plan dated
July 2009 was prepared by ACP regarding the disposition of the remains of Father
Joachim Marechal. It must be noted that the plan was only prepared for Father Marechal
as an active cemetery is exempt from any Burial Treatment Plan. Recommendations
have been made for the remains of Father Joachim Marechal to be disinterred from below
the church floor and re-interred in a concrete tomb located in the floor of the new church
at the foot of the steps to the alter and marked with the same memorial plaque that
currently identifies his grave in the existing church. The survey was submitted to the
-4-
Department of Land and Natural Resources-State Historic Preservation Division for
review and approval. The Department of Land and Natural Resources-State Historic
Preservation Division(DLNR-SHPD) issued a determination letter on August 26, 2009
allowing the demolition to commence with the submitted mitigation measures agreed
upon by the applicant and DLNR-SHPD.
17. Cultural Resources: A Cultural Impact Assessment dated March 2009 was prepared by
Helen Wong Smith for the demolition of Saint Michaels the Archangel Church.
According to the assessment, Saint Michaels the Archangel Church is a pivotal
component of the transition from traditional to introduced belief systems. Kailua, the
center of religious and political change in the Kingdom of Hawaii boasts the first
Catholic parish on the island with a continuous and vital presence to its community. It's
locale in the coastal zone of a royal residence and a major point of Western contact,
suggest the possibility for indigenous remains of habitation, religious and secular
activities. As the plans provide the Church cemetery be left intact, its cultural integrity
remains. The burial treatment plan for Saint Michael's builder, Father Marechal,
provides both reverence and safety for a cultural relic. The coral grotto remaining in situ
represents a re-adaptive use of a cultural feature spanning over a century.
18. Coastal Hazards: The project site is within the Tsunami Evacuation Zone designated by
the Pacific Disaster Center. The development would comply with the requirements of
Chapter 27, Flood Control, of the Hawaii County Code.
19. Recreational/Visual Resources: The proposed development will not have an adverse
impact to the recreational resources to the shoreline and coastal ecosystems. The
proposed development will not substantially interfere with or detract from the line of
sight toward the sea from Kuakini Highway, which is the nearest state highway to the
coast.
20. Public Access: There is no public access to the mountains or the shoreline that run
through the property.
-5-
PUBLIC UTILITIES AND SERVICES
21. Access: Access to the site is from Alii Drive, which is a County roadway with an
approximate 20-foot wide pavement with 3 to 5-foot shoulders within an approximate
37-foot right-of-way.
22. Water: County water is available to the site.
23. Wastewater: According to the applicant, the property is serviced by the County's
wastewater treatment facility at Kealakehe via an existing sewer line in Alii Drive,
fronting the subject property.
24. Essential Utilities and Services: Electrical and telephone services are available to the
project site. Police services are available from the Kealakehe and Captain Cook stations.
Fire protection is available from the Kailua-Kona, Kealakehe and Captain Cook stations,
and emergency medical and paramedical services are provided by the County Fire
Department.
AGENCIES' AND ORGANIZATIONS' COMMENTS
25. Police Department: (Planning Department Exhibit 4—October 8, 2020 Memo)
26. Department of Land and Natural Resources-Engineering Division: (Planning
Department Exhibit 5—October 2, 2020 Letter)
27. Department of Land and Natural Resources-Division of Forestry and Wildlife:
(Planning Department Exhibit 6—October 2,2020 Letter)
28. Department of Land and Natural Resources-Land Division: (Planning Department
Exhibit 7—October 2,2020 Letter)
29. Department of Water Supply: (Planning Department Exhibit 8—October 21,2020
Letter)
30. Department of Public Works—Traffic Division: (Planning Department Exhibit 9—
October 14,2020 Memo)
31. Department of Environmental Management: (Planning Department Exhibit 10—
October 13, 2020)
32. Department of Public Works—Engineering Division: (Planning Department
Exhibit 11—October 29,2020 Memo)
-6-
AGENCIES -NO RESPONSE
33. Department of Public Works—Building Division, Fire Department, Office of
Housing and Community Development, Kona Traffic Safety, Kailua Village Design
Committee,Department of Health and Department of Land and Natural Resources-
State Historic Preservation Division.
PUBLIC COMMENTS
34. The Planning Department has received no letters from the public regarding this
application, as of the date of this writing.
-7-
i
I
PLANNING DEPARTMENT
,oir-Ity of Hawaii
t
1� , )f 44 Ane Kectiolk.)if Hwy
September 14, 2020 KJ-1:1! o-Kona H 96/0
t
t
t
Mr 'Michael Yee. Director
) County Of Hawaii
Planning Department
1 101 Pauahi Street
Hilo, Hawaii 96720
x Dear Mr. Yee,
)
Subject: Special Management Area (SMA) Use Permit No. SMA 10-000044
Applicant: St. Michael the Archangel Catholic Church
Request: Completion of Construction of New Parish Hall
Subject: Time Extension Request for Condition No.3
I Tax Map key: 7-5-008-006
o
J This letter is to requests a 5-year time extension to the existing Special Management Area (SMA) Use
a Permit No. 10-000044 which expires on October 14, 2020. It is the intention of the Owner/Parish to
1 conform to Condition No.: 3 (complete construction of church and related improvements) of the SMA
4 Use Permit.
4
i
I History:
1
1
The following is a brief history of St. Michael the Archangel Church and what brought us to the
)
improvements we are faced with today.
The original St. Michael's Church was built in the 1850's, and after decades of weather and much-needed
i renovations remains on the same property as the present church today. On October 15, 2006, a magnitude
J 6.7 earthquake struck the west coast of the Big Island, causing significant structural damage to many
buildings. including St. Michael the Archangel Church. A structural inspection of the building was
conducted and deemed unsafe and it was demolished.
Plans to rebuild the new church got under way and construction began in December 2012.
j
The first phase of construction included the main Church building. parish hall foundation, surrounding
landscaping and parking This initial phase was completed in early February 2015. The first mass in the
newly constructed Church was celebrated on March 15, 2015.
The second phase of construction was postponed to allow the parish to work on fundraising to pay off the
initial debt.
Unanticipated delays prolonged debt reduction efforts. however, through hard work and the generous
support from parishioners, the community and visitors alike helped in paying off the building debt
incurred in the first phase of construction.
In an effort to cut overall project costs the parish decided to reduce the scope of the second phase by
reducing/eliminating the following:
■ Reduce the overall physical scope of the parish hall from a 2-story structure down to a single-
story Parish Hall/Center maintaining the design and appearance of the existing chure1• i*l4 y-- --------
Planning Dept. �� � ' �`�'
Exhibit I t'�' ��� I
1
• Eliminate the Rectory Building initially proposed to be located in the northwest corner of the
subject property and replace the allotted space with additional parking.
• Eliminate the second driveway entering'exiting the property
Aesthetically the overall appearance will result in a significantly reduced version compared to the original
plan_ I.andscaping, the coral shrine grotto completed in the first phase will remain.
Project Update:
lo expedite the start of construction the parish has started acquiring the required building permits for the
project. Currently the parish has received the approved foundation permit and waiting for final approval
1 of the vertical building permit.
Our Project Team is culTently working on finalizing contract negotiations with a local General Contractor
for the project.
1
Please find the original letter and twenty (20)copies, along with the following documentsfexhibits:
■ Cover letter.
• Owner's Authorization Letter
• SMA Use Permit No.: 10-000044 Status Report
• Exhibit"A"County of Hawaii Tax Map Key printed August 10, 2020.
• Exhibit"B"copy of Plan Approval dated October 8, 2019.
• Exhibit"C" Site Plan overview.
• Exhibit "D" County of Hawaii Real Property Tax Clearance dated September 10, 2020.
• Exhibit "E" letter to Mr. Greg R. Mooers dated October 14, 2010. granting SMA Use Permit.
• Exhibit "F" letter to Mr. Mark Lively dated July 21, 2015, granting 5-year administrative SM A
Use Permit extension.
• $250.00 payment for filing fee.
If you have any questions, please contact Stan Haanio at 987-981 1 or email: x yL .:.;
Sincerely, \
j
9iv>th /fa t�
Rev. Konelio Falexoi
Pastor, St. Michael the Archangel Church
s I
4 's
k f�
ST. MICHAEL THE ARCHANGEL CHURCH
A 75-5769 Ali'i Drive • Kailua-Kona, Hawaii 96740
PH: (808) 326-7771 • Email: stmichaelarchangeli rcchawaii.org
f Website: stmichaelparishkona.org
1 rl
August 18, 2020
`t, I
Rev. Konelio Faletoi
Owner Representative for
St. Michael the Archangel Church
75-5769 Alii Drive
Kailua-Kona, Hawaii 9h740
Michael Yee, Director
County of Hawaii, Planning Dept.
101 Pauahi Street
Hilo, Hawaii 96720
Owner's Authorization Letter
t �
Dear Mr. Yee:
This letter authorizes the request for a 5-year time extension to the Special
Management Arra (SMA) Use Permit number: 10 000044 for the purpose of
finalizing construction on St. Michael Parish Hall.
Sincerely,
PastSr s Signature tate j
Rev. Konelio Faletoi
Pastor's Printed Narne
St.Michael the Archangel Kadua-tea•St.Peter by the Sea Kahatu u•Immaculate Conception Hoh,atoa•St.Paul Kawanui•Holy Rosary Kalaoa
I
,
i
1
0
i
1
1
i
1
1 SMA Use Permit No.: 10-000044 Status Report:
,
i
i 1. The applicant, its successor or assigns shall be responsible for complying with all
stated conditions of approval of this permit.
1 Applicant Response: Applicant agrees to comply with the ongoing conditions set
I forth in this permit.
I
i
4
1 2. The applicant shall submit estimated maximum daily water usage calculations,
;
i prepared by a professional engineer licensed in the State of I lawai'i, for review and
i approval to the Department of Water Supply. The water usage calculations shall
Iinclude the estimated peak flow in gallons per minute (GPM) and the total estimated
1 average daily water usage in gallons per day (GPD) including all irrigation/landscaping
i
,
I use. Based on the water usage calculations provided, if the existing meters cannot
support the estimated demand, a larger or additional meter will be required to be
I installed and remittance of the prevailing facilities charge will be required to be paid.
) The applicant shall install a backflow preventer (reduced pressure type) by a licensed
)
i contractor within five feet of the meter on the applicant's property, meeting with the
i
1 approval of the Department of Water Supply.
i Applicant Response: Applicant has complied with the required water usage
i
i specifications as part of the initial phase of construction completed in 2015. The
) current plan reduces the demand for water usage by eliminating the rectory building
i
1 and reducing the parish hall from a 2-story to a single story parish hall building.
3
)
)
1 3. Construction of the proposed development shall be completed within five (5) years
i from the effective date of this permit. Prior to construction, the applicant, successors
4 or assigns shall secure Final Plan Approval for the proposed development from the
i
1 Planning Director in accordance with Chapter 25-2-70, Chapter 25 (Zoning Code),
I Hawai'i County Code. Plans shall identify, if applicable, all proposed structures, fire
1 protection measures, paved driveway access and parking stalls and other
i . improvements associated with the proposed use. Landscaping shall be included in the
I development plans to mitigate any potential adverse noise or visual impacts to
1,
adjacent properties in accordance with the Planning Department's Rule No. 17
; (Landscaping Requirements).
I
t Applicant Response: Applicant will continue to comply with the recommended
1 requirements and is applying for a 5 year extension to complete construction.
Exhibit, "C" depicts an architectural overview of the subject property. The existing new
1 church building and surrounding landscape were improved in the first phase of
construction completed in 2015. The first phase of construction also included the
concrete foundation footings and gravel fill for the proposed parish hall.
The second phase of construction on the parish hall will start with the concrete slab
on the existing foundation then transitioning to the vertical building.
The Final Plan was updated and approved by the Hawaii County Planning Department
1'
on October 08, 2019.
I4. The project shall connect to the County's sewer line fronting the property along Alii
I Drive prior to the issuance of a Certificate of Occupancy.
Applicant Response: Sewer connection has been finalized and approved as part of
the initial phase of construction completed in 2015, which included service to the
proposed parish hall. No sewer lines will be added or altered in this second phase of
construction. ,
:
,
;
I 1
I ,
i .
1
f '
)
(
3. All development generated runoff shall be disposed of on-site and shall not be
directed toward any adjacent properties. A drainage study shall be prepared by a
licensed civil engineer and submitted to the Department of Public Works prior to
issuance of a construction permit. Any recommended drainage improvements shall be
constructed meeting with the approval of the Department of Public Works prior to
receipt of a Certificate of Occupancy.
Applicant Response: Applicant will comply with the recommended requirements.
( The drainage facilities were installed in phase one of the project. The current phase
directs all runoff to the existing onsite drainage facilities.
f 6. The applicant shall comply with Chapter 27 - Flood Control, of the Hawaii County
Code.
Applicant Response: Applicant will comply with the recommended requirements.
7. For encroachments in or alterations to the AE flood zone, the applicant shall submit
a flood study prepared by a licensed professional civil engineer. If required, the
applicant shall submit for a Conditional Letter of Map Revision (CLOMR) to the Federal
Emergency Management Agency (FEMA) prior to the issuance of any construction
permit. If required, the applicant shall obtain a Letter of Map Revision (LOMR) prior to
the issuance of Certificate of Occupancy.
Applicant Response: August 3, 2020, after review of the LOMR requirements
applicant has received approval from the County of Hawaii Engineering Division.
8. During construction, measures shall be taken to minimize the potential of both
fugitive dust and runoff sedimentation. Such measures shall be in compliance with
construction industry standards and practices utilized during construction projects of
the State of Hawaii.
Applicant Response: Applicant will comply with the recommended requirements.
9. All earthwork and grading shall conform to Chapter 10, Erosion and Sediment
Control of the Hawaii County Code.
Applicant Response: Applicant will comply with the recommended requirements.
10. All driveway connections to Alii Drive shall be at a location approved by the
Department of Public Works and shall conform to Chapter 22, County Streets, of the
Hawaii County Code.
Applicant Response: There are no new driveway connections to Ali'i Drive planned.
Applicant will use existing church driveway approved in first phase of construction.
11. The applicant shall install street lights, signs and markings meeting with the
approval of the Department of Public Works - Traffic Division.
Applicant Response: Applicant will comply with the recommended requirements.
12. An All Hazards Emergency Response Plan shall be submitted to the Hawaii
County Civil Defense Agency for review and approval prior to the issuance of a
Certificate of Occupancy.
Applicant Response: Applicant will comply with the recommended requirements.
4
13. A Solid Waste Management Plan shall be submitted to the Department of
Environmental Management for review and approval prior to the issuance of Final Plan
Approval.
Applicant Response: Applicant will corn p1 with the recommended requirements.
14. Prior to any ground altering activities, the applicant shall submit a monitoring
plan prepared by a qualified archaeologist pursuant to HAR 13-279 to the Department
of Land and Natural Resources - State Historic Preservation Division (DLNR-SHPD) for
review and approval. A copy of the approved monitoring plan shall be provided to the
Planning Department prior to issuance of Final Plan Approval.
Applicant Response: All required civil and/or ground altering work has been
completed in the initial phase of construction. Exhibit "C" depicts an architectural
view of subject property. All construction/improvements to the surrounding area of
the parish hall have been completed in 2015. As such there is no excavation planned
in any native soil. The minor planned underground utilities occur completely within
fill-soils that were placed in 2015.
15. All ground altering activities associated with the proposed development shall be
monitored by a qualified archaeologist in a manner meeting with the approval of the
DLNR-SHPD.
Applicant Response: Applicant will comply with the recommended requirements.
Also see response to Condition #14.
16. The applicant shall implement a relocation plan and interim preservation
measures for the coral shrine grotto during construction.
Applicant Response: The coral shrine grotto has been placed in its permanent
location in the initial phase of construction which has been completed in 2015, and
will not be moved during this phase of construction.
17. The applicant shall implement the lutal phase of the approved Burial Treatment
Plan for the completion of the new Church structure meeting with the approval of the
DLNR-SHPD.
Applicant Response: Burial Treatment and preservation has been completed in the
first phase of construction. Applicant will comply with the recommended
requirements.
18. Should any undiscovered remains of historic sites, such as rock walls, terraces,
platforms, marine shell concentrations or human burials be encountered, work in the
immediate area shall cease and the DLNR-SHPD shall be immediately notified.
Subsequent work shall proceed upon an archaeological clearance from the DLNR-
STIPD when it finds that sufficient mitigation measures have been taken.
Applicant Response: Applicant will comply with the recommended requirements.
19. The applicant shall comply with all applicable County, State and Federal laws, 1
rules, regulations and requirements.
Applicant Response: Applicant will comply with the recommended requirements.
20. An initial extension of time for the performance of conditions within this permit
may be granted by the Planning Director upon the following circumstances:
1
j
i
II
I
A. The non-performance is the result of conditions thatcould not. have been foreseen
or are beyond the control of the applicant, successors or assigns, and that are not the
result of their fault or negligence.
1 Applicant Response: After the first phase of the project was complete the Parish
deemed it necessary to postpone construction on the proposed parish hall in order to
1 focus efforts on paying off the building debt incurred in the first phase of construction.
i As a result numerous fundraising events were held and pleas for support from
parishioners and the community alike were received and very much appreciated.
However, these efforts still took longer than anticipated to reach the final goal of
f paying off the building debt. Slower than anticipated fundraising results attributed to
prolonging debt reduction efforts. These results could not have been foreseen or
anticipated.
As of now the building debt has been paid in full and it is the intent of the parish to
resume with construction of the new parish hall and finalize this project.
1 This project was planned to begin construction in early 2020 and be completed before
the SMA Use Permit expiration date (October 14, 2020). COVID-19 has delayed the
permitting process, plan development and general contractor selection which resulted
in delaying the progress of the project as a whole. As such this time extension request
is submitted for your consideration.
I 13. Granting of the time extension would not be contrary to the General Plan
or Zoning Code.
I
Applicant Response: A time extension would not be contrary to the General Plan or
1 Zoning Code as revisions made to the project substantially reduces the overall size and
i scope of the project. The revised plan eliminates the rectory building, utilizing that
I allotted space for additional parking. It also reduces the parish center from a 2-story
f to a single story parish hall. Additionally, a Final Plan for the current scope was
submitted, reviewed and Approved by the County of Hawaii Planned Department on
October 08, 2019. Their approval implies consistency with the General Plan of the
i Zoning Code.
4
C. Granting of the time extension would not be contrary to the original reasons for the
granting of this permit.
Applicant Response: The current SMA Use Permit expires on October 14, 2020.
Applicant has initiated the permitting process and necessary requirements to resume
with construction. A time extension will allow applicant the time necessary to conform
3
to the conditions set forth above.
3 The revisions to this proposed project will reduce and or minimize the overall size and
scope of the project which will not he contrary to the original reason of granting this
permit.
D. The time extension granted shall be for a period not to exceed the period
originally granted for perforrance (i.e., a condition to be performed within
i one year may be extended for up to one additional year).
E. If the applicant should require an additional extension of time, the
Planning Department shall submit the applicant's request to the Planning
Commission for appropriate action.
4
1
1
1
1
Should any of the foregoing conditions not be met or substantially complied with
in a timely fashion, the Planning Director may initiate procedures to revoke the
permit. This approval does not, however, sanction the specific plans submitted with
the application as they may he subject to change given specific code and regulatory
requirements of the affected agencies.
I
� I
` I
1
I
s
sg
,
•
'
I D 2020 ,)j)I,Ibis Pe' ri.1,",eh :17,0,41"; H Report 750080060000
I9""''511!!
44b*."1
i
1
) Pat eel Number • ,),1);,:je)er"Or p
•
1 ocabon Addres; , ,,,e,-A.1 IiI)Erl
I Project Name
L;ss
Neighbor hood Code10
Property C
0071 I R 1-)E SOP T
1 Legal Information ' .2) t 91(is, t 0 I I
i land Are,3(acres) ))
ilard Are,r approximate r,q ft,
I
,
I PI 1 I !Tl 'iN;
iOwner Information ,
,.
1
1 Owner Names Mailing Address
i ROMAN CATHOI IC CI JUR:Di j"ee()woo, ,
ROMAN CATHOLIC CHURCH Addressee CO CHRISTINA ASA°,FHB TRUST 01E10E0
# PO BOX 1550
i HONOLUI.U14196806 1550
t
1 Assessment Information
i
IiMarket Assessed Market Assessed Total Total Total Total
I Land Dedicated Land Building Building Market Assessed Exemption Taxable
1 Year Property Class Value Use Value Value Value Value Value Value Value Value
2020 r1011 l 11.RESORT 54 477 30C $O 54.47/300 395-1 400 5753400 55.420,700 3i40 700 55.430 700 Si'
i
, Land Information
I
I
l Property Class Square Footage Acreage Agricultural Use Indicator
1 i-i0TEL R,RESORT 139,392 32
i
I Commercial Improvement Information
! Property CLICS Units ,
,
i Building Card i; Structure Type COMM1RCIAL C-S
Building Number Year Built 2015
I Improvement Name NEW ST MIR I lAh L CI IURCH Effective Year Built 2015
i
1 Identical Units 0 Gross Building Desci iption
1 Card Section Floor# Area Perimeter Usage Wall Height Exterior Wall Construction
9 384 412 RT.:11(1101A INS! 25 NIASONR`r STEEUMASONRI
I Sketches
I
!
1
1 Room T •e .Area 1
k 1 A RELIGIOUS MST 1 9384 j
1
1
I
1
i
1
1
I
/
i
1 I
/
1
i 1
1
I
I
i
1
1 ......'
t 3E
i
1 Building 3
i
https://qpublic schnetdercorp corr'Appl,cation aspx?AppiD,,-1048&LayerlD,..23618&PageType10-4&PagelD----9878&KeyValue,--750080060000 115
i
i
§
. •
1 8 1",.'2:Q,) qP...k:b N.,,t H il,“-ii „.4.,Hiit, Hi Reporz 751f 1501160,Y)0
1
iPermit information
:
i
bite
Perriet Number
2,20,-, Rtt1,04, Pei mit Amount
590,,IL;);
$
2) s:Irt
i
: i'1 Z :H,4-i 1-r' 52',10,,12)0
Ii:,),1),, , IL 4 X;00,O,O
L 12 II 21,k2 ,,2,., 1' :%i zi• .]... i
1 I) 11 ?
h 11 :!•:, B D;‘;'),VI?%%!-.. 1,,,,,t,,,,,:,'.:sw 13,)' ,,,,1 i,2 tO
S I fl rx-4
1'.2:D2 ,2 Sr A,r r ',Jcoillg i6,iU('J
I
10 1 1?,-;,, {-9-1,54 1 'P 5 001;
i
Bldg Division Permit and Inspections Information
1
,
i Permit Permit Estimated Inspection Inspection
i Permit Date Type Number Permit Reason Permit Description Cost Date Status Permit Status
i
1 2 24'2015 ER.Ltr,;,t, ,; :._11EIertri;Opk, GENERAL I ANUS(APE.IRRIGATION 52013,000 .3;30/2015 COMPLETED Complete
i ELECTRICAL ONLY
1 9 110'11;.101 Riuildinq -„Li1::; Alter.;tiClf, RE INNING WAIL UP TO 8 L I I I IN 590.000 3,2,7015 COMPLETED Complete
APPROXIMATE 100 FT IONG
1 ;
(
1 5 Y 2i it.: El42:(11r.,1, :..!`.L.,:4SI' IN IN-GROUND RAPT ISMAL FONT 121-EL I DEEP; $10.000 3'232015 COM P LE TEE' (CYTTielf:
WI11 IIN I HE CHURCH CURREN 1 I X UNDER
( CONSTRUCT ION BY SEPARATE PE RMI I P2012-
005282TK ELECT RICAL ONLY ,
1 4.50'2414 Piiiid .: , .:. Ant,at ini i EleOrk al IN GROUND BAPTISMAL 1 ONT(2EEE I DEEP, 540 000 E.511Cci
WIT 1-f1N THE CHURCII CURREN ELY UNDER
i CONSTRUCTION BY SEPARATE PERMIT P2012-
(528288.ELECTRICAL ONLY
!
i 2)20'2014 EleePL-41 ;1) ;1;;;, New wuing to new Our)h building NEW CHURCH $300 COO 3 2 I'2013 C OM Pi_t'r ED Compiete
i ,.
FIRST LEVEL AUDIOVISUAL
ROOM RECONCILIATION ROOM,ASSE!ABLY WITI I
i
STORAGE WORK SACRISTY WITH SINK,& :
WASHER&DRYER,2 STORAGE CHAPH.VESTING
:
4 SACRISTY WITH 2 SINKS&CLOSET ELECTRICAL
i
MEN WOMEN FAMILY'RISTRO
;
2:2P 21;14 L k(I,,, ,, ,_;,., .1. Elezt;,-.7.0;Iv c ontlup.L0 i Io tut,irc:hid,,NEW P014I5I-1E1AD, 510 000 .3.2o,',1111, t;OMP,E ILL% 1,-;,,pie;e ;
; EIR)G. LEVELDINING W MULTI PURPOSE ROOM.
;
ELECTRICAL 3 STOP,AGES,K ITCHEN WITH 3 ,
1 COMPARTMENT SINK 2 COMPARTMENT ,
1
!
SINKSINK.DISH WASHER 2 RANGES 3 PASTOR
ROOMSACCOUNTING,C;PEN OFFICE :
,
CONFERENCE,PASTORAL ROOM ,
,
1 ;
1 1 24 2031 P,,,,nhiur t-R 2; NEW CHURC.,H1 IRS T LEVEL AU1,10 VISUAt 5-10(100 212T;201S COMPETE Et Co Sc :
;
:
ROOM RECONCILIATION ROOM,ASSEN1BLY WIT;I
1 ,
i STORAGE.WORE.5ACRISTY WITH SINKS ,
WASHER&DRYER,2 STORAGE CHAPELNESTING ,
:
1 SACRISTY WITH 2 SINKS&CLOSET ELK:FRICAL.
1 ; MEN WOMEN FAMILY RESTRCLOMS COVERED
; I TERRACE WITH DPINM ,
:
1
;
1
;
1
;
i
1
;
i
i
1
s
1
i
,
i
;
,
I
i
1
;
1
1
i
;
I
i
1
1
I
1 https-/imaublic schneidercorp corn/Application aspx7AppID-1048&LayerlD=23618&PageTypelD--48,PageiD=9878&KeyValue=750080060000 2/5
i
I
i
2020 q' 11,1 1,,:-T , i-i,i,,,„ii .,.. o..i,,-,,, H R.,,wi:rz. 75i)1180060000
1 •
I
N.,,, '111,..r,1),1ii, 1‘,.. 1.; .".PERmI I• D1 2-,2022,
ICE t,,If 12).',/ANDI,1•,'IS
1 c.4,2I1 IT D I 1201.114,0.PT EI MIT NE W PI Al,,03 ILI
IE 1 A' ./.I Alt IE 0:0E-An,,01.2 1 2020
I IF R F.ZE I_IA,,.DFROXI t.i“I IiTEC'T'!AE,
i 10,11 2 12,10 MOVE,111,125ir LI I!14°11N,11111.E.
E>por,c r r r 111TE pECEIvf DI ROM ARCHI I:,...
ANN FAll iAxA Ty:1,00.-PFSPOY.SIBILITYOT THIS
PROW('' RE vISION t F 1 TER RECIFIvED FOS'
ALTI.RATIONS Df PARISH I IAL L TOUNDAI ION
I ANI)UNDE RGRCA..IND 1303 I r.II', 10-TE dr250101F.F
i (0 1.„0 -,11-, ,,!'IN1-V1,i PARISH"'Al t F IRSI
i LEVEL.DININCH MULTI PURPOSE ROOM
1 ELECTRICAL 3 STORAGES KITCHEN WITH 3
cor,vAR I rAt N I SINK 2 COM,PAR I MENT
SINK,SINK DISH WASHER 7 RANGES 3 PASTOR
ROOMS.ACCOUNTING.OPEN OFFICE,
1 CONFERENCE,PASTORAL ROOM 1,11-I SHOP 2
'! FAMILY RES TROOMS DRINKING
FOUNTAIN.ELEVAIOR MACHINE
ROOMJANITORIAL ROOM.ELEVATOR,COVERED
1 PORTICO:COVERED TERRACE SECOND LEVEL.
CONFERENCE AREA WITH MOVABI.F PARTITION
WALLS TO CREATE 4 CONFERENCE ROOMS 2
SINKS CONFERENCE AREA WITH MOVABLE
PARTITION WALL S TO CREATE 3 CONFERENCE
ROOMS.SINK CONFERENCE LIBRARY,WRAP
AROUND BAI CONY.2 FAMILY RESTROOMS 2
4 EXTERIOR STAIRWAYS,2 DATES WITH ROCK
WALLS UP TO 7 FT MAXIMUM.AIR
1 CONDITIONING RE:B2009-1000K CON VE NT
DEMOLITION
1 12 14,20'12 Roildir”„ •_ , N,,', NEW CHURCD-I FIRST LEVEL:AUDIO VISUAL. 52.000,000 3,24:201 5 COMPLETED COMPLETED
... : :
ROOM RI-CONE BEAT ION ROOM ASSEMBLY W4 1-F
STORAGE.WORK SACRISTY WIT II SINK E.,
WASHER&DRYER.2 STORAGE CHAPELVE STING
SACRISTY WITH 2 SINKS&CLOSET ELEC TPICAL,
MEN WOMEN,FAMILY RESTROOMS COVE RED
'ERP/ACE WITH DRINKING FOUNTAIN COVERED
I
PORTICO BAPTISM POOL EQUIPMENT ROOM
BAR'IMAL POOL SECOND LEVELATTIC UTILITY
I ARE A TFTIR13 I F VEL•STORAGE gOURD-1
LEVLI../BEO LOWE R:BEI I TOWER WITH BEI I 4
/
1 EXTERIOR STAIRWAYS,ONE INTERIOR STAIRWAY
AIR CONDI.1 R)N ING NE.B20,0-0993K
DE MOI I TION CHURCH
i
12/11 2.404',',4 B,c!,1,,/, .. ;,4 Dooc,,,t,.., DEMOLITION OC EXISTING ST 4 TIC/TAL LS 31/,000 .W FIVE
i 1../LLTE.,.c„.
1...4 11 200,/ PL,,,li,,, D,,/,2,,,.-, DEMCILI I E'N'-'. F X/ST INC/CONVEN I BUII OIEK/ 04,00 AI2 TiVF
Al ST MIITHAEI SI"ITLIW2i t I
1 . .
I 12 1
F 200",' F'$1,F E.:E ' . ' Drr,c152.5[FErrr 100-TA5 II;GN 0,E XISIINC,ILT t.I,:IR 111T111i211N6 AC I IVE_
i .., OF ST NU('-A'-1 7:CHURCH
12 21 27,C,. LILO/,.,, .,, . ,,, Pc4o.,/,, BERI AC i E.,.0 TIN',11(1,117S C151-11,1E21.1211 $500 ITC TM:
1
11 2 ,,E4 B,c1,1:,), , '1,iv IRE' ",..-r111t'III ON 11X1rETIFJ(1,ROCiEWAL T -S28 I12,1 I,T, 2c10T, COM PEETEC1 ,70M PITTED
i
i
i ••‘, 2 7 T2.90: 61,01,,,: FESiIX", 2:1 1.2002 I,TORI F TED riCy‘lpi ETEC I
i 27 2:TH., E.GY,y.-,, Aly,f.-1,0,, Sr30(. CH,W I
1 Et DC
6 2S 2..)P A EiG-0,G,I : • L A-I: ', A500 (Ht,.W I
CL"'
7,2,,W FIG PL-,, , • .. AI(0.y0,,,' 5•,,EIl, CIAlc IN
3100
2.,:; 1 iiiii I-I,(tr.,.E • R..r.i, $.280 c"iK 1,si
1 I EL III,
1 10 17,5 DLL/DLL' . J„., AddL,..-,,,, 1-20 Off) 2 1 2119F,F 1' NP''E1 TELT COMPLETED
I.I)T-I TEG' B,,!hi,g - R,,,r,, SI',I1X1I 1121K Vi
I FILDG
/
A, ,:.,r7,- ,"r)the Gy,, ,,,,,ys,.Gl,,,r..)thIcI.,-...y urlil (tr.,'"'u,,-.3,- hv!,,,--00P,ItIlleilt f)1 PAL K Work., As,,,Di, 4.0.,,a,1,3Ctles.;,0,-es e;1 or Imp.ied::•srpi ovid,:?ii ft,c111
dAtd her,,,, ,t,,,,,o,PA,oterpr,L.11100.Lod,FILL'
Sales Information
Sale Instrument, Instrument in;trument Date LOH')Court Document Conveyance
5 Sale Date Amount # Type Description Recorded Number Cert# Book/Page Tax Document Type
i
•'-i,C,4 20,„ Si) '3.HE' 030iiiiii,<Aim.,-ii. 0:10{.11I4,;
10 CO 2011 F3 LIT,LE P 1.,^,-v1( 'A Otdc, 'I 1:)/14:24.1.4, ',GS 2 317 012" ) I Lod Court
4
. 0004, 0,04,,,III tyr.,/,$)
1
1
kittos://qpubl;c.s0-,,/ejcierco!-p.corn Appiicatron a sp 0AppID=10488,LayerlD-236188,PageT5peD=4&PageiD=-9878&KeyValue,--750080060000 3'5
1
2,v2,) Hr,:,, ,•,,,- ,-{,-,,,v.0 (,:,,,,-y H R,4'..•>,.;, 15'4'3006,10(11.'1
Current Tax Bill Informal.ion
Origelal T,,,n, 'fay Net
Tax Period Description Due Date Assessment Cn edits Tax Penalty Interest Other Amount Due
,:c.,I'zI) .3:3',e h)c,•14', $o•_c3 So,,Do 5;,04-) Sr
71, 0 11. 11'' 100, .P)(-'•c- :,u,.4-', )r,,;
Y) i.: oc .7,2,,L(•() ::.'i,i,, -7:',',A, i.,),'C'
, .
Historical Tax Information
' Payments
AMOLIflt
Year To, and Credits Penalty Interest Other Due
HR, 5000 $0 or., 50"0 52(X)00.
$2100 ) ,3'00001 3000 30.(;0 3000 300)
$200'A' ($200.001 50.00 30.00 50 00 $0.00
321,(1'I,/j ($200 001 3001 30,,x, $0 00 $0 0',
Si)81_37 '$l1.&i38' $0.00 $0.00 50 00 30 0,)
3100..14,1 13100 001 30.00 30 /) $000 39.00
310,,X, 310030' 30.00 30.00 530(1 3000
• S 1 0c-,,0• 0$100 o(,» 3)00 $0 00 30,00 S000
SIX CC .310) 3),. $,..1 00 $030 $0,A0 $0 00
31,-0,-,c
($100 00) $1013 .3.0 00 30 00 50 00
310 00 1, 1:)01.101 $0.00 $000 50 no &Joe
$1 '',, (,..:,.1no c0) Soo° $0.00 5000 3( 00
$10011,.., ($100 (0) 300', 50 00 3010 50 00
$1,.0100 100 001 50.00 30 00 3001' 30 OC./
33ix3 0-n .3100 000 3J0O 30 00 $0 00 $000
S10(.(70 (3 D.)0 001 31 00 1,11.00 30(1) 1.0 00
$100'..Y.; (3)7-0 ool 30 01) 3000 30 00 $000
r'.1,-,,o 001 30 00 30 00 $0.00 30.1)0 .
51010 0 1$1.00 001 $0 0,...:' 530') $000 $0 00
32.:-.-00 $0 tX) 3' ))') 50'.i0 3( 07
$0'--,(,, 7,0'Y.)) $C,(y.) i'...100 $'11.C 5) ')
I Map
1 .
1 .. „,.;. :' f `,"--,, ,2,,,*4_ •e:!.., „:
. ,„. ,,,,
1 -
- f ......,
0-A: s, '..•. ...,„. ,yr-,s,;.=,.1,-, , , ' .0.-
glt 411,
1 •, .
1 .:414 I. 1,"'" •
1 0 . ,, .17,--- ti„ •:''.. '.4. , l''' -''Ne .
. - - •, ,, A 1 .R..:1. 14:- -".
i
*
1
i
i
htwsliqpubhc schneldercorp.com/Application.aspx?AppID=1048&LayerlD-23618&PageTypelD-4&PagelD-98788,KeyValue-750080060000 4/5
i
E4 " 5"
Ihny Miclutel
“(1,, I • 4j7er\
(•f
\ il kahL •t 1)0;411C ci
1"(1 00,
\AC
County of Hawail. lio„.11.,„„.„ ;‘,67:20
(ti!N 121 17'0 11 011,
(SOS)127 PIANNIN(; DEPARTMENT
October 8, 201 )
David Pfeifer
2800 Third Avenue
San Diego, CA 92103
Dear Mr. Pfeifer:
PLAN APPROVAL APPLIED FOR: New Parish Hall
TMK: 7-5-008:006 (PLA-19-001685)
We have reviewed and approved the plan for the subject proposed project for FINAL PLAN
APPROVAL. Enclosed is a copy of the FINA1,PLAN APPROVAL, PLA-19-001685, dated
10/08/2019, for your file.
Please note the conditions of approval included as part of the FINAL PLAN APPROVAL.
These conditions must be complied with prior to and during occupancy of the proposed
SO uctures, or as otherwise specified. Sonic of these conditions affect design or placement
changes you may consider in the course of construction. We strongly recommend discussing
these conditions of approval in advance with any architects, contractors or other third parties
involved in construction decisions and requests for Certificates of Occupancy.
For your information, all accessible parking spaces shall comply with current State and Federal
Standards. Please find the most current requirements at the Disability and Communication
Access Board website at http:Lhealth.hawaii.govAlcabiparking or visit our website for helpful
information: littp71www.coh.planningdept.coml resources-and-references,
Should you have any questions, please contact Rosalind Newton of our West Hawai'i Office at
323-4770.
S'irrOcrely,
•
\ /
—
*.
/ /Nt IAEL YTE
/c:11(larining Director
( '
RIN:rrn
PLA-19-0 )1685
C:Aiscrs\rnewluirDusktopewlonTlim -7-5-008 006 Pliete; itoc
cc: West Hawaii Office
hipIjITH11,04)l.,0111 II sir I Ole IS<I WO/ Pr ;OP,WO geLl_
'
COI!N[YOyU[AWA\^kPLANNING V»EPAR[NILNI
FINAL PLAN APPROVAL
<M /\ |V_ Uhxi)
\PPLK'/\NT: DATE'PkmV[D. DATE EXPIRES:
David Pbifer10/08 --
_ ___-�
LOCATION: TAX MAE' KEY:
Portion of Hienaloli }" HieookJi 6th, North Kona, 7'51008: 06
Hawaii _� _____ __
PARCEL AREA/PROJECT SITE AREA ZONE:
acresl|qact rs�xc�x��|YResort
Ho�| (Y.75) ______
PROPOSED USE:
New Parish Hall
---
' -
--
| &s� lUwoo» Plan Comments l
______
Front Yard: (Aid Drive) 170' OK, 20'-0" Minimum required
Retir Y•Lird: (List) 1 22'-5" OK, 20'-0" Minimum required
Side Yard: (North) 126' OK,01-0" Minimum recAired
Side Yard: 0outh) 24'-6" OK,tf-0" Minimum required 1
I, lit. of Structure (s): 28'-11" OK, 45'-0" Mtiximum height illowed I
-11
Access to parking: driveway off of Alii Drive ' OK, Existing, Must comply with the requirements of 1
the Department of Public Works.
1 Off-Street Parking: 132 stalls provided, which includes OK, 1
10 compact stalls, I bicycle rack Existinu Church :
with 5 racks (equivalent to one 9,455 sq.ft.175 ,126.07 stalls 1
l parking stall) and 4 van accessible Storage -2,936 stilt./I,1)00= 2,94 stalls I
stalls and I sedan accessible stall. ' New Parish I fall:
Conference Rooms and Cafeteria 4,469 sq.ft/75 ,- 62.04
IShared parking onsite per IICC Section 25-4-51(c) where stalls ,
uses and activities do not occur simultaneously; approved Offices,storage, restrooms, kitchen and food pantry :
per Planning Department letter dated July 9, 20 It)on file. within Parish Hall- 2,387 sq.lt 1300= 7.96 stalls 1
I Loading and ,
1 Unloading Space: 12' s 50' and 10. x 22' OK. 2 requited(OK per PD letter dated .2 -` -...'.- �
0� _ -____---' /
-Densit y:
____� OK,
i -�-- -- ------- ---- -'- -- -- �--- �-- ------- '- --- ----------
\ [codn8and Walk:
_ __ _ �- ____ _1--____-- -- -- ----- ���-------
K4dc/ix|:
11_ Height:
--- '-- -- —� --� ------- — -- �-�------�- -��
Location: i
L.
!,!,11 }'I,„i Apprx'v,i1 Ili IGS 2919[t �tilk -' tiO -fltafit 1'I
Ladscaping: existing per plan
nOh, Complies with Rule No. 17 of the ['limning
Department's Rules of!Practice and Procedure
Others Tax Clearance: ( OK, per letter of tax clearances from RPT dated
• August 12, 2019
Drainage Report OK, DPW-Eng. Approved 8/12/2019
Special Management Area(SMA) Minor Permit No.(t>- OK, approved for a 4,41)sq. addition to the Church
0001)7
{
Special Management Area (SMA) Minor Permit No. (19- OK, approved on September 24.2009 for the demolition
000129 of three earthquake damaged structures
Special Management Area(SMA) Use Permit No. 10- OK, approved on September 30. 2010 for construction of
(1)044 Church, Rectory, Parish [falls and related improvements
Variance No. It)-021 I OK, approved October IS, 2010 approved for 73 foot
building height to lot bell tower and cross on Church
g
buildint`
Kailua Village Design Commission OK, approved September 3, 2019(see condition no. 6)
hoes this project have a Bair Share Condition'' I [_ Yes No
j Approved by:
Name: Rosalind Newlon
Date: 10/02/2019
'ttnditions of Approval:
1. Applicant shall compty with Al otherapplicrible Iaws toles.iep,ulations attd requirements of l lawai‘i Count.
2. This Final Plan Approval is -_slid for two }'ears from the date of tt t royal. and expire on I0/072O21.
3. Prior to approval of a Certificate of. Occupancy (C.O,) thePlantting Department may inspect the subject
property to verify compliance with the a provedplans_ A C.O. shall not be approved where the, buildings,
site improvements, Iandscapingor use pians are found the director to be inconsistent with the submittals
for which the Final Plan Approval is issued.
Approved_parking tobc paved, striped andappropriate signage iustalled prior to issuance of the Certificate
of Occupancy.
5. The t.pplic.tnt is responsible for constructing accessible parking spncesin accordance with iillcurrent County,
State, and Federal standards and requirements,
I f`l.nt Aprho )11`I 11 MK -,-Hw.,.(RHO t'1--\ 1" i01t
G. This ipplicarit shall hollow the recoim endations of the [canna Village Design Commission pisst,itcdiii their
September 5,,_:2019 letter resulting from the September 3, 2019 meeting„and imatch the roufingjnatetials
exterior paint colors as Submitted with the KVDCand plana Prov ii zipplications, as shown ontheir
submittal dated August 8, 2019.
7. The applicant, its successors or assigns shall be responsible for complying with all stated conditions of
approval of SMA_Use Permit No. 10-00044 and Variance No. 10-021.
8. Approved existing and proposed landscaping to be installed and maintained in good condition per approved
land e pin I l ui with litter Or excessive accumulation of plant debris, and the landscaping irrigation
y. r das being operable prior to occupancy or use of any of the proposed facilities
prior to issuance of the ('ertificate of Occupancy.
9. No Modifications to Plans without Prior Written Approval. All work shown on the development plans
covered byApproval
this Final Plan shall he completed as shown. No additions,substitutions or alterations to
the site, Parkin&landscaping or building design plans covered bythis Final Plan Approval,nor any
5$ it,icmuoofthP of uses
esde designated request_dthreishall be made
hilllmade without prior written approval of such
mntlPlanning
inigDepartment. A approval
of such changes shall he submitted in writing
and include scalcdplaifsheets clearly de picting and specifying all proposed changes. Upon assessing the
requested changes, the Director may approve or deny the requested changes or require a new, complete
ipplicttiorr for Plan Approval where the Director finds the cllimoes to be substantial. Prior to ilproval of a
Certificate of Occur ancy_f,( 0.1, the Planning Department m iy inspect the subject property to verify
compliance with the approved plans. A C.O.shall not be approved where the buildings. site improvements,
landscaping or use plans are found by the Director to be inconsistent with the submittals for which this Final
Plan Approval is issued.--
i
12I ii r{ifigDil'ectrr
1) te,' 10/08 201.9
�� c
r �
t 11
i 1
c.)44.1,',1/4);4 '`C.".
. B
3.
l
` - ':
Z
TC,� 114:r ' _
,3 , ,,, I,
., x.. ..._-,mss:::
x
i
i
i
E A '' C i
it
1 •
'
i I
(J '
i
}
•
i
G
I
_ _z
1 +
1
r
i
St Svfi,HnE'_i is RC?•fANi;E� � _ ii
��. NtA G tiaa - i
•
O
O
f E
1
f
G.�cti�bik "p"
iim Kim
a�,�r,,, �NZ k.\, Dcann t S�tl:�.�
Gina c I),i.ctoi
:I „1; 4„y \i% StevLn Hut)!
•
1T�Oi•MSM!.- 1
Y]I
County of Hawaii
DEPARTMENT OF FINANCE - REAL PROPERTY TAX
\ttpuni Centel • IN Pauahi 1 etti • Suite No 4 • Hilo.IIawai`i 06720 • F...x(;•40$i 9h1-84I
App ti iris I SO:41 961-83;,4 • (I r cai(h(t8)3i(I-8'O l • Collection..1 l)ii l()hi-; rt'
\\c,t Hatsei'i Civic Center • 74-5044 Ane K(,ohokalolc Hw) • Bldg.1),7n4 Fli • Kaifu,,Kona.Hawa: i 96746
Ii 4(8)127-3534 • .\plttetie sOROSi373.4 kl • ('lexical(31ih)32k-4880
\\ch5it uwu_ham)npn,petpttlx cum
REAL PROPERTY TAX CLEARANCE
(Rev, 07/13)
Date: September 10, 2020
TMK(s): (3) 7-5-008-006-0000
This is to certify that the real property taxes due to the County of Hawaii on the
parcel(s) listed above have been paid for the tax year 2020-2021,
The County's real property taxes are levied on July 1st each year. The taxes
become a lien on the property assessed as of the levy date.
This clearance was requested on behalf of ROMAN CATHOLIC
CHURCH on this/these parcel(s) only.
)
CMM
By Lisa Miura
REAL PROPERTY TAX DIVISION
r E
{
Hawaii County is an Equal Opportunity Provider and Employer
� I
' �'rYY Os t.'
t i.1..e•-•
County of Hawaii
LEEWARD PLANNING COMMISSION
Aupuni Center • 101 Pauahi Street,Suite 3 • Hilo,Hawaii 96720
Phone(808)961-8288 • Fax(808)961-8742
October 14, 2010
i s
Mr. Gregory R. Mooers
P.O. Box 1101
Kamuela, HI 96743
� E
t 1
Dear Mr. Mooers:
Special Management Area Use Permit Application(SMA 10-000044)
Request: Construction of Church, Rectory,Parish Halls, and
Related Improvements
Applicant: Saint Michael the Archangel Church
Tax Map Key: 7-5-008:006
.
The Leeward Planning Commission at its duly held public hearing on September 30, 2010, voted
to approve the above-referenced request to allow the construction of a church,rectory,and parish
hall and related improvements to replace the former Saint Michael the Archangel Church that
was damaged during the 2006 earthquake. The approximately 3.19 acre property is located on
the northeast(mauka)side of Ali`i Drive directly across Hale Halawai Park and Waterfront Row
shopping complex in Kailua Village,Hienaloli 2"d, North Kona, Hawaii.
Approval of this request is based on the following:
The applicant is requesting a Special Management Area Use Permit to allow the
reconstruction of Saint Michael the Archangel Church and related improvements on
approximately 3.19 acres of land within the Special Management Area. The project will
include a 9,455 square-foot church with a 1,468-square foot attic,a two-story 11,030
square-foot Parrish Hall with a 2,902-square foot exit balcony, a 5,635 square-foot parish
ministries/rectory structure,parking and landscaping.
The original church constructed in 1850 was recently demolished after sustaining
significant structural damage during the October 15,2006 earthquake. The new church
will provide a place of worship for the parishioners of the Roman Catholic faith in the
Kailua-Kona area and visiting Catholics. Since the earthquake, services have been
Ilativai'i County is an Equal Opportunity Provider and Employer
Mr. Gregory R. Moocrs
Page 2
provided in a temporary tent structure on the north side of the property. The new
development will be constructed in approximately 18 months and cost approximately$7
million dollars.
Additionally, the applicant has submitted a request to revoke Special Management
Area Use Permit No. 250,which was approved by the Planning Commission on
December 11, 1986, to allow the demolition of the existing pavilion, relocation of the
existing convent,reconstruction of the existing rectory,construction of a pavilion center,
meeting room facility and a storage/maintenance building, and related improvements.
The Planning Department will schedule this matter at a future Planning Commission
hearing.
The grounds for approving development within the Special Management Area is
based on HRS,Chapter 205A-26(2) (Special Management Area guidelines)and Rule
9-11(E) in the Planning Commission Rules. Planning Commission Rule 9-11(E)states
that the Authority may permit the proposed development only upon finding that:
1. The development will not have any substantial adverse environmental or
ecological effect except as such adverse effect is minimized to the extent
practicable and is clearly outweighed by public health, safety, or compelling
public interest;
2, The development is consistent with the objectives and policies and the Special
Management Area guidelines as provided by Chapter 205A,HRS; and
3. The development is consistent with the General Plan, Zoning Code and other
applicable ordinances.
4. The development will, to the extent feasible,reasonably protect native Hawaiian
rights if they are found to exist, including specific factual findings regarding:
a. The identity and scope of valued cultural, historical or natural resources in
the petition area,including the extent to which traditional and customary
native Hawaiian rights are exercised in the petition area;
b. The extent to which those resources, including traditional and customary
native Hawaiian rights,will be affected or impaired by the proposed
action; and
c. The feasible action, if any, to be taken by the Authority to reasonably
protect any valued cultural, historical or natural resources,including any
existing traditional and customary native Hawaiian rights.
The proposed development will not have any significant adverse
environmental or ecological effect,except as such adverse effect is minimized to the
extent practicable and clearly outweighed by public health,safety,or compelling
public interest. in considering the significance of potential environmental effects, the j P
Mr. Gregory R. Mooers
Page 3
Director shall consider the sum of those effects that adversely affect the quality of the
environment and shall evaluate the overall and cumulative effects of the action. Such
adverse effect shall include,but not be limited to,the potential cumulative impact of
individual developments,each one of which taken in itself might not have a substantial
adverse effect and elimination of planning options.
A"substantial adverse effect"is determined by the specific circumstances of the
proposed use,activity or operation. In determining whether a proposal may have a
substantial adverse effect on the environment, the Director shall consider every phase of a
proposed action and expected consequences,either primary or secondary,or the
cumulative as well as short or long-term effect of the proposal. In reviewing the proposed
development against the factors that may constitute a substantial adverse effect as listed
under Planning Commission Rule 9-10(H)(1 though 10),it has been determined that
reconstruction of the church and related improvements in this area will not have a
significant adverse environmental or ecological effect to the Special Management Area.
It should be noted that under Planning Commission Rule 9-10(H)(9),a proposed use,
activity or operation may constitute a substantial adverse if it affects an environmentally
sensitive areas,such as flood plain,tsunami zone,erosion-prone area,geologically
hazardous land,estuary,fresh water or coastal water. Although this use is located within
Flood Zone AE and the Tsunami Evacuation Zone, the proposed development must meet
the requirements of Chapter 27 - Flood Plain Management,of the Hawaii County Code.
The applicant will be required to submit a flood study to the Department of Public Works
for the encroachments in and/or alterations to the AE flood zone. A Conditional Letter of
Map Revision(CLOMR)may be required prior to the issuance of any construction
permit. As such,the proposed development will not create a substantial adverse effect on
these environmentally sensitive areas.
The proposed development will not create significant adverse impacts upon
nearby and adjacent properties as the immediate area has been extensively developed
(condominiums,retail uses,churches,etc.). Surrounding properties are zoned Resort-
Hotel(V-.75),Open(0)and Village Commercial(CV-7.5). Surrounding land uses in the
immediate vicinity include the County's Hale Halawai Park facility and the Waterfront
Row shopping mall to the east across AEI Drive,the Kailua Public Library to the north,
the 6-story Kailua Village apartment complex to the west,and the Kealaokamalamalama
Church and the Kona Insider Inn &HoteI to the south.
The property is located within an area adequately served with essential services
and facilities such as water,sewer, transportation systems and other utilities. Access to
the project site will be from Ali`i Drive. County water is available to the site. As a
condition of approval, the applicant will be required to hook up the new facilities to the
County's sewer line fronting the property along Ali`i Drive.
•
Mr. Gregory R. Mooers
Page 4
Any potential runoff or discharge that could reach ocean waters can be handled by
on-site improvements consistent with the requirements of the Department of Public
Works. Any impacts from soil erosion and runoff during site preparation and
construction phases can be adequately mitigated through compliance with existing
regulations and proper construction practices. Air emissions generated during the
construction phase for the proposed project can be mitigated by existing construction
regulations. With these precautionary measures in place,the proposed development is
not anticipated to have any substantial adverse effects upon nearby coastal resources or
the surrounding environment. Conditions of approval will be included relating to
wastewater, solid waste and public safety to ensure that impacts on coastal resources are
minimized.
1
The proposed project is consistent with the objectives and policies as
provided by Chapter 205A,HRS,and Special Management Area guidelines
contained in Rule No.9 of the Planning Commission Rules of Practice and
Procedure. The purpose of Chapter 205A,Hawaii Revised Statutes (HRS),and Special
Management Area Rules and Regulations of the County of Hawaii,is to preserve,
protect, and where possible,to restore the natural resources of the coastal zone areas.
Therefore,special controls on development within an area along the shoreline are
necessary to avoid permanent loss of valuable resources and the foreclosure of
management options. In reviewing the proposed development, it has been determined
that it is consistent with the objectives and policies listed under Chapter 205A, HRS,
which includes protecting and preserving recreational resources, historic resources, scenic
and open space resources,coastal ecosystems,economic uses,coastal hazards,beach
protection,and marine resources.
The proposed development will not substantially affect scenic vistas or
viewplanes from the nearest State Highway, which is Kuakini Highway, nor have an
adverse impact on coastal recreational resources to the shoreline and coastal ecosystems.
The project will not restrict access to coastal recreational resources along the shoreline.
It should be noted that the applicant has submitted a separate request for a
variance from the Zoning Code to allow additional height from 55 feet to 73 feet for the
bell tower and cross, which are considered important architectural and religious elements
of the church. This is an administrative process in which the Planning Director makes the
decision for the request.
The proposed development is consistent with the County General Plan and
Zoning Code and other applicable ordinances. The General Plan Land Use Pattern
k E1�
fE
IMr. Gregory R. Mooers
Page 5
Allocation Guide(LUPAG) Map designation for this area is Resort Node, which allows
for a mix of visitor-related uses such as hotels,condominium-hotels (condominiums
developed and/or operated as hotels),single family and multiple family residential units,
golf courses and other typical resort recreational facilities, resort commercial complexes
and other support services.
The proposed development will complement the goals,policies and standards of
the Land Use Element of the General Plan as the proposed church will encourage the
development and maintenance of communities meeting the needs df its residents in
balance with the physical and social environment.
The subject property is zoned Resort-Hotel—750 square feet(V-25)by the
County. Churches are listed as a permitted use within the Resort-Hotel zoning in the
Zoning Code. Therefore,the proposed development is consistent with the County
General Plan and with County zoning.
The proposed development falls within the area affected by the Kona Community
Development Plan,which was adopted by Ordinance No. 08 131. The property is located
within the Kona Urban Area and within the Kailua Village Redevelopment Regional
Center TOD and the proposed use is consistent with the Kona CDP.
Lastly,the property is located within the Kailua Village Special District. As such,
the proposed development will need to be reviewed before the Kailua Village Design
Commission. The purpose of the Kailua Village Design Commission is to advise the
director in matters concerning the design of buildings and structures and all public and
private improvements within Kailua Village. The design of the new church,parish hall
and parish ministries/rectory was reviewed by the Kailua Village Design Commission on
June 15,2010, who voted to recommend approval for the proposed project to the
Planning Director.
The development will to the extent feasible,reasonably protect native
Hawaiian rights if they are found to exist. In view of the Hawaii State Supreme
Court's"PASH"and"Ka Pa'akai 0 Ka'Aina"decisions, the issue relative to native
Hawaiian rights, such as gathering and fishing rights,must be addressed. These rights
must be addressed in terms of the cultural, historical, and natural resources and the
associated traditional and customary practices of the site.
Investigation of valued resources: The following surveys were conducted for the
property and submitted as part of the application:
Mr. Gregory R. Mooers
Page 6
f
• An Archaeological Inventory Survey was conducted of the subject parcel
in 2008 by Archaeological Consultants of the Pacific, Inc. (ACP).
• A Burial Treatment Plan dated July 2009 was prepared by Archaeological
Consultants of the Pacific, Inc. (ACP).
• A Cultural Impact Assessment dated March 2009 was prepared by Helen
Wong Smith for the demolition of Saint Michael the Archangel Church.
• The applicant submitted a biological survey of the property dated January
2009,which was prepared by Reginald E. David of Rana Productions, Ltd.
The biological survey included a botanical survey, an avian survey and a
mammalian survey.
The valuable cultural,historical,and natural resources found in the area: The
Archaeological Inventory Survey identified two previously undocumented sites of
historical significance. The first site being the Church and its ancillary components,
including an active cemetery. The second site is the burial of Father Joachim Marcella'
whose remains were interred beneath the floor of the Church. As the Church and other
structures were damaged in the earthquake,DLNR-SHPD agreed to mitigation measures
including a photographic documentation of the structures. A Burial Treatment PIan was
prepared and approved for the remains of Father Joachim Marechal. The remains are to
be re-interred in a concrete tomb located in the floor of the new Church at the foot of the
steps to the altar and marked with the same memorial plaque that identified his grave in
the original Church.
The Cultural Impact Assessment(CIA)concluded that Saint Michael the
Archangel Church is a pivotal component of the transition from traditional to introduced
belief systems. Kailua,the center of religious and political change in the Kingdom of
Hawai`i boasts the first Catholic parish on the island with a continuous and vital presence
to its community. Its locale in the coastal zone of a royal residence and a major point of
Western contact suggest the possibility for indigenous remains of habitation,religious
and secular activities. The CIA suggested that sub-surface activities should be monitored
by an archaeologist recognizing the likelihood of uncovering cultural material.
The biological survey indicated that there are no native botanical resources
present on the property. The survey concluded that the modification of the current habitat
on the church's property and the construction and operation of a replacement church is
not expected to result in significant impacts to any avian or mammalian species currently
listed as threatened,endangered or proposed for listing under either the Federal, or State
of Hawaii endangered species programs.
Possible adverse effects or impairment of valued resources: With the proposed
mitigation measures in place,there are no adverse effects or impairment of valued
Mr. Gregory R. Mooers
Page 7
resources expected. Native vegetation may be destroyed by ground alteration. There is
no evidence that the flora in the area are particularly desired or used for cultural practices.
Feasible actions to protect native Hawaiian rights: To the extent that traditional
and customary native Hawaiian rights are exercised;the proposed action will not affect
traditional Hawaiian rights. The proposed project will not restrict the use of natural
resources along the shoreline,as the property is not in close proximity to the shoreline. A
condition of approval will protect any unidentified cultural, historical,and natural
resource in the event any are encountered during construction. Additionally,the applicant
will be required to submit a monitoring plan prepared by a qualified archaeologist and
have a qualified archaeologist monitor all ground altering activities associated with the
proposed development. Lastly,the applicant will be required to implement the
° requirements final phase of the Burial Treatment Plan for the burial site of Father
Joachim Marechal.
Based on the above findings,it is determined that the proposed development and related
improvements will not have substantial adverse impacts on the surrounding area,nor will its
approval be contrary to the objectives and policies of Chapter 205A,HRS, relating to Coastal
Zone Management and Rule No.9 of the Planning Commission relating to the Special
Management Area. Approval of this request is subject to the following conditions:
1. The applicant,its successor or assigns shall be responsible for complying with all stated
conditions of approval of this permit.
2. The applicant shall submit estimated maximum daily water usage calculations,prepared
by a professional engineer licensed in the State of Hawai`i, for review and approval to the
Department of Water Supply. The water usage calculations shall include the estimated
peak flow in gallons per minute(GPM)and the total estimated average daily water usage
in gallons per day(GPD) including all irrigation/landscaping use. Based on the water
usage calculations provided,if the existing meters cannot support the estimated demand,
a larger or additional meter will be required to be installed and remittance of the
prevailing facilities charge will be required to be paid. The applicant shall install a
backflow preventer(reduced pressure type)pe)by a licensed contractor within five feet of the
meter on the applicant's property, meeting with the approval of the Department of Water
Supply.
3. Construction of the proposed development shall be completed within five(5)years from
the effective date of this permit. Prior to construction, the applicant,successors or
assigns shall secure Final Plan Approval for the proposed development from the Planning
Director in accordance with Chapter 25-2-70,Chapter 25 (Zoning Code), Hawai`i County
Code. Plans shall identify,if applicable,all proposed structures, fire protection measures,
Mr. Gregory R. Mooers
Page 8
paved driveway access and parking stalls, and other improvements associated with the
proposed use. Landscaping shall be included in the development plans to mitigate any
potential adverse noise or visual impacts to adjacent properties in accordance with the
Planning Department's Rule No. 17 (Landscaping Requirements).
4. The project shall connect to the County's sewer line fronting the property along Ali`i
Drive prior to the issuance of a Certificate of Occupancy.
5. All development-generated runoff shall be disposed of on-site and shall not be directed
toward any adjacent properties. A drainage study shall be prepared by a licensed civil
engineer and submitted to the Department of Public Works prior to issuance of a
construction permit. Any recommended drainage improvements shall be constructed
meeting with the approval of the Department of Public Works prior to receipt of a
Certificate of Occupancy.
6. The applicant shall comply with Chapter 27 -Flood Control, of the Hawai`i County
Code.
7. For encroachments in or alterations to the AE flood zone, the applicant shall submit a
flood study prepared by a licensed professional civil engineer. If required, the applicant
shall submit for a Conditional Letter of Map Revision(CLOMR) to the Federal
Emergency Management Agency(FEMA) prior to the issuance of any construction
permit. If required, the applicant shall obtain a Letter of Map Revision(LOMR) prior to
the issuance of Certificate of Occupancy.
8. During construction, measures shall be taken to minimize the potential of both fugitive
dust and runoff sedimentation. Such measures shall be in compliance with construction
industry standards and practices utilized during construction projects of the State of
} Hawai'i.
9. All earthwork and grading shall conform to Chapter 10, Erosion and Sediment Control of
the Hawaii County Code.
10. All driveway connections to Alii Drive shall be at a location approved by the Department
of Public Works and shall conform to Chapter 22,County Streets,of the Hawaii County
Code.
11. The applicant shall install street lights, signs and markings meeting with the approval of
the Department of Public Works—Traffic Division.
Mr. Gregory R. Mooers
Page 9
12. An All Hazards Emergency Response Plan shall be submitted to the 1-lawai`i County
Civil Defense Agency for review and approval prior to the issuance of a Certificate of
Occupancy.
13. A Solid Waste Management Plan shall be submitted to the Department of Environmental
Management for review and approval prior to the issuance of Final Plan Approval.
14. Prior to any ground altering activities,the applicant shall submit a monitoring plan
prepared by a qualified archaeologist pursuant to HAR 13-279 to the Department of Land
and Natural Resources—State Historic Preservation Division(DLNR-SHPD) for review
and approval. A copy of the approved monitoring plan shall be provided to the Planning
Department prior to issuance of Final Plan Approval.
15. All ground altering activities associated with the proposed development shall be
monitored by a qualified archaeologist in a manner meeting with the approval of the
DLNR-SHPD.
16. The applicant shall implement a relocation plan and interim preservation measures for the
coral shrine grotto during construction.
17. The applicant shall implement the final phase of the approved Burial Treatment Plan for
the completion of the new Church structure meeting with the approval of the
DLNR-SHPD.
18. Should any undiscovered remains of historic sites,such as rock walls, terraces,platforms,
marine shell concentrations or human burials be encountered,work in the immediate area
shall cease and the DLNR-SHPD shall be immediately notified. Subsequent work shall
proceed upon an archaeological clearance from the DLNR-SHPD when it finds that
sufficient mitigation measures have been taken.
19. The applicant shall comply with all applicable County,State and Federal laws,rules,
regulations and requirements.
20. An initial extension of time for the performance of conditions within this permit may be
granted by the Planning Director upon the following circumstances:
A. The non-performance is the result of conditions that could not have been
foreseen or are beyond the control of the applicant,successors or assigns,
and that are not the result of their fault or negligence.
t 1
Mr. Gregory R. Mooers
Page 10
B. Granting of the time extension would not be contrary to the General Plan
or Zoning Code.
C. Granting of the time extension would not be contrary to the original
reasons for the granting of this permit.
D. The time extension granted shall be for a period not to exceed the period
originally granted for performance (i.e., a condition to be performed within
one year may be extended for up to one additional year).
E. If the applicant should require an additional extension of time, the
Planning Department shall submit the applicant's request to the Planning
Commission for appropriate action.
Should any of the foregoing conditions not be met or substantially complied with
in a timely fashion,the Planning Director may initiate procedures to revoke the
permit.
This approval does not, however, sanction the specific plans submitted with the application as
they may be subject to change given specific code and regulatory requirements of the affected
agencies.
Should you have any questions, please contact Daryn Arai of the Planning Department at(808)
961-8288.
! �1
Sincerely,
Frederic ousel,Chairman
Leeward Planning Commission
LsaintmichaelOI Lwpc
cc: Department of Public Works
Department of Water Supply
County Real Property Tax Division
DLNR-State Historic Preservation Division
Planning Department- Kona
Long Range Planning Division
Zoning Inspector- Kona
Plan Approval Section
Mr. Gilbert Bailado l
I
f0,rr,r � • • Duane Kamilla
Bobby Command
aC 011ic:
71 50,1-1 tin I.cchr latolc p� r� (itst€ ru er i+.)face
ldlia-Kt n r Ia:F it c 96 io County of�aiai` IUl f tuahi ti+rLef- aR
f hone(so, } ;--}77 . k1ik, 'rti�ri 9t�?O
�axOt)8; 42Y ;�;,; PLANNING DEPARTMENT1'trc,rreisas)961-x2as
Fax{808)461-87-42
€ d
E !
July 21, 2015 11
Mr. Mark Lively, AIA
Lively Architects
119 Merchant Street, Suite 403
Honolulu, HI 96813
Dear Mr. Lively:
Special Management Area(SM A) Use Permit No. 10-000044 (SMA 10-000044)
Applicant: St. Michael the Archangel Church
Request: Construction of the Church, Rectory, Parish Halls, and Related Improvements
( Subject: Time Extension Request for Condition No.3
Tax Map Key: 7-5-008:006
This is to acknowledge receipt of your letter dated May 6, 2015 requesting an administrative
time extension to comply with Condition No. 3 (complete construction of church and related
improvements) of Special Management Area(SMA) Use Permit No. 10-000044.
The effective date of the SMA Use Permit No. 10-000044 is October 14, 2010. Based on the
reasons in your letter we will grant a 5-year administrative time extension to October 14,2020
to comply with Condition No. 3.
Please be informed, however, should you need an additional extension of time to comply with
Condition No. 3 of Special Management Area Use Permit No. 10-000044, your request and
reasons, along with 20 copies of that request shall be forwarded to the Planning Department with
a$250 filing fee. The request will be transmitted to the Planning Commission for appropriate
action.
{E(
Ha rar'r(aunty..rs an Equal Opporliinity f rovuier cunt Eirplowr
Mr. Mark Lively, AI:A
Lively Architects
Page?
July 21, 2015
I1�you have any questions, please feel free to contact Jeff Darrow at 961-8158.
i H1S8,
Sincerely,
Dtl
,ANF, KANUHA
Planning Director
JWD:mad
P:Apubiiewpwin6JUeff\Letters\Time Ext yLovely-AdminTER-SM,A I 0-44-Cond3dot:
cc w/copy of letter(electronic): Kona Planning Department
1
1YY 0/
-M-
County of Hawaii
LEEWARD PLANNING COMMISSION
Aupuni Center• 101 Pauahi Street,Suite 3 • FGIo,Hawai'i 96720
Phone(808)961-8288 • Fax(808)961-8742
1 October 14, 2010
i
rt
1 Mr.Gregory R.Mooers
P.O.Box 1101
Kamuela,HI 96743 ,
1 Dear Mr.Mooers:
Special Management Area Use Permit Application(SMA 10-000044)
Request: Construction of Church,Rectory,Parish Halls,and
Related Improvements
Applicant: Saint Michael the Archangel Church
Tax Map Key: 7-5-008:006
The Leeward Planning Commission at its duly held public hearing on September 30,2010,voted
to approve the above-referenced request to allow the construction of a church,rectory,and parish
hall and related improvements to replace the former Saint Michael the Archangel Church that
was damaged during the 2006 earthquake. The approximately 3.19 acre property is located on
Ithe northeast(mauka)side of Alii Drive directly across Hale Halawai Park and Waterfront Row
shopping complex in Kailua Village,Hienaloli 2nd,North Kona,Hawai`i.
I Approval of this request is based on the following:
I
I The applicant is requesting a Special Management Area Use Permit to allow the
reconstruction of Saint Michael the Archangel Church and related improvements on
1 approximately 3.19 acres of land within the Special Management Area. The project will
include a 9,455 square-foot church with a 1,468-square foot attic,a two-story 11,030
square-foot Parrish Hall with a 2,902-square foot exit balcony,a 5,635 square-foot parish
ministries/rectory structure,parking and landscaping.
The original church constructed in 1850 was recently demolished after sustaining
significant structural damage during the October 15,2006 earthquake. The new church
I will provide a place of worship for the parishioners of the Roman Catholic faith in the
Kailua-Kona area and visiting Catholics. Since the earthquake,services have been
Hawaii County is an Equal Opportunity Provider and Employer
OC� \1\ Q
1
i
1
(
I
3
a
i
Planning Dept.
Exhibit 9.-
1 1
1
Mr.Gregory R.Mooers
Page 2
provided in a temporary tent structure on the north side of the property. The new
development will be constructed in approximately 18 months and cost approximately$7
million dollars.
Additionally,the applicant has submitted a request to revoke Special Management
Area Use Permit No.250,which was approved by the Planning Commission on
December 11, 1986,to allow the demolition of the existing pavilion,relocation of the
existing convent,reconstruction of the existing rectory,construction of a pavilion center,
meeting room facility and a storage/maintenance building,and related improvements.
The Planning Department will schedule this matter at a future Planning Commission
hearing.
The grounds for approving development within the Special Management Area is
based on HRS,Chapter 205A-26(2)(Special Management Area guidelines)and Rule
9-11(E)in the Planning Commission Rules. Planning Commission Rule 9-11(E)states
that the Authority may permit the proposed development only upon finding that:
1. The development will not have any substantial adverse environmental or
ecological effect except as such adverse effect is minimized to the extent
practicable and is clearly outweighed by public health,safety,or compelling
public interest;
2. The development is consistent with the objectives and policies and the Special
Management Area guidelines as provided by Chapter 205A,HRS;and
3. The development is consistent with the General Plan,Zoning Code and other
applicable ordinances.
4. The development will,to the extent feasible,reasonably protect native Hawaiian
rights if they are found to exist,including specific factual findings regarding:
a. The identity and scope of valued cultural,historical or natural resources in
the petition area,including the extent to which traditional and customary
native Hawaiian rights are exercised in the petition area;
b. The extent to which those resources,including traditional and customary
native Hawaiian rights,will be affected or impaired by the proposed
action;and
c. The feasible action,if any,to be taken by the Authority to reasonably
protect any valued cultural,historical or natural resources,including any
existing traditional and customary native Hawaiian rights.
The proposed development will not have any significant adverse
environmental or ecological effect,except as such adverse effect is minimized to the
extent practicable and clearly outweighed by public health,safety,or compelling
public interest. In considering the significance of potential environmental effects,the
i
1
Mr.Gregory R.Mooers
I Page 3
i
Director shall consider the sum of those effects that adversely affect the quality of the
1 environment and shall evaluate the overall and cumulative effects of the action. Such
adverse effect shall include,but not be limited to,the potential cumulative impact of
1 individual developments,each one of which taken in itself might not have a substantial
adverse effect and elimination of planning options.
J .
A"substantial adverse effect"is determined by the specific circumstances of the
proposed use,activity or operation. hi determining whether a proposal may have a
substantial adverse effect on the environment,the Director shall consider every phase of a
proposed action and expected consequences,either primary or secondary,or the
cumulative as well as short or long-term effect of the proposal. In reviewing the proposed
development against the factors that may constitute a substantial adverse effect as listed
t under Planning Commission Rule 9-10(H)(1 though 10),it has been determined that
reconstruction of the church and related improvements in this area will not have a
r significant adverse environmental or ecological effect to the Special Management Area.
It should be noted that under Planning Commission Rule 9-10(H)(9),a proposed use,
activity or operation may constitute a substantial adverse if it affects an environmentally
sensitive areas,such as flood plain,tsunami zone,erosion-prone area,geologically
1 hazardous land,estuary,fresh water or coastal water. Although this use is located within
Flood Zone AE and the Tsunami Evacuation Zone,the proposed development must meet
the requirements of Chapter 27- Flood Plain Management,of the Hawaii County Code.
I The applicant will be required to submit a flood study to the Department of Public Works
t
1 for the encroachments in and/or alterations to the AE flood zone. A Conditional Letter of
Map Revision(CLOMR)may be required prior to the issuance of any construction
I permit. As such,the proposed development will not create a substantial adverse effect on
these environmentally sensitive areas.
1
The proposed development will not create significant adverse impacts upon
1 nearby and adjacent properties as the immediate area has been extensively developed
(condominiums,retail uses,churches,etc.). Surrounding properties are zoned Resort-
Hotel(V-.75),Open(0)and Village Commercial(CV-7.5). Surrounding land uses in the
1 immediate vicinity include the County's Hale Halawai Park facility and the Waterfront
Row shopping mall to the east across Ali`i Drive,the Kailua Public Library to the north,
the 6-story Kailua Village apartment complex to the west,and the Kealaokamalamalama
l Church and the Kona Insider Inn&Hotel to the south.
The property is located within an area adequately served with essential services
and facilities such as water,sewer,transportation systems and other utilities. Access to
1 the project site will be from Ali`i Drive. County water is available to the site. As a
condition of approval,the applicant will be required to hook up the new facilities to the
County's sewer line fronting the property along Alii Drive.
i
i
1
3
i
1
3
1
4
i
i
{
3
1
1
4
i
1
1
i
i
A
y
9
Mr.Gregory R.Mooers
Page 4
Any potential runoff or discharge that could reach ocean waters can be handled by
on-site improvements consistent with the requirements of the Department of Public
Works. Any impacts from soil erosion and runoff during site preparation and
construction phases can be adequately mitigated through compliance with existing
regulations and proper construction practices. Air emissions generated during the
construction phase for the proposed project can be mitigated by existing construction
regulations. With these precautionary measures in place,the proposed development is
not anticipated to have any substantial adverse effects upon nearby coastal resources or
the surrounding environment. Conditions of approval will be included relating to
wastewater,solid waste and public safety to ensure that impacts on coastal resources are
minimized.
The proposed project is consistent with the objectives and policies as
provided by Chapter 205A,HRS,and Special Management Area guidelines
contained in Rule No.9 of the Planning Commission Rules of Practice and
Procedure. The purpose of Chapter 205A,Hawaii Revised Statutes(HRS),and Special
Management Area Rules and Regulations of the County of Hawai`i,is to preserve,
protect,and where possible,to restore the natural resources of the coastal zone areas.
Therefore,special controls on development within an area along the shoreline are
necessary to avoid permanent loss of valuable resources and the foreclosure of
management options. In reviewing the proposed development,it has been determined
that it is consistent with the objectives and policies listed under Chapter 205A,HRS,
which includes protecting and preserving recreational resources,historic resources,scenic
and open space resources,coastal ecosystems,economic uses,coastal hazards,beach
protection,and marine resources.
The proposed development will not substantially affect scenic vistas or
viewplanes from the nearest State Highway,which is Kuakini Highway,nor have an
adverse impact on coastal recreational resources to the shoreline and coastal ecosystems.
The project will not restrict access to coastal recreational resources along the shoreline.
It should be noted that the applicant has submitted a separate request for a
variance from the Zoning Code to allow additional height from 55 feet to 73 feet for the
bell tower and cross,which are considered important architectural and religious elements
of the church. This is an administrative process in which the Planning Director makes the
decision for the request.
The proposed development is consistent with the County General Plan and
Zoning Code and other applicable ordinances. The General Plan Land Use Pattern
,
1
1
1
, Mr.Gregory R.Mooers
li
Page 5
i
4
i
1 Allocation Guide(LUPAG)Map designation for this area is Resort Node,which allows
1
1 for a mix of visitor-related uses such as hotels,condominium-hotels(condominiums
1
i developed and/or operated as hotels),single family and multiple family residential units,
i golf courses and other typical resort recreational facilities,resort commercial complexes
1 and other support services.
1
The proposed development will complement the goals,policies and standards of
the Land Use Element of the General Plan as the proposed church will encourage the
development and maintenance of communities meeting the needs of its residents in
balance with the physical and social environment.
i The subject property is zoned Resort-Hotel—750 square feet(V-.75)by the
,
iCounty. Churches are listed as a permitted use within the Resort-Hotel zoning in the
1 Zoning Code. Therefore,the proposed development is consistent with the County
i General Plan and with County zoning.
i
i • The proposed development falls within the area affected by the Kona Community
g
iDevelopment Plan,which was adopted by Ordinance No.08 131. The property is located
i within the Kona Urban Area and within the Kailua Village Redevelopment Regional
1 Center TOD and the proposed use is consistent with the Kona CDP.
i
4
4
ILastly,the property is located within the Kailua Village Special District. As such,
the proposed development will need to be reviewed before the Kailua Village Design
ICommission. The purpose of the Kailua Village Design Commission is to advise the
director in matters concerning the design of buildings and structures and all public and
private improvements within Kailua Village. The design of the new church,parish hall
and parish ministries/rectory was reviewed by the Kailua Village Design Commission on
1 June 15,2010,who voted to recommend approval for the proposed project to the
Planning Director.
I
1 The development will to the extent feasible,reasonably protect native
i Hawaiian rights if they are found to exist. In view of the Hawail State Supreme
I
1 Court's"PASH"and"Ka Pa'alcai 0 Ka'Aina"decisions,the issue relative to native
Hawaiian rights,such as gathering and fishing rights,must be addressed. These rights
Imust be addressed in terms of the cultural,historical,and natural resources and the
i
g associated traditional and customary practices of the site.
1
I Investigation of valued resources: The following surveys were conducted for the
property and submitted as part of the application:
•
§
i
i
1
ii
i
g
I
i
,
1
I
i
,
i
,
1
1
,
1
,
,
1
1
1
i
I
Mr.Gregory R.Mooers
Page 6
• An Archaeological Inventory Survey was conducted of the subject parcel
in 2008 by Archaeological Consultants of the Pacific,Inc.(ACP).
• A Burial Treatment Plan dated July 2009 was prepared by Archaeological
Consultants of the Pacific,Inc.(ACP).
• A Cultural Impact Assessment dated March 2009 was prepared by Helen
Wong Smith for the demolition of Saint Michael the Archangel Church.
• The applicant submitted a biological survey of the property dated January
2009,which was prepared by Reginald E.David of Rana Productions,Ltd.
The biological survey included a botanical survey,an avian survey and a
mammalian survey.
The valuable cultural,historical,and natural resources found in the area: The
Archaeological Inventory Survey identified two previously undocumented sites of
historical significance. The first site being the Church and its ancillary components,
including an active cemetery. The second site is the burial of Father Joachim Marechal
whose remains were interred beneath the floor of the Church. As the Church and other
structures were damaged in the earthquake,DLNR-SHPD agreed to mitigation measures
including a photographic documentation of the structures. A Burial Treatment Plan was
prepared and approved for the remains of Father Joachim Marechal. The remains are to
be re-interred in a concrete tomb located in the floor of the new Church at the foot of the
steps to the altar and marked with the same memorial plaque that identified his grave in
the original Church.
The Cultural Impact Assessment(CIA)concluded that Saint Michael the
Archangel Church is a pivotal component of the transition from traditional to introduced
belief systems. Kailua,the center of religious and political change in the Kingdom of
Hawaii boasts the first Catholic parish on the island with a continuous and vital presence
to its community. Its locale in the coastal zone of a royal residence and a major point of
Western contact suggest the possibility for indigenous remains of habitation,religious
and secular activities. The CIA suggested that sub-surface activities should be monitored
by an archaeologist recognizing the likelihood of uncovering cultural material.
The biological survey indicated that there are no native botanical resources
present on the property. The survey concluded that the modification of the current habitat
on the church's property and the construction and operation of a replacement church is
not expected to result in significant impacts to any avian or mammalian species currently
listed as threatened,endangered or proposed for listing under either the Federal,or State
of Hawaii endangered species programs.
Possible adverse effects or impairment of valued resources: With the proposed
mitigation measures in place,there are no adverse effects or impairment of valued
1
Mr.Gregory R.Mooers
Page 7
resources expected. Native vegetation may be destroyed by ground alteration. There is
no evidence that the flora in the area are particularly desired or used for cultural practices.
Feasible actions to protect native Hawaiian rights: To the extent that traditional
and customary native Hawaiian rights are exercised,the proposed action will not affect
3
traditional Hawaiian rights. The proposed project will not restrict the use of natural
resources along the shoreline,as the property is not in close proximity to the shoreline. A
condition of approval will protect any unidentified cultural,historical,and natural
resource in the event any are encountered during construction. Additionally,the applicant
will be required to submit a monitoring plan prepared by a qualified archaeologist and
have a qualified archaeologist monitor all ground altering activities associated with the
proposed development. Lastly,the applicant will be required to implement the
requirements final phase of the Burial Treatment Plan for the burial site of Father
Joachim Marechal.
1
Based on the above findings,it is determined that the proposed development and related
improvements will not have substantial adverse impacts on the surrounding area,nor will its
approval be contrary to the objectives and policies of Chapter 205A,HRS,relating to Coastal
Zone Management and Rule No.9 of the Planning Commission relating to the Special
Management Area.Approval of this request is subject to the following conditions:
1. The applicant,its successor or assigns shall be responsible for complying with all stated
conditions of approval of this permit.
2. The applicant shall submit estimated maximum daily water usage calculations,prepared
by a professional engineer licensed in the State of Hawaii,for review and approval to the
Department of Water Supply. The water usage calculations shall include the estimated
peak flow in gallons per minute(GPM)and the total estimated average daily water usage
F
in gallons per day(GPD)including all irrigation/landscaping use. Based on the water
usage calculations provided,if the existing meters cannot support the estimated demand,
a larger or additional meter will be required to be installed and remittance of the
prevailing facilities charge will be required to be paid. The applicant shall install a
backflow preventer(reduced pressure type)by a licensed contractor within five feet of the
meter on the applicant's property,meeting with the approval of the Department of Water
Supply.
3. Construction of the proposed development shall be completed within five(5)years from
the effective date of this permit. Prior to construction,the applicant,successors or
assigns shall secure Final Plan Approval for the proposed development from the Planning
Director in accordance with Chapter 25-2-70,Chapter 25(Zoning Code),Hawaii County
Code. Plans shall identify,if applicable,all proposed structures,fire protection measures,
_
Mr.Gregory R.Mooers
Page 8
paved driveway access and parking stalls,and other improvements associated with the
proposed use. Landscaping shall be included in the development plans to mitigate any
potential adverse noise or visual impacts to adjacent properties in accordance with the
Planning Department's Rule No. 17(Landscaping Requirements).
4. The project shall connect to the County's sewer line fronting the property along Ali`i
Drive prior to the issuance of a Certificate of Occupancy.
5. All development-generated runoff shall be disposed of on-site and shall not be directed
toward any adjacent properties. A drainage study shall be prepared by a licensed civil
engineer and submitted to the Department of Public Works prior to issuance of a
construction permit. Any recommended drainage improvements shall be constructed
meeting with the approval of the Department of Public Works prior to receipt of a
Certificate of Occupancy.
6. The applicant shall comply with Chapter 27-Flood Control,of the Hawaii County
Code.
7. For encroachments in or alterations to the AE flood zone,the applicant shall submit a
flood study prepared by a licensed professional civil engineer. If required,the applicant
shall submit for a Conditional Letter of Map Revision(CLOMR)to the Federal
Emergency Management Agency(FEMA)prior to the issuance of any construction
permit. If required,the applicant shall obtain a Letter of Map Revision(LOMR)prior to
the issuance of Certificate of Occupancy.
8. During construction,measures shall be taken to minimize the potential of both fugitive
dust and runoff sedimentation. Such measures shall be in compliance with construction
industry standards and practices utilized during construction projects of the State of
Hawaii.
9. All earthwork and grading shall conform to Chapter 10,Erosion and Sediment Control of
the Hawaii County Code.
10. All driveway connections to Alii Drive shall be at a location approved by the Department
of Public Works and shall conform to Chapter 22,County Streets,of the Hawaii County
Code.
11. The applicant shall install street lights,signs and markings meeting with the approval of
the Department of Public Works—Traffic Division.
1
Mr.Gregory R.Mooers
Page 9
1
12. An All Hazards Emergency Response Plan shall be submitted to the Hawaii County
Civil Defense Agency for review and approval prior to the issuance of a Certificate of
Occupancy.
13. A Solid Waste Management Plan shall be submitted to the Department of Environmental
Management for review and approval prior to the issuance of Final Plan Approval.
14. Prior to any ground altering activities,the applicant shall submit a monitoring plan
prepared by a qualified archaeologist pursuant to HAR 13-279 to the Department of Land
and Natural Resources—State Historic Preservation Division(DLNR-SHPD)for review
and approval. A copy of the approved monitoring plan shall be provided to the Planning
Department prior to issuance of Final Plan Approval.
15. All ground altering activities associated with the proposed development shall be
monitored by a qualified archaeologist in a manner meeting with the approval of the
DLNR-SHPD.
16. The applicant shall implement a relocation plan and interim preservation measures for the
coral shrine grotto during construction.
17. The applicant shall implement the final phase of the approved Burial Treatment Plan for
the completion of the new Church structure meeting with the approval of the
DLNR-SHPD.
18. Should any undiscovered remains of historic sites,such as rock walls,terraces,platforms,
marine shell concentrations or human burials be encountered,work in the immediate area
shall cease and the DLNR-SHPD shall be immediately notified. Subsequent work shall
proceed upon an archaeological clearance from the DLNR-SHPD when it finds that
sufficient mitigation measures have been taken.
19. The applicant shall comply with all applicable County,State and Federal laws,rules,
regulations and requirements.
20. An initial extension of time for the performance of conditions within this permit may be
granted by the Planning Director upon the following circumstances:
A. The non-performance is the result of conditions that could not have been
foreseen or are beyond the control of the applicant,successors or assigns,
and that are not the result of their fault or negligence.
P �
a 3
S
Mr.Gregory R.Mooers
Page 10
B. Granting of the time extension would not be contrary to the General Plan
or Zoning Code.
C. Granting of the time extension would not be contrary to the original
reasons for the granting of this permit.
D. The time extension granted shall be for a period not to exceed the period
originally granted for performance(i.e.,a condition to be performed within
one year may be extended for up to one additional year).
E. If the applicant should require an additional extension of time,the
Planning Department shall submit the applicant's request to the Planning
Commission for appropriate action.
Should any of the foregoing conditions not be met or substantially complied with
in a timely fashion,the Planning Director may initiate procedures to revoke the
permit.
This approval does not,however,sanction the specific plans submitted with the application as
they may be subject to change given specific code and regulatory requirements of the affected
agencies.
Should you have any questions,please contact Daryn Arai of the Planning Department at(808)
961-8288.
Sincerely,
?4/42"."-14)
r ,
Frederic ousel,Chairman
Leeward Planning Commission
Lsantmichae101 twpc
cc: Department of Public Works
Department of Water Supply
County Real Property Tax Division
DLNR-State Historic Preservation Division
Planning Department-Kona
Long Range Planning Division
Zoning Inspector-Kona
Plan Approval Section
Mr.Gilbert Bailado
Reverend Konelio Faletoi
• • r
Harry Kim +tr ;,I
Mayor
c �!•,' Michael Yee
•
„`'S'" Director•
Wil Okabe �:'.0';•
'/:•
Mar aging Director
• Duane Kanuha
�e. •:.• Deputy Director
•.44 of'
West Hawaii Office
74-5044 Me Keohokalole Hwy East Hawaii Office
Kailua-Kona,Hawaii 96740 County of Hawaii 101 Hilo, awai Suite0
Phone(808)323-4770 Hilo,Hawaii 96720
Fax(808)327-3563 PLANNING DEPARTMENT Phone Fax(808)961-8288
Fax(808)961-8742
October 8, 2019
David Pfeifer
2800 Third Avenue
San Diego, CA 92103
Dear Mr.Pfeifer:
PLAN APPROVAL APPLIED FOR: New Parish Hall
TMK: 7-5-008:006 (PLA-19-001685)
We have reviewed and approved the plan for the subject proposed project for FINAL PLAN
APPROVAL. Enclosed is a copy of the FINAL PLAN APPROVAL, PLA-19-001685, dated
10/08/2019, for your file.
Please note the conditions of approval included as part of the FINAL PLAN APPROVAL.
These conditions must be complied with prior to and during occupancy of the proposed
structures, or as otherwise specified. Some of these conditions affect design or placement
changes you may consider in the course of construction. We strongly recommend discussing
these conditions of approval in advance with any architects, contractors or other third parties
involved in construction decisions and requests for Certificates of Occupancy.
For your information, all accessible parking spaces shall comply with current State and Federal -
Standards. Please find the most current requirements at the Disability and Communication
Access Board website at http://health.hawaii.gov/dcab/parking or visit our website for helpful
information: http://www.coh.planningdept.com/resources-and-references.
Should you have any questions,please contact Rosalind Newlon of our West Hawai`i Office at
323-4770.
Oierely,
y !
L E
Tanning Director
RJN:rjn
PLA-19-001685 Planning Dept.
Exhibit 3
C:\Users\rnewlon\Desktop\Newlon\Plan Approvals\PAL-7-5-008-006 Pfiefer.doc
cc: West Hawaii Office
www.hiplanningdept.com Hawaii County is an Equal Opportunity Provider and Employer planninaOhawaiicountv.gov
COUNTY OF HAWAII PLANNING DEPARTMENT
FINAL PLAN APPROVAL
(PLA-19-001685)
APPLICANT: DATE APPROVED: DATE EXPIRES:
David Pfeifer 10/08/2019 10/07/2021
LOCATION: TAX MAP KEY:
Portion of Hienaloli—1st Hienaloli 6th,North Kona, 7-5-008:006
Hawaii
PARCEL AREA/PROJECT SITE AREA ZONE:
3.19 acres.acres/3.19 acres Resort Hotel(V-.75)
PROPOSED USE:
New Parish Hall
As Shown on Plan Comments
Front Yard: (Alii Drive) 170' OK, 20'-0" Minimum required
Rear Yard: (East) 122'-5" OK, 20'-0" Minimum required
Side Yard: (North) 126' OK, 0'-0" Minimum required
Side Yard: (South) 24'-6" OK, 0'-0" Minimum required
Ht. of Structure (s): 28'-11" OK, 45'-0" Maximum height allowed
Access to parking: driveway off of Alii Drive OK, Existing, Must comply with the requirements of
the Department of Public Works.
Off-Street Parking: 132 stalls provided,which includes OK,
10 compact stalls, 1 bicycle rack Existing Church :
with 5 racks(equivalent to one 9,455 sq.ft./75 =126.07 stalls
parking stall)and 4 van accessible Storage-2,936 sq.ft./1,000=2.94 stalls
stalls and 1 sedan accessible stall. New Parish Hall:
Conference Rooms and Cafeteria—4,469 sq.ft./75 =62.04
Shared parking onsite per HCC Section 25-4-51(c)where stalls
uses and activities do not occur simultaneously; approved Offices,storage, restrooms, kitchen and food pantry
per Planning Department letter dated July 9, 2010 on file. within Parish Hall—2,387 sq.ft./300=7.96 stalls
TOTAL REQUIRED = 199.01 or 200 stalls
Loading and
Unloading Space: 12' x 50' and 10' x 22' OK, 2 required(OK per PD letter dated 12/28/2010)on
file.
Density: OK,
Fencing and Walls:
Material:
Height:
Location:
Final Plan Approval 10/08/2019(TMK:7-5-008:006)PLA-19-001685
Page 2
Landscaping: existing per plan OK, Complies with Rule No. 17 of the Planning
Department's Rules of Practice and Procedure
Others Tax Clearance: OK,per letter of tax clearances from RPT dated
August 12, 2019
Drainage Report OK, DPW-Eng. Approved 8/12/2019
Special Management Area(SMA)Minor Permit No.05- OK, approved for a 440 sq. addition to the Church
00007
Special Management Area(SMA)Minor Permit No. 09- OK,approved on September 24, 2009 for the demolition
000129 of three earthquake damaged structures
Special Management Area(SMA)Use Permit No. 10- OK, approved on September 30, 2010 for construction of
00044 Church, Rectory, Parish Halls and related improvements
Variance No. 10-021 OK, approved October 18, 2010 approved for 73 foot
building height to for bell tower and cross on Church
building
Kailua Village Design Commission OK, approved September 3, 2019 (see condition no. 6)
Does this project have a Fair Share Condition? ❑Yes ®No
Approved by:
Name: Rosalind Newlon
Date: 10/02/2019
Conditions of Approval:
1. Applicant shall comply with all other applicable laws, rules, regulations and requirements of Hawai'i County.
2. This Final Plan Approval is valid for two years from the date of approval, and shall expire on 10/07/2021.
3. Prior to approval of a Certificate of Occupancy (C.O.), the Planning Department may inspect the subject
property to verify compliance with the approved plans. A C.O. shall not be approved where the buildings,
site improvements, landscaping or use plans are found by the director to be inconsistent with the submittals
for which the Final Plan Approval is issued.
4. Approved parking to be paved, striped, and appropriate signage installed prior to issuance of the Certificate
of Occupancy.
5. The applicant is responsible for constructing accessible parking spaces in accordance with all current County,
State, and Federal standards and requirements.
1
t inal Plan Approval 10/08/2019(TMK:7-5-008:006)PLA-19-001685
Page 3
6. The applicant shall follow the recommendations of the Kailua Village Design Commission as stated in their
September 5, 2019 letter resulting from the September 3, 2019 meeting, and match the roofing materials and
exterior paint colors as submitted with the KVDC and plan approval applications, as shown on their
submittal dated August 8, 2019.
7. The applicant, its successors or assigns shall be responsible for complying with all stated conditions of
approval of SMA Use Permit No. 10-00044 and Variance No. 10-021.
8. Approved existing and proposed landscaping to be installed and maintained in good condition per approved
landscaping plan with no litter or excessive accumulation of plant debris, and the landscaping irrigation
system shall be demonstrated as being operable prior to occupancy or use of any of the proposed facilities
prior to issuance of the Certificate of Occupancy.
9. No Modifications to Plans without Prior Written Approval. All work shown on the development plans
covered by this Final Plan Approval shall be completed as shown. No additions, substitutions or alterations to
the site, parking, landscaping, or building design plans covered by this Final Plan Approval, nor any
modification of the types of uses designated therein, shall be made without prior written approval of such
changes by the Planning Department. A request for approval of such changes shall be submitted in writing
and include scaled plan sheets clearly depicting and specifying all proposed changes. Upon assessing the
requested changes, the Director may approve or deny the requested changes or require a new, complete
application for Plan Approval where the Director finds the changes to be substantial. Prior to approval of a
Certificate of Occupancy(C.O.), the Planning Department may inspect the subject property to verify
compliance with the approved plans. A C.O. shall not be approved where the buildings, site improvements,
landscaping or use plans are found by the Director to be inconsistent with the submittals for which this Final
Plan Approval is issued.
Pla��� i ecto
D to 10/08/2019
,
,
c
1 ..-
leaqS 01111 .7. 4-
_
_
i'
I
,
, p abueg ,V 941 aE-4"oN IS 1 IM
Q
0
,C,....7
1
0>
--
a ......, , c
? t
% , ....„
,4 iTrt!.
_
1
i
,
4 „14 C
c
6 ,S ,....
0
,
,
,
0 -
o
_
..
.. ,
,
.,
c„.
: < a
....:,i
(n.
2
<
N.
g
in
>
1
i
1
..... ..
.,,
r _
I
3qi ; i
t
:
I (-)
. !! n
•
1
1, „!,_
.4....,
1 ;!ii gi ; gg 11
(1) i
0
,
i
.s
4
,
I
• K,4,1,4..,.
, • ,F, -2 ,I,4°.,&' ,N.°
-
, ,','4':,1: , L'• '''
.1,
-,
.;.'
g ?
. -
o°,ee ,,,'• 'p. 1•
•
r , .t ,
41..... ,
;'ili- 3-0,ii
. c
,, , r -10 „,,,,- F.„, .,,,_
't0: °,..t.i
g .V.,ii
.
mr I 1-
r , t
. _ .
. .
rot:
/
1
1
1
.........,............ ...........„„.
1
1
o
I
I
1
'A.
1
I
I
-;e
Harry Kim 11..141- 4:'.• Paul K.Ferreira
Mayort . , ..
\#0,. j. Pohce Chief
1 : •:41i*,, _ ,-,-r, * •
'•. rir.....*Ole-- Kenneth Bugado,Jr.
4 ',....• Deputy Police Chief
1
I
i County of Hawari
1
I POLICE DEPARTMENT
1, 349 Kapeolani Street • Hilo,Hawaii 96720-3998
3
(808)935-3311 • Fax(808)961-2389
i
t
I
I October 8, 2020
1 , .
1
1
1
!
I
1
i TO : MICHAEL YEE, PLANNING DIRECTOR
1
i FROM : ROBERT WA ER, ASSISTANT CHIEF, AREA H OPERATIONS
1
i
1 SUBJECT : SPECIAL MANAGEMENT AREA USE PERMIT NO: SMA 10-000044
1 APPLICANT: ST. MICHAEL THE ARCHANGEL CATHOLIC CHURCH
REQUEST: AMENDMENT TO CONDMON NO. 3 (TIME TO COMPLETE
3
, CONSTRUCTION)
?
1 TAX MAP KEY: 7-5-008:006
1
3
3
3
I
1 The above-referenced Special Management Area Use Permit No. SMA 10-000044 has been
I reviewed and we offer no comments at this time.
Should you have any questions or concerns, please contact Captain Gilbert Gaspar Jr.,
1 Commander of the Kona District, at 326-4646, extension 299.
1
i GG/jaj
2011Q0828
i
i
i
1
a
a
i
a
1
1
1
i
; Planning Dept.
;
i
Exhibit 4
1
1
1 "Hawaei County is an Equal Opportunity ProwdET and Employer 136829
1
1
1
1 ' '
1
,- OF y SUZANNE D CASE
i!
DAVID Y.IGE ,,,9' ' 1959 '!!el CHAIRPERSON
GOVERNOR OF HAWAII
BOARD OF LAND AND NATURAL RESOURCES
J COMMISSION ON WATER RESOURCE
1
MANAGEMENT
i 'ili i.
1 o_and and N,
/It
,
I --- -----__ ---
; ' ':''.::— STATE OF HAWAII
'
I -5.4te of Holi‘ DEPARTMENT OF LAND AND NATURAL RESOURCES
i LAND DIVISION
I POST OFFICE BOX 621
I HONOLULU,HAWAII 96809
i
1
i
1 October 2, 2020
;
ii
FROM: MEMORANDUM
1 .....T.® DLNR Agencies:
; Div. of Aquatic Resources
;
I Div. of Boating & Ocean Recreation
I
I X Engineering Division (DLNR.ENGRhawaii.qov)
;
;
; X Div. of Forestry & Wildlife (rubvrosatterraqohawaii.qov)
I Div. of State Parks
1 X Commission on Water Resource Management (DLNR.CWRMhawaii.clov)
i
I X Office of Conservation & Coastal Lands (sharleen.k.kubahawaii.qov)
; X Land Division - Hawaii District (qordon.c.heithawaii.qov)
1 X Historic Preservation (DLNR.Intake.SHPDhawaii.qov)
TO:
Russell Tsuji
sr-fitelvtir• Russell Y. Tsuji, Land Administrator
!
I SUBJECT: Special Management Area Use Permit No.: SMA 10-000044
I Request for Amendment to Condition No. 3 (Time to Complete Construction)
1 LOCATION: 75-5769 Alii Drive, Kailua-Kona, Island of Hawaii; TMK: (3) 7-5-008:006
APPLICANT: County of Hawaii on behalf of St Michael the Archangel Catholic Church
i
i
I Transmitted for your review and comment is information on the above-referenced
ill subject matter. Please submit comments by October 28, 2020.
If no response is received by the above date, we will assume your agency has no
j comments. Should you have any questions about this request, please contact Darlene
1 Nakamura at darlene.k.nakamurahawaii.qov. Thank you.
i
1 ( ) We have no objections.
( V ) We have no comments.
I ( ) Comments are attached.
ISigned:
IPrint Name; Carty S. Chang, Chief Engineer
I Division: Engineering Division
i
i Date: Oct 20,2020
;
;
i
I
Attachments
I
cc: Central Files
!
Planning Dept.
i Exhibit 5
i
,
1
1
,G O,F_O . SUZANNE D.CASE
CHAIRPERSON
t DAVIDIGE 'q P' i9 5p
I
GOVERNOR OF HAWAII BOARD OF LAND AND NATURAL RESOURCES
COMMISSION ON WATER RESOURCE
r r i �� , MANAGEMENT
i 1
anti ili
r
ls1't .T�y G ,
O - A
1 STATE OF HAWAII
State ofH2,4a DEPARTMENT OF LAND AND NATURAL RESOURCES
LAND DIVISION
1
i
POST OFFICE BOX 621
I HONOLULU,HAWAII 96809
t
t
October 2, 2020
i
MEMORANDUM
TO: DLNR Agencies:
1 _Div. of Aquatic Resources
Div.
_ of Boating & Ocean Recreation
1 X Engineering Division (DLNR.ENGRhawaii.qov)
X Div. of Forestry &Wildlife (rubyrosa.t.terrago(a�hawaii.gov)
: _Div. of State Parks
X Commission on Water Resource Management (DLNR.CWRMhawaii.qov)
X Office of Conservation & Coastal Lands (sharleen.k.kuba(a�hawaii.gov)
X Land Division—Hawaii District (gordon.c.heit(a,hawaii.gov)
X Historic Preservation (DLNR.Intake.SHPDna,hawaii.gov)
Russell Tsuji
1 FROM: Russell Y. Tsuji, Land Administrator
SUBJECT: Special Management Area Use Permit No.: SMA 10-000044
a Request for Amendment to Condition No. 3 (Time to Complete Construction)
LOCATION: 75-5769 Alii Drive, Kailua-Kona, Island of Hawaii; TMK: (3) 7-5-008:006
APPLICANT: County of Hawaii on behalf of St Michael the Archangel Catholic Church
1
I Transmitted for your review and comment is information on the above-referenced
subject matter. Please submit comments by October 28, 2020.
1
If no response is received by the above date, we will assume your agency has no
comments. Should you have any questions about this request, please contact Darlene
Nakamura at darlene.k.nakamura(c�hawaii.gov. Thank you.
3
We have no objections.
i L.
We have no comments.
( ) Comments are attached.
Signed: 44
Print Name:
DAVID G. SMITH, Administrator
I Division:
Division of Forestry and Wildlife
Date:
Oct 27,2020
,
i Attachments
Icc: Central Files
d Planning Dept.
i
Exhibit _fp
I
i
j
)
4 :444.9•7 h SUZANNE D.CASE
1 DAVID Y.ME1P..;,s 9D 9, CHAIRPERSON
GOVERNOR OF HAWAII .. BOARD OF LAND AND NATURAL RESOURCES
/ - COMMISSION ON WATER RESOURCE
t`y,
ct _ SIANAGEMENT
_amd and,Va I ,y
?r_7, :0,8i. .V.•l&--
4
1 e. STATE OF HAWAII
I
I State of 1iav
DEPARTMENT OF LAND AND NATURAL RESOURCES
�*•
"s LAND DIVISION
i
1
POST OFFICE BOX 621
HONOLULU,HAWAII 96809
1
October 2, 2020
I
MEMORANDUM
S
I TO: DLNR Agencies:
Div. of Aquatic Resources
_Div. of Boating & Ocean Recreation
X Engineering Division (DLNR.ENGR(c�hawaii.gov)
X Div. of Forestry &Wildlife (rubyrosa.t.terrago(c hawaii.gov)
I Div. of State Parks
X Commission on Water Resource Management (DLNR.CWRM(a�hawaii.dov)
X Office of Conservation & Coastal Lands (sharleen.k.kubahawaii.gov)
i X Land Division— Hawaii District(gordon.c.heit(c�hawaii.gov)
X Historic Preservation (DLNR.Intake.SHPD a hawaii.gov)
1 FROM: Russell Y. Tsuji, Land Administrator Russell Tsuji
SUBJECT: Special Management Area Use Permit No.: SMA 10-000044
Request for Amendment to Condition No. 3 (Time to Complete Construction)
LOCATION: 75-5769 Alii Drive, Kailua-Kona, Island of Hawaii; TMK: (3) 7-5-008:006
APPLICANT: County of Hawaii on behalf of St Michael the Archangel Catholic Church
Transmitted for your review and comment is information on the above-referenced
subject matter. Please submit comments by October 28, 2020.
If no response is received by the above date, we will assume your agency has no
comments. Should you have any questions about this request, please contact Darlene
Nakamura at darlene.k.nakamura(c�hawaii.gov. Thank you.
( ),,-We have no objections.
We have no comments.
( ) Comments are attached.
Signed:
Print Name: ChocaA) . ,1/ ,i
Division: tea.net�/iiis/n....
Date: 7 /4/..2--0
Attachments
cc: Central Files
Planning Dept.
Exhibit
1
i
i
I
p wATgg
1 "f f
•1 a
/fr.a}* DEPARTMENT OF WATER SUPPLY • COUNTY OF HAWAII
��prraorp.. 345 KEKUANAO'A STREET, SUITE 20 • HILO, HAWAII 96720
1 TELEPHONE (808)961-8050 • FAX(808)961-8657
t
i
October 21. 2020
t
i
1
I
a TO: Mr. Michael Yee, Director
Planning Department
I
FROM: Keith K. Okamoto, Manager-Chief Engineer
I
SUBJECT: Special Management Area Use Permit No. SMA-10-000044
tApplicant- St. Michael the Archangel Catholic Church
I Request: Amendment to Condition No. 3 (Time to Complete Construction)
Tax Map Key 7-5-008:006
i
We have reviewed the subject request and have the following comments.
Please be informed that there is an existing 11/2-inch meter serving the subject parcel, which is limited
to an average daily usage of 4.800 gallons per day (GPI))or 12 units of water at 400 gallons per day,
i per unit.
i
f
1 The Department notes that the applicant is in the process of modifying the design of the project. The
g applicant should keep in mind that the demand of water should be equal to or less than the amount
allotted for the existing service.
Should there be any questions. please contact Mr. Ryan Quitoriano of our Water Resources and
Planning Branch at 961-8070, extension 256.
i
Sincerely yours.
Wommierisle:),i
I
Keith K. Okamoto, P.E.
Manager-Chief Engineer
RQ:dfg
copy — Rev. Konelio Faletoi. St. Michael the Archangel Church
t Planning Dept.
. . . Water, Our14ost Precious&source. . . Ka WaiA Kane. . . 13 7 0 8 7
The Department of Water Supply is an Equal Opportunity provider and employer.
1
1
1
1
I
I DEPARTMENT OF PUBLIC WORKS - TRAFFIC DIVISION
i
i COUNTY OF HAWAII
I PLAN REVIEW COMMENT SHEET
,
1
1 Date Received: 10/5/2020
1 Memorandum No. 2020 - 1161
!
i To: Michael Yee -Planning Director Date Transmitted: 10/14/2020 th
I
1 From: Traffic Division
1 Subdivision/Project: Special Mgmt Area Use Permit No: SMA 10-00044
i
1 Subdivision/Project No: TMK: 7-5-008:006
i
i
1
SIGNS/MARKINGS:
G6 1. R.Mangaoang Review Date: 10/11/2020 Initial:
O No Review 0 See Attached Comments 0 Comments on Plan/Sketch
O Other Comments Ea No Comments
1
a
1 0 2. K.Pacheco Review Date: 10/13/2020 Initial:
i1 D No Review
O Other Comments E See Attached Comments
k No Comments 0 Comments on Plan/Sketch
i
i
1 STREET LIGHTS/TRAFFIC SIGNALS:
1
El 3. M.Tebbakh
O No Review Review Date:
0 See Attached Comments E Comments on Plan/Sketch
i
I Ill Other Comments 0 No Comments
1
1
i 0 4. K.Higaki/D.Calicdan Review Date: Initial:
D No Review 0 See Attached Comments Li Comments on Plan/Sketch
Li Other Comments 0 No Comments
!
0 5. J. Patao/3. Peters Review Date: Initial:
D No Review 0 See Attached Comments 0 Comments on Plan/Sketch
0 Other Comments CI No Comments
ADMINISTRATION:
6. A.Takaba Review Date: 10/14/2020 Initial:
O No Review 0 See Attached Comments 0 Comments on Plan/Sketch
O Other Comments lql No Comments ,
I
i
Planning Denit 36952
1
I
I
I Harry Kim .;;K:"...1
` M; w1 William A. Kucharski
Mayor .::4V ''!'., !/, c.j: Director
Roy Takemoto \F.,.�,.;,+k Diane A.Noda
Managing Director "' Deputy Director
County of Hawaii
DEPARTMENT OF ENVIRONMENTAL MANAGEMENT
345 Kekuanao'a Street,Suite 41 • Hilo, Hawai'i 96720
Ph:(808)961-8083 • Fax:(808)961-8086
( Email: cohdem@hawaiicounty.gov
I
I
i
MEMORANDUM
riI
i TO: Michael Yee, Director
Planning Department
FROM: William A. Ku"cha r i, Director
Environmental Management Department
IDATE: October 13, 2020
(
SUBJECT: Special Management Area Use Permit No.: SMA 10-000044
Applicant: St. Michael the Archangel Catholic Church
Request: Amendment to Condition No. 3 (Time to Complete Construction)
Tax Map Key: (3) 7-5-008:006
)
1
The Solid Waste Division has reviewed the subject application and offers the following
comments and/or recommendations (contact the Solid Waste Division for details):
( X ) No comments.
( ) Commercial operations,State and Federal agencies, religious entities and non-profit
organization may not use transfer stations for disposal.
( ) Aggregates and any other construction/demolition waste should be responsibly reused
to its fullest extent.
( ) Ample and equal room should be provided for rubbish and recycling.
( ) Green waste may be transported to the green waste sites located at the West Hawaii
Organics Facility and East Hawai'i Organics Facility, or other suitable diversion programs.
( ) Construction and demolition waste is prohibited at all County Transfer Stations.
( ) Submit Solid Waste Management Plan in accordance with attached guidelines.
( ) Existing Solid Waste Management Plan is to be followed. Provide update to the
department on current status.
( ) Other: Planning Dept.
F,,s.,,i;+ lO
- - ------
County of Hawaii is an Equal Opportunity Provider and Employer 1 .1 6 9 5 5
.
1
1
1 Mr. Michael Yee, Director
j October 13, 2020
Page 2
1
1
j
The Wastewater Division has reviewed the subject application and offers the following
comments and/or recommendations (contact the Wastewater Division for details):
)
( X ) No comments.
1 ( ) Require connection of existing and/or proposed structures to the public sewer in
accordance with Section 21-5 of the Hawai'i County Code.
( ) Require Council Resolution to approve sewer extension in accordance with Section 21-
26.1 of the Hawaii County Code. Complete Sewer Extension Application.
( ) Require extension of the sewer system to service the proposed subdivision in
] accordance with Section 23-85 of the Hawai'i County Code.
( ( ) Check or line out as applicable: [ ] If required by the Director of the Department of
Environmental Management ("Director of DEM"), [ ] applicant shall conduct a sewer
1 study in accordance with the then applicable wastewater system design standards prior
to approval to connect to the County sewer system. Applicant shall provide such sewer
° line or other facility improvements as the Director of DEM may reasonably require,
which the sewer study may indicate are advisable for mitigation of impacts of the
proposed project. Contact Wastewater Division Chief for details.
( ) Other:
I
1
1
S
WK met
l j
g� 999'
9 I
1 i
+ZY;.,1?
/.
I Harry Kim (•.���'' -\ '/, '. : David Yamamoto,P.E.
Mayor = yes•- Director
• tf . Nt• •'
Roy Takemoto ,,-_ Allan G.Simeon,P.E.
Managing Director Deputy Director
1 Count of itztitxat`t
I DEPARTMENT OF PUBLIC WORKS
Aupuni Center
101 Pauahi Street,Suite 7•Hilo,Hawai'i 96720-4224
1 (808)961-8321 •Fax(808)961-8630
Ipublie_works@hawaiicounty.gov
MEMORANDUM
i
I Date: October 29, 2020
i
:
1 To: Michael Yee, Planning Director
From: Department of Public Works, Engineering Division 0%
i
Subject: Special Management Area Use Permit (SMA 10-000044)
Applicant: St. Michael the Archangel Catholic Church
Request: Amendment to Condition No. 3 (Time to Complete Construction)
Tax Map Key: 7-5-008:006
We have reviewed the subject application and have no further comments.
Should there be any questions concerning this matter, please feel free to contact Kyle Honda of
our Hilo Engineering Division office at 961-8943.
KH