Loading...
HomeMy WebLinkAboutProject Declaration-v.4-6 9.3.21Hawaiʻi County is an equal opportunity provider and employer Project Declaration Last Updated: 9/3/2021 TMK Project Location Application# Project Includes: (NOTE: Electrical drawings required for residential work involving > 200 Amp Service) Building Work Plumbing Work 4 bathrooms or more Electrical Work >200 Amp service Valuation of Building Work Valuation of Plumbing Work Valuation of Electrical Work STATEMENT ACCOMPANYING PERMIT APPLICATION PURSUANT TO CHAPTER 444, H.R.S. (RELATING TO CONTRACTORS) (SEC 444- HRS) (Select Contractor or Owner-Builder) CONTRACTOR I declare that I am licensed under the provisions of Chapter 444, HRS, of the Department of Commerce & Consumer Affairs, State of Hawaii. My license# is in full force and in effect. Signature of RME Date NOTE: RME (Responsible Managing Employee) only to sign. Notarized authorization from RME required for designated agents. Building Contractor Name License #Lic. Expiration Date Phone# Address RME1 Full Name RME2 Full Name RME1 Work Phone RME1 Cell Phone RME2 Work Phone RME2 Cell Phone RME1 Email Address RME2 Email Address OWNER-BUILDER Section 5-1-5 Definition “Owner-builder” means owners or lessees of property who build or improve structures on their property for their own use, or for use by their immediate family. This definition shall not preempt owner-builder by exemption as defined by section 444-2.5, Hawai`i Revised Statutes I declare an exemption under Sec. 444-2(7) for the following reasons: 1) This exemption allows me, as the owner or lessee of the property, to act as my own general contractor without possessing a license 2) To supervise the construction myself 3) To hire licensed subcontractors 4) The building is for my personal use and not for the use or occupancy by the general public 5) Building will not be built for sale or lease within one (1) year after construction is complete. Section 5-4 Definition “Owner-builder” means owners or lessees of property who build or improve structures on their property for their own use, or for use by their immediate family. This definition shall not preempt owner-builder by exemption as defined by section 444-2.5, Hawai`i Revised Statutes Property Owner Owner Name Owner Signature Date Hawaiʻi County is an equal opportunity provider and employer TMK Owner Name Application# Where electrical or plumbing is included, applicant must identify all phases of such work to be covered and the contractor completing the phase. Refer to back side of this form and mark all phases of electrical and/or plumbing work to be included. Contractor Name License #Lic. Expiration Date Work Phone Cell Phone Phase(s) RME1 Full Name RME2 Full Name RME1 Work Phone RME1 Cell Phone RME2 Work Phone RME2 Cell Phone RME1 Email Address RME2 Email Address Signature of RME Date Contractor Name License #Lic. Expiration Date Work Phone Cell Phone Phase(s) RME1 Full Name RME2 Full Name RME1 Work Phone RME1 Cell Phone RME2 Work Phone RME2 Cell Phone RME1 Email Address RME2 Email Address Signature of RME Date Contractor Name License #Lic. Expiration Date Work Phone Cell Phone Phase(s) RME1 Full Name RME2 Full Name RME1 Work Phone RME1 Cell Phone RME2 Work Phone RME2 Cell Phone RME1 Email Address RME2 Email Address Signature of RME Date Contractor Name License #Lic. Expiration Date Work Phone Cell Phone Phase(s) RME1 Full Name RME2 Full Name RME1 Work Phone RME1 Cell Phone RME2 Work Phone RME2 Cell Phone RME1 Email Address RME2 Email Address Signature of RME Date ELECTRICAL PHASES PLUMBING PHASES E1 Temporary Installations E2 Service Equipment HELCO E3 Feeder Wiring E4 Branch Circuit Wiring E5 Electrical Equipment Installation E6 Device and Fixture Installation E7 Fire Alarm System E8 Swimming Pool Wiring E9 Solar Water Heater Wiring E10 Landscape Lighting and Sprinkler Wiring E11 Sign Installation Connection E12 Alt. Energy Installation (PV/Wind/Generator) E13 Low Voltage Wiring/Audio Visual/ Data Communication/Computer Wiring E14 Air Conditioning/Refrigeration Control Wiring E15 Motor Installation E16 Street Lighting/Traffic Signal Installation E17 Empty Conduit Installation E18 Site Work Utilities Installation E19 As Built/Work Started Without Permits E20 Demolition Work P1 Temporary Water P2 Plumbing Fixtures, Equipment P3a Sanitary Piping System (Interior) P3b Sanitary Piping System (Exterior) P3c Grey Water Waste System P3d Sewer Lateral Connection (Including Interceptors, Clarifiers) P3e Private Individual Waste System (Including Interceptors, Clarifiers) P3f Private Wastewater Treatment Plants P4a Water Distribution System (Interior) P4b Building Supply (Outside Water Piping) P4c Water Distribution Main (Subdivision, piping) P4d Water Equipment – Backflow Preventer, Pressure Regulator P4e Water Tank – (Pump/Filter/Water Treatment) P4f Non Potable Water Distribution P5a Automatic Fire Sprinkler System (except water supply) P5b Water Supply for Fire Sprinkler System (Cross Contamination) P5c Standpipes P6a Fuel Gas Piping System and fittings P6b Gas Appliance P7a Solar Water Heating System (Except Water Supply) P7b Solar Water Heater – Water Supply P8 Irrigation Sprinkler System (Cross Contamination) P9 Swimming Pool – Potable Water Supply, Sanitary Drainage, Backflow P10 Air Conditioning – Water Supply, Including Backflow Preventer P11 Alt. Energy (Heat Pumps, PV Hot Water) P12 Medical Gas System P13 Gas Station Piping P14 As-Built