HomeMy WebLinkAboutDraft Non_Res ChecklistNON-RESIDENTIAL PROJECTS: PLEASE COMPLETE CHECK LIST BEFORE SUBMITTING PLANS TO THE BUILDING DIVISION.
☐Legal owners name as it appears on Real Property Tax records. Proof of current ownership is required if the information doesn’t match the RPT record.
☐Lessee, if applicable. If the subject property is on Hawaiian Homelands, copy of DHHL letter must be attached.
☐Tax Map Key number (parcel id)
☐State & County projects: DCAB approval letter must be attached.
☐ADA form, if applicable.
☐Special inspection form, if applicable.
☐Code Date: IBC 2006. (State projects IBC 2018)
☐Electrical Code NEC 2017; Plumbing Code UPC 2012;
☐IECC 2015 or 2018 compliances statement (building, electrical, plumbing, mechanical)
☐Site plan must include: scale, lot dimensions, setbacks, water source, sewer type, all existing structures or permits for other structures on the site.
☐Photovoltaic applications within 5 mile radius of an airport: please check with the Planning Dept.
☐All plans must be stamped by design professionals licensed in the State of Hawaii with the “Supervision” & “Observation” statement. License expiration date for each licensed professional
is also required at each stamp.
This is only a partial list of what is required on the drawings for the intake process. Plan requirements will vary by project.