HomeMy WebLinkAboutNonRes App Submittal Chklist v1.0This is only a partial list of what is required on the drawings for the intake
process. Plan requirements will vary by project.
NON-RESIDENTIAL PROJECTS: PLEASE COMPLETE CHECK LIST
BEFORE SUBMITTING PLANS TO THE BUILDING DIVISION.
☐ Legal owners name as it appears on Real Property Tax records. Proof of
current ownership is required if the information doesn’t match the RPT record.
☐ Lessee, if applicable. If the subject property is on Hawaiian Homelands, copy
of DHHL letter must be attached.
☐ Tax Map Key number (parcel id)
☐ State & County projects: DCAB approval letter must be attached.
☐ ADA form, if applicable.
☐ Special inspection form, if applicable.
☐ Code Date: IBC 2006. (State projects IBC 2018)
☐ Electrical Code NEC 2017; Plumbing Code UPC 2012;
☐ IECC 2015 or 2018 compliances statement (building, electrical, plumbing,
mechanical)
☐ Site plan must include: scale, lot dimensions, setbacks, water source, sewer
type, all existing structures or permits for other structures on the site.
☐ Photovoltaic applications within 5 mile radius of an airport: please check with
the Planning Dept.
☐ All plans must be stamped by design professionals licensed in the State of
Hawaii with the “Supervision” & “Observation” statement. License expiration
date for each licensed professional is also required at each stamp.