My WebLink
|
Help
|
About
|
Sign Out
Home
Chapter 05D Electrical Code
PublicDocuments
>
County Clerk - Council
>
County Clerk
>
County Code
>
Chapter 05D Electrical Code
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2025 11:19:19 AM
Creation date
4/9/2021 8:02:42 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CHAPTER 5D <br />ELECTRICAL CODE* <br />* s: <br /> 1. Pursuant to section 107- <br />and standards listed in HRS, section 107-25 within two years after adoption by the State Building Code council. If a County does not <br />amend, adopt, and update a State code within this time frame, the respective State code shall become applicable as an interim County <br />code. <br /> 2. -61, section 12, and replaced with chapter 5D. <br />Article 1. General Provisions. <br />Section 5D-1-1. Title. <br />Section 5D-1-2. Purpose. <br />Section 5D-1-3. Scope; exceptions. <br />Section 5D-1-4. Administrative provisions. <br />Section 5D-1-5. Existing electrical installations. <br />Section 5D-1-6. Definitions. <br />Section 5D-1-7. Compliance required. <br />Section 5D-1-8. Conflict. <br />Article 2. Installation Requirements. <br />Section 5D-2-1. National electrical code adopted. <br />Article 3. Electrical Work Within Special Flood Hazard Areas. <br />Section 5D-3-1. General applicability. <br />Section 5D-3-2. Definitions. <br />Section 5D-3-3. General Requirements. <br />Section 5D-3-4. Services. <br />Section 5D-3-5. Ground fault protection. <br />Section 5D-3-6. Wiring method and material. <br /> <br /> <br />SUPP. 11 (1-2022) <br />i <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.