Loading...
HomeMy WebLinkAboutPD BACKGROUND REPORT (SPP-20-000221)B Penalout SPP AJR 4 9 21 COUNTY OF HAWAII PLANNING DEPARTMENT BACKGROUND REPORT PABLO PENALOZA SPECIAL PERMIT APPLICATION (SPP 20-000221) PABLO PENALOZA is requesting a Special Permit to develop and operate a childcare center/preschool facility and construct a playground for student use and to develop and operate an event venue" to be rented commercially on a two (2) -acre portion of a 5.3 -acre parcel situated in the State Land Use Agricultural District. The subject property is located at 75-477 Hualalai Road, approximately 988 feet east (mauka) of its intersection with Queen Ka'ahumanu Highway, Wai`aha 1s1, North Kona District, Hawai`i, TMK: (3) 7-5-017: Portion of 045. APPLICANTS' REQUEST 1. Request: The applicant is requesting a Special Permit to develop and operate a preschool/childcare/after-school care center on 2.0 -acre of land within the SLU Agricultural District. The applicant currently operates Alaka'i Academy, a preschool in the Old Industrial Area in Kona. The existing school is licensed under Department of Human Services for 72 students; the applicant is looking to relocate the school to the new location described in the Special Permit application that will accommodate 72 students and approximately 15 staff. The school will be housed in a set of buildings totaling approximately 10,000 square feet. The buildings will consist of classrooms, bathrooms, and cafeteria with a kitchen, lobby, administrative office space and storage rooms. In addition to the buildings, a tent -like pavilion will be constructed for student use associated with the school, such as outdoor performances and gatherings. 2. Mission Statement: Alaka'i Academy follows a whole child approach to education. Students are not only intellectual but also social and emotional beings, and all these dimensions intersect to impact learning and performance. This experience at Alaka'i Academy evolves into leadership traits, influential roles and active contributions to family, school, and society. Alaka' i Academy offers extended operation hours, year-round operation (no summer break), year-round enrollment, and excellence in academics. There are three core aspects to the Alaka'i Academy curriculum: leadership development, structured environment, and academics excellence. 3. Staff/Students: 72 students, approximately 15 full-time staff. 4. Hours of Operation: The school will operate Monday through Friday 7:OOAM to 5:00 PM and will be closed on weekends and major holidays, however it will be open during the summer and non -holiday Department of Education (DOE) school breaks. When the school is not in session, the applicant plans to rent out the venue for events such as fundraisers. Other events include outdoor gatherings of 50 people which will occur Saturdays and Holidays (no Sundays) from 9:OOAM to 8:OOPM; community events of 25 people who will use classrooms and/or outdoor areas which will occur Monday through Friday from 6:OOPM to 9:OOPM. Approximately once a year the applicant plans on hosting a larger school fundraiser that could host up to 100 people and will be held entirely outdoors; hours for this event will be 10:00AM to 2:OOPM. 5. Supportive Information: The applicant has submitted the attached in support of the request: (Planning Department Exhibit 1 — Special Permit Application dated November 19, 2020, Planning Department Exhibit 2- Revised Special Permit Application dated February 25, 2021 and Planning Department Exhibit 3 Addendum to Special Permit Application dated December 21, 2020). 6. Landowner: Pablo Penaloza STATE AND COUNTY PLANS 7. State Land Use (SLU) District: Agricultural District. 8. County Zoning: A -5a; Agricultural 5 -acres. 9. General Plan (LUPAG) Map Designation: Urban Expansion (ue) which allows for a mix of high density, medium density, low density, industrial, industrial -commercial and/or open designation in areas where new settlements may be desirable, but where the specific settlement pattern and mix of uses have not yet been determined and Medium Density Urban (mdu) which includes village and neighborhood commercial and single family and multiple family residential and related functions (multiple family residential — up to 35 units per acre). 10. Kona Community Development Plan (KCDP): The KCDP was adopted by Ordinance No. 08-131, which became effective on September 25, 2008. The subject property is located within the Kona Urban Area and within the Pua`a-Wal aha Village Transit Oriented Development Area. 11. Special Management Area (SMA): The subject property is located approximately one 1) mile from the nearest coastline and is not within the Special Management Area. DESCRIPTION OF PROPERTY AND SURROUNDING AREAS 12. Project Site: The subject parcel is 5.3-acres in size and is rectangular in shape. The property is located at —400 feet above sea level and is generally level with a 6% westerly slope. There is an elevation break that bisects the center of the property from west to east, sloping 1-2 meters towards the north. The property is undeveloped and vacant of any structures. The subject parcel has two access easements, one along the north side of the property which is 20-feet wide, however, only 5-feet of the easement is located on the subject parcel, and a 60-foot wide "road reserve" easement that runs along the east side of the subject parcel. (Planning Department Exhibit 4 — Subdivision Map [SUB-17- 001712] dated December 12, 2018) 13. Surrounding Zoning/Land Uses: Immediately adjacent properties to the north, east, and west of the property are similarly zoned A-5a with properties south of the subject parcel within the A-la zoning district. Many of the surrounding parcels are undeveloped, or in current use as grazing lands for cattle. The parcel directly north of the project area received Special Permit approval (SPP 1262) to operate a public charter school (Innovations) serving grades K to 8th. 14. U.S.D.A. Soil Type: (WHC) Wai`aha extremely stony silt loam, 6 to 12 percent slopes. This soil type is used primarily for pasture. 15. Land Study Bureau Soil Rating: Soils within the project site are classified as "C" or Fair" and "E" or "Very Poor" for agricultural productivity. 16. ALISH: Unclassified. 17. Flood Zone: The project site is located within Zone "X", an area determined by FEMA to be outside the 500-year flood plain. However, the existing roadway access (i.e., Kakalina Extension) crosses the Wai`aha Drainageway, which is designated by FEMA as Flood Zone "AE" which is defined as a special flood hazard area that can be inundated by a 100- year flood. 18. Flora/Faunal Resources: No formal floral studies have been conducted for the site. The project area has been viewed multiple times by an archeologist, a land surveyor, and the applicant. Observed plants include elephant grass, haole koa, multiple small monkeypod African tulip, and kiawe trees and various non-native or invasive weeds such as ivy gourds. Similarly, no formal faunal study was conducted of the site. There are currently 10 cattle grazing on the property and occasionally 3 horses. Observed faunal species include feral pig and mongoose. 19. ArchaeologicaUCulturaUHistorical Resources: An agent for the applicant conducted an Archeological Inventory Survey (AIS) for a 4 -acre portion of the 5.3 -acre parcel which includes the 2 -acre project area. A single historic property was identified, consisting of a stack stone wall remnant and an unimproved road. The road is described as a ranch road, likely dating from the Historic period to present. The site retains integrity of location, design, materials, and workmanship and is assessed as significant under Criterion D, but has been adequately documented and per SHPD, no further archaeological work is recommended. According to SHPD the AIS was accepted and stated that the historic preservation review process is ended, and no further work is required. 20. Public Access: There is no coastal or mountain access through this private property. 21. Traffic: The applicant states the proposed school operates differently from a standard school that has strict pick-up and drop-off times in the AM and PM peak hours. According to the applicant, drop-off times in the AM are from 7:O0AM to 9:30AM and pick-up times will be from 2:OOPM to 5:30PM which could offset peak hour traffic generation. Hualalai Road is a County minor collector and is currently well below capacity, and currently there is no left -tum lane present into Kakalina Extension, however, the study concluded that no mitigation is required. A Traffic Impact Analysis Report (TIAR) was prepared by Island Engineering, LLC on November 4, 2020 for the proposed project. It should be noted that the traffic count data collected in the field is not representative of normal operations due to the ongoing Covid-19 pandemic. Since data regarding current visitor distribution to the island could not be found, the traffic analysis inflated the measured traffic counts to account for the diminished use. Hualalai Road has a dedicated 250 -foot -long right and left -turn lands for turning movements onto State Route 11. The right and left -turn lanes were observed to have a maximum of two (2) vehicles during the AM and PM peak hour of traffic. The project site intersects Hualalai Road and Kakalina Extension which was measured to have satisfactory geometry and adequate stopping sight distance in both directions along Hualalai Road. There is currently no dedicated left or right tum lane onto Kakalina Extension. The applicant has stated they will not have confined pick-up and drop- off times as each family will have flexibility to drop-off between 7:OOAM and 9:OOAM and pick-up times between 3pm and 5pm. PUBLIC SERVICES AND FACILITIES 22. Access: Access to the site is from Kakalina Extension (street), a 35-foot wide, 2-lane paved road located off Hualalai Road that is within a 60-foot-wide access easement. There are several access easements granted to neighbors to utilize the Kakalina Extension, however the subject parcel is a "flag" lot and therefor includes a portion of Kakalina Extension as part of the parcel. According to DPW, Kakalina Extension was approved via Grading Permit No. 9-2457. As part of that review, a no-rise certification addressing the Kakalina Extension portion that crosses the Wai`aha Drainageway Flood zone was approved by DPW. However, a final inspection for that certification was not performed to date. 23. Water: According to the Department of Water Supply (DWS), the existing 8-inch waterline fronting the subject property is inadequate to provide the required 2,000 gallons per minute flow for fire protection. Additionally, the DWS stated that the water availability in the area of the subject parcel provides for the same number of water units as the number of lots allowable under the current zoning. As the current zoning is A-5a and the subject parcel is 5.3-acres, only one (1) lot could be developed and as such only one (1) unit of water is available to the site. The subject parcel is limited to the one (1) existing 5/8-inch meter assigned to the parcel. For reference, one (1) unit of water is equal to an average daily use of 400 gallons, which is suitable for one (1) single -family dwelling. At this time, the DWS is requesting that the applicant submit revised estimated average daily water demand calculations to determine the proposed water usage on the site. According to the applicant's engineer, the estimated average daily consumption for the proposed project is 2,270 gallons per day with a max daily consumption of 3,800 gallons per day. The applicant has stated the water use is far less at its current facility, and that the school could operate with the allotted one (1) unit of water. 24. Drainage: The application states that, according to the Flood Insurance Rate Map (FIRM), the project site is designated Zone "X", or areas of minimal flood hazard. According to the Department of Public Works, Special Flood Hazard Area "AE" affects the subject parcel, and improvements in a floodplain will be subject to the requirements of Hawai`i County Code (HCC), Chapter 27 — Floodplain Management. It should be noted that the area of AE flood zone crosses the existing paved access roadway (Kakalina Extension) that will be used by the applicant for access; no AE flood zones are located within the 2-acre project area. 25. Wastewater: The applicant states that public sewer is not available to the site, therefore a Department of Health approved wastewater system will be designed and constructed for the proposed project once wastewater generation calculations are provided to DOH. 26. Other Essential Utilities and Services: Electricity is currently available through HELCO, however, the applicant states that the feasibility of solar power will be investigated for the proposed school. Telephone and cable are available to the site. AGENCIES' COMMENTS Staff notes that the request for comments provided to agencies included the original application dated November 19, 2020 and not the revised application dated March 4, 2021. Since the proposed project was downsized from the original application the Planning Department did not recirculate the revised application for comments. 27. Department of Water Supply: (Planning Department Exhibit 5 — December 18, 2020 Letter and March 17, 2021 Letter) 28. Department of Public Works: (Planning Department Exhibit 6 — December 23, 2020 Memo) 29. State Department of Health: (Planning Department Exhibit 7 — January 5, 2021 Memo) 30. County Fire Department: (Planning Department Exhibit 8 — December 17, 2020 Letter) 31. DLNR — Engineering Division: (Planning Department Exhibit 9 — December 29, 2020 Memo) 32. Department of Transportation: (Planning Department Exhibit 10 —January 14, 2021 Letter) 33. State Historic Preservation Division (SHPD): (Planning Department Exhibit 11—July 29, 2020 Letter) AGENCIES — NO COMMENTS/CONCERNS 34. Police Department; Department of Environmental Management (DEM); DLNR — Land Division APPLICANTS RESPONSE TO COMMENTS 35. The applicant submitted four (4) letters in response to comments received from agencies Planning Department Exhibit 12 — January 20, 2021 Letters and February 22, 2021 Letter) AGENCIES — NO RESPONSE 36. Department of Public Works — Building and Traffic Divisions; Real Property Tax Office; State Department of Education; State Land Use Commission (LUC); State Office of Planning. PUBLIC COMMENTS 37. As of this writing, the Planning Department has not received any written objections or comments from the general public or adjacent landowners on the subject application. i SPECIAL PERMIT APPLICATION PLANNING DEPARTMENT RECEIVED QV 1 9 2020 NING DEPARTMENT County of Hawaii 4)44 Ane Keohokalole Hwy 11111;1 -Kona. HI 96740 Type or Print the requested information) APPLICANT: PABLO PENALOZA APPLICANT'S SIGNATURE: ADDRESS: 75-477 HU AI ROAD KAILU • ONA, HAWAII 96740 USA DATE: \ j — -- 2 LIST APPLICA_ ' S INTEREST IF NOT OWNER: APPPLICANT IS THE OWNER TELEPHONE: (Bus.) n/a Cell) 808-990-7041 Fax) 877-346-4212 REQUEST: A SPECIAL PERMIT TO OPERATE A CHILDCARE CENTER/PRESCHOOL/AFTER SCHOOL CARE/PLAYGROUND/EVENT VENUE ON A 2 ACRE SECTION OF THIS PROPERTY. TAX MAP KEY: (3) 7-5-017:045 ZONING: A -5a AREA OF PROPERTY/AREA OF REQUESTED USE: 2 ACRES LANDOWNER: PABLO PENALOZA LANDOWNER'S SIGNATURE: DATE: j,f —/ 1 — LANDOWNER S ADDRES 5-378 NAM KAILUA DRI E KAILUA KONA, HAWAII 96740 USA AGENT: N/A ADDRESS: N/A TELEPHONE: N/A Please indicate to whom original correspondence (and copies) should be sent: ORIGINAL: PABLO PENALOZA 0 CP a -s COPIES: N/A ast SCANNED NOV 2 3 2023 By: l?) -1-Q 2- SPECIAL PERMIT APPLICATION SUPPORTING DOCUMENATION: 1. A Filing fee of Five Hundred Dollars ($ 500) payable to the County Director of Finance 2. An Original (signed) and twenty (20) copies of the completed application form with attachments; 3. An Original and twenty (20) copies of the following background information on the subject request: A. Detailed written description of the proposed use, a statement of objectives and reasons for the request, including proposed hours of operation and number of employees/clientele The main goal of this permit is to obtain authorization to construct and operate a preschool/childcare/after school care center on 2 acres of the parcel. Additionally, as a secondary use, the playground may occasionally be rented to host events, such as birthday parties, celebrations, etc., predominantly on weekends. We operate Alaka' i Academy, a preschool in the Old Industrial Area in Kona. Our school is licensed under Department of Human Services to care for over 72 children at one time. If our Special Permit is approved, we will be moving our school to this new facility once constructed and certified to operate. The school will be housed on a set of buildings of approximate 10,000 square feet, consisting of classrooms, bathrooms, and cafeteria with a kitchen, a lobby, some admin space and storage. In addition, a tent -like pavilion will be constructed as well for shade, outdoors performances and other gatherings. We envision that the new facility will have capacity to serve our current license capacity of 72 children on day one. We would likely build in some excess capacity to accommodate growth in the future. It is worth noting that the COVID-l9 crisis has taken a toll on our enrollment and we are currently below our capacity. Yet, our goal would be to increase the enrollment overtime. Our current hours of operations are Mon -Fri 7:00 am to 5:00 pm. We are closed on weekends, and on major holidays, but we don't close for summer and other DOE school breaks. Alaka' i Academy follows a whole child approach to education. Students are not only intellectual but also social and emotional beings, and all these dimensions interact to impact learning and performance. Without empathy, for example, one can be bright, but arrogant. Without confidence, one aims low, ultimately living beneath his or her potential. A balanced approach leads to healthy growth and prepares children to excel in a wide range of interactions. Over time, this experience at Alaka' i Academy naturally evolves into leadership traits, influential roles and active contributions to family, school, and society. Alaka' i Academy offers extended operation hours, year-round operation (no summer break), year-round enrollment, and excellence in academics. In addition, Alaka'i Academy is the only large preschool in Kailua Kona that accepts children who are not potty trained. There are 3 core aspects to the Alaka'i Academy curriculum: Leadership Development, Structured Environment and Academicu Excellence. Leadership is in our name. Alaka' i" means leader/leadership in the Hawaiian language; so it follows that Alaka'i Academy is a Leadership Academy for children. The owner had opportunities to serve in leadership roles during his career. One thing he discovered early on was that leadership success is more likely to be achieved by developing and cultivating emotional intelligence (self-awareness, self-regulation, motivation, empathy, and social skills) than when those skills are relegated to secondary importance. These concepts are very simple such as listening, controlling one's emotions, showing empathy, putting team goals before individual desires, etc.) but at the same time very difficult to master as an adult because they almost always imply changing who we are. While adults have a difficult time changing, the character and identity of children are malleable and shaped through daily interactions. Alaka' i Academy has a leadership development program incorporated in the daily curriculum as a weekly leadership theme adapted for children. Sample themes are: a leader is...kind, grateful, creative, respectful, friendly, and happy, etc.; a leader...is a good listener, uses good manners at the table and much more. This curriculum helps children develop emotionally, at the same pace their intellects and their bodies grow. Alaka'i Academy operates as a very structured environment. Within that structured environment, which provides security and predictability, the teacher's job is to grab the children's imagination and attention, and take them on a metaphorical magic carpet ride, flowing from activity to activity, and from theme to theme, while exposing them to different subjects and concepts along the way. At Alaka'i Academy, children don't "run around wild." The program is delivered via teacher -directed activities. Because children are always looking to the teacher to know what to do next, Alaka'i Academy has been able to greatly minimize children's misbehaviors and accidents. Further, since all classes use this methodology, Alaka'i Academy's individual class approach has developed into culture of proper behavior and safety. While academic excellence may not necessarily, in and of itself, be the sole hallmark of a great leader, Alaka' i Academy feels that developing in children a love for learning and reading is a definite aid to them in their chosen life pursuit. Alaka'i Academy's academic goal is ambitious: to have every child reading at 1st grade level before entering Kindergarten. A head start in their academic life can only help children through the early stages of their education. To achieve this goal, Alaka'i Academy does three things: 1) Hires great teachers, 2) Implements a formal reading program, and 3) Values teachers' input on class size. First: Great teachers. In general, educational requirements for preschool teachers are low and mostly focused on child development theory rather than on teaching techniques. With this in mind, Alaka' i Academy began hiring lead teachers who also had experience teaching at the elementary school level. Alaka'i Academy believed and found out in practice that teachers with this background are better able to deliver curriculum and achieve the academic goals of the school. Second, Alaka' i Academy implements a formal reading curriculum. Reading is an acquired skill. Children don't learn to read by simply hanging out with readers. Reading is not something children just pick up by themselves; reading must be taught. Alaka'i Academy has a fantastic program to help little ones learn to read. It starts with phonics at age 2, moves to upper and lower case letter recognition by age 3, and reinforces phonics with sights words and sound readings, and culminates with developing fluency in 1st grade level books by age prior to entering kindergarten. This approach has been very successful. Over the last 2 years 92% of its students going to kindergarten were reading before they left the school. Further, 100% of children who were with Alaka'i Academy for 2 years read at 1st grade level. Lastly, Alaka'i Academy values teachers' input on class size. Nearly all preschools try to maximize teacher/student ratio to increase profitability. While profitability is important, teachers' input is considered when determining if a class can take new students. This approach allows teachers to feel respected, takes into consideration different class mixes, and it supports the overall goals of delivering a curriculum effectively. The outside area of the school is also critical to foster a safe and inviting learning environment. The school will include things like playground equipment; slides, bounce house; water play areas and water equipment (spray park zone/water playground, floating toys, etc.). Adequate parking spaces will be allocated to meet county guidelines. When school is not in session (evenings, weekends, school breaks, etc.), the venue may be rented out as an additional way to raise revenues to cover expenses, conduct fundraisers, etc. Regarding staffing, we currently employ 13 individuals. The new facility will likely increase that number to 15 plus. li. I ). ription or the subject property in sufficient detail to precisely locate the property. I)uscrihe exiting use;, structures and topography. If portion 0! property to be used. state ume of remainder of propert\ . The parcel is located in Kailua Kona, Riga Island. The property lot size is 5.3 acres. i I HAWAII HAWAII CO, Yf•l :, w :) r 1.. 44410.1, If r PROJECT AREA Figure 1: 5,500 K -Series Map of Hawai`i Showing Location of Project Area (National Geographic Topo!, 2003. Sources: National Geographic Society, USGS). The parcel is located near the intersection of Queen Ka'ahumanu and Hualalai Road. The property will have access via the future Kakalina Street connector road. Approximately 2 acres of the parcel will be designated for the special use (section highlighted in red ). The remainder of the property will he used to build a single family home and some family farming activities. such as a fruit orchard, farming, etc. I'etltl.>t. (;cner.11 l'lall designaUoI!.'l):LI:II lanaren ent -\rea and Community Der telopment Plans. Our Project is located in a site designated under the County of Hawaii General Plan as Urban. Under the land user pattern allocation guide, our project site is identified as medium density urban area, which allows for residential, commercial and multi -family residential uses, which includes daycare/childcare centers and preschools. D. Surrounding zoning and land uses. The property and project site is designated as "Agricultural District" under State Land Use Commission. Immediately adjacent properties to the north, east and west of the property are zoned as A -5a. Adjacent properties to the south are zoned A- l a. Most of the surrounded parcels are still undeveloped. Current use for most surrounding parcels is cattle grazing. The parcel directly north of our property also has a special permit to operate a public charter school serving grades K-8. Alaka'i Academy serves families of pre -K children, which complements nicely with the elementary school next doors. RM -4 i z HOENESr 0 RS-15 pc 0 orl/ l o Oyisr 1 ' WEHILA NI 04, Kahului Bay A -5a MAI( P utU pAAt f 49 0 8 0 Pv •u Project location. Light green indicates A -5a and dark green indicates A -la zoning. Taken from the North Kona Zone Map Section 25-8-3. I Iood Insurance Rate Map (I IRM) designation (contact I)cpartment of Public Works - I.nginccring I )iv isiEn). Flood Hazard Assessment Report Property Information Notes: IMA N'1WM/RSMDPARCELA000ESS 13i 11 Cl704SWAWtAADORESS401DE11 RY !I:. • KAIt VA KONA. HI 9674 . Flood Hazard Information f,77.::74:.i•I., r )i P ti Sl. df a 2i 3,177 01511001 AMP LHANGIIS, NOM I(MA IAM PANEL ESS 46607301 110811 L /I1CTIVf OATf SIP RUBE R 29 201F 1014., 57000211171SWf1 Hitt A tSVNAMI EVOLUTION 20HE NO 10111.4041( MfO VISIT hvb 11w«w rad Moa. 4o.1 OILS PROP( iffy IS *110448 DAM EVACVAtrON 20f44 NO 1057 MOnE IV) VISIT 1474 :111nen4 tuw4. 404/42774 0 600 1-0 h www hawaonflp wig mann In ..IN7 nn n7w•71 y r 7..7o..,! r.l l '75 er f.r.y rhe.. y. e.f'Y.thA .7o7f:rj.e. n•.rfe-7.7!, •tvr:r'J-17478,11, u'nlr'4 nn ora 1...•:,A .w1, .e lean -e. ,. 44.4.7(7,57 a rse:7. M . .570r,,e •M7f, C:78,741157, l%.r4G'. .. sae' .•1,v r, r,rr n n lc'•e 8 74 t•••.7•.411,. a .,fn:7007 fL.r'dune •n.w.0ptMw n.anssnue. 11000 HAZARD ASSE%SNTCNT 7001 LAYER LEGEND YIOAL 11000 NAZARO AREAS (SENA) AAIECT TO INUNDATION BY THE 1% ANNUAL OIANCE 8000 The 3% ann1M7 chance flood 1100. re.7). Yw know as the One Rood. n the flood that ha. a L% chance of 111,54 equaled a e flm p 0eda+ any near SF 81 •nRAEludeDoneA. M. AN, AO. V. and VTa The Base Flood Llev,nan (BEE) •s the watt. unlace tier1110.1 of 11111 Li amu! (luny Bond Mandator, Bono .nsur.nte sw•ouu ado, in Mese Jones laneA NoBlE detenm•ned. Ione AE 0111 date Tnred Lone AN 11 and depths o1 L to feel lunalle roof M pond 1143. BEE4etr700.4 Zone AO Pond depths of 1 to ) lent (uswll7 sneer Mow on 00a,4n): avera4e depths Gert m.on d Ione V Coast.). Read ro•:.• 0:41, 7.7707'I', herard !wave 347001. no BTL detn,r,red Zone VI Cont..' Crag roe,•«n1,0nte:- ntvha, 0d(ware anon!. KE &TTenn.../ Zone AFI faodwaY anat. m Ione Al The floods., M the dlanoe' a( str.yn plus any atAasNV lloodyL.m areas MA must be kern tree of eotroathme t so that the 1% .007,3E chance Iloo4 tan be caned *1a07,4 Iweasang 7110 B1 F NON3 EOAI ROOD N0LMD AMA • An arr. n a :1,w to moderate 1.78 flood :ane No mandat ref, flood Inntaree o0nhase fewenmMis 2op4. but 1Over2le n 1. al.de •n plrnoWor14 (0mrtsuntses 1111 Ion* RS 1R Nadal) 81572, 04 0 I% >onoal chance floodareas ofI% annual chance Rood waft astra4e depths 04 hest than l loot w.M deana4. areas less than 1 Asa, net. and area. deOlet(ed try firers hum II amu.i dance Mood Zone %. Area, dare•mned to be Out see the 0 7% aneuaI Ounce h00.G4n OTHER FLOOD MIASIonaDumtad.m areas where Mood Natant, ale undeler nand. but floe/Ant n OMoble No mandatory flood .reluranfow<Mte .0437 but co.erape •s 4,44,114 n p3'tn.panee tom 7,r n se. I . Archaeological Resources (one of the following): i. An archaeological inventory report containing significance assessments, effect determinations, and proposed mitigation commitments. The report should he completed pursuant to State Department or .and and Natural IRc,ourLe. I listorie Preservation Division (1)1.tik-SI IPU) rules. ii. A "no effect" letter from the State DLNR I listoric Preservation Division. iii. A copy of a letter written by the applicant to the State DLNR Historic Preservation Division requesting a " no effect" letter, including supporting documentation, to which SHPD has not responded after 30 days (SIIPD's time limit under their rules). See Letter from SHPD attached. Exhibit I G. Floral and Faunal Resources. No formal floral studies have been conducted for the site. The site has been walked multiple times by an archaeologist, a surveyor and by my family. Plans easily observed include elephant grass, hlaole Koa bushes (invasive), three small monkey pod trees, a couple African Tulip trees, Kiawe trees, and various other small weeds, such as the Mexican stinky, ivy gourds, etc. Everything seems very common to the area and nothing is rare or endangered plant life. Similarly, no fauna study was conducted for the site. There are currently 10 cows grazing on the property. Occasionally, our neighbor also brings his 3 horses to help keep the grass down. I have seeb mongooses and even a feral pig or two there. Therefore, it does not appear to be any indications that our project will have any significant negative impact, if at all, to the floral and fauna resources in the area. 11. Valued Cultural Resources: Identify any traditional and customary native Hawaiian rights that are exercised in the area; the extent in which the proposed development will affect these rights; and feasible action to be taken to protect native Hawaiian rights if they exist. None exist. Sec Archeological Report. Exhibit 2 I lit;hwav and turn mauka on I lualalai Road and then turn left on the Kakalina Extension Public Access: Existing public access to.and along the shoreline or to mountain areas and knot ledge of whether public access is being used. l'ubli:: access to the site is (al lualalai Road .in the Kakalina extension.• Families corning either from the north or the south would likely come via Queen Ka'ahurnanu Connector road. Families coming from Ali'i Drive would likely come up via Hualalai Road and then turn left on the Kakalina Extension Connector road. Families coming from EUlolualoa Mauka would likely come down via I lualalai Road and then turn right on the Kakalina Extension Connector road. The Kakalina Extension road is 35 feet wide, 2 lane paved road constructed to meet county standards. 100% of the Kakalina Extension road is within my property boundaries so we have unrestricted access and use of the road. There are several easements granted to our neighbors to access their properties via this road so we can't block or develop in a way that stops their access. Due to the nature of our business, we don't have set pickup times or drop off times. Each family has the flexibility to drop off or pickup anywhere within our hours of operations. Typically, most families drop off between 7 am and 9 am and pick up between 3 pm and 5 pm. It is rare to have multiple families at the same time in the lobby. J. Description of access(es) to the area (e.g. width, type of surface and condition of roadway). If a private roadway, submit evidence of access rights. Kakalina Extension is an asphalt road. Pavement surface is 35 feet wide. Road was constructed to county standards with the intention to dedicate the road to county at one point. Pie 1. Taken from 1 Iualalai Road Facing Mauka, showing intersection of Hualalai Road and Kakalina Street I xtension. Pic 2. Taken from Hualalai Road facing Makai, showing intersection of Hualalai Road and Kakalina Street Extension. Pic 3. Taken from I Iualalai Road facing North (Kakalina Extension). 03WS4 RlyUi:vo c."..: '"='= r- 'L76Z•sifll/.'f1i1tums.ciiioiwwomi Pic 4. Taken from Kakalina Extension facing North. Pie 5. Kakalina Extension facing I lualalai Road. Pic 6. Kakalina Extension. Start of our property Pic 7. Kakalina Extension. Property to the left of image. Innovations at the end of the road Pic 8. End of Kakalina extension. Innovations School entrance to upper campus. Pie 9. Kakalina Iixtemion. Water Supply Line, under road. Pic 10. Kakalina Extension facing south. Property to the right of the image. Fire hydrant shown K. Traffic impacts - assessment of existing traffic conditions, anticipated increase in traffic and traffic impacts from proposed use (a formal study may be requested by Department of Public Works or Department of Transportation during the review process). See Traffic Impact Analysis Report. Exhibit 3 I.. Availability of Utilities: Water, telephone, electrieit.v. se\%agc disposal. Water is available at the property. There is a 4 -inch main line that connects from Ilualalai Road under our property. .1.here is a eater line and meter installed on our property. Further, there is a fire hydrant installed in front or our property. Electricity is currently available through HELCO. There is a work order to bring power to the entire subdivision at this time, but engineering fieldwork is not completed. 740KVolts design is underway. A study will also be made to determine if solar system will be advantageous to install. It would seem that we are a good candidate given the location, and the fact that we don't operate throughout the night. Public Sewage services are not available at our location. A septic water/waste system will be designed and engineered to meet the code for our school. Telephone services are available through Spectrum and HawaiianTel and other wireless providers. A provider will be selected at a future date. 4. An Original and twenty (20) copies or how the request meets the following criteria LSB oble<I'd y.p„ sl and gisac<es shape Ieng leaturewC createdate c-natktr:I:Y nsod'LRddate sodf:eabs agency deLwrydal., sourced sc•.erity publ:.hdate shape A. The granting of this request would promote the effectiveness and objectives of•Chapter 05, I la\\aii lte\ ked titdttite.s. as amended. Include discussion t111 how the proposed use is not contrary to Chapter 205A. Coastal /one Management (existing public access, scenic or open space resources, coastal view planes and coastal ecosystems); Chapter 205: This land is not good for intensive farming. Our site is classified as "E" or Very Poor" by the Land Study Bureau's Overall Master Productivity Rating. 3;38 Hawai. 394 95255512 12293 9464099 7E8915E9.CCD3 44A2-AD17. F7 IAAAO000181 9'12'2016. 200 FM 12.29:1699. 1:30 11h1 1598324 984';48 117 37848347031 Project location is here. Also, the Department of Agriculture's ALISH Map does not classify the subject property as having any agricultural importance. Chapter 205A: Property located above highway and more than one mile from the ocean. Approval of this project will not adversely affect coastal ecosystems, economic use, marine resources. etc. on those services. We have operated our preschool for 6 years in the old industrial area and have not unduly burden their services. li. The desired use shall not adversely affect the surrounding properties: The desire use shall not adversely affect the surrounding properties. Most surrounding land i, a ricultural. pa'tore grating land%vacant land. The lot immediately north is a school already. The preschool operates M -F from 7-5pnm and it will be a blessing to the community in general. C. Such use shall not unreasonably burden public agencies to provide roads and streets, sewers, water, drainage, school improvements, and police and fire protection. The attached traffic study shows that no additional roads, streets improvements will be required because of our development. Existing water infrastructure is sufficient for our project. Public sewer system is not available at our site so we will be developing our own waste water system. School improvements are not anticipated because of our project. If anything, we will be taking some of the burden on the public school's preschools by adding to the overall capacity of the system. Police and Fire are available in Kona and our project is not expected to impose a burden D. t;nusual conditions. trends. and needs have arisen .,ince die district boundaries and regulations \ere established. kona's population continues to grow. Demand for preschool services is ver high (most preschools run a waitdist). With cost of living so high in I law aii. most families require that both parents work. Without childcare, it becomes impossible for some families to provide for their children. Our project will support the expected population growth while providing essential services to families in our community. E. The land upon which the proposed use is sought is unsuited for the uses permitted within the district. Our site is as good as it gets to build our school. It is not prime agricultural land, in fact very poor farming land, yet, conveniently accessible to the public and inside the urban development area. Our request is "unusual and reasonable" use of the land. F. The proposed use will not substantially alter or change the essential character of the land and the present use. The proposed use should not substantially alter or change the potential visual character of the land. There is a school next to the lot. Also, landscaping will greatly improve the visual appeal of the area as a whole. G. The proposed use will.not be contrary to the goals, policies and standards of the General Plan and other applicable documents such as community development plans and design plans. (Note: Copies of the General Plan document and other plans are available at the Hawaii County Planning Department or at public libraries) Our proposed use of the land will support the urban designation of the land within the general plan. Most families nowadays have both parents working. Without childcare, it becomes impossible for some families to provide of their children. Accessible and convenient location is also en essential characteristic of childcare. II. The proposed use is an unusual and reasonable use of land, which would not he contrary to the objectives to he sought by the I.and l Ise l,aw and Regulations. which, for the Agricultural and Rural Districts. seeks to preserve or keep lands of high agricultural I , t: inial it a_rieultural use. Our site is classified as "E" or "Very Poor" by the l..and Study Bureau's Overall Master Productivity Rating. Also, the Department of Agriculture's MASH Map does not classify the subject property as having any agricultural importance. Since land is not suitable for farming, non-agricultural uses can and should be allowed. Our project will not result in extensive public project improvements or adversely affect surrounding properties. The land is part of the urban core and childcare preschools are approved uses within the urban core. Fxhihit -1 contains the small size architectural draw ings. Exhibit 5 contains the large size architectural drawings. 5. An Original and twenty (20) copies of a scale- drawn plot plan of the property showing property line; and measurements: all existing and proposed structure; w ith elevations. uses and improvements: and reference points such as roadways. shoreline. etc. 6. One copy of a full- size (2' x 3') scale- drawn plot plan of Item 4 for presentation purposes. 7. A list of the names, addresses and tax map keys of all owners and lessees of record of surrounding properties who are required to receive notice. Owner Names PENALOZA, PABLO A Fee Owner, Tenants by the Entirety PENAZOLA, LUCIANA C Fee Owner Mailing Address PENALOZA, PABLO A 75-378 NANI KAILUA DR KAILUA KONA III 96740-1936 Mailing Address PENALOZA, LUCIANA C 75-378 NANI KAII,UA DR KAILUA KONA III 96740-1936 8. Any other plans or additional information relevant to this application may be requested by the Planning Director to facilitate processing of this request. None. DAVID Y. ICE OOVF.RNOR OFFtAWAII Dndo and H„ t( II 4„ lilorlt tN'.; Of Fids" St July 29, 2020 STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES STATE HISTORIC PRESERVATION DIVISION KAKUHIHEWA BUILDING 601 KAMOKILA BLVD., STE 555 KAPOLEI, HI 96707 Mr. Kyle Honda County of Hawaii Department of Public Works Engineering Division 74-5044 Ane Kaeohokalole Hwy Building D Kailua-Kona, HI 96740 Kylej.Honda@hawaiicountv.gov Dear Mr. Honda: SUZANNE D. CASE CHAIRPERSON BOARD OF LAND AND NATURAL RESOURCES COMMISSION ON WATER RESOURCE. MANAGEMENT ROBERT IC. MASUDA FIRST DEPUTY M. KALEO MANUEL DEPUTY DIRECTOR - WATER AQUATIC RESOURCES BOATING ANDOCEAN RECREATION BUREAU OF CONVEYANCES COMMISSIONON WAIFS RESOURCE MANAGEMENT CONSERVATION AND COASTAL LANDS CONSERVATION AND RESOURCES ENFORCEMENT ENOB1EFRQIOFORESTRYANDWDDLWE HISTORIC PRESERVATION RANOOAWE ISLAND RESERVE CO.NUSION LANDSTATEPARRS IN REPLY REFER TO: Log No. 2020.01308 Doc. No. 2007NM01 Archaeology SUBJECT: Chapter 6E-42 Historic Preservation Review — County of Hawaii Grubbing and Grading Permits for Pablo Penaloza Archaeological Inventory Survey Wai`aha 1" Ahupua`a, North Kona District, Hawaii Island TMK: (3) 7-5-017:045 This letter provides the State Historic Preservation Division's (SHPD's) review of two permit applications and a draft archaeological inventory survey (AIS) report titled, Archaeological Inventory Survey Report for 4.25 Acres Located in Wai'aha Is' Ahupua'a, North Kona District, Hawai'1Island Hawaii (TMK: (3) 7-5-017:045] (Escott, June 2020). SHPD received this submittal on June 8, 2020 (Log. No. 2020.01308). On November 15, 2019, SHPD received a grubbing permit application, a notice of authorization for disposal of grubbing material, project maps, a SHPD HRS 6E Submittal Form, and the draft MS report (Log No. 2019.02536). Subsequently, SHPD received a second submittal on January 14, 2020, which included a grading permit application, an updated plan showing the proposed house layout on Lot 2-B, and duplicates of the materials included in the earlier submittal (Log No. 2020.00079). SHPD requested revisions to the draft AIS in a letter dated April 27, 2020 (Log No. 2019.02536, 2020.00079, Doc. No. 2004NM02). The grubbing permit application and HRS 6E Submittal Form indicates a 4 -acre portion of the 5.352 -acre parcel will be grubbed to remove vegetation. The grading permit application and HRS 6E Submittal Form indicates the -same area will be graded to support construction of a house pad. The Grade Plan identifies the property as Lot B-2, portion of Waiaha 13' to Puapuaanui f' Land Court Award 387. In contrast, the MS report (Escott, June 2020) indicates the owner proposes to build a daycare center (preschool) and a farm dwelling which would serve as a residence and a bed and breakfast. On July 17, 2020, Mr. Penaloza confirmed via email (Nicole Mello [SHPD] and Glenn Escott [SCS]) that he contacted Mr. Honda to inform him that the project plans are as described in the AIS and the County accepted the change in plans. Scientific Consultant Services, Inc. (SCS) conducted the MS on behalf of the owner. The MS fieldwork consisted of 100% pedestrian survey coverage of the 4 -acre portion. A single Historic property, Site #50-10-28-31118, was identified, consisting of a stacked stone wall remnant and an unimproved road. The road is described as a ranch road, likely dating from the Historic period to present. The wall is described as 3-5 courses high and 3-4 courses wide and not as a remnant of a once longer wall but as a wall in which construction was abandoned before being finished. Either end of the wall is described as unfinished. Site -31118 retains integrity of location, design, materials and workmanship and is assessed as significant under Criterion d (information) pursuant to HAR § 13-284-6, as adequately documented and, thus, no further archaeological work is recommended. SHPD concurs with the site significance assessment and the recommendation of no further work. Mr. Kyle Honda July 29, 2020 Page 2 The revised MS adequately addresses the issues and concerns raised in our previous correspondence (Log No. 2019.02536, 2020.00079, Doc. No. 2004NM02). This AIS report satisfies the requirements of HAR § 13-276-5. It is accepted. Please send two hard copies of the document, clearly marked FINAL, along with a text -searchable PDF version, to the Kapolei SHPD office, attention SHPD Library. Please also send a PDF version of this report to Lehua.K. Soaresehawai i.gov. Pursuant to HAR § 13-284-7(e), when the SHPD agrees that the action will not affect any significant historic properties, this is the SHPD's written concurrence and historic preservation review ends. The historic preservation review process is ended. The permit issuance process may proceed. SHPD herby notifies the County that the MS has been accepted. No further archaeological work is required. The historic preservation review process is ended. The permit issuance process may proceed. Please attach to the permit: In the unlikely event that subsurface historic resources, including human skeletal remains, structural remains, cultural deposits, artifacts, sand deposits, or sink holes are identified during the demolition and/or construction work, cease work in the immediate vicinity of the fmd, protect the find from additional disturbance, and contact the State Historic Preservation Division, at (808) 933-6751. Please contact Nicole A. Mello, Hawaii Island Historic Preservation IV, at Nicole.Mello(hawaii.gov for matters regarding archaeological resources or this letter. Aloha, 1lam OW/et Alan S. Downer, PhD Administrator, State Historic Preservation Division Deputy State Historic Preservation Officer cc: Natalie Whitworth, Natal ie.Whitworthehawaiicounty.gov Dion Gonzales, Dion.Gonzales(ihawaii.gov Leilani Lewi, Leilani.Lewi(ihawaiicounty.Qov Pablo Penaloza, ppenaloza@.gmail.com Glenn Escott, g.gescott@ascshawaii.com SCS Project #2388 AIS -2 ARCHAEOLOGICAL INVENTORY SURVEY REPORT FOR 4.25 -ACRES LOCATED IN WAPAHA 1ST AHUPUA`A, NORTH KONA DISTRICT, HAWAII ISLAND, HAWAII TMK: (3) 7-5-017:045 (POR.)] Prepared By: Glenn G. Escott, M.A. JUNE 2020 DRAFT Prepared For: Mr. Pablo Penaloza Alaka`i Academy 74-5565 Luhi Street Kailua-Kona, HI 96740 SCIENTIFIC CONSULTANT SERVICES Inc. 1347 Kapi`olani Boulevard, Suite 408 Honolulu, HI 96814 Hawaii Island Office: PO Box 155 Kea'au, HI 96749 e This Page Intentionally Left Blank TABLE OF CONTENTS LIST OF FIGURES I LIST OF TABLES II INTRODUCTION 1 METHODS 1 ENVIRONMENTAL SETTING 6 HISTORICAL AND CULTURAL CONTEXTS 7 PRE -CONTACT ERA 7 The Kona Field System 9 POST -CONTACT ERA 1 I The Mahele 13 MODERN LAND -USE 15 PREVIOUS ARCHAEOLOGICAL STUDIES 16 EXPECTED ARCHAEOLOGICAL PATTERNS 18 RESULTS OF FIELDWORK 19 CONCLUSION 31 DISCUSSION 31 SIGNIFICANCE ASSESSMENTS 31 RECOMMENDATIONS 32 REFERENCES CITED 33 LIST OF FIGURES Figure 1: 5,500 K -Series Map of Hawaii Showing Location of Project Area (National Geographic Topo!, 2003. Sources: National Geographic Society, USGS). 2 Figure 2: 7.5 -Minute Series USGS Map Showing Location of Project Area (Kailua Quad, ESRI, 2013. Data Sources: National Geographic and County of Hawai` i Planning Department, 2019). 3 Figure 3: Aerial Photograph and TMK Map Showing Location of Parcel 045 and Project Area ESRI, 2013. Data Sources: National Geographic and County of Hawai`i Planning Department, 2019). 4 Figure 4: Aerial Photograph Showing Project Areas, Kailua-Kona, HI, Zone 5 North, 188182 m E, 2173273 m N. (Google Earth, 2013 Image. Data Sources: Digital Globe, GeoEye, Earthstar, USDA, and USGS) 5 Figure 5: 7.5 -Minute Series USGS Map Showing Location of Dirt Road and Project Area Kailua Quad, USGS 1928). 12 Figure 6: Ahupua'a Map Showing Locations of the Current Project Area, LCAs, and Previous Archaeological Studies (Adapted from Haun 2008:5) 14 Figure 7: 7.5 -Minute Series USGS Map Showing Location of Escott (2016) AFT Project Area and Current AIS Project Area Shaded Yellow (Kailua Quad, ESRI, 2013. Data Sources: National Geographic and County of Hawai`i Planning Department, 2019). 17 Figure 8: 7.5 -Minute Series USGS Map Showing Location of Project Area and Site 31118 Kailua Quad, ESRI, 2013. Data Sources: National Geographic and County of Hawaii Planning Department, 2019). 20 I Figure 9: Aerial Photograph Locations of Showing Project Area and Site 31118, Kailua-Kona, HI, Zone 5 North, 188182 m E, 2173273 m N. (Google Earth, 2013 Image. Data Sources: Digital Globe, GeoEye, Earthstar, USDA, and USGS). 21 Figure 10: Site 31118 Rock Wall Segment Plan View Map. 22 Figure 11: Photograph 1 of Site 31118 Rock Wall Segment Looking Northwest 23 Figure 12: Photograph 2 of Site 31118 Rock Wall Segment Looking Southwest 24 Figure 13: Photograph 3 of Site 31118 Rock Wall Segment Looking North. 25 Figure 14: Photograph 4 of Site 31118 Wall Segment Looking North. 26 Figure 15: Photograph 5 of Site 31118 Wall Segment Looking West. 27 Figure 16: Photograph 6 of Site 31118 Wall Segment Looking Northwest. 28 Figure 17: Photograph 7 of Site 31118 Wall Segment Looking North. 29 Figure 18: Photograph 8 of Site 31118 Wall Segment, Looking Northwest. 30 LIST OF TABLES Table 1: Site Significance and Recommended Treatments. 32 II INTRODUCTION Under contract to property owner Mr. Pablo Penaloza, Scientific Consultant Services (SCS) conducted an Archaeological Inventory Survey (AIS) of a 4.25 -acre portion of a 5.352 -acre parcel of land [TMK (3) 7-5-017:045] located in Wai`aha 1st Ahupua`a, North Kona District, Island of Hawaii, Hawai`i (Figure 1 through Figure 4). The street address for Parcel 045 is listed on Hawaii Tax Property Records as 75-477 Hualalai Road. However, the Hawaii County Planning Department has approved a street address change to 75-5916 Kakalina Street. The property access easement is a portion of Kakalina Street. Parcel 045 is bounded to the north by the Innovations Public Charter School campus and is bordered by open cattle pasture on all other sides. Mr. Pablo Penaloza is proposing to build a Day Care Center (Preschool) and a farm dwelling on roughly 4.0 -acre portion of the property. The farm dwelling will serve as his family's personal residence as well as to operate a bed and breakfast establishment. The 4.25 -acre AIS project area is larger than the area to be developed. METHODS The archaeological inventory survey was undertaken in accordance with Hawai`i Administrative Rules 13§13-284 and was performed in compliance with the Rules Governing Minimal Standards for Archaeological Inventory Surveys and Reports contained in Hawaii Administrative Rules 13§13-276. The investigation included the following procedures: 1 SCS conducted historical and archaeological archival research including a search of historic maps, aerial photos, written records, Land Commission Award documents, State and County Planning and Tax Records documents, and previous archaeological reports. 2. SCS carried out a 100% pedestrian survey of the project area. 3. SCS documented all historic properties identified within the project areas. 4. SCS assessed all sites for significance and made recommendations for site disposition. 1 S Prior to lieldwork. a search of geological 'naps, aerial photos. historical maps. historical documents. I lawai'i County Planning records. and previous archaeological reports was conducted. N••••,-- . , . . 11 0 4 HAWAII HAWAII COI 7"“ • fr:\1 4,;Jezr..,•"*"""--, wroa!kitsT 3.,...747,,'...-'.. 7" N. I •••••• 7,r -,•., ,...i_ IP, • • Figure 1: 5.500 k -Series Map of' 11awaii Showing I,ocation of Project Area (National Geographic Topo!, 2003. Sources: National Geographic Society. USGS). KEY D. MRCEL 045 IROJECT AREA 1 NW ROU\ DAR' P• 0 100 200 300 meters i i Figure 2: 7. 5 - Minute Series USGS Map Showing Location of Project Area ( Kailua Quad, ESRI, 2013. Data Sources: Naiiona Geographic and County of Hawai' i Planning Department, 2019). 3 PROJECT AREA FMK BOUNDARY Figure 3: Aerial Photograph and TMK Map Showing Location of Parcel 045 and Project Area ( ESRI. 2013. Data Sources: National Geographic and County of Hawai` i Planning Department, 2019). 4 ELEVATION BREAK PARCEL 045 1 PROJECT AREA TN Figure 4: Aerial Photograph Showing Project Areas, Kailua- Kona, HI. Zone 5 North, 188182 m E, 2173273 m N. ( Google I . th. 2013 Image. Data Sources: Digital Globe. GeoEye, Earthstar, USDA, and USGS). 5 A pedestrian survey and site recording was conducted on August 29 and October 3, 2019 by SCS Senior Archaeologists Glenn Escott M.A. and Suzan Escott, B.A. The fieldwork took a total of 24 person -hours to complete. A series of northwest/southeast transects spaced 1.5 meters apart were walked across the entire project area. Ground cover consisted Guinea grass and koa haole bushes. Ground visibility was fair. Glenn Escott was the principal investigator and project director for the current study. Sites were plotted with a Garmin GPSMAP64 Global Position System (GPS) unit 1.0 m accuracy) using Universal Transverse Mercator (UTM) projection (Zone 5 North) and WSGS84 datum. Written descriptions, scale plan view drawings, and photographs were generated for the single archaeological feature identified. Color photographs were taken of the feature using a 25 cm long north arrow scale divided into 10 cm black and white increments. ENVIRONMENTAL SETTING The property is located at 390 feet (119 meters) to 420 feet (128 meters) above mean sea level on a single Hualalai lava flow dated between 5,000 and 10,000 years before present (Wolfe and Morris 1996). Soil in the project area is Kainaliu (KEC) series very stony silty clay loam (Sato 1973:23) and Punaluu (rPYD) series extremely stony peat (Sato et al. 1973:48). The property is level ground with 6% westerly slope. Annual rainfall at the property ranges from 40 to 60 inches. There is an elevation break (see Figure 4) that bisects the center of the property from west to east. The land slopes one to two meters downward to the north of the elevation break. Plants in the project are dominated by grass varieties and small shrubs with some trees. Tree species include koa haole (Leucaena leucocephala), kiawe (Prosopis pallida), kukui (Aleurites moluccana), and monkeypod (Samanea saman) (Starr Environmental 2016). 6 HISTORICAL AND CULTURAL CONTEXTS Kona is divided into two sections: North Kona or Kona `akau, and; South Kona, or Kona hema (Maly 1996). Kona `akau was further subdivided into north (called Kekaha) and south (called Konakai opua) areas, with the division between the two at the ahupua 'a of Keahuolu. The project area is in Wai`aha Ahupua'a within the area of Konakai'opua in Kona `akau. Wai`aha means (literally) "gathering water" (Pukui et al. 1974:219). Wai'aha is a traditional ahupua'a stretching from the ocean to 2,000 feet amsl. The coastline of Wai`aha Ahupua'a is primarily low rock cliffs. Very little is recorded of Wai'aha Ahupua'a in traditional oral accounts. PRE -CONTACT ERA Wai`aha, Kona, and much of the leeward side of Hawaii Island, while well populated at the time of European Contact, were settled later than the windward side. Many archaeologists believe that Hawai`i Island was first settled around A.D. 1,000 by people sailing from the Marquesas (Athens et al. 2014; Dye 2011; Kahn et al. 2014; Kirch 2011; Kirch and McCoy 2007; McCoy 2005 and 2007; Mulrooney et al. 2011; Reith et al. 2011; Wilmhurst et al. 2011a and 2011b). An article published in the Journal of Archaeological Science reviewing radiocarbon dates recovered at archaeological sites on the Island of Hawaii suggests that, by relying on only carbon samples from short-lived plant remains, the most reliable dates point to initial Polynesian colonization of Hawai`i Island occurring between A.D. 1220 and 1261 (Rieth et al. 2011:2747). Early settlers founded settlements on the windward shores in likely places such as Waipi`o, Waimanu, and Hilo Bay. The windward, or ko `olau shores receive abundant rainfall and have numerous streams such as the Wailuku, Waiolama, `Alenaio, and Wailoa that facilitated agricultural and fishpond production (Maly 1996:3). The windward shores also provide rich benthic and pelagic marine resources. The dry leeward shores of Hawaii Island presented a very different environment requiring a modified set of subsistence strategies. Archaeologists and historians are uncertain about the exact motives that lead to the establishment and spread of settlements on the leeward side of Hawaii, but some suggest population pressure, dwindling fertile land, growing socio-political stratification, or simply the opportunity for a new start 7 might have lead to new communities developing on the dryer west side of the island Cordy 2000:130). Evidence suggests the process was underway between the A.D. 900s and 1100s (ibid.). During this period, areas of permanent habitation were established in Kona Cordy 1981, 1995; Schilt 1984). Habitation was concentrated along the shoreline and lowland slopes, and informal fields were cleared at higher elevations where rainfall was higher. Agricultural fields and habitation areas expanded across the slopes and coastal area of l-lualalai during the period between AD 1100 and 1400 (Burtchard 1995; Cordy 1995). The development of the extensive formal walled fields likely began sometime around AD 1400 to 1600. This period marks the initiation of the Kona Field System KFS) (Schilt 1984). The development of the fields may be, in part, a by-product of the need to extract more subsistence resources from an increasingly limited agricultural base. The population in Kona increased dramatically during this period, as reflected in the abundant radiocarbon dates from habitation structures, shelter caves, and agricultural soils of this period (Burtchard 1995; Haun et al. 1998; Schilt 1984). During this period, the stratified chiefdom structure becomes clearly developed in the archaeological record. Large residential complexes and heiau reflect the segregation of places and power for the growing hierarchy of high and lower chiefs, and ceremonial stewards (Cordy 1981; Haun et al. 1998; Hommon 1986). The produce from the formal walled fields were distributed to higher chiefs through a hierarchy of lower chiefs responsible for management and collection of the cultivated and wild resources. By the time of the Competition Period (AD 1600 to 1800), the royal centers and larger heiau were in place, reflecting the growth in power of the rulers and chiefs in the region (Barrera 1971; Hammatt and Folk 1980). Resources may have reached their maximum carrying capacity, resulting in social stress between neighboring groups. Hostility between groups is reflected archaeologically with the development of refuge caves during this period (Schilt 1984). This volatile period was probably accompanied by internal rebellion and territorial annexation (Hommon 1986; Kirch 1985). Royal centers are located at Kailua, Holualoa, Kahalu'u, Kealakekua, and Honaunau (Cordy 1995). 8 The region of Holualoa, to the south of the current project area, developed into a royal center in the late 1600s to early 1700s under the reigns of Keakamahana (reigned 1680-1700) and Keakealaniwahine (reigned 1700-1720) (Cordy 2000:244). Many ali'i and konohiki residences and numerous religious sites are known to have existed here. The majority of the heiau and royal residences were constructed along or near the coast, most notably at Kamoa Point south of the project area. The royal center at Holualoa was eclipsed in the second half of the 1700s by the royal center in the Kahalu`u and Keauhou region. The Kona Field System During his travels in the region in 1823 William Ellis noted, as cited in Handy 1940), that the area above and south of Kailua was: quite a garden compared with that through which they had passed on first leaving the town. It was generally divided into small fields, about fifteen rods square, fenced with low stone walls, made of fragments of lava which had been gathered from the surface of the enclosures. These fields were planted with bananas, sweet potatoes, mountain taro, tapa trees, melons and sugar cane, flourishing luxuriantly in every direction [Handy 1940:114 and 162]. Rocky lands in the olden days were walled up all around with big and small stones of the patch until there was a wall about 2 feet high and in the enclosure were but weeds of every kind, ama`u tree ferns and so on, and then topped well with soil taken from the patch itself to enrich it [Handy 1940:147] . These gardens have been studied in some detail, and are often referred to as the Kona Field System". Many of the archaeological projects conducted within Kona deal with components of the KFS (Cordy 1995; Newman 1970; Schilt 1984). This area extends north at least to Ka`u Ahupua'a and south to Honaunau, west from the coastline and east to the forested slopes of Hualalai (Cordy 1995). A large portion of this area is designated in the Hawai`i SIHP (State Inventory of Historic Places) as Site 50-10-37- 6601. The basic characteristics and general locations of the zones within the system as presented in Newman (1970) have been confirmed and elaborated on by more intensive and extensive ethnohistorical investigations (Kelly 1983). 9 The kula zone of the KFS is the area from sea level to 150 m amsl (Kelly 1983; Newman 1970). This lower elevation zone is traditionally associated with habitation and the cultivation of sweet potatoes (uala), paper mulberry (wauke), and gourds (ipu). Agricultural features, such as clearing mounds, planting mounds, planting depressions, modified outcrops, and planting terraces, are common throughout much of this zone Hammatt and Clark 1980; Hammatt and Folk 1980; Haun et al. 1998; Schilt 1984). Dwellings are often scattered throughout the agricultural portion of the kula, but they are commonly concentrated along the shoreline subdivision of the kula zone (Cordy 1981). The shoreline area, extending inland approximately 200 m, was used primarily for permanent habitation and other non-agricultural activities, such as canoe storage, ceremonial and burial practices, recreation, and fishing -related activity. Royal centers and high chiefly centers were also situated within the shoreline of the kula. These complexes include dwellings for rulers, chiefs, and the supporting populace, places of refuge, and other structures (Berrigan et al. 2010). Single, or clustered, burials are also situated in the shoreline, and near -shore kula (flan et al. 1986; Hammatt and Clark 1980; Hammatt and Meeker I979). Burials occur in caves, within finely built platforms, cruder rock mounds, and houses in the shoreline, and are more often in the near -shore kula (Cordy 1995; Han et al. 1986; Schilt 1984; Tainter 1973; Tomonari-Tuggle 1993). The large, and densely populated, royal centers were situated at several locations along the shoreline between Kailua and Honaunau (Cordy 1995; Tomonari-Tuggle 1993). The residential areas, large and small heiau, sporting areas, and burial clusters, are present continuously farther inland than the usual 200 meters for the shoreline habitation portion of the kula. Consequently, a variety of non-agricultural features are present in the kula near royal centers. The project area is located in Wai`aha Ahupua'a meaning gathering water (Pukui ct al. 1974:219) or water gathering ceremony (Maly 1993:390). The name is associated with Ma'o Heiau located on the coast of Wai'aha Ahupua'a. Ceremonies were conducted at Ma`o Heiau to bring about the rains, or to end the rains. Wai`aha was named for Wai `aha-ka-wTa priest of the hull honua (versed in divining the nature of the earth) and kilokilo (seers) classes (Maly 1993:390). 10 POST -CONTACT ERA The extensive features of the KFS were exploited and altered during the post - contact era. Walls, kua `iwi (low, linear stone or earthen agricultural field border mounds), springs, and pathways created generations earlier were used and planted with alien cultigens (coffee, cotton, sugar, and sisal) and ultimately used as pastures for cattle. Sugar was a major crop in Hawai`i as early as signing of the Reciprocity Treaty in 1876 (Kelly 1983:90). The sugar industry grew rapidly, and by 1899 the one and only sugar mill in the Kona area was built by the Kona Sugar Company. It was located along present day I lienaloli Road, roughly 1.0 km mauka (east) of the current project area. People from countries in East Asia, Southeast Asia and Portugal were encouraged to immigrate to Hawai`i to work on the sugar plantations (ibid:111). Chinese immigrant laborers also worked to build a railroad in 1901 to haul cane from the fields to their mill site in Wai`aha (Figure 5). The former railroad bed is the location of Hienaloli Road. Lack of water to mill sugarcane caused repeated shutdowns. The sugar company failed in 1903, and was bought out by a Japanese company that continued the sugar cultivation and processing until 1926. The railroad was bought by Kona Development Company, and was used for freight, sugarcane and by the Hawaiian Lumber Company (ibid:111). Sugar was grown above the railroad line. The cut sugar was delivered to the tracks with the assistance of gravity by wire cables and flumes. Cotton was grown on lands below the railroad tracks (ibid:111). Cotton gins were located south of the project area. Cotton was being picked as late as the 1930s. Other plants grown below the tracks in the dryer lands were sisal and tobacco (ibid:1 12). Formal cattle ranching began in the Kailua-Kona region in the early 1900s, but wild cattle may have been in the area as early as the late 1800s (Bowser 1880; Maly and Maly 2001:285). The pa 'aina (`walls of the land'), native tenants' wall enclosures, were prevalent in the area, as indicated by their inclusion in many local Mahele testimonies Waihona `Aina 2019). These were used to mark the boundary of properties and to keep livestock out of crop areas (Kuykendall 1967:318 note 76). Later, cattle ranchers built walls to control their cattle (Maly and Maly 2001: 277). 11 Figure 5: 7. 5 - Minute Series USGS Map Showing Location of Dirt Road and Project Area ( Kailua Quad, USGS 1928). 12 t71 c: 800z: ItIWI phirp \ • ) irordoloaepay sno! Aaid pun . syjiiy raid ILK- Limp: Ito to suopuool * Ru! motis cieN n, rndt- Rie : 9 a. inVu i 0. 111, k 0 N.. tt' • HOZ IP,. • 41> tan t trinta Si- N N I ,""'•' • Most of the awards were small, less than 1.0 acre (n=8). while !bur were between 1.0 and 2.0 acres. I,CA #387. a large parcel of land that included much of Wai'aha Ahupua'a. was awarded to Seth :Andrews. as a medical missionary with the 81h American Board of Commissioners IOr I ()reign Missions company. The project area parcels arc part of the lands of I,CA ',387. Seth Lathrop Andrews (1809-1892), originally from Putney, Vermont, arrived in Kona in 1837 (Titus Coan Memorial Library 2019). He was educated at Dartmouth College and attended Medical College in Fairfield, New York. He was the only physician on Hawaii Island when he arrived. Dr. Andrews returned to the United States in 1849, after his wife and three children died of fever. A large portion of the lands of Wai`aha 2"d Ahupua`a, just south of the current project, was part of Land Grant (LG) #4394 made to II. Wilgerhoth (Waihona `Aina 2019). LG #4394 was applied for and patented between 1898 and 1900. The grant was for 43.8 acres at a cost of $570.00. Forty three acres of the same land had been previously leased by Wilgerhoth. Wilgerhoth is listed as a sugar boiler in sugar plantation literature. In 1890, Wilgerhoth had traveled to Germany to purchase a sugar -house outfit complete with diffusion and triple -effect evaporating apparatus for Koloalua (likely Holualoa) plantation in Kona, Hawai`i Island (Louisiana Sugar Planter's Association 1890). It is likely that Wilgerhoth was growing sugar on his property at that time. The changing subsistence and trade regimes developed by incoming European and American settlers, as well as other historical factors, caused a depopulation of the coastal areas of Kona (Nordyke 1989:18-27). Ranches and farms were established in the uplands where rainfall was higher, and the temperatures were cooler (Maly and Maly 2001: 288). Schools, churches, stores, and other businesses were also established in the uplands. MODERN LAND -USE Hawaii County Planning Department property records show that by the early 1950s, the project area property was being used by the Gomes family as cattle pasture. The property is currently used as cattle pasture. There is a dirt ranch road between Queen Ka'ahumanu highway and the northeast quadrant of the project area (see Figure 2 through Figure 4). 15 The dirt ranch road provides access to storage containers and two large water tanks on properties west of the project area. The road appears on a 1928 USGS map and appears to provide access to two buildings east of the project area (see Figure 5). The 1959 t .,S(.1S map shows one of the buildings as a gauging station !Or the \\aler pipeline alongside the road. The pipeline leads to two large water tanks shown on the 1928 USGS map. PREVIOUS ARCHAEOLOGICAL STUDIES At least nine archaeological studies have been conducted in the coastal and upland regions of Wai'aha 1'` and 2"d Ahuptta`a (see Figure 6). More than half of the studies are summarized in an MS report by Haun and Associates (Haun 2008). The coastal region, approximately 1.2 km west of the current project area, contained a higher site density and included many pre -Contact era habitation, agricultural, and ceremonial features. The upland studies (Bevan et al. 2004, Kouneski et al. 2006) documented a smaller number of pre -Contact era agricultural features and Historic era agricultural and ranching features. The Haun (2008) AIS study was conducted on a roughly 2.0 acre portion in the southeast corner of TMK: (3) 7-5-017:004. Parcel 004 was subdivided and it is not possible to determine on which new parcel the 1-laun (2008) study was conducted as there is no TMK map figure in the AIS report. The Haun (2008) project area appears to be located on new Parcels 050 and 052, putting their project area roughly 1.0 km southeast of the current field inspection project area. The Ilaun (2008) report noted that the project arca ground surface had been heavily disturbed by past land clearing activities. Six single feature sites were documented in the AIS report including four ranch walls, an historic artifact scatter, and a temporary habitation terrace. SCS conducted an Archaeological Field Inspection (Escott 2016) on Parcels 012, 046 and 047 just east of the current project area (Figure 7). There were no archaeological sites identified in the AFI project, though there were rock mounds and rock walls identified just outside of the project area. 16 1 KEY House Lots Survey Areas Ranch Road Survey Area 0 - TMK Parcel Boundaries TN 11111 200 melon 300 18800m E I89( IOnt F Figure 7: 7. 5 - Minute Series USGS Map Showing Location of Escott ( 2016) AFI Project Area and Current . AIS Project .\ rc; 1 Shaded Yellow ( Kailua Quad, ESRI, 2013. Data Sources: National Geographic and County of Hawaii Planning Department. 201 y1. I7 While there were additional studies conducted in Wai'aha I" and 2"` Ahupua'a, the {taint (2008) and l .scott (2016) studies best represent the types of sites and features expected within the current project area. The two studies most accurately predict the t\pes of archaeological sites that will be identified. As a result. descriptions of only then: last two studies were included in the previous archaeological studies section. Descriptions and maps of the remaining previous archaeological studies, some very distant from the current project area, will not provide additional useful information or novel information relevant to the current project area and not provided in Haun (2008) or Escott (2016). EXPECTED ARCHAEOLOGICAL PATTERNS Based on previous archaeological studies, geological studies, historical research, and County Planning Department records it is expected that any archaeological sites remaining on the current project area will be related to pre -Contact era agriculture and habitation, and to post -Contact era ranching and sugarcane agriculture activities. Archaeological sites and features are likely to consist of rock clearing mounds, terraces, small enclosures, and rock walls. Itl.l i.l'S OF FIELDWORK 1 Single archaeological site. Site 1150-10-28-31118 (hereafter Site 31 1 I8), consisting of a rock %Nall segment and a dirt ranch road. ‘N ere documented near the center of the project area during the current study (Figure 8 and Figure 9). The dirt road, depicted on a 1928 USGS map (see Figure 5). is a Historic era feature. The rock all segment might have been constructed in the Historic era or is a later Modern era feature constructed along the side of the dirt road. There were no other archaeological sites identified during the archaeological inventory survey work. SITE 31118 Rock Wall & Dirt Road FUNCTION: Travel & Transportation AGE: Historic to Modern Eras DIMENSIONS: Length: 133.0 m E/W; Width, 4.0 m; Height, 0.71 m Max. CONDITION: Fair INTEGRITY: Altered by Cattle SURFACE ARTIFACTS: None EXCAVATION: None DESCRIPTION: Site 31 118 is a wall segment and dirt ranch road located at the center of the project area (see Figure 8 and Figure 9). The wall is roughly 44.0 meters long ((/W) by 0.80 m wide by 0.71 m in maximum height (Figure 10). It appears that the rock wall segment construction was never completed as the east and west ends have not been finished. The wall is constructed of angular and subangular large cobbles and small boulders stacked three to five courses high and three to four courses wide (Figure 11 through 18). The wall is bi-faced and the rock is well fitted in places. The wall is not core -filled with cobbles. The wall has been impacted by grazing cattle and is in fair condition. The dirt ranch road is located along the north edge of the rock wall segment (see Figure 8 and Figure 9). The road is approximately 133.0 m long where it crosses the project area. The road continues west and has been removed by the construction of Kakalina Street east of the project area. The dirt road is roughly 1.5 meters wide and is overgrown with grass and koa haole bushes. The wall and road appear to be unaltered, are in fair condition and no further work is recommended at Site 31118. Site 31 1 18 was assessed as significant under criterion "d" for information important to the history of ranching. 19 Watcr' / Tanks 1' µ1 -. 1/ 1 µ1x- ` V(. 1. KEY PARCE1. 04S PROJECT AREA TM1K ROUIDARI SITE TSI ROCK WALT. 1'\ 0 10( 1 200 300 meters 4 ., pf af ray, kok...4' 44. 11°° IIOg1011m t: Figure 8: 7. 5 - Minute Series USGS Map Showing Location of Project Area and Site 31118 ( Kailua Quad. ESR1, 2013. Dma Sources: National Geographic and County of Hawai` i Planning Department, 2019). 20 KEY PARCEL 0 -IS PROJECT AREA T.1K BOUN1)ARI SITE TSI ROCK \\ALL Figure 9: Aerial Photograph Locations of Showing Project Area and Site 31118, Kailua- Kona, HI, Zone 5 North, 188182 m E, 2173273 m N. (Google Earth, 2013 Image. Data Sources: Digital Globe, GeoEye, Earthstar, USDA, and USGS). 21 9U) 4; • b 8) p i_ 71 . PARTIALLY COLLAPSED 8 7 6 PHOTO 8 PI IOTO 7 PHOTO 6 0 2 5' • 00 froon,PHOTO 5 WALL BREACH 4 6 8m COLLAPSED UNDER ; FREE PHOTO 2 4 PHOT() 4 KEY Er am BASALT ROCKS HEIGHT ABOVE GROUND SURFACE IN cm PHOTOGRAPH # & DIRECTION TAKEN PHOTO 1 TREE . COLLAPSED PHOTO 3 Figure 10: Site 31118 Rock Wall Segment Plan View Map. 22 Figure 11: Photograph 1 of Site 31 1 18 Rock Wall Segment Looking Northwest. 23 Figure 12: Photograph 2 of Site 31 118 Rock Wall Segment Looking Southwest. 24 Figure 13: Photograph 3 of Site 31 1 18 Rock Wall Segment Looking North. 25 Figure 14: Photograph 4 of Site 31 1 18 Wall Segment Looking North. 26 Figure 15: Photograph 5 of cite 31 1 18 Wall Segment Looking West. 27 tia 0z 00 CG) Eto oo cC s: n. I- L 00sG OLLi. 00 Figure 17: Photograph 7 of Site 31 1 1 Wall Segment Looking North. 29 Figure 18: Photograph 8 of Site 31118 Wall Segment, Looking Northwest. 30 In the early 1840s, cattle were said to be "maintained on the kula," a mile from the coast where the ground was "covered with herbage" (Wilkes 1845:4, 95). Cattle, introduced to Kona by Vancouver in 1794, became a nuisance later, when their numbers increased. They fed on the grass of the kula and from time to time on the thatch of Hawaiians' homes and on vegetables in their gardens. The open upland fields, bounded only by low earth and stone walls, were in full cultivation in the 1850s [Kelly 1983:76]. Ranchers leased land below the railroad to graze cattle that they owned (Kelly 1983:1 1 1). Higher walls were built in the 1920s and 1930s to control animals. According to Joe Gomes, a longtime rancher in the area, Walls about 3 ft high can keep donkeys penned. The usual wall is about 4 V2 ft high and keeps cattle in. For goats you need a wall 6 to 8 ft high. For wild pigs you need a 6 to 8 ft -high wall. They climb over lower walls easily. They come down from the mountains for macadamia nuts and also in mango season for mangoes [Kelly 1983:112]. The Mahele With the coming of the Great Mahele (1848), the Alien Land Ownership Act 1850) and the Kuleana Act (1850), the traditional Hawaiian archetype of land -use was essentially deconstructed and replaced with the European concept of fee -simple land ownership (Chinen 1961:13). Article IV of the Board of Commissioners to Quiet Land Titles was passed in December 1845 and began the legal process of private land ownership. Through the Mahele of 1847-48 the Alien Land Ownership Act of 1850 and the Kuleana Act of 1850, land was made available for private ownership authorizing the sale of land in fee simple to resident aliens and the award of kuleana lands to native tenants. Thirteen Land Commission awards (LCA) were made in Wai`aha ls` and 2"d Ahupua`a, (Waihona `Aina 2019) all of them either along the coast or in the upland portion of the two ahupua 'a, above Mamalahoa Highway (Figure 6). 13 CONCLUSION DISCUSSION A single archaeological site (Site 31118), consisting of a dirt ranch road and a rock wall segment, was documented during the current study. The dirt road is depicted on The 1928 USGS Kailua quadrangle map and was constructed during the Historic era. The dirt road begins along the mauka (east) side of Holualoa Road and continues 1.3 km mauka almost to the railroad line. The makai (west) end of the dirt road is more substantially constructed than the remainder of the road. There are two small structures, likely water tanks, located along the dirt road. The 1959 USGS map labels the easternmost structure as a water tank, while the tank at the middle of the dirt road has been replaced by two water tanks at the west end of the dirt road. Only the west end of the dirt road is depicted in the 1959 map. The easternmost water tank depicted in the 1928 and 1959 maps is no longer accessible from the dirt road, but is accessed from Hienaoli Road above the tank. Holualoa Road was the main route between coastal Kailua Town and upland Holualoa Village. There are a number of water tanks depicted on the 1928 and 1959 USGS Kailua quadrangle maps in Wai`aha Ahupua'a and Pua'a Ahupua'a to the north. Water collection and storage were important elements of both sugarcane agriculture and cattle ranching. The dirt road most likely was constructed to service water tanks. The rock wall segment constructed along the edge of the dirt road was never completed, but might have been intended to keep cattle off of the road. SIGNIFICANCE ASSESSMENTS Sites identified during this project were assessed for their significance as outlined in Hawai`i Administrative Rules §13-275-6. To be assessed as significant a site must be characterized by one or more of the following five criteria: a) It must be associated with events that have made a significant contribution to the broad patterns of our history, or be considered a traditional cultural property. b) It must be associated with the lives of persons significant in the past. c) It must embody distinctive characteristics of a type, period, or method of construction, or represent a significant and distinguishable entity whose components may lack individual 31 distinction. d) It must have yielded or may be likely to yield, information important in prehistory or history. e) Have important value to native Hawaiian people or other ethnicities in the state, due to associations with cultural practices and traditional beliefs that were, or still are, carried out. Site 31118 possesses integrity of location, design, materials and workmanship and was evaluated as significant under criterion "d" as the site has yielded information important to Historic era ranching and sugarcane agriculture (Table 1). More specifically, the dirt road and rock wall segment were constructed to access and maintain water collection and storage tanks necessary for Historic era and early Modem era commercial agricultural and ranching. Table 1: Site Significance and Recommended Treatments. Site # Site Type Age Site Function Significance Criteria Recommended Treatment 31118 Wall & Road Historic to Modem Travel d No Further Work RECOMMENDATIONS No further work is recommended for Site 31118. Information recorded during the current study has adequately ascertained the timing and function of both features at the site. The features are associated with Historic era to Modem era ranching. Full documentation of the features is contained in this report, including relevant historical information, maps, figures, and descriptions. The proposed construction project determination is No Effect to Historic Properties. 32 REFERENCES CITED Athens, J., T. Reith, and T. Dye 2014 A paleoenvironmental and archaeological model -based age estimate for the colonization of Hawai`i. American Antiquity, 79(4):144-55. Barrera, W. 1971 Archaeological Excavations and Survey at Keauhou, North Kona, Hawaii. Bishop Museum Departmental Report Series 71-10. Submitted to Kamehameha Development Corporation. B.P. Bishop Museum, Honolulu. 1991 Archaeological Reconnaissance Survey: Wai `aha 2, North Kona, Hawai `i (TMK: 7-5-18: 7). Report prepared by Chiniago, Inc.. Berrigan, D., A. Haun, and D. Henry 2007 Archaeological Data Recovery, Sites 15512, 15513, 15515, 15516, 22041, 22042, and 22046, Land of Waraha 1, North Kona District, Island of Hawai'i. Haun and Associates Report 120 prepared for Tom Bolton, Kailua-Kona. 2010 Draft Archaeological Site Preservation Plan Sites 6302, 7861-7869, 7871, 7874- 7876, 7901, 7903, 7905, 7911, 11863, and 11872, Land ofKahalu'u, North Kona District, Island of Hawai `i (TMK: 7-8-10: POR. 4 & TMK: 7-8-14:56. Haun & Associates Report 783-101810 prepared for Towne Development of Hawai` i, Inc., Honolulu. Burtchard, G. C. 995 Population and Land -use on the Keauhou Coast, the Mauka Lands Inventory Survey, Keauhou, North Kona, Hawai `i Island, the Narrative, part 1. Submitted to Belt, Collins and Associates and Kamehameha Investment Corporation. IARII, Honolulu. Bevin, A., M. Elmore, and J. Kennedy 2004 An Archaeological Inventory Surveyfor TMK: 7-5-16: 31 and 35 (Pors.) in Wai `aha l' and 2nd Ahupua `a, North Kona District, Island of Hawai `i. Archaeological Consultants of the Pacific, Inc., Haleiwa. 33 Corbin, A., and B. Gothar 2001 Archaeological Inventory Survey, Walua Apartment Project, Land of Wai 'aha JSr North Kona District, Islandf llawai'i (TMK: 3-7-5-18:7). PHRI report prepared for Maryl Group, Inc. Cordy, R. 1981 A Study of Prehistoric Social Change: The Development of Complex Societies in the Hawaiian Islands. Academic Press, New York. Dye, T. 1995 Central Kona Archaeological Settlement Patterns. Department of Land and Natural Resources, State Historic Preservation Division, Honolulu. 2000 Exalted Sits the Chief Mutual Publishing, Honolulu. 2011 A model -based age estimate for Polynesian colonization of Hawai`i. Archaeology in Oceania, 46:130-38. Escott, G. 2016 Archaeological Field Inspection Letter Report for Four Proposed House Lots Totaling 3.44 Acres and 845.0 Meters of Existing Ranch Road Totaling 1.044 Acres Located on 24.676 Acres of Land in Wai 'aha Is: Ahupua'a, Kailua-Kona, North Kona District, Hawai `i Island [TMK: (3) 7-5-017:046 and 047]. SCS Letter Report #1951 prepared for Dan Bolton, Kailua-Kona. ESRI 2011 Arc GIS Explorer. Environmental Systems Research Institute, Redlands, Ca. Google Earth 2016 Google Earth Imagery. Google Earth. Mountain View, Ca. Hammatt, H. H., and S. D. Clark 1980 Archaeological Testing and Salvage Excavations of a 155 Acre (Ginter) Parcel in Na ahupua 'a Pahoehoe, La'aloa, and Kapala'alaea, Kona, Hawaii Island. ARCH Report 14-152 III. Submitted to Pacific Basin Resorts, Inc. Ilammatt, H.H., and W.H. Folk 34 1980 Archaeological Survey, Phase I: Portions of Keauhou-Kona Resort, Keauhou and Kahulu `u, Kona, HawaiI Island. ARCH Report 14-1771I.I. Submitted to Kamehameha Investment Corporation. Hammatt, H. H., and V. W. Meeker 1979 Archaeological Excavations and Heiau Stabilization at Kahalu'u, Kona, Hawaii Island. ARCH Report 14-172(I1). Submitted to Gerald Park, Urban Planner. Han, T. L., S. L. Collins, S. D. Clark, and A. Garland 1986 Moe Kau a Ho `oilo: Hawaiian Mortuary Practices at Keopu, Kona, Hawai `i. Chapter VII. Artifacts and Manuports from the Keopu Burial Site. Bishop Museum Departmental Report Series 86-1. Submitted to Department of Transportation, Honolulu. Handy, E.S.C. 1940 The Hawaiian Planter — Volume I. B.P. Bishop Museum Bulletin 161. Honolulu. I faun, A. 2008 Archaeological Inventory Survey TMK: (3) 7-5-17:Por. 4, Land of Wai `aha 2, North Kona District, Island of Hawai `i. Haun and Associates Report 580-022108 prepared for Mr. Stanly Gomes, Kailua-Kona. Haun, A. E., J. D. Henry, J. A. Jimenez, M. A. Kirkendall, K. Maly, and T. R. Wolforth 1998 Ali? Highway Phased Mitigation Program Phase I - Archaeological Intensive Survey, Summary, vol. 1. PHRI Report 1320-052798. Submitted to County of Hawai`i. PHRI, Hilo. Hawaii County Planning Department 2019 Hawai `i County TMK Maps. http://www.hawaiicounty.gov/tax- maps/current. Head, J., S. Goodfellow, and P. Rosendahl 1994 Archaeological Inventory Survey, Ali? Drive Sewer Project, Lands of Puapua 'a 2nd and 3'' and Wai 'aha I' and 2"d North Kona District, Island of Hawai `i TMK: 7-5-18, 7-8). 35 1 Hommon, R. J. 1986 Social Evolution in Ancient Hawai`i. In Island Societies: Archaeological Approaches to Evolution and Transformation, edited by P.V. Kirch, pp. 55-88. University Press, Cambridge. Kahn, J., Rieth, P. Kirch, J. Athens, and G. Murakami 2014 Re -dating of the Kuli`ou`ou rockshelter, Oahu, Hawai`i: Location of the first radiocarbon date from the Pacific Islands. Journal of the Polynesian Society, 123(1):67-90. Kelly, M. 1983 Na Mala o Kona: Gardens of Kona. Dept. of Anthropology Report Series 83-2. Bishop Museum. Honolulu. Kirch, P.V. 2011 When did the Polynesians settle Hawai`i? A re -view of 150 years of scholarly inquiry and a tentative answer. Hawaiian Archaeology, 12:3-26. Kirch, P.V. and M. McCoy 2007 Reconfiguring the Hawaiian Cultural Sequence: Results of re -dating the Halawa dune site (MO -A1-3), Molokai Island. Journal of the Polynesian Society, 116:385-406. Kouneski, E., D. Grant, and J. Kennedy 2006 An Archaeological Inventory Survey Report for TMK: 7-5-16:35 (Por.) in Wai `aha I' Ahupua `a, North Kona District, Island of Hawai `i. Archaeological Consultants of the Pacific, Inc. report for Mr. Brian Takeda, R.M. Towill Corp, Honolulu. Kuykendall, R.S. 1967 The Hawaiian Kingdom: the Kalakaua Dynasty. University of Hawai`i Press. Honolulu. Louisiana Sugar Planter's Association 1890 Louisiana Sugar Planter and Sugar Manufacturer Weekly Newspaper. September 6, 1890, Vol. V, No. 10:174). Maly, K. 1993 Ka 'ao Ho 'oniva Pu `uwaino Kamiki: The Heart Stirring Story of Ka-Miki. Translation prepared for Paul H. Rosendahl, Ph.D., Inc. Hilo. 36 1996 Historical Documentary Research. In Archaeological Inventory Survey Proposed Henry Street Extension Road Corridor, by Wulzen, W., T.R. Wolforth, and L.J. Franklin, pp. 9-19. PRHI Report 1465-092696. Prepared for Maryl Development, Kailua-Kona. PHRI, Hilo. Maly, K. and Maly, 0 2001 He Wahi Mo 'olelo No Na `aina, A Me Na Ala Hele I Hehi 'Ia, Mai Keauhou A I Kealakekua, Ma Kona, Hawai'IA Historical Overview of the Lands, and Trails Travelled, Between Keauhou and Kelalakekua, Kona, Hawai`i. Prepared for NA Ala Hele Program Manager (Hawai`i Island), State Division of Forestry and Wildlife, P.O. Box 4849, Hilo, Hawai`i 96720. McCoy, M. 2005 The development of the Kalaupapa field system, Koloka`i Island, Hawaii. Journal of the Polynesian Society, 116:339-58. 2007 Revised late Holocene culture history for Molokai Island, Hawai`i. Radiocarbon, 49(3):1273-1322. Mulrooney, M, S. Bickler, M. Allen, and T. Ladefoged 2011 High -precision dating of colonization and settlement in East Polynesia. Proceedings of the National Academy ofSciences, 108:E192 -E194. National Geographic, Topo! 2003 Seamless USGS Topographic Maps on CD-ROM, Hawai `i. National Geographic Holdings, Inc. Washington, D.C. Newman, T. S. 1970 Hawaiian Fishing and Farming on the Island of Hawaii A.D. 1778. Department of Land and Natural Resources, Honolulu. Nordyke, E. 1989 The Peopling ofHawai`i: Second Edition. University of Hawai`i Press, Honolulu. Pukui, M.K., S.H. Elbert, and E.T. Mookini 1974 Place Names ofHawaii. University of Hawaii Press, Honolulu. 37 Rechtman, R. 2002 An Archaeological Inventory Survey of TMK: 3-7-5-18:08, Wai 'aha P' Ahupua'a, North Kona District, island ofHawai `i. Rechtman Consulting, LLC report prepared for Dan Bolton, Kailua-Kona. Rieth, Timothy M., Terry L. Hunt, Carl Lipo, and Janet M. Wilmshurst 2011 The 13th Century Polynesian Colonization of Hawai`i Island. Journal of Archaeological Science 38:2740-2749. Sato, H., W. Ikeda, R Paeth, R Smythe, and M. Takehiro Jr. 1973 Soil Survey of Island of Hawaii, State of Hawaii. United States Department of Agriculture Soil Conservation Service. Washington D.C. Schilt, R. 1984 Subsistence and Conflict in Kona, Hawai `i: An Archaeological Study of the Kuakini Highway Realignment Corridor. Department of Anthropology, B.P. Bishop Museum, Honolulu. Report prepared for the Hawai` i Department of Transportation. On file at the SHPD Library, Kapolei. Soehren, L. 1979 Reconnaissance Survey, TMK: 7-5-18:5 & 29. Wai `aha 2, North Kona, Hawai `i. Captain Cook, Hawai`i. 1981 Archaeological Reconnaissance Survey: Wai 'aha 1, North Kona, Hawai `i (TMK: 7-5-18:20 and 87). Captain Cook, Hawai`i. Starr Environmental 2016 Botanical and Faunal Surveys in the State of Hawaii. Makawao. www.starrenvironmental.com. Tainter, J. A. 1973 The Social Correlates of Mortuary Patterning at Kaloko, North Kona, Hawaii. Archaeology and Physical Anthropology in Oceania 8(1):1-11. Titus Coan Memorial Library 38 2019 Missionaries, Profiles, Seth Lthrop Andrews, M.D. — 8th Missionary Company 1837. https://www.tc-lib.org/Missionaries/Profiles/AndrewsSL.html. Tomonari-Tuggle, M. J. 1990 Archaeological Inventory Survey of Development Parcel 26 of the Keauhou Resort, Ahupua 'a of Kahalu'u, North Kona, Island of Hawai '1. Prepared for Belt Collins and Associates. International Archaeological Research Institute, Inc. Honolulu. U.S. Geological Survey 1928 15 -Minute Series Topographic Hilo Quadrangle Map. USGS Print, Washington, DC. URL: http://geonames.usgs.gov/pls/topomaps/. Waihona `Aina 2019 MAhele online database. www.waihona.com. Wilkes, C. 1845 Narrative of the United States Exploring Expedition During the Years 1938-1842. Vols. 1-5 and Atlas. Lea & Blanchard. Philadelphia. Wilmhurst, J., T. Hunt, C. Lipo, and A. Anderson 2011a High -precision radiocarbon dating shows recent and rapid colonization of East Polynesia. Proceedings of the National Academy of Sciences, 108:1815-20. 2011b Reply to Mulrooney et al.: Accepting lower precision radiocarbon dates results in longer colonization chronologies for East Polynesia. Proceedings of the National Academy of Sciences, 108:E195. Wolfe, E.W., and J. Morris 1996 Geological Map of the Island of Hawai` i. U.S.G.S. Miscellaneous Investigations Series. Department of the Interior, Washington, D.C. 39 TRAFFIC IMPACT ANALYSIS REPORT ALAKA'I ACADEMY CHILD DEVELOPMENT CENTER 75-477 Hualalai Road Kailua Kona, Hawaii, Hawaii TMK: (3) 7-5-017: 045 Prepared for: Pablo Penaloza 75-378 Nani Kailua Drive Kailua Kona, HI 96740 November 4, 2020 Island Engineering, LLC PO Box 283 Pahoa, HI 96778 808) 756-6825 jross@islandengineeringlIc.com sY S. LICENSEDPROFESSIONALENGINEER No. 17089-C Nit II, EAt 1 1 3o I2 Z TRAFFIC IMPACT ANALYSIS REPORT ALAKA'I ACADEMY CHILD DEVELOPMENT CENTER Kailua-Kona, Hawai'i, Hawai'i I. INTRODUCTION This report documents the findings of a traffic study to evaluate the potential traffic impacts resulting from the proposed relocation of Alaka'i Academy, which will include approximately two acres of various school facilities, located in Kailua-Kona, County and Island of Hawai'i, Hawai'i. A. Project Description The project plans to relocate the existing school operation to a proposed facility on an undeveloped 5.352 acre flag lot fronting Hualalai Road. The project location and vicinity are shown in Figure 1. The project will include construction of three buildings holding classrooms, administration, and cafeteria, totalling 10,900 square feet. Proposed plans also include a parking lot, landscaping, and outside playgrounds. It is proposed to have a maximum of 55 students and 11 faculty members. The proposed site plan is shown in Figure 2. B. Location The project is located in Kailua-Kona, on the island of Hawai'i, on the north side of Hualalai Road between Queen Ka'ahumanu Highway (State Route 11) to the west and Mamalahoa Highway (County Route 180) to the east. The site is bordered by Innovations Public Charter School to the north and undeveloped agriculture zoned properties to the south, west, and east. The project site is more specifically identified as TMK (3) 7-5-017: 045, Lot B-2, Portion of Waiaha Ridge Subdivision. C. Study Methodology The study will address the following: 1. Existing traffic operations, specifically turning movements, at key locations within the study area during the AM and PM weekday peak hours of traffic. 2. Traffic projections for Base Years 2025, 2030, and 2040 (without the project) including traffic generated by an annual growth rate of 0.7%. 1 PACIFIC OCEAN PROJECTLOCATION PROJECT LOCATION k 2 al sr— N HAM PACI=IC OCEAN 92C- 5 - PACIFIC y PACIFIC OCEAN ELAND OF HAWAII STATE OF HAWAII BIG ISLAND MAP NOT TO SCALE NOT TO SCALE ALAKA'I ACADEMY CHILD DEVELOPMENT CENTER LOCATION MAP FIGURE 1 Island Lngineering, LLC P.O. fox 283 Pai oa, HawaN 96776 1'0,11.12-'0VP'111.3202400a..1,10,0•112C01,002(0009,0X00.0,t301Base80•mon03Vu) FLA • StowSe1,200.40).A2ISPPlotDate. October5.2020 I IALAKA/1ACADEMY 75-477HUALALAIROAD KAILUAKONA, HAWAII96740 0)73017: OALOT $2 3. Traffic projections for Future Years 2025, 2030, and 2040 (with the project) to determine the potential impacts to existing traffic volumes and intersection functionality. 4. Due to the COVID-19 pandemic, special considerations have been made to inflate the existing traffic volumes to include visitor and school related traffic. D. Analysis Methodology The National Cooperative Highway Research Program (NCHRP), Web -only Document 193, Development of Left -turn Lane Warrants for Unsignalized Intersections, was used for determining the left -turn lane warrant from Hualalai Road onto the project access road (Kakalina Street). The 2010 Highway Capacity Manual, Volume 3, Chapter 19 was used for determining Level of Service (LOS) based on control delay for turning movements at the Hualalai Road and SR 11 intersection. Queue Iengths were also analyzed to determine existing turn lane adequacy. II. EXISTING CONDITIONS A. Roadway System The following are brief descriptions of the existing roadways in the vicinity of the project: Hualalai Road (County) is generally an east -west, two-lane, two-way, minor collector roadway. This roadway begins on SR 11 and terminates to the east at CR 180. The roadway is undivided with passing restricted and a posted speed limit of 25 miles per hour (mph). SR 11, (State), in the study area, is generally a north -south, two-lane, two-way highway. The subject intersection of Hualalai Road and SR 11 is bounded by signalized intersections to the north and south at Nani Kailua Drive and Puapuaanui Street, respectively. This roadway is undivided with a posted speed limit of 55 mph. B. Existing Traffic Volumes The Weekday Morning (AM) and Weekday Evening (PM) peak hour traffic data utilized in this report was collected on Monday, June 16th, 2020. Based on this traffic count data, the weekday AM peak hour of traffic was determined to be from 7:00 AM to 8:00 AM and the weekday PM peak hour of traffic was determined to be from 3:30 PM to 4:30 PM. The field traffic count data is provided in Table A-1, Appendix A. C. COVID-19 Pandemic and School Closure Impacts to Report Findings 4 It shall be noted that the traffic count data collected in the field is not representative of normal operations due to the ongoing (at time of study) COVID-19 pandemic. Visitor and school traffic could not be accounted for due to travel restrictions and school closures. The approach of this study is to use local resources, statistics, and data to conservatively estimate traffic under normal operations. According to the Hawai'i Tourism Authority Release 20-182, dated September 28, 2020, Hawai 'i Visitor Statistics Released for August 2020, through the first eight months of 2020, visitor arrivals dropped 66.8 percent. Data regarding visitor distribution to the island could not be found. To be conservative, SR 11 traffic counts have been inflated by 100 peak hour trips (approximately 20 percent) to include visitor generated traffic. Hualalai Road is a minor collector that receives mostly local traffic; therefore, the existing traffic counts have been inflated by 10 percent. According to the Hawai'i State Department of Education, the Kailua-Kona area has eight schools (public and private) with approximately 2,000 students enrolled. The traffic counts have been inflated by 10 percent to include school generated traffic. The inflated traffic count data is provided in Table B-1, Appendix B. NOTE: For the remainder of this report, EXISTING refers to the INFLATED traffic volumes. D. Existing Traffic Conditions Analysis and Observations at SR 11 Intersection The existing intersection at SR 11 and Hualalai Road is three-legged with stop sign control on Hualalai Road. Southbound SR 11 has a dedicated 425 -ft long left -turn lane with a 135 -ft taper and a 125 -ft long acceleration lane with a 165 -ft taper for left turns from Hualalai Road. Northbound SR 11 is a through lane with a triangular island on Hualalai Road with a yield sign (for right turns), giving the south bound left turn movement the right-of-way. The intersection was observed to operate with minor delay during both the AM and PM peak hour of traffic. The SR 11 left -turn lane was observed to have a maximum of three (3) vehicles during the AM and PM peak hour of traffic. The left -turn lane has storage capacity of approximately seventeen (17) vehicles (25 -ft per car; 425 -ft long left turn lane). The left - turn lane was observed to operate at LOS A (AM) and LOS B (PM). Hualalai Road has dedicated 250 -ft long right and left -turn lanes for turning movements onto SR 11. The right and left -turn lanes were observed to have a maximum of two (2) vehicles during the AM and PM peak hour of traffic. The right and left -turn lanes have storage capacity of ten (10) vehicles. The left turn movement was observed to operate at LOS B for both AM and PM. The right turn movement was observed to operate at LOS C for both AM and PM. Table 1 below provides the volume -to -capacity (v/c) for the through lanes of SR 11. Table 1. Existing Volume -to -capacity ratios for SR 11 Approach AM Peak Hour PM Peak Hour V/C V/C SR 11 Southbound 0.38 0.65 SR 11 Southbound 0.59 0.50 The study intersection is currently operating with minor delays and traffic queues at an overall LOS C. Table 2 below provides the existing delay (seconds), 95th percentile queue lengths (vehicles), and LOS for the study intersection. Existing traffic volumes and lane configurations are shown in Figure 3. Table 2. Existing Level of Service For Turning Movements at SR 11 / Hualalai Road Intersection Approach AM Peak Hour PM Peak Hour Delay 95% Q LOS Delay 95% Q LOS SR 11 Left Turn 9 0.2 A 11 0.1 B Hualalai Rd Right Turn 23 0.1 C 20 0.1 C Hualalai Rd Left Turn 14 0.0 B 14 0.0 B OVERALL 16 C 15 B 6 CCI r V 0 CD Q 1-4 f 0 CNO) co Q 0) CD 34 (AM) 58 (PM) 10 (AM) 10 (PM) Y HUALALAI ROAD 14 (AM) 10 (PM) ALAKA'I ACADEMY EXISTING LANE CONFIGURATIONS AND TRAFFIC VOLUMES Island Engineering, LLC. CHILD DEVELOPMENT CENTER P.p. Fbox1283 Pah.,1 lawai'i 90778FIGURE3 E. Existing Traffic Conditions Analysis and Observations at Kakalina Street The project site intersects Hualalai Road on Kakalina Street (private). The access has satisfactory geometry (90 -degrees) and adequate stopping sight distance in both directions along Hualalai Road. At the intersection, Kakalina Street is a 28 -ft wide paved road with radius returns connecting to Hualalai Street with a stop bar and stop sign. There is currently no dedicated left or right turn lanes onto Kakalina Street. Volume -to -capacityratiosareshowninTable3below. Table 3. Existing Volume -to -capacity ratios for Hualalai Road Approach Westbound LEastbound AM Peak Hour I PM Peak Hour V/C I V/C 0.02 0.04 0.03 0.01 III. PROJECT 'TRIP GENERATION Future traffic volumes generated by a project are typically estimated using the methodologydescribedintheTripGenerationManual, 10 Edition published by the Institute of Transportation Engineers (ITE). This method uses trip generation rates to estimate the number of trips that the project will generate during the peak hours. From the ITE manual, land use code 565 (Daycare Center) was assigned. Table 4 below provides the estimated trips generated by the proposed project for AM and PM peak hours based on 55 students. Land lise Daycare Center ITE 565) Table 4. Project Trip Generation Independent Variable Trips Per Variable AM Peak Hour 55 Students J 8 PM Peak Hour 0.79 0.81 The total trips generated for the project are 44 (AM) and 45 (PM). Hawai'i County Code25-2-46 (d) requires 5-, 10-, 20 -year projections if project trip generations exceed 50 peak hour trips. The proposed development does not exceed this threshold; however, the code has been followed for the purposes of this report. IV. BASE YEAR 2025, 2030, AND 2040 INTERSECTION TRAFFIC ANALYSIS A. Growth Rate An annual growth rate of 0.7% was used in forecasting base year 2025, 2030, and 2040 without project generated traffic volumes. B. Results of Intersection Analysis for Base Year 2025 Traffic conditions at the study intersection without the proposed development would result in a change to overall LOS C for the PM peak hour. See Table 5 below. Base Year 2025 traffic volumes and lane configurations are shown in Table C-1, Appendix C and Figure 4. Table 5. Base Year 2025 Without Development Level of Service For Turning Movements at SR 11 / Hualalai Road Intersection Approach AM Peak Hour PM Peak Hour Delay 95% Q LOS Delay 95% Q LOS SR 11 Left Turn 9 0.2 A 12 0.1 B Hualalai Rd Right Turn 24 0.1 C 21 0.1 C Hualalai Rd Left Turn 15 0.0 B 15 0.0 B OVERALL 16 C 16 C C. Results of Intersection Analysis for Base Year 2030 Traffic conditions at the study intersection without the proposed development would result in no change to overall LOS. See Table 6 below. Base Year 2030 traffic volumes and lane configurations are shown in Table C-2, Appendix C and Figure 5. 9 Table 6. Base Year 2030 Without Development Level of Service For Turning Movements at SR 11 /Hualalai Road Intersection Approach AM Peak Hour PM Peak Hour Delay 95% Q LOS Delay 95% Q LOS SR 11 Left Turn 10 0.2 A 12 0.1 B Hualalai Rd Right Turn 25 0.1 C 21 0.1 C Hualalai Rd Left Turn 15 0.0 B 15 0.1 B OVERALL 17 C 16 C D. Results of Intersection Analysis for Base Year 2040 Traffic conditions at the study intersection without the proposed development would result in no change to overall LOS. See Table 7 below. Base Year 2040 traffic volumes and lane configurations are shown in Table C-3, Appendix C and Figure 6. Table 7. Base Year 2040 Without Development Level of Service For Turning Movements at SR 11 / Hualalai Road Intersection Approach Delay AM Peak Hour 95% Q PM Peak Hour LOS Delay 95% Q LOS SR 11 Left Turn 10 0.2 A 12 0.1 B Hualalai Rd Right Turn Hualalai Rd Left Turn 27 0.2 D 23 0.1 C 16 0.1 C 16 0.1 OVERALL 18 C 17 C C l0 V) N Q CO CL Q 0) 0 rn OrnO I10 (AM) 10 (PM) HUALALAI ROAD 15 (AM) 10 (PM) ALAKA'I ACADEMY CHILD DEVELOPMENT CENTER BASE YEAR 2025 LANE CONFIGURATIONS AND TRAFFIC VOLUMES Island Engineering, LLC. P.O. box 283 FIGURE 4 rAoa, Flawai'i 9.5778 a r) N n V a_ O L(7) 36 (AM) 61 (PM) N O) ON 10 (AM) 10 (PM) HUALALAI ROAD ALAKA'I ACADEMY CHILD DEVELOPMENT CENTER BASE YEAR 2030 LANE CONFIGURATIONS AND TRAFFIC VOLUMES FIGURE 5 Island Engineerin-, LLC. P.O. bo' 285 Pakoa, I ;awai'i 96778 0 0N) 0_ l'1 r/1 J 38 (AM) 64 (PM) 1 11 (AM) 11 (PM) HUALALAI ROAD ALAKA'I ACADEMY CHILD DEVELOPMENT CENTER BASE YEAR 2040 LANE CONFIGURATIONS AND TRAFFIC VOLUMES FIGURE 6 Isiand Engineering, LLC, P.O. box 283 rakoa, hawai'i 96776 V. FUTURE YEAR INTERSECTION TRAFFIC ANALYSIS WITH DEVELOPMENT A. Results of Intersection Analysis for Future Year 2025 with Development Traffic conditions at the study intersection with the proposed development would result in no change to overall LOS. See Table 8 below. Future year 2025 traffic volumes can befoundinTableD-1, Appendix D and Figure 7. Table 8. Future Year 2025 With Development Level of Service For Turning Movements at SR II / Hualalai Road Intersection Approach AM Peak Hour PM Peak Hour Delay 95% Q LOS Delay 95% Q LOS SR 11 Left Turn 10 0.3 A 12 0.2 B Hualalai Rd Right Turn 26 0.4 D 23 0.2 Hualalai Rd Left Turn 16 OVERALL 18 0.1 C 15 C 17 0.1 C B C B. Results of Intersection Analysis for Future Year 2030 with Development Traffic conditions at the study intersection without the proposed development would result in no change to overall LOS. See Table 9 below. Future year 2030 traffic volumes can be found in Table D-2, Appendix D and Figure 8. 14 Table 9. Future Year 2030 With Development Level of Service For Turning Movements at SR 11 / Hualalai Road Intersection Approach AM Peak Hour PM Peak Hour Delay 95% Q LOS Delay 95% Q LOS SR 11 Left Turn 10 0.312 A 12 0.2 B Hualalai Rd Right Turn 28 0.4 D 24 0.2 C Hualalai Rd Left Turn 16 0.1 C 16 0.1 C OVERALL 18 C 18 C C. Results of Intersection Analysis for Future Year 2040 with Development Traffic conditions at the study intersection without the proposed development would result in no change to overall LOS. See Table 10 below. Future year 2040 traffic volumes can be found in Table D-3, Appendix D and Figure 9. Table 10. Future Year 2040 With Development Level of Service For Turning Movements at SR 11 / Hualalai Road Intersection Approach AM Peak Hour PM Peak Hour Delay 95% Q LOS Delay 95% Q LOS SR 11 Left Turn 10 0.3 A 13 0.2 B Hualalai Rd Right Turn 31 0.5 D 26 0.3 D Hualalai Rd Left Turn 17 0.2 C 16 0.1 OVERALL 20 C C 19 C 15 a CDN cD 0_ N) M 58 (AM) 84 (PM) 28 (AM) 21 (PM) HUALALAI ROAD ALAKA'I ACADEMY CHILD DEVELOPMENT CENTER FUTURE YEAR 2025 LANE CONFIGURATIONS AND TRAFFIC VOLUMES FIGURE 7 Island Engineering, LLC P.Q. Sox 28 j rakoa, t1awai'i 96778 CL N a_ if) tom) N - f 1-4 59 (AM) 85 (PM) 28 (AM) 21 (PM) N Q) Q ON HUALALAI ROAD ALAKA'I ACADEMY CHILD DEVELOPMENT CENTER FUTURE YEAR 2030 LANE CONFIGURATIONS AND island Engineering, LLCTRAFFICVOLUMES FIGURE 8 P.O. box 283 Pakoa, r'jawai'i 90778 CD r` a_ r` r\ 61 (AM) 89 (PM) I- 29 (AM) 22 (PM) HUALALAI ROAD ALAKA'I ACADEMY CHILD DEVELOPMENT CENTER FUTURE YEAR 2040 LANE CONFIGURATIONS AND Island Engineering, LLC. TRAFFIC VOLUMES FIGURE 9 P.O. za 3 Pahoa, rjawai'i 56778 VI. HUALALAI ROAD — KAKALINA STREET LEFT -TURN WARRANT ANALYSIS Many procedures are currently in use by various organizations to determine the need for left -turn lanes, and most criteria are based on AASHTO's Green Book or NCHRP Report 279, both of which are based on work done by M. Harmelink in the 1960s and included in the NCHRP Document 193 used in this report. Warrants based on safety have been selected for the purposes of this report. The traffic volumes on Hualalai Road are below the thresholds of the studies referenced in the NCHRP report. See Figures 10 — 11 and Table 11 below for the left -turn warrant. Advancing volume (VA)—the total peak hourly volume of traffic on the major road approaching the intersection from the same direction as the left -turn movement underconsideration. Left -turn volume (VL)—the portion of the advancing volume that turns left at theintersection. Percent left turns (PL) --the percentage of the advancing volume that turns left; equal to the left -turn volume divided by the advancing volume (PL = [VLA VA) x 100). Straight -through volume (Vs)—the portion of the advancing volume that travels straightthroughtheintersection (VL + Vs = VA). Opposing volume (Vo)—the total peak hourly volume of vehicles opposing theadvancingvolume. Lcll Turning Volume im`Advancing Volume imSaarght•ThroughV.) Volume IVO Opposing VolumeVim) Figure 10. Volumes for use in left -turn lane warrant methods. 19 Table 11. Left -turn Warrant Movements for Future Years w/ Development 2025 VA (vph) 99 AM Peak Hour 2030 101 2040 104 Vo (vph) 53 54 57 VL (vph) 35 35 35 Vs (vph) 64 66 69 36 35 34 Table 2. AASHTO (S) guide for left- OperatingSpeed mph) OpposingVolume veh/hr) Advancing veh/hr) veh/hr) 5% LeftTurns 10% LeftTuras 20% LeftTurns 30% LeftTurns 40 800600400200100 330410510640720 240305380470515 180225275350390 160200245305340 50 800 600400200100 280 350430550615 210260320400445 165195240300335 135170210270295 60 800600400200100 230290365450505 170210270330370 125160200250275 115140175215240 NCHRP Report 279 Figure 1 I . AASHTO Guide for Left -turn Lanes on Two-lane Highways 20 VII. CONCLUSION AND RECOMMENDATIONS A. SR 11/Hualalai Road Study Intersection The three-legged study intersection currently operates at LOS C with left and right turn lanes experiencing minor delays during both the AM and PM peak hour. The existing turnlanesappeartohaveadequatelength. The overall LOS for the study intersection is forecast to continue operating at overall LOS C with the proposed development. Based on the findings of this study, no mitigation is required at the study intersection. B. Hualalai Road/Kakalina Street Study Intersection The proposed project site is located in the Waiaha Ridge Subdivision. The subject parcel and surrounding parcels are zoned Ag -5A. The private subdivision road, Kakalina Street, serves several other parcels within the subdivision. At the time of this study, there are no known developments occurring which may impact traffic at the study intersection. Hualalai Road is a County minor collector and is currently well below capacity. Currently, no left -turn lane is present into the subdivision. Based on the NCHRP Document 193, left -turn lanes should be considered mostly on arterial roadways with high volume and higher speed limits. The following factors were considered for the left - turn lane warrant: Speed limit Volume -to -capacity ratio Development generated traffic Sight distance Green Book methodology and various studies Based on the findings of this study no mitigation is required at the study intersection. C. Traffic Management Plan Alaka'i Academy operates differently from a standard school regarding traffic peak hours. Standard school operations have a specific window in which students are dropped off and picked up. This window is usually very short which concentrates congestion to a short time during the peak hours. According to the school director, drop off times in the morning are from 7:00 AM to 9:30 AM and pick up times in the afternoon are from 2:00 PM to 5:30 PM which will potentially offset the peak hour traffic generated from the proposed development. 21 I • APPENDIX A Major Street Highway 11 Table A-1 — Field Traffic Count Data Unsignalized Intersection: June 16, 2020 7:00 am — 7:15 am 7:15 am -7:30 am 7:30 am — 7:45 am 7:45 am -8:00 am 8:00 am -8:15 am 8:15 am -8:30 am 8:30 am -8:45 am 8:45 am — 9:00 am 3:00 pm —3:15 pm 3:15 pm -3:30 pm 3:30 pm — 3:45 pm 3:45 pm — 4:00 pm 4:00 pm — 4:15 pm 4:15 pm 4:30 pm 4:30 pm — 4:45 pm 4:45 pm -5:00 pm South Leg (Northbound Approach) RIGHT THRU North Leg (Souththbound Approach) LEFT 0 215 0 213 2 218 0 206 3 209 0 211 3 215 0 178 1 175 0 173 0 175 2 174 1 178 0 180 2 161 0 159 Minor Street Hualalai Road East Leg (Westbound Approach) THRU 6 119 4 116 5 120 7 125 10 130 5 129 7 130 9 131 0 237 0 239 0 236 1 235 1 236 2 237 0 237 0 243 RIGHT LEFT 7:00 am -7:15 am 7:15 am -7:30 am 7:30 am -7:45 am 7:45 am — 8:00 am 8:00 am — 8:15 am 8:15 am — 8:30 am 8:30 am -8:45 am 8:45 am — 9:00 am 2 1 3 0 5 0 7 2 5 1 7 1 7 0 6 1 3:00 pm — 3:15 pm 3:15 pm -3:30 pm 3:30 pm — 3:45 pm 3:45 pm — 4:00 pm 4:00 pm -4:15 pm 4:15 pm -4:30 pm 4:30 pm — 4:45 pm 4:45 pm — 5:00 pm 9 0 12 2 10 1 8 0 9 1 10 1 12 1 11 0 APPENDIX B o • Table B-1. Existing Traffic Peak Hour Volumes (vph) Road Segment SR 11 Approach AM Peak Hour Southbound 676 Northbound 1059 Left Turn 48 Right Turn Hualalai Road 14 Westbound 43 Eastbound 62 Left Turn 10 Right Turn 34 PM Peak Hour 1169 892 10 10 67 19 10 58 APPENDIX C Table C -I. Base Year 2025 Traffic Peak Hour Volumes (vph) Road Segment SR 11 Approach AM Peak Hour PM Peak Hour Southbound Northbound 695 1090 1203 917 Left Turn 49 10 Hualalai Road Right Turn Westbound 15 44 10 69 Eastbound Left Turn Right Turn 64 10 35 20 10 59 Table C-2. Base Year 2030 Traffic Peak Hour Volumes (vph) Road Segment Approach AM Peak Hour PM Peak Hour SR 1 Southbound 713 1237 Northbound 1120 942 Left Turn 51 10 Right Turn 15 10 Hualalai Road Westbound 46 71 Eastbound Left Turn 66 10 20 10 Right Turn 36 61 Table C-3. Base Year 2040 Traffic Peak Hour Volumes (vph) Road Segment Approach AM Peak Hour PM Peak Hour SR 11 Southbound 750 1305 Northbound 1181 993 Left Turn 54 11 Right Turn 16 11 Hualalai Road Westbound 48 75 Eastbound 70 21 Left Turn 11 11 Right Turn 38 64 APPENDIX ll Table D-1. Future Year 2025 w/ Development Traffic Peak Hour Volumes (vph) Road Segment SR 11 Approach Southbound AM Peak Hour 695 PM Peak Hour 1203 Northbound Left Turn Right Turn 1090 73 26 917 34 21 Hualalai Road Westbound 53 78 Eastbound 99 55 Left Turn 28 21 Right Turn 58 84 Table D-2. Future Year 2030 w/ Development Traffic Peak Hour Volumes (vph) Road Segment SR 11 Approach AM Peak Hour PM Peak Hour Southbound 713 1237 Northbound Left Turn 1120 75 942 35 Right Turn Hualalai Road 26 21 Westbound 54 80 Eastbound Left Turn 101 28 56 21 Right Turn 59 85 Table D-3. Future Year 2040 w/ Development Traffic Peak Hour Volumes (vph) Road Segment SR 11 Approach Southbound AM Peak Hour 750 PM Peak Hour 1305 Northbound Left Turn 1181 77 993 35 Hualalai Road Right Turn Westbound Eastbound Left Turn Right Turn 27 57 104 29 61 22 84 57 22 89 ProtDateSeptember30. 2020 2 8 aa xi ALAKA' I ACADEMY LOCATION MAP NCR , O SCALE KAUM NOW r i7 avn; LANAI PICK OCEJA or Hawaiian 151and5 75- 477 HUALALAI ROAD KAILUA KONA, HAWAII 96740 TAX MAP KEY: ( 3) 7- 5- 017: 045, LOT B-2 2020 VICINITY MAP WIT TO SCALE CILLI. uu •••••••••••••••••••• •••• PROJECT DIRECTORY ARCH! IC' Associates. LLC 1010 bNsuv:OIUrSI IONIC r1411014m MONOKN. vnN40 rmmm a MU WELL TON LOCA ns V¢ wm . w. xi DUCCCOM, G^. TSI prtaxtr..5.0.oces,20:,100ono, widen, mcovic.Q4300opk0..10, tosi. oldfl$+43OVNoshootse200,400A3.€tamg 8 5 00 KAILUAKONA, HAWAII96740 75-477HUALALAIROAD1111: ALAKA1ACADEMY 41)7541700LO,112 NEP' MeV 0 YYMMUC51011,",. QQU.CON+.,...a.A•C«+.aD.7,7.x0...301s....0670"...." • b..e5Q '..ODA2s•.wyPlotDateOctober5, 2020 Pi 0 ALAKNIACADEMY 75-477HUALAIAIROAD KAILUAKONA, HAWAII96740 9) 73017: 045.095a2 E 237i "* nR. PlotDate: September30. 2020 r R S3 I. x E 4 S a 4 CHILD CARE FACILITY ZONING ASa ACRICUV- URAL SPECIAL PERMIT REQUIRED ECR 1. 1110 CARL CARTER HEIGHT LIMIT = A501 MINIMUM BJILDING SITE AREA 5 ACRES IRON' SETBACK • 360' REAR SE 19ACK = - Cr SIDE SETBACK = 200' PARKING - DAYCARE CENTERS UNE FOR EACH TEN CARE RECIPIENTS OF DEMON CAPACITY OR ONE FOR EACH 200 SQUARE FEET CF GESOSE AREA. WMCHFVER IS GREATER HON-= 2 CLASSROOM = 33 SINAL NTS NUNS = 2 CLASSROOM = 32 STUDENTS REE • 2CLASSROOM - A6 STUDENTS NA' lA = 2 CLASSROOM = 46 STUDENTS GAL - 160 S' UDEER6 160 STUDENTS 110 • 16 PARKING STALLS OR 5 e26 SF. r 202 = 5163 = 55 PARKING STA1LS PARKING STALLS PROVIDED LOTA = 2a STALLS LOT 8 L. 21 STALLS TOTAL - 15 STALLS S. DUES NOT COUPES POSSIBL F SCLUTICIL REQUEST VARIANCE FROM PLANNING DEPT LOADING SPACE • ! REQUIRED 10.. 27-0' LF- TOOOECsr LOADING SPACE = I REQUIRED 12-0'•50'01 5. 001 - 10'500S.F RAWAJ REVISED STATUTES • TT, 17 Chapter 865 • L ICE N51W ( 1F INFANT AND TCODLER CHILDCARE CENTER SECTION 17 - 065 - AI ICRRIOEA7 THERE JRAi-, BE ( HIHTYrNE SQUARE FEET PER CHIC OF UNENCUMBERED INSTRUCTIONAL OR PLAY AREA EXCLUSIVE OF BATHROOMS. KITCHENS. CUPBOARD SPACE. HALLWAYS. AND SPACES CONSUMED BY CRIBS AND PLAYPENS SECTION 1749541 I440111101 THE THIRTY FIVE SOUARE FEET PER 06120 REOUIREMEW CAN BE BASED ON TIRE GENERAL SQUARE FOOTAGE OFTHE ENTIRE CENTER. NOT NECESSARILY BASED ON THE SQUARE FOOTAGE OF EACH CLASSROOM AND. SECTION 17. 095- 41 ( aAUA! EC) LANAI AREA WI CH HAS BOTH A 603+ MD FINISHED FLOORING. MAY BE COURIE0 FOR UP TO TTIRTY PER CENT OFTHE REOUIRI TT P50105ED AREA SECTION 1769641 ( 45155 THE CENTER SHALL IAAINTAIN OR HAVE ACCESS TO. AN 0575006 PLAY AREA OF AT LEAST SEVENTY- FIVE SQUARE • EETFOR EACH CHILD USING THE OUTDOOR AREA AT ANY TIME. AND SECTION 17- 95. 41 ( 0012) LANAI AREA. Y. MEN NOT INCLUDED INTIIC REQUIRED ENCLOSED PLAY AREA, MAY BF COUNTED FOR UP 70 THIRTY PER CENT OF THE RECURRED OUTDOOR SPACE OCCUPANCY TYPE : HE USE Of A BUILDING OR STRUCTURE. OR PORTION THEREOF. FOR EDUCATIONAL. SUPERVISION OR PERSONAL CARE SERVICES FOR MORE THAN FIVE CHILDREN OLDER IRAN 2- 10 YEARS OF AGE SHALL BE CLASSIFIED AS A GROVE E OCCUPANCY. DAY CARE SPACES WITH AN OCCUPANT LOAD CF TEN OR MORE SHALL HAVE TWO MEANS Cr EGRESS FLOOR PLAN - CHILD CARE CALL1/31• -tea CODE ANALYSR. 70001 INTERNATIONAL BULGING CODE SECTION 305S,, USE TYPE E' EDUCATION GROUP • THE JSE OF A KM CIN5 UR S IRUCTURE: ki PORTION 1, E REO' ( CLASSROOM SPACES( FOR EDUCATIONAL. SUPERVISION CR PERSONAL CARE SERVICES FOR MORE THAN FIVE CHILDREN 010ER THAN 2- 1C2 3, AHS Of AGE. SHALL BE CLASSIFIED AS A GROUP E OCCUPANCY BUS Na? Gkp F• pNFOBBY RECEPTION PRIVATE CFFICES STAT: LGiNG. ETF. RTA K1. CHEN S- 2PSTORADE GROUP - IDR STORAGE ROOM EOR RAY EOUIPMENT SLPP UES 10005 TABLE 003, ALLOWABLE HEIGHT AND BLIELDINO AREA [ FOR GROUP Ej CONSTRUCTION IN PE B NON - RATED ALL. CANDLE AREA 9,500S ACICAL AREA 10926 SF SECTION 5062 FRONTAGE INCREASE P=(F/P- 0.25; WI33 R = AREA INCREASE DUE TO FRONTAGE F = BUILDING PERIMETER TNAY FRONTS ON A PUBLIC WAYOR20 WOE MWIMUM OPEN $ AACF P • PERIMETER CF ENTIRE BALDING W = WIDTH OF PSBL. IC WAY OR OPEN SPACE N = 1 S92 f 502. 005(3O130 075 ( 10 d75 THEREFORE C. 75+ S SOBS F ALLOWABLE = 71255 • THEREFORE 95COSF • 11255. 6 • A24$ F THEREFORE ' SEX 5. F AL105A9LC • 10 926 S F ACTUAL • COMPLY ALLOWABLE STORIES ! ACTUAL STORIES 1 Associate. U.0 1141. , AtVAI 3) 71017e/4LOTS2 noMILT203' r10 wnwn., Iu,. v 0010.1,1.,41 L6nMwa ROOK RAN CAUIARE INR 51103. A1. 1 PABLO AND LUCIANA PENALOZA 75-378 NANI KAILUA DR. KAILUA KONA. HI 95740 PAY TO THE L) L1 OR OF Q A (" v. i"1 rt 4n AMERICAN SAVINGS BANK P.O. BOX 2300 HONOLULU, HAWAII 96804-2300 www.aabhawali.com 1:3 2 13707651:13 10 8100711. .4-11-(910 QFOR PLANNING DEPARTMENT County of Hawaii 74-5044 Ane Keohokalole HwyKailua-Kona. HI 96740 RECEIVED ;! 2020 1310 59-7076/3213 t 20 DOLLARS 8 MOUNT RAINIER NATIONAL PARK 2 CDII PLANNING DEF MAR 3 2021 Am9: t SPECIAL PERMIT APPLICATION RECO BY PLANNING DEPARTMENT Type or Print the requested information) APPLICANT: PABLO PENALOZA APPLICANT'S SIGNATURE: DATE: 2---25"-?-1 ADDRESS: 75-477 HUA KAILUA USA AI ROAD NA, HAWAII 96740 LIST APPLICANT' S INTEREST IF NOT OWNER: APPPLICANT IS THE OWNER TELEPHONE: (Bus.) n/a Cell) 808-990-7041 (Fax) 877-346-4212 REQUEST: A SPECIAL PERMIT TO OPERATE A CHILDCARE CENTER/PRESCHOOL/AFTER SCHOOL CARE ON A 2 ACRE SECTION OF THIS PROPERTY. TAX MAP KEY: (3) 7-5-017:045 ZONING: A -5a AREA OF PROPERTY/AREA OF REQUESTED USE: 2 ACRES LANDOWNER: PABLO PENALOZA / LANDOWNER'S SIGNATURE: DATE: 2--5.--- ,2 I LANDOWNER' S ADDRESS: 75-378 I ANI KAILUA DRIVE KA UA KONA, HAWAII 96740 A AGENT: N/A ADDRESS: N/A TELEPHONE: N/A Please indicate to whom original correspondence (and copies) should be sent: ORIGINAL: PABLO PENALOZA COPIES: N/A SCANNED MAR 0 4 2021 x;14 ()ILL 10 -0 --MAR 0 8 2021 3/3;i1 SPECIAL PERMIT APPLICATION SUPPORTING DOCUMENATION: 1. A Filing fee of Five Hundred Dollars ($ 500) payable to the County Director of Finance 2. An Original (signed) and twenty (20) copies of the completed application form with attachments; 3. An Original and twenty (20) copies of the following background information on the subject request: A. Detailed written description of the proposed use, a statement of objectives and reasons for the request, including proposed hours of operation and number of employees/clientele The main goal of this permit is to obtain authorization to construct and operate a preschool/childcare/after school care center on 2 acres of the parcel. UPDATE***********REMOVING THIS WORDING*********** END OF UPDATE*********** We operate Alaka'i Academy, a preschool in the Old Industrial Area in Kona. Our school is licensed under Department of Human Services to care for over 72 children at one time. If our Special Permit is approved, we will be moving our school to this new facility once constructed and certified to operate. The school will be housed on a set of buildings of approximate 10,000 square feet, consisting of classrooms, bathrooms, and cafeteria with a kitchen, a lobby, some admin space and storage. In addition, a tent -like pavilion will be constructed as well for shade, outdoors performances and other gatherings. We envision that the new facility will have capacity to serve our current license capacity of 72 children on day one. We would likely build in some excess capacity to accommodate growth in the future. It is worth noting that the COVID-19 crisis has taken a toll on our enrollment and we are currently below our capacity. Yet, our goal would be to increase the enrollment overtime. Our current hours of operations are Mon -Fri 7:00 am to 5:00 pm. We are closed on weekends, and on major holidays, but we don't close for summer and other DOE school breaks. Alaka' i Academy follows a whole child approach to education. Students are not only intellectual but also social and emotional beings, and all these dimensions interact to impact learning and performance. Without empathy, for example, one can be bright, but arrogant. Without confidence, one aims low, ultimately living beneath his or her potential. A balanced approach leads to healthy growth and prepares children to excel in a wide range of interactions. Over time, this experience at Alaka'i Academy naturally evolves into leadership traits, influential roles and active contributions to family, school, and society. Alaka' i Academy offers extended operation hours, year-round operation (no summer break), year-round enrollment, and excellence in academics. In addition, Alaka' i Academy is the only large preschool in Kailua Kona that accepts children who are not potty trained. There are 3 core aspects to the Alaka' i Academy curriculum: Leadership Development, Structured Environment and Academic Excellence. Leadership is in our name. Alaka'i" means leader/leadership in the Hawaiian language; so it follows that Alaka'i Academy is a Leadership Academy for children. The owner had opportunities to serve in leadership roles during his career. One thing he discovered early on was that leadership success is more likely to be achieved by developing and cultivating emotional intelligence (self-awareness, self-regulation, motivation, empathy, and social skills) than when those skills are relegated to secondary importance. These concepts are very simple such as listening, controlling one's emotions, showing empathy, putting team goals before individual desires, etc.) but at the same time very difficult to master as an adult because they almost always imply changing who we are. While adults have a difficult time changing, the character and identity of children are malleable and shaped through daily interactions. Alaka' i Academy has a leadership development program incorporated in the daily curriculum as a weekly leadership theme adapted for children. Sample themes are: a leader is...kind, grateful, creative, respectful, friendly, and happy, etc.; a leader...is a good listener, uses good manners at the table and much more. This curriculum helps children develop emotionally, at the same pace their intellects and their bodies grow. Alaka'i Academy operates as a very structured environment. Within that structured environment, which provides security and predictability, the teacher's job is to grab the children's imagination and attention, and take them on a metaphorical magic carpet ride, flowing from activity to activity, and from theme to theme, while exposing them to different subjects and concepts along the way. At Alaka'i Academy, children don't "run around wild." The program is delivered via teacher -directed activities. Because children are always looking to the teacher to know what to do next, Alaka'i Academy has been able to greatly minimize children's misbehaviors and accidents. Further, since all classes use this methodology, Alaka' i Academy's individual class approach has developed into culture of proper behavior and safety. While academic excellence may not necessarily, in and of itself, be the sole hallmark of a great leader, Alaka' i Academy feels that developing in children a love for learning and reading is a definite aid to them in their chosen life pursuit. Alaka' i Academy's academic goal is ambitious: to have every child reading at 1st grade level before entering Kindergarten. A head start in their academic life can only help children through the early stages of their education. To achieve this goal, Alaka'i Academy does three things: 1) Hires great teachers, 2) Implements a formal reading program, and 3) Values teachers' input on class size. First: Great teachers. In general, educational requirements for preschool teachers are low and mostly focused on child development theory rather than on teaching techniques. With this in mind, Alaka'i Academy began hiring lead teachers who also had experience teaching at the elementary school level. Alaka'i Academy believed and found out in practice that teachers with this background are better able to deliver curriculum and achieve the academic goals of the school. Second, Alaka'i Academy implements a formal reading curriculum. Reading is an acquired skill. Children don't learn to read by simply hanging out with readers. Reading is not something children just pick up by themselves; reading must be taught. Alaka' i Academy has a fantastic program to help little ones learn to read. It starts with phonics at age 2, moves to upper and lower case letter recognition by age 3, and reinforces phonics with sights words and sound readings, and culminates with developing fluency in 1st grade level books by age prior to entering kindergarten. This approach has been very successful. Over the last 2 years 92% of its students going to kindergarten were reading before they left the school. Further, 100% of children who were with Alaka' i Academy for 2 years read at 1st grade level. Lastly, Alaka' i Academy values teachers' input on class size. Nearly all preschools try to maximize teacher/student ratio to increase profitability. While profitability is important, teachers' input is considered when determining if a class can take new students. This approach allows teachers to feel respected, takes into consideration different class mixes, and it supports the overall goals of delivering a curriculum effectively. The outside area of the school is also critical to foster a safe and inviting learning environment. The school will include things like playground equipment; slides, bounce house; water play areas and water equipment (spray park zone/water playground, floating toys, etc.). Adequate parking spaces will be allocated to meet county guidelines. When school is not in session (evenings, weekends, school breaks, etc.), the venue may be rented out as an additional way to raise revenues to cover expenses, conduct fundraisers, etc. Regarding staffing, we currently employ 13 individuals. The new facility will likely increase that number to 15 plus. B. Description of the subject property in sufficient detail to precisely locate the property. Describe existing uses, structures and topography. If portion of property to be used, state use of remainder of property. The parcel is located in Kailua Kona, Big Island. The property lot size is 5.3 acres. 01040006. 09400004 0011 e. stagy 00bwE 06694034, Oc-: )900?0+0. C.58.0 Zane $Q )21003^E. S t 3SS. LO. fl • 10,w-0. Tf. 3yaw••3E. a079COr.E_ 719 0^E. 131000. )4i0^3! OSS +3E 967900^E. =1900'^t.=?I,%=^-E ?6;X=^E. l.+ 19 I) yells 19 1; :0 3 b }) +}b Figure 1: 5,500 K -Series Map of Hawai`i Showing Location of Project Area (National Geographic Topo!, 2003. Sources: National Geographic Society, USGS). The parcel is located near the intersection of Queen Ka'ahumanu and Hualalai Road. The property will have access via the future Kakalina Street connector road. Approximately 2 acres of the parcel will be designated for the special use (section highlighted in red). A' FA The remainder of the property will be used to build a single family home and some family fanning activities, such as a fruit orchard, farming, etc. C. State/ County Plans affecting the subject request: General Plan designation, Special Management Area and Community Development Plans. viv-u'l Cite) arettisam SLS A -,t ii_ovtq cxe Our Project is located in a site designated under the County of Hawaii General Plan as Urban. Under the land user pattern allocation guide, our project site is identified as medium density urban area, which allows for residential, commercial and multi -family residential uses, which includes daycare/childcare centers and preschools. D. Surrounding zoning and land uses. The property and project site is designated as "Agricultural District" under State Land Use Commission. Immediately adjacent properties to the north, east and west of the property are zoned as A -5a. Adjacent properties to the south are zoned A- la. Most of the surrounded parcels are still undeveloped. Current use for most surrounding parcels is cattle grazing. The parcel directly north of our property also has a special permit to operate a public charter school serving grades K-8. Alaka'i Academy serves families of pre -K children, which complements nicely with the elementary school next doors. z4.--'12-71EZ sc.s, r7-44,71Maff.00 Y.44411.114RE NUM" Project location. Light green indicates A -5a and dark green indicates A -la zoning. Taken from the North Kona Zone Map Section 25-8-3. E. Flood Insurance Rate Map (FIRM) designation (contact Department of Public Works - Engineering Division). 711. yL. C t ..., rl: ..r BASEMAPj.MM BASFJu%AP 0951F Flood Hazard Assessment Report unwi traw•aiinlp.org Property Information COUNTYTMKNO. HAWAII3I7 -S-017:045 WATERSHED. WAIAHA PARCEL ADDRESS: AOORESS NOT OETERMINEO KAILUA KONA• HI 96740 Flood Hazard Information FIRM INDEX DATE: LETTER OF MAP CHANGE(S): FEMA FIRM PANEL: PANEL EFFECTIVE DATE: Notes: SEPTEMBER 29, 2017 NONE1551660738ESEPTEMBER29, 2017 THIS PROPERTY IS WITHIN A TSUNAMI EVACUTION ZONE: NO FOR MORE INFO, VISIT: http''//www.scd.hawaj. govt THIS PROPERTY ISVal THIN A DAM EVACUATION ZONE: NO FOR MORE INFO, NSR: Mtp://dlweng. hawak.gov/dant 0 1,200R Oddoarrer The Honed Oe0artmen: di Land and Natural Resources !GINA) assumes no reformubydy ansin9 ham the an, rummy. completeness, nod Hmn'aess of oily afoemanon ranrnne0 In No apart. Vinnero/Usels are resowss.AIn Jo' reryyrng The attorney o/ the informorron and agree to indenuafI, the TUNA,1ry officers. and employ - eel /corn any Whiny wheal may mile from. its use a/ es duty arc info,Rafron. If Mtn mop has been IdcnhfnM as PACLIMINARY, please node that .t is bung provided for oformonorloi p epaa¢F m,des not to be used for flood .n,,aance raring. Corvert row chanty JIoadoeuln 'enema., tor flood conn determ;ao. nuns tU N. rased/or cenlpinni e wan /mol /loadploin management reQalanae,. FLOOD HAZARD ASSESSMENT TOOL SAYER LEGEND Note. term., coos nor.. .:,':d :SCh Wein) SPECIAL FLOOD HAZARD AREAS (SF HAs) SUBJECT TO INUNDATION 05 THE 1% ANNUAL CHANCE FLOOD - The 1% annual Nance flood (100. year), also know as the base flood, is the Rood that has a 1% chance of being equaled or exceeded in any Ammo year. SFHAs include Zone A, AE, All, AO, V. and VE. The Ouse Rood Elevation (BFE) is the water surface elevation of the 1% annual chance flood Mandatory flood insurance Purchase applies In these man Zone A: No BFE determined. Zone Al BEE determined. Zone AN: flood depths o11 to 3 feet (usually areas of ponding), BEE determined Zone AO: Flood depths of 1 to 3 feet (usually sheet flow on sloping terrain); average depths determined. Zone V. Coastal flood zone arab velocity hazard (wave amon); no BFE determined. Zone VI: Coastal food zone with velooty hazard (ware action); BEE determined. Zone AEP. Floodway anus In Zone AE. The floodway is the channel of stream plus any adjacent floodplain areas that must be kept free of encroachment so that the 1% annual chance flood can be carried without increasing the BEE. NON•SPEOAL FLOOD HAZARD AREA • An area in a low.to•moderate risk Rood :one. No mandatory flood insurance purchase requfremems apply, but carer ge b available in parndpanng communities. Zone XS (X shaded): Areas of 0.2% annual chance flood; areas of 1% annual chance flood with average depths of less than 1 foot Or with drainage areas less than 1 square mile; and areas protected by levees from 1% annual chance flood. Zone X. Areas determined to be out side the 0.2% annual chance lloodplaln. OTHER FLO00 AREASZoneCr: Unstudied areas where flood hazards are widelen mined, but Booing IS possible. No mandatory flood insurance purchase apply, but coverage is available in partldpating can me nines. F. Archaeological Resources (one of the following): i. An archaeological inventory report containing significance assessments, effect determinations, and proposed mitigation commitments. The report should be completed pursuant to State Department of Land and Natural Resources Historic Preservation Division (DLNR-SHPD) rules. ii. A "no effect" letter from the State DLNR Historic Preservation Division. iii. A copy of a letter written by the applicant to the State DLNR Historic Preservation Division requesting a " no effect" letter, including supporting documentation, to which SHPD has not responded after 30 days (SHPD's time limit under their rules). See Letter from SHPD attached. Exhibit 1 G. Floral and Faunal Resources. No formal floral studies have been conducted for the site. The site has been walked multiple times by an archaeologist, a surveyor and by my family. Plans easily observed include elephant grass, Haole Koa bushes (invasive), three small monkey pod trees, a couple African Tulip trees, Kiawe trees, and various other small weeds, such as the Mexican stinky, ivy gourds, etc. Everything seems very common to the area and nothing is rare or endangered plant life. Similarly, no fauna study was conducted for the site. There are currently 10 cows grazing on the property. Occasionally, our neighbor also brings his 3 horses to help keep the grass down. I have seeb mongooses and even a feral pig or two there. Therefore, it does not appear to be any indications that our project will have any significant negative impact, if at all, to the floral and fauna resources in the area. H. Valued Cultural Resources: Identify any traditional and customary native Hawaiian rights that are exercised in the area; the extent in which the proposed development will affect these rights; and feasible action to be taken to protect native Hawaiian rights if they exist. None exist. See Archeological Report. Exhibit 2 I. Public Access: Existing public access to and along the shoreline or to mountain areas and knowledge of whether public access is being used. Public access to the site is off Hualalai Road via the Kakalina extension. Families coming either from the north or the south would likely come via Queen Ka'ahumanu Highway and turn mauka on Hualalai Road and then turn left on the Kakalina Extension Connector road. Families coming from Ali'i Drive would likely come up via Hualalai Road and then turn left on the Kakalina Extension Connector road. Families coming from Holualoa Mauka would likely come down via Hualalai Road and then turn right on the Kakalina Extension Connector road. The Kakalina Extension road is 35 feet wide, 2 lane paved road constructed to meet county standards. 100% of the Kakalina Extension road is within my property boundaries so we have unrestricted access and use of the road. There are several easements granted to our neighbors to access their properties via this road so we can't block or develop in a way that stops their access. Due to the nature of our business, we don't have set pickup times or drop off times. Each family has the flexibility to drop off or pickup anywhere within our hours of operations. Typically, most families drop off between 7 am and 9 am and pick up between 3 pm and 5 pm. It is rare to have multiple families at the same time in the lobby. J. Description of access(es) to the area (e.g. width, type of surface and condition of roadway). If a private roadway, submit evidence of access rights. Kakalina Extension is an asphalt road. Pavement surface is 35 feet wide. Road was constructed to county standards with the intention to dedicate the road to county at one point. Pic 1. Taken from Hualalai Road facing Mauka, showing intersection of Hualalai Road and Kakalina Street Extension. Pic 2. Taken from Hualalai Road facing Makai, showing intersection of Hualalai Road and Kakalina Street Extension. Pic 3. Taken from Hualalai Road facing North (Kakalina Extension). ifFo. ': .r as..hwn.sm.awur.sfv n;w ve sr xaru.is.r. xw ...••,--» .r •_ _-z- iL53 dI LIF 0?`3,Nt:: - sv:owoa:"a+s roSal+S tii1. iYi'J.^.'dlY.i'itN.-r: .vv. c..oa=,ti ,,- Pic 4. Taken from Kakalina Extension facing North. Pic 5. Kakalina Extension facing Hualalai Road. Pic 6. Kakalina Extension. Start of our property Pic 7. Kakalina Extension. Property to the left of image. Innovations at the end of the road Pic 8. End of Kakalina extension. Innovations School entrance to upper campus. Pic 10. Kakalina Extension facing south. Property to the right of the image. Fire Hydrant shown. K. Traffic impacts - assessment of existing traffic conditions, anticipated increase in traffic and traffic impacts from proposed use (a formal study may be requested by Department of Public Works or Department of Transportation during the review process). See Traffic Impact Analysis Report. Exhibit 3 L. Availability of Utilities: Water, telephone, electricity, sewage disposal. Water is available at the property. There is a 4 -inch main line that connects from Hualalai Road under our property. There is a water line and meter installed on our property. Further, there is a fire hydrant installed in front or our property. Electricity is currently available through HELCO. There is a work order to bring power to the entire subdivision at this time, but engineering fieldwork is not completed. 740KVolts design is underway. A study will also be made to determine if solar system will be advantageous to install. It would seem that we are a good candidate given the location, and the fact that we don't operate throughout the night. Public Sewage services are not available at our location. A septic water/waste system will be designed and engineered to meet the code for our school. Telephone services are available through Spectrum and HawaiianTel and other wireless providers. A provider will be selected at a future date. 4. An Original and twenty (20) copies of how the request meets the following criteria: A. The granting of this request would promote the effectiveness and objectives of Chapter 205, Hawaii Revised Statutes, as amended. Include discussion on how the proposed use is not contrary to Chapter 205A, Coastal Zone Management (existing public access, scenic or open space resources, coastal view planes and coastal ecosystems); LSB objectid type island gisacres shape_leng featureuid createdate createdby modifieddate modifiedby agency deliverydate sourceid severity publishdate comments shape st_area(shape) st_perimeterishape) Chapter 205: This land is not good for intensive farming. Our site is classified as "E" or Very Poor" by the Land Study Bureau's Overall Master Productivity Rating. 3338 E Hawaii 394.95255512 12293.9464099 7E8915E9-0CD3.44A2.AD17- F71AAA00CD18) 9/12/2016, 2:00 PM 12/29/1899, 1:30 PM 1598324. 9847748 117• - 37848347035 Project location is here. Also, the Department of Agriculture's ALISH Map does not classify the subject property as having any agricultural importance. Chapter 205A: Property located above highway and more than one mile from the ocean. Approval of this project will not adversely affect coastal ecosystems, economic use, marine resources, etc. B. The desired use shall not adversely affect the surrounding properties; The desire use shall not adversely affect the surrounding properties. Most surrounding land is agricultural/pasture grazing land/vacant land. The lot immediately north is a school already. The preschool operates M -F from 7-5pm and it will be a blessing to the community in general. C. Such use shall not unreasonably burden public agencies to provide roads and streets, sewers, water, drainage, school improvements, and police and fire protection. The attached traffic study shows that no additional roads, streets improvements will be required because of our development. Existing water infrastructure is sufficient for our project. Public sewer system is not available at our site so we will be developing our own waste water system. School improvements are not anticipated because of our project. If anything, we will be taking some of the burden on the public school's preschools by adding to the overall capacity of the system. Police and Fire are available in Kona and our project is not expected to impose a burden on those services. We have operated our preschool for 6 years in the old industrial area and have not unduly burden their services. D. Unusual conditions, trends, and needs have arisen since the district boundaries and regulations were established. Kona's population continues to grow. Demand for preschool services is very high (most preschools run a waitlist). With cost of living so high in Hawaii, most families require that both parents work. Without childcare, it becomes impossible for some families to provide for their children. Our project will support the expected population growth while providing essential services to families in our community. E. The land upon which the proposed use is sought is unsuited for the uses permitted within the district. Our site is as good as it gets to build our school. It is not prime agricultural land, in fact very poor farming land, yet, conveniently accessible to the public and inside the urban development area. Our request is "unusual and reasonable" use of the land. F. The proposed use will not substantially alter or change the essential character of the land and the present use. The proposed use should not substantially alter or change the potential visual character of the land. There is a school next to the lot. Also, landscaping will greatly improve the visual appeal of the area as a whole. G. The proposed use will not be contrary to the goals, policies and standards of the General Plan and other applicable documents such as community development plans and design plans. (Note: Copies of the General Plan document and other plans are available at the Hawaii County Planning Department or at public libraries) Our proposed use of the land will support the urban designation of the land within the general plan. Most families nowadays have both parents working. Without childcare, it becomes impossible for some families to provide of their children. Accessible and convenient location is also en essential characteristic of childcare. H. The proposed use is an unusual and reasonable use of land, which would not be contrary to the objectives to be sought by the Land Use Law and Regulations, which, for the Agricultural and Rural Districts, seeks to preserve or keep lands of high agricultural potential in agricultural use. Our site is classified as "E" or "Very Poor" by the Land Study Bureau's Overall Master Productivity Rating. Also, the Department of Agriculture's ALISH Map does not classify the subject property as having any agricultural importance. Since land is not suitable for farming, non-agricultural uses can and should be allowed. Our project will not result in extensive public project improvements or adversely affect surrounding properties. The land is part of the urban core and childcare/preschools are approved uses within the urban core. 5. An Original and twenty (20) copies of a scale- drawn plot plan of the property showing property lines and measurements; all existing and proposed structures with elevations, uses and improvements; and reference points such as roadways, shoreline, etc. Exhibit 4 contains the small size architectural drawings. 6. One copy of a full- size (2' x 3') scale- drawn plot plan of Item 4 for presentation purposes. Exhibit 5 contains the large size architectural drawings. 7. A list of the names, addresses and tax map keys of all owners and lessees of record of surrounding properties who are required to receive notice. Owner Names PENALOZA, PABLO A Fee Owner, Tenants by the Entirety PENAZOLA, LUCIANA C Fee Owner Mailing Address PENALOZA, PABLO A 75-378 NANI KAILUA DR KAILUA KONA HI 96740-1936 Mailing Address PENALOZA, LUCIANA C 75-378 NANI KAILUA DR KAILUA KONA HI 96740-1936 8. Any other plans or additional information relevant to this application may be requested by the Planning Director to facilitate processing of this request. None. Addendum to Special Permit application APPLICANT: PABLO PENALOZA ADDRESS: 75-477 HUALALAI ROAD KAILUA KONA, HAWAII 96740 USA TAX MAP KEY: (3) 7-5-017:045 Additional information clarifying the uses of the property: PLANNING DEPARTMENT County of Hawaii 74-5044 Ane Keohokalole HwyKailua-Kona, HI 96740 RECEIVED DEC 21/202 Questions from Planning: Based on the application you are requesting that the facility be permitted to hold special events on the weekends. We need specifics regarding that proposed use. Number of guests, parking, bathrooms, food service, type of events, timing of events hours of operation), etc. We need as much detail as possible on those weekend events to support that use. Regarding the event venue portion, my vision is to use the school facility to host birthday parties, community events and schools fundraisers. I would also like to add a comment regarding our food permit and expected ktchen capabilities. Birthday Parties. The venue will be open to the community but I anticipate that it may be mainly our students and their friends and families. As for number of guests, I would think no more than 50 people. The party will be 100% outdoors. Parking will be same as shown on the site plan. Our building design has 3 bathrooms that are accessible from the outdoor playground are so those would be available for the party. We will not provide food service or access to our kitchen area for parties. I imagine guests bringing their own food/snacks. The typical hours would be Saturday and Holidays (No Sundays) between 9 am and 8 pm but each event would be less than 3 hours. I don't anticipate having more than 2 events in the same day. Community Events. We would like to make available a single classroom while school is not at capacity) or the outdoor space on evenings to groups that may want to use our space to meet up. Examples may be (Ukulele group, hula classes, etc.). Our criteria would be to promote activities for young children after hours. The school will not run those activities, just provide the facility space to meet. As for number of guests for community events, I would think no more than 25 people. Parking will be same as shown on the site plan. If these activities are conducted inside the classrooms, bathrooms will be available on each classroom. If outside, then, the bathrooms to be use will SCANNED 2 !' H Y aFJ'EC , 5 2223By; 11,‘0245c r be the outside bathrooms. Hours will be evening only, so after 6PM and before 9PM. School Fundraisers. I would like to do a large event once per year where the entire staff and parents would come together. Bouncy houses for the keiki, live music maybe a carnival or something like that would create the atmosphere. This even will have a specific goal to raise funds for scholarships, or to improve the facilities, etc. Food is always a big hit when it comes to fundraisers in Kona. We would like to explore offering a pancake breakfast, or plate lunch type of foodservice of the event. We will seek to obtain a special event permit for that purpose. I anticipate this annual event to be large in attendance, probably around 100 people with people coming and going through the event. All school bathrooms will be available as needed. Initially, depending on the number or attendees. The event will be 100% outdoors and parking will be same as shown on the site plan. The hours of these even will likely be between 10-2 and will be done during a summer month. School Kitchen. Under our current operations, we hold a food -establishment permit (High Risk Institutional Kitchens) that allows us to operate our kitchen under the supervision of the department of health that conducts quarterly inspections. Alaka'i Academy is currently part of the USDA child nutrition program, which allows the school to provide meals, free of charge, to low income children in our care. The school currently serves breakfast, lunch and an afternoon snack. It is our expectation that the new facility will hold a similar license and operate in a similar fashion as it relates to our kitchen infrastructure and operations. I hope that this addendum will help answer some of the questions regarding the uses we seek for our property. Should you have any further comments, I will be prompt to reply. Pablo Penal 808) 99 i - 041 tz/2-i 40 INSET A I Inch - 100It vairpo- 700 1)e Iey. V. " ark; B-/ ' aT '' #°• 20' MOE ACCESS EASEMENT ra el FAVOR OF LOT 3- A- 1 R.1t LAND COURT APP. 1666 MAP 23 LOT 3-A-1 187%' ZlyTTO' L0' Nktas' r 770017• 11 77. x009' 09' 9LOT 2-4-A o. 8 INSET B 1 fads - 100ft. 267' 20700' 601' 77. 11. WaT t ni 1 N- enr t1r°.SY 83' 07 29' 6.00' 7.00 262; 06' a', S. iu$ B2• U6' 96' 700' INSET F I inch - 20IL 87. 20' 00- 0.0.120Easement D-1 Port 3A 0. 177 acres COURSE I DIRECTION) DISTANCE 1 330'51'22 8.67' 2 33827' 01' 198.24' R. 750' I 3 346' 02'41' 69.51' 4 119'26'32' 41.29' 5 166'02'41' 41.14' 6 158'27'01' 190.31' R= 720' 7 150'51'22' 6.21' 8 236. 10'19' 30.10' Easement D-1 Port 38 3. 446 squore feet COURSE I DIRECTION) DISTANCE58.39' 196'57'47 2 346' 02' 41' 139.11' 3 72' 55' 41' 30.04' 4 166'02'41 90.65 LEGEND O. 0. w9. tom• ooy Ilnh oppro. Rn. t0 moor of Rood : nundol' enpr F1000 STUDY BY LYONS & ASSOOAIES AND 11. 000 PLANE PER FIRM COSOIIP TY PANEL 150166 0713 0. REVISED 608 IS 1690 GRANT UKEASEMENTEASEMENT RR ROAD RESEROE EASEMEN0 REAENTE0 NOTESThe nooses of adjoining owners ore from ovoloble Tax Mop records. Azimuths and coordinates are referred to Government Survey Triangulation Station ' KAHELO' Subject Parcel is located partially in Zone AE ( special flood hazard areas inundated by 100 - year flood, base flood elevations determined), partially in Zone X ( shoded)( oreos of 500 - year flood) and partially in Zone X areas determined to be outside the 500 - year flood plain) as per Flood Insuronce Rote Mop ( FIRM) Community- Ponel Number 155166 0713 0. revised Moy 16. 1994 and Flood Insurance Rote Mop ( F.I.R.M.) Community - Panel Number 155166 0714 C. revised September 16, 1988 SUBJECT PARCEL VICINITY MAP ( N. T. , S) LOT B LOT PStrENW8 LOT C-/ 21219, 1: 525.) 6 63 00 54. 49 LOT C-2 y1503! 7? LOT N s1Z LOT Al 1 ROA° oi A1. 99, 91, 60A- 2 1, 60At. A\ 25/ 1 72 At INSET E 1010960 EASEMENT A- 3, Pert I A Part 2 QQ6 77471100'— 117974- 0 Af3b• 2, 5771 JO' ZONE AG - 5A--\ 00. 0.. a MEW Sym UsFO., LAND COURT APP. 1666 MAP 23 LOT 3-A-1 4 8776' 2677000' —^ B-7 4. 621 Ac. Portion of R. P. American 1930 to Asa Thurst No. 3 to Board of Corn AbM. Setie. 0teeow.- 217/ 1 4/ , 2. 087/ I 20' PAOE ACCESS EASEMENT l' , rIl/ ( FAVOR OF LOT 3 - A - I tug I rl1l SEE INSETe n, L. C. Aw. 387, Port 4, Section 2. 11 issioners for Foreign Missions 60 - FL Rood Reserve 11 , Zws/ 71' 441 7259 FI FIIM95 P 2015 i J0tJ 1 5715122' 2- 75o541}. 425 F'° 5 O Easement RR, Part 6 1, 511 egaae feet 0 8I INSET C t Inch - 1000. LOT 2-4-A pUAA 3RD LOTS 5. 352 Ac. WOier e and er ' / CV wo`` er aWAIAHA 1ST u 6779 78' 12 5257 Mem. Mega MC F Owns sf2514-49 Ft Rdod Reredo 10' NIDE POLE UNE EASEMENT f7044: 1s', IN FAVOR OF HELCO A NICO 9092 Recorded: Lbw 19, 113 Pose 310 116 EASE.1/ ENT RR , Por/ 6 00 - Ft Rood Reser. Re- okkeiodf Sir / N,S(TC _ ee, w,. Mee* UC / w Owns e4lela r9w/. 44 / w Oww WAIAHA 2nd GRAPHIC SCALE200 1K FEET ) 1 ch - 100ft Vize i, t RGa / ttP fly/ R00b P4) ft. Easement P- 5 lbs ( 10 - Ft. Wide) 1NANSAN3Grat nt alN.. LIDw Easement P-4 10 - Ft. Wide) LOT 8- 11\ 757: 000' 6005" LOT 3-A-1 8- 970' LOT C 67sd' 7' R-/,0v taw• LOT P 500/ 71' emu 8II17'p/. 8. 7eo 58270/' MX' 8. 110 it INSET D 1 Inch • 100ft. LOT N SHOWING EASEMENT ' Au - 1' ( 60, - FT VIDE) FOR ACCESS AND UTIUTY ( 1. 390 ACRES) IN FAVOR OF LOTS 3-A-1. B. C- 1 & C-2 10 LOT A/ HwALALAt ROAD 5606 4394 Melo* Meg* 0C. / Overs NI M. MARE. [ ICIO..' .. 0 rft e Rood 0 Set aCk Gro' t MAP SHOWING THE CONSOLIDATION OF LOTS B of WAIAHA RIDGE SUBDIVISION and TMK 7- 5- 17: 09 Being a Portion of R. P. 1930 to Asa Thurston, L. C. Aw. 387, Part 4, Section 2, No. 3 to American Board of Commissioners for Foreign Missions, Grant 983 to Kipola, and Grant 4394 to H. Willgeroth AND SUBDIVISION INTO LOTS B- 1 AND B- 2 AT KAHULUI 1st, WAIAHA 1st & 2nd, NORTH KONA ISLAND, COUNTY AND STATE OF HAWAII TOTAL AREA: 9. 973 ACRES TOTAL LOTS: 2 983 8E1901VISION NUMBER APPROVED FOR RECORDATION anno &N. of Can,...' MbofWoo: 1.0 OA° to H. WitlgerothC. 0) ca Sul 26960 KAHULUI SUB - 17- 001712 ow. DEC 12 2018 PREPARED FOR: WAIAHA RIDGE LLC. ( OWNER) PO Box 909 KAILUA- KORA, HAWAII 96745 1STIDI, r/.10/113 0110 wOe, WAS PREPARED Br00 O. UNINR M ILNLR45Iw. yR. 6/16/17 ePyta 00 vox emu NEm¢ 3/02/18 Erik Lange I.S. 75- 5810 Puo Keni Keni Place Koilua- Kona, HI 96740 Phone ( 808) 896- 7925 DEPARTMENT OF WATER SUPPLY • COUNTY OF HAWAII 345 KEKUANAO'A STREET, SUITE 20 • HILO, HAWAII 96720 TELEPHONE (808) 961-8050 • FAX (808) 961-8657 December 18, 2020 TO: Mr. Zendo Kern, Director Planning Department FROM: Keith K. Okamoto, Manager—Chief Engineer CDH PLANNING DEF DEC 212020 pm2:2 REC'D HAND DEL IUERt SUBJECT: Special Permit Application (SPP 20-000221) Applicant — Pablo Penazola Request — To Operate a Childcare Center/Preschool Facility and Construct a Playground for Student Use Si as an "Event Venue" to be Rented Commercially Tax Map Key 7-5-017:045 We have reviewed the subject application and have the following comments and conditions. The Department requests that the applicant submit estimated maximum daily water usage calculations for review and approval. The water usage calculations shall be prepared by a professional engineer licensed in the State of Hawaii and should include the estimated peak flow in gallons per minute (GPM) and the total estimated maximum daily water usage in gallons per day, including all irrigation/landscaping use. Upon receipt of the water usage calculations above, the Department will make a determination as to the water commitment deposit amount and prevailing facilities charge (subject to change) to be paid, if necessary. Based on the water demand calculations, the Department will determine the appropriate service lateral and meter size required. The proposed zoning will require the installation of a reduced pressure type backflow prevention assembly within five (5) feet of the meter on private property. If a larger or additional meter is required, a backflow prevention assembly will also be required for the that meter. The installation of the backflow prevention assembly(s) must be inspected and approved by the Department before the commencement/continuation of water service. Please be informed that the existing 8 -inch waterline fronting the subject parcel is inadequate to provide the required Q. 1 O) C :pC •— a s it La 2,000 gallons per minute flow for fire protection, as per the Department's Water System Standards. Should there be any questions, please contact Mr. Troy Samura of our Water Resources and Planning Branch at 961-8070, extension 255. TS:dmj copy — Pablo Penazola Sincerely yours, Keith K. Okamoto. P.E. Manager --Chief Engineer SCANNFD nEC 2 2 2020 r=13 etd+4 Water, Our (Most Precious 9(gsource ... 1(a Wai A Noe .. . The Department of Water Supply is an Equal Opportunity provider and employer. Mitchell D. Roth Mayor Lee E. Lord Managing Director MEMORANDUM TO: County of Hawai'i DEPARTMENT OF ENVIRONMENTAL MANAGEMENT 345 Kekuanac'a Street, Suite 41 • Hilo, Hawaii 96720 Ph: (808) 961-8083 • Fax: (808) 961-8086 Email: cohdem@hawaiicounty.gov Zendo Kern, Director Planning Department FROM: Ramzi I. Mansour, Director . Environmental Management Department DATE: December 16, 2020 Ramzi I. Mansour Director CON PLANNING D:='r DEC 24 2020 PML:e RECD HAND DEL:V°u-E SUBJECT: Special Permit Application (SPP 20-000221) Applicant: Pablo Penazola Request to Operate a Childcare Center/ Preschool Facility and Construct a Playground for Student Use and as an Event Venue to be Rented Commercially Tax Map Key: (3) 7-5-017-045 The Solid Waste Division has reviewed the subject application and offers the following comments and/or recommendations (contact the Solid Waste Division for details): No comments. Commercial operations, State and Federal agencies, religious entities and non-profit organization may not use transfer stations for disposal. Aggregates and any other construction/demolition waste should be responsibly reused to its fullest extent. Ample and equal room should be provided for rubbish and recycling. Green waste may be transported to the green waste sites located at the West Hawai'i Organics Facility and East Hawai'i Organics Facility, or other suitable diversion programs. Construction and demolition waste is prohibited at all County Transfer Stations. Submit Solid Waste Management Plan in accordance with attached guidelines. Existing Solid Waste Management Plan is to be followed. Provide update to the department on current status. Other: County of Hawai'i is an Equal Opportunity. Provider and Employer. Se ANNE") C 2 0 U J387 9 1 SPP -20.221 DEPARTMENT OF WATER SUPPLY • COUNTY OF HAWAII 345 KEKUANAO'A STREET, SUITE 20 • HILO, HAWAII 96720 TELEPHONE (808) 961-8050 • FAX (808) 961-8657 March 17, 2021 Mr. Mark Morrison, P.E. P.O. Box 529 Holualoa, HI 96725 Dear Mr. Morrison: Subject: Water Usage Calculations for the Alaka`i Academy Applicant — Pablo Penazola Tax Map Key 7-5-017:045 We have received the water demand calculations for the subject project and have the following comments. Please be informed that the Department requests that the engineer submit revised estimated average daily water demand calculations. Enclosed is a marked -up copy of the water usage calculations with our comments noted in red. Please be informed that the water availability in the area of the subject parcel provides for the same number of water units as the number of lots allowable under the current zoning. Based on the above information, the subject parcel is limited to the one (l) existing 5/8 -inch meter Account No. 890-05581, allotted one I I ] equivalent unit of water) assigned to the parcel. For your information, one (1) unit of water is equal to an average daily usage of 400 gallons, which is suitable for only one (1) single-family dwelling. The Department acknowledges that potable water is Hawaii Island's most precious resource and encourages our communities to promote water conservation and reserve the highest quality of water for • the most valuable end use, which is the sustenance of life. Alternate methods (i.e. reclaimed or reused water) for non -potable demand of water or irrigation should be implemented. The proposed use will require the installation of a reduced pressure type backflow prevention assembly, within five (5) feet of the meter on private property. The installation of the backflow prevention assembly must be inspected and approved by the Department before the commencement/continuation of water service. Water, Our Most Precious (Resource ... 7(,a Wai A Kane . . The Department or water Supply is an Equal Opportunity provider and employer. SCANNED Mr. Mark Morrison, P.E. Page 2 March 17, 2021 Please be informed that the existing 8 -inch waterline fronting the subject parcel is inadequate to provide the required 2,000 gallons per minute flow for fire protection, as per the Department's Water System Standards. Should there be any questions, please contact Mr. Troy Samura of our Water Resources and Planning Branch at 961-8070, extension 255. Sincerely yours, Keith K. Okamoto, P.E. Manager—Chief Engineer TS:dfg Enc. copy — Pablo Penazola Planning Department Mitchell D. Roth Mayor Lee E. Lord Managing Director Cou* of aii tti`i DEPARTMENT OF PUBLIC WORKS Aupuni Center 101 Pauahi Street, Suite 7 - Hilo, Hawaii 96720-4224 808) 961-8321 Fax (808) 961-8630 public_worksgahawaiicountygov MEMORANDUM Date: December 23, 2020 To: Zendo Kern, Planning Director From: Department of Public Works, Engineering Division 4" Steven Ikaika Rodenhurst, P.E. Director uniti PLANNING Dr: DEC 20 2020 Rts8:2 Subject: Special Permit Application (SPP 20-000221) Applicant: Pablo Penaloza Request: To Operate a Childcare Center/Preschool Facility and Construct a Playground for Student Use & as an "Event Venue" to be Rented Commercially Tax Map Key: 7-5-017:045 We have reviewed the subject application and our comments are as follows: 1. DPW Engineering feels that the traffic count inflation for COVID and School Closure is too low. DPW Engineering will leave further comment on this to DPW Traffic Division and the State DOT as they are the jurisdictional agencies over Hualalai Road and Queen Kaahumanu Highway, respectively. 2. Special Flood Hazard Areas AE and AEF affect the subject parcel as designated by the Flood Insurance Rate Map (FIRM). Improvements in a floodplain will be subject to the requirements of Chapter 27 — Floodplain Management — of the Hawaii County Code. 3. All earthwork and grading shall conform to Chapter 10 — Erosion and Sedimentation Control — of the Hawaii County Code. 4. All work within the County Right -of -Way shall conform to Chapter 22 — County Streets — of the Hawaii County Code. 5. All development generated runoff shall be disposed of on site and shall not be directed toward any adjacent properties. Additionally, the project generated runoff shall not be directed toward Kakalina Road, the access easements, nor the Waiaha Drainageway & Waiaha Drainageway Splitflow No. 1. A drainage report shall be prepared and submitted to DPW Engineering for review and approval. Please feel free to contact our Kona Engineering Division office at 323-4850 with Pry gLActinns NW Copy: ENG-HILO/KONA County of Hawn!'i is an Equal Opportunity Provider and Employer. nCO n. 61C C C s at SCANNED) PFT 28 MO 80.118795 DAVID Y. ISE owEexm OF -Knell MEMORANDUM DATE: January 5, 2021 STATE OF HAWAII DEPARTMENT OF HEALTH P. 0. BOX 916 HILO, HI 96721-0916 TO: Mr. Zendo Kern Planning Director, County of Hawaii FROM: Eric Honda District Environmental Health Program Chief ELIZABETH A. CHAP, M.O. DIRECTOR OF HEALTH N repoplease relerly File: RECO HP:ND .I SUBJECT: Special Permit Application (SPP 20-000221) Applicant: Pablo Penazola Request: To Operate a Childcare Center/Preschool Facility and Construct a Playground for Student Use & as an "Event Venue" to be Rented Commercially. TMK: 7-5-017:045 The applicant would need to meet the requirements of our Department of Health Air Pollution Rules, Chapter 60.1, Title 11, State of Hawaii for fugitive dust control. If there is need to discuss these requirements, please contact our Clean Air Branch staff at Ph. 933-0401. The proposed kitchen needs to meet the requirements of Chapter 50, Food Safety Code. Please call our office (Ph. 933-0917) for consultation and additional information. Wastewater Branch is unable to make comments to the proposed project at this time. Before we can offer any comments, the applicant needs to address the following: a. The amount of wastewater to be generated by the project. Please have your engineer submit to WWB wastewater calculations and management plans. The Department of Health (DOH), Clean Water Branch (CWB), acknowledges receipt of the subject document on December 15, 2020. The CWB has reviewed the limited information contained in the subject document and offers the following comments: Permit Issuance Any project and its potential impacts to State waters must meet the State's: 1) Antidegradation policy, which requires that the existing uses and the level SCANNED JAN 0 7 2021 00,119 0 7 7 dichael Yee January 5, 2021 Page 2 of 5 of water quality necessary to protect the existing uses of the receiving State water be maintained and protected; 2) Designated uses, as determined by the classification of the receiving State waters; and 3) Water quality criteria [Hawaii Administrative Rules (HAR), Chapter 11-54], A Section 401 Water quality Certification (WQC) is required if your project/activity: Requires a federal permit, license, certificate, approval, registration, or Statutory exemption; and May result in a discharge into State waters. The term "discharge" is defined in Clean Water Act, Subsections 502(16), 502(12), and 502(6). Examples of "discharge" include, but are not limited to, allowing the following pollutants to enter State waters from the surface or in -water: solid waste, rock/sand/dirt, heat, sewage, construction debris, any underwater work, chemicals, fugitive dust/spray/paint, agricultural wastes, biological materials, industrial wastes, concrete/sealant/epoxy, and washing/cleaning effluent. Determine if your project/activity requires a federal permit, license, certificate, approval, registration, or statutory exemption by contacting the appropriate federal agencies (e.g. Department of the Army (DA), U.S. Army Corps of Engineers (COE), Pacific Ocean Division Honolulu District Office (P011) Tel: 808-835-4303; U.S. Environmental Protection Agency Tel: 415-947-8021; Federal Energy Regulatory Commission Tel: 866-208-3372; U.S. Coast Guard Office of Bridge Programs Tel: 202-372-1511). To request a Section 401 WQC, you must complete and submit the Section 401 WQC application. This application is available on the e -Permitting Portal website located at: huts, (/gh hni=Lrinhh iii = /cpenri if'. Please see HAR, chapter 11-54 for the State' Water Quality Standards and for more information on the Section 401 WQC. HAR, Chapter 11-54 is available on the CWB website at: hi.p ',health h iso _m /geld. National Pollutant Discharge Elimination System (NPDES) permit coverage is required for: Storm water associated with construction activities for land disturbances of one (1) acre or more. Land disturbance includes, but is not limited to, clearing, grading, grubbing, excavation, demolition, uprooting of vegetation, equipment staging, and storage areas. Storm water associated with industrial activities for facilities with Standard Industrial Classification Codes regulated in 40 CFR 122.26(b)(14)(i) through ix) and (xi). Storm water and certain non -storm water from a small Municipal Separate Storm Sewer System. Michael Yee January 5, 2021 Page 3 of 5 Discharges of water pollutants into State surface waters. Examples of these discharges include, but are not limited to, cooling water, hydrotesting waters, dewatering effluent, and process wastewater. Discharges from the application of pesticides (including pesticides, herbicides, fungicides, rodenticides, and various other substances to control pest) to State waters. An application for an NPDES individual permit must be submitted at least 180 calendar days before the commencement of the discharge or start of construction activities. To request and NPDES individual permit, you must complete and submit the NPDES individual permit application. This application is available on the e -Permitting Portal website located at: h¢s.//eha-clrnid Aoh.h_ncai Leos/crntit/. A Notice of Intent (NOI) for coverage under a specific NPDES general permit must be submitted at least 30 calendar days before the commencement of the discharge or start of construction activities. To request NPDES general permit coverage, you must complete and submit the NOI. The NOI is available on the e -Permitting Portal website located at: hitt» //'ha-Inut1 Loh, h,nr:u i. /epe nils/. Please see HAR, Chapter 11-55 for more information on the NPDES individual permit and NPDES general permits. The specific NPDES general permits located in HAR, Chapter 11-55, Appendices B through M. HAR, Chapter 11-55 and HAR, Chapter 11-55, Appendices B through M are available on the CWB website at: Imo://lic.dih.huauii.sovAcwh/. According to State law, all discharges related to the project construction or operation activities, whether or not NPDES permit coverage and/or Section 401 WQC are required, must comply with the State's Water Quality Standards. Monitoring Effluent discharge and/or receiving water monitoring may be required as conditions of Section 401 Water Quality Certifications and NPDES General and Individual permits. Enforcement Noncompliance with water quality requirements contained in HAR, Chapter 11-54 and/or permitting requirements specified in HAR, Chapter 11-55 may be subject to penalties of $25,000 per day per violation. Violations of Hawaii Revised Statutes 342D and 342E may elicit administrative, civil and criminal penalties for such violations. Michael Yee January 5, 2021 Page 4 of 5 Polluted Runoff Control Manage projects identified in watershed -based plans that reduce polluted runoff and educate the public about nonpoint source pollution. Projects are selected through an annual request for proposals. Funding is provided by the EPA through the Clean Water Act. For more information on projects and funding opportunities, please visit: www flaw. i.gos/doh/pollulediunoticontrol. If you have any questions, please contact Ms. Joanne Seto, Supervisor of the Engineering Section, CWB, at (808) 586-4309. Construction activities must comply with the provisions of Hawaii Administrative Rules, Chapter 11-46, "Community Noise Control." The contractor must obtain a noise permit if the noise levels from the construction activities are expected to exceed the allowable levels of the rules. 2. Construction equipment and on-site vehicles requiring an exhaust of gas or air must be equipped with mufflers. 3. The contractor must comply with the requirements pertaining to construction activities as specified in the rules and the conditions issued with the permit. Should there be any questions on this matter, please contact the Department of Health at 933- 0917. Lands formerly used for sugarcane production are now being developed into communities where residential homes, schools and commercial businesses are being constructed. Chemicals associated with the sugarcane industry persist in soil today and may be a threat to public health and the environment. Elevated arsenic levels were discovered in soil at former sugarcane production areas on the islands. The HEER Office has identified former sugarcane production areas for assessment throughout the state and plans to work with property owners to conduct environmental assessments to identify and address elevated soil arsenic levels prior to finalizing development plans for the properties. We recommend that you review all of the Standard Comments on our website: http://hawaii.gov/health/environmental/env-planning/landuse/landuse.html. Any comments specifically applicable to this project should be adhered to. The same website also features a Healthy Community Design Smart Growth Checklist Checklist) created by Built Environment Working Group (BEWG) of the Hawaii State Department of Health. The BEWG recommends that state and county planning departments, developers, planners, engineers and other interested parties apply the healthy built environment Michael Yee January 5, 2021 Page 5 of 5 principles in the Checklist whenever they plan or review new developments or redevelopments projects. We also ask you to share this list with others to increase community awareness on healthy community design. Mitchell D. Roth Mayor Lee E. Lord Managing Director December 17, 2020 County Of 3atuat'i HAWAII FIRE DEPARTMENT 25 Aupuni Street • Suite 2501 • Hilo, Newall 96720 808) 932-2900 • Fax (808) 932-2928 TO: ZENDO KERN, PLANNING DIRECTOR FROM: ROBERT R. K. PERREIRA, ACTING FIRE CHIEF Robert R.K. Perreira Acting Fire Chief SUBJECT: Special Permit Application (SPP 20-000221) Applicant Pablo Penazola Request: To Operate a Childcare Center/Preschool Facility and Construct A Playground for Student Use & as an "Event Venue" to be Rented Commercially Tax Map Key: (3) 7-5-017:045 In regards to the above-mentioned request, the following shall be in accordance: NEPA 1, UNIFORM FIRE CODE, 2006 EDITION Note: Hawaii .State Fire Code, National Fire Protection Association 2006 version, with County ofHawai'i amendments. County amendments are identified with a preceding `C—" of the reference code. Chapter 18 Fire Department Access and Water Supply 18.1 General. Fire department access and water supplies shall comply with this chapter. For occupancies of an especially hazardous nature, or where special hazards exist in addition to the normal hazard of the occupancy, or where access for fire apparatus is unduly difficult, or areas where there is an inadequate fire flow, or inadequate fire hydrant spacing, and the AHI may require additional safeguards including, but not limited to, additional fire appliance units, more than one type of appliance, or special systems suitable for the protection of the hazard involved. 18.1.1 Plans. 18.1.1.1 Fire Apparatus Access. Plans for fire apparatus access roads shall be submitted to the fire department for review and approval prior to construction. Harvai', Coo Y' Equal Opportunity Provider and f nploye tihb1-1N Zendo Kem, Planning Director December 17, 2020 Page 2 of 8 18.1.1.2 Fire Hydrant Systems. Plans and specifications for fire hydrant systems shall be submitted to the fire department for review and approval prior to construction. C-18.1.1.2.1 Fire Hydrant use and Restrictions. No unauthorized person shall use or operate any Fire hydrant unless such person first secures permission or a permit from the owner or representative of the department, or company that owns or governs that water supply or system. Exception: Fire Department personnel conducting firefighting operations, hydrant testing, and/or maintenance, and the flushing and acceptance of hydrants witnessed by Fire Prevention Bureau personnel. 18.2 Fire Department Access. 18.2.1 Fire department access and fire department access roads shall be provided and maintained in accordance with Section 18.2. 18.2.2* Access to Structures or Areas. 18.2.2.1 Access Box(es). The AHJ shall have the authority to require an access box(es) to be installed in an accessible location where access to or within a structure or area is difficult because of security. 18.2.2.2 Access to Gated Subdivisions or Developments. The AHJ shall have the authority to require fire department access be provided to gated subdivisions or developments through the use of an approved device or system. 18.2.2.3 Access Maintenance. The owner or occupant of a structure or area, with required fire department access as specified in 18.2.2.1 or 18.2.2.2, shall notify the AHJ when the access is modified in a manner that could prevent fire department access. 18.2.3 Fire Department Access Roads. (*may he referred as FDAR) 18.2.3.1 Required Access. 18.2.3.1.1 Approved fire department access roads shall be provided for every facility, building, or portion of a building hereafter constructed or relocated. 18.2.3.1.2 Fire Department access roads shall consist of roadways, fire lanes, parking lots lanes, or a combination thereof. 18.2.3.1.3* When not more than two one- and two-family dwellings or private garages, carports, sheds, agricultural buildings, and detached buildings or structures 400ft2 (37 mc) or less are present, the requirements of 18.2.3.1 through 18.2.3.2.1 shall be permitted to be modified by the AHJ. Zendo Kern, Planning Director December 17, 2020 Page 3 of 8 18.2.3.1.4 When fire department access roads cannot be installed due to location on property, topography, waterways, nonnegotiable grades, or other similar conditions, the AHJ shall be authorized to require additional fire protection features. 18.2.3.2 Access to Building. 18.2.3.2.1 A fire department access road shall extend to within in 50 ft (15 m) of at least one exterior door that can be opened from the outside that provides access to the interior of the building. Exception: 1 and 2 single-family dwellings. 18.2.3.2.1.1 When buildings are protected throughout with an approved automatic sprinkler system that is installed in accordance with NFPA 13, NFPA 13D, or NFPA 13R, the distance in 18.2.3.2.1 shall be permitted to be increased to 300 feet. 18.2.3.2.2 Fire department access roads shall be provided such that any portion of the facility or any portion of an exterior wall of the first story of the building is located not more than 150 ft 46 m) from fire department access roads as measured by an approved route around the exterior of the building or facility. 18.2.3.2.2.1 When buildings are protected throughout with an approved automatic sprinkler system that is installed in accordance with NFPA 13, NFPA 13D, or NFPA 13R, the distance in 18.2.3.2.2 shall be permitted to be increased to 450 ft (137 m). 18.2.3.3 Multiple Access Roads. More than one fire department access road shall be provided when it is determined by the AHJ that access by a single road could be impaired by vehicle congestion, condition of terrain, climatic conditions, or other factors that could limit access. 18.2.3.4 Specifications. 18.2.3.4.1 Dimensions. C— 18.2.3.4.1.1 FDAR shall have an unobstructed width of not less than 20ft with an approved tum around area if the FDAR exceeds 150 feet. Exception: FDAR for one and two family dwellings shall have an unobstructed width of not less than 15 feet, with an area of not less than 20 feet wide within 150 feet of the structure being protected. An approved turn around area shall be provided if the FDAR exceeds 250 feet. C— 18.2.3.4.1.2 FDAR shall have an unobstructed vertical clearance of not less then 13ft 6 in. C— 18.2.3.4.1.2.1 Vertical clearances may be increased or reduced by the AHJ, provided such increase or reduction does not impair access by the fire apparatus, and approved signs are installed and maintained indicating such approved changes. Zendo Kem, Planning Director December 17, 2020 Page 4 of 8 C-18.2.3.4.1.2.2 Vertical clearances shall be increased when vertical clearances or widths are not adequate to accommodate fire apparatus. C— 18.2.3.4.2 Surface. Fire department access roads and bridges shall be designed and maintained to support the imposed loads (25 Tons) of the fire apparatus. Such FDAR and shall be comprised of an all-weather driving surface. 18.2.3.4.3 Turning Radius. C— 18.2.3.4.3.1 Fire department access roads shall have a minimum inside turning radius of 30 feet, and a minimum outside turning radius of 60 feet. 18.2.3.4.3.2 Tums in fire department access road shall maintain the minimum road width. 18.2.3.4.4 Dead Ends. Dead-end fire department access roads in excess of 150 ft (46 m) in length shall be provided with approved provisions for the fire apparatus to turn around. 18.2.3.4.5 Bridges. 18.2.3.4.5.1 When a bridge is required to be used as part of a fire department access road, it shall be constructed and maintained in accordance with county requirements. 18.2.3.4.5.2 The bridge shall be designed for a live load sufficient to carry the imposed loads of fire apparatus. 18.2.3.4.5.3 Vehicle load limits shall be posted at both entrances to bridges where required by the AHJ. 18.2.3.4.6 Grade. C— 18.2.3.4.6.1The maximum gradient of a Fire department access road shall not exceed 12 percent for unpaved surfaces and 15 percent for paved surfaces. In areas of the FDAR where a Fire apparatus would connect to a Fire hydrant or Fire Department Connection, the maximum gradient of such area(s) shall not exceed 10 percent. 18.2.3.4.6.2* The angle of approach and departure for any means of fire department access road shall not exceed 1 ft drop in 20 ft (0.3 m drop in 6 m) or the design limitations of the fire apparatus of the fire department, and shall be subject to approval by the AHJ. 18.2.3.4.6.3 Fire department access roads connecting to roadways shall be provided with curb cuts extending at least 2 ft (0.61 m) beyond each edge of the fire lane. 18.2.3.4.7 Traffic Calming Devices. The design and use of traffic calming devices shall be approved the AHI. 18.2.3.5 Marking of Fire Apparatus Access Road. Zendo Kern, Planning Director December 17, 2020 Page 5 of 8 18.2.3.5.1 Where required by the AHJ, approved signs or other approved notices shall be provided and maintained to identify fire department access roads or to prohibit the obstruction thereof of both. 18.2.3.5.2 A marked fire apparatus access road shall also be known as a fife lane. 18.2.4* Obstruction and Control of Fire Department Access Road. 18.2.4.1 General. 18.2.4.1.1 The required width of a fire department access road shall not be obstructed in any manner, including by the parking of vehicles. 18.2.4.1.2 Minimum required widths and clearances established under 18.2.3.4 shall be maintained at all times. 18.2.4.1.3* Facilities and structures shall be maintained in a manner that does not impair or impede accessibility for fire department operations. 18.2.4.1.4 Entrances to fire departments access roads that have been closed with gates and barriers in accordance with 18.2.4.2.1 shall not be obstructed by parked vehicles. 18.2.4.2 Closure of Accessways. 18.2.4.2.1 The AHJ shall be authorized to require the installation and maintenance of gates or other approved barricades across roads, trails, or other accessways not including public streets, alleys, or highways. 18.2.4.2.2 Where required, gates and barricades shall be secured in an approved manner. 18.2.4.2.3 Roads, trails, and other access ways that have been closed and obstructed in the manner prescribed by 18.2.4.2.1 shall not be trespassed upon or used unless authorized by the owner and the AHJ. 18.2.4.2.4 Public officers acting within their scope of duty shall be permitted to access restricted property identified in 18.2.4.2.1. 18.2.4.2.5 Locks, gates, doors, barricades, chains, enclosures, signs, tags, or seals that have been installed by the fire department or by its order or under its control shall not be removed, unlocked, destroyed, tampered with, or otherwise vandalized in any manner. Zendo Kern, Planning Director December 17, 2020 Page 6 of 8 18.3 Water Supplies and Fire Hydrants 18.3.1* A water supply approved by the county, capable of supplying the required fire flow for fire protection shall be provided to alt premises upon which facilities or buildings, or portions thereof, are hereafter constructed, or moved into or within the county. When any portion of the facility or building is in excess of 150 feet (45 720 mm) from a water supply on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on- site fire hydrants and mains capable of supplying the required fire flow shall be provided when required by the AHJ. For on-site fire hydrant requirements sec section 18.3.3. EXCEPTIONS: 1. When facilities or buildings, or portions thereof, arc completely protected with an approved automatic fire sprinkler system the provisions of section 18.3.1 may be modified by the AHJ. 2. When water supply requirements cannot be installed due to topography or other conditions, the AHI may require additional fire protection as specified in section 18.3.2 as amended in the code. 3. When there are not more than two dwellings, or two private garage, carports, sheds and agricultural. Occupancies, the requirements of section 18.3.1 may be modified by AHJ. 18.3.2* Where no adequate or reliable water distribution system exists, approved reservoirs, pressure tanks, elevated tanks, fire department tanker shuttles, or other approved systems capable of providing the required fire flow shall be permitted. 18.3.3* The location, number and type of fire hydrants connected to a water supply capable of delivering the required fire flow shall be provided on a fire apparatus access road on the site of the premises or both, in accordance with the appropriate county water requirements. 18.3.4 Fire Hydrants and connections to other approved water supplies shall be accessible to the fire department. 18.3.5 Private water supply systems shall be tested and maintained in accordance with NFPA 25 or county requirements as determined by the AHJ. 18.3.6 Where required by the AHJ, fire hydrants subject to vehicular damage shall be protected unless located within a public right of way. 18.3.7 The AHJ shall be notified whenever any fire hydrant is placed out of service or returned to service. Owners of private property required to have hydrants shall maintain hydrant records of approval, testing, and maintenance, in accordance with the respective county water requirements. Records shall be made available for review by the AHJ upon request. Zendo Kern, Planning Director December 17, 2020 Page 7 of 8 0- 18.3.8 Minimum water supply for buildings that do not meet the minimum County water standards: Buildings up to 2000 square feet, shall have a minimum of 3,000 gallons of water available for Firefighting. Buildings 2001- 3000 square feet, shall have a minimum of 6,000 gallons of water available for Firefighting. Buildings, 3001- 6000 square feet, shall have a minimum of 12,000 gallons of water available for Firefighting. Buildings, greater than 6000 square feet, shall meet the minimum County water and fire flow requirements. Multiple story buildings shall multiply the square feet by the amount of stories when determining the minimum water supply. Commercial buildings requiring a minimum fire flow of 2000gpm per the Department of Water standards shall double the minimum water supply reserved for firefighting. Fire Department Connections (FDC) to alternative water supplies shall comply with 18.3.8 (1)- 6) of this code. NOTE: In that water catchment systems are being used as a means of water supply for firefighting, such systems shall meet the following requirements: 1) In that a single water tank is used for both domestic and firefighting water, the water for domestic use shall not be capable of being drawn from the water reserved for firefighting; 2) Minimum pipe diameter sizes from the water supply to the Fire Department Connection FDC) shall be as follows: a) 4" for C900 PVC pipe; b) 4" for C906 PE pipe; c) 3" for ductile Iron; d) 3' for galvanized steel. 3) The Fire Department Connection (FDC) shall: a) be made of galvanized steel; b) have a gated valve with 2-1/2 inch, National Standard Thread male fitting and cap; c) be located between 8 ft and 16 ft from the Fire department access. The location shall be approved by the AHJ; d) not be located less than 24 inches, and no higher than 36 inches from finish grade, as measured from the center of the FDC orifice; e) be secure and capable of withstanding drafting operations. Engineered stamped plans may be required; Zendo Kem, Planning Director December 17, 2020 Page 8 of 8 t) not be located more than 150 feet of the most remote part, but not less than 20 feet, of the structure being protected; g) also comply with section 13.1.3 and 18.2.3.4.6.1 of this code. 4) Commercial buildings requiring a fire flow of 2000gpm shall be provided with a second FDC. Each FDC shall be independent of each other, with each FDC being capable of flowing 500gpm by engineered design standards. The second FDC shall be located in an area approved by the AHI with the idea of multiple Fire apparatus'conducting drafting operations at once, in mind. 5) Inspection and maintenance shall be in accordance to NFPA 25. 6) The owner or lessee of the property shall be responsible for maintaining the water level, quality, and appurtenances of the system. EXCEPTIONS TO SECTION 18.3.8: 1) Agricultural buildings, storage sheds, and shade houses with no combustible or equipment storage. 2) Buildings less than 800 square feet in size that meets the minimum Fire Department Access Road requirements. 3) For one and two family dwellings, agricultural buildings, storage sheds, and detached garages 800 to 2000 square feet in size, and meets the minimum Fire Department Access Road requirements, the distance to the Fire Department Connection may be increased to 1000 feet. 4) For one and two family dwellings, agricultural buildings, and storage sheds greater than 2000square feet, but less than 3000 square feet and meets the minimum Fire Department Access Road requirements, the distance to the Fire Department Connection may be increased to 500 feet. 5) For buildings with an approved automatic sprinkler system, the minimum water supply required may be modified. If there are any questions regarding these requirements, please contact Assistant Fire Chief Ian Smith at (808) 932-2907. ROBERT R. K. PERREIRA Acting Fire Chief DGOVERNOR OF wan STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES LAND DIVISION POST OFFICE BOX 621 HONOLULU, HAWAII 96209 December 18, 2020 SUZANNE D CASE CHAIRPERSON BOARD OF LANDON SDINATTERRESOconwSure^Ce exr state CES FROM: MEMORANDUM T6— DLNR Agencies: Div. of Aquatic Resources Div. of Boating & Ocean Recreation X Engineering Division (DLNR.ENGR(q hawaii.gov) X Div. of Forestry & Wildlife(rubvrosa.t.terrago(cahawaii.gov) Div. of State Parks X Commission on Water Resource Management (DLNR.CWRM(cilhawaii.dov) Office of Conservation & Coastal Lands X Land Division — Hawaii District (gordon.c.heit(o7hawaii.qov) TO: Russell Tsuji Russell Y. Tsuji, Land Administrator SUBJECT: Special Permit Application (SPP 20-000221) Request to Operate a Childcare Center/Preschool Facility and Construct a Playground for Student Use & as an "Event Venue" to be Rented Commercially LOCATION: Hualalai Road, Kailua-Kona, Island of Hawaii; TMK: (3) 7-5-017:045 APPLICANT: County of Hawaii on behalf of Pablo Penazola Transmitted for your review and comment is information on the above -referenced subject matter. Please submit comments by January 7, 2021. If no response is received by the above date, we will assume your agency has no comments. Should you have any questions about this request, please contact Darlene Nakamura at darlene.k.nakamuraahawaii.gov. Thank you. We have no objections. We have no comments. Comments are attached. Signed: Print Name Division: Date: Attachments cc: Central Files Carty S. Chang, Chief Engineer Engineering Division Dec 29, 2020 DEPARTMENT OF LAND AND NATURAL RESOURCES ENGINEERING DIVISION LD/Russell Y. Tsuji Ref: Special Permit Application (SPP 20-000221) Request to Operate a Childcare Center/Preschool Facility and Construct a Playground for Student Use & as an "Event Venue" to be Rented Commercially Location: Hualalai Road, Kailua-Kona, Island of Hawaii TMK(s): (3) 7-5-017:045 Applicant: County of Hawaii on behalf of Pablo Penazola COMMENTS The rules and regulations of the National Flood Insurance Program (NFIP), Title 44 of the Code of Federal Regulations (44CFR). are in effect when development falls within a Special Flood Hazard Area (high risk areas). State projects are required to comply with 44CFR regulations as stipulated in Section 60.12. Be advised that 44CFR reflects the minimum standards as set forth by the NFIP. Local community flood ordinances may stipulate higher standards that can be more restrictive and would take precedence over the minimum NFIP standards. The owner of the project property and/or their representative is responsible to research the Flood Hazard Zone designation for the project. Flood Hazard Zones are designated on FEMA's Flood Insurance Rate Maps (FIRM), which can be viewed on our Flood Hazard Assessment Tool (FHAT) (http://gis.hawaiinfip.org/FHAT). If there are questions regarding the local flood ordinances, please contact the applicable County NFIP coordinating agency below: o Oahu: City and County of Honolulu, Department of Planning and Permitting 808) 768-8098. o Hawaii Island: County of Hawaii, Department of Public Works (808) 961-8327. o Maui/Molokai/Lanai County of Maui, Department of Planning (808) 270-7253. o Kauai: County of Kauai, Department of Public Works (808) 241-4896. Signed: CARTY S1MG, CHIEF ENGINEER Date: Dec 29, 2020 DAVID Y. IGE GOVERNOR Mr. Zendo Kern Director Department of Planning County of Hawaii 101 Pauahi Street, Suite 3 Hilo, Hawaii 96720 Attention: Mr. Alex Roy Dear Mr. Kern: STATE OF HAWAII DEPARTMENT OF TRANSPORTATION 869 PUNCHBOWL STREET HONOLULU. HAWAII 96813-5097 January 14, 2021 Subject: Request for Comments for Special Permit Application Alakai Academy Preschool Facility (SPP20-000221) 75-477 Hualalai Highway —Kailua-Kona, Hawaii Tax Map Key No.: (3) 7-5-017: 045 JADE T. BUTAYDIRECTOR Deputy Director LYNN A S. ARPXI REGAN DEREK J. CHOW ROSS M. HIGASHI EDWIN H SNIFFEN IN REPLY REFER TO' STP 20-144 HWY-PS 2.4807 Thank you for your letter dated December 11, 2020, requesting for our review and comments of the Special Permit Application. The proposed request is to allow the development of a Preschool and Childcare Center with a daily 9:00 a.m. to 5:00 p.m. operation. The applicant is licensed to allow up to 72 children and 15 staff with plans for future growth to include increased enrollment count. The request also includes a secondary use to allow public rental of the site for events, parties, and performances within the 2 -acre portion of a 5.3 -acre site during school closure. The proposed work includes the construction of 3 building structures totaling 10,800 square feet, as well as an outdoor parking lot and a playground. The site is a flag lot with a primary access on Kakalina Street; a private road and is accessible to the nearby State Queen Kaahumanu Highway (State Route 11) via a County -owned, Hualalai Road. The Hawaii Department of Transportation (HDOT) has the following comments: 1. We have reviewed the Traffic Impact Analysis Report (TIAR) dated November 4, 2020. While the proposed project does not appear to significantly impact the State highway system, we note that there are several issues of concern as follows: a. In accordance with Hawaii Administrative Rules, HAR 16-115-9, the Engineer is required to provide a Certification Statement: "THIS WORK WAS PREPARED BY ME OR UNDER MY SUPERVISION." SCANNED JAN 14 2021 4129229 y MJ—" JAN 1 9 2021 A,d202021 Mr. Zendo Kern January 14, 2021 Page 2 HWY-PS 2.4807 h. The application stated that the operation is licensed and anticipated to have up to 72 students and 15 staff with upcoming plans to increase the enrollment count. However, the trip generation in the TZAR was based on 55 students and 11 staff. Therefore, the study should be revised to be consistent with the application, which should include a discussion of enrollment expansion plans and timelines. c. An analysis is missing and should be provided in the study to identify trip generated impacts by the secondary uses proposed for public events from the project site onto the nearest State Queen Kaahumanu Highway. Provide also, any mitigation measures that may be required. d. A revised TIAR should be submitted to the HOOT for review and acceptance. i. I lowever, in the event the Special Permit application is approved, we advise that a condition should be required that any future expansion or intensification of land use beyond what is presented under this application, will require a revised or updated TIAR to be submitted to the HDOT for review and acceptance, and to determine any traffic impacts generated by the project onto the State Kaahumanu Highway. The project shall mitigate its traffic impacts at no cost to the State. 2. The application should provide evidence of access rights for the use of Kalcalina Street under Item 1. 3. In Item E of the application relating to the Flood Hazard Assessment Report, it appears that the property's roadway access to Hualalai Road is impacted by potential flood concems in several locations. A discussion should be provided on how the development will address flooding/drainage concerns and to identify any potential impacts to the nearby State Kaahumanu Highway. 4. The applicant shall coordinate with the Highways Division, Hawaii District Engineer on any further requirements or permits. If you have any questions, please contact Jeyan Thirugnanam, Systems Planning Engineer, Highways Division, Planning Branch at (808) 587-6336 or by email atjeyanthinignanam@hawaii.gov. Please reference file review number PS 2020-192. Sincerely, -# C/2J JADE T. BUTAY Director of Transportation DAVID Y. ME HAWAII July 29, 2020 STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES STATE HISTORIC PRESERVATION DIVISION KAKUHIHEWA BUILDING 601 KAMOKILA BLVD., S T E 555 KAPOLEI. HI 96707 suuxx D CASE ROY EMT IC M•41/114. w.r maw AdMOCEAN MOW RCM cotrsER vAnni Am) COASTAL LA/C5 POWEEWOOFORESTRYANDWELDLIF E Hamm PRE3IRVAP014 IFAKCOLOW ISLAM REFER 'WE CCM14.1391, WM IN REPLY REFER TO: Mr. Kyle Honda Log No. 2020.01308 County of Hawaii Doc. No. 2007NM01 Department of Public Works Archaeology Engineering Division 74-5044 Ane Kaeohokalole Hwy Building D Kailua-Kona, 111 96740 Kylei.Hondadthawai icountv.zov Dear Mr. Honda: SUBJECT: Chapter 6E-42 Historic Preservation Review — County of Hawaii Grubbing and Grading Permits for Pablo Penaloza Archaeological Inventory Survey W ai'aha 1" Ahupua'a, North Kona District, Hawaii Island TMK: (3)7-5-017:045 This letter provides the State Historic Preservation Division's (SHPD's) review of two permit applications and a draft archaeological inventory survey (AIS) report titled, Archaeological Inventory Survey Report for 4.15 -Acres Located in Wai'aha I"Ahupua'a, North Kona District, Hawaii Island Nawai'i [MIK: (3)7-5417'0451 (Escott, June 2020). SHPD received this submittal on lune 8, 2020 (Log. No. 2020.01308). On November 15, 2019, SHPD received a grubbing permit application, a notice of authorization for disposal of grubbing material, project maps, a SHPD HRS GE Submittal Form, and the draft AIS report (Log No. 2019.02536). Subsequently, SHPD received a second submittal on January 14, 2020, which included agrading permit application, an updated plan showing the proposed house layout an Lot 2-B, and duplicates of the materials included in the earlier submittal (Log No. 2020.00079). SHPD requested revisions to the draft AIS in a letter dated April 27, 2020 (Log No. 2019.02536, 2020.00079, Doc. No. 2004NM02). The grubbing permit application and HRS 6E Submittal Farm indicates a 4 -acre portion of the 5.352 -acre parcel will be grubbed to remove vegetation. The grading permit application and HRS 6E Submittal Form indicates the -same area will be graded to support construction of a house pad. The Grade Plan identifies the property as Lot 13-2, portion of Waiaha 1"to Puapuaanui 1"Land Court Award 387. In contrast, the AIS report (Escort, June 2020) indicates the owner proposes to build a daycare center (preschool) and a farm dwelling which would serve as a residence and a bed and breakfast. On July 17, 2020, Mr. Penaloza confirmed via email (Nicole Mello ISHPD] and Glenn Escort [SCS]) that he contacted Mr. Honda to infant him that the project plans are as described in the AIS and the County accepted the change in plans_ ScientificConsultant Services, Inc. (SCS) conducted the AIS on behalf of the owner. The AIS fieldwork consisted of 100% pedestrian survey coverage of the 4 -acre portion. A single Historic property, Site 1150-10-28-31118, was identified, consisting ofa stacked stone wall remnant and an unimproved road. The road is described as a ranch road, likely dating from the Historic period to present. The wall is described as 3-5 courses high and 3-4 courses wide and mat as a remnant of a once longer wall but as a wall in which construction was abandoned before being finished. Either end of the wall is described as unfinished, Site -31(18 retains integrity of location, design, materials and workmanship and is assessed as significant under Criterion d (information) pursuant to HAR §13-284-6, as adequately documented and, thus, no further archaeological work is recommended. SHPD concurs with the site significance assessment and the recommendation of no further work. Mr. Kyle Honda July 29, 202D Page 2 The revised AIS adequately addresses the issues and concerns raised in our previous correspondence (Log No. 2019.02536, 2020 00079, Doc. No. 2004NM02). This AIS report satisfies the requirements of HAR §13-276-5. 1t is accepted. Please send two hard copies of the document, clearly marked FINAL, along with a text -searchable PDF version, to the Kapolei SHPD office, attention SHPD Library. Please also send a PDF version of this report to Lehua.K. Soares(@,,hawaii. gov. Pursuant to HAR §13-284-7(e), when the SHPD agrees that the action will not affect any significant historic properties, this is the SHPD's written concurrence and historic preservation review ends. The historic preservation review process is ended. The permit issuance process may proceed. SHPD herby notifies the County that the AIS has been accepted. No further archaeological work is required. The historic preservation review process is ended. The permit issuance process may proceed. Please attach to the permit: In the unlikely event that subsurface historic resources. including human skeletal remains, structural remains, cultural deposits, artifacts, sand deposits, or sink holes are identified during the demolition and/or construction work, cease work in the immediate vicinity of the find, protect the find from additional disturbance, and contact the State Historic Preservation Division, at (808) 933-6751. Please contact Nicole A. Mello, Hawaii Island Historic Preservation IV at Nicole.Mellor3hawaii.gov for matters regarding archaeological resources or this letter. Aloha, glair 09ofe` Alan S. Downer, PhD Administrator, State Historic Preservation Division Deputy State f listoric Preservation Officer cc: Natalie Whitworth Natalie.VVhitworth(rlrhawaiicountv.00v Dion Gonzales Dion,Gonzales(dhawali.gov Leilani Lewi Leilani.Lewit hawaiicounty.¢ov Pablo Penaloza,,venaloza(rD¢mail.com Glenn Escott gyescott'scshawaii.con MARK MORRISON, P.E. P.O. Box 529 Rolmaloa, HI 96725 808) 960-2089 - fax (888) 958-2377 mfalohacaloha.net February 22, 2021 County of Hawaii - Department of Water Supply Attn: Keith K. Okamoto 345 Kekuanaoa Street, Suite 20 Hilo, HI 96720 SUBJECT: Alaka'f Academy, Special Permit Application (SPP 20-000221) Applicant - Pablo Penaloza TMK# 7-5-017:045 Dear Keith, CJH PLANNING DEP FEB 26 2021 PH12:7. RECD EV EH I have completed water usage calculations for obtaining water service for this project. Calculations for Domestic Water consumption are as follows: Average Daily Consumption = 2270 gallons/day Max. daily consumption = 3800 gallons/day Estimated Peak hour flow = 368 gallons = 6.1 GPM based on actual fixture counts and historical usage; includes irrigation) Please advise if any other information is needed for this project. Very truly yours, Mark Morrison, P.E. SCANNED MAR 140148v Carty Chang Engineering Division State of Hawaii DLNR PO Box 621 Honolulu, HI 96809 Reference: Special Permit Application SPP 20-000221 (TMK 3-7-5-017:045) Attention Engineering Division COH PPLMN s 2132821 _•7 EC.. _'- January 20, 2021 Our property is shaped as a flag. We are aware that the "pole" section of the lot, which would be used to access the preschool, is located in an area designated as flood zone. Since I have known the property, we have not seen any floodwater flowing at all. At this point, the access road follows the contour of the land. Our plan includes monitoring the impacted access area every time it rains. If we notice any flooding, we will work with engineering to address the issues without any delay. Thank you for your comments. Pablo Penaloza SCANNED MAR 0 4 2021 by..i 0146 Hawaii Fire Department 25 Aupuni Street, Suite 2501 Hilo, HI 96720 Reference: Special Permit Application SPP20-000221 (TMK 3-7-5-017:045) January 20, 2021 Dear Robert Perreira, Comments Response: Thank you for your comments and research supplied regarding the regulations regarding fire protection requirements. I will be sure to have each comment incorporated by our design/engineering team. Mahalo, Pablo PenalozaM SC/A NNPD 40 =1147 Department of Water Supply 345 Kekuanaoa Street Hilo, HI 96720 Reference: Special Permit Application SPP 20-000221 (TMK 3-7-5-017:045) Dear Keith Okamoto, COB P QNWING DEP FEB 26 2021 Fr12: REED 8V Et/ALL January 20, 2021 Comments Response: I have hired an engineering firm to conduct a water usage calculation study. I will forward that as soon as I have the report. A backflow prevention assembly will be installed as required. We acknowledge that the 8 -inch main water line won't be sufficient to provide the 2,000gpm flow for fire protection. We will work with our design/engineering team and fire department to ensure adequate fire protection is put in place. Thank you for your comments. Pablo Penaloza SCA Nin MAR 0 5 2021 bt.I_40202