Loading...
HomeMy WebLinkAbout2021-04-22 DEM Director's Report TO THE ENVIRONMENTAL MANAGEMENT COMMISSION April 28, 2021 Agenda item 7 1. LEGISLATIVE UPDATE a. County Council (Since last report posted on 3/18/21) ITEM DESCRIPTION CURRENT STATUS Completed items Bill 25 Amends capital budget to appropriate Approved by Mayor as Ordinance funding for federally funded wastewater No. 21-30, effective 3/31/21. projects: Phoa and Puak. Res. 67-21 Authorizes payment of a five-year lease for Approved by Council 4/7/21. two multifunction copy machines for Admin/Business Services and Solid Waste Comm. 167 Appoints Elyse Robinson of Council District 2 Approved by Council 4/7/21. to the EMC for a term to end 12/31/25. Res. 73-21 Authorizes acceptance of the 2019 Integrated Positive recommendation by Solid Waste Management Plan. RAWEEMC on 4/6/21. Approved by Council 4/21/21. Comm. 182 Appoints Carrie Hoopii of Council District 3 to Positive recommendation by the EMC for a term to end 12/31/25. RAWEEMC on 4/6/21. Approved by Council 4/21/21. DEM budget Completed on 4/15/21. its annual budget and program review for DEM. Comm. 207 Requests discussion with DEM regarding rule Discussion completed in prohibiting trailers at transfer stations. RAWEEMC on 4/19/21. Active items Bill 29 Appropriates revenues in the Federal Block Positive recommendation by Grant account ($2,699,374) and the Block Finance Committee on 4/6/21. Grant Program Income account ($100,000); Approved by Council on first and appropriates the same to the following reading on 4/21/21. Anticipated accounts: Ulu Wini Low Income Housing vote by Council on second reading Wastewater Treatment Plant Repairs on 5/5/21. ($1,420,889); Ulu Wini Low Income Housing Certified Kitchen Conversion ($495,500); Hale Ohana Domestic Abuse Shelter - Interior & Exterior Renovations ($225,760); West r Interior & Exterior Renovations ($157,225); and Administration, Planning & Fair Housing ($500,000). Upcoming item Budget Draft 2 Updated budget numbers using certified RPT. Mayor to release draft on 5/5/21. 1 b. Active bills in the Legislature as of 4/22/21 HB 1298 HD1 SD1 Transfers to the general fund $5 million from the beverage container deposit CD1 special fund and $1 million from the electronic device recycling fund. HB 1299 HD1 SD1 Section 20 redirects funds generated from the advance disposal fee from the CD1 environmental management special fund into the general fund. Makes funding of glass recovery programs subject to legislative approval. Status: Senators and representatives have met and have reconciled their differences regarding final amendments to the above bills. Upon Senate, the bills are to be transmitted to the Governor for his review and possible approval. 2. REQUESTS FOR UPDATES a. Transfer station closures, including Wai Commissioner McIntosh) b. N McIntosh) See Section 4, Wastewater Division updates c. Implementing the goals and priorities of the ISWMP (Requested by Chair Adams) d. Administrative rule banning trailers at solid waste transfer stations (Requested by Chair Adams) 3. SOLID WASTE DIVISION 1. OPERATIONS The Department instated Rule No. 9-17 on April 17, 2021. The Department was requested by Council to answer questions regarding this rule. Additional discussions with Council members are to take place in the coming weeks to discuss any possible alternatives to this rule. 2. ADMINISTRATION The SWD will hold safety training for all operations personnel on April 28, 2021. In order to facilitate participation by all employees the Division will close the Hilo, Kea this training. This training and subsequent closure are to occur on a quarterly basis. 3. SOLID WASTE CAPITAL IMPROVEMENTS (No report.) 2 4. RECYCLING SECTION Out of the Sea Media Arts is continuing to develop education information focused on reducing food waste, Master Recycler Program, and update various promotional materials. Currently, no manufacturer offers convenient on-island take-back of electronics. the Electronic Waste and Television Recycling & Recovery Act (HRS 339D) mandatory take-back provisions. Solid Waste requests the Commission to advocate for a stronger state Extended Producer Responsibility law requiring convenient on-island manufacturer sponsored take-back. 5. DERELICT AND ABANDONED VEHICLE (DAV) PROGRAM Monthly towing numbers: AV Towing 2020-21 E. The total tow requests for March 2021 was 203; however, 21 vehicles were July 2020 115 89 not on location at the time of arrival. Aug 2020 87 76 Sept 2020 80 54 Oct 2020 82 43 Nov 2020 64 55 Dec 2020 76 45 Jan 2021 90 54 Feb 2021 107 57 Mar 2021 147 35 Apr 2021 May 2021 June 2021 6. RELOAD FACILITY UPDATE (FY 20-21) Total Tons Taken Month/Year to Sort Station Jul 2020 4,529.58 Aug 2020 4,333.78 Sept 2020 4,052.55 Oct 2020 4,210.63 Nov 2020 4,406.67 Dec 2020 4,684.32 Jan 2021 4,645.69 Feb 2021 4,092.99 3 Mar 20214,622.19 Apr 2021 May 2021 Jun 2021 Totals 39,578.40 When time permits, SWD staff removes the corrugated cardboard from the trash and places it in a roll-off for recycling. 7. MONTHLY LANDFILL TONNAGES (FY 20-21) Month/Year WHSL Jul 2020 17,409.38 Aug 2020 16,027.05 Sept 2020 14,526.61 Oct 2020 16,605.86 Nov 2020 15,521.35 Dec 2020 16,326.19 Jan 2021 15,740.65 Feb 2021 14,956.72 Mar 2021 17,914.90 Apr 2021 May 2021 Jun 2021 Totals 145,028.71 8. MONTHLY TRANSFER STATION TONNAGES (FY 20-21) Month/Year EHRSS WHSL Jul 2020 3,800.06 8,778.34 Aug 2020 3,673.55 8,386.36 Sept 2020 3,421.87 8,089.05 Oct 2020 3,543.85 8,280.06 Nov 2020 3,719.65 7,936.21 Dec 2020 3,911.84 9,058.94 Jan 2021 3,942.90 8,791.50 Feb 2021 3,430.00 7,748.00 Mar 2021 3,827.42 8,581.64 Apr 2021 May 2021 Jun 2021 Totals 33,271.14 75,650.10 The above table is to include data on the waste disposed in the landfill (not the greenwaste or recycling data). 4 4. WASTEWATER DIVISION As the Wastewater Division faces numerous fiscal, regulatory, and political challenges and seeks the advice, assistance and expertise on ways to overcome these challenges. Efforts are being made among multiple fronts to address these concerns. Wastewater Division reports the following activities and invites comment on the following: 1. communication with the EPA, consultants from Brown and Caldwell, the Office of the Mayor, the Finance Department, and Corporation Counsel regarding the status of the closures of these large capacity cesspools. Knowing the challenges in meeting deadlines due to recent geological discoveries and issues with land acquisition in administration for the design of the two wastewater treatment plants, we are supportive of different designs that will meet the secondary treatment requirement of the administrative order on consent without severely burdening the County with capital obligations. These meetings with EPA Region 9 are ongoing and we do not have a result to report at this t has been paused while these issues are being worked out. 2. Hilo Wastewater Treatment Plant: The condition of the treatment plant has received renewed attention recently and has received site visits from federal, state, and county lawmakers. Wastewater Division has presented to Rep. Kahele a list of shovel-ready projects for island-wide that are in dire need of funding, should it become available. Wastewater has placed as its highest priority the design of a replacement for the biosolids digester and the headworks components at the Hilo Wastewater Treatment Plant. The new asset management program and the new positions will get us back on track to catch up on deferred maintenance. 3. County Budget: The County Council beginning on May 5 will receive an updated budget picture with certified real property tax values and will make amendments as they deem necessary. The preliminary budget released on March 1 included a request for 14 positions in wastewater division. These positions are necessary for the new Environmental Quality Control section that includes compliance, and the re-organized maintenance section to serve facilities island-wide. Besides the improvement of the Hilo WWTP, other proposals include upgrades to wastewater treatment plants and facilities island-wide, pump station upgrades and extensions of the sewer collection systems in east and west Hawaii. 4. Currently, working with a grant-seeking consultant who has identified possible loan/grant agencies to follow up with for possible funding. Actively applying for grant funds from USDA. 5 1. WASTEWATER CAPITAL IMPROVEMENTS A. Project Design is under re-evaluation with total project cost approaching $45 million. Discussions with EPA regarding estimated WWTP construction costs increasing from $14.6 million to $20.6 million because WWTP site has steeper slopes than predicted. Also, geotechnical borings confirmed the WWTP site has underground voids due to lava tubes. Unknown lava tubes will add additional construction costs should they be encountered during construction. EPA is trying to determine what effects these changes have on the NEPA Environmental Assessment (EA) that was completed last March 2020. County also needs to request for an extension of the current AOC milestone deadlines approved by EPA on May 24, 2021 (using the June 24, 2021 backstop deadline for Phase 1 Collection System Design). Current Schedule 11/04/20: Final AMP approved by SHPD (letter received 11/09/2020). 05/01/21: Awaiting EPA review of NEPA EA if COH changes WWTP. 06/28/21: WWTP Land Acquisition via Condemnation (Re-doing Land appraisal). 08/06/21: Submit Special Permit Application (County acquires Land to submit). 09/23/21: Complete Design-Build RFP for WWTP and Phase 1 Collection System. 10/01/21: Advertise Design-Build RFP WWTP and Phase 1 Collection System. 01/15/22: Issue NTP for Design-Build Contract 04/18 LCCs closure. o Final EA/FONSI was published with OEQC on 03/08/20. Also, the Draft Final AIS was submitted to SHPD on 02/26/20 and SHPD approved as Final AIS on 04/20/20. o , an Archaeological Monitoring Plan (AMP) was required. AMP was logged in queue by SHPD on 05/05/20 for review/approval. SHPD approval dated 11/04/2020 was received 11/09/2020. o The project is planned for funding with Clean Water State Revolving Funds (CWSRF) loan, County Bonds (CIP), and partially by a federal EPA grant. B. The state-level OEQC EA completion is required prior to land purchase for the WWTP/disposal facility. because no federal funds are being used on this LCC project (note: if CWSRF funds are utilized federal cross-cutters are still required). Initial archaeological, flora and fauna field work completed (11/2020). Section 106 and Section 7 consultation by DOH pending final area of potential effect for all three CWSRF projects. AOC compliance completion of the final EA was originally 10/05/2019 which was extended to 07/23/21 at COH request on 6 09/26/2019. COH requested and EPA granted on 06/01/2020 another extension of the EA completion date of 08/27/23. Project Design is under re-evaluation because total project cost was approaching $80 million, assuming UV disinfection and concrete lined lagoons. The project is planned for funding with Clean Water State Revolving Funds (CWSRF) monies and County Bonds (CIP). Current Schedule: 11/2020: Complete Archaeology and Biology Field Studies. 10/2020: Field Study/Literature Review (FSLR) and AIS Plan logged by SHPD for Review. 12/2020: SHPD requests an AIS in the project area and indicates current proposed AIS testing strategy appears sufficient. 09/2021: Observation of geotechnical survey to provide further information about project area geology and stratigraphy for Draft AIS anticipated 10/2021: Draft EA and Anticipated FONSI scheduled for OEQC publication. 03/2022: Draft AIS to SHPD anticipated. 06/2023: Section 6E and 106 concurrence anticipated from SHPD/SHPO. 05/2023: Final EA publication. 02/2024: AMP approval from SHPD. 09/2025: WWTP and Phase 1 Collection System Design complete. 09/2025: Anticipated advertisement for bids-Phase 1 Construction. 06/2027: LCCs closure Phase 1 construction complete. 7