Loading...
HomeMy WebLinkAbout2021-07-28 - Director's Report DIRECTOR’S INFORMATIONAL REPORT TO THE ENVIRONMENTAL MANAGEMENT COMMISSION July 28, 2021 Agenda item 7 1. LEGISLATIVE UPDATE a. County Council(Since last report posted on 5/20/21) ITEMDESCRIPTION CURRENT STATUS Completed items Budget bills Bills 21 and 22 establish the operating and Approved by Council on final capital budgets, respectively, for FY 21-22. reading 6/3. Approved by Mayor as Ordinance Nos. 21-38 and 21- 39. Comm. 286Discussion on implementation of landfill tipping Discussion held in RAWEEMC on fee prescribed by the Department of 6/15. Environmental Management. Res No. 143-21 Resolution urging the County Department Positive recommendation by of Environmental Management to ensure that RAWEEMC on 6/15. Adopted by destinations to which the County of H Council on 7/7. transports its recyclable waste for out-of-state processing abide by the environmental standards outlined by the Basel Convention. Res. 158-21 Authorizes sewer improvement district for Adopted by Council on 7/7. Kaloko Heights project. Active item Res. 167-21 Authorizes entering into agreement with DHHL Postponed by Council on 7/21 to to collaborate on removal of abandoned and the call of the chair. derelict vehicles from various DHHL properties. 2. REQUESTS FOR UPDATES a. An overview of the $1 billion wastewater project list that DEM is pursuing via federal infrastructure funds. List the projects, cost per project, alternatives considered for each project, and timelines for completion proposed in the federal request or projected timelines for each project’s completion. Is the proposed $1 billion sought in the form of grants or loans? If both, please specify. (Gaffney) Response: See attached PDF and underlined comments below. b. DEM’s short-term and long-term plans for recycled water management and cost recovery. Does DEM intend to push DWS to handle the sale and distribution of R-1 water (as other counties do) or does DEM intend to manage those specifics of recycling from within DEM? (Gaffney) 1 Response: At the present time, DEM intends to manage WWD’s recycling program. c. Response: At present there is no negotiations on-going. DEM has discussed with EPA the new site condition information received after the Environmental Assessment (EA)/FONSI was completed (for Pahala LCC) has driven the construction cost of the aerated lagoon second treatment plant much higher than what was estimated in the Preliminary Engineering Report. EPA does not know if the switch to a different secondary treatment plant will necessitate requiring a supplemental EA. Given that EPA did not grant DEM an extension because of these new site condition information, DEM is pursuing a Design/Build approach to meet the April 2023 LCC closure deadline. d. Residential fee credit issue discussed at RAWEEMC 6/15/21 Response: In addition to the primary discussion regarding the rate increase which is scheduled to take effect on July 1, 2021, the Council asked questions regarding the removal of the “Residential Credit” that was previously in Chapter 20 of the Code. The discussion before Council revolved around the possibility of the Credit being reinstated in some form. Council requested that the Department return to discuss options for possible replacement programs. e. Impacts of Council approved Budget 2021-22 for DEM, including life cycle assessment contract and funding a contractor to look into wastewater funding alternatives. Response: The consultant contract for the Life Cycle Analysis is complete. SWD is able to utilize FY20-21 funds for the project. f. Ideas for using the newly authorized County transient accommodations tax (Part III, Act 1, Special Session 2021), if enacted by County ordinance, to support sustainability or other program needs. (Adams) g. Request for discussion regarding greenwaste diversion program policies and Top 2019 ISWMP recommendations – Status update 1. Conduct education, outreach, and DEM leadership participated in the “Revitalize public awareness Puna” community event on June 9 to address questions relating to solid waste, wastewater, and recycling issues important to the Puna district. 2 2.Regularly review and, when Ongoing. Parties are in active discussionswith appropriate, renegotiate WHSL each other. contract 3. Conduct additional household hazardous waste collection events 4. Change County Code to allow small businesses to drop off recyclables at recycling and transfer stations 5. Establish goals that are expressed and See “Requests for Updates,” item (e), relating to measured in terms of environmental the Life Cycle Analysis, above. impacts and consider full life cycle impacts, in addition to tonnage-based landfill diversion or waste recovery goals 6. Develop County policy and Council adoptsResolution No. 143-21, relating ordinances related to source to the Basel Convention reduction and recycling Other 2019 ISWMP recommendations – Status update 8-1: Reconstruct one or more recycling and in transfer stations annuallyprogress. 3. SOLID WASTE DIVISION 1. The Solid Waste Division held its quarterly training event on July 21 for all baseyards island wide. This will result in closures of Transfer Stations that are normally open on Wednesdays. 2. The Abandoned Vehicle Section held its first Rural Junk Car Collection event in Hawaiian Ocean View Estates (HOVE) on July 17-18. Nearly 60 junk cars were collected from residents in the HOVE area. This was a huge success due to the collaboration of multiple agencies between the County and State. The AV section also had significant support from Council Woman Maile David and the HOVE community groups. 3. Multiple contracts for various services were renewed over the past month including the 2- bin recycling program, security guard contract for Solid Waste Transfer Stations, E- Waste collection and junk vehicle towing contracts. 4. The Division is working toward finalizing the Annual Operating Reports for the State Department of Health. These reports outline all of the tonnages of materials collected by the Division during the calendar year. 5. is in the process of getting all of the site preparations completed. This project is expected to be completed during the winter of 2021-22. 3 3a. RELOAD FACILITY UPDATE (FY 20-21) (new data shaded in gray) Total Tons Taken Month/Yearto Sort Station Jul 2020 4,529.58 Aug 2020 4,333.78 Sept 20204,052.55 Oct 20204,210.63 Nov 20204,406.67 Dec 20204,684.32 Jan 2021 4,645.69 Feb 2021 4,092.99 Mar 2021 4,622.19 Apr 20214,341.20 May 2021 4,477.45 Jun 2021 4,563.52 Totals 52,960.57 When time permits, SWD staff removes the corrugated cardboard from the trash and places it in a roll-off for recycling. 3b. WHSL MONTHLY LANDFILL TONNAGES (FY 20-21) FY 20-21 20,000 18,000 16,000 14,000 12,000 10,000 8,000 6,000 4,000 2,000 0 JulyAugSeptOctNovDecJanFebMarAprMayJune FY 20-21 Jul 2020 17,409.38 Aug 2020 16,027.05 Sept 2020 14,526.61 Oct 2020 16,605.86 Nov 2020 15,521.35 4 Dec 2020 16,326.19 Jan 2021 15,740.65 Feb 2021 14,956.72 Mar 202117,914.90 Apr 2021 17,222.15 May 2021 17,163.90 Jun 2021 16,952.91 Totals196,367.67 3c. MONTHLY TRANSFER STATION TONNAGES (FY 20-21) Month/YearEHRSSWHSL Jul 2020 3,800.068,778.34 Aug 2020 3,673.558,386.36 Sept 2020 3,421.878,089.05 Oct 2020 3,543.858,280.06 Nov 2020 3,719.657,936.21 Dec 2020 3,911.849,058.94 Jan 2021 3,942.908,791.50 Feb 2021 3,430.007,748.00 Mar 2021 3,827.428,581.64 Apr 2021 3,567.618,588.27 May 2021 3,712.928,789.57 Jun 2021 3,724.738,615.02 Totals44,276.40101,642.96 The above table is to include data on the waste disposed in the landfill (not the greenwaste or recycling data). 4.WASTEWATER DIVISION 1. WASTEWATER CAPITAL IMPROVEMENTS A. Project Design is under re-evaluation with total project cost approaching $45 million. Discussions with EPA regarding estimated WWTP construction costs increasing from $14.6 million to $20.6 million because WWTP site has steeper slopes than predicted. Also, geotechnical borings confirmed the WWTP site has underground voids due to lava tubes. Unknown lava tubes will add additional construction costs should they be encountered during construction. EPA is trying to determine what effects these changes have on the NEPA Environmental Assessment (EA) that was completed last March 2020. County’srequestfor an extension of the current AOC milestone “Design of WWTP” deadline approved 5 by EPA on May 24, 2021 (using the July 24, 2021 backstop deadline for WWTP Design) was denied by EPA • Current Schedule 11/04/20: Final AMP approved by SHPD (letter received 11/09/2020). 06/14/21:WWTP Land Acquisition via Condemnation (Re-doing Land appraisal) submitted to Court. 06/24/21:Complete Design of Phase 1 Collection System. 07/24/21:Complete Design of WWTPunder a Design/Build procurement. 08/06/21:Submit Subdivision and Special Permit Application (County acquires titleto land). 11/01/21:Advertise for Design/Bid RFP -WWTP and Phase 1 Collection System. 01/31/22: Issue NTP for Contract 04/18/23: o Final EA/FONSI was published with OEQC on 03/08/20. Also, the Draft Final AIS was submitted to SHPD on 02/26/20 and SHPD approved as Final AIS on 04/20/20. o Based on SHPD’s review and acceptance of the AIS, an Archaeological Monitoring Plan (AMP) was required. AMP was logged in queue by SHPD on 05/05/20 for review/approval. SHPD approval dated 11/04/2020 was received 11/09/2020. o The project is planned for funding with Clean Water State Revolving Funds (CWSRF) loan, County Bonds (CIP), and partially by a federal EPA grant. B. •The state-level OEQC EA completion is required prior to land purchase for the WWTP/disposal facility. because no federal funds are being used on this LCC project (note: if CWSRF funds are utilized federal cross-cutters are still required). • Initial archaeological, flora and fauna field work completed (11/2020). Section 106 and Section 7 consultation by DOH pending final area of potential effect for all three CWSRF projects. AOC compliance completion of the final EA was originally 10/05/2019 which was extended to 07/23/21 at COH request on 09/26/2019. COH requested and EPA granted on 06/01/2020 another extension of the EA completion date of 08/27/23. • Project Design is under re-evaluation because total project cost was approaching $80 million, assuming UV disinfection and concrete lined lagoons. • The project is planned for funding with Clean Water State Revolving Funds (CWSRF) monies and County Bonds (CIP). • Current Schedule: 11/2020: Complete Archaeology and Biology Field Studies. 10/2020: Field Study/Literature Review (FSLR) and AIS Plan logged by SHPD for Review. 12/2020: SHPD requests an AIS in the project area and indicates current proposed AIS testing strategy appears sufficient. 6 09/2021: Observation of geotechnical survey to provide further information about project area geology and stratigraphy for Draft AIS anticipated 03/2022:Draft AIS to SHPD anticipated. 10/2022:Draft EA and Anticipated FONSI scheduled for OEQC publication. 06/2023: Section 6E and 106 concurrence anticipated from SHPD/SHPO. 08/2023: Final EA publication. (Note: EPA Compliance deadline for the following milestones were given the same August 2023 deadlineas the EA.) 02/2024: AMP approval from SHPD. 09/2025:WWTP and Phase 1 Collection System Design complete. 09/2025:Anticipated advertisementfor bids-Phase 1 Construction. 06/2027:LCCs closure –Phase 1 construction complete. C. Capital Improvement Projects (CIP) Please see attached Table for the listing of CIP projects under consideration for the existing Wastewater Basins currently being served by the County. Both - Wastewater Division. EMC’s request for alternatives being considered does not currently exist for many projects where the planning level effort have not been initiated. For many of the repair/maintenance projects, effort is focused on repairing, renovating, and upgrading components of that respective facility (i.e., pump stations and wastewater treatment plants). For the CIP projects identified, the total costs are estimated at $915,545,000. 7 Notes Prelim/Hdwks Process Upgrades, Anaerobic Digester UpgradePrimary Process Upgrades, 2nd Phase of Solids Handling Fac UpgradesPlanning in progressDesign initiatedPlanning in progressDesign initiatedPlanning in progressPlanning in progressPlanning in progressPlanning in progress Jun-23Jun-24Jun-25Jun-24Jun-30Jun-38Jun-25Jun-24Jun-25 Dec-25Dec-25Dec-26Dec-25Dec-23Dec-26Dec-24Dec-24Dec-24Dec-24Dec-24Dec-24Dec-24Dec-26Dec-25 Nov-24 Complete Construction Jul-22Jul-22Jul-23Jul-21Jul-21Jul-24Jul-28Jul-22Jul-23 Jan-22Jan-23Jan-22 Jun-22 Sep-21Sep-21 Dec-21Dec-22Dec-21Dec-21Dec-21Dec-21Dec-21Dec-21Dec-21Dec-22 Start 500 4,0001,2003,0004,0007,8005,0603,5005,7504,6003,6004,600 50,00054,50065,00032,00026,00025,00010,40070,000 ЍЉͲЋЉЉБЉͲЉЉЉ 24,47519,00020,000 ЌБЉͲЎЊЉ ($*1000) Project Cost Hilo WWTP Basin Pahala WWTP Basin Na'alehu WWTP Basin Kealakehe WWTP Basin Hilo WWTP Basin SubTotal: Hilo WWTP Phase 1 UpgradesHilo WWTP Phase 2 UpgradesHilo WWTP Secondary Process Upgrade w/ UV DisinfectionHilo WWTP Biotower Pump Station Replacement & Snail RemovalHilo WWTP Centrifuge RepairsHilo Facilities Plan UpdateOdor Control Upgrade at Hilo WWTPEast-Side SCADA for SPSPua Sewage Pump Station RenovationPua Sewage Pump Station Force Main Installation and RehabilitationWailoa SPS Renovation & Dual FMWailuku FM Replacement, Wailuku Bridge & Pueo Bridge SewersRenovate Onekahakaha SPS and Dual Force MainRenovate Kolea SPS and Dual Force MainKaumana Gardens Collector SewerAinako Aina Nani Collector SewerAinako Interceptor Sewer Phase 2Kalanianaole Collector Sewer Phase IIEast-side Collection System Improvements (Ext'g)New East-side Collection System Improvements Pahala Wastewater System Na'alehu Wastewater System Kealakehe WWTP Headworks UpgradeNorth Kona SPS, FM, Hina Lani Grv sewer, W HI Bus Prk Grv sewerKealakehe SPS - FM and Pump Replacement, Odor Control Upgrade Design initiatedPlanning CompletedDesign at 90% complete Jun-24Jun-25Jun-23Jun-34Jun-22Jun-23Jun-27Jun-23Jun-27Jun-26 Dec-23Dec-26Dec-24Dec-24Dec-24Dec-26Dec-24Dec-27Dec-22Dec-27 Mar-22Mar-22Mar-22 Jul-23Jul-24Jul-21Jul-21Jul-23 Jan-23Jan-22Jan-22Jan-22Jan-22 Jun-23Jun-23 Sep-21Sep-21Sep-21Sep-21 Dec-21Dec-21Dec-21Dec-21Dec-21Dec-21Dec-21 250500250300150 3,0009,1602,1003,7504,0008,800 2,0003,0001,0002,5004,0003,000 20,00015,60060,00013,500 ЋАͲЎЎЉ 15,500 ЋЌͲЉЉЉ 119,000 ЌЉЉͲБЌЎ Kapehu WWTP Basin Honokaa WWTP Basin Papaikou WWTP Basin Kulaimano WWTP Basin Kealakehe WWTP Subtotal: Papaikou WWTP Basin Subtotal: Kulaimano WWTP Basin Subtotal: Kealakehe R-1 North & South PipelinesKealakehe Facilities Plan UpdateKeopu Pump Station Renovation and Relocation (reappr.)Renovate Hala Halawai SPS and Force Main (reappr.)Renovate P19 SPS & FMLanihau SPS UpgradeWest side SPS SCADA UpgradeKealakehe Wastewater Treatment Plant R-1 UpgradeKealakehe SPS Building Re-roofingOdor Control Upgrades at 4 West side SPSWest-side Collection System Improvements Paukaa New Force MainPapaikou WWTP UpgradePapaikou Clarifier Center Drive RepairsPapaikou Headworks RenovationUV Disinfection Upgrade & SCADA SystemKulaimano Aeration Basin & Digesters UpgradeKulaimano Headworks RenovationUV Disinfection Upgrade & SCADA SystemKulaimano WWTP Upgrade Honokaa MCC Bldg RepairsPerimeter Security FenceWWTP Renovation Repair of Ext'g facilities until Rehab workRepair of Ext'g facilities until Rehab work Jun-27Jun-27 Jul-22Jul-22 - ЌͲЊЎЉ 20,00040,000 ЏЉͲЉЉЉ ВЊЎͲЎЍЎ υ Corrosion Repairs TOTAL: Corrosion Repairs Subtotal: Kapehu WWTP Basin Subtotal: West side RepairsEast side Repairs