Loading...
HomeMy WebLinkAbout2021-09-22 EMC testimony - (09-19) - Demoruelle, Sandra - DEM July 23, 2021 Correspondence to EPA Design Build Plan3 4 PUNI ss WAILUKIL,EHAWAII n>. WAS WAS STORAGE o DESIGN/BUILD DOCUMENTS TRUCKTO NAALEHU W WTP THESE DRAWINGS WERE RAS PREPARED FOR SUBMISSION TO EPA IN JULV 2021 TO PROVIDE A GENERAL UNDERSTANDING OF THE PROJECT CONCEPT AND MANUAL BARRACK ARE NOT INTENDED TO REFLECT -DIFFOAd HANN T DESIGN REQUIREMENTS. C INFLUENT C ERMEATE SURVEY �axmm n u ul�,m xux v rem n I �^��vv�wrmr ,..k wx, a a��I rdL�rluns w" rLU, ry N V VI Id x, inry I,aK,n W, rMm w -.A, mvm CIVIL N ATURAL GROU ND OR GRADE _+B 'RUSHED ROCA.—R.AVEL� EDGE OF ASPHALT PAVEMENTIN PLAN yI.( ouV litltin ASPHALT PAVEMENT IN SECTION GRAVEL OR ROADWAY ASPHALT SURFACE OR ROADWAY O 1INIRETE SURFACE, SLAB OR BLOCK O DATER MAN INSPELTION ASPHALT REMOVAL DELINEATED, TLAND Es ® WETLAND NITIG.ATICN AREA GENERAL TREE RE TIVAL AREA " FENCE(EASANG SCREENED) Im —119 FASTING GRADF CANTAURs IOR CAREENED) FINISH GRADE CONTOURS EXISTING SPOT ELEVATION ,Ql SCREENED) FINISH ION / F UTT GERI GROUNDTEILE /.ATION C,IALE CR DEPRECSION ICY "-.�- FD O T WLINE ALL DIRECTIONALL FROM �I STIFF 11 HOI TO I VERY), PLAN SLOPE IB HOR TO I VERY), SECTION TREES GENERALSYMBOLS /7jjr7T, EXISTING EOUIPN ENT ORD r IrniFR MATERIAL To BE REMOVE suRacF TO BE ILT FUTUREUREMOOIaL ____ ROPERTY LIN E PH.aNTCM LINE OR MATCH LINE NFU FACIunED(souDl PENTERUNE EUSTING(OR SCREENED) HIDDEN NNE OR BURIED OR FUTURE L.APRCVEMENTs GENERALNOTES I THISD US IS GENERAL IN NATURE SOME SVMaGLS SHOWN HERFON MAY NET BE USED ON THE SGIL BORING AND CONTRACT DRAWINGS. DESIGNATION s. SEE OTHER DRAvrING's FOR ABBREVIATIONS AND .ADDITIONAL SYMBOLS. FIRE HYDRANT OR FIRE DEFT CONNECTION I- lYllPTI A' SYMBOL. II AI BEUGEDON ANY IFTI IN EC CONTRACT AND IN'ATEG'ERIES FOR CONVEWENCE ONLv, FTHE CONTRACT DRAWINGS. (WITH TRAFFIC BOLLARDS) d ECTON OF THE ENIRONMENT.NO'ONSTRUCTIAN RELATED ACTIVITYIHALL CONTRIBUTE TO THE aUwED VALVE (ExISTWG SCREENED) CnTION OF HF ENNRONMENT AVOW MATERIAL TO FNTFR SURFACE OR GROUNDwnTFRe OR ANYAITIINITHATRIEENi.ulY FluoN A oISCVH.ARLE TO STATE ,Y ITEBY Musr HAVE SWoa APPROVAL OFTHE ST.ATEOFw.ASHINGTON, DEPARTMENTOFECOLOG/ MANHOLE OR TYPE 2 CATCH BRAD FACILITY NUMBERING SYSTEM TOR HEADWORKS FACILITY 200 MEMBRANE BIOREACTOR(DAE) 300 CHLORINE CONTACT TANK (OPT) 400 IRRIGATION EQUALIZATION TANK 500 SUBSURFACE DRIP EFFLUENT DISPOSAL SYSTEM 600 OPERATIONS BUILDINGISTANDBY GENERATOR 700 POTABLE WATER TANK PIPING SYSTEMS SING SYSTEMS ARE CALLED OUT BY SEE FOLLOWED BY PIPING SYMBOL ENCLOSED AS SHOVO nJ� . TDs EXISTING PIPING PIPE SIZE sEc� FUTU -- ¢S FUPUNI siREHAWAIs RE PIPING Il I2' o5,� �� %I UKU. HAWAII'L PIPING SYSTEM ISEE ` DRAWING .AND SEE F_AGAANNS) PIPING SYSTEM DESIGNATIONS FOR EwsTINI PIPE INDICATE TYPE OF sFRVICE ONLY AND Do NOT IMPLY PIPE MATERIALS USED SEE GNG FIR EXISTING PIPING ABBREVIATIONS DESIGN/BUILD DOCUMENTS THESE DRAWINGS WERE PREPARED FOR SUBMISSION TO EPA IN JULY 2021 TO PROVIDE A GENERAL UNDERSTANDING OF THE PROJECT CONCEPT AND ARE NOT INTENDED TO REFLECT DESIGN REQUIREMENTS. PIPING SYSTEM IDENTIFICATION ACH ATE AT ASC BG BUT FAIL .IFBAILER FFMBAILER BWW COIN CLA OLL Ol AGE G DINS ER DS PASA DC EE E F FOS FP Fnr 11 FILE "IS - LGI IT HWB IA LI LOW TV ERATION AIR AGITATION AIR UMINUM CHLOROHYGRATE ,All FLAT.ATIAN EFFLUENT ALLIMMSG ASCORBIC ACID 3113FILTER ORCULATI ON C'LBOILER I MENT MEEDIUM PRESSURE BOILER BLOWDOW N. LO ! PRESSUREu REg'4, agLER aLOwoOwN MEDwrn PREss EFFLUENT BOILER FEEDWATER, LOW PRESSURE FES BLENDEDEEDWSLUDATER, MEDIUM PRESSURE OF BACKWASH IAGTE DOLING WATER EHEMICALEDRAIN REGLAME VlATERRE cMLaRINF GAS ORINENOUID LGRE SOLDnoN w LANNF VACUUM MEDIUM PRESSURE ""UL TIN°sLGDGE IAGULATEDSE'ANDARYEFFLUENT DIGEATE' 'LEANING DEGESTER CLEAN NC RETURN D IONIZED WATER DIGESTER MIXING SLUDGE UL AIR BRAN DIGESTED S W DGE D1=SELFUEL D DIGESTED SLUDGE DISTILLED WATER GINEEPTIUST _ALREDSLUDGE FLAT OULOAIR ION DRAW FILTRATE L OIL RETURN FILELOILSUPPLY FILROTPROTECTIAN ATION SLUDGE FILTERED SECONDARY EFFLUENT FILTER 'ETD SECONDARY ASGRCETURNN GLYCOL SUPPLY GLUT ODIUM HvvocHLOwTE RvgR RETURN LEAT y RVgR SUPPLY HIGH PRE= SLUDGE GAS MEsnc PAYABLE HATvvATFRER E IT IN RETURN LAWTEMPERATUREHEAUNGGDPPLYUN INSTRUMENT AIR AS AT R ofY AIR WAS AB LABARATARYVAcuUM NG ALP P'L P.Pw III IRS R.,R SYS SDR IN BS FIR, TRIP TD TO TSS TWAs vArtR 'A VC, VP RAIL S_ ELUTION MIXED NOUOR AGED SLUDGE MEDIUM PRESSURE SLUDGE GAS NATURAL GAs OXYGEN LOU PRESSURE REaERarloN aIR UMPED FRAINALE PRIMARY EFFLUENT PLANT EFFLUENT FLOW HOLY' PRI MARYSLUDGE^� MARYSCUM ACTEvnTED SLUDGE All SEWAG RA,r N RAN WATER PIPE RECLAMEDYIATER(CLASSB, C, CR D) sER,NCEAN PINGS INGL ARY DRAM PP ANIT EFFLUENT ANITR Rol SEWAGE ARTING AIR cu IU RAIN SEALWATEI IC THKENED BOTTOM SLUDGE RETURN TANK BRAN THICKENER EFFLUENT THICKENED SLU DGE THICKEN ER OVERFLOW THCKENED PNMARvswoGE ANSFERSLUDUP TEMPERED VIATER SYSTEM THI'HENED,W.ASTE A'TNI.ATED SLUDGE VENT TO ROOF PA'UND CH EMICAL E/NN PETROLEUMT AC AQUOLEGE VrASTE MIXED ED LIOUER AT ER) T ER ERiS"ECrJN�ARY EFFLUENT) WATER HIGH PRESSURE ARINATED WATER 5'APING IRRIGATION No.3 SPRAYUATER C ,f I j� yF�p✓ yI,a vey". P" ^ PAHALA WASTEWATER TREATMENT PLANT DESIGN/BUILD DOCUMENTS REVISIONS REV DATE DESCRIPTION e LIL AIE DESIGNED. APPROVED FILENAME CIVIL 01 tlNL LEGEND.D4VG B'PROJE' BER r NUMBER CLIENT PROJECT CML CIVIL LEGEND D R-NC NUMBER c-637 3 GH ER 25 GENERAL NOTES GENERAL NOTES (CONT) 0KEY NOTES 1. ALL OTHER UTILITIES AND SITE FEATURES 3. COORDINATE DEMOLITION OF EXISTING 1. CONTRACTOR SHALL REMOVE ABOVE AND ANO OUTSIDE OF THE DEMOLITION LIMITS OF UTILITIES WITH NEW INSTALLATIONS, AS BELOW GRADE STRUCTURES, UTILITIES, A 1 11 WORK SHALL BE CONSIDERED "EXISTING APPLICABLE. CONTRACTOR SHALL TREES, AND PAVEMENT WITHIN THE b i ii TO REMAIN" UNLESS NOTED OTHERWISE. INSTALL TEMPORARY OR PERMANENT DEMOLITION LIMITS OF WORK AS NEEDED ALL STRUCTURES, UTILITIES AND STORMWATER DRAINAGE FACILITIES, TO COMPLETE THE PROJECT. THE APPURTENANCES, AND FACILITIES THAT INCLUDING BYPASS PIPELINES AND MATERIALS TO BE ABANDONED IN -PLACE REMAIN. PERMANENTLY OR TEMPORARILY, CUTFALLS, TO CONTROL SURFACE WATER OR DEMOLISHED AND REMOVED INCLUDE, ss WAILI HAWAIIa SHALL BE PROTECTED FROM DAMAGE. RUNOFF PRIOR TO DEMOLITION OF BUT ARE NOT LIMITED TO, UNDERGROUND CONTRACTOR SHALL REPAIR OR REPLACE EXISTING STORM DRAINAGE FACILITIES. OR AT GRADE IRRIGATION PIPING AND EXISTING UTILITIES THEY DAMAGE AT ITS FIXTURES, ASPHALT PAVEMENT, C OWN EXPENSE. FIELD LOCATED UTILITIES 4. CONTRACTOR IS RESPONSIBLE FOR ELECTRICAL WIRING, VEGETATION, SIGNS. THAT REMAIN PRIOR TO DEMOLITION STORMWATER MANAGEMENT AND UTILITIES, AND MISCELLANEOUS DEBRIS. ACTIVITIES. EROSION CONTROL FOR THIS CONTRACT PORTIONS OF EXISTING ORCHARD SHALL AT ALL TIMES DURING CONSTRUCTION. BE"EXISTING TO REMAIN." 2. CONTRACTOR SHALL DEMOLISH, REMOVE THE CONTRACTOR SHALL SEQUENCE OR ARAN DON IN -PLACE ALL STRUCTURES, DEMOLITION AND CONSTRUCTION 2. REMOVE AC PAVEMENT AND DRIVEWAY DESIGN/BUILD TREES, UTILITIES, AND OTHER SITE ACTIVITIES IN ACCORDANCE WITH APRON. PROVIDE A VERTICAL FULL DEPTH FEATURES THAT HAVE BEEN IDENTIFIED EROSION AND SEDIMENT CONTROL SAW CUT ALONG MAILE STREET OUTSIDE DOCUMENTS FOR DEMOLITION. THE CONTRACTOR SHEETS AND SPECIFICATIONS OF THE OF THE TRAVEL WAY. SHALL PREPARE THE BID BASED ON A CONTRACT DOCUMENTS. THOROUGH SITE RECONNAISSANCE 3. REMOVE TWO PINE TREES AND CLEAR AND CONDUCTED AFTER THE ADVERTISING GRUB FOR NEW DRIVEWAY APRON. DATE. ABSENCE OF OBJECT FROM THESE SHEETS DOES NOT RELIEVE THE 4. REMOVE UNPAVED ROAD BED. THESE DRAWINGS WERE CONTRACTOR FROM THE OBLIGATION TO PREPARED FOR SUBMISSION TO REMOVE MATERIALS OR STRUCTURES NOT 5. FIELD VERIFY AND REMOVE IRRIGATION EPA IN JULY 2021 TO PROVIDE A TO REMAIN WITHIN DEMOLITION LIMITS. APPURTENANCE. COORDINATE WITH LOT 1 GENERAL UNDERSTANDING OF OWNER FOR RELOCATION OF WATER THE PROJECT CONCEPT AND SERVICE TO LOT I. ARE NOT INTENDED TO REFLECT N. TRENCHING FOR UTILITY POINT OF DESIGN REQUIREMENTS. CONNECTIONS. C n1 ;111,,11t 1,11 ,-�r11�� Inll A All1.- 1.1�; ,uLu1.r r ,i ilr,l,ilrt T 11 .,lu YS CESSPOOLTO 8E tl LOF N e'w ^" NN i, it ip I1! rIV1 Jtl' v $' ^ N zl . F LARGE CAPACITY WORKORK ITVPI , s ( q ' ' L r q III ABANDONED k II' PAHA""A } I M Ip WASTEWATER oyo " TREATMENT PLANT 5 DESIGN/BUILD DOCUMENTS REVISIONS ^ w;y CRIaiION y f REV DATE DES af•o, y m�ay1 A tiVi I1 1 1 �� NNTL LIMITS (T 1 a" ` WORK (TYP) 5 „ 1` 1­ jI I I \ ^\II �\ ' O IESIONEo. III NF, y y 1FILENAME a 1 I I 1 I d It '.' 2 I ^ sM 12 1'1u rill V,:UIrr EI �1 H'"^PotH '1 MY CLIENT 0 100 200 cuE T110J c PUIMEE V[ I^ ^L ll 1 x 3111 1 IN FEET a4N 1 CIVIL ^r ) OVERALL EXISTING Nm'I 3 4 s J 1 AND DEMOLITION a ` 1 PLAN �'"�"F'Uao-^�m�alolr.KnNa e,y Nmc s."t^r�s*�a"ra,�r"ro�^^a�^a!w�ucdraz ^gym. +�?; r �M1r ��� '�H��'c'a^�,�.h,s"T�s'T.'"�TMa� rthr�'�rA, L MA IT STREET (COUNTY) iA Tr s'e - A 1 4{ ^ Dune^nNc Nur,aEu GOOK PINE TREES ROW TO 111 C_002 �A;Im1� L�1� ^ TO VALE STREET ROW TO 111 .L' tl II 1'r 1 REMAIN (48 EA) 41� '.Irl1 III FI11/9h1. 4 s Ea 25 VI 2 3 4 1 16 I, I, All I4 if \I � I "I fill b I G vt It,) RS MANHOLE, ll I q IIiV PROCESS AREA I4 if \I � I "I fill b I G vt It,) RS MANHOLE, ll I q IIiV PROCESS AREA 100 HEADWORKS 200 MEMBRANE BICREACTOR(CAR) 30C CHLORINE CONTACT TANK (OPT) 400 IRRIGATION EOUALIZATION TANK S00 EFFLUENT DISPOSAL 500 UTILITY BUILDING 100 I POTABLE WATER TANK GENERAL NOTES AINID 1. SEE CIVIL LEGEND FOR FACILITY NAMES. 2. SEE TYPICAL ROADWAY SECTION SHEETS. ■A� 1 3. MEMBRANE 810REACTOR OR APPROVED EQUIVALENT SECONDARY TREATMENT zRWAILUKU, SYSTEM (OAE). HAWAIIa C KEY NOTES 1. PAD MOUNT ELECTRICAL TRANSFORMER. 2, BULK FUEL STORAGE TANK, DESIGN/BUILD S. s•cHAINLINK FENCE. DOCUMENTS 4. POINT OF CONNECTION AREA FOR ELECTRICAL SERVICE AND RAW SEWER CONVEYANCE. THESE DRAWINGS WERE PREPARED FOR SUBMISSION TO EPA IN JULV 2021 TO PROVIDE A GENERAL UNDERSTANDING OF THE PROJECT CONCEPT AND ARE NOTINTENDED TO REFLECT DESIGN REQUIREMENTS. r I!I !I!' ' \ , i I PROPERTY LINE J X l FLOW III':- ,V A`.: ill �,nPill O IEl Ir Nn n I O � 93 SITE -VG 0 1OOu-200 cUENPR er=tt Rya ICT 1 y NllnneEa scALE IN FEET CIVIL OVERALL SITE PLAN PROPERTY LINE P I {p': fl' ,f I C TR003 5 25 FUNCTIONAL IDENTIFICATION INSTRUMENT SIGNAL LINES PROCESS AND SIGNAL CROSS REFERENCE SYSTEM MEASURED OR INITIATING READOUTOR PASSIVE OUTPUT p ® 1M1ID® VARIABLE VARIABLE DESCRIPTION MODIFIER FUNCTION FUNCTION MODIFIER ----------- �� ti INSTRUMENT SUPPLV, PROCESS TAPS ELECTRICAL SIGNAL (ANALOG OR DISCRETE) ELECTROMAGNETIC OR SONIC SIGNAL (GUIDED) ELECTROMAGNETIC OR �— SONIC SIGNAL (UNGUIDED) SOFTWARE OR DATA LINK ELECTRIC POWER SUPPLV WGO WHEN A PROCESS LINE CROSSES FROM DRAWING TO DRAWING. THE P&ID DRAWING NUMBERS NEED TO BE SHEET WHERE LINE REFERENCED. AS AN EXAMPLE, A PROGESS IS PUMPING TD A CONTINUES TO/FROIA TANK ON ASEPARATE P&ID.. SEE BELOW F--------------------------_------------------------, UNE LINE F`5 P- ausnc sao.a 91 AuSTIL satin I 1' PUMP I--sTaBAOE TANu I I P&ID P..y00 P&ID P-501 L--------------------- F J PROCESS DESCRIPTION OF PROCESS DESCRIPTION OF WHERE LINE GOES TO/FROM WHERE LINE GOES TOTROM IF THERE ARE MULTIPLE LINES CROSSING C { lL ��ss xwuw s•aeeT, suite sas WAILUKU, HAWAII A ANALYSIS ALARM B BURNER, COMBUSTION C CONDUCTIVITY CONTROL CLOSE D DENSITY, SPECIFIC GRAVITY DIFFERENTIAL DEVIATION E VOLTAGE, SOLENOID PRIMARY ELEMENT F FLOW, FLOW RATE RATIO IT FIRE, SMOKE GLASS DESIGN/BUILD DOCUMENTS H HAND HIGH I CURRENT INDICATE J POWER SCAN K TIME, SCHEDULE TIME RATE CONTROL OF CHANGE STATION ES� VAC ti0 HZ UNLESS OTHERWISE NOTED. (=.g. ES480 VAC) THE SAME TWO P&ID DRAWINGS. IT IS ACCEPTABLE TO ADD A LETTER FOR CLARITY L LEVEL LIGHT LOW M MOISTURE. HUMIDITY, MOMENTARY MIDDLE, INTERMEDIATE MOTION THESE DRAWINGS WERE N EQUIPMENT STATUS TYPICAL INSTRUMENT IDENTIFICATION PROCESS LINES PREPARED FOR SUBMISSION PROVIDE A EPAIN JULENDE To PROVIDE A GENERAL UNDERSTANDING OF O DISSOLVED OXYGEN ORIFICE OPEN P PRESSURE, VACUUM POINT (TEST)CONNECTION THE PROJECT CONCEPT AND ARENOTINTENDEDTOREFLECT DESIGN REQUIREMENTS. Q QUANTITY INTEGRATE, TOTALIZE NEW PRIMARY PROCESS FLOW NEW SECONDARY PROCESS FLOW NEW UTILITY PROCESS FLOW — — — — — — W FUTURE 0, EXISTING PROCESS FLOW,EQUIPMENT, OR SIGNAL PATH (SCREENED) �I NEWIEXISTING CONNECTIONS TEMPORARY PIPING --- — — — PROCESS AREA _— _ VENDOR PACKAGE BOUNDARY R RADIATION RECORD RUN CODE AREA CODE DESCRIPTION '4Vf `"^ P 1 yw ,y S SPEED, FREQUENCY SAFETY SWITCH STOP T TEMPERATURE TRANSMIT 100 HEADWORKS U MULTIVARIABLE MULTIFUNCTION MULTIFUNCTION MULTIFUNCTION 200 MEMBRANE BIOREACTOR(OAE) V VIBRATION, MECHANICAL ANALYSIS VALVE, DAMPER, LOUVER 300 CHLORINE CONTACT TANK 40C IRRIGATION EQUALIZATION TANK W WEIGHT, FORCE, TORQUE WELL, PROBE 500 SUBSURFACE DRIP EFFLUENT DISPOSAL SYSTEM X UNCLASSIFIED XAXIS 600 OPERATIONS BUILDING V EVENT, STATE OR V AXIS AUXILIARY T00 POTABLE WATER TANK PRESENCE DEVICES F pp="y+eP 2 POSITION. DIMENSION 2AXIS RIVETOR, AC❑TUAR, PAHALA MNELEMENRQLI WASTEWATER TREATMENT PLANT CONTROL AND MEASUREMENT NOTATIONS INSTRUMENT TAG AND LOOP IDENTIFICATION DESIGN/BUILD DOCUMENTS MEASURED CR INITIATING VARIABLE 110 STARTISTOP OR OPEN REVISIONS # MODIFIER WHEN REQUIRED ACK ACKNOWLEDGE OSC OPEN/STOPICLOSE REV DATE ESCWPTION AM AUTO&IAN PAL LOW PRESSURE SUCCEEDING LETTERS. -READOUT OR PB PUSHBUTTON PASSIVE FUNCTION, OUTPUT FUNCTION, BYP BYPASS pH pH OR MODIFIER POT POTENTIOMETER UNIQUE LOOP NUMBER PER INSTRUMENT PANEL LOCATION # CL CL2 CLOSE CHLORINE (# =OPTIONAL) V RDREADY FUNCTIONAL IDENTIFICATION DS DISCONNECT SWITCH RNG RUNNING ROT RE P D I T 1 0 0 2 0 0 A AND MEASUREMENT NOTATIONS # ESP EMERGENCVSTOP RST RESET ESTCONTROL 'LL—INCHEs AT F~LL INSTRUM ENT FUNCTIONAL IDENTIFICATION PER # - ALPHABETICAL IDENTIFIER FOR LIKE INSTRUMENTS IN SAME LOOP LP2 DO FLT FWD FAULT SP STOP FORWARD ST START oESICNEo. TABLE THIS SHEET ID ENIFIER SIMILAR W ix 4-1A FUNCTION SYMBOL FIR FORWARDIREVERSE TBL TROUBLE OHECKER IHEIKER RELATFOR INSTRUMENTS IN RELATED PROCESSES INS RUMEN F FIS FASTISLOW OR LOOP \\ HOA UVF ULTRA VIOLET TRANSIAITTANCE HAND/OFFIAUTOIPPROIED FILENAME `PART OF VEN BOR PACKAGE TOR HAND/OFFIREMOTE UVI ULTRAVIOLET INTENSITY AREA CODE TO WHICH LOOP BELONGS LOOP NUMBER LCS LOCAL CONTROL STATION VCR VENDOR CONTROL PANEL NUMBER Bc PROJECT LITLEADILAG CLIENT PROJECT NUMRER EXAMPLE: fp 2,`� #OPTIONAL #-OPTIONAL LOR ED ALIOFF/REMOTE LOS ED KOUTSTOP PADS LEGENDS, ABBREV., NETWORKTYPE E ETHERNET UP LOCALIREMOTE 0AC OPENICLOSE/AUTO EQUIPMENT IDENTIFICATION SYSTEM IA -TOR MODSUSTCP OC OPENICLOSE SYMBOLS-1 OCP OL PURGE VALVE OP/CLIPC OVERLOAD RAPID MIXER EQUIPMENT NAME TYPICAL ANALOG HARDWIRED 1/0 GROUPING GENERAL NOTES: xxI� EQUIPMENT NUMBER 1. THIS DRAWING IS GENERAL IN NATURE SOME SYMBOLS SPEC. 4-1 11 SPECIFICATION REFERENCE AND IDENTIFICATIONS SHOWN HEREON MAY NOT BE USED ON THE CONTRACT DRAWINGS. DISCRETE HARDVv1RED 110 GTYPI ROUPING GROUPING 2. SYMBOLS ARE ARRANGED ON SPECIFIC DRAWINGS AND IN CATEGORIES FOR CONVENIENCE ONLY; SYMBOLS BR.H!Arvc; NUMEER p_QQ'� MAY BE USED ON ANY OF THE CONTRACT DRAWINGS. 6 s R 25 D C C A C MISCELLANEOUS SYMBOLS PRIMARY ELEMENT SYMBOLS VALVES eMCC (MOTOR CONTROLISTARTER) l--ICI--S ORIFICE PLATE !-- Mo-� MAGNETIC FLOWMETER NORMALLY OPEN N NORMALLY I/ CLOSED K� GATE VALVE I� DOUBLE LEAF CHECK VALVE S SOLENOID VALVE AN1D 1 l� i OP PURGE OR FLUSHING DEVICE F---5 VENTURI OR FLOWTUBE � SONIC TRANSIT TOIME)ETER (DOPPLER OR W PLUG VALVE ICI N VALVE pI DIAPHRAGMI�I ^I^ OPERATED VALVE z WAILUKU,EHAWAII ui <S> RESET FOR LATCH -TYPE OPERATOR ^� NOZZLE FLOW l--�� POSITIVE DISPLACEMENT METER IIN�iII fH1 BALL VALVE I'01 II `ll�� BALL CHECK VALVE I/ V PRESSURE BALANCE e SEAL WATER CONTROL UNIT �� PILOT TUBE dT THERMAL FLOELEMENT W IIYYyyII V-N GLOBE IIyy�� ICJ r l PU PVALVEDISCHARGE OPERATED VALVE M NEEDLE GAUGE OR MOTOR OPERATED VALVE DESIGN/BUILD OI INTERLOCKING OR CONTROL FUNCTION �� PROPELLER OR TURBINE METER ' VORTEX FLOW ELEMENT VALVE ROOT VALVE DOCUMENTS IS INTRINSIC SAFETY BARRIER 7 FLUME i CORIOLIS FLOW ELEMENT Fj KNIFE GATE VALVE T PRESSUREAND M MOTOR OPERATED VALVE, MODULATING / \ VACUUM RELIEF p DISCRETE INPUT I� �I I--I-I—{ LJ WEIR b FLOAT LEVEL ELEMENT DIAPHRAGM VALVE VALVE NOTE. USE VALVE BODY SYMBOL TO MATCH TYPE THESE DRAWINGS WERE PREPARED FOR SUBMISSION TO EPA IN JULV 2021 TO PROVIDE A p ♦ DISCRETE OUTPUT ANALOG INPUT OR VARIABLE AREA FLOW INDICATOR O ... �� ULTRASONIC LEVEL ELEMENT I( � BUTTERFLY VALVE ANGLE VALVE VACUUM RELIEF VALVE OF VALVE. PISTON OPERATED VALVE GENERAL UNDERSTANDING OF THE PROJECT CONCEPT AND ARE NOT INTENDED TO REFLECT DESIGN REQUIREMENTS. ♦ ANALOG OUTPUT R (ROTAMETER) o vo BUBBLER LEVEL TUBE THREE N/AV VALVE PRESSURE RELIEF O7 CAMERA(CCTVI SUBMERSIBLE LEVEL VALVE TELESCOPING VFD VARIABLE FREQUENCY DRIVE VSD VARIABLE SPEED DRIVE �j DIAPHRAGM SEAL IN -LINE ANNULAR SEAL O 11J TRANSMITTER HYDROSTATIC LEVEL PROBE RADAR OR ULTRASONIC LEVEL ELEMENT �J. �J� FOUR WAV VALVE FLOAT VALVE PINCH VALVE BALANCING cocK PRESSURE REGULATING VALVE (SELF-CONTAINED) BACK PRESSURE REGULATING VALVE (SELF-CONTAINED) FUSIBLE VALVE _ MUD VALVEh+ AN TI SIPHON VALVE L LIFT CHECK VALVE 1. n., q1' .e� S A� � I6 `L' * ,p 3 '+vA M AvF;,mip, CbP� PAHALA WASTEWATER ACTUATORS/MOTORS/POWER ASD DRIVE( (MECHANICAL) DRIVE (MECHAwcAL) Er ROTARY PISTON LINK TREATMENT PLANT ACTUATORS. VALVE DESIGN/BUILD OR GATE DOCUMENTS LINEAR PISTON REVISIONS ACTUATORS. VALVE OR GATE DESCRIPTION 4 SOLENOID ACTUATOR, FUNCTION SYMBOLS INSTRUMENTATION SYMBOLS SLIDE AND SLUICE GATES VALVE MANUAL OR HAND T ACTUATOR,VALVE OR GATE (OR BLANK) n MOTOR(ACTUATOR, O SHARE❑❑ISPLAY,PROCESSCONTROLSVSTEM SOFTWAREFUNCTIONALITY INTEGRAL NSTRUMENT CLOSE COUPLED INSTRUMENT SEPARATE REMOTE INSTRUMENT OR MOUNTED NORMALLY NORMALLY OPEN CLOSED IR FLAP GATE R 7 VALVE, GATE OR �� T�lo BUTTERFLY GATE ~7.,E EQUIPMENT) _ O FIELD OR PANEL DEVICE LO � NC oESICNEo-. ENGINE LOCATION AND ACCESSIBILITY MODIFIERS FOR PRIMARY ELEMENT SYMBOL PRIMARY ELEMENT SYMBOL PRIMARY ELEMENT SYMBOL MULTI VARIABLE INSTRUMENT STOP GATE APPROVED FUNCTION SYMBOLS SLIDE GATE IIIE 110I.I DVG BC PRIJEIT NUMBER EJECTOR, STAND ALONE DEVICE. O O PNEUMATIC OPERATOR ACCESSIBLE SEPARATE OR SEPARATE OR xx SEPARATE OR CLIENT PROJECT NUMBER REMOTE INSTRUMENT MOUNTED REMOTE INSTRUREMOTE MOUNTED .�.� REMOTEMOUNTED MC INSTRUMENT SLUICEGATE IAPS LOCATED ON FRONT OF PANEL OR If LEGENDS, S, O GENERATOR see CONSOLE, OPERATOR ACCESSIBLE ., SYMBOLS-2 PRIMARY ELEMENT PRIMARY ELEMENT PRIMARY ELEMENT SINGLE VARIABLE LOCATED IN REAR OF PANEL OR SYMBOL SYMBOL SYMBOL INSTRUMENT O e CONSOLE, OPERATOR INACCESSIBLE FLANGE OR ELEMENT TAPS PIPE TAPS COMBINATION TAPS GENERAL NOTES. 1. THIS DRAWING IS GENERAL IN NATURE. SOME SYMBOLS AND IDENTIFICATIONS SHOWN HEREON MAY NOT BE USED ON THE CONTRACT DRAWINGS. o -11jING NUMBER P-002 2. SYMBOLS ARE ARRANGED ON SPECIFIC DRAWINGS AND IN CATEGORIES FOR CONVENIENCE ONLY; SYMBOLS MAY BE USED ON ANY OF THE CONTRACT DRAWINGS. 7 BR ER 25 D C Ca A C B `a a A PUMPS PIPE LINE DEVICES HVAC RELATED MIXERS PUMP, CENTRIFUGAL PUMP, 'UMP' AGM 1 1, T TRAP Q I VENT TO ROOF VENT INJECTOR FLAME TRAP FAN, INLINE Q ))) (\u/ CHILLER MIXER /'• A1N1D y {{ PUNIV zRWAILUKU,EHAWAII al SEDIMENT PUMP, GEAR PUMP, METERING PUMP, PERISTALTIC / DT TRAP GAS DRIP TRAP SEPARATOR/ DRYER f + STEAM VENT AUTOMATIC VENT I�I �--p p�.i LJ � FLAME TRAP WITH THEIR MO SHUTOFF ASSEMBLY FLAME CHECK SAMPLING AND FLUSHING CONNECTIONS FILTER OR FILTERSILENCER INLET AIR BOILER � CHILLER DRAFT TUBE MIXER MIXER, INLINE ® STATIC DESIGN/BUILD DOCUMENTS THESE DRAWINGS WERE PREPARED FOR SUBMISSION TO EPA IN JULU TO PROVIDE A H� PUMPS PROGRESSING CAVITY PIPELINE FILTER MANUAL VENT � I I SUCTION f�l DIFFUSER SCREENS AND CONVEYORS BAR SCREEN PUMP, ROTARY LOBE RUPTURE DISK (VACUUMS RELIEF) , IYI _ STRAINERS TEMPERATURE WELL DE GENERAL UNDERSTANDING OF PT AND ENOTIHE JECT NDEDT RELEE ARE NOTINTENDED TO REFLECT DESIGN REQUIREMENTS. PUMP, SUBMERSIBLE RUPTURE DISK (PRESSURE RELIEF) 1 FOOT VALVE S—®i FLOW STRAIGHTENING VANES CONVENOR U - \ ISVip M PUMP, JET PUMP, VERTICAL Y� CONNECTION BETWEEN NEW AND EXISTING PIPING UNION Iq� _ —'d + AIR SEPARATOR��,.,yu DRAIN Pa n ® PRESSURE REDUCING ASSEMBLY AMIAONIA UNION HYDROCYCLONE 001 GRIT CLASSIFIER FINE SCREEN PAHALA WASTEWATER TREATMENT PLANT DESIGN/BUILD DOCUMENTS QUICK CONNECTOR CAP CRy PLUG BLIND FLANGE I AN VALVE CALIBRATION CHAMBER Hz� LS:J Ir DAMPER SIGHT GLASS PIG LAUNCHER/ RECEIVER �� GRIT CYCLONE VORTEX GRIT SEPARATOR GRIT SEPARATOR BLOWERS/COMPRESSORS BLQWEROR O CENTRIFUGAL FAN REVISIONS DESCRIPTION ® q 0 COMPRESSOR. COMPRESSOR LIQUID RING BLOWER.R COMPRESSOR. IE{(}}{{ I"'�I"'I FLEX CONNECTOR FABRIC EXPANSION JOINT PULSATION DAMPENER IIC�II VI REDUCER FLEX COUPLING �L ROTARY LOBE aT Fu^ E iz�l SLIDE AND SLUICE GATES oESICNEo-. COMPRESSOR.. ROTARY NORMALLY NORMALLY IHELUED SCREW APPROVED FleENni1'E COMPRESSOR.. ROTARY OPEN fly FLAP CLOSED GATE R O ecP NUMBER 1s�u SLIDING VANE CLIENT PROJECT NUMBER COMPRESSOR. PISTON BUTTERFLY GATE NO NC STOP GATE P&IDS LEGENDS, ABBREV., SYMBOLS-3 SLIDE GATE GENERAL NOTES: 1. THIS DRAWING IS GENERAL IN NATURE. SOME SYMBOLS SLUICE GATE AND IDENTIFICATIONS SHOWN HEREON MAY NOT BE USED ON THE CONTRACT DRAWINGS. D 11111ING NUIIEa P-003 V. SYMBOLS ARE ARRANGED ON SPECIFIC DRAWINGS AND IN CATEGORIES FOR CONVENIENCE ONLY; SYMBOLS MAY BE USED ON ANY OF THE CONTRACT DRAWINGS. 8 sN Ea 25 D C m A 2 3 4 6 INFLUENT SCREEN SCREEN BrownAFD FLOW HIGH FLOW INFLUENNFLUENMFLUENT SCREEN SCREEN 2UP 2 SCREEN SCREEN SCREEN METERINFLUENT TOTAL TOTAL FLOW FLOW HIGH 2HIGH SCREEN STREAM DOWN 2DIFF 21N 2 PS-2 Caldwell VAULT FLOW YSTDAY TODAY TOTAL RATE LEVEL LEVEL 2FAULT LEVEL STREAM LEVEL AUTO RUNNING FAULT c� ca ca ca ca ca ca ca ca ca a c� D 1T T T T T T T WAILUKU, HAWAII D SCADA ___________________________ 5 5 5 I5 i �— DESIGN/BUILD DOCUMENTS I I I I I I I I I I I I I MCP_______THESE DRAWINGS WERE 1 PREPARED FOR SUBMISSION TO EPA IN JULY 2021 TO PROVIDE A GENERAL UNDERSTANDING CF p THE PROJECT CONCEPT AND ARE NOT INTENDED TO REFLECT DESIGN REQUIREMENTS. I I I I I I I I C C I 100, I I I I � / NL I OVERFLOW --AGE WEIR ii Pzov Es i I I I PAHALA I I rt I �� I I �sH I I TOMaR WASTEWATER TREATMENT PLANT DESIGN/BUILD ❑ �_ WL I v RE OVAL DOCUMENTS v TANK RS `� REVISIONS REV I DATE I DE­RIPTION FROM PAHALA e I I I e I I I I I I I I I I I I I I I i I I S S i ESIGrvE BAG OR CONTNNER S HRLErv.a BER CUErvia EAT NUllR PBIDS A 3W A OTHER uses HEADWORKS UTILITY WATER FACILITY P&ID SCREENING SCREENING WASHER SPRAY FINE SCREENING BARRACK MANUAL BARRACK SLIDE GATE WATER VALVES SLIDE GATE SLIDE GATE BAR RACK SLIDE GATE SCREEN o­rvc rvw.,sER Poo Poo Poo PPooF Pao P_101 SPEG: SHE. - SPEC : SPEC : SPEC'. SPEC '. 9 s ER 25 1 3 4 5 6 IYPICAL FOR 2 PUMPS I FAL HIM I— IAV —L FNL N)N fLON u u awlm 0.01 Mai aM11 0.1 RUMING MN REYGIE HIGH 1ENP HIM YOISi WHY I— HIM —L I£�FL MEEO PoINNING WN RMOM HIM IENP HIM Y06i FlAV M iAH Nfl FlC K iAH lR NII dYll III galll OINII OIaIM ON161 aININ OW111 N11 MYN H11 W0111 aN111 a1Y11 SCADA HMI — — — — — — — — I I I I I MBR PLC amll aNll Nm _ _ _ � n owls ao�M� aaNvl omv � _ _ _ awlsl MCC I I I I u I r________________J N — — — YY NS REMOTE 1/0 CABINET 2 �01 0011 — i i— J I 1E-040101 AX-01 ANOXIC BASIN 1NK-040100 M o. DESIGN/BUILD — SCADA HMI DOCUMENTS MBR PLC THESE DRAVANGS WERE PREPARED FOR SUBMISSION TO EPA IN JULV 2021 TO PROVIDE A GENERAL UNDERSTANDING CF THE PROJECT CONCEPT AND MCC ARE NOT INTENDED TO REFLECT DESIGN REQUIREMENTS. REMOTE 1/0 CABINET 2 mm PAHALA WASTEWATER TREATMENT PLANT DESIGN/BUILD DOCUMENTS REVISIONS mL P&IDS ANOXIC BASIN F P-201 10 SI EE 25 2 3 4 6 BrownAPa . Caldwell ' �� WAILUKU,EHAWAII ov D lN! 1EYP ILN 00 ru rcma: Ni410i D rtly o0 ux nn ux rfiNN r5mm aNm DESIGN/BUILD SCADA HMI SCADA HMI DOCUMENTS REMOTE 1/0 CABINET 2 u u u REMOTE 1/0 CABINET 2 THESE DRANANGS WERE PREPARED FOR SUBMISSION TO EPA IN JULV 2021 TO PROVIDE A GENERAL UNDERSTANDING OF MCC �— i MCC THE PROJECT CONCEPT AND ARE NOT IN TENDED TO REFLECT — — — — — — — — — — — — — — — — — — I I I I I I I I I — — DESIGN REQUIREMENTS. C I I I I I I I I I C o� j12XY,w f Nub I I I ��N �dm�Fit I I I f I I I I I I PAHALA WASTEWATER A FliOM PROCESS AIR BLOWERS F TREATMENT PLANT DESIGN/BUILD RECYCLE FROM AX-01 ur Ili NI r601N rfiN01 t®IP! DOCUMENTS REVISIONS REV DATE I cRIPTInN 6 N OE rfiNN � rfiN01 �/� 6 NE-050121 W 0 TO MBR BASIN unTll V 120122 DEBICNED. EIrEN.aME DP&IUNUMBER BCP 171 FBD-050111 cuENT -EAT NUMBER PA-01 P&ID5 PRE -AERATION A PRE -AERATION BASIN 1NK-050100 BASIN A DRAI NG NU-1 P-202 11 sN R 25 3 4 5 6 2 3 4 6 BrownAam . Caldwell ' zzcW AI LUKU,EHAW All n>. D FNL Lmr FlAv D u FK aMIN aMB6 CLO50] OPENO] OPEN FEMOIE LOW LML HIGH LLlf1 AR f ➢C ZKI YC FlR 'Mel amm aNIm oAIM amlq oulm A DESIGN/BUILD SCADA HMI SCADA HMI DOCUMENTS q I s q q W MBR PLC — — — — — MBR PLC THESE DRAWINGS WERE PREPARED FOR SUBMISSION TO EPA IN JULV 2021 TO PROVIDE A GENERAL UNDERSTANDING OF THE PROJECT CONCEPT AND MCC MCC ARENOTINTENDEDTOREFLECT 1— — — — — — — —I — — — — — — DESIGN REQUIREMENTS. TiSHT P20B A00 I I I I I I A WASH Rff C C L, UPPER PERMEATE Z50 y U TRIF SIFT P204 aA M I a��,'+�µ �rY° DZMBI� y C LTOOCOLTE LCTPERMON PROCE55 AIR aM°I ^y w: FROM BLOW42S _______ __ _____ __ T PAHALA I WASTEWATER L i TREATMENT PLANT T T DESIGN/BUILD DOCUMENTS I REVISIONS I i I I I I II I �PGN B I I I L4 LSH 8 A FROM PRE AWERAR IN BASIN amlq oMm AT I I I I I II III IJ I o � F�� 12E� � I I I I I I I J aDMB6 I I rl I L.I LII LJ r 1 Z oE51GNEo. I I �1rI JJ I I I I ill lllj ICI Ill llli ICI N 3'-WS e TO WAS-01 wA NiI1 L.l FE-07018fi 1 4 1 FlLENnIn L J I BIPaHPMG�UMBE' 15 SMU-070111 SMU-070121 SMU- CLIENT aRaECT I — - (FUTURE (FUTURE MEMBRANES) P&IDS MB-01 MEMBRANE A MEMBRANE 01 REACTOR BASIN BIOREACTOR A TNK-070100 BASIN GRnwING NUIn Ea P-203 12 - EFl 25 1 2 3 4 5 6 1 HIM PflESS FNL HIM RR8 F.1L PN u u aeoIN mmm w"" win OPM OSE FENOIE PRE59JflE FENOIE RUN RUNNING OPM RASE RMOIE fl➢N POSIPM ROSE➢ XC PIR M XC FQR AIRFC ➢C D)4111 Ofill aN 101 OB0101 H01 UBMIY 41011E OBMII OnWI Onln Onln SCADA HMI — MBR PLC —i — T I I amlm mmOl I I I I I MCC I I I I I I I VENT i0 AMOSPHERE Z5C (1YP) xv ®IR will Pi D)0111 rAT �LNI 4N001 FCV ®IYI FE E aoln B UPPQ .mB-ol E FRON MB-01 � min OBOWI N n L —R ..RN FE-080141 PNP-080101 DESIGN/BUILD — — SCADA HMI DOCUMENTS MBR PLC THESE DRAWINGS WERE PREPARED FOR SUBMISSION TO EPA IN JULV 2021 TO PROVIDE A GENERAL UNDERSTANDING OF THE PROJECT CONCEPT AND MCC ARENOTINTENDEDTOREFLECT — — DESIGN REQUIREMENTS. mm wG PAHALA WASTEWATER TREATMENT PLANT DESIGN/BUILD DOCUMENTS REVISIONS mit S P&ID PERMEATE COLLECTION a P-204 13 - ER 25 TIPICAL FOR 2 BLOWERS I DI I N —I M I N I N— I DI I DI I DI I 0 —IO11N IONN — — — — — — — — — — — — — — DESIGN/BUILD SCADA HMI SCADA HMI DOCUMENTS MBR PLC + +^°+ + MBR PLC — — — — — — — — — — — — — — — — — — THESE DRAWINGS WERE PREPARED FOR SUBMISSION TO EPA IN JULV 2021 TO PROVIDE A GENERAL UNDERSTANDING OF CB, 480V THE PROJECT CONCEPT AND MDP-2 �-MDP-2 ARENOTINTENBEDTOREFLEGT r DESIGN REQUIREMENTS. I nrArAxcxcxcsG01010Od01ONNB00101UON01IO11NCIt — — — —--------------------------- PRE-AERA00N BLOWER 1 R N M M. MUT FRMRE, x 1 Ir REF 41i P-202 I 'y" rfIPEAAILI[ ONII£rVhY4AAl11[NW C MT. PoIIEA, FpNfl CdNE IYO flNNPNE BLR-100101 souro u�aasAc �4 wA 4 PAHALA WASTEWATER TREATMENT PLANT DESIGN/BUILD r DOCUMENTS REVISIONS REV C.dTE 0 ECCWPi1CN y y Q141N OF G 01 OIOIA DI M d M GIC �MN COIN B PROCESS AIR I-------- ON Ao, .m. wTwc--------��I—\F--�—4------------------------- C TOMB-01 MQABRANE BI)REACTOR BLOWER I T - Omn �Mo c .Nr, w ET rfl m flc Nor 1 -Am II£rV1EY4AAl11[NNOrw OJflflFNi, PoIIEA, FpNfl CdNE IYO flNNPNE. BLR-090101 T S00ro0—__—__—__—__—__—__ EB NEC APPROVED NLENA E PRO R@ICSUMBER 518' CLIENT PROJECT NNMaER B PROCESS P R FROM SRI-BY BLR. — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — J P&IOS PRE -AERATION AND MEMBRANE a BI OREACTOR TOWERS P-205 14 ............. 25 2 3 4 6 Brownarro . Caldwell ' zzcW AI LUKU,EHAW All n>. D AC D u IAIm R04➢ OPWgI OPM 6➢ff FEmOIE ROW ➢C ➢O M IR 'Alm no 111 0 'A'm Irnu DESIGN/BUILD SCADA HMI SCADA HMI DOCUMENTS 5 q p — — — IAIm � MBR PLC _ _ _ _ _ _ _ — -----_ _ _ _ _ _ _ _ _ _ _ MBR PLC W t THESE DRAWINGS WERE T� I PREPARED FOR SUBMISSION TO EPA IN JULV 2021 TO PROVIDE A GENERAL UNDERSTANDING OF THE PROJECT CONCEPT AND MCC — — — — — — — — — — — — — MCC ARENOTINTENDEDTOREFLECT I I I I DESIGN REQUIREMENTS. I I I I I I I I C I I I I C I I I I I i51 I I pM1 ( dy I IAIm I I wSi ,,, „�,� \'•tiro I T IAII1 Ri IAIm IA'� UPUiY N ACID WA91 w^� I " I 4 RE 4N1Bi PI2 3 PAHALA WASTEWATER TREATMENT PLANT DESIGN/BUILD DOCUMENTS REVISIONS REV DATE DESCRIPTION B I Fl i0 DRAIN I g T �-17D171 41 LI ELS2 NCNEI OXALIC ACID DE -RED 55 CAL DRUM 1NK-170100 CONTAINMENT AREA APPROVED IT ENn P@IOS.D.D El PRIJEIT NUMBER 151,7, CLIENT PROJECT NUllER P&IDs ACID CLEANING A A ARnwl'G NUlgER P-206 15 - ER 25 1 2 3 4 5 6 4 ® 11 { U zzcW AI LUKU,EHAW All n>. D wn rc DESIGN/BUILD SCADA HMI SCADA HMI DOCUMENTS MBR PLC — — — — — — — — — — — — MBR PLC THESE DRAWINGS WERE PREPARED FOR SUBMISSION TO EPA IN JULY 2021 TO PROVIDE A MCC MCC GENERAL UNDERSTANDING OF THE PROJECT CONCEPT AND ARENOTINTENDEDTOREFLECT G PANEL 2A — — — — — — — — — — — — I I — — — — — � — — — — PANEL 2A DESIGN REQUIREMENTS. G I I I r�1 �____ I w ILafi iaav auncr *},'" PAHALA WASTEWATER I I TREATMENT PLANT ii DESIGN/BUILD pHAJJ N DOCUMENTS REVISIONS REV DATE CRIPMN g I SODIUM HYDROXIDE I 55 CAL DRUM 1NK-160100 PNP-160101 g WNTNNMENT AREA_ _ ES 7 1,E DESIGNEDAPPROVED UIERIIIE O' A El PRIJEIT NUMBER 151,7, CLIENT PROJECT NUMBER P&IDS PH ADJUSTMENT A ARnwING NUI;ER P-207 16 sR ER 25 1 2 3 4 6 2 3 4 6 BroWnarro . Caldwell zzcW AI LUKU,EHAW All n>. D Td m140 DESIGN/BUILD SCADA HMI SCADA HMI DOCUMENTS N MBR PLC — — — — — — — — MBR PLC THESE DRAWINGS WERE PREPARED FOR SUBMISSION TO EPA IN JULY 2021 TO PROVIDE A GENERAL UNDERSTANDING OF CB,4BOV MDP-2 MDP-2 THE PROJECT CONCEPT AND ARE NOT INTENDED TO REFLECT — — — — — — — — — T — — I I I I I I — — — — — — — — — — DESIGN REQUIREMENTS. C I I I I I I C �ENOOR PACKAGE 03 PNL-120100 El PIENT GALLERY' PUMP STATION LOCAL -- � „+ "- CONTROL PANEL PAHALA WASTEWATER TREATMENT PLANT DESIGN/BUILD DOCUMENTS EQN GALLERY 4 PS TO AX-01 REVISIONSDE—P-N L91 LT J 6 tTT T41 NE TSH ME �1mn �m�n �ma �1ma I I I I 8 ~ , LE-120101 -------------------J I I PNP-120111 PNP-120112 APPROVED P@I 01= El PRI NUMBER CLIENT RJT aE`Y NUMaEB P&IDS WW-01 EQUIPMENT A EQUIPMENT GALLERY PUMP STATION TNK-120100 GALLERY PUMP A STATION GRnwING NUMBER P-208 17 - EB 25 2 3 4 6 2 3 4 6 BroWnAro . Caldwell ' x� WAILUKU,EHAWAII ov TYPICAL FOR 2 BLONERS R ➢Y RUM1IX0 UN D PaYfR WAN ERR(fl S T STOP IAAO CIHIENi f1fI aaY L XC XC SFl DESIGN/BUILD SCADA HMI--nTM-TN;;_ SCADA HMI DOCUMENTS AI MBR PLC MBR PLC — — — — — — — — — — — — — — — — — — — — — — THESE ❑RANANGS WERE PREPARED FOR SUBMISSION TO EPA IN JULY 2021 TO PROVIDE A GENERAL UNDERSTANDING OF rC8,�980V THE PROJECT CONCEPT AND MDP-2 �MDP-2 ARE NOT IN TENDED TO REFLECT — r DESIGN REQUIREMENTS. I I ---------------------- Go NU 11 11 YI YI YA YA YL MC XC SC Fl G IIOIa ar IOIa IOIaX IOlat IIpaO IOIa IIOIaB Ima IOIaX IlaaC Ilan IIOIa I --��I—\I—�--— — — — — — — — — — — — — — — — — — — — — — — O — WAS STORAGE— —BLONER � REF SHi P210 f% eno nwu vwns AVAiAac Tax xax raaxc rmloq v =f PlaEsmlaE — 1ELPFRANflE, Wa£I 1ELPEPANRE, III aIRSXT POAEP EflKlfl CODE MO FLa1XE L / f )F BLR-110101 — — maxfgLO9RE— T ---------------------- NU 11 11 YI YI YA YA YL MC XC SC Fl OF II0111 — ar IIMIIA— IIOIIIB IIMIIC — IlallO IIOIIIA IIOIIIB —IIMIIA IIOIIIB—IIOIIK hall IIDIII I PAHALA ---------------------- ------L---------------------------- b iOPA&UBB1Rn WASTEWATER srarvo-er eLOWEa _ REF SHi P20 TREATMENT PLANT �xo E r T, a nET PmAE, Ix T IELPERANflF, Wa£iY1ELPERANflE, YOTaV aIPoSXT, PaxER, WiOfl CaIE MO PoNIXE BLR—II0111 DESIGN/BUILD SaMO fNCIL9JflE _ — _ _ — _ _ — _ _ — _ _ DOCUMENTS R"ASIONS REV DATE D RIPTION B B SIGNED FILEN.a P81 E—G GIIENTP EGT NUllEa P&IDS WAS STORAGE AND A STAND-BY A BLOWERS oFlAI NG NUllER P-209 18 s" R 25 1 3 4 5 6 N. -- — NM01 NM01 g1f1 IlR NOIM SCADA HMI — — — — — — — — — — MBR PLC u I MCC I I I I REMOTE 1/0 CABINET 2 — — — — — I I — — — I I I I I I I — — PROCESS P1R I I I i I A - — — - — — — - FROq E<OVhRS— — — — — — — — - — — — —— — — — — — — — —, L I � T E FRON NB-01 I I REF SHT P207 I n I I Li 9N01 I LE-190102 WAS WAS STORAGE BASIN TNK-190100 RNL N0111 RUNNING Run PDIOIE HQ R- HIGH ugsr - H III Ngll IHII 19N11 19N11 q 01 —J 1901II Hq --- 19M11 I I � , I I , - I I ur � I lunn Isdn -j — — i I r-- � I I � I I � , I I ; � � I I � , I I I I � I I � , I � , I � , I I I I � I I � , I � , I � , I I I I � I I � , I � I I � I I � , I � , I DESIGN/BUILD — SCADA HMI DOCUMENTS — — — — MBR PLC I THESE DRAWINGS WERE PREPARED FOR SUBMISSION TO EPA IN JULV 2021 TO PROVIDE A GENERAL UNDERSTANDING OF THE PROJECT CONCEPT AND MCC ARENOTINTENDEDTOREFLECT — — — — DESIGN REQUIREMENTS. REMOTE 1/0 CABINET 2 E k PAHALA WASTEWATER TREATMENT PLANT DESIGN/BUILD DOCUMENTS REVISIONS acNEo- CKED ROVED Fl2"'E o Pi DS.Dw auEHT PRaEcr IUNIER P&IDs WAS STORAGE BASIN a oRwwc 1U11EE P-210 19 - ER 25 l ll" zzcW AI LUKU,EHAW All n>. C DESIGN/BUILD SCADA HMI SCADA HMI DOCUMENTS MBR PLC MBR PLC THESE DRAWINGS WERE PREPARED FOR SUBMISSION TO EPA IN JULV 2021 TO PROVIDE A GENERAL UNDERSTANDING OF CB 480V MDP-2 �� MDP-2 THE PROJECT CONCEPT AND ARE NOT INTENDED TO REFLECT I I I — — — — — — — — — — — — DESIGN REQUIREMENTS. I c LOCAL CONTROL PANEL I Iwr w� J PAHALA �g WASTEWATER I TREATMENT PLANT i WA U K DESIGN/BUILD 0 DOCUMENTS C FRa�WIA' N N REVISIONS PNP- 3 EscwvnaN E WAS P P&IDS U MP P P-211 20 - - 25 EQUALIZATION HI TANK LO TANK LEAD LAG ALL TANK LEVEL LEVEL LEVEL LEVEL XMTR TANK START START STOP HI SAP\ CHI\ SAP\ LOW\ F/A-U-L�T LEVEL SAP\ SAP\ SAP\ LEVEL Y � � � � zai oai oal 7Qoi 4oz SCAPA , I , I I I , I , I , I , I , I , I I j I , I , I , I I j I , I , I I j I , I I I I I I I I I FROM PERMEATE I I I � I I COLLECTION REF SIFT P-204 I CONTACT BASIN HYPOCHLORITE SOLUTION TANK FLOW u/FK\ Y I I I I i i I I I I I I I I I I I I I I I I I I I i I I I I i I I I I I I I FE— 1 ll" WAILUKU, HAWAII DESIGN/BUILD DOCUMENTS THESE DRAWINGS WERE PREPARED FOR SUBMISSION TO EPA IN JULY 2021 TO PROVIDE A GENERAL UNDERSTANDING OF THE PROJECT CONCEPT AND ------------ ARE NOTINTENDEDTO REFLECT DESIGN RECUIREMENTS. C PAHALA WASTEWATER TREATMENT PLANT DESIGN/BUILD DOCUMENTS REIASIONS CMPMN S TO EFFLUENT DISPOSAL REF SHT P-,501 P&IDS P IRRIGATION EQUALIZATION TANK P&ID P A NGNu'a P-401 1 - - 25 VALVE VALVE VALVE VALVE VALVE VALVE IN OPEN CLOSE OPENED CLOSED FAULT AUTO SETT SETT i i i T TT "I" "{" I I I L'7- I L 7- 7 I I I I I I I I I I I I -- � `F' I I L I I — , 1, I DRIP 20NE 1 DRIP ZONE 2 DRIP ZONE 3 DRIP ZONE 4 l ll' WAILUKU, HAWAII DESIGN/BUILD DOCUMENTS THESE DRAWINGS WERE PREPARED FOR SUBMISSION TO EPA IN JULV 2021 TO PROVIDE A GENERAL UNDERSTANDING OF THE PROJECT CONCEPT AND ------------ ARE NOTINTENDEDTO REFLECT DESIGN REQUIREMENTS. c � !6 w� m, ��'�P:aa� PAHALA WASTEWATER TREATMENT PLANT DESIGN/BUILD DOCUMENTS RE\ASIONS --N E P&IDS P SUBSURFACE DRIP EFFLUENT DISPOSAL P&ID o nwwc NUN R P-501 R C 'z B A HIGH ®®Alm SE, SCADA 22WAILUKU, HAWAII ni MCP sao,lal `----y----+----y----` DESIGN/BUILD I I DOCUMENTS I I I THESE DRAWINGS WERE HIGH LEVEL LEVEL L pRFEARED FOR SUBMISSION TO I r I .��...EPA NI GERAL UNDERSTANDING OF THE PROJECT CONCEPT AND I I I ARE NDTINTENDEDTO REFLECT DESIGN REQUIREMENTS. �\ goo zo E -J soo iA I I I ES 120VAC FUEL TANK MONITORING SYSTEM �ooam 1 I I I I I PAHALA I I i WASTEWATER n TREATMENT PLANT �TAHK oAYTANK DESIGN/BUILD DOCUMENTS I I REVISIONS REV DATE IE-P-N I I I LEAK O ESIGNEl VENDOR PA—E APPRIVED EVEN"" CUENT PRaECT NUllEC p&IDS GENERATOR BULK FUELSTORAGE BULK FUEL STORAGE TANK P&ID SPEC. GRAWING NUMBER P-601 23 - EH 25 D Ca A C Lew EEL rvi�� RArvsFE RArvsFE �Inrm . EVELL oQBUNI L` Q Q Q Q Q SCADA "VAILUKU, HAWAII ni �ao.oas �oo.oao Soa.PnA �oo.aaE �oo.oa �oo..ov rncP sao.lal �----}----y----y----�----J DESIGN/BUILD I DOCUMENTS I a�, EVEL --------------------- �EN��NTR�LPANEL I THESE DRAWINGS WERE PREPARED FOR SUBMISSION TO HIGH LEVEL EPA IN JULV 2021 TO PROVIDE A LOW LEVEL GENERAL UNDERSTANDING OF LK TA THE PROJECT CONCEPT AND ARE NOT INTENDED TO REFLECT I � I I I I I I I I I I I I I DESIGN REQUIREMENTS. �qh°e�•+��•�,� tt U d VENDOR PACKAGE 120VAC i ES iGENERATOR DAY TANK PANEL PAHALA WASTEWATER TREATMENT PLANT DESIGN/BUILD I I I I I I DOCUMENTS FOR ,•-EOR ,..Fos E°s REVISIONS R SCRIP-N I I 0 .�aza I I I I I ELST'R F NK I I I TANK EL STORAGE NNEL SIGNED. LEAK v APPROVEDNLENA BI ECT CLIENT PRJOJ NUnn ER P&ICS GENERATOR DAY TANK P&ID GENERATOR IL FILTER GENERATOR FUEL TRANSPFER PUMP OI GENERATOR DAY TTANK D GENERATOR FUEL TRAN PF0ER PUMP 2 ARAwnnIrvG NUsER P-602 s c. sPEc. SPEC. sPEc. 24 s" R 25 m A C ERY TFITeA NIB GEING -INC EI l ll SCADA � WAILUKIJ, HAWAII ui ea .00vc soo aoyc eoo.oas Eoa.UnA eao:oaA eoo.oaA MCP sao,lal DESIGN/BUILD I I DOCUMENTS I VENDOR PACKAGE I THESE DRAWINGS WERE PREPARED FOR SUBMISSION TO EPA IN JULV 2021 TO PROVIDE A GENERAL UNDERSTANDING OF THE PROJECT CONCEPT AND PANELES T 12oVAC i GENERATOR CONTROL PANEL�ESP O al I GENERATOR STARTING ATT BERY CHARGER GHGR 600,211 1GOVAG ES SPEC GENERATOREX AUST SILENCER S 600,210 SPEC: ARE NOTINTENDEDTO REFLECT DESIGN REQUIREMENTS. * f .GiP� PAHALA WASTEWATER TREATMENT PLANT DESIGN/BUILD DOCUMENTS I i REVISIONS REVscwPnaN I I I I I ❑ 8 zaav Es U.Av TANK DESIGNED'. APPRIVED N_ENRN PRIJEITeER GUENT—JT NUMaEe P&Io5 STANDBY GENERATOR GENERATOR GENERATOR P&ID ONBOARD FUEL PUMP ENGINE BLOCK STANDBY HEATER GENERATOR EPEE ARAVIING NUllUF P-603 25 - ER 25 D C Ca A