HomeMy WebLinkAbout2021-09-22 EMC testimony - (09-19) - Demoruelle, Sandra - DEM July 23, 2021 Correspondence to EPA Design Build Plan3 4
PUNI ss WAILUKIL,EHAWAII n>.
WAS
WAS STORAGE
o
DESIGN/BUILD
DOCUMENTS
TRUCKTO
NAALEHU W WTP
THESE DRAWINGS WERE
RAS PREPARED FOR SUBMISSION TO
EPA IN JULV 2021 TO PROVIDE A
GENERAL UNDERSTANDING OF
THE PROJECT CONCEPT AND
MANUAL BARRACK ARE NOT INTENDED TO REFLECT
-DIFFOAd HANN T DESIGN REQUIREMENTS.
C INFLUENT C
ERMEATE
SURVEY
�axmm n u ul�,m
xux v rem
n
I �^��vv�wrmr
,..k
wx, a a��I rdL�rluns
w" rLU,
ry
N
V VI Id x,
inry I,aK,n W, rMm
w
-.A, mvm
CIVIL
N ATURAL GROU ND OR GRADE
_+B
'RUSHED ROCA.—R.AVEL�
EDGE OF ASPHALT PAVEMENTIN PLAN
yI.(
ouV
litltin
ASPHALT PAVEMENT IN SECTION
GRAVEL OR ROADWAY
ASPHALT SURFACE OR ROADWAY
O
1INIRETE SURFACE, SLAB OR BLOCK
O
DATER MAN INSPELTION
ASPHALT REMOVAL
DELINEATED, TLAND
Es
®
WETLAND NITIG.ATICN AREA
GENERAL TREE RE TIVAL AREA
"
FENCE(EASANG SCREENED)
Im
—119
FASTING GRADF CANTAURs
IOR CAREENED)
FINISH GRADE CONTOURS
EXISTING SPOT ELEVATION
,Ql SCREENED)
FINISH
ION
/ F
UTT GERI GROUNDTEILE /.ATION
C,IALE CR DEPRECSION
ICY
"-.�-
FD O T WLINE
ALL DIRECTIONALL FROM
�I
STIFF 11 HOI TO I VERY), PLAN
SLOPE IB HOR TO I VERY), SECTION
TREES
GENERALSYMBOLS
/7jjr7T, EXISTING EOUIPN ENT ORD r IrniFR MATERIAL To BE REMOVE
suRacF
TO BE
ILT
FUTUREUREMOOIaL ____ ROPERTY LIN E PH.aNTCM
LINE OR MATCH LINE
NFU FACIunED(souDl PENTERUNE
EUSTING(OR SCREENED) HIDDEN NNE OR BURIED OR
FUTURE L.APRCVEMENTs
GENERALNOTES
I THISD US IS GENERAL IN NATURE SOME SVMaGLS SHOWN HERFON MAY NET BE USED ON THE
SGIL BORING AND CONTRACT DRAWINGS.
DESIGNATION s. SEE OTHER DRAvrING's FOR ABBREVIATIONS AND .ADDITIONAL SYMBOLS.
FIRE HYDRANT OR FIRE DEFT CONNECTION I- lYllPTI A' SYMBOL. II AI BEUGEDON ANY IFTI IN EC CONTRACT
AND IN'ATEG'ERIES FOR CONVEWENCE ONLv,
FTHE CONTRACT DRAWINGS.
(WITH TRAFFIC BOLLARDS)
d ECTON OF THE ENIRONMENT.NO'ONSTRUCTIAN RELATED ACTIVITYIHALL CONTRIBUTE TO THE
aUwED VALVE (ExISTWG SCREENED) CnTION OF HF ENNRONMENT AVOW MATERIAL TO FNTFR SURFACE OR GROUNDwnTFRe OR
ANYAITIINITHATRIEENi.ulY FluoN A oISCVH.ARLE TO STATE ,Y ITEBY Musr HAVE SWoa APPROVAL
OFTHE
ST.ATEOFw.ASHINGTON, DEPARTMENTOFECOLOG/
MANHOLE OR TYPE 2 CATCH BRAD
FACILITY NUMBERING SYSTEM
TOR
HEADWORKS FACILITY
200
MEMBRANE BIOREACTOR(DAE)
300
CHLORINE CONTACT TANK (OPT)
400
IRRIGATION EQUALIZATION TANK
500
SUBSURFACE DRIP EFFLUENT DISPOSAL
SYSTEM
600
OPERATIONS BUILDINGISTANDBY
GENERATOR
700
POTABLE WATER TANK
PIPING SYSTEMS
SING SYSTEMS ARE CALLED OUT BY SEE FOLLOWED BY PIPING SYMBOL ENCLOSED AS SHOVO nJ� .
TDs EXISTING PIPING
PIPE SIZE sEc� FUTU -- ¢S FUPUNI siREHAWAIs
RE PIPING Il I2' o5,� �� %I UKU. HAWAII'L
PIPING SYSTEM ISEE `
DRAWING .AND SEE
F_AGAANNS)
PIPING SYSTEM DESIGNATIONS FOR EwsTINI PIPE INDICATE TYPE OF sFRVICE ONLY AND Do NOT IMPLY PIPE MATERIALS USED
SEE GNG FIR EXISTING PIPING ABBREVIATIONS
DESIGN/BUILD
DOCUMENTS
THESE DRAWINGS WERE
PREPARED FOR SUBMISSION TO
EPA IN JULY 2021 TO PROVIDE A
GENERAL UNDERSTANDING OF
THE PROJECT CONCEPT AND
ARE NOT INTENDED TO REFLECT
DESIGN REQUIREMENTS.
PIPING SYSTEM IDENTIFICATION
ACH
ATE
AT
ASC
BG
BUT
FAIL
.IFBAILER
FFMBAILER
BWW
COIN
CLA
OLL
Ol
AGE
G
DINS
ER
DS
PASA
DC
EE
E
F
FOS
FP
Fnr
11
FILE
"IS
-
LGI
IT
HWB
IA
LI
LOW
TV
ERATION AIR
AGITATION AIR
UMINUM CHLOROHYGRATE
,All FLAT.ATIAN EFFLUENT
ALLIMMSG
ASCORBIC ACID
3113FILTER ORCULATI ON
C'LBOILER I MENT MEEDIUM PRESSURE
BOILER BLOWDOW N. LO ! PRESSUREu REg'4,
agLER aLOwoOwN MEDwrn PREss
EFFLUENT
BOILER FEEDWATER, LOW PRESSURE
FES BLENDEDEEDWSLUDATER, MEDIUM PRESSURE
OF
BACKWASH IAGTE
DOLING WATER
EHEMICALEDRAIN
REGLAME VlATERRE
cMLaRINF GAS
ORINENOUID
LGRE SOLDnoN
w
LANNF VACUUM
MEDIUM PRESSURE
""UL TIN°sLGDGE
IAGULATEDSE'ANDARYEFFLUENT
DIGEATE' 'LEANING
DEGESTER CLEAN NC RETURN
D IONIZED WATER
DIGESTER MIXING SLUDGE
UL AIR BRAN
DIGESTED S W DGE
D1=SELFUEL
D DIGESTED SLUDGE
DISTILLED WATER
GINEEPTIUST
_ALREDSLUDGE
FLAT
OULOAIR
ION DRAW
FILTRATE
L OIL RETURN
FILELOILSUPPLY
FILROTPROTECTIAN
ATION SLUDGE
FILTERED SECONDARY EFFLUENT
FILTER 'ETD SECONDARY
ASGRCETURNN
GLYCOL SUPPLY
GLUT
ODIUM HvvocHLOwTE
RvgR RETURN
LEAT y RVgR SUPPLY
HIGH PRE= SLUDGE GAS
MEsnc PAYABLE HATvvATFRER
E IT IN RETURN
LAWTEMPERATUREHEAUNGGDPPLYUN
INSTRUMENT AIR
AS AT R
ofY AIR
WAS
AB
LABARATARYVAcuUM
NG
ALP
P'L
P.Pw
III
IRS
R.,R
SYS
SDR
IN
BS
FIR,
TRIP
TD
TO
TSS
TWAs
vArtR
'A
VC,
VP
RAIL
S_
ELUTION
MIXED NOUOR
AGED SLUDGE
MEDIUM PRESSURE SLUDGE GAS
NATURAL GAs
OXYGEN LOU PRESSURE
REaERarloN aIR
UMPED FRAINALE
PRIMARY EFFLUENT
PLANT EFFLUENT FLOW
HOLY'
PRI MARYSLUDGE^�
MARYSCUM
ACTEvnTED SLUDGE
All SEWAG
RA,r N
RAN WATER PIPE
RECLAMEDYIATER(CLASSB, C, CR D)
sER,NCEAN
PINGS INGL
ARY DRAM PP
ANIT
EFFLUENT
ANITR Rol SEWAGE
ARTING AIR cu IU
RAIN
SEALWATEI
IC THKENED BOTTOM SLUDGE RETURN
TANK BRAN
THICKENER EFFLUENT
THICKENED SLU DGE
THICKEN ER OVERFLOW
THCKENED PNMARvswoGE
ANSFERSLUDUP
TEMPERED VIATER SYSTEM
THI'HENED,W.ASTE A'TNI.ATED SLUDGE
VENT TO ROOF
PA'UND
CH EMICAL E/NN
PETROLEUMT
AC AQUOLEGE
VrASTE MIXED
ED LIOUER
AT ER)
T
ER
ERiS"ECrJN�ARY EFFLUENT)
WATER HIGH PRESSURE
ARINATED
WATER
5'APING IRRIGATION
No.3 SPRAYUATER
C
,f I j�
yF�p✓ yI,a
vey".
P" ^
PAHALA
WASTEWATER
TREATMENT PLANT
DESIGN/BUILD
DOCUMENTS
REVISIONS
REV
DATE
DESCRIPTION
e
LIL AIE
DESIGNED.
APPROVED
FILENAME CIVIL
01 tlNL LEGEND.D4VG
B'PROJE' BER
r NUMBER
CLIENT PROJECT
CML
CIVIL LEGEND
D R-NC NUMBER
c-637
3 GH ER 25
GENERAL NOTES GENERAL NOTES (CONT) 0KEY NOTES
1. ALL OTHER UTILITIES AND SITE FEATURES 3. COORDINATE DEMOLITION OF EXISTING 1. CONTRACTOR SHALL REMOVE ABOVE AND ANO
OUTSIDE OF THE DEMOLITION LIMITS OF UTILITIES WITH NEW INSTALLATIONS, AS BELOW GRADE STRUCTURES, UTILITIES, A 1 11
WORK SHALL BE CONSIDERED "EXISTING APPLICABLE. CONTRACTOR SHALL TREES, AND PAVEMENT WITHIN THE b i ii
TO REMAIN" UNLESS NOTED OTHERWISE. INSTALL TEMPORARY OR PERMANENT DEMOLITION LIMITS OF WORK AS NEEDED
ALL STRUCTURES, UTILITIES AND STORMWATER DRAINAGE FACILITIES, TO COMPLETE THE PROJECT. THE
APPURTENANCES, AND FACILITIES THAT INCLUDING BYPASS PIPELINES AND MATERIALS TO BE ABANDONED IN -PLACE
REMAIN. PERMANENTLY OR TEMPORARILY, CUTFALLS, TO CONTROL SURFACE WATER OR DEMOLISHED AND REMOVED INCLUDE, ss WAILI HAWAIIa
SHALL BE PROTECTED FROM DAMAGE. RUNOFF PRIOR TO DEMOLITION OF BUT ARE NOT LIMITED TO, UNDERGROUND
CONTRACTOR SHALL REPAIR OR REPLACE EXISTING STORM DRAINAGE FACILITIES. OR AT GRADE IRRIGATION PIPING AND
EXISTING UTILITIES THEY DAMAGE AT ITS FIXTURES, ASPHALT PAVEMENT, C
OWN EXPENSE. FIELD LOCATED UTILITIES 4. CONTRACTOR IS RESPONSIBLE FOR ELECTRICAL WIRING, VEGETATION, SIGNS.
THAT REMAIN PRIOR TO DEMOLITION STORMWATER MANAGEMENT AND UTILITIES, AND MISCELLANEOUS DEBRIS.
ACTIVITIES. EROSION CONTROL FOR THIS CONTRACT PORTIONS OF EXISTING ORCHARD SHALL
AT ALL TIMES DURING CONSTRUCTION. BE"EXISTING TO REMAIN."
2. CONTRACTOR SHALL DEMOLISH, REMOVE THE CONTRACTOR SHALL SEQUENCE
OR ARAN DON IN -PLACE ALL STRUCTURES, DEMOLITION AND CONSTRUCTION 2. REMOVE AC PAVEMENT AND DRIVEWAY DESIGN/BUILD
TREES, UTILITIES, AND OTHER SITE ACTIVITIES IN ACCORDANCE WITH APRON. PROVIDE A VERTICAL FULL DEPTH
FEATURES THAT HAVE BEEN IDENTIFIED EROSION AND SEDIMENT CONTROL SAW CUT ALONG MAILE STREET OUTSIDE DOCUMENTS
FOR DEMOLITION. THE CONTRACTOR SHEETS AND SPECIFICATIONS OF THE OF THE TRAVEL WAY.
SHALL PREPARE THE BID BASED ON A CONTRACT DOCUMENTS.
THOROUGH SITE RECONNAISSANCE 3. REMOVE TWO PINE TREES AND CLEAR AND
CONDUCTED AFTER THE ADVERTISING GRUB FOR NEW DRIVEWAY APRON.
DATE. ABSENCE OF OBJECT FROM THESE
SHEETS DOES NOT RELIEVE THE 4. REMOVE UNPAVED ROAD BED. THESE DRAWINGS WERE
CONTRACTOR FROM THE OBLIGATION TO PREPARED FOR SUBMISSION TO
REMOVE MATERIALS OR STRUCTURES NOT 5. FIELD VERIFY AND REMOVE IRRIGATION EPA IN JULY 2021 TO PROVIDE A
TO REMAIN WITHIN DEMOLITION LIMITS. APPURTENANCE. COORDINATE WITH LOT 1 GENERAL UNDERSTANDING OF
OWNER FOR RELOCATION OF WATER THE PROJECT CONCEPT AND
SERVICE TO LOT I. ARE NOT INTENDED TO REFLECT
N. TRENCHING FOR UTILITY POINT OF DESIGN REQUIREMENTS.
CONNECTIONS.
C
n1 ;111,,11t 1,11 ,-�r11�� Inll
A All1.- 1.1�; ,uLu1.r r ,i ilr,l,ilrt T
11 .,lu
YS CESSPOOLTO 8E tl LOF N e'w ^" NN i, it ip I1! rIV1 Jtl' v $'
^ N zl .
F
LARGE CAPACITY WORKORK ITVPI ,
s (
q
' ' L r q III
ABANDONED
k II' PAHA""A
}
I M Ip WASTEWATER
oyo " TREATMENT PLANT
5 DESIGN/BUILD
DOCUMENTS
REVISIONS
^ w;y CRIaiION y f REV DATE DES
af•o,
y m�ay1
A tiVi
I1 1 1 �� NNTL
LIMITS (T 1 a"
` WORK (TYP) 5 „ 1` 1 jI I I \ ^\II �\ ' O IESIONEo.
III NF,
y
y 1FILENAME
a 1
I I 1 I
d It '.' 2 I
^ sM 12 1'1u rill V,:UIrr EI
�1 H'"^PotH '1 MY
CLIENT
0 100 200 cuE T110J c PUIMEE
V[ I^ ^L ll 1 x
3111 1 IN FEET
a4N 1 CIVIL
^r ) OVERALL EXISTING
Nm'I 3 4 s J 1 AND DEMOLITION a
` 1 PLAN
�'"�"F'Uao-^�m�alolr.KnNa e,y Nmc s."t^r�s*�a"ra,�r"ro�^^a�^a!w�ucdraz ^gym. +�?; r �M1r ��� '�H��'c'a^�,�.h,s"T�s'T.'"�TMa� rthr�'�rA,
L
MA IT STREET (COUNTY)
iA Tr s'e - A 1 4{ ^
Dune^nNc Nur,aEu
GOOK PINE TREES ROW TO 111 C_002 �A;Im1� L�1�
^ TO VALE STREET ROW TO 111 .L' tl II 1'r 1 REMAIN (48 EA) 41� '.Irl1 III FI11/9h1. 4 s Ea 25
VI
2 3 4 1 16
I,
I,
All
I4 if \I � I "I fill b I G
vt It,)
RS MANHOLE,
ll I q IIiV
PROCESS AREA
I4 if \I � I "I fill b I G
vt It,)
RS MANHOLE,
ll I q IIiV
PROCESS AREA
100
HEADWORKS
200
MEMBRANE BICREACTOR(CAR)
30C
CHLORINE CONTACT TANK (OPT)
400
IRRIGATION EOUALIZATION TANK
S00
EFFLUENT DISPOSAL
500
UTILITY BUILDING
100
I POTABLE WATER TANK
GENERAL NOTES
AINID
1. SEE CIVIL LEGEND FOR FACILITY NAMES.
2. SEE TYPICAL ROADWAY SECTION SHEETS.
■A� 1
3. MEMBRANE 810REACTOR OR APPROVED
EQUIVALENT SECONDARY TREATMENT
zRWAILUKU,
SYSTEM (OAE).
HAWAIIa
C
KEY NOTES
1. PAD MOUNT ELECTRICAL TRANSFORMER.
2, BULK FUEL STORAGE TANK,
DESIGN/BUILD
S. s•cHAINLINK FENCE.
DOCUMENTS
4. POINT OF CONNECTION AREA FOR
ELECTRICAL SERVICE AND RAW SEWER
CONVEYANCE.
THESE DRAWINGS WERE
PREPARED FOR SUBMISSION TO
EPA IN JULV 2021 TO PROVIDE A
GENERAL UNDERSTANDING OF
THE PROJECT CONCEPT AND
ARE NOTINTENDED TO REFLECT
DESIGN REQUIREMENTS.
r
I!I !I!'
' \ ,
i
I
PROPERTY LINE J
X
l FLOW III':- ,V A`.:
ill �,nPill
O
IEl Ir Nn n
I O � 93 SITE -VG
0 1OOu-200 cUENPR er=tt
Rya ICT
1 y NllnneEa
scALE IN FEET
CIVIL
OVERALL SITE PLAN
PROPERTY LINE P
I {p': fl'
,f I
C TR003
5 25
FUNCTIONAL IDENTIFICATION
INSTRUMENT SIGNAL LINES
PROCESS AND SIGNAL CROSS REFERENCE SYSTEM
MEASURED OR INITIATING
READOUTOR PASSIVE
OUTPUT
p ® 1M1ID®
VARIABLE
VARIABLE DESCRIPTION
MODIFIER
FUNCTION
FUNCTION
MODIFIER
-----------
��
ti
INSTRUMENT SUPPLV,
PROCESS TAPS
ELECTRICAL SIGNAL
(ANALOG OR DISCRETE)
ELECTROMAGNETIC OR
SONIC SIGNAL (GUIDED)
ELECTROMAGNETIC OR
�— SONIC SIGNAL (UNGUIDED)
SOFTWARE OR DATA LINK
ELECTRIC POWER SUPPLV WGO
WHEN A PROCESS LINE CROSSES FROM DRAWING TO
DRAWING. THE P&ID DRAWING NUMBERS NEED TO BE SHEET WHERE LINE
REFERENCED. AS AN EXAMPLE, A PROGESS IS PUMPING TD A CONTINUES TO/FROIA
TANK ON ASEPARATE P&ID.. SEE BELOW
F--------------------------_------------------------,
UNE LINE
F`5 P-
ausnc sao.a 91 AuSTIL satin
I 1' PUMP
I--sTaBAOE TANu I I
P&ID P..y00 P&ID P-501
L--------------------- F
J
PROCESS DESCRIPTION OF PROCESS DESCRIPTION OF
WHERE LINE GOES TO/FROM WHERE LINE GOES TOTROM
IF THERE ARE MULTIPLE LINES CROSSING
C { lL
��ss xwuw s•aeeT, suite sas
WAILUKU, HAWAII
A
ANALYSIS
ALARM
B
BURNER, COMBUSTION
C
CONDUCTIVITY
CONTROL
CLOSE
D
DENSITY, SPECIFIC GRAVITY
DIFFERENTIAL
DEVIATION
E
VOLTAGE, SOLENOID
PRIMARY ELEMENT
F
FLOW, FLOW RATE
RATIO
IT
FIRE, SMOKE
GLASS
DESIGN/BUILD
DOCUMENTS
H
HAND
HIGH
I
CURRENT
INDICATE
J
POWER
SCAN
K
TIME, SCHEDULE
TIME RATE
CONTROL
OF CHANGE
STATION
ES�
VAC ti0 HZ UNLESS OTHERWISE
NOTED. (=.g. ES480 VAC)
THE SAME TWO P&ID DRAWINGS. IT IS
ACCEPTABLE TO ADD A LETTER FOR CLARITY
L
LEVEL
LIGHT
LOW
M
MOISTURE. HUMIDITY,
MOMENTARY
MIDDLE, INTERMEDIATE
MOTION
THESE DRAWINGS WERE
N
EQUIPMENT STATUS
TYPICAL INSTRUMENT IDENTIFICATION
PROCESS LINES
PREPARED FOR SUBMISSION PROVIDE A
EPAIN JULENDE To PROVIDE A
GENERAL UNDERSTANDING OF
O
DISSOLVED OXYGEN
ORIFICE
OPEN
P
PRESSURE, VACUUM
POINT (TEST)CONNECTION
THE PROJECT CONCEPT AND
ARENOTINTENDEDTOREFLECT
DESIGN REQUIREMENTS.
Q
QUANTITY
INTEGRATE,
TOTALIZE
NEW PRIMARY PROCESS FLOW
NEW SECONDARY PROCESS FLOW
NEW UTILITY PROCESS FLOW
— — — — — — W FUTURE
0, EXISTING PROCESS FLOW,EQUIPMENT, OR SIGNAL PATH (SCREENED)
�I NEWIEXISTING CONNECTIONS
TEMPORARY PIPING
--- — — — PROCESS AREA
_—
_ VENDOR PACKAGE BOUNDARY
R
RADIATION
RECORD
RUN
CODE
AREA CODE
DESCRIPTION
'4Vf
`"^ P
1 yw
,y
S
SPEED, FREQUENCY
SAFETY
SWITCH
STOP
T
TEMPERATURE
TRANSMIT
100
HEADWORKS
U
MULTIVARIABLE
MULTIFUNCTION
MULTIFUNCTION
MULTIFUNCTION
200
MEMBRANE BIOREACTOR(OAE)
V
VIBRATION, MECHANICAL
ANALYSIS
VALVE, DAMPER,
LOUVER
300
CHLORINE CONTACT TANK
40C
IRRIGATION EQUALIZATION TANK
W
WEIGHT, FORCE, TORQUE
WELL, PROBE
500
SUBSURFACE DRIP EFFLUENT DISPOSAL SYSTEM
X
UNCLASSIFIED
XAXIS
600
OPERATIONS BUILDING
V
EVENT, STATE OR
V AXIS
AUXILIARY
T00
POTABLE WATER TANK
PRESENCE
DEVICES
F pp="y+eP
2
POSITION. DIMENSION
2AXIS
RIVETOR,
AC❑TUAR,
PAHALA
MNELEMENRQLI
WASTEWATER
TREATMENT PLANT
CONTROL AND MEASUREMENT NOTATIONS
INSTRUMENT
TAG AND LOOP IDENTIFICATION
DESIGN/BUILD
DOCUMENTS
MEASURED CR INITIATING VARIABLE
110
STARTISTOP OR OPEN
REVISIONS
# MODIFIER WHEN REQUIRED
ACK
ACKNOWLEDGE OSC OPEN/STOPICLOSE
REV
DATE
ESCWPTION
AM
AUTO&IAN PAL LOW PRESSURE
SUCCEEDING LETTERS. -READOUT OR
PB PUSHBUTTON
PASSIVE FUNCTION, OUTPUT FUNCTION,
BYP
BYPASS pH pH
OR MODIFIER
POT POTENTIOMETER
UNIQUE LOOP NUMBER
PER INSTRUMENT
PANEL LOCATION #
CL
CL2
CLOSE
CHLORINE
(# =OPTIONAL)
V
RDREADY
FUNCTIONAL IDENTIFICATION
DS DISCONNECT SWITCH RNG RUNNING
ROT RE
P D I T
1 0 0 2 0 0 A
AND MEASUREMENT
NOTATIONS #
ESP
EMERGENCVSTOP RST RESET
ESTCONTROL
'LL—INCHEs
AT F~LL
INSTRUM ENT FUNCTIONAL
IDENTIFICATION PER
# - ALPHABETICAL IDENTIFIER FOR LIKE
INSTRUMENTS IN SAME LOOP
LP2 DO
FLT
FWD
FAULT SP STOP
FORWARD ST START
oESICNEo.
TABLE THIS SHEET
ID ENIFIER SIMILAR
W
ix 4-1A FUNCTION SYMBOL
FIR
FORWARDIREVERSE TBL TROUBLE
OHECKER
IHEIKER
RELATFOR
INSTRUMENTS IN RELATED PROCESSES
INS RUMEN
F
FIS FASTISLOW
OR LOOP
\\
HOA
UVF ULTRA VIOLET TRANSIAITTANCE
HAND/OFFIAUTOIPPROIED
FILENAME
`PART OF VEN BOR PACKAGE
TOR HAND/OFFIREMOTE UVI ULTRAVIOLET INTENSITY
AREA CODE TO WHICH LOOP BELONGS
LOOP NUMBER
LCS
LOCAL CONTROL STATION VCR VENDOR CONTROL PANEL
NUMBER
Bc PROJECT
LITLEADILAG
CLIENT PROJECT NUMRER
EXAMPLE: fp 2,`� #OPTIONAL
#-OPTIONAL
LOR ED ALIOFF/REMOTE
LOS
ED KOUTSTOP
PADS
LEGENDS, ABBREV.,
NETWORKTYPE
E ETHERNET
UP LOCALIREMOTE
0AC OPENICLOSE/AUTO
EQUIPMENT IDENTIFICATION SYSTEM
IA -TOR MODSUSTCP
OC
OPENICLOSE
SYMBOLS-1
OCP
OL
PURGE VALVE OP/CLIPC
OVERLOAD
RAPID MIXER
EQUIPMENT NAME
TYPICAL ANALOG HARDWIRED 1/0
GROUPING
GENERAL NOTES:
xxI�
EQUIPMENT NUMBER
1. THIS DRAWING IS GENERAL IN NATURE SOME SYMBOLS
SPEC. 4-1 11
SPECIFICATION REFERENCE
AND IDENTIFICATIONS SHOWN HEREON MAY NOT BE
USED ON THE CONTRACT DRAWINGS.
DISCRETE HARDVv1RED 110
GTYPI ROUPING
GROUPING
2. SYMBOLS ARE ARRANGED ON SPECIFIC DRAWINGS AND
IN CATEGORIES FOR CONVENIENCE ONLY; SYMBOLS
BR.H!Arvc; NUMEER
p_QQ'�
MAY BE USED ON ANY OF THE CONTRACT DRAWINGS.
6 s R 25
D
C
C
A
C
MISCELLANEOUS SYMBOLS
PRIMARY ELEMENT SYMBOLS
VALVES
eMCC
(MOTOR CONTROLISTARTER)
l--ICI--S
ORIFICE PLATE
!-- Mo-�
MAGNETIC FLOWMETER
NORMALLY
OPEN
N
NORMALLY I/
CLOSED K�
GATE VALVE I�
DOUBLE LEAF CHECK
VALVE S SOLENOID
VALVE
AN1D
1 l�
i
OP
PURGE OR FLUSHING DEVICE
F---5
VENTURI OR FLOWTUBE
�
SONIC TRANSIT TOIME)ETER (DOPPLER OR
W
PLUG VALVE
ICI
N
VALVE
pI
DIAPHRAGMI�I ^I^ OPERATED VALVE
z WAILUKU,EHAWAII ui
<S>
RESET FOR LATCH -TYPE OPERATOR
^�
NOZZLE FLOW
l--��
POSITIVE DISPLACEMENT METER
IIN�iII
fH1
BALL VALVE
I'01
II
`ll��
BALL CHECK
VALVE
I/ V
PRESSURE BALANCE
e
SEAL WATER CONTROL UNIT
��
PILOT TUBE
dT
THERMAL FLOELEMENT
W
IIYYyyII
V-N
GLOBE
IIyy��
ICJ
r l
PU PVALVEDISCHARGE
OPERATED VALVE
M
NEEDLE
GAUGE OR
MOTOR OPERATED
VALVE
DESIGN/BUILD
OI
INTERLOCKING OR CONTROL FUNCTION
��
PROPELLER OR TURBINE METER
'
VORTEX FLOW ELEMENT
VALVE
ROOT VALVE
DOCUMENTS
IS
INTRINSIC SAFETY BARRIER
7
FLUME
i
CORIOLIS FLOW ELEMENT
Fj
KNIFE GATE
VALVE
T
PRESSUREAND
M
MOTOR OPERATED
VALVE, MODULATING
/ \
VACUUM RELIEF
p
DISCRETE INPUT
I� �I
I--I-I—{
LJ
WEIR
b
FLOAT LEVEL ELEMENT
DIAPHRAGM
VALVE
VALVE
NOTE. USE VALVE BODY
SYMBOL TO MATCH TYPE
THESE DRAWINGS WERE
PREPARED FOR SUBMISSION TO
EPA IN JULV 2021 TO PROVIDE A
p
♦
DISCRETE OUTPUT
ANALOG INPUT
OR
VARIABLE AREA FLOW INDICATOR
O
...
��
ULTRASONIC LEVEL ELEMENT
I(
�
BUTTERFLY
VALVE
ANGLE
VALVE
VACUUM RELIEF
VALVE
OF VALVE.
PISTON OPERATED
VALVE
GENERAL UNDERSTANDING OF
THE PROJECT CONCEPT AND
ARE NOT INTENDED TO REFLECT
DESIGN REQUIREMENTS.
♦
ANALOG OUTPUT
R
(ROTAMETER)
o
vo
BUBBLER LEVEL TUBE
THREE N/AV
VALVE
PRESSURE RELIEF
O7
CAMERA(CCTVI
SUBMERSIBLE LEVEL
VALVE
TELESCOPING
VFD VARIABLE FREQUENCY DRIVE
VSD VARIABLE SPEED DRIVE
�j
DIAPHRAGM SEAL
IN -LINE ANNULAR SEAL
O
11J
TRANSMITTER
HYDROSTATIC
LEVEL PROBE
RADAR OR ULTRASONIC
LEVEL ELEMENT
�J.
�J�
FOUR WAV
VALVE
FLOAT
VALVE
PINCH
VALVE
BALANCING
cocK
PRESSURE
REGULATING VALVE
(SELF-CONTAINED)
BACK PRESSURE
REGULATING VALVE
(SELF-CONTAINED)
FUSIBLE
VALVE
_
MUD VALVEh+
AN TI SIPHON
VALVE
L
LIFT CHECK
VALVE
1. n.,
q1' .e�
S
A�
� I6
`L'
* ,p
3
'+vA M
AvF;,mip,
CbP�
PAHALA
WASTEWATER
ACTUATORS/MOTORS/POWER
ASD DRIVE( (MECHANICAL)
DRIVE (MECHAwcAL)
Er ROTARY PISTON
LINK
TREATMENT PLANT
ACTUATORS. VALVE
DESIGN/BUILD
OR GATE
DOCUMENTS
LINEAR PISTON
REVISIONS
ACTUATORS. VALVE
OR GATE
DESCRIPTION
4 SOLENOID ACTUATOR,
FUNCTION SYMBOLS
INSTRUMENTATION SYMBOLS
SLIDE AND SLUICE GATES
VALVE
MANUAL OR HAND
T ACTUATOR,VALVE
OR GATE (OR BLANK)
n MOTOR(ACTUATOR,
O
SHARE❑❑ISPLAY,PROCESSCONTROLSVSTEM
SOFTWAREFUNCTIONALITY
INTEGRAL
NSTRUMENT CLOSE
COUPLED
INSTRUMENT
SEPARATE
REMOTE
INSTRUMENT
OR
MOUNTED
NORMALLY NORMALLY
OPEN CLOSED
IR FLAP GATE R
7 VALVE, GATE OR
��
T�lo
BUTTERFLY GATE
~7.,E
EQUIPMENT)
_
O
FIELD OR PANEL DEVICE
LO � NC
oESICNEo-.
ENGINE
LOCATION
AND ACCESSIBILITY
MODIFIERS FOR
PRIMARY ELEMENT
SYMBOL
PRIMARY ELEMENT
SYMBOL
PRIMARY ELEMENT
SYMBOL
MULTI VARIABLE
INSTRUMENT
STOP GATE
APPROVED
FUNCTION SYMBOLS
SLIDE GATE
IIIE
110I.I DVG
BC PRIJEIT NUMBER
EJECTOR,
STAND ALONE DEVICE.
O O
PNEUMATIC
OPERATOR ACCESSIBLE
SEPARATE OR SEPARATE
OR xx SEPARATE
OR
CLIENT PROJECT NUMBER
REMOTE
INSTRUMENT
MOUNTED REMOTE
INSTRUREMOTE
MOUNTED .�.� REMOTEMOUNTED
MC INSTRUMENT
SLUICEGATE
IAPS
LOCATED ON FRONT OF PANEL OR
If
LEGENDS,
S,
O GENERATOR
see
CONSOLE, OPERATOR ACCESSIBLE
.,
SYMBOLS-2
PRIMARY ELEMENT
PRIMARY ELEMENT
PRIMARY ELEMENT
SINGLE VARIABLE
LOCATED IN REAR OF PANEL OR
SYMBOL
SYMBOL
SYMBOL
INSTRUMENT
O e
CONSOLE, OPERATOR INACCESSIBLE
FLANGE OR
ELEMENT TAPS
PIPE TAPS
COMBINATION
TAPS
GENERAL NOTES.
1. THIS DRAWING IS GENERAL IN NATURE. SOME SYMBOLS
AND IDENTIFICATIONS SHOWN HEREON MAY NOT BE
USED ON THE
CONTRACT DRAWINGS.
o -11jING NUMBER
P-002
2. SYMBOLS ARE ARRANGED ON SPECIFIC DRAWINGS AND
IN CATEGORIES FOR CONVENIENCE ONLY; SYMBOLS
MAY BE USED
ON ANY OF THE CONTRACT DRAWINGS.
7 BR ER 25
D
C
Ca
A
C
B
`a
a A
PUMPS
PIPE LINE DEVICES
HVAC RELATED
MIXERS
PUMP,
CENTRIFUGAL
PUMP,
'UMP' AGM
1
1,
T
TRAP
Q
I
VENT TO
ROOF
VENT
INJECTOR
FLAME TRAP
FAN, INLINE
Q )))
(\u/ CHILLER
MIXER
/'• A1N1D
y {{
PUNIV
zRWAILUKU,EHAWAII al
SEDIMENT
PUMP, GEAR
PUMP,
METERING
PUMP,
PERISTALTIC
/
DT
TRAP
GAS DRIP
TRAP
SEPARATOR/
DRYER
f +
STEAM VENT
AUTOMATIC
VENT
I�I
�--p p�.i
LJ
�
FLAME TRAP WITH
THEIR MO SHUTOFF
ASSEMBLY
FLAME
CHECK
SAMPLING AND
FLUSHING
CONNECTIONS
FILTER OR
FILTERSILENCER
INLET AIR
BOILER
� CHILLER
DRAFT TUBE
MIXER
MIXER, INLINE
®
STATIC
DESIGN/BUILD
DOCUMENTS
THESE DRAWINGS WERE
PREPARED FOR SUBMISSION TO
EPA IN JULU TO PROVIDE A
H� PUMPS
PROGRESSING
CAVITY
PIPELINE
FILTER
MANUAL
VENT
�
I I SUCTION
f�l DIFFUSER
SCREENS AND CONVEYORS
BAR SCREEN
PUMP,
ROTARY
LOBE
RUPTURE DISK
(VACUUMS
RELIEF)
, IYI _ STRAINERS
TEMPERATURE
WELL
DE
GENERAL UNDERSTANDING OF
PT AND
ENOTIHE JECT NDEDT RELEE
ARE NOTINTENDED TO REFLECT
DESIGN REQUIREMENTS.
PUMP,
SUBMERSIBLE
RUPTURE DISK
(PRESSURE
RELIEF)
1
FOOT VALVE
S—®i
FLOW
STRAIGHTENING
VANES
CONVENOR
U - \ ISVip
M
PUMP, JET
PUMP,
VERTICAL
Y�
CONNECTION
BETWEEN NEW
AND EXISTING
PIPING
UNION
Iq�
_
—'d
+
AIR
SEPARATOR��,.,yu
DRAIN
Pa n
®
PRESSURE
REDUCING
ASSEMBLY
AMIAONIA
UNION
HYDROCYCLONE
001 GRIT
CLASSIFIER
FINE SCREEN
PAHALA
WASTEWATER
TREATMENT PLANT
DESIGN/BUILD
DOCUMENTS
QUICK
CONNECTOR
CAP CRy
PLUG
BLIND
FLANGE
I AN
VALVE
CALIBRATION
CHAMBER
Hz�
LS:J
Ir
DAMPER
SIGHT
GLASS
PIG LAUNCHER/
RECEIVER
�� GRIT
CYCLONE
VORTEX GRIT
SEPARATOR
GRIT
SEPARATOR
BLOWERS/COMPRESSORS
BLQWEROR
O CENTRIFUGAL
FAN
REVISIONS
DESCRIPTION
®
q
0
COMPRESSOR.
COMPRESSOR
LIQUID RING
BLOWER.R
COMPRESSOR.
IE{(}}{{
I"'�I"'I
FLEX
CONNECTOR
FABRIC
EXPANSION
JOINT
PULSATION
DAMPENER
IIC�II
VI
REDUCER
FLEX
COUPLING
�L ROTARY
LOBE
aT Fu^ E iz�l
SLIDE AND SLUICE GATES
oESICNEo-.
COMPRESSOR..
ROTARY
NORMALLY
NORMALLY
IHELUED
SCREW
APPROVED
FleENni1'E
COMPRESSOR..
ROTARY
OPEN
fly FLAP
CLOSED
GATE R
O
ecP NUMBER
1s�u
SLIDING
VANE
CLIENT PROJECT NUMBER
COMPRESSOR.
PISTON
BUTTERFLY GATE
NO NC
STOP GATE
P&IDS
LEGENDS, ABBREV.,
SYMBOLS-3
SLIDE
GATE
GENERAL NOTES:
1. THIS DRAWING IS GENERAL IN NATURE. SOME SYMBOLS
SLUICE GATE
AND IDENTIFICATIONS SHOWN HEREON MAY NOT BE
USED ON THE CONTRACT DRAWINGS.
D 11111ING NUIIEa
P-003
V. SYMBOLS ARE ARRANGED ON SPECIFIC DRAWINGS AND
IN CATEGORIES FOR CONVENIENCE ONLY; SYMBOLS
MAY BE USED ON ANY OF THE CONTRACT DRAWINGS.
8 sN Ea 25
D
C
m
A
2 3 4 6
INFLUENT SCREEN SCREEN BrownAFD FLOW HIGH FLOW INFLUENNFLUENMFLUENT SCREEN SCREEN 2UP 2 SCREEN SCREEN SCREEN
METERINFLUENT TOTAL TOTAL FLOW FLOW HIGH 2HIGH SCREEN STREAM DOWN 2DIFF 21N 2 PS-2 Caldwell
VAULT FLOW YSTDAY TODAY TOTAL RATE LEVEL LEVEL 2FAULT LEVEL STREAM LEVEL AUTO RUNNING FAULT
c� ca ca ca ca ca ca ca ca ca a c�
D 1T T T T T T T WAILUKU, HAWAII D
SCADA ___________________________
5 5 5 I5 i
�— DESIGN/BUILD
DOCUMENTS
I I I I I
I I I I I
I I I
MCP_______THESE DRAWINGS WERE
1 PREPARED FOR SUBMISSION TO
EPA IN JULY 2021 TO PROVIDE A
GENERAL UNDERSTANDING CF
p THE PROJECT CONCEPT AND
ARE NOT INTENDED TO REFLECT
DESIGN REQUIREMENTS.
I I I
I I I
I I
C C
I 100,
I I
I I �
/ NL
I
OVERFLOW
--AGE WEIR
ii Pzov Es i I I I PAHALA
I I rt I ��
I
I �sH I I TOMaR WASTEWATER
TREATMENT PLANT
DESIGN/BUILD
❑ �_ WL I v RE OVAL DOCUMENTS
v TANK
RS `� REVISIONS
REV I DATE I DERIPTION
FROM PAHALA
e I I I e
I I I
I I I
I I I
I I I
I I I
i I I
S
S i ESIGrvE
BAG OR
CONTNNER
S HRLErv.a
BER
CUErvia EAT NUllR
PBIDS
A 3W A
OTHER uses HEADWORKS
UTILITY WATER FACILITY P&ID
SCREENING
SCREENING WASHER SPRAY FINE SCREENING BARRACK MANUAL BARRACK
SLIDE GATE WATER VALVES SLIDE GATE SLIDE GATE BAR RACK SLIDE GATE
SCREEN orvc rvw.,sER
Poo Poo Poo PPooF Pao P_101
SPEG: SHE. - SPEC : SPEC : SPEC'. SPEC '.
9 s ER 25
1 3 4 5 6
IYPICAL FOR 2 PUMPS
I FAL HIM I— IAV —L FNL N)N fLON
u u
awlm 0.01 Mai aM11 0.1
RUMING MN REYGIE HIGH 1ENP HIM YOISi WHY I— HIM —L I£�FL MEEO PoINNING WN RMOM HIM IENP HIM Y06i FlAV
M iAH Nfl FlC K iAH lR
NII dYll III galll OINII OIaIM ON161 aININ OW111 N11 MYN H11 W0111 aN111 a1Y11
SCADA HMI — — — — — — — —
I I I I I
MBR PLC
amll aNll Nm _ _ _ � n owls ao�M� aaNvl omv � _ _ _ awlsl
MCC
I
I I I u I r________________J N
— — — YY NS
REMOTE 1/0 CABINET 2 �01 0011 — i i—
J
I
1E-040101
AX-01
ANOXIC BASIN
1NK-040100
M o.
DESIGN/BUILD
— SCADA HMI DOCUMENTS
MBR PLC THESE DRAVANGS WERE
PREPARED FOR SUBMISSION TO
EPA IN JULV 2021 TO PROVIDE A
GENERAL UNDERSTANDING CF
THE PROJECT CONCEPT AND
MCC ARE NOT INTENDED TO REFLECT
DESIGN REQUIREMENTS.
REMOTE 1/0 CABINET 2
mm
PAHALA
WASTEWATER
TREATMENT PLANT
DESIGN/BUILD
DOCUMENTS
REVISIONS
mL
P&IDS
ANOXIC BASIN
F
P-201
10 SI EE 25
2 3
4
6
BrownAPa .
Caldwell '
�� WAILUKU,EHAWAII ov
D
lN! 1EYP ILN 00
ru
rcma: Ni410i
D
rtly o0
ux nn ux
rfiNN r5mm aNm
DESIGN/BUILD
SCADA HMI
SCADA HMI
DOCUMENTS
REMOTE 1/0 CABINET 2
u u u
REMOTE 1/0 CABINET 2
THESE DRANANGS WERE
PREPARED FOR SUBMISSION TO
EPA IN JULV 2021 TO PROVIDE A
GENERAL UNDERSTANDING OF
MCC
�— i
MCC
THE PROJECT CONCEPT AND
ARE NOT IN TENDED TO REFLECT
— — — — — — — — — —
— —
— — — — — —
I I I
I I I
I I I
— —
DESIGN REQUIREMENTS.
C
I I I
I I I
I I I
C
o� j12XY,w
f Nub
I I I
��N �dm�Fit
I I I
f
I I I
I I I
PAHALA
WASTEWATER
A FliOM PROCESS AIR BLOWERS
F
TREATMENT PLANT
DESIGN/BUILD
RECYCLE
FROM AX-01
ur Ili NI
r601N rfiN01 t®IP!
DOCUMENTS
REVISIONS
REV
DATE
I cRIPTInN
6
N OE
rfiNN � rfiN01 �/�
6
NE-050121
W
0 TO MBR BASIN
unTll
V 120122
DEBICNED.
EIrEN.aME
DP&IUNUMBER
BCP
171
FBD-050111
cuENT -EAT NUMBER
PA-01
P&ID5
PRE -AERATION
A
PRE -AERATION BASIN
1NK-050100
BASIN A
DRAI NG NU-1
P-202
11 sN R 25
3
4 5
6
2 3 4 6
BrownAam .
Caldwell '
zzcW AI LUKU,EHAW All n>.
D FNL Lmr FlAv D
u FK
aMIN aMB6
CLO50] OPENO] OPEN FEMOIE LOW LML HIGH LLlf1 AR f
➢C ZKI YC FlR
'Mel amm aNIm oAIM amlq oulm A DESIGN/BUILD
SCADA HMI SCADA HMI DOCUMENTS
q I s q q W
MBR PLC — — — — — MBR PLC THESE DRAWINGS WERE
PREPARED FOR SUBMISSION TO
EPA IN JULV 2021 TO PROVIDE A
GENERAL UNDERSTANDING OF
THE PROJECT CONCEPT AND
MCC MCC ARENOTINTENDEDTOREFLECT
1— — — — — — — —I — — — — — — DESIGN REQUIREMENTS.
TiSHT P20B
A00 I I I I I I
A WASH
Rff
C C
L, UPPER PERMEATE
Z50 y U TRIF SIFT P204
aA M I
a��,'+�µ �rY°
DZMBI� y C LTOOCOLTE
LCTPERMON
PROCE55 AIR aM°I ^y w:
FROM BLOW42S _______ __ _____ __
T PAHALA
I WASTEWATER
L i TREATMENT PLANT
T T DESIGN/BUILD
DOCUMENTS
I REVISIONS
I i I I I I
II I �PGN
B I I I L4 LSH 8
A FROM PRE AWERAR IN BASIN amlq oMm
AT
I I I I I II III IJ I o � F�� 12E�
� I I I I I I I J aDMB6
I I rl I L.I LII LJ r 1 Z oE51GNEo.
I I �1rI JJ I I
I I ill lllj
ICI Ill llli ICI N 3'-WS e TO WAS-01
wA
NiI1 L.l FE-07018fi
1 4 1 FlLENnIn
L J I BIPaHPMG�UMBE'
15
SMU-070111 SMU-070121 SMU- CLIENT aRaECT I — -
(FUTURE (FUTURE MEMBRANES)
P&IDS
MB-01 MEMBRANE
A MEMBRANE 01 REACTOR BASIN BIOREACTOR A
TNK-070100
BASIN
GRnwING NUIn Ea
P-203
12 - EFl 25
1 2 3 4 5 6
1 HIM PflESS FNL HIM RR8 F.1L
PN u u
aeoIN mmm w"" win
OPM OSE FENOIE PRE59JflE FENOIE RUN RUNNING OPM RASE RMOIE fl➢N POSIPM ROSE➢
XC PIR M XC FQR AIRFC ➢C
D)4111 Ofill aN 101 OB0101 H01 UBMIY 41011E OBMII OnWI Onln Onln
SCADA HMI
—
MBR PLC
—i — T
I I amlm mmOl I I I I I
MCC
I I I I I I I
VENT i0
AMOSPHERE Z5C
(1YP) xv ®IR
will Pi D)0111 rAT
�LNI 4N001 FCV
®IYI FE E
aoln
B UPPQ .mB-ol E
FRON MB-01 � min OBOWI N
n L —R ..RN FE-080141
PNP-080101
DESIGN/BUILD
— — SCADA HMI
DOCUMENTS
MBR PLC
THESE DRAWINGS WERE
PREPARED FOR SUBMISSION TO
EPA IN JULV 2021 TO PROVIDE A
GENERAL UNDERSTANDING OF
THE PROJECT CONCEPT AND
MCC
ARENOTINTENDEDTOREFLECT
— —
DESIGN REQUIREMENTS.
mm
wG
PAHALA
WASTEWATER
TREATMENT PLANT
DESIGN/BUILD
DOCUMENTS
REVISIONS
mit
S P&ID
PERMEATE
COLLECTION a
P-204
13 - ER 25
TIPICAL FOR 2 BLOWERS
I DI I N —I M I N I N— I DI I DI I DI I 0 —IO11N IONN — — — — — — — — — — — — — — DESIGN/BUILD
SCADA HMI SCADA HMI DOCUMENTS
MBR PLC + +^°+ + MBR PLC
— — — — — — — — — — — — — — — — — — THESE DRAWINGS WERE
PREPARED FOR SUBMISSION TO
EPA IN JULV 2021 TO PROVIDE A
GENERAL UNDERSTANDING OF
CB, 480V THE PROJECT CONCEPT AND
MDP-2 �-MDP-2 ARENOTINTENBEDTOREFLEGT
r
DESIGN REQUIREMENTS.
I
nrArAxcxcxcsG01010Od01ONNB00101UON01IO11NCIt
— — — —--------------------------- PRE-AERA00N BLOWER 1 R N M M. MUT FRMRE, x 1 Ir REF 41i P-202 I 'y"
rfIPEAAILI[ ONII£rVhY4AAl11[NW C MT. PoIIEA, FpNfl CdNE IYO flNNPNE
BLR-100101
souro u�aasAc �4
wA
4
PAHALA
WASTEWATER
TREATMENT PLANT
DESIGN/BUILD
r DOCUMENTS
REVISIONS
REV C.dTE 0 ECCWPi1CN y y
Q141N OF
G 01 OIOIA DI M d M GIC �MN COIN
B
PROCESS AIR
I-------- ON
Ao, .m. wTwc--------��I—\F--�—4------------------------- C TOMB-01
MQABRANE BI)REACTOR BLOWER I T -
Omn �Mo c .Nr, w ET rfl m flc Nor 1
-Am II£rV1EY4AAl11[NNOrw OJflflFNi, PoIIEA, FpNfl CdNE IYO flNNPNE.
BLR-090101 T
S00ro0—__—__—__—__—__—__
EB NEC
APPROVED
NLENA
E PRO
R@ICSUMBER
518' CLIENT PROJECT NNMaER
B PROCESS P R
FROM SRI-BY BLR. — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — J
P&IOS
PRE -AERATION AND
MEMBRANE a
BI OREACTOR
TOWERS
P-205
14 ............. 25
2 3 4 6
Brownarro .
Caldwell '
zzcW AI LUKU,EHAW All n>.
D AC D
u
IAIm
R04➢ OPWgI OPM 6➢ff FEmOIE ROW
➢C ➢O M IR
'Alm no 111 0 'A'm Irnu DESIGN/BUILD
SCADA HMI SCADA HMI DOCUMENTS
5 q p
— — — IAIm �
MBR PLC _ _ _ _ _ _ _ — -----_ _ _ _ _ _ _ _ _ _ _ MBR PLC W t THESE DRAWINGS WERE
T� I PREPARED FOR SUBMISSION TO
EPA IN JULV 2021 TO PROVIDE A
GENERAL UNDERSTANDING OF
THE PROJECT CONCEPT AND
MCC — — — — — — — — — — — — — MCC ARENOTINTENDEDTOREFLECT
I I I I
DESIGN REQUIREMENTS.
I I I I
I I I I
C I I I I C
I I I I
I i51 I I pM1 ( dy
I IAIm I I wSi ,,, „�,� \'•tiro
I T
IAII1 Ri
IAIm IA'�
UPUiY N ACID WA91
w^� I " I 4 RE 4N1Bi PI2 3 PAHALA
WASTEWATER
TREATMENT PLANT
DESIGN/BUILD
DOCUMENTS
REVISIONS
REV DATE DESCRIPTION
B I Fl i0 DRAIN I g
T
�-17D171
41
LI ELS2 NCNEI
OXALIC ACID DE -RED
55 CAL DRUM
1NK-170100 CONTAINMENT AREA
APPROVED
IT ENn
P@IOS.D.D
El PRIJEIT NUMBER
151,7,
CLIENT PROJECT NUllER
P&IDs
ACID CLEANING
A A
ARnwl'G NUlgER
P-206
15 - ER 25
1 2 3 4 5 6
4
® 11
{ U
zzcW AI LUKU,EHAW All n>.
D
wn
rc
DESIGN/BUILD
SCADA HMI
SCADA HMI
DOCUMENTS
MBR PLC
— — — —
— — —
— — — — —
MBR PLC
THESE DRAWINGS WERE
PREPARED FOR SUBMISSION TO
EPA IN JULY 2021 TO PROVIDE A
MCC
MCC
GENERAL UNDERSTANDING OF
THE PROJECT CONCEPT AND
ARENOTINTENDEDTOREFLECT
G PANEL 2A — — — —
— — —
— — — — —
I
I
— — — — —
�
— — — — PANEL 2A
DESIGN REQUIREMENTS.
G
I
I I
r�1
�____ I w ILafi iaav auncr
*},'"
PAHALA
WASTEWATER
I
I
TREATMENT PLANT
ii
DESIGN/BUILD
pHAJJ N
DOCUMENTS
REVISIONS
REV
DATE
CRIPMN
g
I
SODIUM HYDROXIDE I
55 CAL DRUM
1NK-160100
PNP-160101
g
WNTNNMENT AREA_ _
ES
7 1,E
DESIGNEDAPPROVED
UIERIIIE
O'
A
El PRIJEIT NUMBER
151,7,
CLIENT PROJECT NUMBER
P&IDS
PH ADJUSTMENT
A
ARnwING NUI;ER
P-207
16 sR ER 25
1
2
3
4
6
2 3
4
6
BroWnarro .
Caldwell
zzcW AI LUKU,EHAW All n>.
D
Td
m140
DESIGN/BUILD
SCADA HMI
SCADA HMI
DOCUMENTS
N
MBR PLC
— — — — — — — —
MBR PLC
THESE DRAWINGS WERE
PREPARED FOR SUBMISSION TO
EPA IN JULY 2021 TO PROVIDE A
GENERAL UNDERSTANDING OF
CB,4BOV
MDP-2
MDP-2
THE PROJECT CONCEPT AND
ARE NOT INTENDED TO REFLECT
— — — — — — — — — T — —
I I
I I
I I
— — — — — —
— — — —
DESIGN REQUIREMENTS.
C I I
I I
I I
C
�ENOOR PACKAGE 03
PNL-120100
El PIENT GALLERY'
PUMP STATION LOCAL
--
� „+
"-
CONTROL PANEL
PAHALA
WASTEWATER
TREATMENT PLANT
DESIGN/BUILD
DOCUMENTS
EQN GALLERY
4 PS TO AX-01
REVISIONSDE—P-N
L91 LT
J
6 tTT
T41 NE TSH ME
�1mn �m�n �ma �1ma
I I
I I
8
~ ,
LE-120101
-------------------J
I I
PNP-120111 PNP-120112
APPROVED
P@I
01=
El PRI NUMBER
CLIENT RJT aE`Y NUMaEB
P&IDS
WW-01
EQUIPMENT
A EQUIPMENT GALLERY PUMP STATION
TNK-120100
GALLERY PUMP A
STATION
GRnwING NUMBER
P-208
17 - EB 25
2 3
4
6
2 3 4 6
BroWnAro .
Caldwell '
x� WAILUKU,EHAWAII ov
TYPICAL FOR 2 BLONERS
R ➢Y RUM1IX0 UN D PaYfR WAN ERR(fl S T STOP IAAO CIHIENi f1fI
aaY L XC XC SFl
DESIGN/BUILD
SCADA HMI--nTM-TN;;_
SCADA HMI DOCUMENTS
AI
MBR PLC MBR PLC
— — — — — — — — — — — — — — — — — — — — — — THESE ❑RANANGS WERE
PREPARED FOR SUBMISSION TO
EPA IN JULY 2021 TO PROVIDE A
GENERAL UNDERSTANDING OF
rC8,�980V THE PROJECT CONCEPT AND
MDP-2 �MDP-2 ARE NOT IN TENDED TO REFLECT
— r
DESIGN REQUIREMENTS.
I
I
----------------------
Go
NU 11 11 YI YI YA YA YL MC XC SC Fl G
IIOIa ar IOIa IOIaX IOlat IIpaO IOIa IIOIaB Ima IOIaX IlaaC Ilan IIOIa
I --��I—\I—�--— — — — — — — — — — — — — — — — — — — — — — —
O —
WAS
STORAGE— —BLONER � REF SHi P210 f%
eno nwu vwns AVAiAac Tax xax raaxc rmloq v =f PlaEsmlaE —
1ELPFRANflE, Wa£I 1ELPEPANRE, III aIRSXT POAEP EflKlfl CODE MO FLa1XE L / f )F
BLR-110101 — — maxfgLO9RE— T
----------------------
NU 11 11 YI YI YA YA YL MC XC SC Fl OF
II0111 — ar IIMIIA— IIOIIIB IIMIIC — IlallO IIOIIIA IIOIIIB —IIMIIA IIOIIIB—IIOIIK hall IIDIII I PAHALA
---------------------- ------L---------------------------- b iOPA&UBB1Rn WASTEWATER
srarvo-er eLOWEa _ REF SHi P20 TREATMENT PLANT
�xo E r T, a nET PmAE, Ix T
IELPERANflF, Wa£iY1ELPERANflE, YOTaV aIPoSXT, PaxER, WiOfl CaIE MO PoNIXE
BLR—II0111
DESIGN/BUILD
SaMO fNCIL9JflE _ — _ _ — _ _ — _ _ — _ _ DOCUMENTS
R"ASIONS
REV DATE D
RIPTION
B B
SIGNED
FILEN.a
P81 E—G
GIIENTP EGT NUllEa
P&IDS
WAS STORAGE AND
A STAND-BY A
BLOWERS
oFlAI NG NUllER
P-209
18 s" R 25
1 3 4 5 6
N. -- —
NM01 NM01
g1f1
IlR
NOIM
SCADA HMI — — — — — — —
—
— —
MBR PLC
u
I
MCC
I
I
I
I
REMOTE 1/0 CABINET 2 — — — — —
I
I
— — —
I
I
I
I
I
I
I
— —
PROCESS P1R
I
I
I
i
I
A - — —
- — — — -
FROq E<OVhRS— — — — — — — — -
— — — —— — — — — — —
— —,
L
I
�
T
E FRON NB-01
I
I
REF SHT P207
I
n
I
I Li
9N01
I
LE-190102
WAS
WAS STORAGE BASIN
TNK-190100
RNL
N0111
RUNNING Run PDIOIE HQ R- HIGH ugsr
- H
III Ngll IHII 19N11 19N11
q 01
—J
1901II Hq --- 19M11
I I
� , I
I , -
I I ur � I lunn Isdn
-j — —
i I r--
� I I
� I I
� , I
I ; �
� I I
� , I
I I I
� I I
� , I
� , I
� , I
I I I
� I I
� , I
� , I
� , I
I I I
� I I
� , I
� I I
� I I
� , I
� , I
DESIGN/BUILD
— SCADA HMI DOCUMENTS
— — — — MBR PLC
I THESE DRAWINGS WERE
PREPARED FOR SUBMISSION TO
EPA IN JULV 2021 TO PROVIDE A
GENERAL UNDERSTANDING OF
THE PROJECT CONCEPT AND
MCC
ARENOTINTENDEDTOREFLECT
— — — —
DESIGN REQUIREMENTS.
REMOTE 1/0 CABINET 2
E
k
PAHALA
WASTEWATER
TREATMENT PLANT
DESIGN/BUILD
DOCUMENTS
REVISIONS
acNEo-
CKED
ROVED
Fl2"'E
o Pi DS.Dw
auEHT PRaEcr IUNIER
P&IDs
WAS STORAGE
BASIN a
oRwwc 1U11EE
P-210
19 - ER 25
l ll"
zzcW AI LUKU,EHAW All n>.
C
DESIGN/BUILD
SCADA HMI
SCADA HMI
DOCUMENTS
MBR PLC
MBR PLC
THESE DRAWINGS WERE
PREPARED FOR SUBMISSION TO
EPA IN JULV 2021 TO PROVIDE A
GENERAL UNDERSTANDING OF
CB 480V
MDP-2 ��
MDP-2
THE PROJECT CONCEPT AND
ARE NOT INTENDED TO REFLECT
I
I
I
— — — — — —
— — — — — —
DESIGN REQUIREMENTS.
I
c
LOCAL CONTROL PANEL I
Iwr
w�
J
PAHALA
�g
WASTEWATER
I
TREATMENT PLANT
i
WA U K
DESIGN/BUILD
0
DOCUMENTS
C FRa�WIA' N N
REVISIONS
PNP-
3
EscwvnaN
E
WAS P
P&IDS
U MP
P
P-211
20 - - 25
EQUALIZATION
HI TANK LO TANK LEAD LAG ALL TANK
LEVEL LEVEL LEVEL LEVEL XMTR TANK START START STOP HI
SAP\ CHI\ SAP\ LOW\ F/A-U-L�T LEVEL SAP\ SAP\ SAP\ LEVEL
Y � � � � zai oai oal 7Qoi 4oz
SCAPA
, I
, I
I
I ,
I ,
I ,
I ,
I ,
I ,
I
I j
I ,
I ,
I ,
I
I j
I ,
I ,
I
I j
I ,
I
I
I
I
I
I
I
I
I
FROM PERMEATE
I
I
I
� I
I
COLLECTION
REF SIFT P-204
I
CONTACT
BASIN
HYPOCHLORITE
SOLUTION
TANK
FLOW
u/FK\
Y
I
I
I
I
i
i
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
i
I
I
I
I
i
I
I
I
I
I
I
I
FE—
1 ll"
WAILUKU, HAWAII
DESIGN/BUILD
DOCUMENTS
THESE DRAWINGS WERE
PREPARED FOR SUBMISSION TO
EPA IN JULY 2021 TO PROVIDE A
GENERAL UNDERSTANDING OF
THE PROJECT CONCEPT AND
------------ ARE NOTINTENDEDTO REFLECT
DESIGN RECUIREMENTS.
C
PAHALA
WASTEWATER
TREATMENT PLANT
DESIGN/BUILD
DOCUMENTS
REIASIONS
CMPMN
S
TO EFFLUENT DISPOSAL
REF SHT P-,501
P&IDS
P
IRRIGATION
EQUALIZATION
TANK P&ID
P A NGNu'a
P-401
1 - - 25
VALVE
VALVE VALVE
VALVE VALVE VALVE
IN
OPEN CLOSE
OPENED CLOSED FAULT
AUTO
SETT SETT
i
i i
T
TT
"I" "{"
I I I
L'7-
I
L 7- 7
I I
I I I
I I
I
I I
I I
--
�
`F'
I I
L
I I —
,
1, I
DRIP 20NE 1
DRIP ZONE 2
DRIP ZONE 3
DRIP ZONE 4
l ll'
WAILUKU, HAWAII
DESIGN/BUILD
DOCUMENTS
THESE DRAWINGS WERE
PREPARED FOR SUBMISSION TO
EPA IN JULV 2021 TO PROVIDE A
GENERAL UNDERSTANDING OF
THE PROJECT CONCEPT AND
------------ ARE NOTINTENDEDTO REFLECT
DESIGN REQUIREMENTS.
c
� !6
w�
m,
��'�P:aa�
PAHALA
WASTEWATER
TREATMENT PLANT
DESIGN/BUILD
DOCUMENTS
RE\ASIONS
--N
E
P&IDS
P
SUBSURFACE DRIP
EFFLUENT
DISPOSAL P&ID
o nwwc NUN R P-501 R
C
'z B
A
HIGH
®®Alm
SE,
SCADA
22WAILUKU, HAWAII ni
MCP sao,lal
`----y----+----y----`
DESIGN/BUILD
I
I
DOCUMENTS
I
I
I
THESE DRAWINGS WERE
HIGH LEVEL
LEVEL
L
pRFEARED FOR SUBMISSION TO
I
r
I
.��...EPA
NI GERAL UNDERSTANDING OF
THE PROJECT CONCEPT AND
I
I
I
ARE NDTINTENDEDTO REFLECT
DESIGN REQUIREMENTS.
�\
goo zo E
-J
soo iA
I I I
ES 120VAC
FUEL TANK MONITORING SYSTEM
�ooam 1
I I
I I I
PAHALA
I
I i
WASTEWATER
n
TREATMENT PLANT
�TAHK
oAYTANK
DESIGN/BUILD
DOCUMENTS
I
I
REVISIONS
REV
DATE
IE-P-N
I
I
I
LEAK
O
ESIGNEl
VENDOR PA—E
APPRIVED
EVEN""
CUENT PRaECT NUllEC
p&IDS
GENERATOR BULK
FUELSTORAGE
BULK FUEL
STORAGE TANK
P&ID
SPEC.
GRAWING NUMBER
P-601
23 - EH 25
D
Ca
A
C
Lew
EEL rvi��
RArvsFE RArvsFE
�Inrm .
EVELL
oQBUNI
L`
Q
Q Q
Q
Q
SCADA
"VAILUKU, HAWAII ni
�ao.oas
�oo.oao Soa.PnA
�oo.aaE
�oo.oa
�oo..ov
rncP sao.lal
�----}----y----y----�----J
DESIGN/BUILD
I
DOCUMENTS
I
a�, EVEL
---------------------
�EN��NTR�LPANEL
I
THESE DRAWINGS WERE
PREPARED FOR SUBMISSION TO
HIGH LEVEL
EPA IN JULV 2021 TO PROVIDE A
LOW LEVEL
GENERAL UNDERSTANDING OF
LK TA
THE PROJECT CONCEPT AND
ARE NOT INTENDED TO REFLECT
I
�
I
I
I
I
I
I
I
I
I
I
I
I
I
DESIGN REQUIREMENTS.
�qh°e�•+��•�,�
tt
U
d
VENDOR PACKAGE 120VAC
i
ES
iGENERATOR
DAY TANK PANEL
PAHALA
WASTEWATER
TREATMENT PLANT
DESIGN/BUILD
I
I I
I
I
I
DOCUMENTS
FOR ,•-EOR
,..Fos E°s
REVISIONS
R
SCRIP-N
I
I
0
.�aza
I
I
I
I
I
ELST'R F
NK
I
I
I
TANK EL STORAGE
NNEL
SIGNED.
LEAK
v
APPROVEDNLENA
BI
ECT
CLIENT PRJOJ NUnn ER
P&ICS
GENERATOR DAY
TANK P&ID
GENERATOR
IL FILTER
GENERATOR FUEL
TRANSPFER PUMP OI
GENERATOR DAY
TTANK
D
GENERATOR FUEL
TRAN PF0ER PUMP 2
ARAwnnIrvG NUsER
P-602
s c. sPEc. SPEC. sPEc.
24 s" R 25
m
A
C
ERY
TFITeA
NIB GEING
-INC
EI
l ll
SCADA
� WAILUKIJ, HAWAII ui
ea .00vc soo aoyc eoo.oas Eoa.UnA
eao:oaA
eoo.oaA
MCP sao,lal
DESIGN/BUILD
I
I
DOCUMENTS
I
VENDOR PACKAGE I
THESE DRAWINGS WERE
PREPARED FOR SUBMISSION TO
EPA IN JULV 2021 TO PROVIDE A
GENERAL UNDERSTANDING OF
THE PROJECT CONCEPT AND
PANELES
T
12oVAC
i GENERATOR CONTROL PANEL�ESP
O al
I
GENERATOR
STARTING ATT BERY CHARGER
GHGR 600,211 1GOVAG ES
SPEC
GENERATOREX AUST
SILENCER
S 600,210
SPEC:
ARE NOTINTENDEDTO REFLECT
DESIGN REQUIREMENTS.
* f
.GiP�
PAHALA
WASTEWATER
TREATMENT PLANT
DESIGN/BUILD
DOCUMENTS
I
i
REVISIONS
REVscwPnaN
I
I
I
I
I
❑
8
zaav Es
U.Av TANK
DESIGNED'.
APPRIVED
N_ENRN
PRIJEITeER
GUENT—JT NUMaEe
P&Io5
STANDBY
GENERATOR
GENERATOR
GENERATOR P&ID
ONBOARD FUEL
PUMP
ENGINE BLOCK STANDBY
HEATER GENERATOR
EPEE
ARAVIING NUllUF
P-603
25 - ER 25
D
C
Ca
A