HomeMy WebLinkAboutReport of Change Orders Authorized 3.31.2022REPORT OF CHANGE ORDERS AUTHORIZED
FOR THE PERIOD OF:
3/16/2022-3/31/2022
COSAPSCPTA
GS
Original Original % of Cumulative % of
Execution Job Contract Project Contrac Dept.Contract Contract CO/SA CO/SA Orig CO/SA Orig Contractor Project Project Purpose
Date ##Title Type Amount Date No.Amount Cont Total Cont Manager Status
3/17/2022 NA C.008454 Wildlife monitoring and predator control for the Kealakehe Wastewater Treatment Plan SA DEM $101,571.00 7/7/2020 1 $0.00 0.00%$0.00 0%AECOS, Inc. Dora Beck Open
Additional services required for the monitoring, reporting and predator control of the endangered wildlife found within the Kealakehe Wastewater Treatment Plant, as
required by the US Fish and Wildlife and SOH-DOFAW3/17/2022 RFP#3720 C.007069 Website design, hosting and maintenance, COH SA Fin $119,505.00 9/19/2018 4 $20,200.00 16.90%$88,942.38 74%Granicus, LLC Diane Nakagawa Open Adding additional design and hosting for the Mass Transit Agency. 3/23/2022 B-3777 C.009108 Hawaii County Emergency Call Center CO DPW $31,070,000.00 6/2/2021 2 -$68,237.67 -0.22%-$5,707,860.67 -18%Hensel Phelps Construction Co. Noland Eskaran Open Deduction of bid allowance for Hawaiian Electric.
3/23/2022 IFB#3486 PTA Chopper 1 flight operations and repair services, COH SA Fin $0.00 12/19/2016 6 $0.00 0.00%$0.00 0%Manuiwa Airways Inc. dba Volcano Helicopters Diane Nakagawa Open Extend for an additional six month period beginning January 1, 2022 and ending June 30, 2022.
3/28/2022 PR-4526 C.009511 Papa'aloa Park Accessibility Improvements SA DPW $4,567,025.00 9/17/2021 1 -$813,404.08 -17.81%-$813,404.08 -18%Isemoto Contracting Co Ltd. Kevin Sakai Open
Credit for the deletion of the gym's renovation scope of work. Reroute existing waterline due to demolition of gym. Unforeseen roof framing damage and unsafe electrical wiring in Annex building.
3/29/2022 B-3777 C.008289 Professional consulting services for the Fire Administration Support Complex, Fire/Police Dispatch Center also known as Hawaii County Emergency Call Center CO DPW $702,763.00 4/13/2020 2 $201,674.00 28.70%$325,846.00 46%Anbe, Aruga & Ishizu Architects, Inc. Julann Sonomura Open
1) Easement needed for HECO transmission line for power to call center 2) surveillance camera system 3) raised floor to provide flexibility for future furniture layouts 4)
Carrier and P25 Frequency Study necessary due to the lack of adequate cell phone
coverage at the site determined once construction began 5) NEC 708 provisions necessary to met the NEC Design Code for critical operations center to ensure operation during disaster events.
Total CO/SA
for Period
\
Contracts
Total CO/SA -$659,767.75Amount for Period
6 Total Original Contract $36,560,864.00 6Amount
Price Term AgreementOther Goods & Services
Legend:Change Order
Supplemental Agreement
Professional Services
Construction