Loading...
HomeMy WebLinkAbout2022-05-24 Water Board AgendaDEPARTMENT OF WATER SUPPLY COUNTY OF HAWAVI WATER BOARD MEETING AGENDA MEETING DATE: May 24, 2022 TIME: 10:00 a.m. PLACE: West Hawaii Civic Center, Building G, Community Hale, 74-5044 Ane Keohokalole Highway, Kailua-Kona, Hawaii Due to the expiration of Governor Ige's COViD-19 Emergency Proclamation, members of the public are encouraged to continue face masking, physical distancing, and sanitizing, as outlined in the County of Hawaii Coronavirus Best Practices, Living with Coronavirus in our Community. Public testimony may be done in person or in writing by email (dws@hawaiidws.org), fax (808-961-8657), or by mail: 345 Kekuanao`a Street, Suite 20, Hilo, HI 96720. Please indicate agenda item submitting for. All testimony, regardless of time of receipt, will be part of the permanent record. 1) CALL TO ORDER — 10:00 a.m. (please turn cell phones off or set to silent) 2) STATEMENTS FROM THE PUBLIC 3) APPROVAL OF MINUTES: • Minutes of the April 26, 2022, Public Hearing on the Proposed New Cost of Power Adjustment Clause • Minutes of the April 26, 2022, Public Hearing on the Fiscal Year 2023, Operating Budget and 5-Year Capital Improvements Budget for Fiscal Years 2023-2027 • Minutes of the April 26, 2022, regular Water Board Meeting. 4) APPROVAL OF ADDENDUM AND/OR SUPPLEMENTAL AGENDA (if necessary) (Note: Roll Call Required) 5) DEPARTMENT OF WATER SUPPLY PROPOSED AMENDED OPERATING AND 5-YEAR CAPITAL IMPROVEMENT PROJECTS (C.I.P.) BUDGETS FOR FISCAL YEAR 2023: The Department's Fiscal Year 2023 Amended Operating Budget, totaling $61,711,853, and 5-Year C.I.P. Budget for Fiscal Year 2023-2027, totaling $176,400,000 has been distributed for the Board's review. A public hearing was held on April 26, 2022, to accept testimony. The Board may change either Budget or adopt them as presented over two readings. RECOMMENDATION: It is recommended that the Board approve the Department's Amended Fiscal Year 2023 Operating and C.I.P. Budgets on this second of two readings. 6) POWER COST CHARGE: Departmental power costs from all power sources increased since the last Power Cost Charge rate was determined. The Department proposes to increase the Power Cost Charge from $2.34 to $2.48 per thousand gallons as a result of this increase. Power cost charges over the past two years were as follows: Page 1 of 16 May 24, 2022, Water Board Agenda Effective PCC May 1, 2022 $2.34 March 1, 2022 $2.02 November 1, 2021 $2.15 June 1, 2021 $1.85 December 1, 2020 $1.71 August 1, 2020 $2.01 Before the Power Cost Charge is changed, a Public Hearing should be scheduled to accept public testimony. RECOMMENDATION: It is recommended that the Board approve holding a Public Hearing on June 28, 2022, at 9:45 a.m., to receive testimony on increasing the Power Cost Charge from $2.34 to $2.48, effective July 1, 2022. 7) SOUTH HILO: A. JOB NO.2020-1146, HILO OPERATIONS BASEYARD EMERGENCY GENERATOR REPLACEMENT — REQUEST FOR ADDITIONAL FUNDS: The Contractor, Isemoto Contracting Co., Ltd., is requesting a contract change order for additional work resulting from a difference in interpretation of the electrical code. The Department's consultant furnished drawings meeting all electrical code requirements, however upon inspection, the County electrical inspector determined that disconnect switches were required to comply with electrical code requirement. In addition to the installation of the disconnect switches, the Department had requested surge protection devices to be added to these disconnect switches as a best practice measure and the replacement of an enclosed circuit breaker and associated junction box that are severely corroded. The description of the additional work and associated fees is as follows: ITEM DESCRIPTION AMOUNT Change Order Proposal #6: New service disconnect switches required by $107,839.00 DPW electrical inspector; installation of surge protection devices on new service disconnect switches; and replacement of enclosed circuit breaker and associated junction box for caretaker's cottage due to corrosion. TOTAL $107,839.00 Original Contract Amount: $1,384,052.00 Original Contingency Amount: $138,348.00 1't Change Order: $7,463.00 2" a Change Order: $49,314.00 3ra Change Order: $13,677.00 4" Change Order: $10,418.00 Ist Additional Funds Request: $50,363.00 Total Revised Contract Amount: $1,572,763.00 Staff reviewed the request for additional funds and found the requested $50,363.00 justified. Note: Payment of this work shall be performed by force account. RECOMMENDATION: It is recommended that the Board approve an increase in contingency of $50,363.00 to Isemoto Contracting Co., Ltd., for JOB NO. 2020-1146, HILO OPERATIONS BASEYARD EMERGENCY GENERATOR REPLACEMENT. If approved, the total revised contract amount shall be $1,572,763.00 Page 2 of 16 May 24, 2022, Water Board Agenda 8) SOUTH KOHALA: A. WATER TREATMENT PROPOSAL NO. 2022-03, FURNISHING AND DELIVERING COAGULANTS TO THE WAIMEA WATER TREATMENT PLANT: This project generally consists of furnishing all labor, materials, tools and equipment necessary to deliver coagulants to the Waimea Water Treatment Plant, for a period not to exceed two years. Bids for this project were opened on May 5, 2022, at 1:30 p.m., and the following are the bid results: Bidder Bid Amount (24-Month Contract Period) Pural Water Specialty Co., Inc. $209,992.86 Bidder 1) Pural Water Specialty Co., Inc. 2) Contingency Amount $209,992.86 $150,007.14 TOTAL CONTRACT PRICE $360,000.00 The reason for the high contingency is that as the source water's turbidity increases during the year due to unstable weather conditions, more coagulants are used to meet the water quality requirements of the State of Hawaii, Department of Health. RECOMMENDATION: It is recommended that the Board award the contract for WATER TREATMENT PROPOSAL NO. 2022-03, FURNISHING AND DELIVERING COAGULANTS TO THE WAIMEA WATER TREATMENT PLANT, to Pural Water Specialty Co., Inc., for the bid price of $209,992.86, plus $150,007.14 in contingency, for a total contract price of $360,000.00 for the period from July 1, 2022, to June 30, 2024, and that either the Chairperson or Vice -Chairperson be authorized to sign the contract, subject to review as to form and legality by Corporation Counsel. B. JOB NO. 2019-1107, CONSTRUCTION OF THE LALAMILO 10 MG RESERVOIR: This project generally consists of furnishing all labor, materials, tools, and equipment necessary for constructing the Laldmilo 10 MG Reservoir, including 10 MG tank, water mains, demolition work, check valve station, flowmeter station, access roadway, civil site work, SCADA (Supervisory Control and Data Acquisition) improvements, and chain link fencing, mechanical, electrical, and structural work, in accordance with the plans and specifications, ready for operation. Bids for this project were opened on May 5, 2022, at 3:00 p.m., and the following are the bid results: Bidder Bid Amount Adjusted Bid Amount w/Preferences* Isemoto Contracting Co., Ltd. $18,035,449.00 $16,994,176.55 Goodfellow Bros. LLC $18,601,959.00 $17,483,839.75 Jas W. Glover Ltd. $18 899 000.00 $17 760 782.00 Nan, Inc. $19,885,679.00 $18,678,355.75 *Bids were adjusted (for purposes of award) to provide credits for use of Hawaii Products and participation in the State Apprenticeship Program, in accordance with Hawaii Administrative Rules. Project Costs: 1) Low Bidder (Isemoto Contracting Co., Ltd.) 2) Construction Contingency (-10%) $18,035,449.00 1,804,551.00 Total Cost: 19,840,000.00 Page 3 of 16 May 24, 2022, Water Board Agenda 9) Funding for this project will be from a State of Hawaii Appropriation and the State of Hawaii DWSRF (Drinking Water State Revolving Fund) loan. The contractor will have 600 calendar days to complete this project. The engineering estimate is $17,193,290.00. RECOMMENDATION: It is recommended that the Board award the contract for JOB NO, 2019-1107, CONSTRUCTION OF THE LALAMILO 10 MG RESERVOIR, to the lowest responsible bidder, Isemoto Contracting Co., Ltd., for their bid amount of $18,035,449.00, plus $1,804,551.00 for construction contingency, for a total contract amount of $19,840,000.00. It is further recommended that either the Chairperson or Vice -Chairperson be authorized to sign the contract, subject to review as to form and legality of the contract by Corporation Counsel. MISCELLANEOUS: A. DEDICATIONS: We received the following documents for action by the Water Board. The water systems have been constructed in accordance with the Department's standards and are in acceptable condition for dedication: 1. Grant Easement Grantors: Marco Franklin Muna Castro and Tarin Kahealani Castro Kupulau Uka Subdivision SUB-03-000150r Tax Map Key (3) 2-4-035 : 019 (portion) Waiakea, South Hilo, Island of Hawaii, Hawaii 2. Bill of Sale Transferor: 938 Kupulau LLC Kupulau Uka Subdivision SUB-03-000150r Tax Map Key (3) 2-4-035: 019 Facilities Charge: $22,000.00 Date Paid: 1/14/2020 Final Inspection Date: 8/03/2020 Water System Cost: $110,000.00 3. Grant of Easement and Bill of Sale Grantor: Hilo One Incorporated Sub. No. SUB-19-001924 (Waiakea Nani Estates) Tax Map Key 2-4-039: 026 Waiakea, South Hilo, Island of Hawaii, Hawaii Facilities Charge: $176,755.00 Date Paid: 10/28/2021 Final Inspection Date: 2/16/2022 Water System Cost: $359,131.61 4. Bill of Sale Transferor: Mark Rodrigues and Kim Irene Rodrigues, Trustees of the Rodrigues Family Joint Revocable Trust dated June 1, 2011 Water system improvement at Kaumana Drive — Country Club Drive Intersection at Kaumana, South Hilo, Island of Hawaii, State of Hawaii Facilities Charge: $22,000.00 Date Paid: 12/01/2020 Final Inspection Date: 10/30/2020 Water System Cost: $84,475.00 Page 4 of 16 May 24, 2022, Water Board Agenda 5. Grant of Easement/Bill of Sale Grantor: Mark Rodrigues and Kim Irene Rodrigues, Trustees of the Rodrigues Family Joint Revocable Trust dated June 1, 2011 Tax Map Key (3) 2-5-003: 110 (portion) Kaumana, South Hilo, Island of Hawaii, State of Hawaii Facilities Charge: same as above Date Paid: same as above Final Inspection Date: same as above Water System Cost: $ same as above 6. Bill of Sale Seller: Kabumoto-Uriu LLC Water system improvement along Old Government Road Kohanaiki, North Hilo, Island of Hawaii, State of Hawaii Facilities Charge: $11,000.00 Date Paid: 2/19/2016 Final Inspection Date: 8/14/2015 Water System Cost: $64,890.00 RECOMMENDATION: It is recommended that the Water Board accept these documents subject to the approval of the Corporation Counsel and that either the Chairperson or Vice -Chairperson be authorized to sign the documents. B. MATERIAL BID NO. 2021-04, FURNISHING AND DELIVERING SPARE PUMP AND MOTOR SETS FOR PARKER RANCH DEEPWELL, WAIMEA DEEPWELL, AND KEOPC #1 DEEPWELL, AND REFURBISHING PUMP AND MOTOR SET FOR HALEKI`I DEEPWELL FOR THE DEPARTMENT OF WATER SUPPLY: Bids were received and opened on May 12, 2022, at 2:30 p.m., and the following are the bid results: Beylik Energetic Derrick's Well Wastewater SECTION DESCRIPTION A JV Drilling & Pump Solutions, LLC Services, LLC 1 PARKER RANCH $277,780.00 Non -Responsive Non -Responsive DEEPWELL 2 WAIMEA DEEPWELL $299,360.00 Non -Responsive Non -Responsive 3 KEOPU #1 DEEPWELL $255,530.00 Non -Responsive Non -Responsive 4 HALEKI`I DEEPWELL $211,740.00 Non -Responsive Non -Responsive The estimated costs for the pump and motor set and refurbished motor, respectively, were as follows: • Parker Ranch Deepwell: $175,000 • Waimea Deepwell: $250,000 • Ke6pu 41 Deepwell: $160,000 • Haleki`i Deepwell: $145,000 RECOMMENDATION: It is recommended that the Board award the contract for MATERIAL BID NO. 2021-04, FURNISHING AND DELIVERING SPARE PUMP AND MOTOR SETS FOR PARKER RANCH DEEPWELL, WAIMEA DEEPWELL, AND KEOPC #1 DEEPWELL, AND REFURBISHING PUMP AND MOTOR SET FOR HALEKI`I DEEPWELL FOR THE DEPARTMENT OF WATER SUPPLY, by Sections to the following bidders for the amounts shown above, and that either the Chairperson or Vice -Chairperson be authorized to sign the contract(s), subject to review as to form and legality of the contract(s) by Corporation Counsel: Page 5 of 16 May 24, 2022, Water Board Agenda Section 1 — Parker Ranch Deepwell to Beylik Energetic A JV Section 2 — Waimea Deepwell to Beylik Energetic A JV Section 3 — Ke6pu #1 Deepwell to Beylik Energetic A JV Section 4 — Haleki`i Deepwell to Beylik Energetic A JV C. MATERIAL BID NO. 2022-01, FURNISHING AND DELIVERING PIPES, FITTINGS, WATER METERS, FIRE HYDRANTS, BRASS GOODS, VALVES, ELECTRICAL SUPPLIES, ELECTRICAL EQUIPMENT, SCADA, WATER QUALITY EQUIPMENT, CHLORINATORS, MOTORS AND MISCELLANEOUS ITEMS FOR THE DEPARTMENT OF WATER SUPPLY STOCK: Bids were opened on May 4, 2022, at 1:30 p.m., and following are the bid results: The contract period for all Parts is one year, from July 1, 2022, to June 30, 2023. All Parts are established price agreements for materials on an "As -Needed Basis." RECOMMENDATION: It is recommended that the Board award the contract(s) to the following bidders for MATERIAL BID NO. 2022-01, FURNISHING AND DELIVERING PIPES, FITTINGS, WATER METERS, FIRE HYDRANTS, BRASS GOODS, VALVES, ELECTRICAL SUPPLIES, ELECTRICAL EQUIPMENT, SCADA, WATER QUALITY EQUIPMENT, CHLORINATORS, MOTORS AND MISCELLANEOUS ITEMS FOR THE DEPARTMENT OF WATER SUPPLY STOCK, on an as -needed basis, as listed below, and that either the Chairperson or Vice -Chairperson be authorized to sign the contract(s), subject to review as to form and legality of the contract(s) by Corporation Counsel. The contract period shall be from July 1, 2022, to June 30, 2023, PART DESCRIPTION BIDDER AMOUNT NO. I DUCTILE IRON PIPE, PUSH -ON TYPE Core & Main LP dba $86,800.00 JOINT Pacific Pipe Co., Inc. 2 DUCTILE IRON FITTINGS Core & Main LP dba $152,901.00 Pacific Pie Co., Inc. 3 DUCTILE IRON SOLID BODY Core & Main LP dba $57,020.00 SLEEVES Pacific Pipe Co., Inc. 4 FLANGE GASKETS No Bids. 5 NUTS, BOLTS, AND THREADED Fastenal Company $76,423.12 RODS 6 COPPER TUBING Core & Main LP dba Pacific Pipe Co., Inc. $183,050.00 7 GALVANIZED PIPES T&C Core & Main LP dba $23,210.00 (THREADED & COUPLED) Pacific Pipe Co., Inc. 8 METER BOXES M&H Investment Corp. dba ICO Supply $45,500.00 9 METER COVERS Ferguson Enterprises, Inc. $19,017.50 10 AUTOMATIC METER READING UNIT Ferguson Enterprises, Inc. $98,638.80 Page 6 of 16 May 24, 2022, Water Board Agenda PART NO. DESCRIPTION BIDDER AMOUNT 11 SMART WATER METERS No Bids. 12 5/8" WATER METERS Badger Meter, Inc. $54,360.00 13 NEPTUNE T-10 SERIES METER PARTS Ferguson Enterprises, Inc. $96,661.00 14 BADGER RECORDALL SERIES METER PARTS Badger Meter, Inc. $4,306.39 15 1"- 2" WATER METERS Badger Meter, Inc. $10,427.80 16 COMPOUND WATER METERS Badger Meter, Inc.. $11,211.30 17 TURBINE METERS Badger Meter, Inc. $20,199.14 18 DETECTOR CHECK METERS Core & Main LP dba Pacific Pipe Co., Inc. $5,170.00 19 FIRE SERVICE METERS Badger Meter, Inc. $62,366.24 20 FIRE HYDRANTS Core & Main LP dba Pacific Pipe Co., Inc. $121,150.00 21 TAMPER -RESISTANT FIRE HYDRANTS Core & Main LP dba Pacific Pipe Co., Inc. $158,325.00 22 MUELLER FIRE HYDRANT PARTS Ferguson Enterprises, Inc. $8,041.84 23 MUELLER FIRE HYDRANT EXTENSION KITS Ferguson Enterprises, Inc. $10,342.43 24 M&H VALVE FIRE HYDRANT PARTS No Bids 25 BALL METER VALVES Core & Main LP dba Pacific Pipe Co., Inc. $75,500.00 26 BALL VALVE, PACK JOINT X METER COUPLING / FIP Female Iron Pipe) Ferguson Enterprises, Inc. $52,939.25 27 COMPRESSION JOINT COUPLING Core & Main LP dba Pacific Pipe Co., Inc. $7,550.00 28 METER FLANGE COUPLING Ferguson Enterprises, Inc. $5,385.75 29 PACK JOINT COUPLING Ferguson Enterprises, Inc. $48,795.05 30 CORPORATION AND CURB STOPS — BALL TYPE Core & Main LP dba Pacific Pipe Co., Inc. $125,657.15 31 PRESSURE REGULATORS No Bids 32 HOSE BIBBS No Bids 33 INVERTED MARKING PAINT Safety Systems & Signs Hawaii, Inc. $13,344.00 Page 7 of 16 May 24, 2022, Water Board Agenda PART DESCRIPTION BIDDER AMOUNT NO. 34 AIR RELIEF VALVES Core & Main LP dba Pacific Pipe Co., Inc. $17,400.00 35 SLOW CLOSING AIR/VACUUM No Bids VALVES 36 SILENT CHECK VALVES Core & Main LP dba Pacific Pipe Co., Inc. $103,280.00 37 DUCKBILL CHECK VALVES No Bids 38 GATE VALVES — 3" AND LARGER, Ferguson Enterprises, Inc. $47,939.36 125# CLASS 39 GATE VALVES — 3" AND LARGER, Ferguson Enterprises, Inc. $88,365.76 2504 CLASS 40 AUTOMATIC CONTROL VALVES Ferguson Enterprises, Inc. $1,887,644.02 41 ROTARY PUMP CONTROL VALVES No Bids AND ACTUATION 42 RESERVOIR LEVEL INDICATOR TK Process Hawaii, LLC $11,118.29 43 HATCH FRAMES AND COVERS Core & Main LP dba Pacific Pipe Co., Inc. $41,900.00 44 EMERGENCY EYEWASH/SHOWER Safety Systems & Signs $157,205.70 STATIONS Hawaii, Inc. 45 TOXIC GAS MONITORS No Bids 46 SIGNAL DEVICES Graybar Electric Company, $151,250.00 Inc. 47 ARC FLASH PPE — DAILY WEAR No Bids 48 SUPPLEMENTAL PPE Safety Systems & Signs Hawaii, Inc. $10,968.94 49 ELECTRICAL GLOVES Safety Systems & Signs Hawaii, Inc. $1,222.48 50 DIGITAL MULTIMETER & TESTING No Bids 51 Graybar Electric Company, $4,270.00 ELECTRICAL SAFETY EQUIPMENT Inc. 52 ELECTRICAL EQUIPMENT TESTING No Bids SERVICES 53 INDUSTRIAL MOTOR LEAD CABLE Graybar Electric Company, Inc. $140,840.00 54 Graybar Electric Company, $12,105.00 INDUSTRIAL CONTROL WIRING Inc. Page 8 of 16 May 24, 2022, Water Board Agenda PART NO. DESCRIPTION BIDDER AMOUNT 55 HEAVY-DUTY SAFETY SWITCH No Bids 56 SOLID STATE REDUCED VOLTAGE SOFTSTARTER No Bids 57 MAGNETIC CONTACTORS No Bids 58 MEDIUM -VOLTAGE REDUCED VOLTAGE SOFT STARTER TK Process Hawaii, LLC $115,491.43 59 VARIABLE FREQUENCY DRIVES TK Process Hawaii, LLC $5,395,265.87 60 POWER QUALITY EQUIPMENT TK Process Hawaii, LLC $303,127.92 61 PAD -MOUNTED STEP-UP TRANSFORMER No Bids 62 SURGE PROTECTION DEVICES TK Process Hawaii, LLC $89,620.94 63 POWER MONITORING EQUIPMENT No Bids 64 PROGRAMMING SERVICES No Bids 65A PRESSURE TRANSDUCER— WELL LEVEL SCADA & Control Solutions, LLC $39,650.71 66 PRESSURE TRANSDUCER — RESERVOIR LEVEL No Bids 67 PRESSURE TRANSMITTER TK Process Hawaii, LLC $4,762.56 68 FLOW SWITCH TK Process Hawaii, LLC $2,163.48 69 LEGACY ELECTROMAGNETIC FLOW METER PARTS No Bids 70 UNIVERSAL ELECTROMAGNETIC FLOW METERS No Bids 71 REAGENTLESS CHLORINE RESIDUAL ANALYZERS No Bids 72 WATER QUALITY EQUIPMENT No Bids 73 REAGENTS AND STANDARDS No Bids 74 MULTISTAGE BOOSTER PUMPS No Bids 75 CHEMICAL FEEDER PUMP No Bids 76 DIGITAL CHLORINE CYLINDER SCALE No Bids 77 CHLORINE GAS FEEDER No Bids 78 TABLET CHLORINATOR & PARTS No Bids 79 MECHANICAL SEALS No Bids 80 MOTORS No Bids Page 9 of 16 May 24, 2022, Water Board Agenda PART DESCRIPTION BIDDER AMOUNT NO. 81 LEGACY LEAK NOISE DATA Wong's Equipment & $1 895.69 LOGGER & PARTS Services, LLC ' 82 LEAK NOISE DATA LOGGERS TK Process Hawaii, LLC $70,439.53 83 REMOTE PRESSURE MONITORING No Bids SYSTEM 84 LIGHT EMITTING DIODE Graybar Electric Company, $3,825.00 LUMINARIES Inc. 85 INDUSTRIAL LUBRICANTS No Bids For the Sections where no bids were received, staff shall seek alternative procurement pursuant to HAR 3-122-35 to procure the required materials in the best interests of the Department. D. MAINTENANCE BID NO.2022-02, REPAIR & MAINTENANCE OF EMERGENCY STANDBY GENERATOR SETS: This maintenance contract consists of furnishing all labor, materials, tools and equipment necessary to inspect, service, maintain, repair and test the Department of Water Supply's thirteen (13) emergency standby generator sets for a two-year term, from July 1, 2022, to June 30, 2024. This contract includes as -needed allowances for call -out repairs: • Material allowance: $45,000.00 • Labor allowance: 48 regular hours and 48 emergency/overtime hours, at the Contractor's hourly rate provided in its bid. Bids were opened on April 28, 2022, at 2:00 p.m., and the following are the bid results: Bidder Bid Amount (including Allowances) Power Generation Services, Inc. $157,851.28* Generator and Power Systems $251,220.00 *Bid arithmetic errors were corrected in accordance with Hawaii Administrative Rules. Project Costs: 1) Low Bidder (Power Generation Services, Inc.) $157,851.28 Funding for this project will be from DWS' Operations Budget. RECOMMENDATION: It is recommended that the Board award the contract for MAINTENANCE BID NO. 2022-02, REPAIR & MAINTENANCE OF EMERGENCY STANDBY GENERATOR SETS, to the lowest responsible bidder, Power Generation Services, Inc., for a total contract amount of $157,851.28. It is further recommended that either the Chairperson or Vice -Chairperson be authorized to sign the contract, subject to review as to form and legality by Corporation Counsel. E. WATER TREATMENT BID NO.2022-04, FURNISHING LIQUID CHLORINE (ON AN AS -NEEDED BASIS) FOR THE DEPARTMENT OF WATER SUPPLY: This project consists of furnishing liquid chlorine on an as -needed basis to the Department of Water Supply, for a period not to exceed two years. Bids for this project were opened on May 12, 2022, at 2:00 p.m., and the following are the bid results: Page 10 of 16 May 24, 2022, Water Board Agenda Bidder Bid Amount 150 lb. Cylinder 1000 lb. Cylinder JCI Jones Chemicals, Inc. $506.00 $3,785.00 Estimated contract use: 150 lb. Cylinder: $506.00/cylinder X 475 cylinders/year X 2 years = $480,700.00 1000 lb. Cylinder: $3,785.00/cylinder X 16 cylinders/year X 2 years=$121,120.00 Total: $601,820.00 RECOMMENDATION: It is recommended the Board award the contract for WATER TREATMENT BID NO. 2022-04, FURNISHING LIQUID CHLORINE (ON AN AS -NEEDED BASIS), to the lowest responsible bidder, JCI Jones Chemicals Inc., for the unit prices listed above, for the period from July 1, 2022, through June 30, 2024, and that either the Chairperson or Vice -Chairperson be authorized to sign the contract, subject to review as to form and legality by Corporation Counsel. F. WATER TREATMENT BID NO. 2022-05, FURNISHING AND DELIVERING OF VARIOUS TREATMENT CHEMICALS (LIQUID AMMONIA; 50% LIQUID CAUSTIC SODA; C-9 POLYPHOSPHATE; 38% SODIUM BISULFITE; 50% SULFURIC ACID; 12.5% SODIUM HYPOCHLORITE; 50% SODIUM HYDROXIDE, ACCU-TAB TABLETS, AND SODA ASH) TO THE WAIMEA WATER TREATMENT PLANT, DISTRICT OF SOUTH KOHALA (ON AN AS -NEEDED BASIS): This project generally consists of furnishing all labor, materials, tools and equipment necessary to deliver various treatment chemicals to the Waimea Water Treatment Plant, for a period not to exceed two years. Bids for this project were opened on April 28, 2022, at 1:30 p.m., and the following are the bid results: Phoenix V LLC Shannon JCI Jones South Pacific Gold dba BEI Chemical Chemicals, Combine LLC DBA Hawaii Corporation Inc. Chemstation Hawaii Part A — Liquid No Bid No Bid No Bid No Bid Ammonia, delivery once per month, (90 cylinders per year) Cost per 100 pound cylinders Part B — 50% Liquid $2,101.52 No Bid No Bid No Bid Caustic Soda (4 dry tons per 5 weeks) Cost per dry ton Part C — C-9 $1,225.07 $1,577.27 No Bid $1,042.00 Polyphosphate (7 drums per month) Cost per 30 gallon drum Part D — 38% $609.69 No Bid No Bid $519.40 Sodium Bisulfite (Delivery once per Page 11 of 16 May 24, 2022, Water Board Agenda 3 weeks) Cost per 50 gallon drum Part E— 50% $799.10 No Bid No Bid $722.00 Sulfuric Acid (Delivery once per 3 weeks) Cost per 750 pound drum Part F — 12.5% $389.62 No Bid No Bid No Bid Sodium Hypochlorite (3 drums per month) Cost per 53 gallon drum Part G — 50% $385.65 No Bid No Bid No Bid Sodium Hydroxide (Delivery once per month) Cost per 650 pound drum Part H — Accu-Tabs $197.08 No Bid No Bid No Bid SI Tablets (14 buckets per month) Cost per 60 pound bucket Part I — Soda Ash $25.20 No Bid No Bid $31.80 (62 bags per 3 weeks) Cost per 50 pound bag RECOMMENDATION: It is recommended that the Board award the contract for WATER TREATMENT BID NO. 2022-05, FURNISHING AND DELIVERING OF VARIOUS TREATMENT CHEMICALS (LIQUID AMMONIA; 50% LIQUID CAUSTIC SODA; C-9 POLYPHOSPHATE; 38% SODIUM BISULFITE; 50% SULFURIC ACID; 12.5% SODIUM HYPOCHLORITE; 50% SODIUM HYDROXIDE, ACCU-TAB TABLETS, AND SODA ASH) TO THE WAIMEA WATER TREATMENT PLANT, DISTRICT OF SOUTH KOHALA (ON AN AS -NEEDED BASIS), to Phoenix V LLC dba BEI Hawaii for Parts B, F, G, H, and 1; and to South Pacific Gold Combine LLC dba Chemstation Hawaii for Parts C, D, and E, for the unit prices listed above for the period from July 1, 2022, to June 30, 2024, and that either the Chairperson or Vice - Chairperson be authorized to sign the contracts, subject to review as to form and legality by Corporation Counsel. No bids were received for Part A. Staff will seek alternative procurement pursuant to Hawaii Administrative Rules (HAR) 3-122-35 to procure the required services. G. MATERIAL BID NO. 2022-06, FURNISH BASE COURSE, SAND, COLD MIX HOT MIX, AND NO. 3F ROCK TO THE DEPARTMENT OF WATER SUPPLY: Bids were opened on May 12, 2022, at 1:30 p.m., and the following are the bid results: Page 12 of 16 May 24, 2022, Water Board Agenda WHC Ltd. Grace Jas. W. Puna Rock dba West Yamada Pacific Glover Company Hawaii & Sons LLC Ltd. Limited Concrete Inc. DISTRICT 1: IA. 3/4-Inch Base Course No Bid $20.95 Non No Bid $25.15 (Cost per ton) Responsive 113. 11/2-Inch Base Course No Bid $20.95 Non - No Bid $24.65 (Cost per ton) Responsive 1C. No. 3F Rock No Bid $40.84 Non No Bid $29.85 (Cost per ton) Responsive 11). #4 Sand (Cost per ton) No Bid $48.17 Non No Bid $57.10 Responsive IE. Mortar Sand - ASTM No Bid $65.50 Non- No Bid No Bid C144 (Cost per ton) Responsive 1F. Cold Mix - ASTM D4215-87 (Cost per No Bid No Bid Non _ No Bid $201.45 ton) Responsive 1 G. Blended Material 60% #4 Sand and 40% No. No Bid $56.55 Non- No Bid No Bid 3F Rock (Cost per ton) Responsive 1H. Hot Mix - County Mix No Bid $164.00 Non No Bid $187.10 IV (Cost per ton) Responsive DISTRICT 11: 2A. 3/4-Inch Base Course No Bid No Bid Non - No Bid (Cost per ton) (Cost Responsive 2B. 11/2-Inch Base Course No Bid No Bid Non - $17.72 No Bid (Cost per ton) Responsive 2C. No. 3F Rock No Bid No Bid Non $33.88 No Bid (Cost per ton) Responsive 21). #4 Sand (Cost per ton) No Bid No Bid Non $38.27 No Bid Responsive 2E. Mortar Sand - ASTM No Bid No Bid Non $65.39 No Bid C 144 (Cost per ton) Responsive 2F. Cold Mix - ASTM D4215-87 (Cost per No Bid No Bid Non _ No Bid No Bid ton) Responsive 2G. Blended Material 60% Non- #4 Sand and 40% No. No Bid No Bid Responsive No Bid No Bid 3F Rock (Cost per ton) DISTRICT III: Page 13 of 16 May 24, 2022, Water Board Agenda 3A. 3/4-Inch Base Course No Bid No Bid Non $29.06 No Bid (Cost per ton) Responsive 3B• 11/2-Inch Base Course No Bid No Bid Non - $26.81 No Bid (Cost per ton) Responsive 3C. No. 3F Rock No Bid No Bid Non $47.06 No Bid (Cost per ton) Responsive 3D. 44 Sand (Cost per ton) No Bid No Bid Non - $54.90 No Bid Responsive 3E. Mortar Sand - ASTM No Bid No Bid Non $79.07 No Bid C144 (Cost per ton) Responsive 3F. Cold Mix - ASTM D4215-87 (Cost per $174.00 No Bid Non _ No Bid No Bid ton) Responsive 3G. Blended Material 60% Non- #4 Sand and 40% No. $174.00 No Bid No Bid No Bid 3F Rock (Cost per ton) Responsive RECOMMENDATION: It is recommended that the Water Board approve the contract for MATERIAL BID NO. 2022-06, FURNISH BASE COURSE, SAND, COLD MIX, HOT MIX, AND NO. 3F ROCK TO THE DEPARTMENT OF WATER SUPPLY by Parts to the following for the amounts shown above, and that either the Chairperson or Vice -Chairperson be authorized to sign the contract(s), subject to review as to form and legality of the contract(s) by Corporation Counsel. The price agreement shall be from July 1, 2022, to June 30, 2023. District I - Parts IA, 1B, 1D, IE, IG, and 1H to Jas. W. Glover, Ltd. Parts I and 1F to Yamada & Sons, Inc. District II - Parts 2A, 213, 2C, 2D, and 2E to WHC Ltd. dba West Hawaii Concrete District III - Parts 3A, 3B, 3C, 3D, and 3E to WHC Ltd. dba West Hawaii Concrete Parts 3F and 3G to Grace Pacific, LLC For Parts 2F and 2G no bids were received. Staff will seek alternative procurement per HAR §3-122-35 to secure pricing in the best interests of the Department. H. SERVICE BID NO. 2022-07 (ALT), HAUL & DELIVER ONE -TON CHLORINE CYLINDERS AND 150 LB. CHLORINE CYLINDERS TO VARIOUS LOCATIONS ISLANDWIDE (ON AN AS -NEEDED BASIS): This project consists of furnishing all materials, labor, transportation, tools, taxes, machinery, and equipment necessary to collect 20-foot containers from harbor; offload chlorine gas cylinders from the container; and deliver chlorine gas cylinders to various locations in accordance with the specifications. The bidder will provide services on an as -needed basis. Bids for this project were opened on April 14, 2022, at 1:30 p.m., and no bids were received. Staff pursued alternative procurement pursuant to HAR 3-122-35 to procure the required services. Request for Quotations for this project were due May 9, 2022, at 11:00 a.m., and following are the bid results: Bidder Bid Amount Kona Transportation Co., Inc. $40,048.00 Conen's Freight Transport, Inc. $74,643.64 Page 14 of 16 May 24, 2022, Water Board Agenda ACR Water Hauling NO BID Keaau Service Station, Inc. NO BID Service Costs: 1) Low Bidder (Kona Transportation Co., Inc.) $40,048.00 Total Cost: S40,048A0 The contract for SERVICE BID NO. 2022-07 (ALT), HAUL & DELIVER CHLORINE TO DWS, will be awarded to the lowest responsible bidder, Kona Transportation Co., Inc., for their bid amount of $40,048.00. L MAINTENANCE BID NO. 2022-08, REPAIR AND MAINTENANCE OF KAHALU`U SHAFT INCLINED LIFT: This project generally consists of furnishing all transportation, labor, equipment, tools and consumable materials necessary to provide monthly maintenance and repair services to the inclined lift system and its related appurtenances at the Department of Water Supply's Kahalu`u Shaft facility. Bid Opening for this project was May 5, 2022, at 2:30 p.m. No bids were received. Staff will seek alternative procurement per Hawaii Administrative Rules (HAR) §3-122-35 to procure the required services in the best interests of the Department. J. RENEWAL OF CONTRACT FOR MAINTENANCE AGREEMENT - SOUTH KOHALA, HAMAKUA, AND LAUPAHOEHOE SITES (BRANTLEY CENTER, INCA: Brantley Center, Inc., presently has a Maintenance Agreement for site maintenance for the Department's South Kohala, Hamakua, and Laupahoehoe tank and pump sites. We are requesting to renew this Agreement from July 1, 2022, to June 30, 2023. The rates would be as follows: South Kohala - $4,392.35/month x 12 months (23 sites) = $52,708.20 Hamakua - $2,944.16/month x 12 months (15 sites) = $35,329.92 Laupahoehoe - $738.48/month x 12 months (3 sites) = $8,861.76 Total: $96,899.88 The Department has the right to award the contract to Brantley Center, Inc., without advertising or calling for bids, according to Subsection 103D-1010 of the Hawaii Public Procurement Code. Brantley Center, Inc., has submitted the necessary documents to meet the requirements as a qualified rehabilitation facility. There is no increase from their proposal for Fiscal Year 2021-2022. Brantley Center's performance has been satisfactory, and the costs are reasonable. A total of 41 sites are covered by this agreement. RECOMMENDATION: It is recommended that the Board award the contract for the RENEWAL OF CONTRACT FOR MAINTENANCE AGREEMENT — SOUTH KOHALA, HAMAKUA, AND LAUPAHOEHOE SITES, to Brantley Center, Inc., for a period from July 1, 2022, to June 30, 2023, at a total cost of $96,899.88, and that either the Chairperson or Vice -Chairperson be authorized to sign the documents, subject to approval by Corporation Counsel. K. MONTHLY PROGRESS REPORT: Submission of Progress Report of Projects by the Department. Department personnel will be available to respond to questions by the Board regarding the status/progress of any project. Page 15 of 16 May 24, 2022, Water Board Agenda L. REVIEW OF MONTHLY FINANCIAL STATEMENTS: Submission of financial statements and information relating to the financial status of the Department. Department personnel will be available to respond to questions by the Board relating to the financial status of the Department. M. MANAGER -CHIEF ENGINEER'S REPORT: The Manager -Chief Engineer to provide an update on the following: 1. North Kona Wells 2. COVID-19 Update 3. Department of Water Supply Energy Report 4. Update on Establishment of Permitted Interaction Group, Re: Capacity Expansion N. EXECUTIVE SESSION REGARDING POTENTIAL DISPUTED SETTLEMENT - JOB NO.2016-1056 WAI`AHA DEEPWELL REPAIR, DISTRICT OF NORTH KONA: The Board anticipates convening an executive meeting for the purposes of an attorney -client confidential discussion regarding the above -entitled matter. Pursuant to Section 92-5(a)(4) Hawaii Revised Statutes, the purpose of the executive meeting is to consult with the Board's attorney on questions and issues pertaining to the Board's duties, privileges, immunities, and liabilities. A two-thirds vote is necessary to hold an executive meeting, provided that the affirmative vote constitutes a majority of the Board. O. CHAIRPERSON'S REPORT: Chairperson to report on matters of interest to the Board. 10) ANNOUNCEMENTS: 1. Next Meeting: - June 28, 2022, 10:00 a.m., at the Liquor Control Conference Room, Hilo Lagoon Centre, 101 Aupuni Street, Room 230, Hilo, Hawaii. 11) ADJOURNMENT Anyone requiring an accommodation or auxiliary aid and/or services to participate in this meeting (i.e. sign language, interpreter, large print), please contact the Board Secretary, at (808) 961-8050 as soon as possible, but no later than five days before the scheduled meeting. Notice to Lobbyists: if you are a lobbyist, you must register with the Hawaii County Clerk within five days of becoming a lobbyist. {Article 15, Section 2-91.3(b), Hawaii County Code} A lobbyist means "any individual engaged for pay or other consideration who spends more than five hours in any month or $275 in any six-month period for the purpose of attempting to influence legislative or administrative action by communicating or urging others to communicate with public officials." {Article 15, Section 2-91.3(a)(6), Hawaii County Code} Registration forms and expenditure report documents are available at the Office of the County Clerk -Council, Hilo, Hawaii. Board Packet Pursuant to Hawaii Revised Statutes, Section 92-7.5, the board packet provided to members of the board for this meeting is available for public inspection during regular business hours at the Department of Water Supply office, 345 Kekfiana6`a Street, Suite 20, Hilo, Hawaii. "The Department of Water Supply is an Equal Opportunity provider and employer." Page 16 of 16 May 24, 2022, Water Board Agenda