Laserfiche WebLink
RKe`AlohaLaniLLCREZ-7/8/22 <br /> COUNTY OF HAWAII PLANNING DEPARTMENT <br /> RECOMMENDATION REPORT <br /> KE`ALOHA LANI,LLC <br /> CHANGE OF ZONE APPLICATION (PL-REZ-2022-000023) <br /> Upon careful review of the request to amend conditions of Ordinance No. 17 65, the <br /> Planning Director is recommending that a favorable recommendation with modifications for <br /> the applicant's proposed amendments Conditions E and I be forwarded to the County <br /> Council. Since this recommendation is made without the benefit of public testimony, the <br /> Director reserves the right to modify and/or alter this recommendation based upon additional <br /> information presented at the public hearing. This favorable recommendation is based on the <br /> following findings: <br /> The applicant, Ke`Aloha Lani LLC,has submitted an application to amend conditions of <br /> Change of Zone Ordinance No. 17 65 which was originally approved on September 29, <br /> 2017 to change the zoning from an Agricultural (A-20a)to General Industrial (MG-20) <br /> zoning district for 6.505 acres of land. Concurrently, Ordinance No. 17 64 was approved <br /> to change the State Land Use Boundary designation from Agricultural to Urban. <br /> As the subject ordinance has infrastructure obligation conditions that the applicant <br /> has not met or reasonably fulfilled, the applicant is requesting to amend certain <br /> conditions of the ordinance, specifically Condition E and I of Change of Zone Ordinance <br /> No. 17 65. These amendments are to the following conditions: <br /> ■ Condition E: (Timing of Fire Flow Improvements) <br /> ■ Condition I: (Timing of Roadway Improvements) <br /> The applicant originally proposed to develop a 7,500+/- square-foot beverage <br /> processing facility (microbrewery)that would include a 2,000+/- square foot supportive <br /> visitor/retail sales/tasting center with a 300 square foot kitchen, as well as required <br /> improvements to the access road and parking areas. <br /> According to the applicant, they request that the water and road infrastructure <br /> improvements be implemented in conjunction with a subdivision and not a certificate of <br /> occupancy for a structure. The reason is that the requirement for the industrial or <br /> commercial level roadway requirement is specifically triggered or called for in the <br /> -1- <br />