DIRECTOR’S QUARTERLY INFORMATIONAL REPORT
TO THE ENVIRONMENTAL MANAGEMENT COMMISSION
January 17, 2023
Agenda item VII
1. LEGISLATIVE UPDATE
1. County Council (Since last report posted on 10/20/22)
ITEM DESCRIPTION CURRENT STATUS
Completed items
Comm. 1034
(20-22 term)
Nominates Dell Otsuka of District 3 to the
EMC
10/19: Pos. rec. RAWEEMC
11/02: Approved by Council
Bill 223
(20-22 term)
Amends Capital Budget to add $17 million
appropriation to capital budget for “Hilo
WWTP Upgrades – SRF”
10/18 – Positive recommendation
from FC. 11/02
11/16: Approved by Council.
Ord. 22-123
Bill 225
(20-22 term)
Authorizes agreement for State Water
Pollution Control Revolving Fund Loan of
$17 million and authorizing issuance of G.O.
bonds for Hilo WWTP Upgrades.
10/18 – Positive recommendation
from FC. 11/02
11/16: Approved by Council.
Ord. 22-125
Bill 245
(20-22 term)
Initiates Charter Amendment relating to the
qualifications of the DEM Director
11/15: Postponed to 1/04
1/04: Postponed to call of PCCCRA
Chair
Active items
Res. 35-23 Authorizes payment of funds for a multi-
year lease of one sewer cleaning truck
1/04: Positive recommendation
from FC.
2. Legislature
The 2023 regular session of the Legislature will convene on January 18, 2023. DEM will closely
track bills that are introduced and will submit testimony as hearings are scheduled. Priorities
will include but are not limited to: Legislation relating to the recommendations of the Cesspool
Conversion Working Group; Extended Producer Responsibility; waste reduction; and public-
private partnerships.
2. SOLID WASTE DIVISION
RELOAD FACILITY UPDATE (new data shaded in gray)
Month/Year
Total Tons Taken
to Sort Station
Jan 2022 4,119.67
Feb 2022 3,910.66
Mar 2022 4,312.99
Apr 2022 4,066.66
May 2022 4,316.79
Jun 2022 4,141.05
2
When time permits, SWD staff removes the corrugated cardboard from the trash and places it in
a roll-off for recycling.
WHSL MONTHLY LANDFILL TONNAGES
Jul 2022 4,109.14
Aug 2022 4,041.56
Sep 2022 3,721.44
Oct 2022 4,091.66
Nov 2022 4,131.77
Dec 2022 4,362.12
Totals 49,325.51
Jan 2022 17,301.02
Feb 2022 14,689.88
Mar 2022 17,780.90
Apr 2022 17,020.72
May 2022 16,947.70
Jun 2022 16,821.88
Jul 2022 17,331.84
Aug 2022 17,852.37
Sep 2022 16,643.39
Oct 2022 16,229.23
Nov 2022 17,259.61
Dec 2022 17,535.74
Totals 203,377.14
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
18,000
20,000
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
3
MONTHLY TRANSFER STATION TONNAGES
The above table is to include data on the waste disposed in the landfill (not the
greenwaste or recycling data).
1. Wai‘ōhinu Recycling and Transfer Station updates – January 2023
• Concrete has been poured on the sides of the pad. The middle portion is to be poured
when the chute is installed. This will minimize damage to the new concrete pad when
installing the chute.
• Asphalt is to be ready to be installed in mid-January on the roadway, etc.
• Railings on the west side to be installed and recycling bins can be moved to the new
station.
• Tanks are installed, roadway is graded and ready for asphalt; slopes are shaped
• Still waiting for trailers
2. Life Cycle Analysis status
The LCA is in the final draft stage. Comments were submitted after an initial review with a
report due soon.
3. Recycling and Landfill Diversion updates
E-Waste Program – The Solid Waste Division has been holding special electronics recycling
collection events at Mr. K’s Recycle & Redemption on December 10 and January 14 (815
Kino‘ole Street, Hilo), and at the Kona Crossroads Shopping Center parking lot on December 17
and January 21.
All events are from 8:30 a.m. to 4:30 p.m. These free events are open to households,
businesses, government agencies and non-profits.
Month/Year EHRSS WHSL
Jan 2021 3,276.92 9,312.59
Feb 2021 3,086.50 7,125.42
Mar 2021 3,376.69 8,878.20
Apr 2022 3,158.53 8,183.80
May 2022 3,382.30 8,416.06
Jun 2022 3,232.58 7,559.68
Jul 2022 3,170.79 8,631.04
Aug 2022 3,072.41 8,320.43
Sep 2022 2,837.48 7,769.79
Oct 2022 3,183.58 3,481.96
Nov 2022 3,184.00 3,619.62
Dec 2022 3,451.66 3,775.82
Totals 38,413.44 71,515.01
4
The Solid Waste Division’s contractor is collecting computers (desktops, tablets and laptops),
printers/fax machines, computer peripherals (keyboards and mice), TVs and monitors (CRT,
plasma, LCD & LED), uninterruptible power supply systems (UPS), mobile and landline phones,
digital cameras, VCRs/DVD players and stereo components (no speakers). No other types of
electronics will be accepted.
Businesses, nonprofit organizations and agencies must make a scheduled appointment and
detail the electronic devices they want to recycle at the event. There is a strict limit of one
pallet load per business, nonprofit or agency customer. Businesses, nonprofits or agencies
without a scheduled appointment, or with electronics quantities that exceed the limit will be
disallowed. To schedule an appointment please call Mr. K’s Recycle & Redemption at 808-969-
1222.
4. SWD Accomplishments 2020-2022
-196,631 tons at West Hawai‘i Sanitary Landfill in FY 2021
-203,872 tons received in FY 2022 (3.6% increase YOY)
-Closed Miloli‘i Transfer Station in accordance with state law
-Opened Ocean View Transfer Station
-South Hilo Sanitary Landfill completed first year of Post Closure
-Second Expansion of the GCCS system was completed at WHSL
-Opened Second Scale at West Hawai‘i Sanitary Landfill
-Scrap Metal Yard in Kona is near completion
-Design for remediation of Scrap Metal Yard in Hilo was initiated
-Completed lower entry into Hilo TS chute area
-Secured owner’s signature on the DOH permit for Waiea Transfer Station to enable continued
operations; Survey and appraisal moving forward to pursue purchase
-Kea‘au structure study was completed
-E-waste collection revamped and new locations.
-Working with the other counties to press Legislature to improve state Extended Producer
Responsibility law for electronics. Starting January 2023 manufacturer-funded electronics
collections much more convenient for island residents and removed from County
management. New Kona business, agency & non-profit collections to start in January 2023.
-Food Waste Reduction education.
-Coordination with BSH for compactor removal at Hawi TS and contaminated soil clean up
-Hilo Reuse Parking Restriping
-UMO collection sites remained open during covid / updated UMO informational handouts.
-Non-mineral sunscreen ordinance; Admin Rules, Warning Letter and Inspection Form waiting
to go into the amendment process for the entire departmental rules.
-Ensured the timely removal of derelict/abandoned vehicles from public property and private
ungated roadways open to the public.
o FY 20-21 Reports Received: 2,827 Total Towed: 1,713
o FY 21-22 Reports Received: 4,026 Total Towed: 2,573
-Worked with Hawai’i County Police Department (HPD) Community Police Officers to conduct
derelict/abandoned vehicle community cleanup projects.
5
-Assisted HPD with towing and notification to owners for vehicles towed from accidents and
Aliyah’s Law.
-Worked with the Department of Hawaiian Homelands to remove derelict /abandoned vehicles
from Hawaiian Homes property.
-Offered year-round vehicle disposal assistance programs to the public.
o FY 20-21 Total Disposed: 270
o FY 21-22 Total Disposed: 357
-Coordinated a rural area junk vehicle collection event that assisted Ocean View residents with
the disposal of unwanted vehicles.
-Provided vehicles for the Hawaii County Fire Department to conduct vehicle extrication
trainings for new recruits and refreshers for current firefighters.
-Conducted multiple auctions for the sale of abandoned vehicles that have met State mandated
holding and notification periods.
-Worked on a bill to allow free towing and disposal of up to two (2) unwanted vehicles per
calendar year. *Start date pending until staffing and contract needs are met.
-Attended meetings within the community to educate the public on derelict/abandoned
vehicles.
3. WASTEWATER DIVISION
1. Pāhala and Nā‘ālehu AOC
The cesspool closures remain on track and in compliance with deadlines. Four options have
been found to be legally and financially feasible: 1) Package plants and new collection systems;
2) package plants connected to the existing collection systems; a maintenance contract model
individual wastewater system program; and 4) an operating permit model individual
wastewater system program for both communities.
The County has contracted an engineering firm to study each of the four options and provide
preliminary engineering reports, which will be due for Pāhala on May 6, 2023, and for Nā‘ālehu
on September 3, 2023. The next public informational meeting is tentatively scheduled for
February 23, 2023, at the Pāhala Community Center, beginning at 6 p.m.
See Appendix
2. West Hawai‘i wastewater projects - (To be delivered orally)
3. Hilo WWTP upgrades
The engineering contractor has conducted a two-day design workshop in Hilo on January 11
and 12. Phase 1 of the project remains on track for bids to be advertised in February 2023, with
bid opening anticipated in April 2023. The Phase 1 construction contract is anticipated to be
awarded in June 2023. Design of Phase 2 has begun. See also Appendix.
4. Puna wastewater projects - See Appendix
5. South Kohala wastewater projects – See Appendix
6
6. WWD Accomplishments 2020-2022
-Finalizing Hilo WWTP design plans for phase I and initiated Phase II design
-Completed Kapuʻe Stream Bridge sewer pipe replacement
-Completed the Hilo WWTP bio-tower arm and feed pump replacement
-Installation of two new pumps at Pua SPS
-Completed installation of two new pumps at Kealakehe SPS
-Completed Kealakehe R-1 USBR Feasibility Study
-Completed Lono Kona Sewer ID Project
-Completed Lanihau SPS Force Main Project
-Kapehu WWTP Perimeter Security Fence - Design, Bid, and currently Under construction
-Ulu Wini WWTP (Kaloko) – Secured HUD CDBE Grant, Completed Design-Build Package, and
pending award
-Secured FEMA (HIEMA) Grant for WWTP/SPS Emergency Generators
-Secured HUD CDBG Grant for Ulu Wini WWTP Pumper Truck
-Kealakehe SPS Roof Replacement – Completed In-house Design, Bid, and currently under
construction
-Completed Kapehu WWTP Manhole cover replacement
-Design of the Pua Force main Installation and Rehabilitation and Hale Hālāwai Force Main
replacement projects were initiated and currently at 30% conceptual design phase.
-Utilizing the corrective action Work Orders from the Asset Management System that has been
in operation for less than two years, the maintenance branch with help from the operations
branch has completed 1,064 work orders.
-More than 80 percent of the completed work orders were performed by the east side working
crew. The west side has only one mechanic and no electricians so they have been relying on the
east side for help.
-Created and filled the Sewer Maintenance Supervisor II position providing focus for the sewer
collection team.
-Implementation of the Asset Management System for maintenance and warehouse modules
-Employees obtained NASSCO certification for collection system condition assessments
-Division wide CCTV video access to streamline decision making for maintenance
-Continue to work with private investors/developer to inspect the newly installed sewer
systems and provide documentation to accept subdivision and private development.
-Lanihau Properties; East and West DHHL; plumbers; “A” license contractor
-Started a comprehensive maintenance program of cleaning, CCTV, and manhole inspections in
all applicable districts.
-Procured piping and parts in preparation for emergencies to ensure continued operation,
repair and maintenance of the islandwide sewer collections system during emergencies.
-Increased the line crew staff to accomplish more cleaning and CCTV maintenance can be done
on the collection system.
-Raised manholes on Kino‘ole Street fronting Central Fire Station to make traveling more
comfortable for motorists.
-Successfully worked through the challenges of cleaning the 60-year-old Kapu‘e Stream Bridge
gravity line replacement.
7
-Investigated exposed pipes in our collection system and documented condition as part of the
Division’s asset management program.
-Completed video of exterior and interior of 60-year-old gravity line on the Wailuku Bridge (aka
“Singing Bridge”) in East Hawaii to better assess next steps for repair.
-Pretreatment Program Development and AOC compliance
-Naalehu and Pahala AOC compliance
4. INFORMATION REQUESTS FROM COMMISSIONERS
1. (Adams) Capacity of the West Hawai‘i Sanitary Landfill
1. Current estimates of the remaining capacity and options to extend the lifetime
in the short term and the long term 1
As of January 4, 2023, the landfill is nearing capacity in Cell 13 with 10 Cells remaining. The
Cells are reaching capacity with materials every 2.31 years. At the current rate of operation
(and no changes) and fill sequencing, the landfill will reach full capacity in approximately 23.1
years. The downturn in recycling markets, COVID pandemic and consumer bulk purchasing have
had significant impacts on recent landfill consumption of airspace. Approximately, 40% of the
materials received at WHSL can be diverted. With legislation, mandates and ordinances
removing most of the 40% from landfilling can add about 10 years to the capacity/life of
WHSL. Operational Efficiencies, Education and outreach throughout the Island can further help
increase diversion from the 60% of trash presently being disposed daily, again increasing life
expectancy at WHSL. The importance of source reductions, community outreach on reducing
packaging, reuse will have significant impacts on increasing capacity and airspace at WHSL.
2. Feasibility of establishing a Construction & Demolition landfill
The WHSL accepts about 65 tons per day of C&D for disposal. Justification for a landfill for C&D
would be challenging to justify for the Island. Legislation/Ordinance to ban C&D from landfilling
with mandates for recycling of construction and demolition would be more beneficial and cost
effective.
3. Current status and contracts for county recycling
RFP4024 – Drop Off Recycling (Collect, Haul & Process) at 19 recycling & transfer stations
• Contractor: Business Services Hawai`i
• Purpose: diverts cardboard & non-HI5 glass recyclables from the landfills.
• Contract Status -
o Year 1, July 1, 2021 thru June 30, 2022
o Option Yr, July 1, 2022 thru June 30, 2023, with 3 remaining options years.
• Plan –
o Continue operations
o Outreach & Education to prevent contamination
RFP4068 – Operate Reuse Centers at 7 County Transfer Stations
1 VII.2.1.1: Landfill options (Adams): https://records.hawaiicounty.gov/weblink/DocView.aspx?dbid=1&id=119838
8
• Contractor: Transfer Station Thrift Store, LLC
• Purpose: diverts reusable items from the landfill.
• Contract Status -
o Year 1, May 1, 2021 thru April 30, 2022
o Option Yr 1, May 1, 2022 thru April 30, 2023, with 3 remaining options years.
• Plan –
o Continue operations
o Kea‘au Reuse; replace tent structures or cover and 3 year plan.
o Hilo Reuse; raise the area that’s ponding and move water away
from site.
o Pāhoa Reuse; base coarse or wood pallet chips to fill low lying
area, trim the palms and replace the bamboo fence.
o Kealakehe Reuse; possibly relocate HI5 tent next to reuse tent.
IFB4346 – Provide and Operate Electronic Recycling Collection Events
• Contractor: Mr. K’s Recycle and Redemption Center, Inc.
• Purpose: Collect, Transport and Recycle Electronics via Certified Electronics End
Destination Recyclers
• Contract Status -
o Year 1, December 7, 2022 thru November 30, 2023
• Plan –
• Collection Events (4)
• December 10, 2022; Hilo Event
o 200 – 250 customers
o Approx. 33,000 lbs. collected.
• December 17, 2022; Kona Event
o 300+
o Approx. 42,000 lbs. collected.
• January 14, 2022; Hilo Event
• January 21, 2022; Kona Event
• Transition to Manufacturer-Funded (Act 151), electronics recycling collections in
January/February 2023. Managed through DOH and they are responsible for
compliance with the state law.
• County of Hawai‘i Manufacturer-Funded free drop off locations:
o Mr. K's Recycle & Redemption Center Inc.
815 Kino‘ole Street, Hilo 96720
Hours: Daily 10:00 am – 3:00 pm
o Kona location & hours of operation To Be Determined
o Collection [pick-up] service cost: $1.65/pound *$200 minimum charge (call (808)
969-1222 to schedule a pick-up)
IFB3847 – Collect Residential HHW at 6 Collection Events Annually
9
• Contractor: EnviroServices & Training Center, LLC
• Purpose: diverts household hazardous materials from the landfills, prevents unsafe
disposal at Transfer Stations.
• Contract Status -
o Year 1, August 1, 2019 thru July 31, 2020
o Option Yr 3 currently, one option year remaining,
• Plan –
o Continue operations
o Additional Outreach & Education to promote events and
encourage safe disposal of HHW.
o Remaining Collection Events
February 4, 2023, Saturday; West Hawai‘i Civic Center 7;30a to 2:30p
February 11, 2023, Saturday; Waiākea High School parking lot B 7:30a to 2:30p
March 4, 2023, Saturday; Waimea District Park 8:30a to 3:30p
March 5, 2023, Sunday; Pahoa Recycling & Transfer Station 8:30a to 3:30p
IFB4328 - Collection/ Transportation and Disposal Of Used Motor Oil For Various Locations
And Volunteer Sites
Contractor: Unitek Solvent Services
• Purpose: divert Hazardous Materials from the landfill and bring public awareness
• Contract Status: November 25, 2022, thru December 31, 2023
• Plan –
o Continue services
IFB4233 – Provide Certified Redemption Center Services at Hāwī, Honoka`a and Puakō
Recycling & Transfer Stations
Contractor: HMP, Business Services Hawai`i
• Purpose: divert HI5 bi-metal, glass, plastic 1 & 2 and aluminum from the landfill.
• Contract Status:
o Year 1, July 1, 2021, thru June 30, 2022
o Option Yr 1, June 1, 2022, thru July 1, 2023, with 3 Option Yrs
• Plan –
o Continue services
IFB4233 – Provide Certified Redemption Center Services at Kea‘au, Keauhou, Wai’ōhinu
Recycling & Transfer Stations
Contractor: Atlas Recycling
• Purpose: divert HI5 bi-metal, glass, plastic 1 & 2 and aluminum from the landfill.
• Contract Status:
o Year 1, July 1, 2021 thru June 30, 2022
o Option Yr 1, June 1, 2022 thru July 1, 2023, with 3 Option Yrs
• Plan –
o Continue services
10
IFB4233 – Provide Certified Redemption Center Services at Ocean View Recycling & Transfer
Stations
Contractor: Atlas Recycling
• Purpose: divert HI5 bi-metal, glass, plastic 1 & 2 and aluminum from the landfill.
• Contract Status:
o Year 1, July 1, 2021 thru June 30, 2022
o Option Yr 1, June 1, 2022 thru July 1, 2023, with 3 Option Yrs
• Plan –
o Continue services
IFB4331, Provide Certified Redemption Center Services at Volcano Recycling & Transfer
Stations
• No bid received; 3rd time Volcano has gone back out to Bid. Problem for no bid is due to
staffing shortage/ finding dependable staff and the theft/ break in problems occurring
their again.
• Plan –
o Will send back out to Bid.
IFB4245 – Provide Mixed Metal and White Goods/Appliance Recycling Services
Contractor: Big Island Scrap Metal
• Purpose: divert mix metals and white goods/appliances from the landfill.
• Contract Status:
o Year 1, June 23, 2022 thru June 22, 2023
o 2 Option Yrs
• Plan –
o Continue services
IFB4369 – Provide Recycling of Used Propane Tanks
Contractor: Big Island Scrap Metal
• Purpose: properly recycle propane tanks illegally dumped at Solid Waste Facilities
• Contract Status:
o Bid closed January 5, 2023
• Plan –
o Continue services
RFP 3298 - Organics Diversion Program in East Hawai`i and West Hawai`i
• Contractor: Hawaiian Earth Products
• Purpose: Diverts green waste from the landfill by processing green waste into mulch.
• Contract Status; ends 12/31/2036
• Plan –
o Continue operations.
11
IFB3958 – Provide Recycling of Used Tires
Contractor: Big Island Scrap Metal
• Purpose: properly recycle vehicle tires illegally dumped at Solid Waste Facilities
• Contract Status:
o Year 1, April 12, 2020 thru April 11, 2021
o Option Yr 2 currently, April 12, 2022 thru April 11, 2023, no options remaining
• Plan –
o Continue services
o Signs currently posted at all Recycling & Transfer Stations advising customers to
properly dispose of used tires.
Hawaiizerowaste.org
• Professional Services: Kilauea WebWorks
• Purpose: provide web hosting and maintenance for Hawaiizerowaste.org
• Contract Status: annual contract ends 12/31/2023
• Plan –
o Continue services
Recycling Outreach and Education
• Professional Services: Out of the Sea Media Arts, Inc.
• Purpose: Recycling Education Program Development
• Contract Status: Contract extended to June 7, 2023.
• Plan –
o Continue services
NON-MINERAL SUN SCREEN ORDINANCE
• Draft of Admin Rules, Warning Letter and Inspection Form at Corp Counsel and awaiting
to be added to the SWD Admin Rules.
EPA Solid Waste Infrastructure for Recycling Grant Program
• REUSABLE FOODWARE PROJECT, currently in progress.
o Partners: DEM is working with Zero Waste Hawaii Island and Perpetual Reusable
Foodware Project. Perpetual is a non-profit that is providing free consulting to four
US cities, including Hilo.
o Grant Writer: Perpetual will be writing the grant and DEM will be submitting it.
o Purpose: design and implementation of a city-scale reusable foodware system in Hilo.
In such a system, restaurants are supplied with reusable foodware for a low per-use
fee, comparable to what they currently pay for disposables. Customers receive food
and drinks in reusables at no net cost to them, then they drop them in one of many
conveniently located bins when they’re done. Service providers collect, clean &
inspect the items before restocking them.
The Solid Waste Infrastructure for Recycling Program provides grants
to implement the National Recycling Strategy to improve post-consumer materials
12
management and infrastructure; support improvements to local post-consumer
materials management and recycling programs; and assist local waste
management authorities in making improvements to local waste management
systems.
o Zero Waste Hawaii Island recently received funding from the EPA to do a project in
Hilo for reusable cutlery and survey businesses about reusable container program.
• RESOURCE RECOVERY PARK, not in progress due to reasons underlined below.
o Partners: DEM working with Recycle Hawai`i.
o Grant Writer: grant writer selected.
o Purpose: Expand the capabilities of four existing solid waste and recycling facilities
(Hilo, Kealakehe, Waimea and Kea’au) to create Resource Recovery Parks (RRPs), that
are geographically distributed for ease of access by communities around Hawaiʻi
Island including those in rural areas and population centers. Such parks would
provide a one-stop place for individuals and businesses to drop off materials for
reuse or recycling and divert these materials from landfilling. Through the
development of these parks, entrepreneurs and existing small-business owners
provide the means by which current but limited end-markets are more fully utilized
and new ones created.
Hilo Recycling & Transfer Station; currently does not have the room for this
project.
Kea’au Recycling & Transfer Station; does not have the acreage.
Kealakehe Recycling & Transfer Station; does not have the acreage.
Waimea Recycling & Transfer Station; does not have the acreage.
3-4 acres of land needed for each Resource Recovery Park facility.
Ideally could be sited on county transfer station land, many benefits including
DOH permitting
Covered warehouse space/large facility that can be built out later into resource
recovery park –
Space could possibly be leased to ecopreneurs or contractors to deal with
specific waste types.
Cost per site; $12 million for the built-out Resource Recovery Park with
equipment. That does not include land or rent.
$4 million available through EPA Solid Waste Infrastructure for Recycling
Grant.
$8 million will/could be through private investors and Closed Loop
Partner's loan/fund.
EPA will most likely not fund due to $8 million is not guaranteed to complete
the project.
Processing equipment for glass, containerized composting machines for organics
(including paper and cardboard), as well as improving collection bins for clean
stream marketable recyclable plastics (#1 and #2) and other materials at smaller
transfer stations, and improved signage.
13
Resources targeted but all need to be CLEAN (i.e., no tape or adhesives, no
labels, residues or caps)
Corrugated Cardboard and Newsprint (no glossy inserts)--will be sorted
into two categories:
1) Mobile composter for farmers, backyard farmers;
2) Large pieces to be perforated for weed mat for farmers, backyard
farmers, landscapers.
There may be legal issues for corrugated cardboard due to current
contract.
Office Paper (no “windowed” envelopes or glossy paper), boxboard (cereal
boxes, toilet paper rolls, etc.)--to be added to mobile composter for farmers,
backyard farmers.
PET (#1) plastics (non-HI5) – organization or company would like to have the
plastics.
Glass Bottles and Jars only (no window glass, dishes, plate glass, porcelain,
etc.). If glass is clean, can be used for landscaping, glass mulch, sand; or for
artists, gardeners.
There may be legal issues for non-HI5 glass due to current contract.
Green Waste (as is currently collected; no painted pallets, no Christmas trees
with flocking, etc.) can be added to in-vessel composters for farmers,
landscapers, backyard farmers.
There may be legal issues due to current contract.
Who will be cleaning the recyclables?
Number of County employees needed to increase staffing at Resource
Recovery Parks with objective of opening more hours to increase access, etc.
U.S. Department of Agriculture - Rural Development
• HOME COMPOSTING UNITS TO COMMUNITIES LOCATED IN RURAL AREAS
o Partners: DEM Recycling and possibly others TBA.
o Grant Writer: Craig Kawaguchi
o Purpose: to provide home composting units to communities located in rural areas,
where no green waste, mulch or composting services are provided or would have to
drive to get to those services. The County of Hawai`i, Recycling Section will be
providing training to residents on home composting, food scraps and yard trimmings
generated at home can be turned into a healthy soil amendment and diverted from
the on landfill on Hawai`i Island.
Solid Waste Management Grant (SWMG) program is designed to assist
communities through technical assistance and training provided by grant
recipients to qualified organizations. SWMG program funds can be used to help
reduce or eliminate pollution of water resources in rural areas and improve
planning and management of solid waste sites in rural areas
o The communities that the County will be applying the grant for home composters
are:
Wai‘ōhinu, Hawai`i County, HI
14
Nā‘ālehu, Hawai`i County, HI
Pāhala, Hawaii County, HI
o Services will be provided at workshops or community events and outreach &
education for the community. County staff, Volunteers or a non-profit group will
provide the Technical Assistance or Training.
2. Update on report and final recommendations of the Cesspool Conversion
Working Group
(https://health.hawaii.gov/wastewater/files/2022/11/ccwg_final_report.pdf)
A. Recommendations for Cesspool Conversion Prioritization and Timeline
The working group recommends, based on greater understanding of impacts cesspools have on
nearshore water quality and human health, that the deadline by which cesspools in the State
must be converted should be adjusted to a staggered timeline that would accelerate the
mandatory conversion date for cesspools that pose the highest risk of harming human or
environmental health, as determined by the Hawai’i Cesspool Prioritization Tool and supporting
water quality data. The working group further recommends the adoption of policies and
mechanisms that will facilitate this acceleration and the need for an iterative process as new
findings are established.
A1. Replace the 2050 deadline, from Act 125 Session Laws of Hawaii (SLH) 2017, for cesspool
conversion as follows:
• Priority 1 zones (13,821 cesspools) converted by 2030
• Priority 2 zones (12,367 cesspools) converted by 2035
• Priority 3 zones (55,237 cesspools) converted by 2050
Approximately 35%, 7%, 21%, and 37% of cesspools in the Priority Level 1 group are located on
O‘ahu, Maui, Kaua‘i, and Hawai’i Island, respectively. Refer to Section 2.3 of the report for
priority zone definitions.
A2. Adopt and implement policies and mechanisms to accelerate cesspool conversions
statewide, prioritizing the highest risk areas. Recommendations include:
• Point-of-sale conversion requirements
• Require a seller’s disclosure form for any property sold that has a cesspool
• Financial incentives including grants, tax credits, and loans to offset the cost of conversion
A3. Priority areas and/or timelines of cesspool conversion should be updated/evaluated when
significant information, policy, and/or data changes arise. For example, use a higher resolution
map (census blocks or block-groups, rather than larger census tracts) to better assist managers
in identifying urgent problem areas.
B. Recommendations for Cesspool Conversion Financing
15
The high upfront costs associated with onsite wastewater system replacement are not
affordable for many Hawaii residents and are the biggest obstacle to cesspool conversion
among all income levels. The working group recommends developing robust funding and
financing options to assist low- and moderate-income homeowners to finance conversions, as
well as incentives for cesspool conversion for all homeowners. The working group further
recommends maximizing the use of available federal funding, which has been a missed
opportunity in the past. There will be a need for a corresponding increase in capacity at both
the state and county levels to effectively access and spend more federal dollars. Additionally,
both the state and counties will need to consider options for either reallocating resources or
generating new revenue to supplement other financing programs and homeowners’ dollars.
B1. Maximize use of available Federal funds such as the Infrastructure Investment and Jobs Act
funds, Inflation Reduction Act and American Rescue Plan Act for State and Counties to
implement cesspool conversion. Conversion solutions may include, but are not limited to,
options for onsite replacement, connections to sewers, and local cluster wastewater treatment
systems. Where appropriate, State, County and local governments should pursue
congressionally designated spending requests for cesspool conversions.
B2. The State and Counties should develop a long-term, low-interest loan program for lowand
moderate-income homeowners.
B3. Partner with private lending institutions to integrate financing for cesspool conversions into
private lending applications. Explore the feasibility of financing cesspool conversions within
existing loan programs such as the Department of Veterans Affairs, the US Department of
Housing and Urban Development, and Fannie Mae.
B4. Maximize use of all available federal, State and local funding, including grant, rebate, and
revolving loan programs. Analyze existing models set up by places like Suffolk County, New
York. Even with federal funding, it is likely that local financing will still be needed to achieve
cesspool conversions by 2050. Another option is to consider fees for homeowners with
cesspools to generate funds to finance or fund cesspool conversions. Special Assessment
Districts (Chapter 12) or Improvement Districts (Chapter 32) could allocate property tax to
finance improvements.
B5. Provide tax credits and rebates for upgrades or connection costs and allow these incentives
to be claimed by a third party on behalf of the homeowner.
B6. Increase personnel capacity at the State and County level to apply for and manage Federal
loans, grants, and other financial assistance programs.
B7. Enact policies to enable nonprofits and community development financial institutions to
help cesspool owners access available funding through the Clean Water State Revolving Funds.
B8. Create an entity within the State to help administer and provide federal funding to
16
Counties, nonprofits, and community development financial institutions for cesspool
conversions.
C. Recommendations for Public Outreach for Cesspool Conversions
Public outreach and education are essential components of a cesspool conversion program.
Wastewater upgrade programs in other jurisdictions found that robust public outreach was
necessary for the success of their efforts.
C1. Establish paid public outreach personnel for cesspool conversion at State and/or County
levels and work with non-profits to educate homeowners about why cesspools need to be
converted, what the due dates are, options and resources available to help with conversions,
and other relevant information.
C2. Fund the development of a comprehensive outreach strategy for cesspool conversions that
educates homeowners on conversion options and resources. Work with existing nonprofits and
institutions that support conversions.
C3. Support the development of a web page to serve as an informational clearinghouse with
resources needed for homeowners and wastewater industry professionals. Include information
about priority zones, cesspool impacts, links to priority zone web maps, and other relevant
information.
D. Recommendations for Cesspool Conversion Technology Considerations
Supporting access to certified technology that addresses nutrient pollution reduction and public
health protection is essential for Hawai‘i‘s unique geology, climate, and land use practices. The
working group seeks to promote the certification and adoption of novel wastewater treatment
and disposal technologies and policies to allow tailored solution.
D1. The Hawaii Department of Health should develop and maintain an online comprehensive
resource of approved technology options, including advantages and disadvantages of approved
technology options for given locations and site conditions (including onsite systems, sewering
systems, and cluster systems).
D2. Collaborate with national onsite wastewater testing centers (like Stony Brook University
Center for Clean Water Technology and Massachusetts Alternative Septic System Test Center)
for onsite wastewater testing, training, and education to test and approve new alternative
wastewater treatment solutions.
D3. The Hawaii Department of Health should update minimum treatment standards (i.e.,
reduction of nutrients) for onsite wastewater technology for ecologically sensitive areas (high
water table, proximity to ocean/streams, prone to sea level rise).
D4. Establish a pilot program to provide matching funding for trialing wastewater technologies
in coordination with the Department of Health.
17
D5. The Hawaii Department of Health should develop an online map and database inventory of
all onsite wastewater treatment systems within the state for management and maintenance
tracking.
E. Recommendations for Cesspool Conversion Planning/Program Administration
Undertaking a massive infrastructure project such as converting 80,000 or more cesspools
requires proper planning and administration across stakeholders and governmental institutions.
The working group seeks to set up the State and Counties for successful implementation of its
conversion plan through the following recommendations.
E1. Require each County to develop a comprehensive integrated wastewater management plan
to include where connections to centralized (public and private) treatment systems are
planned, where individual treatment systems will continue to be needed, and where smaller
scale “cluster” treatment systems might be utilized. Include financial strategies.
E2. Establish a cesspool section within the Hawaii Department of Health’s Wastewater Branch
to include at least three to four staff to work on cesspool conversions planning,
implementation, permitting, and regulatory framework.
E3. Increase administrative capacity as needed for cesspool conversion on State lands. Include
Department of Hawaiian Home Lands, Department of Land and Natural Resources, Department
of Agriculture, Hawaii Community Development Authority, and Hawaii House Finance and
Development Corporation.
E4. Prioritize environmental justice principles for disadvantaged community needs (i.e.
Department of Hawaiian Homelands), including identifying funding and position(s) to promote
equitable outcomes related to the entire cesspool conversion process.
F. Recommendations for Cesspool Conversion Workforce Development
Converting 80,000+ cesspools will require many professionals in the wastewater field. By
investing in education and workforce development targeted at residents of Hawai’i, it may
enable the State’s economy to grow by offering well-paying jobs while meeting its
environmental goals.
F1. Assess and identify the workforce needs for upgrading all cesspools, including but not
limited to State and County workers, contractors, engineering, permitting and public
engagement. Include research and work already in progress with the community colleges.
F2. Re-evaluate current public sector salaries and whether they are sufficient to attract the
needed workforce. Streamline the hiring process to facilitate filling needed positions.
F3. Allocate funding to support existing (i.e. the Workforce-4-Water program) and/or the
creation of new workforce training program(s) such as education, certification, on the job
training, partnerships with other agencies, the University of Hawaii system, labor unions, non-
profits, or other entities as appropriate.
18
Wai‘ōhinu Transfer Station Construction
-
Naalehu and Pahala Large Capacity Cesspool AOC
100%
35%
25%19%
0%0%0%0%
100%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
% COMPLETE
21%
Name Start Finish Duration % Complete
Final Draft -RFP
Package
Mon 12/19/22 Mon 1/16/23 20 days 75%
LATE TASKS
Tasks that are Past Due
SAT 7/1/17 WED 10/20/27
PROJECT OVERVIEW
% COMPLETE
Status for All Top-Level Tasks
Name Deadline Text30 %
Complete
Submit PER for Pahala Sat 5/6/23 Within 180 days of
EPA's Approval of
the Feasibility
Report
0%
Provide Notice of
Feburary Public
Outreach Meeting
Wed 2/15/23 At Least 14 Days in
Advance
0%
February Public
Outreach Meeting
Thu 2/23/23 At Least Once in
February (scheduled
2/23/23)
0%
AOC DEADLINES
3 Month Outlook for AOC Deadlines
Deadline Details
APPENDIX
Name Finish % Complete
Construction (Pahala Elderly Apartments)Thu 7/14/22 100%
Pahala Elderly Apartments Cesspool Replacement Project Thu 7/14/22 100%
Implement the Pahala Elderly Apartments Compliance Plan Thu 7/14/22 100%
Design (Pahala)Wed 5/15/24 0%
Pahala Community Cesspool Closure Project Wed 5/15/24 0%
Implement the Pahala Community Cesspool Closure Project Wed 5/15/24 0%
Planning Mon 1/13/25 25%
Feasibility Evaluation Report (Pahala)Mon 11/7/22 100%
Submit Feasibility Evaluation Report (Pahala)Fri 10/21/22 100%
EPA Review & Approval of Feasibility Report (Pahala)Mon 11/7/22 100%
Feasibility Evaluation Report (Naalehu)Mon 11/7/22 100%
Submit Feasibility Evaluation Report (Naalehu)Fri 10/21/22 100%
EPA Review & Approval of Feasibility Report (Naalehu)Mon 11/7/22 100%
Preliminary Engineering Report (PER)Fri 9/29/23 39%
Submit PER for Pahala Sat 5/6/23 0%
Submit PER for Naalehu Sun 9/3/23 0%
Pahala Pahala Community Cesspool Closure Implementation Plan Thu 2/15/24 0%
Submit Pahala Implementation Plan Fri 1/26/24 0%
Environmental Review Fri 10/25/24 6%
Submit an Environmental Information Document (EID) for Pahala Wed 11/29/23 0%
Submit an Environmental Information Document (EID) for Naalehu Sat 9/28/24 0%
Naalehu Pahala Community Cesspool Closure Implementation Plan Mon 1/13/25 0%
Submit Naalehu Implementation Plan Tue 12/24/24 0%
Construction (Naalehu)Wed 2/19/25 0%
LCC Closure Wed 2/19/25 0%
Close Naalehu Community Cesspool Wed 2/19/25 0%
Construction (Pahala)Tue 7/21/26 0%
PROJECT MILESTONES
Major Milestones for this Project Include Contract Execution, Tasks and Deliverables
Construction (Pahala)Tue 7/21/26 0%LCC Closure Tue 7/21/26 0%
Close Pahala Community Cesspool Tue 7/21/26 0%
Public Engagement Wed 7/21/27 35%
Create Public Webpage and Submit Address to EPA Thu 9/22/22 100%
Public Meeting to Explain AOC Requirements Thu 10/6/22 100%
Public Engagement (Pahala Project Options & EID)Fri 3/1/24 0%
Commence Solicitation of Public Comment on the Project Options and EID for Pahala Sat 1/27/24 0%
Provide Notice of all Public Meetings and Opportunities for Public Engagement & Instructions for Submitting Comments Sun 1/28/24 0%
Hold At Least One Public Meeting within the Community Where the Project will Take Place Mon 1/29/24 0%
Submit a Summary Response Document & Post on the Website Fri 3/1/24 0%
Public Engagement (Naalehu Project Options & EID)Sun 12/29/24 0%
Commence Solicitation of Public Comment on the Project Options and EID for Naalehu Mon 11/25/24 0%
Provide Notice of all Public Meetings and Opportunities for Public Engagement & Instructions for Submitting Comments Tue 11/26/24 0%
Hold At Least One Public Meeting within the Community Where the Project will Take Place Wed 11/27/24 0%
Submit a Summary Response Document & Post on the Website Sun 12/29/24 0%
Maintain Public Webpage and Submit Address to EPA Wed 7/21/27 37%
Update Webpage (Monthly)Wed 7/21/27 37%
Reporting and Meetings Wed 10/20/27 19%
Semiannual Reports Thu 7/1/27 20%
January Semiannual Reports Sat 1/2/27 34%
July Semiannual Reports Thu 7/1/27 4%
Semiannual Public Outreach Meetings Tue 8/31/27 9%
February Public Outreach Meetings Sun 2/28/27 0%
August Public Outreach Meetings Tue 8/31/27 17%
Quarterly Meetings with EPA Wed 10/20/27 17%
January Quarterly Meetings Wed 1/20/27 0%
April Quarterly Meetings Tue 4/20/27 17%
July Quarterly Meetings Tue 7/20/27 17%
October Quarterly Meetings Wed 10/20/27 29%
-
Hilo Wastewater Treatment Plant Upgrade
99%
40%
0%
28%
0%0%0%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
% COMPLETE
8%
LATE TASKS
Tasks that are Past Due
Name Finish
Consultant Notice to Proceed (NTP)Thu 9/1/22
Draft EA Exception Mon 9/19/22
EA Exemption Wed 11/30/22
Complete SHPD Clearance for HRS 6E-8 Fri 12/30/22
Complete Section 106 Clearance Fri 12/30/22
Complete Section 7 Clearance Fri 12/30/22
Draft Environmental Assessment Tue 11/21/23
Final Environmental Assessment Tue 2/13/24
Final Design Submittal Workshop Thu 1/12/23
Conceptual Design Workshop Wed 1/11/23
50% Design Submittal Workshop Wed 6/7/23
Final Design Submittal Workshop Thu 12/14/23
Advertise for Bidding Tue 5/30/23
Notice of Award Tue 5/30/23
Advertise for Bidding Tue 1/2/24
Notice of Award Tue 4/30/24
Notice to Proceed Mon 7/31/23
Notice to Proceed Mon 7/1/24
MILESTONES DUE
Milestones that are Coming Soon
FRI 9/24/21 WED 5/23/29
PROJECT OVERVIEW
% COMPLETE
Status for All Top-Level Tasks
Name Start Finish Duration % Complete
Consultant Selection
Approved by
Management
Thu 5/26/22 Thu 5/26/22 1 day?97%
Consultant Notice to
Proceed (NTP)
Thu 9/1/22 Thu 9/1/22 0 days 0%
Draft EA Exception Wed 6/1/22 Mon 9/19/22 79 days 40%
EA Exemption Wed 6/1/22 Wed 11/30/22 131 days 40%
Complete SHPD
Clearance for HRS 6E-
8
Wed 6/1/22 Fri 12/30/22 153 days?40%
Complete Section 106
Clearance
Wed 6/1/22 Fri 12/30/22 153 days?40%
Complete Section 7
Clearance
Wed 6/1/22 Fri 12/30/22 153 days?40%
Complete Section 7 Clearance Wed 6/1/22 Fri 12/30/22 153 days?40%
Final Design
Submittal/Bid
Documents
Wed 8/31/22 Mon 1/30/23 109 days 15%
Phase 1 Permitting
Process
Mon 8/1/22 Fri 3/31/23 175 days 25%
Conceptual Design Thu 9/1/22 Tue 11/22/22 59 days 0%
Complete Consultant
Selection
Wed 9/7/22 Wed 9/7/22 1 day 50%
Submit Consultant
Selection for Approval
Thu 9/8/22 Thu 9/8/22 1 day?0%
Develop Scope of
Contract with
Consultant and
Evaluate Proposal
Mon 10/3/22 Fri 10/14/22 10 days 0%
Complete Fair and
Reasonable Analysis
Mon 10/17/22 Mon 10/17/22 1 day?0%
Complete Draft
Contract
Tue 10/18/22 Tue 10/18/22 1 day?0%
Submit to Draft
Contract to BSS
Review and
Finalization
Wed 10/19/22 Tue 11/1/22 10 days 0%
Route Contract
Externally for
Signature
Wed 11/2/22 Wed 11/2/22 1 day?0%
Receive Certification
of Funds from Finance
Dept.
Wed 11/2/22 Tue 1/31/23 65 days?0%
Name Finish %
Complete
Planning EA Exemption Fri 12/30/22 40%
Draft EA Exception Mon 9/19/22 40%
EA Exemption Wed
11/30/22
40%
Complete SHPD Clearance for HRS 6E-8 Fri 12/30/22 40%
Complete Section 106 Clearance Fri 12/30/22 40%
Complete Section 7 Clearance Fri 12/30/22 40%
Design Contract Development c.009652 Fri 3/31/23 99%
Phase 1 Contract Wed 1/26/22 100%
Consultant Notice to Proceed (NTP)Wed 1/26/22 100%
Phase 2 Supplemental Agreement Thu 9/1/22 99%
Consultant Notice to Proceed (NTP)Thu 9/1/22 0%
Planning EA Tue 2/13/24 0%
Permit Cooling Period Tue
11/21/23
0%
Draft Environmental Assessment Tue
11/21/23
0%
Final Environmental Assessment Tue 2/13/24 0%
Advertisement and Award of Construction Project Tue 4/30/24 0%
Phase 1 Bid/Award Period Tue 5/30/23 0%
Advertise for Bidding Tue 5/30/23 0%
Notice of Award Tue 5/30/23 0%
Phase 2 Bid/Award Period Tue 4/30/24 0%
Advertise for Bidding Tue 1/2/24 0%
Notice of Award Tue 4/30/24 0%
Design Tue
12/10/24
28%
Phase 1 Design Tue 5/30/23 55%
Complete Conceptual Design Fri 6/3/22 100%
PROJECT MILESTONES
Major Milestones for this Project Include Contract Execution, Tasks and Deliverables
Name Start Finish %
Complete
Design Contract Development c.009652 Fri 9/24/21 Fri 3/31/23 99%
Phase 2 Supplemental Agreement Fri 2/25/22 Thu 9/1/22 99%
Consultant Selection
Approved by
Management
Thu 5/26/22 Thu
5/26/22
97%
Consultant Notice to
Proceed (NTP)
Thu 9/1/22 Thu 9/1/22 0%
Planning EA Exemption Wed 6/1/22 Fri
12/30/22
40%
Draft EA Exception Wed 6/1/22 Mon
9/19/22
40%
EA Exemption Wed 6/1/22 Wed
11/30/22
40%
Complete SHPD Clearance for HRS
6E-8
Wed 6/1/22 Fri
12/30/22
40%
Complete Section 106 Clearance Wed 6/1/22 Fri
12/30/22
40%
Complete Section 7 Clearance Wed 6/1/22 Fri
12/30/22
40%
Design Wed 1/26/22 Tue
12/10/24
28%
Phase 1 Design Wed 1/26/22 Tue
5/30/23
55%
Complete Final Design
Submittal/Bid Documents
Wed 8/31/22 Mon
1/30/23
15%
Final Design
Submittal
Workshop
Thu 1/12/23 Thu
1/12/23
0%
Final Design
Submittal/Bid
Documents
Wed 8/31/22 Mon
1/30/23
15%
Phase 1 Permitting Mon 8/1/22 Fri 3/31/23 25%
Status of Tasks Sarting in the Next 3 Months
TASKS STARTING SOON
Complete Conceptual Design
Submittal
Fri 6/3/22 100%
Solids Conceptual Design Tue 5/31/22 100%
Headworks Conceptual
Design Workshop
Fri 6/3/22 100%
Complete 50% Design Submittal Tue 8/30/22 100%
50% Design Submittal
Workshop
Tue 8/30/22 100%
Complete Final Design Submittal/Bid
Documents
Mon 1/30/23 15%
Final Design Submittal
Workshop
Thu 1/12/23 0%
Phase 2 Design Tue 4/30/24 0%
Complete Conceptual Design
Submittal
Wed 1/11/23 0%
Conceptual Design
Workshop
Wed 1/11/23 0%
Complete 50% Design Submittal Wed 6/7/23 0%
50% Design Submittal
Workshop
Wed 6/7/23 0%
Complete Final Design Submittal/Bid
Documents
Fri 12/29/23 0%
Final Design Submittal
Workshop
Thu
12/14/23
0%
Construction Thu
12/30/27
0%
Phase 1 Construction Fri 7/31/26 0%
Notice to Proceed Mon 7/31/23 0%
Phase 2 Construction Thu
12/30/27
0%
Notice to Proceed Mon 7/1/24 0%
Phase 1 Permitting Process Mon 8/1/22 Fri 3/31/23 25%
Phase 1
Permitting
Process
Mon 8/1/22 Fri 3/31/23 25%
Phase 2 Design Thu 9/1/22 Tue
4/30/24
0%
Complete Conceptual
Design Submittal
Thu 9/1/22 Wed
1/11/23
0%
Conceptual
Design
Thu 9/1/22 Tue
11/22/22
0%
Conceptual
Design
Workshop
Wed 1/11/23 Wed
1/11/23
0%
Advertisement and Award of Construction
Project
Mon 1/30/23 Tue
4/30/24
0%
Phase 1 Bid/Award Period Mon 1/30/23 Tue
5/30/23
0%
Bid Period Mon 1/30/23 Fri 3/31/23 0%
Construction Management Contract
Development
Wed 9/7/22 Tue 4/4/23 0%
Complete Consultant Selection Wed 9/7/22 Wed
9/7/22
50%
Submit Consultant Selection for
Approval
Thu 9/8/22 Thu 9/8/22 0%
Develop Scope of Contract with
Consultant and Evaluate Proposal
Mon 10/3/22 Fri
10/14/22
0%
Complete Fair and Reasonable
Analysis
Mon
10/17/22
Mon
10/17/22
0%
Complete Draft Contract Tue
10/18/22
Tue
10/18/22
0%
Submit to Draft Contract to BSS
Review and Finalization
Wed
10/19/22
Tue
11/1/22
0%
Route Contract Externally for
Signature
Wed 11/2/22 Wed
11/2/22
0%
Receive Certification of Funds
from Finance Dept.
Wed 11/2/22 Tue
1/31/23
0%
Route Contract Internally for
Signature
Wed 2/1/23 Tue
3/14/23
0%
Route Contract Internally for Signature Wed 2/1/23 Tue 3/14/23 0%
Consultant Notice to Proceed
(NTP)
Wed 3/15/23 Tue 4/4/23 0%
-
Pahoa Wastewater Feasibility and Cost Study
100%100%
62%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Project Execution Project Definition
Report (PDR)
Feasibility Study
% COMPLETE
67%
Name Start Finish Duration % Complete
LATE TASKS
Tasks that are Past Due
Name Finish
Complete Draft Feasibility Study Wed 1/18/23
Complete Pre-Final Feasibility Study Wed 4/19/23
Complete Final Feasibility Study Thu 10/19/23
MILESTONES DUE
Milestones that are Coming Soon
SUN 7/17/22 THU 10/19/23
PROJECT OVERVIEW
% COMPLETE
Status for All Top-Level Tasks
**THERE ARE NO LATE TASKS FOR THIS PROJECT**
Name Finish %
Complete
Project Execution Wed 8/24/22 100%
Notice to Proceed with Contract (c009862) Sun 7/17/22 100%
Project Definition Report (PDR)Fri 11/18/22 100%
Complete Draft PDR Fri 11/4/22 100%
Complete Final PDR Fri 11/18/22 100%
Feasibility Study Thu
10/19/23
62%
Complete Draft Feasibility Study Wed 1/18/23 0%
Complete Pre-Final Feasibility Study Wed 4/19/23 0%
Complete Final Feasibility Study Thu
10/19/23
0%
PROJECT MILESTONES
Major Milestones for this Project Include Contract Execution, Tasks and Deliverables
Name Start Finish %
Complete
Feasibility Study Mon 10/3/22 Thu
10/19/23
62%
Complete Draft Feasibility Study Wed 1/18/23 Wed
1/18/23
0%
Feasibility Workshop Thu 2/2/23 Thu 2/2/23 0%
Status of Tasks Sarting in the Next 3 Months
TASKS STARTING SOON
-
Puna Wastewater PEIS and Facility Plan
100%100%
47%
100%
65%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Project
Execution
Project
Definition
Report (PDR)
Facility Plan Public Review
and
Participation
PEIS
% COMPLETE
65%
Name Start Finish Duration % Complete
LATE TASKS
Tasks that are Past Due
Name Finish
Complete Draft Facility Plan Fri 2/24/23
Complete Final Facility Plan Sat 8/26/23
File Draft PEIS Publication Mon 3/6/23
Final PEIS Publication Fri 9/8/23
MILESTONES DUE
Milestones that are Coming Soon
MON 3/14/22 FRI 9/8/23
PROJECT OVERVIEW % COMPLETE
Status for all top-level tasks.
**THERE ARE NO LATE TASKS FOR THIS PROJECT**
Name Finish %
Complete
Project Execution Mon 3/14/22 100%
Notice to Proceed with Contract (c009727)Mon 3/14/22 100%
Project Definition Report (PDR)Tue 9/13/22 100%
Complete Final PDR Tue 9/13/22 100%
Public Review and Participation Mon
10/24/22
100%
PEIS Public Scoping Meeting Wed
10/12/22
100%
Facility Plan Sat 8/26/23 47%
Complete Draft Facility Plan Fri 2/24/23 0%
Complete Final Facility Plan Sat 8/26/23 0%
PEIS Fri 9/8/23 65%
Programmatic EISPN Mon
10/24/22
100%
PEISPN Publication Fri 9/23/22 100%
Draft PEIS Mon 2/27/23 85%
Complete Draft PEIS Mon 1/9/23 100%
File Draft PEIS Mon 5/8/23 0%
File Draft PEIS Publication Mon 3/6/23 0%
Final PEIS Fri 9/8/23 0%
Final PEIS Publication Fri 9/8/23 0%
PROJECT MILESTONES
Major Milestones for this Project Include Contract Execution, Tasks and Deliverables
Name Start Finish %
Complete
Facility Plan Tue 6/28/22 Sat 8/26/23 47%
Prepare Draft Facility Plan Tue 6/28/22 Fri 2/24/23 90%
Complete Draft Facility Plan Fri 2/24/23 Fri 2/24/23 0%
HDEM Review Mon 2/27/23 Fri 4/7/23 0%
PEIS Fri 4/15/22 Fri 9/8/23 65%
Draft PEIS Tue 8/2/22 Mon
2/27/23
85%
HDEM Review Tue 1/10/23 Mon
1/30/23
10%
PEIS Workshop Fri 1/27/23 Fri 1/27/23 0%
Revise and Submit Final
PDEIS
Tue 1/31/23 Mon
2/27/23
0%
File Draft PEIS Mon 3/6/23 Mon
5/8/23
0%
File Draft PEIS Publication Mon 3/6/23 Mon
3/6/23
0%
Status of Tasks Sarting in the Next 3 Months
TASKS STARTING SOON
-
Puako & South Kohala Regional Wastewater Master Plan
100%
14%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Project Execution Planning
% COMPLETE
14%
Name Start Finish Duration % Complete
LATE TASKS
Tasks that are Past Due
Name Finish
Complete Draft PDR Sat 4/8/23
Complete Final PDR Wed 7/19/23
Complete Pre-Final Wastewater Master Plan Mon 8/19/24
Complete Final Wastewater Master Plan Sun 1/19/25
MILESTONES DUE
Milestones that are Coming Soon
FRI 7/15/22 SUN 1/19/25
PROJECT OVERVIEW
% COMPLETE
Status for All Top-Level Tasks
**THERE ARE NO LATE TASKS FOR THIS PROJECT**
Name Finish %
Complete
Project Execution Tue 8/30/22 100%
Notice To Proceed with Contract c.009861 Sun 7/17/22 100%
Planning Sun 1/19/25 14%
Project Definition Report (PDR)Sat 1/18/25 44%
Complete Draft PDR Sat 4/8/23 0%
Complete Final PDR Wed 7/19/23 0%
Wastewater Master Plan Sun 1/19/25 0%
Complete Pre-Final Wastewater
Master Plan
Mon 8/19/24 0%
Complete Final Wastewater Master
Plan
Sun 1/19/25 0%
PROJECT MILESTONES
Major Milestones for this Project Include Contract Execution, Tasks and Deliverables
Name Start Finish %
Complete
Planning Mon 8/1/22 Sun
1/19/25
14%
Project Definition Report (PDR)Mon 8/1/22 Sat 1/18/25 44%
Collect Background Data Mon 8/1/22 Fri 4/7/23 75%
Gather Info, including
info on private WWTPs
from DOH
Mon 8/1/22 Fri 4/7/23 75%
Description of Study
Areas
Mon 8/1/22 Fri 4/7/23 75%
Wastewater
Infrastructure Options
Mon 8/1/22 Fri 4/7/23 75%
Complete Draft PDR Sat 4/8/23 Sat 4/8/23 0%
Status of Tasks Sarting in the Next 3 Months
TASKS STARTING SOON