Loading...
HomeMy WebLinkAbout2023-02-28 EMC testimony (02-27) Flaherty, ChuckSIERRACLUB HAWAI'I ISLAND GROUP February 27,2423 County of Hawai'i Environmental Management Commission 34.5 Kektanao'a St.. Suite 41 Hilo. Hawai'i96720 Re: February 28,2A22Meeting Agenda Item VII.4.3. Aloha Madame Chair and Members of the Environmental Manasement Commission- After seeing the February Office of Environmental Quality Control's February 2023 Bulletin, the Sierra Club Haw-ai'i Island Gronp became av/are the Hilo Wastewater Treatment Plant is on the exemption list as shown below': q*ilr*ne@dt8-t-ar44 b@Mnt ot ENtuMd &,owrt l@oq ol tu@i)@ cMt l@3) S 1 @, tu*i@t@tudi@6q,s tobmn@m'*ediooto.4(heaii@&hhamii&v tu qaeb6, c6td G@ ot (@ | W1* In addition,the*23-01-17 Director's Report and Appendix" states < Flipbod' B:94 Pg WE, Feb 22 Cfbs.ha#5ii.gov. . ' :(' ,x.;' 1.,.i te..:.;._.-23/, lre L..'nf:^-, az.efla.a - a.,c1:.. rri:aF.4da. 4 "11i 41-r t!-i- \ ?- :l T r--' Ain:€.r' ?iriaE f;ii 9, ::;.k j;r7 2'9.tte-jr;a-rt1ea! !aLe. "3. Hilo WWTP upgrades The engineering contractor has conducted a two-day design workshop in Hilo on January 11 and 12. Phase I of the project remains on track for bids to be advertised in February 2023, with bid opening anticipated in April 2023. The Phase 1 construction contract is anticipated to be arvarded in .Tune .2023. Design of Phase 2 has begun. See also Appendix." A large and substantial project that involves tens of millions of dollars. such as the Hilo WWTP, does not meet the guidelines for exemption from an environmental assessment and does not qualif"v for the exemption list. Exemption lists are limited to things like replacing pumps or broken equipment and are not intended for large rehabilitation projects. Additionally. the project listed as being exempted only represents the first phase and that the Department of Environmental Management is planning and preparing bid documents for another phase. Sierra Club urges.the EMC to require compliance ,"vith state environmental larv. Without an environmental assessment- the impact of the scope of the work cannot be properly considered beyond the price tag. Does it include much needed sewer line rehabilitation work to address some 400,000 gallons per day oi infritration that inciudes saltwater that harms the biological treatment process? Will it include new serice lines in Hilo to connect homes on cesspools? What measures will be put in place during construction to prevent bypasses? What is the expected capacity? The purpose of our state environment laws is that projects must fully disclose what is being done and what altematives were considered. as well as the impacts of theaction and the how these are being addressed. For many years, the Sierra Club HIG has been in very strong support of efforts to restore compliance and end ongoing violations of the Clean Water Act. However. it does not suppoft the dangerous precedent of improperly listing a project as being exempt when the project does no1 conform to the exemption guidelines and is, therefore. in violation of state envilonmental law-s. Mahalo,W Charles Flahertfl 6t ui. .. L.