Loading...
HomeMy WebLinkAbout2023-05-01 Letter from Ronald Kim Esq. Revision to Condition No. 6 Law Offices ofYeh & Kim RONALD N.W.KIM A Limited Liability Law Company Of Counsel: rkim@yeha"dkim.com THOMAS L.H.YEH 505 Kilauea Ave.#B,Hilo,Hawaii 96720-2830 fly@ yehandkim.com Telephone 808 961-0055 JoxN MUKAI p � � jmukai@yehandkim.com JILL D.RAZNOV jdramov@gmail.com WPC Hearing Item #2 Windward Planning Commission BWC, LLC (PL-SPP-2023-033) c/o Planning Department 05-01-23 Letter from Ronald Kim Esq. County of Hawaii regarding Revision to Condition No. 6 101 Pauahi Street Hilo, Hawaii 96720 May 1, 2023 Re: Revision to Condition No. 6 for Special Permit No. 2004-000005 (SPP 04-005) Applicant: BWA LLC dba Botanical World Adventures Request: Establish a Visitor's Center, Parking and Related Improvements Subject: Request for Time Extension TMK No. (3) 3-1-001:015 (por.) Kamae`e,North Hilo, State and County of Hawaii Dear Chairperson Lin and Members of the Planning Commission: On behalf of our client, BWA LLC dba Botanical World Adventures ("Applicant"), we respectfully request that the Commission revise the language of Condition No. 6 to clarify that the updated Transportation Impact Analysis Report("TIAR") should evaluate whether certain improvements are required due to the traffic impacts of the project, and that any traffic improvements which Applicant must provide will be to mitigate traffic impacts attributed to the proj ect. The present wording of Condition No. 6 could be interpreted to provide that the Applicant is expected to construct the referenced improvements; however, the condition was amended due to the comment of the State Department of Transportation ("DOT") which recommended that the Applicant be required to provide traffic improvements to mitigate traffic impacts attributed to the project. DOT's comment letter dated April 10, 2013, is attached to the Planning Department's Background Report as Exhibit 6, and states in pertinent part that: a. "The traffic study should include an evaluation of intersection improvements such as ingress/egress to and from Route 19 and acceleration/deceleration lanes at Leopolino Road and Hawaii Belt Road. b. If there are traffic impacts attributed to the project, the applicant is required to provide mitigated traffic improvements at no cost to the state." As such, the TIAR should analyze existing conditions and the mitigation of traffic impacts attributable to the proposed project. Should mitigation measures be required due to those traffic impacts, they may range from striping to turning lanes. Law Offices of Yeh& Kim A Limited Liability Law Company Windward Planning Commission May 1, 2023 Page 2 Condition No. 6 presently reads as follows: Prior to issuance of Final Plan Approval,the Applicant shall submit an updated TIAR,to be reviewed and approved by the Planning Director, in consultation with the Department of Transportation. The updated TIAR shall include,but not be limited to, an evaluation of intersection improvements such as ingress/egress to and from Highway 19 and acceleration/deceleration lanes at Leopolino Road and Hawaii Belt Road Highway 19). Any required traffic improvements or mitigation measures shall be provided by the Applicant, at no cost to the state. Our proposed revised language for Condition No. 6 would read as follows, with deleted language bracketed and struck-through and additional language underlined: Prior to issuance of Final Plan Approval,the Applicant shall submit an updated TIAR,to be reviewed and approved by the Planning Director, in consultation with the Department of Transportation. The updated TIAR shall include,but not be limited to, an evaluation of whether intersection improvements such as ingress/egress to and from Route 19 and acceleration/deceleration lanes at Leopolino Road and Hawaii Belt Road would be required as a result of anticipated traffic generated bApplicanfs operations. [ ,L1 there are traffic impacts attributable to Applicant's project,Applicant shall be required to provide appropriate traffic mitigation improvements at no cost to the State." We believe that our proposed revised language accurately reflects the request from the DOT for the Applicant to update the TIAR and evaluate whether specific improvements are required to mitigate traffic impacts attributable to the project. The original propose language could be interpreted to state that Applicant will unconditionally perform the referenced improvements, when the Applicant is actually evaluating whether those specific improvements are needed to mitigate traffic impacts attributable to the project. We are open to discussing other or further revisions to this language and gratefully look forward to your consideration of Applicant's request at the upcoming hearing. Very truly yours, LAW OFFICES OF YEH & KIM RONALD N.W. KIM