HomeMy WebLinkAbout2023-04-25 Kailua Village Design Commission Minutes
KAILUA VILLAGE DESIGN COMMISSION
COUNTY OF HAWAI‘I
MINUTES
Meeting Date: April 25, 2023
Time: 2:34 p.m.
Location: Live-stream online meeting, with the Planning Department Conference Room,
nd
West Hawai‘i Civic Center, Building E, 2 Floor, 74-5044 Ane Keohokālole
Highway, Kailua-Kona, Hawai‘i, as the in-person meeting site
CALL TO ORDER
Commissioners present via Zoom: Shaun Roth, Alayna Kilkuskie, Palani Greenwell,
Coleman Ka‘ōpua, Bronsten Kossow, Rebekah Lussiaa,
and Tsing Young
Absent and excused: Ann Kern
Office of the Corporation Counsel: Suzanna Tiapula, Esq. (Counsel to the Commission)
Planning Department: Deanne Bugado (Planner), Rosalind Newlon (Planner), and
Noriko Sauer (Commission Secretary)
Applicants/Representatives: Stan Haanio (Item 1), Mark Krzyzanowski (Item 2), and
William McCowatt, Mark Leong and Loch Soderquist
(Item 3)
Public member in person: None
A quorum was present. Chairman Roth called the meeting to order at 2:34 p.m.
Chairman Roth introduced the Commissioners and welcomed new members. He explained the
Commission’s duties and meeting procedure and reminded the Commissioners to keep their
cameras on. Chairman Roth made a disclosure that Ms. Kari Kimura might be in the room next
door \[but not participating in the meeting\]. Commissioner Greenwell also disclosed that his
draftsperson Winter Anderson was nearby \[but not participating in the meeting\].
APPROVAL OF MINUTES
Minutes of the Meeting of March 7, 2023.
Chairman Roth asked if there were any corrections to the minutes. No corrections were offered,
and the minutes were approved as circulated.
STATEMENTS FROM THE PUBLIC ON AGENDA ITEMS
Chairman Roth confirmed with staff that there were no statements from the public.
NEW BUSINESS
1. PL-KVD-2022-000021: The applicant, Stanley Haanio, is requesting design review for
two new wall signs at the new Grace Parish Center on the same property as St.
Michael’s Church, located at TMK 7-5-008:006. The project includes installing a wall
sign facing Ali‘i Drive with an area of 19.5 square feet and letter height of 10 inches and
15 inches, with letters made of stainless-steel standoff metal, painted black to match the
storefront, at an elevation of approximately 20 feet. The second wall sign faces the
1
interior courtyard with an area of 12 square feet with maximum letter height of 8
inches tall, with letters made of stainless-steel standoff metal, painted white/off-white
for contrast, at an elevation of approximately 9 feet.
Applicant: Stanley Haanio
Landowner: Roman Catholic Church
TMK: (3) 7-5-008:006
Location: 75-5769 Alii Drive, Kailua-Kona, HI 96740
Ms. Newlon gave a PowerPoint presentation on the proposed two wall signs. She noted that
the one facing the interior courtyard would meet the Sign Code, but that the other facing Ali‘i
Drive would exceed the maximum sign area and letter height allowed under the Sign Code.
She said that the applicant would have to work with the Department of Public Works
(“DPW”), Building Division, to see if a variance application would be required. She noted
that the applicant pointed out that the sign location would be set back 170 feet from the
roadway, which they could bring up as a justification for the variance. There were no
questions from the Commissioners.
Chairman Roth called upon the applicant. Mr. Haanio clarified that although the application
indicated the color of the courtyard sign being white, their intent was to make it the same as
the color of the other sign, which would be bronze. He stated that in addition to the 170-foot
setback, there are many trees in the front, through which people might not even be able to see
the building itself from Ali‘i Drive once they become fuller. He added that the church
landscaping crew do a great job, and the well-maintained landscape is adding to the
aesthetics of the Kailua Village in his opinion. He concluded his presentation by saying that
the letter size as recommended by their architect, though exceeding the Sign Code allowance,
would look good and would not be overwhelming.
When asked by Chairman Roth if there is another sign along Ali‘i Drive near the entrance,
Mr. Haanio said that there is a small sign inside the gates, about 3 feet by 3 feet, displaying
their Mass schedule.
Commissioner Young asked for clarification on why the applicant would need a variance.
Ms. Newlon explained that they would need a variance from the Sign Code, approved by the
Director of DPW, for the letter height and overall size of the front sign that exceed the limit
of 9 inches and 12 square feet, respectively. She further explained that in this particular case,
the setback distance from the roadway and mitigation by trees, as Mr. Haanio had noted,
would support their grounds for a variance allowing exceptions from the code requirements.
Commissioner Lussiaa asked if those code requirements are set regardless of setbacks or wall
sizes. Chairman Roth responded that in some cases, a variance is justified because of those
conditions of the site. Ms. Newlon also responded that regardless of setback distance or wall
size, the Sign Code sets the maximum letter height to 9 inches and the sign area to 12 square
feet within the Kailua Village Core section, and there is another section in the Kailua Village
where larger signs are allowed. Chairman Roth informed the new members that in the past
the Commission had had a lot of discussions in reviewing signs that required a variance and
recommended disapproval in some cases, and that the Commission had also recommended
approval in other cases where the colors were acceptable, the size was proportional to the
building, and/or the distance from the roadway was far. He added that there are some
2
Kailua Village Design Commission
April 25, 2023, Meeting Minutes
developments that already have a variance covering the entire complex because of their
setback distance.
Commissioner Young expressed her concern about potential reflection of the metal material
because of the close proximity of Ali‘i Drive and farmers’ market. Mr. Haanio responded
that the bronze metal material is the same as the existing railings in dark brown and would
become like a flat finish that is non-reflective.
Commissioner Lussiaa asked if the code requirements only apply to permanent signage. She
noted that the Courtyard King Kamehameha’s Kona Beach Hotel lights up the wall with its
name in large letters at night, although their front sign is small. Chairman Roth responded
that it is likely that that particular sign is not permitted, and that there are many signs in the
Kailua Village that are not permitted. He said that the issue often comes up with the
Commission is that enforcing the Sign Code is difficult, which creates unfairness. He further
said that he was happy that this applicant is doing it right, and that another reason why he
would support applicants is when they are doing it right.
Upon being asked by Commissioner Young, Mr. Haanio confirmed that neither signs would
be illuminated.
Commissioner Kilkuskie suggested to the applicant that for resubmittal, the elevation sheets
should be revised as well to reflect the color change for both signs from white and black to
bronze.
It was moved by Commissioner Greenwell and seconded by Commissioner Kilkuskie that the
Commission recommend approval of the application, including the lettering height and sign
area that exceed the Sign Code allowance, with the change of letter color to a dark non-
reflective bronze for both signs as described by the applicant at the meeting. There being no
discussion on the motion, a roll call vote was taken, and the motion carried with six ayes
(Greenwell, Kilkuskie, Ka‘ōpua, Kossow, Lussiaa and Young), and one absent and excused
(Kern).
2. PL-KVD-2023-000031: The applicant, Mark Krzyzanowski of MK Planning, is
requesting design review for a new duplex, located at 75-196 Alakai Street, in the Lono
Kona Subdivision. The proposed duplex is a two-story building that consists of two 4-
bedroom/4-bath units, each with 2 bedrooms/2 baths upstairs and 2 bedrooms/2 baths
downstairs, with six off-street parking spaces, landscaping, and associated
improvements. The proposed exterior colors include tan/gray tones with black/charcoal
fascia and gutters, white trim, with white vinyl windows.
Applicant: Mark Krzyzanowski, MK Planning
Landowner: Viktor Kocharov, Avik Construction
TMK: (3) 7-5-022:084
Location: 75-196 Alakai Street, Kailua-Kona, HI 96740
Ms. Newlon gave a PowerPoint presentation on the application. She noted that the proposed
project is a new two-story duplex, with the proposed landscaping is from the Master Plan.
Each unit will have four bedrooms, two upstairs and 2 downstairs, with exterior stairs to
access the downstair bedrooms of each unit. Ms. Newlon noted to the commission that the
owner is a contractor and has built a similar duplex next door to this property.
3
Kailua Village Design Commission
April 25, 2023, Meeting Minutes
Commissioner Young requested clarification of the project and Ms. Newlon confirmed that
the duplex would be new construction. That the next steps for the applicant would be plan
approval. Ms. Bugado clarified to the commission that the applicant has submitted a plan
approval application, but it is on hold for some corrective information and for the project to
have a KVDC recommendation.
Commissioner Young requested clarification of how the duplex would be operated, if it will
be a rental property, such as a short-term vacation rental. Chair Roth pointed out that the
question would be better answered by the applicant later on in the review.
Commissioner Ka‘ōpua questioned if there was a requirement for there to be a certain
percentage of grass in the project. Ms. Newlon provided explanation of Planning
Department Rule 17, Landscaping Requirements for the Double-Family Residential District
(RD) that the project is in. At the request of Commissioner Young Ms. Newlon also clarified
that parking could be located in the setback.
Mr. Krzyzanowski provided the commission with some clarification of the issues that had
been discussed. Grass would be located on the property, it is a part of the drainage for the
property. The owner is from Ukraine and will primarily utilize the duplex to provide housing
for families immigrating to the island.
Commissioner Young requested clarification of the existing flood channel in the area goes
through this property. Ms. Newlon pointed out that this property is located in zone X so
would not be located in the flood channel.
Chair Roth pointed out that the property next door (who was built by the current applicant)
appears to have been built with high quality and if this property is built the same it will
elevate the area. It is also nice that the proposed plan includes more landscaping than is
required as well as additional parking on-site.
It was moved by Commissioner Young and seconded by Commissioner Lussiaa that the
Commission recommend approval of the application as submitted. There being no discussion
on the motion, a roll call vote was taken, and the motion carried with six ayes (Greenwell,
Kilkuskie, Ka‘ōpua, Kossow, Lussiaa and Young), and one absent and excused (Kern).
3. PL-KVD-2023-000033: The applicant, William McCowatt, is requesting design review
for a new Lex Brodies lube and carwash facility off of Alahou Street at Henry Street,
located at TMK 7-5-004:013. The new lube and carwash facility is proposed as a two-
story building, with a wash tunnel and equipment area, and connected to a fast lube
area with glass roll up doors, an administration/break room area, with off-street
parking and landscaping improvements. The building exterior includes lava rock
veneer with stucco siding (color: “warm stone”) and standing seam metal roof (color:
“country red”), along with CMU walls (color: “black mountain”) and metal trim (color:
“Charcoal”). There are two approved easements onsite for archaeological site
preservation purposes with lava rock enclosures.
Applicant: William McCowatt
Landowner: Hawaii Lube Company LLC
TMK: (3) 7-5-004:013
Location: 75-5697 Alahou Street, Kailua-Kona, HI 96740
4
Kailua Village Design Commission
April 25, 2023, Meeting Minutes
Ms. Newlon gave a PowerPoint presentation on the application. She noted that the project
will be the new location for Lex Brodies Car Wash and Lube Station. Ms. Newlon pointed
out the archeological easement on-site and how the applicant has adjusted their project to
accommodate compliance. Ms. Newlon pointed out the requirements from the zoning code
for the General Commercial (CG) zoning district to operate a car wash. The project will also
be required to apply for a plan approval before they are able to get a building permit.
Commissioner Young requested clarification from staff of the location of the parcel. Ms.
Newlon pointed out the location of the parcel – the corner of Alahou Street and Henry Street,
across from the new Safeway Store in the Niumalu Commercial Center. Commissioner
Young also asked to see the proposed landscaping plan again and Ms. Newlon pointed out
that the applicant is utilizing the recommendations from the Master Plan in the proposed
landscape plan. Chair Roth requested confirmation that the landscape plan would need buffer
landscaping between the CG district and Residential zoned parcels and Ms. Newlon
confirmed that requirement.
Commissioner Young requested clarification of the entry access to the parcel. Ms. Newlon
pointed out the access points from easement roadways that extends to Henry Street and
Alahou Street, there is no direct access of this parcel onto Henry Street. Commissioner
Young also requested clarification of connection to the sewer line but was directed to follow
that up with the applicant.
William McCowatt introduced himself as well as the owner, Mark Leong and the architect
Loch Soderquist. Mr. McCowatt reiterated the entry and exists of the project and how the
project has tried to comply with the requirements of the archeological easements on the
property as well position the buildings and entry/exit points of the car wash to mitigate the
noise.
Commissioner Young requested the hours of operation. Mr. Leong stated that the hours
would be from seven to five, Monday to Saturday and eight to five on Sundays. Mr. Leong
also discussed the challenges that has been faced to comply with the shared access
easements, the design of the traffic signal, trash at the archeological easement and the
homeless.
Chair Roth requested clarification on the landscape plan regarding an area that the Architect
Mr. Soderquist identified as the buffer area, that will be a hedge and rock wall of varying
heights along the property line (this is between the parcel and residential zoning). Mr.
Soderquist did acknowledge that there needs to be trees along this buffer but that they are
trying to identify trees that will meet the requirements but still allow the residential views
toward the ocean to be impacted minimally. Before the application is submitted for Plan
Approval it will be decided.
Mr. McCowatt and Mr. Soderquist also confirmed the building placement, construction and
entry/exit points have been made to mitigate the noise and site of the business activity to the
surrounding residents. Mr. Soderquist also discussed the innovation of the car wash system
and the differences between this system and the one that the existing Lex Brodies operates.
Commissioner Lussiaa requested clarification of what will be built above this proposed
project. Mr. Leong pointed out that that would be the proposed hotel.
5
Kailua Village Design Commission
April 25, 2023, Meeting Minutes
Commissioner Ka’ōpua requested information on the requirements of the archeological
easement. Mr. Leong provided that they had been meeting with the lineal descendants and
have been referencing the updated burial treatment plan as the development plans have been
made.
Commissioner Young requested some clarification on proposed parking plan and possible
impact of the stalls on the residential community. Both Mr. McCowatt and Mr. Leong
provided some more information of the sound and noise impacts are mitigated by how the
buildings are placed and the parking is situated.
Commissioner Greenwell stated that he needed to recuse himself as he has been in discussion
to be the civil engineer for this project.
Commissioner Young requested clarification on certain areas of the site plan. Mr. McCowatt
provided clarification and identification of the site plan. He identified the archeological areas
and the boundary areas that are indicated on the site plan. Mr. Leong provided that the site is
approximately 2.3 acres but that only approximately 77,000 s.f. (1/3 of the area) are usable.
It was moved by Commissioner Lussiaa and seconded by Commissioner Ka’ōpua that the
Commission recommend approval of the application as submitted. There being no discussion
on the motion, a roll call vote was taken, and the motion carried with five ayes (Kilkuskie,
Ka‘ōpua, Kossow, Lussiaa and Roth), one absent and excused (Kern), one abstain (Young)
and one recused (Greenwell)
ANNOUNCEMENTS
The next meeting is tentatively scheduled for May 9, 2023
Commissioner Lussiaa questioned when the Commission could discuss the time of the
Commission meeting, Ms. Bugado and the Chair confirmed that discussion of the time of the
Commission meeting would be on the next agenda.
ADJOURNMENT
There being no further business, Chairman Roth adjourned the meeting at 4:01 p.m.
Respectfully submitted,
Deanne Bugado, Planner
A T T E S T:
Shaun Roth, Chairman
Kailua Village Design Commission
6
Kailua Village Design Commission
April 25, 2023, Meeting Minutes