Loading...
HomeMy WebLinkAboutCD.2 Sea Engineering, Inc Sea Engineering, Inc. Makai Research Pier Waimanalo, Hawaii 96795-1820 E-mail: sei@seaengineering.com Phone: (808) 259-7966 / FAX (808) 259-8143 Website: www.seaengineering.com June 21, 2023 Mr. Talmadge Magno, Civil Defense Administrative Officer County of Hawaii 920 Ululani Street Hilo, Hawaii 96720 Subject: Professional Services, Fiscal Year 2023-2024 Dear Mr. Magno: This is in response to your solicitation for professional services dated June 1, 2023. We would be pleased to provide professional engineering services to the County of Hawaii, Civil Defense Department during Fiscal Year 2023-2024 (July 1, 2023 to June 30, 2024). Sea Engineering, Inc. (SEI) specializes in coastal engineering, marine and coastal environmental assessments, hydrographic and geophysical surveys, underwater inspection, marine construction, and boat and diving services. We are specifically interested in providing services to your department in the following area: CD.2. Safety Engineering/General Physical Science (Hazard Mitigation Specialist) – (Ocean/ Coastal Engineering) A Federal Standard Form SF330 is enclosed presenting our experience and qualifications along with a copy of the State of Hawaii, Professional License card for each licensed person referenced in our submittal. In addition, our qualifications are also available at our website: www.seaengineeering.com. We look forward to possibly assisting the County of Hawaii, Civil Defense during the coming fiscal year. Should you desire any additional information please contact me at 808-259-7966 or by email at cconger@seaengineering.com. Very truly yours, Chris Conger Vice President STANDARD FORM 330 (6/2004) ARCHITECT – ENGINEER QUALIFICATIONS PART I – CONTRACT-SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 1. TITLE AND LOCATION (City and State) County of Hawaii Notice to Providers of Professional Services 2. PUBLIC NOTICE DATE 3. SOLICITATION OR PROJECT NUMBER June 1, 2023 Fiscal Year 2023-2024 (July 1, 2023 to June 30, 2024) B. ARCHITECT-ENGINEER POINT OF CONTACT 4. NAME AND TITLE Chris Conger, Vice President 5. NAME OF FIRM Sea Engineering, Inc. 6. TELEPHONE NUMBER 7. FAX NUMBER 8. E-MAIL ADDRESS (808) 259-7966 cconger@seaengineering.com C. PROPOSED TEAM (Complete this section for the prime contractor and all key subcontractors.) (Check) 12. FIRM NAME 13. ADDRESS 14. ROLE IN THIS CONTRACT Prime J-V Partner Subcontractor a. Sea Engineering, Inc. Makai Research Pier 41-305 Kalanianaole Hwy Waimanalo, HI 96795 Coastal and Ocean Engineering b. CHECK IF BRANCH OFFICE Sea Engineering, Inc. 863 N. Nimitz Hwy Honolulu, HI 96817 Marine Construction, Boat and Diving Services c. CHECK IF BRANCH OFFICE d. CHECK IF BRANCH OFFICE e. CHECK IF BRANCH OFFICE f. CHECK IF BRANCH OFFICE g. CHECK IF BRANCH OFFICE h. CHECK IF BRANCH OFFICE i. CHECK IF BRANCH OFFICE D. ORGANIZATIONAL CHART OF PROPOSED TEAM (Attached) E. RESUME OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE David A. Smith, Ph.D., P.E. Coastal Engineer a. TOTAL b. WITH THIS FIRM 24 15 15. FIRM NAME and LOCATION (City and State) Sea Engineering, Inc. 16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Ph.D., University of Hawaii-Manoa, Ocean Engineering M.S., University of Hawaii-Manoa, Ocean Engineering B.S., University of Hawaii-Manoa, Mathematics Hawaii Professional Engineer Guam Professional Engineer California Professional Engineer 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Member – ASCE PADI Open Water Diver Certification, Nitrox Certification 19. RELEVANT PROJECTS a. (1) TITLE and LOCATION (City and State) (2) YEAR COMPLETED Laupahoehoe Harbor Repair Design Laupahoehoe, Hawaii Professional Services Construction 2020 to present (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) and SPECIFIC ROLE Check if project performed with current firm In 2019, USACE retained the services of Nagamine Okawa Engineers, Inc. and Sea Engineering, Inc. (SEI) to evaluate the condition of the existing breakwater, develop and compare alternative repair plans, and develop conceptual repair plans and rough order of magnitude construction costs under the U.S. Army Corps of Engineers (USACE) Operations & Maintenance (O&M) program. In 2020, USACE retained the services of Cardno GS, Inc., and SEI to develop the repair plan through final design. Cost:$141,640 Role: Project Manager/Coastal Engineer b. (1) TITLE and LOCATION (City and State) (2) YEAR COMPLETED Hilo Harbor Breakwater Repair Hilo, Hawaii 2020 to present n/a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) and SPECIFIC ROLE Check if project performed with current firm Sea Engineering, Inc. (SEI) has been contracted by Cardno GS and the U.S. Corps of Engineers (USCOE) to investigate the existing breakwater condition, and to develop alternative plans to repair the breakwater. Cost: $93,888 Role: Project Manager c. (1) TITLE and LOCATION (City and State) (2) YEAR COMPLETED Ala Moana Park Sand Replenishment and EIS Ala Moana Beach Park, Oahu Professional Services Construction 2017 to present n/a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) and SPECIFIC ROLE Check if project performed with current firm Sea Engineering, Inc., was contracted by Belt Collins to support the City and County of Honolulu efforts to improve Ala Moana Beach Park. Work tasks include sand source investigations, determination of sand recovery and transport methodology, investigation of existing beach conditions and characteristics, analysis of coastal engineering design parameters, design of the beach nourishment plan, water quality assessments, EIS input and preparation of necessary Federal, State and City and County permit applications. Cost: $ 78,200 Role: Coastal Engineer d. (1) TITLE and LOCATION (City and State) (2) YEAR COMPLETED Waikoloa Beach Management Plan Waikoloa, Hawaii Professional Services Construction 2017 to preesnt n/a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) and SPECIFIC ROLE Check if project performed with current firm During a tsunami in March 2011 the beach at Anahoomalu Bay was severely eroded. A 200-foot-wide breach was created through the beach and into the fishpond. Much of the fishpond rock wall which acted as a backstop for the beach was destroyed. Following completion of repairs, the beach has been relatively stable. To ensure the continued stability of their beach, and address concerns about sea level rise, the Waikoloa Land Company and Waikoloa Beach Association have contracted Sea Engineering to develop a long-term plan for management and maintenance. Work includes Beach change monitoring, coastal assessment and preliminary concept plan, offshore sand survey, development of a detailed beach maintenance/management plan, environmental assessment and permit application, and detailed design and construction documents. Cost: $36,760 Role: Coastal Engineer e.. (1) TITLE and LOCATION (City and State) (2) YEAR COMPLETED Federal Coastal Navigation Structure Inspections Hawaiian Islands, Guam, CNMI, &American Samoa Professional Services Construction 2015, 2016, 2017 n/a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) and SPECIFIC ROLE Check if project performed with current firm Sea Engineering was contracted to perform inspections of 24 federal coastal navigation structures (CNS) throughout Hawaii, Guam, Rota, and American Samoa operated and maintained by the U.S. Army Corps of Engineers (USACE), Pacific Ocean Division (POD), including Hilo, Kaiwaihae, Laupahoehoe, Pohoiki harbors. The purposes of the inspections were to verify the current condition of the structures, locate areas of concern on each structure, and identify and recommend future maintenance requirements. Client: USACE, KAI Hawaii Role: Project Manager, Coastal/Design Engineer E. RESUME OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Christopher Goody, P.E. Coastal /Ocean Engineer a. TOTAL b. WITH FIRM 26 15 15. FIRM NAME and LOCATION (City and State) Sea Engineering, Inc. 16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) MS, Ocean Engineering, University of Hawaii at Manoa BS, Ocean Engineering, Florida Institute of Technology Hawaii Professional Engineer (Civil) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) American Society of Civil Engineers, Marine Technology Society SCUBA certified 19. RELEVANT PROJECTS a. (1) TITLE and LOCATION (City and State) (2) YEAR COMPLETED Hilo Wastewater Treatment Plant Outfall Inspection Hilo, Hawaii Professional Services Construction 2023 n/a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) and SPECIFIC ROLE Check if project performed with current firm Sea Engineering, Inc (SEI), has been contracted by the County of Hawaii Wastewater Division to inspect the Hilo Wastewater Treatment Plant (WWTP) Ocean Outfall as part of the requirement in the facility's National Pollutant Discharge Elimination System permit (NPDES Permit No. HI 00213 77). Work tasks include a visual and dye inspection, and a color video documenting the inspection, a written report summarizing the results of the inspection noting all identified defects and their location. Cost: $25,995 Role: Ocean Engineer b. (1) TITLE and LOCATION (City and State) (2) YEAR COMPLETED Kona Village Resort Beach Restoration Kailua-Kona, Hawaii 2021 to present n/a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) and SPECIFIC ROLE Check if project performed with current firm Sea Engineering Inc has been contracted by Kenney Wilson and the Kona Village Resort to develop a sand pushing plan for the beach fronting the Kona Village Resort to enhance its recreational use for visitors and the general public. Work tasks include site investigations, beach profile survey, beach sand sampling and laboratory analysis, develop sand pushing conceptual designs, and preparation and submittal of a SPA authorization to DLNR. Cost: $30,000 Role: Project Manager/Ocean Engineer c. (1) TITLE and LOCATION (City and State) (2) YEAR COMPLETED Laupahoehoe Harbor Repair Design Laupahoehoe, Hawaii Professional Services Construction 2020 to present n/a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) and SPECIFIC ROLE Check if project performed with current firm In 2019, USACE retained the services of Nagamine Okawa Engineers, Inc. and Sea Engineering, Inc. (SEI) to evaluate the condition of the existing breakwater, develop and compare alternative repair plans, and develop conceptual repair plans and rough order of magnitude construction costs under the U.S. Army Corps of Engineers (USACE) Operations & Maintenance (O&M) program. In 2020, USACE retained the services of Cardno GS, Inc., and SEI to develop the repair plan through final design. Cost:$141,640 Role: Ocean Engineer d. (1) TITLE and LOCATION (City and State) (2) YEAR COMPLETED Hilo Harbor Breakwater Repair Hilo, Hawaii Professional Services Construction 2019 to present n/a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) and SPECIFIC ROLE Check if project performed with current firm Sea Engineering, Inc. (SEI) has been contracted by Cardno GS and the U.S. Corps of Engineers (USCOE) to investigate the existing breakwater condition, and to develop alternative plans to repair the breakwater. Cost: $93,888 Role: Ocean Engineer e. (1) TITLE and LOCATION (City and State) (2) YEAR COMPLETED Keauhou Bay Offshore Mooring Design Keauhou Bay, North Shore, Island of Hawaii Professional Services Construction 2013 n/a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) and SPECIFIC ROLE Check if project performed with current firm Sea Engineering was contracted by the Department of Land and Natural Resources (DLNR) to design offshore moorings for small boats in Keauhou Bay, Hawaii. The project required field site investigations, design of a gravity anchor system suitable for the rocky cobble substrate, design of a layout to maximize boat mooring capacity and Department of the Army permit acquisition. Cost: $70,000 Role: Ocean Engineer E. RESUME OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Christopher L. Conger, Vice President Project Manager/Coastal Scientist a. TOTAL b. WITH THIS FIRM 18 12 15. FIRM NAME and LOCATION (City and State) Sea Engineering, Inc. 16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) M.Sc., University of Hawaii-Manoa, Coastal Geology B.S., University of Hawaii-Manoa, Geology and Geophysics 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 100 ton near shore Captains License, Navy Second Class Diver Certification, Commercial Diver Certification (ADC Supervisor) 19. RELEVANT PROJECTS a. (1) TITLE and LOCATION (City and State) (2) YEAR COMPLETED Scour Critical Bridges – Phase III Hawaii, Kauai, Maui, and Oahu Professional Services Construction 2021 to present n/a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) and SPECIFIC ROLE Check if project performed with current firm The Hawaii Department of Transportation has inspected 19 bridges across the State that were identified as Scour Critical. Sea Engineering, Inc, has been contracted by KAI Hawaii in support of the Scour Critical Bridge project and will prepare, submit, and track the required permit applications for eight total bridges – Kapue, Weoweopilau, Maliko, Hakipuu, Kaalaea, Kaukonahau, and Paumalu. Cost: $534,995 Role: Project Manager b. (1) TITLE and LOCATION (City and State) (2) YEAR COMPLETED Mauna Kea Shoreline Restoration Project Kohala Coast, Hawaii Professional Services Construction 2018 to present n/a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) and SPECIFIC ROLE Check if project performed with current firm Sea Engineering has been contracted to conduct detailed oceanographic and shoreline investigations to support implementation of these improvements. Work tasks included: 1. Wave analysis including deepwater wave climate, extreme deepwater wave height, numerical wave modeling of wave transformation to shallow water, wave runup, analysis of a particular extreme wave event that resulted in backshore flooding, and sea level rise impacts. 2. Site investigations including beach profile measurements, beach topographic survey, sand sampling and analysis, and assessment of coastal processes. 3. Development of a dune restoration plan. Cost: $81,800 Role: Project Manager c. (1) TITLE and LOCATION (City and State) (2) YEAR COMPLETED Laupahoehoe Boat Ramp Repair Hawaii (Big Island) Professional Services Construction 2014 to present n/a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) and SPECIFIC ROLE Check if project performed with current firm Laupahoehoe Park contains a boat launch ramp facility and protective, 250-foot-long breakwater built in 1988. In the summer of 2009, the launch ramp was closed due to hazardous conditions, including erosion of deep grooves in the ramp surface, exposed reinforcing rebar, and loss of traction. Sea Engineering, Inc. (SEI) and Arnold T. Okubo & Associates were contracted by the County of Hawaii to investigate site conditions of the ramp, repairs to the ramp, prepare the necessary environmental and permit documents, and provide support through construction. Cost: 200,000 Role: Project Manager d. (1) TITLE and LOCATION (City and State) (2) YEAR COMPLETED Ka’anapali Beach Nourishment Ka’anapali, Maui Professional Services Construction 2014 to 2023 n/a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) and SPECIFIC ROLE Check if project performed with current firm Sea Engineering, Inc., was contracted by the Department of Land and Natural Resources to provide research, planning, permitting, and design services for the Ka’anapali Beach Restoration and Berm Enhancement project. The project consisted of restoring and enhancing the beaches along Ka’anapali shoreline to reduce or mitigate damage from erosion, and to increase available recreational beach. Cost: $ 792,200 Role: Project Manager, Coastal Scientist e. (1) TITLE and LOCATION (City and State) (2) YEAR COMPLETED Hawaii DOT Scour Critical Bridge Project – Bathymetry & Underwater Inspection and Permitting Hawaii Island, Kauai, & Oahu Professional Services Construction 2017 n/a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) and SPECIFIC ROLE Check if project performed with current firm The State Department of Transportation is assessing up to 27 bridges across the State for possible scour repairs. Sea Engineering completed bathymetry surveys and underwater inspections of 5 bridges, including Kolekole Bridge and Paheehee Bridge on Hawaii Island, Wailua River Bridge and Wailua River Plantation Bridge on Kauai, and the Waimea River Bridge on Oahu. SEI is also responsible for requiring permits for the repair work. Cost: $319,655 Role: Project Manger E. RESUME OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Marc Ericksen, Senior Executive Officer Project Manager a. TOTAL b. WITH FIRM 32 32 15. FIRM NAME and LOCATION (City and State) Sea Engineering, Inc. 16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) M.S. Coastal Geology B.S. Earth Sciences 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Member – ASCE, MTS, ACECH, SAME, WEDA, WEF, ASBPA Certified Hydrographer – National Society of Professional Surveyors/Hydrographic Society of America 19. RELEVANT PROJECTS a. (1) TITLE and LOCATION (City and State) (2) YEAR COMPLETED Laupahoehoe Biological Surveys and Environmental Support Laupahoehoe, Hawaii 2020 to present n/a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) and SPECIFIC ROLE Check if project performed with current firm Sea Engineering, Inc., has been contracted by Cardno GS for USACE to perform reconnaissance biological surveys of the marine environment within and adjacent to the Laupahoehoe Harbor breakwater. Work tasks include generating habitat maps, conduct quantitative surveys, develop a report presenting key findings and to provide qualitative information that characterizes presence/absence and abundance of fish, macroalgae, and non-coral macroinvertebrates species. Cost: $38,036 Role: Project Manager b. (1) TITLE and LOCATION (City and State) (2) YEAR COMPLETED Laupahoehoe Boat Ramp Repair Hawaii (Big Island) Professional Services Construction 2014 to present n/a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) and SPECIFIC ROLE Check if project performed with current firm Laupahoehoe Park contains a boat launch ramp facility and protective, 250-foot-long breakwater built in 1988. In the summer of 2009, the launch ramp was closed due to hazardous conditions, including erosion of deep grooves in the ramp surface, exposed reinforcing rebar, and loss of traction. Sea Engineering, Inc. (SEI) and Arnold T. Okubo & Associates were contracted by the County of Hawaii to investigate site conditions of the ramp, repairs to the ramp, prepare the necessary environmental and permit documents, and provide support through construction. Cost: 200,000 Role: Project Manager c. (1) TITLE and LOCATION (City and State) (2) YEAR COMPLETED Hilo WWTP Outfall Inspection Hilo, Hawaii Professional Services Construction 2018 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) and SPECIFIC ROLE Check if project performed with current firm Sea Engineering, Inc. (SEI) was contracted by the Hawaii County Wastewater Division to perform an underwater inspection of the Hilo Wastewater Treatment Plant (WWTP) outfall. SEI performed inspections on the outfall in 1987, 1990, 2001, 2005, 2011, and 2012 and again in September of 2018. The inspection was conducted by a five-man dive team using SCUBA and covered the submerged length of the outfall. Cost: $22,400 Role: Project Manager d. (1) TITLE and LOCATION (City and State) (2) YEAR COMPLETED Hawaii DOT Scour Critical Bridge Project – Bathymetry & Underwater Inspections, and Permitting Hawaii Island, Kauai, and Oahu 2016 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) and SPECIFIC ROLE Check if project performed with current firm The State Department of Transportation is assessing up to 27 bridges across the State for possible scour repairs. Sea Engineering completed bathymetry surveys and underwater inspections of 5 bridges, including Kolekole Bridge and Paheehee Bridge on Hawaii Island, Wailua River Bridge and Wailua River Plantation Bridge on Kauai, and the Waimea River Bridge on Oahu. SEI is also responsible for requiring permits for the repair work. Cost: $319,655 Role: Project Manager. e. (1) TITLE and LOCATION (City and State) (2) YEAR COMPLETED Post – Storm Hydrographic Survey of Hilo Harbor Island of Hawaii 2015 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) and SPECIFIC ROLE Check if project performed with current firm Tropical Storm Iselle hit the east side of Hawaii Island on August 7, 2014. Concerns that the Hilo Harbor channel would be compromised by sunken debris or other obstructions due to the effects of the storm, SEI was contracted by AECOM/USACOE to provide a hydrographic survey to verify that the channel was clear of obstacles. Two survey engineers completed the survey mid-morning the day after the storm, and the results were communicated to the USACOE_POH. The Harbor was immediately re-opened. Cost: $25,911 Role: Project Engineer/Hydrographer E. RESUME OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Scott P. Sullivan, Senior Coastal Engineer Project Manager/Coastal Engineer a. TOTAL b. WITH FIRM 50 50 15. FIRM NAME and LOCATION (City and State) Sea Engineering, Inc. 16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) M.S. Ocean Engineering B.S. Mechanical Engineering 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 19. RELEVANT PROJECTS a. (1) TITLE and LOCATION (City and State) (2) YEAR COMPLETED Pohoiki Boat Ramp Repair Relocation Study Puna District, Hawaii Professional Services Construction 2019 to present (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) and SPECIFIC ROLE Check if project performed with current firm Sea Engineering was contracted by the Department of Land & Natural Resources – DBOR to provide coastal engineering and environmental permitting services to determine the scope of work, environmental permitting requirements and cost estimates to repair or replace the Pohoiki Boat Ramp facility located along the southeast coast of Hawaii Island. Cost: $42,960 Role: Project Manager/Coastal Engineer b. (1) TITLE and LOCATION (City and State) (2) YEAR COMPLETED Waikoloa Beach Management Plan Waikoloa, Hawaii Professional Services Construction 2017 to present (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) and SPECIFIC ROLE Check if project performed with current firm During a tsunami in March 2011 the beach at Anahoomalu Bay was severely eroded, a 200-foot-wide breach was created through the beach into the fishpond depositing sand in the pond, and much of the fishpond rock wall which acted as a backstop for the beach was destroyed. Following completion of repairs, the beach has been relatively stable. To ensure the continued stability of their beach, and address concerns about sea level rise, the Waikoloa Land Company and Waikoloa Beach Association have contracted Sea Engineering to develop a long-term plan for management and maintenance of their valuable beach resource. Work includes beach change monitoring, coastal assessment and preliminary concept plan, offshore sand survey, development of a detailed beach maintenance/management plan, environmental assessment and permit application, and detailed design and construction documents. Cost: $12,560 Role: Project Manager c. (1) TITLE and LOCATION (City and State) (2) YEAR COMPLETED Waikiki Beach Restoration Honolulu, Hawaii Professional Services Construction 2016 to present (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) and SPECIFIC ROLE Check if project performed with current firm Sea Engineering, Inc., under contract to the State of Hawaii, Department of Land and Natural Resources in support of developing a more stable, resilient, and sustainable beach configuration in Waikiki. The general scope of work includes a feasibility study, environmental impact statement and conceptual design and permitting for beach improvements. Cost: $799,300 Role: Project Manager/Coastal Engineer d. (1) TITLE and LOCATION (City and State) (2) YEAR COMPLETED Anaehoomalu Bay Tsunami Damage Repair Anaehoomalu, Waikoloa, South Kohala, Hawaii Professional Services Construction 2016 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) and SPECIFIC ROLE Check if project performed with current firm Sea Engineering was contracted to obtain permits and do emergency repair work to Waikoloa Beach and the historical fishpond that was severely damaged by the 2011 tsunami. A sand-filled geotextile tube barrier was installed to close the gap in the beach. The emergency repair work was accomplished as an intermediate step to protect the fishpond while a long-term, permanent repair/restoration plan for the pond and beach can be developed. Permanent repairs include rebuilding the fishpond wall and restoration of the beach to its pre-tsunami condition. Cost: 235,000 Role: Project Manager e. (1) TITLE and LOCATION (City and State) (2) YEAR COMPLETED Keauhou Bay Offshore Mooring Design Keauhou Bay, North Shore, Island of Hawaii Professional Services Construction 2013 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) and SPECIFIC ROLE Check if project performed with current firm Sea Engineering was contracted by the Department of Land and Natural Resources (DLNR) to design offshore moorings for small boats in Keauhou Bay, Hawaii. The project required field site investigations, design of a gravity anchor system suitable for the rocky cobble substrate, design of a layout to maximize boat mooring capacity and Department of the Army permit acquisition. Cost: $70,000 Role: Project Manager E. RESUME OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Morgan Stephenson Coastal Engineer a. TOTAL b. WITH THIS FIRM 12 12 15. FIRM NAME and LOCATION (City and State) Sea Engineering, Inc. 16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) M.S. Coastal Engineering M.S. Civil Engineering B.S. Civil Engineering 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Member – ASCE 19. RELEVANT PROJECTS a. (1) TITLE and LOCATION (City and State) (2) YEAR COMPLETED Laupahoehoe Harbor Repair Design Laupahoehoe, Hawaii Professional Services Construction 2020 to present n/a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) and SPECIFIC ROLE Check if project performed with current firm In 2019, USACE retained the services of Nagamine Okawa Engineers, Inc. and Sea Engineering, Inc. (SEI) to evaluate the condition of the existing breakwater, develop and compare alternative repair plans, and develop conceptual repair plans and rough order of magnitude construction costs under the U.S. Army Corps of Engineers (USACE) Operations & Maintenance (O&M) program. In 2020, USACE retained the services of Cardno GS, Inc., and SEI to develop the repair plan through final design. Cost:$141,640 Role: Coastal Engineer b. (1) TITLE and LOCATION (City and State) (2) YEAR COMPLETED Pohoiki Boat Ramp Repair Relocation Study Puna, Hawaii Professional Services Construction 2019 to present n/a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) and SPECIFIC ROLE Check if project performed with current firm Sea Engineering was contracted by the Department of Land & Natural Resources – DBOR to provide coastal engineering and environmental permitting services to determine the scope of work, environmental permitting requirements, and cost estimates to repair and improve the Pohoiki Boat Ramp facility located along the southeast coast of Hawaii Island. Cost: $42,960 Role: Coastal Engineer c. (1) TITLE and LOCATION (City and State) (2) YEAR COMPLETED Kalepa Revetment and Seawall Repair Kalepa, Maui Professional Services Construction 2016 to present n/a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) and SPECIFIC ROLE Check if project performed with current firm Sea Engineering, Inc. (SEI) was contracted by the County of Maui, Department of Public Works to provide the design and permitting of shore and road protection along an approximate 450-ft reach of the Piilani Highway at the Kalepa headland. Work included: Topographic survey, planning and permitting, project permits, and project design. Design elements include the shore protection revetment, shore protection seawall/retaining wall, roadway improvements (asphalt paving and guardrail installation), and additional bank stabilization and possible shore protection. Cost: $461,872 Role: Coastal Engineer d. (1) TITLE and LOCATION (City and State) (2) YEAR COMPLETED Kalaeloa Harbor Channel & Basin Hydrographic Survey Kalaeloa Harbor, Oahu Professional Services Construction 2019 n/a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) and SPECIFIC ROLE Check if project performed with current firm Sea Engineering, Inc (SEI) was contracted by Control Point Surveying for HDOT Harbors Division to provide a Multibeam hydrographic Survey of the channel and basin areas of Kalaeloa Barbers Point Harbor. Project deliverables included an xyz file of the bathymetry data and a color-coded DEM. Cost: $20,300 Role: Coastal Engineer/Hydrographic Surveyor e. (1) TITLE and LOCATION (City and State) (2) YEAR COMPLETED Kahului Harbor Pier 2 High Spot Hydrographic Survey Kahului Harbor, Maui Professional Services Construction 2018 n/a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) and SPECIFIC ROLE Check if project performed with current firm Sea Engineering, Inc (SEI) was contracted by Control Point Surveying for HDOT Harbors Division to provide a hydrographic survey of a high spot in the Pier 2 vicinity of Kahului Harbor. Project deliverables included a xyz spreadsheet of bathymetry data. Cost: $26,200 Role: Coastal Engineer/Hydrographic Surveyor F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY 1 21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED Hilo Harbor Breakwater Improvements – Basis of Design Hilo, Hawaii PROFESSIONAL SERVICES CONSTRUCTION 2021 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL U.S. Army Corps of Engineers Ben Berridge – Cardno GS 808-476-0067 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The Hilo Harbor breakwater is an approximately two-mile-long rubble mound rock structure that protects inner Hilo Bay’s port facilities from direct wave exposure. Recent inspections of the Hilo breakwater have found areas of possible damage, mostly limited to local areas along the structure. Multiple visual inspections of the breakwater were conducted as part of the annual Project Condition Surveys (PCS), which were performed by a mix of USACE and Sea Engineering, Inc. (SEI) inspection teams in 2015, 2016, 2017, 2018, 2020, and 2021. Observed irregularities were found to include displaced armor units, attrition of supportive core stone (hollowing out of core), structure slumping, and excessive settling. As a result of the inspections, repairs have been recommended in numerous locations identified along the breakwater and vary in size from very localized to hundreds of feet in length. In support of the need for repairs to the breakwater, SEI has been contracted by Cardno GS and the U.S. Army corps of Engineers to develop, analyze, organize and summarize all necessary design conditions, that will constitute an updated Basis of Design (BoD). Cost: $381,189 (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Sea Engineering, Inc. Waimanalo, Hawaii Coastal/Ocean Engineering F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY 2 21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED Laupahoehoe Harbor Breakwater Repair Basis of Design Laupahoehoe, Hawaii PROFESSIONAL SERVICES CONSTRUCTION 2021 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL U.S. Army Corps of Engineers Cardno GS, Inc. – Ben Berridge 808-476-0067 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Laupahoehoe Harbor is located on the Hamakua Coast on the northeast side of the Island of Hawaii, approximately 25 miles north-northwest of Hilo. The facility includes a boat launch ramp and protective, 200-foot-long breakwater that was built in 1988. The usability of the boat ramp has decreased since the facility was built. The breakwater has lost effectiveness in reducing wave energy at the boat ramp over time, and there has been a decrease in the functionality of the harbor to less than the design usability of 70%. In 2019, USACE retained the services of Nagamine Okawa Engineers, Inc. and Sea Engineering, Inc. (SEI) to evaluate the condition of the existing breakwater, develop and compare alternative repair plans, and develop conceptual repair plans and rough order of magnitude construction costs under the U.S. Army Corps of Engineers (USACE) Operations & Maintenance (O&M) program. In 2020, USACE retained the services of Cardno GS, Inc., and SEI to develop the repair plan through final design. Cost: $141,640 (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Sea Engineering, Inc. Waimanalo, Hawaii Coastal/Ocean Engineering F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY 3 21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED Hawaii DOT Scour Critical Bridge Project – Bathymetry and Underwater Inspection Big Island, Kauai, Oahu, HI PROFESSIONAL SERVICES CONSTRUCTION 2015 to present n/a 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL State of Hawaii, DOT Kai Hawaii – Mike Hunneman 808-533-2210 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The State Department of Transportation is assessing up to 27 bridges across the State for possible scour repairs. In support of this effort, Sea Engineering completed bathymetry surveys and underwater inspections of 5 bridges, including Kolekole Bridge and Paheehee Bridge on Hawaii Island, Wailua River Bridge and Wailua River Plantation Bridge on Kauai, and the Waimea River Bridge on Oahu. The underwater inspections were conducted by a three-man dive team using surface supplied air. Sea Engineering was also responsible for obtaining all required permits for the proposed repair activities. Cost: 319,655 (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Sea Engineering, Inc. Waimanalo, Oahu, Hawaii Coastal/Ocean Engineering F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY 4 21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED Pohoiki Boat Ramp Repair Relocation Study Puna District, Island of Hawaii PROFESSIONAL SERVICES CONSTRUCTION 2019 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL State of Hawaii, DLNR Edward Underwood (DOBOR) 808-587-1966 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Hawaii Island’s Kilauea Volcano lower East Rift Zone began erupting on May 3, 2018, ultimately transforming the landscape of the Lower Puna district on the southeast coast of the island. When the eruption stopped in August 2018 lava had covered more than 13 square miles of residential, farm, industrial and natural lands, and created some 875 acres of new land extending into the ocean. At Pohoiki Bay, site of the State DLNR-Division of Boating and Ocean Recreation (DOBOR) Pohoiki Boat Ramp facility, large volumes of volcanic debris (rocks, cobbles and sand) began to fill in the bay and the vicinity of the boat ramp. By the spring of 2019 the bay was filled, and the boat ramp was land locked by a 200-foot-wide black sand and cobble beach. Sea Engineering was contracted by the Department of Land and Natural Resources, Division of Boating and Ocean Recreation, to prepare a concept screening study for re-opening the existing ramp facility or relocating it to an alternate site. The work involved coastal engineering to develop concepts for evaluation, and development of a rough-order-of-magnitude (ROM) construction cost estimate for the two concepts. Planning, design and permitting costs were also estimated. Cost: $43,960 (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Sea Engineering, Inc. Waimanalo, Hawaii Coastal/Ocean Engineering F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY 5 21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED Waikoloa Beach Management Plan Waikoloa, Hawaii PROFESSIONAL SERVICES CONSTRUCTION 2017 to present 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL Waikoloa Beach Association Scott Head 808-886-1000 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Waikoloa Beach Resort is located on the west coast of the island of Hawaii, and the southern portion encompasses the shoreline of Anaehoomalu Bay. During a tsunami in March 2011 the beach was severely eroded, a 200-foot-wide breach was created through the beach into the fishpond depositing sand in the pond, and much of the fishpond rock wall which acted as a backstop for the beach was destroyed. Following completion of repairs, the beach has been relatively stable, and the additional beach crest height has reduced wave overtopping. To ensure the continued stability of their beach, and address concerns about sea level rise, the Waikoloa Land Company and Waikoloa Beach Association have contracted Sea Engineering to develop a long-term plan for management and maintenance of their valuable beach resource. Work includes: Beach change monitoring, coastal assessment and preliminary concept plan, offshore sand survey, development of a detailed beach maintenance/management plan, environmental assessment and permit application, and detailed design and construction documents. Cost: $12,560 (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Sea Engineering, Inc. Waimanalo, Hawaii Coastal/Ocean Engineering F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY 6 21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED Mauna Kea Shoreline Restoration Project Kohala Coast, Hawaii PROFESSIONAL SERVICES CONSTRUCTION 2018 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL Hookuleana LLC – Prince Resorts Hawaii Peter Young 808-226-3567 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The Mauna Kea Resort on Hawaii Island is planning improvements to their shoreline and hotel. Sea Engineering has been contracted to conduct detailed oceanographic and shoreline investigations to support implementation of these improvements. Work tasks included: 1. Wave analyses including deepwater wave climate, extreme deepwater wave height, numerical wave modeling of wave transformation to shallow water, wave runup, analysis of a particular extreme wave event that resulted in backshore flooding, and sea level rise impacts. 2. Site investigations including beach profile measurements, beach topographic survey, sand sampling and analysis, and assessment of coastal processes. 3. Development of a dune restoration plan based on regional, typical dune morphologies. Sea level impacts were considered, and a design report prepared. Cost: $81,855 (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Sea Engineering, Inc. Waimanalo, Hawaii Coastal/Ocean Engineering F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY 7 21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED Project Conditions Survey Inspections of Federal Coastal Navigation Structures Hilo, Kawaihae, Laupahoehoe, Pohoiki PROFESSIONAL SERVICES CONSTRUCTION 2015, 2016, & 2017 n/a 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL USACE Mike Hunneman – KAI Hawaii 808-533-2210 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Sea Engineering was contracted to perform inspections of 24 federal coastal navigation structures (CNS) throughout Hawaii, Guam, Rota, and American Samoa operated and maintained by the U.S. Army Corps of Engineers (USACE), Pacific Ocean Division (POD), Honolulu District (POH). The purposes of the inspections were to verify the current condition of the structures, locate areas of concern on each structure, and identify and recommend future maintenance requirements. Specific work tasks included: 1) Categorizing each CNS into distinct reaches according to type of construction (rubble- mound, concrete armor, sheet pile, etc.); unique structural feature (head, trunk, root, etc.); and cross-sectional features (crest elevation, side slopes, toe protection, etc.). 2) Conducting inspections by physically walking the length of each CNS and inspecting areas including the crest, slopes, and toe of the structure. Damage was located with accurate GPS, described and photographed. 3) Preparing draft and final post-inspection reports that summarize the findings documented during the site inspection. 4) Preparing a plan-view map including the aerial imagery of the project site, stationing, structure components, CEPD benchmark, and the GPS location of each finding recorded during the site inspection. Cost: $131,994 (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Sea Engineering, Inc. Waimanalo, Hawaii Coastal/Ocean Engineering Kawaihae Small Boat Harbor F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY 8 21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED Anaehoomalu Bay Tsunami Damage Repair Anaehoomalu, Waikoloa, South Kohala, Hawaii PROFESSIONAL SERVICES CONSTRUCTION 2016 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL Waikoloa Beach Association Eleanor Mirikitani 808-886-1000 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Scope: On March 11, 2011, a tsunami generated by a massive earthquake in Japan struck the Hawaiian Islands and caused significant damage along portions of the State’s shoreline. Waikoloa Beach on the island of Hawaii was directly impacted, with inundation reaching the backshore historical fishpond, subsequently destroying the pond wall and creating a 200-foot-wide breach through the beach fronting the pond. Sea Engineering, Inc. was contracted to obtain permits and do emergency repair work to close the breach, and this work was completed in July of 2011. A sand-filled geotextile tube barrier was installed to close the gap in the beach. The emergency repair work was accomplished as an intermediate step to protect the fishpond while a long-term, permanent repair/restoration plan for the pond and beach can be developed. Permanent repairs would include rebuilding the fishpond wall and restoration of the beach to its pre-tsunami condition. Cost: $235,000 (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Sea Engineering, Inc. Waimanalo, Oahu, Hawaii Coastal/Ocean Engineering March 14, 2012 Shoreline The tsunami breach at Waikoloa Beach, as photographed 03/17/2011 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY 9 21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED Keauhou Bay Offshore Mooring Design Keauhou Bay, North Kona, Island of Hawaii PROFESSIONAL SERVICES CONSTRUCTION 2013 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL State of Hawaii – DLNR Eric Yuasa 808-327-9585 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Scope: Sea Engineering Inc., was contracted by the State of Hawaii Division of Boating and Ocean Recreation (DOBOR), DLNR to redesign the mooring layout and mooring assembly design for Keauhou Bay, Hawaii. The purpose is to more effectively accommodate vessels and improve mooring assembly design and vessel and user safety. The work included the following: Detailed site investigation to map existing moorings and bottom composition Design of a gravity mooring anchor system suitable for the variable, rocky, rubbly substrate in the bay Design of a mooring layout that maximizes vessel capacity in a safe manner Acquisition of a Department of the Army permit for the mooring buoys In total, the proposed moorings will accommodate 14 vessels ranging from 30 to 60 feet in length. Mooring locations have been selected to avoid areas with high benthic marine life as far as practicable. The mooring plan calls for six 30ft vessels, three 40ft vessels, three 50ft vessels, and two 60ft vessels. Cost: $50,700 (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Sea Engineering, Inc. Waimanalo, Oahu, Hawaii Coastal/Ocean Engineering F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY 10 21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED Hilo WWTP Outfall Inspection Hilo, Hawaii PROFESSIONAL SERVICES CONSTRUCTION 2018, 2012, 2011 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL County of Hawaii Wastewater Curtis Bailey 808-961-8338 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Sea Engineering, Inc. (SEI) was contracted by the Hawaii County Wastewater Division to perform an underwater inspection of the Hilo Wastewater Treatment Plant (WWTP) outfall. The purpose of the inspection was to satisfy requirements of the U.S. Environmental Protection Agency Administrative Order. SEI performed inspections on the outfall in 1987, 1990, 2001, 2005, 2011, 2012, and again in September of 2018. The inspection was conducted by a five-man dive team using SCUBA and covered the submerged length of the outfall. Stationing was established by dropping orange plastic markers along the outfall and video was recorded along the entire length of the outfall. In order to help identify any leaks from the pipe, Bright Dyes® fluorescent yellow/green tracer dye was injected into the pipe through a manhole located on land near the entry point of the pipe into the ocean. No leaks were detected along the length of the outfall. SEI is scheduled to perform this upcoming inspection in 2023. Cost: $48,995 (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Sea Engineering, Inc. Waimanalo, Hawaii Coastal/Ocean Engineering F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY 11 21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED Post-Storm Hydrographic Survey of Hilo Harbor, Island of Hawaii Hilo, Hawaii PROFESSIONAL SERVICES CONSTRUCTION 2015 n/a 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL USACE-POH/AECOM Jerry Matsuda (AECOM) 808-356-5370 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Scope: Tropical Storm Iselle hit the east side of Hawaii Island at approximately 11:00 pm on August 7, 2014, with near hurricane force winds of 70 mph. Concerns that the Hilo Harbor channel would be compromised by sunken debris or other obstructions due to the effects of the storm prompted harbor closure until a hydrographic survey could be completed to verify that the channel was clear of obstacles. Sea Engineering, Inc. (SEI) was notified at approximately noon on August 7, 2014, that a survey would be necessary the following day at Hilo Harbor. Two survey engineers from Sea Engineering with equipment flew to Hilo mid- morning on August 8 to conduct the survey. The survey was successfully completed, and results were communicated to the USACOE-POH at 7:00 pm on August 8, 2014. The Harbor was immediately re-opened. Scan sonar mosaic of Federal Project Area, Hilo Harbor Cost: $15,000 (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Sea Engineering, Inc. Waimanalo, Oahu, Hawaii Coastal/Ocean Engineering F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY 12 21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED Laupahoehoe Boat Ramp Repair Hawaii (Big Island) PROFESSIONAL SERVICES CONSTRUCTION 2010 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL County of Hawaii Dept. of Parks and Recreation James Komata (808) 961-8531 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Scope: Laupahoehoe Park is located on the Hamakua Coast on the northeast side of the Island of Hawaii, approximately 25 miles north-northwest of Hilo. The park contains a boat launch ramp facility and protective 250-foot-long breakwater built in 1988. The site is exposed to rough trade wind seas and north swells, and the condition of the boat ramp has deteriorated. In the summer of 2009, the launch ramp was closed due to hazardous conditions, including erosion of deep grooves in the ramp surface, exposed reinforcing rebar, and loss of traction. Sea Engineering, Inc. (SEI) and Arnold T. Okubo & Associates were contracted by the County of Hawaii to investigate site conditions of the ramp, design repairs to the ramp, prepare the necessary environmental and permit documents, and provide engineering support through construction. Cost: $200,000 (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Sea Engineering, Inc. Waimanalo, Oahu, Hawaii Coastal/Ocean Engineering G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 26. NAMES OF KEY PERSONNEL (From Section E, Block 12) 27. ROLE IN THIS CONTRACT (From Section E, Block 13) 28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in “Example Projects Key” section below before completing table. Place “X” under project key number for participation in same or similar role.) 1 2 3 4 5 6 7 8 9 10 11 12 David Smith, P. E. Coastal Engineer X X X X X Chris Goody, P.E. Ocean Engineer X X X X Chris Conger Coastal Scientist X X X X X X Marc Ericksen Project Manger X X X X Scott Sullivan Project Manager X X X X Morgan Stephenson Ocean Engineer X X X X X 29. EXAMPLE PROJECTS KEY NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) 1 Hilo Harbor Breakwater Improvements – Basis of Design 2 Laupahoehoe Harbor Breakwater Repair Basis of Design 3 Hawaii DOT Scour Critical Bridge Project 4 Pohoiki Boat Ramp Repair Relocation 5 Waikoloa Beach Management Plan 6 Mauna Kea Shoreline Restoration Project 7 Project Conditions Survey Inspections of Federal Coastal Navigation Structures 8 Anaehoomalu Bay Tsunami Damage Repair 9 Keauhou Bay Offshore Mooring Design 10 Hilo WWTP Outfall Inspection 11 Post-Storm Hydrographic Survey Hilo Harbor 12 Laupahoehoe Boat Ramp Repair H. ADDITIONAL INFORMATION 30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS REQUIRED. A. SPECIALIZED EXPERIENCE OF THE FIRM Sea Engineering, Inc. (SEI) specializes in coastal and ocean engineering, and marine environmental services. Experienced staff is available to undertake a wide range of projects. With experience in Hawaii, California and throughout the Pacific Basin, SEI is able to respond rapidly to project needs, drawing on an in-house database and the knowledge gained from extensive work in the different island groups. Awards: 2022 ASBPA Robert L. Weigel Award – Iroquois Point Beach Nourishment and Stabilization 2022 ASBPA Best Restored Beach – Waikiki Beach Maintenance 2021 ASCE Project of the Year, Region 8. Less than $10M Royal Hawaiian Groin Replacement 2020 ASCE Best Special Project for Royal Hawaiian Groin Replacement & Engineering Services 2020 GCA Build Hawaii Awards – MERIT AWARD – Haleiwa Beach Park Emergency Stabilization 2020 GCA Build Hawaii – Grand Award for U.S.S Arizona Memorial & Floating Dock Damage Repairs 2019 ASCE Best Research Project - Saipan Lagoon Hydrodynamic Study 2018 ASCE Hawaii Best Large Project Award – Governor Eloy S. Enos Peace Park, Puerto Rico, Saipan,CNMI 2014 National Best Restored Beach Award recognized by the American Shore and Beach Preservation Association. 2012 ASCE Best Special Project Award for Waikiki Beach Restoration 2012 Outstanding ACAS rating received from TEC, Inc & NAVFAC Pacific for Monitoring of Existing Turbidity at the CVN Capable Berth Project, Apra Harbor, Guam. 2011 Outstanding ACAS rating received from TEC, Inc. & NAVFAC Pacific for the Oceanographic/Marine Ecological Assessment, Apra Harbor, Guam. 2009 ASCE Hawaii Best Small Project Award – Analysis and Prediction of Waves and Surge in Kahului Harbor 2008 ASCE Hawaii Outstanding Civil Engineering Achievement Award for the Design of Kaumalapau Harbor Breakwater Modification 2004 ASCE Outstanding Civil Engineering Achievement Award for the Sewer Outfall Extension at Fort Kamehameha, Pearl Harbor, Oahu, Hawaii. Coastal Engineering: Marina and harbor design; coastal planning; beach nourishment design; dredging planning and analysis; design and evaluation of coastal structures for erosion control, shore protection and navigation; storm inundation analyses; beach erosion and coastal processes studies. Sea Level Rise (SLR) analysis and adaptation measures. Numerical Modeling: State-of-the-science 2- and 3-dimensional hydrodynamic and transport modeling for applications including sediment transport; contaminant transport; water quality; beach response; and discharges into marine and freshwater environments. Modeling of deep-water to nearshore wave transformation using both 2- D steady-state models and 3-D fully non-linear Boussinesq models. High resolution computational fluid dynamics (CFD). Ocean Engineering: Determination of engineering oceanographic design criteria; storm wave propagation and wave-driven circulation modeling; armor design; measurement and analysis of waves, tides currents and other parameters for planning and design; submarine pipeline and cable route selection and conceptual design. Marine Environmental: Preparation of Environmental Assessments and Impact Statements; preparation of Federal, State and City permit applications for marine projects; measurement and analysis of sediment and contaminant transport and water quality; turbidity analysis; water quality monitoring; analysis and assessment of the impact of coastal facilities on the marine environment; oceanographic studies; search and recovery of hazardous materials. SLR modeling and potential impact studies. Marine Construction Services: Fully equipped commercial diving locker to provide diving services in support of the construction and repair of pipelines, wharves, cable landings, breakwaters, offshore oil moorings, and other coastal and offshore marine facilities. Repair and construction of waterfront structures, including wharves, piers, intakes, small boat ramps and other structures. H. ADDITIONAL INFORMATION Hydrographic and Geophysical Surveys: Fully automated hydrographic and geophysical survey capability including bathymetry, side scan sonar, subbottom profiling, UXO detection, and ROV surveys. Surveys tasks have included dredge monitoring and payment, dredge design, cable route reconnaissance and selection, environmental assessment, bottom mapping, object location, and sand deposit mapping. Logistical Support: Support for oceanographic or research projects includes a fully equipped shop on the Honolulu Harbor waterfront and vessels ranging from 17 to 84 feet long. b. PROFESSIONAL QUALIFICATIONS OF STAFF TO BE ASSIGNED TO THE PROJECTS SEI principals, engineers and scientists have graduate level degrees in ocean engineering and coastal geology. The majority of employees have worked for the firm for over 10 years. Senior level managers and engineers have worked for SEI for over 20 years. Resumes of key personnel are included in this submittal. c. PAST PERFORMANCE ON SIMILAR PROJECTS SEI has completed numerous contracts for the State of Hawaii and on the Big Island. Sea Engineering. Inc. projects are completed within budget, on schedule and with the highest attention to quality control. Representative projects SEI has worked on in Hawaii County as well for the State of Hawaii, include the following projects: Project Date Firm Hilo WWTP Outfall Inspection 2018 & 2023 County of Hawaii, Wastewater Division Lahaina Small Boat Harbor and Mala Boat Ramp Maintenance Dredging 2023 State of Hawaii, DLNR Kona Village Resort Beach Restoration 2021 to present Kona Village Resort Hilo Harbor Breakwater Improvements – Basis of Design 2020 to present USACE, Cardno GS Laupahoehoe Marine Biological Surveys & Environmental support 2020 to present USACE, Cardno GS Laupahoehoe Harbor Repair Design 2020 to present USACE, Cardno GS Kalaeloa Fuel Pier Development 2018 to present State of Hawaii DOT, Mitsunaga & Associates Waikiki Beach Restoration 2017 to present State of Hawaii, DLNR Hawaii DOT Scour Critical Bridge Project – Bathymetry & Underwater Inspections, and Permitting 2015 to present State of Hawaii DOT, KAI Hawaii Royal Hawaiian Groin Replacement 2020 State of Hawaii, DLNR Waikoloa Beach Management Plan 2020 Waikoloa Beach Association Harbors Oahu District Baseyard Improvements 2019 State of Hawaii DOT, RM Towill Corp Pier 28-33 Hydrographic Survey Honolulu Harbor 2019 State of Hawaii DOT, Westin Solutions Pohoiki Boat Ramp Repair Relocation 2019 State of Hawaii, DOBOR Hilo Ocean Outfall Inspection 2018 County of Hawaii Laupahoehoe Harbor Breakwater Repair 2018 USCOE, Nagamine Okawa, Engineers, Mauana Kea Shoreline Restoration Project 2018 Hookuleana LLC, Prince Resorts Hawaii Kahului Harbor Pier 2 High Spot Hydrographic Survey 2018 State of Hawaii DOT, Control Point Surveying Anaehoomalu Bay Tsunami Damage Repair 2016 Waikoloa Beach Association Post – Storm Hydrographic Survey of Hilo Harbor 2015 USACE, AECOM H. ADDITIONAL INFORMATION Keahou Bay Offshore Mooring Design 2013 State of Hawaii, DLNR d. CAPACITY TO ACCOMPLISH WORK SEI has a proven capacity for accomplishing work on time and on budget. We have participated in numerous design projects which have been successfully constructed. We have an experienced staff available to undertake a wide variety of coastal-related engineering projects, and our projected workload will permit timely accomplishment of future work. e. KNOWLEDGE OF THE LOCALITY SEI is located in Honolulu, Hawaii. We have performed engineering studies throughout the Pacific Basin, including all the main Hawaiian Islands, Guam, the Northern Marianas, American Samoa, the Marshall Islands, Okinawa, the Federated States of Micronesia, the Republic of Palau, as well as Alaska and California. SEI has considerable “local” knowledge for the Pacific region, and an extensive in-house data base for the Pacific area. Sea Engineering, Inc. is a Small Business - 541330 (Engineering Services, Marine Engineering). I. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. 31. SIGNATURE 32. DATE June 21, 2023 41. NAME and TITLE (Print or type) Chris Conger, Vice President ARCHITECT-ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (if any) County of Hawaii FY 2023-2024 PART II – GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM (OR BRANCH OFFICE) NAME 3. YEAR ESTABLISHED 4. DUNS NUMBER SEA ENGINEERING, INC. 1973 DUNS#: 066273905 CAGE: 0H711 2b. STREET 5. OWNERSHIP 41-305 Kalanianaole Hwy, Makai Research Pier 2c. CITY 2d. STATE 2e. ZIP CODE a. TYPE Waimanalo HI 96795 Corporation 6a. POINT OF CONTACT NAME and TITLE b. SMALL BUSINESS STATUS Chris Conger, Vice President Small Business - Engineering Services, Marine Engineering 6b. TELEPHONE NUMBER 6d. E-MAIL ADDRESS 7. NAME OF FIRM (If block 2a is a branch office) (808) 259-7966 cconger@seaengineering.com 8a. FORMER FIRM NAMES(S) (If any) N/A 8b. YR. ESTABLISHED 1973 8c. DUNS NUMBER DUNS#: 066273905 CAGE: 0H711 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM’S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Function Code b. Discipline c. No. of Employees a. Profile Code b. Experience c. Revenue Index No. (see below) (1) Firm (2) Branch 01 Administrative 4 1 B02 Bridges 4 12 Civil Engineer 6 3 C05 Coastal Engineering 6 30 Geologist 3 3 D04 Design-Build 5 - Ocean Engineer 5 2 E08 EIS 5 - Coastal Engineer 7 7 H01 Harbors, jetties, etc. 6 44 Oceanographer 1 1 H13 Hydrographic Surveying 4 23 Environmental Engineer 1 0 O02 Oceanographic Engineering 4 R04 Marinas 1 R11 Rivers, Canals, Waterways 1 Total 24 14 S10 Surveying, mapping 2 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS PROFESSIONAL SERVICES REVENUE INDEX NUMBER (Insert revenue index number shown at right) 1. Less than $100,000 2. $100,000 to less than $250,000 3. $250,000 to less than $500,000 4. $500,000 to less than $1 million 5. $1 million to less than $2 million 6. $2 million to less than $5 million 7. $5 million to less than $10 million 8. $10 million to less than $25 million 9. $25 million to less than $50 million 10. $50 million or greater a. Federal Work 6 b. Non-Federal Work 6 c. Total Work 6 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. a. SIGNATURE b. DATE June 21, 2023 c. NAME OF AUTHORIZED (Print or type) d. TITLE (Print or type) Chris Conger Vice-President \ Sea Engineering, Inc. Makai Research Pier 41-305 Kalanianaole Hwy Waimanalo, Hawaii 96795-1820 Phone: (808) 259-7966 FAX (808) 259-8143 E-mail: sei@seaengineering.com Website: www.seaengineering.com SEI CORPORATE REFERENCES Professional Services (July 2023 to June 2024) Ms. Elaine Morisato, Civil Engineer Department of Design & Construction 650 So. King St., 11th Floor Honolulu, HI 96813 Mr. Ross Tanimoto, Deputy Director City & County of Honolulu, Dept. of Environmental Services 1000 Uluohia St., Suite 308 Kapolei, Hawaii 96707 Mr. Mike Hunneman, Vice President KAI Hawaii 50 S. Beretania Street, #C-119C Honolulu, HI 96813 Phone: (808) 533-2210 Mr. Rick Heltzel, President Healy Tibbitts Builders, Inc. 99-994 lwaena Street, #A Aiea, Hawaii 96701 Phone: (808) 487-3664 Mr. Michael Cain, Administrator Department of Land & Natural Resources Office of Conservation and Coastal Lands Kalanimoku Building 1151 Punchbowl St., Rm 131 Honolulu, Hawaii 96813 Phone: (808) 587-0377