HomeMy WebLinkAboutPL-INT-2023-005433 06.21.23 SEA ENGINEERING INC SOQ CAT PL.4, PL.5 Araujo, Jaclyn
From: Brandie Markos <bmarkos@seaengineering.com>
Sent: Wednesday, June 21, 2023 2:00 PM
To: Planning Internet Mail
Subject: Sea Engineering, Inc - Professional Services Submittal FY 2023-2024
Attachments: Sea Engineering Professional Services 2023-2024.pdf
Aloha,
Please find attached our submittal for professional services FY2023—2024. If you should have any questions or require
additional information, please let me know.
Mahalo,
Brandie Markos
Sea Engineering, Inc. I http://www.seaengineering.com
A:41-305 Kalanianaole Hwy, Makai Research Pier, Waimanalo, HI 96795
O: 808.259.7966 ext. 200 1 D: 808.460.3430 1 M: 808.372.6545 1 E:bmarkos@seaengineering.com
1
E Sea Engineering, Inc.
Makai Research Pier • Waimanalo, Hawaii 96795-1820 • E-mail:sei@seaengineering.com
Phone: (808) 259-7966/FAX(808) 259-8143 • Website:www.seaengineering.com
June 21, 2023
Mr. Zendo Kern, Planning Director
Planning Department, County of Hawai'i
101 Pauahi Street, Suite 3
Hilo, Hawaii 96720
Subject: Professional Services, Fiscal Year 2023-2024
Dear Mr. Kern:
This is in response to your solicitation for professional services dated June 1, 2023. We would be
pleased to provide professional engineering services to the County of Hawaii, Planning Department
during Fiscal Year 2023-2024 (July 1, 2023 to June 30, 2024).
Sea Engineering, Inc. (SEI) specializes in coastal engineering,marine and coastal environmental
assessments,hydrographic and geophysical surveys, underwater inspection, marine construction, and
boat and diving services.
• We are specifically interested in providing services to your department in the following areas:
PLA. Community Planning—(Community/Regional Plans, General Plan, Climate Adaptation)
-Coastal/Marine climate issues such as Sea Level Rise Vulnerability(SLR)
PL.5. Community Planning—(Environmental Planning,Environmental Assessments,
Environmental Impact Statements)—Coastal/Marine
A Federal Standard Form SF330 is enclosed presenting our experience and qualifications along with
a copy of the State of Hawaii, Professional License card for each licensed person referenced in our
submittal.
In addition, our qualifications are also available at our website: www.seaen2ineeerin2.com.
We look forward to possibly assisting the County of Hawaii, Planning Department during the coming
fiscal year. Should you desire any additional information please contact me at 259-7966 or by email
at mericksen@seaengineering.com.
Very trulyyours,
Chris Conger
Vice President
ARCHITECT— ENGINEER QUALIFICATIONS
PART I—CONTRACT-SPECIFIC QUALIFICATIONS
A. CONTRACT INFORMATION
1. TITLE AND LOCATION(City and State)
County of Hawaii
Notice to Providers of Professional Services
2. PUBLIC NOTICE DATE 3. SOLICITATION OR PROJECT NUMBER
June 1,2023 Fiscal Year 2023-2024
(July 1,2023 to June 30,2024
B. ARCHITECT-ENGINEER POINT OF CONTACT
4. NAME AND TITLE
Chris Conger,Vice President T _
5. NAME OF FIRM C
Sea Engineering,Inc. _____J
6. TELEPHONE NUMBER 7. FAX NUMBER 8. E-MAIL ADDRESS
808 259-7966 Icon er seaen ineerin .corn
C. PROPOSED TEAM
(Complete this section for the prime contractor and all key subcontractors.)
Check
a�
`o
a r 14. ROLE IN THIS
E 12. FIRM NAME 13. ADDRESS CONTRACT
a a o
a. Makai Research Pier Coastal and Ocean
Sea Engineering,Inc. 41-305 Kalanianaole Hwy Engineering
Waimanalo,HI 96795
b.
Sea Engineering, Inc. Marine Construction,
®CHECK IF BRANCH OFFICE 863 N.Nimitz Hwy Boat and Diving
Honolulu,HI 96817 Services
C.
❑CHECK IF BRANCH OFFICE
d.
❑CHECK IF BRANCH OFFICE
e.
❑CHECK IF BRANCH OFFICE
f.
❑CHECK IF BRANCH OFFICE
9
❑CHECK IF BRANCH OFFICE
h.
❑CHECK IF BRANCH OFFICE
i.
❑CHECK IF BRANCH OFFICE
D. ORGANIZATIONAL CHART OF PROPOSED TEAM ❑ (Attached)
STANDARD FORM 330(6/2004)
E. RESUME OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
a. TOTAL I b. WITH THIS FIRM
David A.Smith,Ph.D.,P.E. Coastal Engineer 24 15
15. FIRM NAME and LOCATION(City and State
Sea Engineering,Inc.
16. EDUCATION(Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION State and Discipline)
Ph.D.,University of Hawaii-Manoa,Ocean Engineering Hawaii Professional Engineer
M.S.,University of Hawaii-Manoa,Ocean Engineering Guam Professional Engineer
B.S.,University of Hawaii-Manoa,Mathematics California Professional Engineer
18. OTHER PROFESSIONAL QUALIFICATIONS Publications,Organizations, Training,Awards,etc.
Member—ASCE PADI Open Water Diver Certification,Nitrox Certification
19. RELEVANT PROJECTS
1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
Laupahoehoc Harbor Repair Design Professional Services Construction
Lau ahoehoe,Hawaii 2020 to present
3 BRIEF DESCRIPTION Brief scope,size,cost,etc. and SPECIFIC ROLE ®Check if promect performed with current firm
In 2019,USACE retained the services of Nagamine Okawa Engineers,Inc. and Sea Engineering,Inc. (SEI)to evaluate the
a. condition of the existing breakwater,develop and compare alternative repair plans,and develop conceptual repair plans and
rough order of magnitude construction costs under the U.S.Army Corps of Engineers(USACE)Operations&Maintenance
(O&M)program.In 2020,USACE retained the services of Cardno GS,Inc.,and SEI to develop the repair plan through final
design.
Cost:$141,640 Role:Project Manager/Coastal Engineer
1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
Hilo Harbor Breakwater Repair
2020 to present n/a
Hilo,Hawaii
b 3 BRIEF DESCRIPTION Brief scope,size,cost,etc. and SPECIFIC ROLE ®Check if project performed with current firm
Sea Engineering,Inc.(SEI)has been contracted by Cardno GS and the U.S. Corps of Engineers(USCOE)to investigate the
existing breakwater condition,and to develop alternative plans to repair the breakwater.
Cost: $93,888 Role:Project Manager
1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
Ala Moana Park Sand Replenishment and EIS Professional Services Construction
Ala Moana Beach Park,Oahu 2017 to present I n/a
3 BRIEF DESCRIPTION Brief scope,size,cost,etc. and SPECIFIC ROLE ®Check if project performed with current firm
Sea Engineering, Inc., was contracted by Belt Collins to support the City and County of Honolulu efforts to improve Ala
C. Moana Beach Park. Work tasks include sand source investigations, determination of sand recovery and transport
methodology, investigation of existing beach conditions and characteristics, analysis of coastal engineering design
parameters,design of the beach nourishment plan,water quality assessments,EIS input and preparation of necessary Federal,
State and City and County permit applications.
Cost: $78,200 Role:Coastal Engineer
1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
Waikoloa Beach Management Plan Professional Services Construction
Waikoloa,Hawaii 2017 to preesnt n/a
3 BRIEF DESCRIPTION Brief scope,size,cost,etc. and SPECIFIC ROLE ®Check if project performed with current firm
During a tsunami in March 2011 the beach at Anahoomalu Bay was severely eroded.A 200-foot-wide breach was created
through the beach and into the fishpond. Much of the fishpond rock wall which acted as a backstop for the beach was
d. destroyed. Following completion of repairs,the beach has been relatively stable. To ensure the continued stability of their
beach, and address concerns about sea level rise, the Waikoloa Land Company and Waikoloa Beach Association have
contracted Sea Engineering to develop a long-term plan for management and maintenance. Work includes Beach change
monitoring, coastal assessment and preliminary concept plan, offshore sand survey, development of a detailed beach
maintenance/management plan, environmental assessment and permit application, and detailed design and construction
documents.
Cost: $36,760 Role:Coastal Engineer
1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
Federal Coastal Navigation Structure Inspections Professional Services Construction
Hawaiian Islands,Guam,CNMI,&American Samoa 2015,2016,2017 1 a
3 BRIEF DESCRIPTION Brief scope,size,cost,etc. and SPECIFIC ROLE ®Check if project performed with current firm
Sea Engineering was contracted to perform inspections of 24 federal coastal navigation structures(CNS)throughout Hawaii,
e.. Guam,Rota,and American Samoa operated and maintained by the U.S.Army Corps of Engineers(USACE),Pacific Ocean
Division(POD), including Hilo,Kaiwaihae, Laupahoehoe,Pohoiki harbors. The purposes of the inspections were to verify
the current condition of the structures, locate areas of concern on each structure, and identify and recommend future
maintenance requirements.
Client:USACE,KAI Hawaii Role:Project Manager,Coastal/Design Engineer
E. RESUME OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
Christopher Goody,P.E. Coastal/Ocean Engineer a. TOTAL b. WITH FIRM
26 15
15. FIRM NAME and LOCATION(City and State
Sea Engineering,Inc.
16. EDUCATION(Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION State and Discipline)
MS,Ocean Engineering,University of Hawaii at Manoa Hawaii Professional Engineer(Civil)
BS,Ocean Engineering,Florida Institute of Technolo
18. OTHER PROFESSIONAL QUALIFICATIONS Publications,Or anizations, Training,Awards,etc.
American Society of Civil Engineers,Marine Technology Society
SCUBA certified
19. RELEVANT PROJECTS
1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
Hilo Wastewater Treatment Plant Outfall Inspection Professional Services Construction
Hilo,Hawaii 2023 n/a
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
Sea Engineering, Inc (SEI), has been contracted by the County of Hawaii Wastewater Division to inspect the Hilo
a. Wastewater Treatment Plant(WWTP)Ocean Outfall as part of the requirement in the facility's National Pollutant Discharge
Elimination System permit(NPDES Permit No.HI 00213 77). Work tasks include a visual and dye inspection,and a color
video documenting the inspection,a written report summarizing the results of the inspection noting all identified defects and
their location.
Cost: $25,995 Role:Ocean Engineer
1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
Kona Village Resort Beach Restoration
Kailua-Kona,Hawaii 2021 to present I n/a
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
b. Sea Engineering Inc has been contracted by Kenney Wilson and the Kona Village Resort to develop a sand pushing plan for
the beach fronting the Kona Village Resort to enhance its recreational use for visitors and the general public. Work tasks
include site investigations, beach profile survey, beach sand sampling and laboratory analysis, develop sand pushing
conceptual designs,and preparation and submittal of a SPA authorization to DLNR.
Cost: $30,000 Role:Project Manager/Ocean Engineer
1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
Laupahoehoc Harbor Repair Design Professional Services Construction
Lau ahoehoe,Hawaii 2020 to present n/a
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
In 2019,USACE retained the services of Nagamine Okawa Engineers,Inc. and Sea Engineering,Inc. (SEI)to evaluate the
C. condition of the existing breakwater,develop and compare alternative repair plans,and develop conceptual repair plans and
rough order of magnitude construction costs under the U.S.Army Corps of Engineers(USACE)Operations&Maintenance
(O&M)program.In 2020,USACE retained the services of Cardno GS,Inc.,and SEI to develop the repair plan through final
design.
Cost:$141,640 Role:Ocean Engineer
1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
Hilo Harbor Breakwater Repair Professional Services Construction
Hilo,Hawaii 2019 to present n/a
d (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
Sea Engineering,Inc.(SEI)has been contracted by Cardno GS and the U.S.Corps of Engineers(USCOE)to investigate the
existing breakwater condition,and to develop alternative plans to repair the breakwater.
Cost: $93,888 Role:Ocean Engineer
1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
Keauhou Bay Offshore Mooring Design Professional Services Construction
Keauhou Bay,North Shore,Island of Hawaii 2013 n/a
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
e. Sea Engineering was contracted by the Department of Land and Natural Resources(DLNR)to design offshore moorings for
small boats in Keauhou Bay,Hawaii.The project required field site investigations,design of a gravity anchor system suitable
for the rocky cobble substrate, design of a layout to maximize boat mooring capacity and Department of the Army permit
acquisition.
Cost: $70,000 Role: Ocean Engineer
E. RESUME OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
Christopher L.Conger,Vice President Project Manager/Coastal Scientist a. TOTAL b. WITH THIS FIRM18 12
15. FIRM NAME and LOCATION(City and State
Sea Engineering,Inc.
16. EDUCATION(Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION State and Discipline)
M.Sc.,University of Hawaii-Manoa,Coastal Geology
B.S.,University of Hawaii-Manoa,Geology and Geophysics
18. OTHER PROFESSIONAL QUALIFICATIONS Publications,Organizations, Training,Awards,etc.
100 ton near shore Captains License,Navy Second Class Diver Certification,Commercial Diver Certification ADC Supervisor)
19. RELEVANT PROJECTS
1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
Scour Critical Bridges—Phase III Professional Services Construction
Hawaii,Kauai,Maui,and Oahu 2021 to present n/a
3 BRIEF DESCRIPTION Brief scope,size,cost,etc. and SPECIFIC ROLE ®Check if project performed with current firm
a. The Hawaii Department of Transportation has inspected 19 bridges across the State that were identified as Scour Critical. Sea
Engineering,Inc,has been contracted by KAI Hawaii in support of the Scour Critical Bridge project and will prepare,submit,
and track the required permit applications for eight total bridges—Kapue,Weoweopilau,Maliko,Hakipuu,Kaalaea,
Kaukonahau,and Paumalu.
Cost: $534,995 Role:Project Manager
1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
Mauna Kea Shoreline Restoration Project Professional Services Construction
Kohala Coast,Hawaii 2018 to present n/a
3 BRIEF DESCRIPTION Brief scope,size,cost,etc. and SPECIFIC ROLE ®Check if project performed with current firm
Sea Engineering has been contracted to conduct detailed oceanographic and shoreline investigations to support implementation
b. of these improvements. Work tasks included: 1. Wave analysis including deepwater wave climate, extreme deepwater wave
height,numerical wave modeling of wave transformation to shallow water,wave runup,analysis of a particular extreme wave
event that resulted in backshore flooding,and sea level rise impacts.2.Site investigations including beach profile measurements,
beach topographic survey, sand sampling and analysis, and assessment of coastal processes. 3. Development of a dune
restoration plan.
Cost: $81,800 Role:Project Manager
1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
Laupahoehoe Boat Ramp Repair Professional Services Construction
Hawaii(Big Island) 2014 to present n/a
3 BRIEF DESCRIPTION Brief scope,size,cost,etc. and SPECIFIC ROLE ®Check if project performed with current firm
Laupahoehoe Park contains a boat launch ramp facility and protective,250-foot-long breakwater built in 1988.In the summer
C. of 2009,the launch ramp was closed due to hazardous conditions,including erosion of deep grooves in the ramp surface,exposed
reinforcing rebar,and loss of traction. Sea Engineering,Inc.(SEI)and Arnold T.Okubo&Associates were contracted by the
County of Hawaii to investigate site conditions of the ramp,repairs to the ramp,prepare the necessary environmental and permit
documents,and provide support through construction.
Cost:200,000 Role:Project Manager
(1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
Ka'anapali Beach Nourishment Professional Services Construction
—Ka'anapali,Maui 2014 to 2023 n/a
3 BRIEF DESCRIPTION Brief scope,size,cost,etc. and SPECIFIC ROLE ®Check if promect performed with current firm
d. Sea Engineering, Inc., was contracted by the Department of Land and Natural Resources to provide research, planning,
permitting,and design services for the Ka'anapali Beach Restoration and Berm Enhancement project. The project consisted of
restoring and enhancing the beaches along Ka'anapali shoreline to reduce or mitigate damage from erosion, and to increase
available recreational beach.
Cost: $792,200 Role:Project Manager,Coastal Scientist
1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
Hawaii DOT Scour Critical Bridge Project—Bathymetry&Underwater Professional Services Construction
Inspection and Permitting 2017 n/a
Hawaii Island,Kauai,&Oahu
3 BRIEF DESCRIPTION Brief scope,size,cost,etc. and SPECIFIC ROLE ®Check if promect performed with current firm
e. The State Department of Transportation is assessing up to 27 bridges across the State for possible scour repairs.Sea Engineering
completed bathymetry surveys and underwater inspections of 5 bridges, including Kolekole Bridge and Paheehee Bridge on
Hawaii Island,Wailua River Bridge and Wailua River Plantation Bridge on Kauai,and the Waimea River Bridge on Oahu. SEI
is also responsible for requiring permits for the repair work.
Cost: $319,655 Role:Project Manger
E. RESUME OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME 1 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
FIRM
Marc Ericksen,Senior Executive Officer Project Manager 32 a. TOTAL b. WITH TH
32
15. FIRM NAME and LOCATION(City and State
Sea Engineering,Inc.
16. EDUCATION(Degree and S ecialization 17. CURRENT PROFESSIONAL REGISTRATION State and Discipline)
M.S.Coastal Geology
B.S.Earth Sciences
18. OTHER PROFESSIONAL QUALIFICATIONS Publications,Organizations, Training,Awards,etc.
Member—ASCE,NITS,ACECH,SAME,WEDA,WEF,ASBPA
Certified H dro a her—National Society of Professional Surve ors/H dro ra hic Society of America
19. RELEVANT PROJECTS
(1)TITLE and LOCATION(City and State) (2)YEAR COMPLETED
Laupahoehoe Biological Surveys and Environmental Support
Laupahoehoe,Hawaii 2020 to present n/a
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
a. Sea Engineering,Inc.,has been contracted by Cardno GS for USACE to perform reconnaissance biological surveys of the marine
environment within and adjacent to the Laupahoehoe Harbor breakwater. Work tasks include generating habitat maps, conduct
quantitative surveys, develop a report presenting key findings and to provide qualitative information that characterizes
presence/absence and abundance of fish,macroalgae,and non-coral macroinvertebrates species.
Cost: $38,036 Role:Project Manager
1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
Laupahoehoe Boat Ramp Repair Professional Services Construction
Hawaii(Big Island 2014 to present n/a
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
Laupahoehoe Park contains a boat launch ramp facility and protective,250-foot-long breakwater built in 1988.In the summer of
b. 2009,the launch ramp was closed due to hazardous conditions,including erosion of deep grooves in the ramp surface,exposed
reinforcing rebar, and loss of traction. Sea Engineering, Inc. (SEI) and Arnold T. Okubo &Associates were contracted by the
County of Hawaii to investigate site conditions of the ramp,repairs to the ramp,prepare the necessary environmental and permit
documents,and provide support through construction.
Cost:200,000 Role:Project Manager
1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
Hilo WWTP Outfall Inspection Professional Services Construction
Hilo,Hawaii 2018
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
�. Sea Engineering,Inc.(SEI)was contracted by the Hawaii County Wastewater Division to perform an underwater inspection of
the Hilo Wastewater Treatment Plant(WWTP)outfall. SEI performed inspections on the outfall in 1987, 1990,2001,2005,
2011,and 2012 and again in September of 2018.The inspection was conducted by a five-man dive team using SCUBA and
covered the submerged length of the outfall.
Cost: $22,400 Role:Project Manager
1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
Hawaii DOT Scour Critical Bridge Project—Bathymetry&Underwater
Inspections,and Permitting 2016
Hawaii Island,Kauai,and Oahu
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
d. The State Department of Transportation is assessing up to 27 bridges across the State for possible scour repairs. Sea Engineering
completed bathymetry surveys and underwater inspections of 5 bridges, including Kolekole Bridge and Paheehee Bridge on
Hawaii Island,Wailua River Bridge and Wailua River Plantation Bridge on Kauai,and the Waimea River Bridge on Oahu.SEI is
also responsible for requiring permits for the repair work.
Cost: $319,655 Role:Project Manager.
1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
Post—Storm Hydrographic Survey of Hilo Harbor
Island of Hawaii 2015
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
e. Tropical Storm Iselle hit the east side of Hawaii Island on August 7, 2014. Concerns that the Hilo Harbor channel would be
compromised by sunken debris or other obstructions due to the effects of the storm,SEI was contracted by AECOM/USACOE to
provide a hydrographic survey to verify that the channel was clear of obstacles.Two survey engineers completed the survey mid-
morning the day after the storm, and the results were communicated to the USACOE_POH. The Harbor was immediately re-
opened.
Cost: $25,911 Role:Project En ineer/H dro a her
E. RESUME OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
Scott P.Sullivan,Senior Coastal Engineer Project Manager/Coastal a. TOTAL b. WITH FIRM
Engineer 50 50
15. FIRM NAME and LOCATION(City and State
Sea Engineering,Inc.
16. EDUCATION(Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION State and Discipline)
M.S.Ocean Engineering
B.S.Mechanical Engineering
18. OTHER PROFESSIONAL QUALIFICATIONS Publications,Organizations, Training,Awards,etc.
19. RELEVANT PROJECTS
1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
Pohoiki Boat Ramp Repair Relocation Study Professional Services Construction
Puna District,Hawaii 2019 to present
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current
a. firm
Sea Engineering was contracted by the Department of Land&Natural Resources—DBOR to provide coastal engineering and
environmental permitting services to determine the scope of work,environmental permitting requirements and cost estimates to
repair or replace the Pohoiki Boat Ramp facility located along the southeast coast of Hawaii Island.
Cost: $42,960 Role:Project Manager/Coastal Engineer
1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
Waikoloa Beach Management Plan Professional Services Construction
Waikoloa,Hawaii 2017 to present
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current
fi rm
During a tsunami in March 2011 the beach at Anahoomalu Bay was severely eroded,a 200-foot-wide breach was created through
the beach into the fishpond depositing sand in the pond,and much of the fishpond rock wall which acted as a backstop for the
b. beach was destroyed. Following completion of repairs,the beach has been relatively stable.To ensure the continued stability of
their beach, and address concerns about sea level rise, the Waikoloa Land Company and Waikoloa Beach Association have
contracted Sea Engineering to develop a long-term plan for management and maintenance of their valuable beach resource.Work
includes beach change monitoring, coastal assessment and preliminary concept plan, offshore sand survey, development of a
detailed beach maintenance/management plan, environmental assessment and permit application, and detailed design and
construction documents.
Cost: $12,560 Role:Project Manager
1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
Waikiki Beach Restoration Professional Services Construction
Honolulu,Hawaii 2016 to present
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current
C. firm
Sea Engineering,Inc.,under contract to the State of Hawaii,Department of Land and Natural Resources in support of
developing a more stable,resilient,and sustainable beach configuration in Waikiki.The general scope of work includes a
feasibility study,environmental impact statement and conceptual design and permitting for beach improvements.
Cost: $799,300 Role:Project Manager/Coastal Engineer
1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
Anaehoomalu Bay Tsunami Damage Repair Professional Services Construction
Anaehoomalu,Waikoloa,South Kohala,Hawaii 2016
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current
firm
d Sea Engineering was contracted to obtain permits and do emergency repair work to Waikoloa Beach and the historical fishpond
that was severely damaged by the 2011 tsunami.A sand-filled geotextile tube barrier was installed to close the gap in the beach.
The emergency repair work was accomplished as an intermediate step to protect the fishpond while a long-term, permanent
repair/restoration plan for the pond and beach can be developed. Permanent repairs include rebuilding the fishpond wall and
restoration of the beach to its pre-tsunami condition.
Cost:235,000 Role:Project Manager
1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
Keauhou Bay Offshore Mooring Design Professional Services Construction
Keauhou Bay,North Shore,Island of Hawaii 2013
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current
e. firm
Sea Engineering was contracted by the Department of Land and Natural Resources (DLNR) to design offshore moorings for
small boats in Keauhou Bay,Hawaii.The project required field site investigations,design of a gravity anchor system suitable for
the rocky cobble substrate,design of a layout to maximize boat mooring capacity and Department of the Army permit acquisition.
Cost: $70,000 Role:Project Manager
E. RESUME OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
Morgan Stephenson Coastal Engineer a. TOTAL b. WITH THIS FIRM12 12
15. FIRM NAME and LOCATION(City and State
Sea Engineering,Inc.
16. EDUCATION(Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION State and Discipline)
M.S.Coastal Engineering
M.S.Civil Engineering
B.S.Civil Engineering
18. OTHER PROFESSIONAL QUALIFICATIONS Publications, Oi anizations, Training,Awards,etc.
Member—ASCE
19. RELEVANT PROJECTS
1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
Laupahoehoe Harbor Repair Design Professional Services Construction
Lau ahoehoe,Hawaii 2020 to present n/a
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
In 2019, USACE retained the services of Nagamine Okawa Engineers, Inc. and Sea Engineering, Inc. (SEI) to evaluate the
a. condition of the existing breakwater, develop and compare alternative repair plans, and develop conceptual repair plans and
rough order of magnitude construction costs under the U.S. Army Corps of Engineers (USACE)Operations& Maintenance
(O&M)program. In 2020,USACE retained the services of Cardno GS,Inc.,and SEI to develop the repair plan through final
design.
Cost:$141,640 Role:Coastal Engineer
1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
Pohoiki Boat Ramp Repair Relocation Study Professional Services Construction
Puna,Hawaii 2019 to present n/a
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
b. Sea Engineering was contracted by the Department of Land&Natural Resources—DBOR to provide coastal engineering and
environmental permitting services to determine the scope of work,environmental permitting requirements,and cost estimates
to repair and improve the Pohoiki Boat Ramp facility located along the southeast coast of Hawaii Island.
Cost: $42,960 Role: Coastal Engineer
1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
Kalepa Revetment and Seawall Repair Professional Services Construction
Kalepa,Maui 2016 to present n/a
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
Sea Engineering,Inc.(SEI)was contracted by the County of Maui,Department of Public Works to provide the design and
C. permitting of shore and road protection along an approximate 450-ft reach of the Piilani Highway at the Kalepa headland.
Work included:Topographic survey,planning and permitting,project permits,and project design.Design elements include
the shore protection revetment,shore protection seawall/retaining wall,roadway improvements(asphalt paving and guardrail
installation),and additional bank stabilization and possible shore protection.
Cost: $461,872 Role:Coastal Engineer
1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
Kalaeloa Harbor Channel&Basin Hydrographic Survey Professional Services Construction
Kalaeloa Harbor,Oahu 2019 n/a
(3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)and SPECIFIC ROLE ®Check if project performed with current firm
d. Sea Engineering,Inc(SEI)was contracted by Control Point Surveying for HDOT Harbors Division to provide a Multibeam
hydrographic Survey of the channel and basin areas of Kalaeloa Barbers Point Harbor.Project deliverables included an xyz
file of the bathymetry data and a color-coded DEM.
Cost: $20,300 Role:Coastal Engineer/Hydrographic Surveyor
1 TITLE and LOCATION(City and State 2 YEAR COMPLETED
Kahului Harbor Pier 2 High Spot Hydrographic Survey Professional Services Construction
Kahului Harbor,Maui 2018 n/a
3 BRIEF DESCRIPTION Brief scope,size,cost,etc. and SPECIFIC ROLE ®Check if project performed with current firm
e. Sea Engineering,Inc(SEI)was contracted by Control Point Surveying for HDOT Harbors Division to provide a hydrographic
survey of a high spot in the Pier 2 vicinity of Kahului Harbor.Project deliverables included a xyz spreadsheet of bathymetry
data.
Cost: $26,200 Role:Coastal Engineer/Hydrographic Surveyor
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY
QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the 1
agency,or 10 projects,if not specified. Complete one Section F for each project.)
21. TITLE and LOCATION(City and State) 22. YEAR COMPLETED
Hilo Harbor Breakwater Improvements—Basis of Design PROFESSIONAL SERVICES CONSTRUCTION
Hilo,Hawaii 2021
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL
U.S.Army Corps of
Engineers Ben Berridge—Cardno GS 808-476-0067
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost)
The Hilo Harbor breakwater is an
approximately two-mile-long
rubble mound rock structure that
protects inner Hilo Bay's port
facilities from direct wave
exposure.
Recent inspections of the Hilo
breakwater have found areas of '
possible damage, mostly limited to
local areas along the structure.
Multiple visual inspections of the
breakwater were conducted as part
of the annual Project Condition Surveys (PCS), which were performed by a mix of USACE and Sea
Engineering, Inc. (SEI) inspection teams in 2015, 2016, 2017, 2018, 2020, and 2021. Observed
irregularities were found to include displaced armor units,attrition of supportive core stone (hollowing
out of core),structure slumping,and excessive settling. As a result of the inspections,repairs have been
recommended in numerous locations
156.10°W 15608"W 15508°W
identified along the breakwater and vary in
a size from very localized to hundreds of feet
E
in length.
In support of the need for repairs to the
breakwater, SEI has been contracted by
Cardno GS and the U.S. Army corps of
Engineers to develop, analyze, organize
and summarize all necessary design
conditions, that will constitute an updated
Basis of Design(BoD).
w
lssos•w rssorw
Cost: $381,189
(1)FIRM NAME (2)FIRM LOCATION (3)ROLE
(City and State
�Zl Sea Engineering,Inc. Waimanalo,Hawaii Coastal/Ocean Engineering
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY
QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the 2
agency,or 10 projects,if not specified_ Complete one Section F for each project)
21. TITLE and LOCATION(Cityand State) 22. YEAR COMPLETED
Laupahoehoe Harbor Breakwater Repair Basis of Design PROFESSIONAL SERVICES CONSTRUCTION
Laupahoehoe,Hawaii 2021
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL
U.S.Army Corps of
Engineers Cardno GS,Inc.—Ben Berridge 808-476-0067
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost)
Laupahoehoe Harbor is located on the Hamakua
Coast on the northeast side of the Island of
Hawaii, approximately 25 miles north-
northwest of Hilo. The facility includes a boat
launch ramp and protective, 200-foot-long
breakwater that was built in 1988. The usability - 40
of the boat ramp has decreased since the facility
was built. The breakwater has lost effectiveness
in reducing wave energy at the boat ramp over
time, and there has been a decrease in the +
functionality of the harbor to less than the design ty
usability of 70%.
In 2019 USACE retained the services of
Nagamine Okawa Engineers, Inc. and Sea
Engineering,Inc.(SEI)to evaluate the condition
of the existing breakwater,develop and compare , ..-�'
alternative repair plans,and develop conceptual
repair plans and rough order of magnitude f wr°ria d eHoc ' eoR -
construction costs under the U.S. Army Corps '._ 2AT .
r
of Engineers (USACE) Operations & �76
Maintenance(O&M)program. ~
T
In 2020,USACE retained the services of Cardno „
GS, Inc., and SEI to develop the repair plan
through final design.
GR,4PHIC SCALE: ` r y s w
±ss
�• e
Cost: $141,640 aEvwnoes ct E A TO 11LLw ' �-
(1)FIRM NAME (2)FIRM LOCATION (3)ROLE
(City and State
�Xl Sea Engineering,Inc. Waimanalo,Hawaii Coastal/Ocean Engineering
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY
QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the 3
agency,or 10 projects,if not specified. Complete one Section F for each project) IN
21. TITLE and LOCATION (City and State) 22. YEAR COMPLETED
Hawaii DOT Scour Critical Bridge Project—Bathymetry PROFESSIONAL CONSTRUCTION
SERVICES
and Underwater Inspection
BigIsland,Kauai, Oahu,HI 2015 to present n/a
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL
State of Hawaii,DOT Kai Hawaii—Mike Hunneman 1 808-533-2210
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,andcost)
The State Department of
Transportation is assessing up to 27
bridges across the State for possible. �� 4 ` 4
scour repairs. In support of this
effort, Sea g En ineerin completed
g p
bathymetry surveys and underwater
inspections of 5 bridges, including '
Kolekole Bridge and Paheehee
Bridge on Hawaii Island, Wailua
River Bridge and Wailua River
Plantation Bridge on Kauai, and the
Waimea River Bridge on Oahu. The
underwater inspections were
conducted by a three-man dive team using surface supplied air. Sea Engineering was also responsible for
obtaining all required permits for the proposed repair activities.
f-
Cost: 319,655
(1)FIRM NAME (2)FIRM LOCATION(Cityand (3)ROLE
State
Sea Engineering,Inc. Waimanalo,Oahu, Coastal/Ocean Engineering
Hawaii
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY
QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the 4
agency,or 10 projects,if not specified_ Complete one Section F for each project)
21. TITLE and LOCATION(City and State) 22. YEAR COMPLETED
Pohoiki Boat Ramp Repair Relocation Study PROFESSIONAL SERVICES CONSTRUCTION
Puna District,Island of Hawaii 2019
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL
State of Hawaii,DLNR Edward Underwood(DOBOR) 1 808-587-1966
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost)
Hawaii Island's Kilauea Volcano
lower East Rift Zone began erupting on
May 3, 2018, ultimately transforming
the landscape of the Lower Puna _
district on the southeast coast of the
island. When the eruption stopped in POHOIKI
August 2018 lava had covered more BOAT RAMP
than 13 square miles of residential,
farm, industrial and natural lands, and x+.
created some 875 acres of new land
extending into the ocean. At Pohoiki � '
Bay, site of the State DLNR-Division
of Boating and Ocean Recreation
(DOBOR) Pohoiki Boat Ramp facility, large volumes of volcanic debris (rocks, cobbles and
sand) began to fill in the bay and the vicinity of the boat ramp. By the spring of 2019 the bay
was filled, and the boat ramp was land locked by a 200-foot-wide black sand and cobble beach.
Sea Engineering was contracted by the
Department of Land and Natural Resources,
Division of Boating and Ocean Recreation, to
_ - prepare a concept screening study for re-opening
the existing ramp facility or relocating it to an
alternate site. The work involved coastal
engineering to develop concepts for evaluation,
and development of a rough-order-of-magnitude
(ROM) construction cost estimate for the two
concepts. Planning, design and permitting costs
were also estimated.
Cost: $43,960
(1)FIRM NAME (2)FIRM LOCATION (3)ROLE
(City and State
L,�CE Sea Engineering,Inc. Waimanalo,Hawaii Coastal/Ocean Engineering
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY
QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the 5
agency,or 10 projects,if not specified. Complete one Section F for each project.)
21. TITLE and LOCATION(Cityand State) 22. YEAR COMPLETED
Waikoloa Beach Management Plan PROFESSIONAL SERVICES CONSTRUCTION
Waikoloa,Hawaii 2017 to present
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL
Waikoloa Beach Association Scott Head 808-886-1000
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost)
Waikoloa Beach Resort is located on the west coast of ,
f
the island of Hawaii, and the southern portion
encompasses the shoreline of Anaehoomalu Bay. -�
During a tsunami in March 2011 the beach was severely
eroded,a 200-foot-wide breach was created through the
beach into the fishpond depositing sand in the pond,and
much of the fishpond rock wall which acted as a
backstop for the beach was destroyed. Following
completion of repairs, the beach has been relatively
stable,and the additional beach crest height has reduced
wave overtopping.
To ensure the continued stability of their beach, and
address concerns about sea level rise, the Waikoloa
Land Company and Waikoloa Beach Association have contracted Sea Engineering to develop a long-
term plan for management and maintenance of their valuable beach resource. Work includes: Beach
change monitoring, coastal assessment and preliminary concept plan, offshore sand survey,
development of a detailed beach maintenance/management plan,environmental assessment and permit
application, and detailed design and construction documents.
x
� KIJUALII FISHPOND
Abhwad
r �
Cost: $12,560
(1)FIRM NAME (2)FIRM LOCATION (3)ROLE
(City and State
�zl Sea Engineering,Inc. Waimanalo,Hawaii CoastaVOcean Engineering
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY
QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the 6
agency,or 10 projects,if not specified Complete one Section F for each project)
21. TITLE and LOCATION Cit and State 22. YEAR COMPLETED
Mauna Kea Shoreline Restoration Project PROFESSIONAL SERVICES CONSTRUCTION
Kohala Coast,Hawaii 2018
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL
Hookuleana LLC—
Prince Resorts Hawaii Peter Young 808-226-3567
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost)
The Mauna Kea Resort on Hawaii Island is
planning improvements to their shoreline and
hotel. Sea Engineering has been contracted to
conduct detailed oceanographic and shoreline
investigations to support implementation of
these improvements. Work tasks included:
eo
1. Wave analyses including deepwater wave
.5 climate, extreme deepwater wave height,
numerical wave modeling of wave
` transformation to shallow water,wave runup,
analysis of a particular extreme wave event
that resulted in backshore flooding, and sea
level rise impacts.
a, 2. Site investigations including beach profile
measurements, beach topographic survey,
-5 ° ,5 .10 sand sampling and analysis, and assessment
of coastal processes.
� 3. Development of a dune restoration plan
x' based on regional,typical dune morphologies.
/ Sea level impacts were considered, and a
design report prepared.
ry Graphic Scale
— � rs o 11 iso•
Cost: $81,855
(1)FIRM NAME (2)FIRM LOCATION (3)ROLE
(City and State
�Xl Sea Engineering,Inc. Waimanalo,Hawaii Coastal/Ocean Engineering
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY
QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the 7
agency,or 10 projects,if not specified- Complete one Section F for each project)
21. TITLE and LOCATION(Cityand State) 22. YEAR COMPLETED
Project Conditions Survey Inspections of Federal Coastal PROFESSIONAL SERVICES CONSTRUCTION
Navigation Structures 2015,2016,& n/a
Hilo,Kawaihae,Lau ahoehoe,Pohoiki 2017
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL
USACE Mike Hunneman—KAI Hawaii 1 808-533-2210
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost)
Sea Engineering was contracted to perform
inspections of 24 federal coastal navigation
structures (CNS)throughout Hawaii, Guam, Rota, -
and American Samoa operated and maintained by ,
the U.S. Army Corps of Engineers (USACE), -
Pacific Ocean Division (POD), Honolulu District
(POH). The purposes of the inspections were to
verify the current condition of the structures,locate s -
areas of concern on each structure,and identify and
recommend future maintenance requirements.
Specific work tasks included:
Kawaihae Small Boat Harbor
1) Categorizing each CNS into distinct reaches according to type of construction (rubble-
mound, concrete armor, sheet pile, etc.); unique structural feature (head, trunk, root, etc.); and
cross-sectional features (crest elevation, side slopes,toe protection, etc.).
2) Conducting inspections by physically walking the length of each CNS and inspecting areas
including the crest, slopes, and toe of the structure. Damage was located with accurate GPS,
described and photographed.
3) Preparing draft and final post-inspection
reports that summarize the findings documented
during the site inspection.
4) Preparing a plan-view map including the
aerial imagery of the project site, stationing,
structure components, CEPD benchmark, and
the GPS location of each finding recorded during
the site inspection.
Cost: $131,994
(1)FIRM NAME (2)FIRM LOCATION (3)ROLE
(City and State
�xl Sea Engineering,Inc. Waimanalo,Hawaii Coastal/Ocean Engineering
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY
QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the g
agency,or 10 projects,if not specified. Complete one Section F for each project.)
21. TITLE and LOCATION(Cityand State) 22. YEAR COMPLETED
Anaehoomalu Bay Tsunami Damage Repair PROFESSIONAL CONSTRUCTION
SERVICES
Anaehoomalu,Waikoloa, South Kohala,Hawaii 2016
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL
Waikoloa Beach Association IEleanor Mirikitam 808-886-1000
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(include scope,size,andcost)
Scope: On March 11, 2011, a
tsunami generated by a massive
earthquake in Japan struck the
Hawaiian Islands and caused
significant damage along portions of
the State's shoreline. Waikoloa
Beach on the island of Hawaii was
directly impacted, with inundation - �• �
reaching the backshore historical .
fishpond, subsequently destroying
the pond wall and creating a 200-
foot-wide breach through the beach
fronting the pond.
Sea Engineering,Inc.was contracted " 'i ' '"to obtain permits and do emergency
repair work to close the breach, and
this work was completed in July of
2011. A sand-filled geotextile tube
barrier was installed to close the gap
in the beach. The emergency repair
work was accomplished as an
intermediate step to protect the
fishpond while a long-term, R. t �' JP
permanent repair/restoration plan for
the pond and beach can be
developed. Permanent repairs would _
include rebuilding the fishpond wall -
and restoration of the beach to its
pre-tsunami condition. ,
Cost: $235,000
March 14,2012 Shoreline
(1)FIRM NAME (2)FIRM LOCATION(Cityand (3)ROLE
State
Sea Engineering,Inc. Waimanalo,Oahu, Coastal/Ocean Engineering
Hawaii
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY
QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency,or10 9
projects,if not specified_ Complete one Section F for each project)
21. TITLE and LOCATION(CityandState) 22. YEAR COMPLETED
Keauhou Bay Offshore Mooring Design PROFESSIONAL CONSTRUCTION
SERVICES
Keauhou Bay,North Kona,Island of Hawaii 2013
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL
State of Hawaii—DLNR IEric Yuasa 808-327-9585
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost)
Scope: Sea Engineering Inc., was
contracted by the State of Hawaii Division
of Boating and Ocean Recreation
(DOBOR), DLNR to redesign the mooring
layout and mooring assembly design for
Keauhou Bay, Hawaii. The purpose is to
more effectively accommodate vessels and C6 �
improve mooring assembly design and "ems x
vessel and user safety.
oo 2oo
The work included the following:
• Detailed site investigation to map „oab.o� k
existing moorings and bottom
composition ��
• Design of a gravity mooring
anchor system suitable for the -
variable,rocky,rubbly substrate in of _
the bay .
• Design of a mooring layout that maximizes vessel
capacity in a safe manner
•Acquisition of a Department of the Army permit for the
mooring buoys
In total, the proposed moorings will accommodate 14 vessels
ranging from 30 to 60 feet in length.Mooring locations have been
selected to avoid areas with high benthic marine life as far as
practicable.
The mooring plan calls for six 30ft vessels,three 40ft vessels,three
50ft vessels, and two 60ft vessels.
Cost: $50,700
VEIrSea
FIRMNAME 2 FIRM LOCATION Cit andState 3 ROLE
Engineering Inc. Waimanalo,Oahu,Hawaii Coastal/Ocean Engineering
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY
QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the to
agency,or 10 projects,if not specified. Complete one Section F for each project.)
21. TITLE and LOCATION(Cityand State) 22. YEAR COMPLETED
Hilo WWTP Outfall Inspection PROFESSIONAL SERVICES CONSTRUCTION
Hilo,Hawaii 2018,2012,2011
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL
County of Hawaii
Wastewater Curtis Bailey 808-961-8338
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost)
Sea Engineering, Inc. (SEI) was
contracted by the Hawaii County
Wastewater Division to perform an
underwater inspection of the Hilo
Wastewater Treatment Plant (WWTP)
outfall. The purpose of the inspection
was to satisfy requirements of the U.S.
Environmental Protection Agency
Administrative Order.
SEI performed inspections on the outfall
in 1987, 1990, 2001, 2005, 2011, 2012,
and again in September of 2018. The
inspection was conducted by a five-man
dive team using SCUBA and covered the submerged length of the outfall. Stationing was established by
dropping orange plastic markers along the outfall and video was recorded along the entire length of the
outfall.
In order to help identify any leaks from
the pipe, Bright Dyes® fluorescent
yellow/green tracer dye was injected into
the pipe through a manhole located on
land near the entry point of the pipe into
the ocean. No leaks were detected along
the length of the outfall.
SEI is scheduled to perform this
upcoming inspection in 2023.
Cost: $48,995
(1)FIRM NAME (2)FIRM LOCATION (3)ROLE
(City and State
Sea Engineering,Inc. Waimanalo,Hawaii Coastal/Ocean Engineering
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY
QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency,or 10 l l
projects,if not specified. Complete one Section F for each project)
21. TITLE and LOCATION(CityandState) 22. YEAR COMPLETED
PROFESSIONAL CONSTRUCTION
Post-Storm Hydrographic Survey of Hilo Harbor,Island of Hawaii SERVICES
Hilo,Hawaii 2015 n/a
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL
USACE-POH/AECOM Jerry Matsuda(AECOM) 808-356-5370
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost)
Scone: Tropical Storm Iselle hit the east side of
Hawaii Island at approximately 11:00 pm on August
7, 2014,with near hurricane force winds of 70 mph.
Concerns that the Hilo Harbor channel would be
compromised by sunken debris or other obstructions Pe 'Tne.... a�A�PM Mon
due to the effects of the storm prompted harbor
closure until a hydrographic survey could be
completed to verify that the channel was clear of 8 PM Sun
9 PM Sat
obstacles. Sea Engineering, Inc. (SEI) was notified ' „PM Thu
at approximately noon on August 7, 2014, that a w
survey would be necessary the following day at Hilo ~
T—pi—i Storm Is He 'Current Information: •Os Position.-Forecast Pons:a
Harbor. Two survey engineers from Sea >> �o=
' a=�o",a.0N,s.,W .rropi..l Cyd� Q Pwt T-pi-I
Min S.—i-d!wine mph sustai—Win- D< mph
Engineering with equipment flew to Hilo mid- Potential Tack Area`a` Watches:n"� War ngs"'410 mph M>„pmph
morning on August 8 to conduct the survey. The �Day1-3 CJ, "ay45 11-im ae Trop.storm �H-rim.-e To°storm
survey was successfully completed, and results were communicated to the USACOE-POH at 7:00 pm on
August 8,2014. The Harbor was immediately re-opened.
12 21 37 13 Co 11
40 M l 38 19 114 13 13
40 37 .13 35 _ ,14 9
2 sou�oeas oar•ano11
39 38 39 //n 34 35 13 r acer i '19 14 ,.La7FOfiM 8
� f 111 9--
_---------
,.
pit
i 1
n p
` 1��_�28 3
r14
13
10,C.oconut I * IO 98o** 8 S Sh Co 8 gg9
0 ANCHORAGE ARtA
TV `
i 9.••'fa°1 iR * 8 t;0.728h(see dote A} & 5• >< �
7 10 .4iRk
Scan sonar mosaic of Federal Project Area,Hilo Harbor
Cost: $15,000
1 FIRM NAME 2 FIRM LOCATION Cit and State 3 ROLE
Sea Engineering,Inc. Waimanalo, Oahu, Hawaii Coastal/Ocean Engineering
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY
QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency,orl0 12
projects,if not specified. Complete one Section F for each project)
21. TITLE and LOCATION(City and State) 22. YEAR COMPLETED
Laupahoehoe Boat Ramp Repair PROFESSIONAL CONSTRUCTION
SERVICES
Hawaii (Big Island) 2010
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TEL
County of Hawaii (808)961-8531
Dept. of Parks and Recreation James Komata
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost)
Scope: Laupahoehoe Park is located on the Hamakua Coast on the northeast side of the Island
of Hawaii, approximately 25 miles north-northwest of Hilo. The park contains a boat launch
ramp facility and protective 250-foot-long breakwater built in 1988. The site is exposed to rough
trade wind seas and north swells, and the condition of the boat ramp has deteriorated. In the
summer of 2009, the launch ramp was closed due to hazardous conditions, including erosion of
deep grooves in the ramp surface, exposed reinforcing rebar, and loss of traction. Sea
Engineering, Inc. (SEI) and Arnold T. Okubo & Associates were contracted by the County of
Hawaii to investigate site conditions of the ramp, design repairs to the ramp, prepare the
necessary environmental and permit documents, and provide engineering support through
construction.
Cost: $200,000
1 FIRM NAME 2 FIRM LOCATION(CityandState) 3 ROLE
FW1 Sea Engineering,Inc. Waimanalo, Oahu,Hawaii Coastal/Ocean Engineering
G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS
26. NAMES OF KEY 27. ROLE IN THIS 28. EXAMPLE PROJECTS LISTED IN SECTION F
PERSONNEL CONTRACT (Fill in`Example Projects Key"section below before completing table. Place W under project key number for
(From Section E,Block (From Section E,Block participation in same or similar role.
12) 13) 1 2 3 4 5 6 7 8 9 10 11 12
David Smith, P. E. Coastal Engineer X X X X X
Chris Goody, P.E. Ocean Engineer X X X X
Chris Conger Coastal Scientist X X X X X X
Marc Ericksen Project Manger X X X X
Scott Sullivan Project Manager X X X X
Morgan Stephenson Ocean Engineer X X X X X
29. EXAMPLE PROJECTS KEY
NO. TITLE OF EXAMPLE PROJECT(FROM SECTION F)
1 Hilo Harbor Breakwater Improvements—Basis of Design
2 Laupahoehoe Harbor Breakwater Repair Basis of Design
3 Hawaii DOT Scour Critical Bridge Project
4 Pohoiki Boat Ramp Repair Relocation
5 Waikoloa Beach Management Plan
6 Mauna Kea Shoreline Restoration Project
7 Project Conditions Survey Inspections of Federal Coastal Navigation Structures
8 Anaehoomalu Bay Tsunami Damage Repair
9 Keauhou Bay Offshore Mooring Design
10 Hilo WWTP Outfall Inspection
11 Post-Storm Hydrographic Survey Hilo Harbor
12 Laupahoehoe Boat Ramp Repair
H. ADDITIONAL INFORMATION
30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS REQUIRED.
A. SPECIALIZED EXPERIENCE OF THE FIRM
Sea Engineering, Inc. (SEI) specializes in coastal and ocean engineering, and marine environmental services.
Experienced staff is available to undertake a wide range of projects. With experience in Hawaii, California and
throughout the Pacific Basin, SEI is able to respond rapidly to project needs,drawing on an in-house database and the
knowledge gained from extensive work in the different island groups.
Awards:
• 2022 ASBPA Robert L.Weigel Award—Iroquois Point Beach Nourishment and Stabilization
• 2022 ASBPA Best Restored Beach—Waikiki Beach Maintenance
• 2021 ASCE Project of the Year,Region 8. Less than$10M Royal Hawaiian Groin Replacement
• 2020 ASCE Best Special Project for Royal Hawaiian Groin Replacement&Engineering Services
• 2020 GCA Build Hawaii Awards—MERIT AWARD—Haleiwa Beach Park Emergency Stabilization
• 2020 GCA Build Hawaii—Grand Award for U.S.S Arizona Memorial&Floating Dock Damage Repairs
• 2019 ASCE Best Research Project- Saipan Lagoon Hydrodynamic Study
• 2018 ASCE Hawaii Best Large Project Award — Governor Eloy S. Enos Peace Park, Puerto Rico,
Saipan,CNMI
• 2014 National Best Restored Beach Award recognized by the American Shore and Beach Preservation
Association.
• 2012 ASCE Best Special Project Award for Waikiki Beach Restoration
• 2012 Outstanding ACAS rating received from TEC, Inc & NAVFAC Pacific for Monitoring of Existing
Turbidity at the CVN Capable Berth Project,Apra Harbor,Guam.
• 2011 Outstanding ACAS rating received from TEC,Inc. &NAVFAC Pacific for the Oceanographic/Marine
Ecological Assessment,Apra Harbor,Guam.
• 2009 ASCE Hawaii Best Small Project Award—Analysis and Prediction of Waves and Surge in Kahului Harbor
• 2008 ASCE Hawaii Outstanding Civil Engineering Achievement Award for the Design of Kaumalapau Harbor
Breakwater Modification
• 2004 ASCE Outstanding Civil Engineering Achievement Award for the Sewer Outfall Extension at Fort
Kamehameha,Pearl Harbor,Oahu,Hawaii.
Coastal Engineering: Marina and harbor design; coastal planning; beach nourishment design; dredging planning and
analysis;design and evaluation of coastal structures for erosion control,shore protection and navigation;storm inundation
analyses;beach erosion and coastal processes studies. Sea Level Rise (SLR) analysis and adaptation measures.
Numerical Modeling: State-of-the-science 2-and 3-dimensional hydrodynamic and transport modeling for applications
including sediment transport; contaminant transport; water quality; beach response; and discharges into marine and
freshwater environments. Modeling of deep-water to nearshore wave transformation using both 2-D steady-state models
and 3-D fully non-linear Boussinesq models.High resolution computational fluid dynamics(CFD).
Ocean Engineering: Determination of engineering oceanographic design criteria; storm wave propagation and wave-
driven circulation modeling; armor design; measurement and analysis of waves, tides currents and other parameters for
planning and design; submarine pipeline and cable route selection and conceptual design.
Marine Environmental: Preparation of Environmental Assessments and Impact Statements;preparation of Federal,State
and City permit applications for marine projects; measurement and analysis of sediment and contaminant transport and
water quality;turbidity analysis; water quality monitoring; analysis and assessment of the impact of coastal facilities on
the marine environment;oceanographic studies; search and recovery of hazardous materials. SLR modeling and potential
impact studies.
Marine Construction Services: Fully equipped commercial diving locker to provide diving services in support of the
construction and repair of pipelines, wharves, cable landings, breakwaters, offshore oil moorings, and other coastal and
offshore marine facilities. Repair and construction of waterfront structures, including wharves,piers, intakes, small boat
ramps and other structures.
H. ADDITIONAL INFORMATION
Hydrographic and Geophysical Surveys: Fully automated hydrographic and geophysical survey capability including
bathymetry, side scan sonar, subbottom profiling,UXO detection, and ROV surveys. Surveys tasks have included dredge
monitoring and payment, dredge design, cable route reconnaissance and selection, environmental assessment, bottom
mapping,object location, and sand deposit mapping.
Logistical Support: Support for oceanographic or research projects includes a fully equipped shop on the Honolulu
Harbor waterfront and vessels ranging from 17 to 84 feet long.
b. PROFESSIONAL QUALIFICATIONS OF STAFF TO BE ASSIGNED TO THE PROJECTS
SEI principals, engineers and scientists have graduate level degrees in ocean engineering and coastal geology. The
majority of employees have worked for the firm for over 10 years. Senior level managers and engineers have worked
for SEI for over 20 years. Resumes of key personnel are included in this submittal.
c. PAST PERFORMANCE ON SIMILAR PROJECTS
SEI has completed numerous contracts for the State of Hawaii and on the Big Island. Sea Engineering. Inc. projects are
completed within budget, on schedule and with the highest attention to quality control. Representative projects SEI has
worked on in Hawaii County as well for the State of Hawaii,include the foll wing prolects:
Protect Date Firm
Hilo WWTP Outfall Inspection 2018 &2023 County of Hawaii,Wastewater Division
Lahaina Small Boat Harbor and Mala Boat Ramp Maintenance 2023 State of Hawaii, DLNR
Dredging
Kona Village Resort Beach Restoration 2021 to present Kona Village Resort
Hilo Harbor Breakwater Improvements—Basis of Design 2020 to present USACE, Cardno GS
Laupahoehoe Marine Biological Surveys& Environmental 2020 to present USACE, Cardno GS
support
Laupahoehoe Harbor Repair Design 2020 to present USACE, Cardno GS
Kalaeloa Fuel Pier Development 2018 to present State of Hawaii DOT, Mitsunaga&
Associates
Waikiki Beach Restoration 2017 to present State of Hawaii, DLNR
Hawaii DOT Scour Critical Bridge Project—Bathymetry& 2015 to present State of Hawaii DOT, KAI Hawaii
Underwater Inspections, and Permitting
Royal Hawaiian Groin Replacement 2020 State of Hawaii, DLNR
Waikoloa Beach Management Plan 2020 Waikoloa Beach Association
Harbors Oahu District Baseyard Improvements 2019 State of Hawaii DOT, RM Towill Corp
Pier 28-33 Hydrographic Survey Honolulu Harbor 2019 State of Hawaii DOT, Westin Solutions
Pohoiki Boat Ramp Repair Relocation 2019 State of Hawaii, DOBOR
Hilo Ocean Outfall Inspection 2018 County of Hawaii
Laupahoehoe Harbor Breakwater Repair 2018 USCCE, Nagamine Okawa, Engineers,
Mauana Kea Shoreline Restoration Project 2018 Hookuleana LLC, Prince Resorts Hawaii
Kahului Harbor Pier 2 High Spot Hydrographic Survey 2018 State of Hawaii DOT, Control Point Surveying
Anaehoomalu Bay Tsunami Damage Repair 2016 Waikoloa Beach Association
Post—Storm Hydrographic Survey of Hilo Harbor 2015 USACE,AECOM
H. ADDITIONAL INFORMATION
Keahou Bay Offshore Mooring Design 2013 State of Hawaii, DLNR
d. CAPACITY TO ACCOMPLISH WORK
SEI has a proven capacity for accomplishing work on time and on budget. We have participated in numerous design
projects which have been successfully constructed. We have an experienced staff available to undertake a wide variety
of coastal-related engineering projects,and our projected workload will permit timely accomplishment of future work.
e. KNOWLEDGE OF THE LOCALITY
SEI is located in Honolulu,Hawaii. We have performed engineering studies throughout the Pacific Basin, including all
the main Hawaiian Islands, Guam, the Northern Marianas, American Samoa, the Marshall Islands, Okinawa, the
Federated States of Micronesia, the Republic of Palau, as well as Alaska and California. SEI has considerable "local'
knowledge for the Pacific region,and an extensive in-house data base for the Pacific area.
Sea Engineering,Inc. is a Small Business- 541330(Engineering Services,Marine Engineering).
I. AUTHORIZED REPRESENTATIVE
The foregoing is a statement of facts.
31. SIGNATURE 32. DATE
June 21,2023
41. NAME and TITLE(Printortype)
Chris Conger,Vice President
1. SOLICITATION NUMBER(if any)
ARCHITECT-ENGINEER QUALIFICATIONS County of Hawaii
FY 2023-2024
PART II—GENERAL QUALIFICATIONS
(if a firm has branch offices, complete for each specific branch office seeking work.)
2a. FIRM(OR BRANCH OFFICE)NAME 3. YEAR 4. DUNS NUMBER
ESTABLISHED
SEA ENGINEERING,INC. 1973 DUNS#: 066273905
-w CAGE: OH711
2b. STREET
41-305 Kalanianaole Hwy,Makai Research Pier 5. OWNERSHIP
2c. CITY 2d. STATE 2e. ZIP CODE a. TYPE
Waimanalo HI 96795 Corporation
6a. POINT OF CONTACT NAME and TITLE b. SMALL BUSINESS STATUS
Chris Conger,Vice President Small Business-Engineering Services,
Marine Engineering
6b. TELEPHONE NUMBER 6d. E-MAIL ADDRESS 7. NAME OF FIRM(Ifblock 2a is a branch office)
(808)259-7966 ccongerAseaengineering.com
8a. FORMER FIRM NAMES(S)(If any) 8b. YR. 8c. DUNS NUMBER
N/A ESTABLISHED DUNS#: 066273905
1973
CAGE: OH711
9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL
AVERAGE REVENUE FOR LAST 5 YEARS
a. c. No.of Em to ees Profile c.Revenue
a.
Function b. Discipline (2) b. Experience Index No.
Code (1)Firm Branch Code (see below)
O1 Administrative 4 1 B02 Bridges 4
12 Civil Engineer 6 3 C05 Coastal Engineering 6
30 Geologist 3 3 D04 Design-Build 5
Ocean Engineer 5 2 E08 EIS 5
Coastal Engineer 7 7 HO1 Harbors,jetties, etc. 6
44 Oceanographer 1 1 H13 Hydrographic Surveying 4
23 Environmental Engineer 1 0 002 Oceanographic Engineering 4
R04 Marinas 1
R11 Rivers, Canals,Waterways 1
Total 24 14 S10 Surveying,mapping 2
11. ANNUAL AVERAGE
PROFESSIONAL SERVICES REVENUES PROFESSIONAL SERVICES REVENUE INDEX NUMBER
OF FIRM FOR LAST 3 YEARS
Insert revenue index number shown at right) 1. Less than$100,000 6. $2 million to less than$5 million
a. Federal Work 6 2. $100,000 to less than$250,000 7. $5 million to less than$10 million
3. $250,000 to less than$500,000 8. $10 million to less than$25 million
b. Non-Federal 6 4. $500,000 to less than$1 million 9. $25 million to less than$50 million
Work 5. $1 million to less than$2 million 10. $50 million or greater
c. Total Work 6
12. AUTHORIZED REPRESENTATIVE
The foregoing is a statement of facts.
a. SIGNATURE b. DATE
C:�� �� ��� June 21,2023
c. NAME OF AUTHORIZED(Print or type) d. TITLE(Print or type)
Chris Conger Vice-President
Sea Engineering, Inc.
Makai Research Pier • 41-305 Kalanianaole Hwy • Waimanalo, Hawaii 96795-1820
Phone: 808 259-7966 • FAX 808 259-8143 • E-mail:sei0seaen ineerin .com • Website:www.seaengineering.com
SEI CORPORATE REFERENCES Professional Services
(July 2023 to June 2024)
Ms. Elaine Morisato, Civil Engineer
Department of Design & Construction
650 So. King St., 111" Floor
Honolulu, HI 96813
Mr. Ross Tanimoto, Deputy Director
City & County of Honolulu, Dept. of Environmental Services
1000 Uluohia St., Suite 308
Kapolei, Hawaii 96707
Mr. Mike Hunneman, Vice President
KAI Hawaii
50 S. Beretania Street, #C-119C
Honolulu, HI 96813
Phone: (808) 533-2210
Mr. Rick Heltzel, President
Healy Tibbitts Builders, Inc.
99-994 Iwaena Street, #A
Aiea, Hawaii 96701
Phone: (808) 487-3664
Mr. Michael Cain, Administrator
Department of Land & Natural Resources
Office of Conservation and Coastal Lands
Kalanimoku Building
1151 Punchbowl St., Rm 131
Honolulu, Hawaii 96813
Phone: (808) 587-0377
PE-12544
CHRISTOPHER C GOODY
SEA ENGINEERING, INC. MAKAI RESEARCH
PIER 41-305 KALANIANAOLE HWY
WAIMANALO, HI 96795
PROFESSIONAL ENGINEER
NOTICE THIS POCKET ID CARD IDENTIFIES YOU TO THE PUBLIC AS BEING CURRENTLY
LICENSED AND SHOULD BE KEPT IN YOUR POSSESSION AT ALL TIMES.
CLASSES(ACTIVE):
License Number Expiration date Q,
PE-12544 4/30/2024
STATE OF HAWAII DEPARTMENT OF COMMERCE AND CONSUMER AFFAIRS
PROFESSIONAL ENGINEER ❑
■
CLASS(ES):CE CIVIL
CHRISTOPHER C GOODY
SEA ENGINEERING,INC.MAKAI RESEARCH
PIER 41-305 KALANIANAOLE HWY
WAIMANALO,HI 96795
SIGNATURE OF LICENSEE
PE-11453
DAVID A SMITH
SEA ENGINEERING, INC. MAKAI RESEARCH
PIER 41-305 KALANIANAOLE HWY
WAIMANALO, HI 96795
PROFESSIONAL ENGINEER
NOTICE THIS POCKET ID CARD IDENTIFIES YOU TO THE PUBLIC AS BEING CURRENTLY
LICENSED AND SHOULD BE KEPT IN YOUR POSSESSION AT ALL TIMES.
CLASSES(ACTIVE):
License Number Expiration date Q,
PE-11453 4/30/2024
STATEOF HAWAII DEPARTMENT OF COMMERCE AND CONSUMER AFFAIRS .
PROFESSIONAL ENGINEER
CLASS(ES):CE CIVIL
DAVID A SMITH
SEA ENGINEERING,INC.MAKAI RESEARCH
PIER 41-305 KALANIANAOLE HWY
WAIMANALO,HI 96795
SIGNATURE OF LICENSEE