HomeMy WebLinkAbout2024-01-24 Director's Report 1 DIRECTOR’S QUARTERLY INFORMATIONAL REPORT TO THE ENVIRONMENTAL MANAGEMENT COMMISSION January 24, 2024 Agenda item VII 1. LEGISLATIVE UPDATE 1. County Council (Since last report posted on 10/18/23) ITEM DESCRIPTION CURRENT STATUS Completed items Res. 305-23 Allows receipt of $1,522,130 in federal funds to DEM for reusable foodware grant Adopted 11/1/23 Bill No. 88 Allows receipt of $1,522,130 in federal funds to DEM for reusable foodware grant Council 1st reading 11/1/23 Council 2nd reading 11/15/23 Ord. 23-89, eff. 12/5/23 Bill 94 Authorizes up to $100 million in General Obligation Bonds to Hilo WWTP for construction Council 1st reading 11/1/23 Council 2nd reading 11/15/23 Ord. 23-95, eff. 12/5/23 Comm. 612 Nominates Jim Beets to EMC, District 1 Pos. Rec. GOEAC 12/5/23 Confirmed 12/20/23 Comm. 625 Nominates Erica Perez to EMC, District 4 Pos. Rec. GOEAC 12/19/23 Confirmed 1/10/24 Comm. 673 Presentation Regarding the Integrated Wastewater Management Plan and Related Community Outreach CRCOC 1/23/24 Current items Res. 415 Authorizes payment of funds for multi- year leases of 1 forklift, 1 dump truck, 1 super duty truck with utility body and crane Finance Committee 1/23/24 2. Legislature The 2024 legislative session opened on January 17, 2024. The Department of Environmental Management will monitor legislation and provide testimony in support of bills that improve recycling rates, reduce waste generation, support extended producer responsibility, and support the recommendations of the cesspool conversion working group. DEM provided a response to the Legislature regarding HCR 208 HD1 (2023). 2. SOLID WASTE DIVISION PROJECTS AND UPDATES 1. Landfill tonnage RELOAD FACILITY UPDATE (new data shaded in gray) 2 WHSL MONTHLY LANDFILL TONNAGES Month/Year Total Tons Taken to Sort Station Jan 2023 4,221.43 Feb 2023 3,827.83 Mar 2023 4,173.38 Apr 2023 3,799.26 May 2023 3,993.36 Jun 2023 4,324.80 July 2023 4,430.82 Aug 2023 4,091.16 Sep 2023 3,792.82 Oct 2023 4,125.99 Nov 2023 3,996.96 Dec 2023 4,427.42 Total 49,205.42 Jan 2023 17,186.60 Feb 2023 15,849.21 Mar 2023 18,217.83 Apr 2023 16,809.28 May 2023 17,215.66 Jun 2023 16,789.75 0 5000 10000 15000 20000 Jan Feb Mar April May June July Aug Sep Oct Nov Dec WHSL tonnage WHSL tonnage 3 MONTHLY TRANSFER STATION TONNAGES The above table includes data on the waste disposed in the landfill (not the greenwaste or recycling data). July 2023 16,597.59 Aug 2023 17,693.23 Sept 2023 16,143.91 Oct 2023 16,426.09 Nov 2023 16,825.36 Dec 2023 17,550.13 Total 203,304.64 Month/Year EHRSS WHSL Jan 2023 3,345.50 3,840.45 Feb 2023 2,975.84 3,350.62 March 2023 3,239.10 3,939.63 Apr 2023 2,940.49 3,561.94 May 2023 3,113.09 3,622.57 Jun 2023 3,412.17 3,657.98 July 2023 3,555.25 3,867.92 Aug 2023 3,180.37 3,753.74 Sep 2023 2,981.49 3,506.66 Oct 2023 3,286.29 3,632.70 Nov 2023 3,148.48 3,608.37 Dec 2023 3,556.53 3,938.45 Total 38,734.60 44,281.45 4 2. Recycling and Landfill Diversion updates EAST HAWAII ORGANICS FACILITY (EHOF) DATE GW Residential Drop Off EHOF (Tons) GW Commerical Drop Off EHOF (Tons) GW Transfer Stations Drop Off EHOF (Tons) Total GW At EHOF (Tons) JULY 2023 512.15 150.39 153.17 815.71 AUGUST 2023 583.86 168.61 159.98 912.45 SEPTEMBER 2023 665.57 176.69 161.86 1,004.12 OCTOBER 2023 618.37 198.05 156.79 973.21 NOVEMBER 2023 450.55 357.19 133.88 941.62 TOTAL 4,647.11 TRANSFER STATION GREEN WASTE DATE KEAAU (Tons) PAHOA (Tons) VOLCANO (Tons) TOTAL TO EHOF (Tons) JULY 2023 30.47 89.89 32.81 153.17 AUGUST 2023 37.58 101.59 20.81 159.98 SEPTEMBER 2023 45.47 89.83 26.56 161.86 OCTOBER 2023 42.51 92.70 21.58 156.79 NOVEMBER 2023 36.90 78.89 18.09 133.88 765.68 WEST HAWAII ORGANICS FACILILTY (WHOF) DATE GW From Residential To WHOF (Tons) GW From Commerical to WHOF (Tons) GW From Transfer Stations To WHOF (Tons) Total GW At WHOF (Tons) JULY 2023 782.51 1,211.74 557.96 2,552.21 AUGUST 2023 789.98 1,793.21 565.15 3,148.34 SEPTEMBER 2023 761.87 1,937.83 537.79 3,237.49 OCTOBER 2023 704.75 1,623.14 525.26 2,853.15 NOVEMBER 2023 612.06 1,670.34 452.54 2,734.94 TOTAL 14,526.13 TRANSFER STATION GREEN WASTE 5 DATE KEEI (Tons) KONA (Tons) WAIMEA (Tons) TOTAL TO WHOF (Tons) JULY 2023 56.04 370.69 131.23 557.96 AUGUST 2023 44.57 391.26 129.32 565.15 SEPTEMBER 2023 70.96 330.77 136.06 537.79 OCTOBER 2023 60.23 323.21 141.82 525.26 NOVEMBER 2023 27.62 301.20 123.72 452.54 TOTAL 2638.70 Kealakehe RTS Mulch Pick-Up Area DATE WHOF Mulch Delivered To Kealakehe (Tons) WHOF Mulch Delivered To EHOF (Tons) Total Mulch Delivered (Tons) JULY 2023 274.58 7.83 282.41 AUGUST 2023 310.30 89.18 399.48 SEPTEMBER 2023 208.43 31.86 240.29 OCTOBER 2023 134.47 76.37 210.84 NOVEMBER 2023 150.73 291.61 442.34 TOTAL 1,575.36 3. Solid Waste Operational Study update Community stakeholder interviews are ongoing. Element Environmental has completed all interviews for responsive Commissioners. Project completion is still on track for October 2024. 3. WASTEWATER DIVISION PROJECTS AND UPDATES. 1. Pāhala and Nā‘ālehu Large Capacity Cesspool Closure AOC (Updates on this project are posted at dem.hawaiicounty.gov/projects) The next district-wide semi-annual public informational outreach meeting will be scheduled at 6 p.m. February 29, 2024, at Pāhala Community Center. 1. Update on Pāhala Environmental Information Document The County is working with the Environmental Protection Agency to resolve an error in the Administrative Order on Consent. When executed, the 2024 revision will result in an extension to the due date of the final Environmental Information Document, from January 27, 2024, to July 30, 2024. Accordingly, the final deadline for the County to close the Large Capacity Cesspools in Pahala will also be extended, until January 22, 2027. The collection period for the surveys is complete. The community is invited to Pāhala Community Center at 6 p.m. February 29 for the next update. 6 2. Update on Nā‘ālehu Draft EID development In compliance with the federal consent order, the County is engaging with the public to solicit feedback on the options explored in the Preliminary Engineering Report in preparation for the Draft Environmental Information Document. In late October 2023, public preference surveys to gather input on the four feasible options were mailed out to 194 lot owners in the LCC closure area. A public meeting was held November 16, at the Nā‘ālehu Community Center to engage with the public to solicit feedback on the options explored in the PER, and to provide a general overview of the EID being prepared. The survey collection period remains open. The Final Environmental Information Document is due to EPA on October 22, 2024. The final deadline for the County to close the large capacity cesspools is December 31, 2027. 2. West Hawai‘i wastewater projects (Verbal report) 3. Hilo WWTP upgrades (Verbal report) HOUSE OF REPRESENTATIVES 208 THIRTY-SECOND LEGISLATURE,2023 H.D.I STATE OF HAWAII HOUSE CONCURRENT RESOLUTION REQUESTING EACH COUNTY TO DEVELOP A COMPREHENSIVE INTEGRATED WASTEWATER MANAGEMENT PLAN AND FINANCIAL STRATEGY TO UPGRADE,CONVERT,OR CONNECT CESSPOOLS LOCATED WITHIN ITS RESPECTIVE JURISDICTION BY 2050. I WHEREAS,there are approximately 83,000 cesspools across 2 the State,with 48,596 on the island of Hawaii;14,300 on Kauai; 3 11,038 on Maui;7,491 on Oahu;and 1,400 on Molokai;and 4 5 WHEREAS,Act 125,Session Laws of Hawaii 2017,requires 6 every cesspool in the State,excluding cesspools granted 7 exemptions by the Director of Health,to be upgraded or 8 converted to a Director—approved wastewater system or connected 9 to a sewerage system by January 1,2050;and 10 11 WHEREAS,according to the Cesspool Conversion Working Group 12 Final Report to the 2023 Regular Session Legislature,the cost 13 of conversions to most private and residential property owners 14 is significant,ranging from an estimated collective total of 15 $880,000,000 to more than $5,300,000,000,with only three 16 percent of all residents unburdened by the cost to convert;and 17 18 WHEREAS,many properties in rural areas,especially on the 19 neighbor islands,may not have existing county infrastructure 20 that allows for easy upgrade,conversion,or connection;and 21 22 WHEREAS,undertaking a massive infrastructure project,such 23 as converting 83,000 cesspools by 2050,requires proper planning 24 and administration across various stakeholders and governmental 25 institutions,including those of the counties;now,therefore, 26 27 BE IT RESOLVED by the House of Representatives of the 28 Thirty-second Legislature of the State of Hawaii,Regular 29 Session of 2023,the Senate concurring,that each county is 30 requested to develop a comprehensive integrated wastewater 2023—2959 HCR2O8 HD1 HMSO H.C.R.Nc~.~•i 1 management plan and financial strategy to upgrade,convert,or 2 connect cesspools located within its respective jurisdiction by 3 2050;and 4 5 BE IT FURTHER RESOLVED that each county is requested to 6 include the following information in its comprehensive 7 integrated wastewater management plan and financial strategy: 8 9 (1)Planned connections to centralized public and private 10 treatment systems; 11 12 (2)Locations where individualized treatment systems will 13 be needed; 14 15 (3)Locations where smaller—scale cluster treatment 16 systems may be used; 17 18 (4)Individual treatment system needs for homes having 19 cesspools,including whether there is appropriate 20 existing infrastructure capacity to handle the 21 upgrade,conversion,or connection of cesspools by 22 2050;and 23 24 (5)Financial needs,funding mechanisms,and financing 25 strategies to assist with cesspool upgrades, 26 conversions,or connections;and 27 28 BE IT FURTHER RESOLVED that each county is requested to 29 submit its respective comprehensive integrated wastewater 30 management plan and financial strategy,including any proposed 31 legislation,to the Legislature no later than twenty days prior 32 to the convening of the Regular Session of 2024;and 33 34 BE IT FURTHER RESOLVED that certified copies of this 35 Concurrent Resolution be transmitted to the Director of Health, 36 Mayor of the City and County of Honolulu,Mayor of the County of 37 Hawaii,Mayor of the County of Maui,and Mayor of the County of 38 Kauai. 2023—2959 HCR2O8 HD1 HMSO 2 COUNTY OF HAWAIʻI, DEPARTMENT OF ENVIRONMENTAL MANAGEMENT Response to State of Hawaiʻi House Concurrent Resolution No. 208, H.D. 1 December 2023 -This Page Intentionally Left Blank- RESPONSE TO STATE OF HAWAIʻI HOUSE CONCURRENT RESOLUTION NO. 208, H.D. 1 1 Introduction In 2017, the Hawaiʻi State Legislature passed Acts 125 and 87, which mandates that all cesspools in the State, unless granted an extension, shall be converted to an approved wastewater system, or connected to a sewerage system by January 1, 2050. House Concurrent Resolution No. 208, H.D. 1 (Resolution), adopted in the 2023 session, requests that each County in the State of Hawaiʻi “develop a comprehensive integrated wastewater management plan and financial strategy to upgrade, convert, or connect cesspools located within its respective jurisdiction” no later than twenty days prior to the convening of the Regular Legislative Session of 2024. The Resolution summarizes the State-wide issues, challenges, and importance of this significant undertaking. The County of Hawaiʻi (County) shares the concerns of the Legislature related to cesspool conversions in the State and initiated necessary planning efforts in 2022 to develop a long-term cesspool conversion strategy. This ongoing planning represents a cumulative investment of approximately $8,000,000 toward the implementation of the most appropriate conversion approach. This initial work has enabled the County to quantify the considerable magnitude and complexity of the cesspool conversion issue. Although the County has been proactively conducting comprehensive planning efforts for nearly two years, the information requested by the Resolution cannot be completed prior to the start of the next Regular Legislative Session. This report documents work completed to date by the County, summarizes ongoing evaluations, presents anticipated future actions, and suggests information for legislative consideration. Background The County has the most cesspools in the State. Of the approximately 83,000 cesspools State- wide, nearly 60 percent (48,596) are in the County of Hawaiʻi. The cost of conversion of the Puna District alone, with approximately 16,000 cesspools, is estimated to be a minimum of $1.4 billion (AECOM, 2023). Total County-wide costs for cesspool conversions could exceed $3 billion. A study commissioned by the Hawaiʻi State Department of Health (DOH) concluded that “Hawaiʻi County has the greatest affordability challenges, the most cesspools of all the counties, and a large proportion with potential impacts to drinking water and sensitive coastal waters” (Carollo, 2021). That same report determined that all property owners in the County will be financially burdened by cesspool conversions based on median household income data. Financial assistance will be key to a successful cesspool conversion program. The County has the greatest affordability challenges, the most cesspools of all counties, and a large proportion with potential impacts to drinking water and sensitive coastal waters. RESPONSE TO STATE OF HAWAIʻI HOUSE CONCURRENT RESOLUTION NO. 208, H.D. 1 2 Cesspool conversions also face technical challenges. The County is primarily composed of rural, decentralized communities. It is estimated that 78 percent of the existing County population does not have access to a centralized sewer system, indicating that connection to an existing sewer service area is unlikely to be available for most properties. This is expected to drive a large portion of the conversions to an approved individual wastewater system (IWS) which can be costly due to the lack of topsoil on Hawaiʻi island to serve as an appropriate means of wastewater treatment and disposal. Most homeowners will require some form of assistance to navigate the process required to upgrade their onsite system. Given the cost, environmental impacts, and potential neighborhood disruption associated with the overall conversion effort, public input, outreach, and education will also be key to the implementation of the program. Ideally these efforts should be consistent State-wide. Cesspool Conversion Planning Completed to Date As previously discussed, the County has been proactively engaged in the development of a program for County-wide cesspool conversions for nearly two years. This work has included the following planning efforts. Facility Plan and Programmatic Environmental Impact Statement, Addition of Wastewater Services for the Puna District. This recently completed comprehensive plan evaluated alternatives for providing sewer service for an area on the windward side of the island with approximately 20,000 onsite sewage disposal systems, including 16,000 cesspools. A range of options were considered including IWS, decentralized treatment, subregional treatment, as well as urban sewer connections and conveyance of wastewater flows to the existing Hilo Wastewater Treatment Plant (WWTP). Based on cost, environmental, and technical factors, a combination of IWS and decentralized treatment was ranked as the most favorable option. The plan identified the need for the development of appropriate institutional arrangements along with the evaluation of funding and financing approaches. Public outreach, input, and education were also key elements of the plan development. Wastewater Feasibility Study for the Town of Pāhoa. This feasibility study was completed in November 2023 and focused on specific sewer service needs associated with the Pāhoa area within the Puna District. There is currently no public sewer system for wastewater generated in Pāhoa. Residential wastewater is disposed of via The Puna Facility Plan evaluated options for the conversion of 16,000 cesspools within the County. RESPONSE TO STATE OF HAWAIʻI HOUSE CONCURRENT RESOLUTION NO. 208, H.D. 1 3 390 onsite systems, 320 of which are cesspools, and one small decentralized WWTP for flows from a shopping center. Alternatives considered included IWS, decentralized systems, and new sewers connecting to a new Pāhoa WWTP. Similar to the broader study for the Puna District, the alternative of IWS in combination with decentralized systems was determined to be most favorable. Project Definition Report, Regional Wastewater Master Planning for Puakō and Other Communities within South Kohala. The study area for this 2023 report encompasses approximately 176,000 acres, or 275 square miles. Based on the recent Hawaiʻi Cesspool Prioritization Tool commissioned by the Cesspool Conversion Working Group, the area contains 4,530 cesspools. The County does not currently provide wastewater collection and treatment services in the region. The Project Definition Report serves as the initial scoping document that prioritizes locations where wastewater services can be implemented in the project area, including development of potential alternative wastewater infrastructure. Data review included the summary of prior wastewater treatment evaluations for the area; private wastewater treatment plant information; zoning mapping and current development plans; cesspool location mapping; as well as physical features in the planning area such as depth to groundwater and soil type mapping. This information is currently being used for the development of options for community wastewater service as part of the wastewater master plan being developed for the South Kohala District. Cesspool Conversion Planning Currently in Progress The County is continuing efforts to develop a comprehensive integrated wastewater management plan and financial strategy to upgrade, convert, or connect cesspools on Hawaiʻi Island. Cesspool conversions in compliance with Act 125 will necessitate a combination of efforts by the County and individual property owners. The following work is underway and is expected to be completed by the end of 2024. South Kohala Regional Wastewater Master Plan. This master plan will conduct an analysis of wastewater infrastructure required for the conversion of the 4,530 cesspools in the South Kohala District, focused on the communities of Puakō, Kawaihae, Waimea, and Waikoloa Village. The master plan is being prepared in accordance with requirements of the Hawaiʻi State DOH for a wastewater system planning document. It will provide a roadmap for feasibility and The Project Definition Report for the South Kohala District establishes a baseline for further study of cesspool conversion options. RESPONSE TO STATE OF HAWAIʻI HOUSE CONCURRENT RESOLUTION NO. 208, H.D. 1 4 implementation for the County’s sanitary sewer system in the area through the 30-year planning period (2022 to 2052). The plan will substantiate the need for the proposed facilities; identify feasible alternatives; and provide a systemic evaluation of these alternatives considering the unique demographic, geotechnical, topographic, hydrologic, and institutional characteristics of the area. The goal is for the master plan to demonstrate that the recommendations are implementable from legal, institutional, financial, physical, and management standpoints. County-Wide Cesspool Conversion Plan. This comprehensive plan will evaluate the feasibility of extending sewer service from existing County-owned wastewater treatment facilities, study conversion alternatives for cesspool areas not previously evaluated, and integrate previous studies into a complete County-wide cesspool conversion plan. The scope of this effort addresses a wide range of tasks including:  Review of previous studies, reports, and available GIS-based cesspool mapping.  Evaluation of cesspool conversion options such as connection to existing sewer service areas, upgraded onsite wastewater treatment system, and decentralized or “satellite” collection and treatment systems.  Site visits to confirm conversion analyses.  Community engagement and education.  Summary of potential funding sources.  Preparation of a written cesspool conversion plan document with recommended options and conceptual level costs. This work is expected to be complete in mid to late 2024. County-Wide Wastewater Facilities Plan. The County-wide facilities plan will focus on the evaluation and condition assessment of existing County wastewater infrastructure including collection system pump stations and treatment plants. Key to the assessment is the determination of available capacity within the existing Honokaʻa, Kapehu, Kulaʻimano, Pāpaʻikou, Hilo, and Kealakehe service areas to accommodate additional wastewater contributions from cesspool conversions. The analysis will result in an overall wastewater capital improvement program (CIP) for existing County facilities. Integrated Wastewater Management Plan. The integrated wastewater management plan will provide a summary of the County-wide Cesspool Conversion and Wastewater Facilities Plans into a single document and will establish a framework for implementation of the resulting CIP. Wastewater Rates and Fees Evaluation. Based on the CIP developed as part of the County-Wide Wastewater Facilities Plan, the existing system of wastewater rates and fees will be updated to sustain operations going forward. The new rates and fees will be an important element in the County’s financial strategy for selectively extending sewer service to areas with existing cesspools. Anticipated Future Actions Future actions will be predicated on the results of planning activities currently under development. However, it is expected that these plans will result in a combination of feasible alternatives for cesspool conversions within the County. These alternatives may include:  Extension of wastewater collection and treatment services from existing County-owned sewer service areas.  Creation of new County sewer service areas and satellite or decentralized treatment facilities. The County-wide Cesspool Conversion Plan currently under development will establish a path for the conversion of all 48,600 cesspools within the County. RESPONSE TO STATE OF HAWAIʻI HOUSE CONCURRENT RESOLUTION NO. 208, H.D. 1 5  Connection of cesspool areas to non-County owned wastewater systems.  Property owner-initiated upgrades to an approved IWS. Implementation of a successful cesspool conversion plan will also require the County to consider revisions to existing sewer service policies as well as adoption of the wastewater CIP and associated system of rates and fees. Actions for Consideration by the State Legislature The magnitude of the program necessary to connect or convert all cesspools by 2050 requires a coordinated and cooperative effort by all levels of government, the public, and private industry. There are several areas where State legislation and resulting State-directed initiatives are needed to ensure the success of this undertaking. Workforce Development. There may not be adequate qualified technical support and construction contractors to meet projected cesspool conversion needs. Additional resources are likely needed throughout the State to support cesspool conversions and sewer system expansions. A more formal gap analysis of workforce and training needs will be helpful to support workforce development needed for cesspool conversions. Public Outreach and Education. There is currently a wide range of inconsistent communications in the public domain regarding cesspool conversions. It is imperative that a consistent and effective message be developed and communicated to the public State-wide. Homeowners need to understand and support the environmental drivers behind the need for cesspool conversions. Resources for Property Owner IWS Conversions. It is likely that a large percentage of the cesspool conversions in the State will consist of upgrades to approved alternate onsite systems to be implemented by property owners. Property owners will require access to informative and consistent State-wide guidance to assist them with the complete cesspool conversion process, including planning, engineering, permitting, construction, and financing. Funding. The cost of the cesspool conversion program will be in the billions of dollars. A successful program of this magnitude will require financial assistance from both the State and Federal governments to expand public wastewater infrastructure and to assist property owners with conversion to an approved IWS or connect to a sewer. This is one of the most critical issues that requires attention from all levels of leadership to support the conversion program. References AECOM, 2023. Final Facilities Plan, Addition of Wastewater Services for the Puna District. Carollo, 2021. Final Cesspool Conversion Finance Research Summary Report. Legislation is required to establish state-wide programs for workforce development, public outreach and education; technical resources for IWS conversions; and program funding. RESPONSE TO STATE OF HAWAIʻI HOUSE CONCURRENT RESOLUTION NO. 208, H.D. 1