Loading...
HomeMy WebLinkAboutEID-EA Consultation - Naalehu Large Capacity Cesspool Closure Project_NILSON OKAMOTO C O R P O R A T I O N INNOVATORS•PLANNERS •ENGINEERS 10345-OS March 29, 2024 Chair Georj can Adams Environmental Management Commission 345 Kekuanaoa St., Suite 41 Hilo, HI 96720 Subject: Environmental Information Document and Environmental Assessment Consultation Package for Na`alehu LCC Closure Na`alehu, Hawaii Island, Hawaii Dear Chair Adams: On behalf of the County of Hawaii —Department of Environmental Management (CoH-DEM), Wilson Okamoto Corporation is currently preparing a Draft Environmental Information Document (EID) and Environmental Assessment (EA) for the proposed Na`alehu Large Capacity Cesspool (LCC) Closure project (Proposed Project) located in the Ka`u District on the island of Hawaii. The Proposed Project involves the construction of facilities which would allow the County to close the three LCCs in Na`alehu and thereby meet the compliance requirements of the Amended AOC and the applicable portions of the Clean Water Act. The Proposed Action would be achieved by any of the 4 alternatives set forth in the Amended AOC. The proposed Project Area includes approximately 204 discrete tax parcels (in whole or in part) and portions of multiple County of Hawai'i roadways in Na`alehu. A summary of the Proposed Project and associated figures are enclosed for your review. As part of the EID / EA Consultation process, we are soliciting any comments that you may have on the Proposed Project. Please submit comments via email to publiccomment@wilsonokamoto.com, or written comments via mail to: Wilson Okamoto Corporation 1907 South Beretania Street, Suite 400 Honolulu, Hawaii 96826 Attention: Mr. Keola Cheng We would appreciate your written comments by April 28, 2024. If you have any questions or require additional information, please feel free to call Ms. Harlee Meyers, or myself, at (808) 946-2277. Sincerely, Keola Cheng Director - Planning Enclosures cc: Mr. Mark Grant, Wastewater Division Project Coordinator Mr. Chris Sparber P.E., Acting Wastewater Division Chief NA'ALEHU LCC CLOSURE ENVIRONMENTAL INFORMATION DOCUMENT & ENVIRONMENTAL ASSESSMENT CONSULTATION PACKAGE 1. BACKGROUND On behalf of the County of Hawaii (County) Department of Environmental Management (DEM), Wilson Okamoto Corporation has prepared this Consultation Package to notify stakeholders of the preparation of a Draft Environmental Information Document (EID) / Environmental Assessment (EA) for the Na'alehu Large Capacity Cesspool (LCC) Closure (Proposed Action), as well as to solicit scoping input. The Proposed Action will be situated within the community of Na'alehu in the Kau District, Island of Hawai'i (See Figure 1). • The Na'alehu community was established as the result of the sugar operations of the C. Brewer Company. A portion of the community is serviced by a sewer system that was privately built, owned, and operated by the C. Brewer Company, which merged with Hawaiian Agriculture Company (HAC) in 1972. The wastewater collected by the sewer system discharges into three large capacity "gang" cesspools (LCCs). Many years after its establishment, the private sewer system ownership was conveyed to the County of Hawaii Department of Environmental Management. In anticipation of C. Brewer's dissolution, C. Brewer proposed, and the County agreed, to enter into a formal agreement not only to construct and maintain a new and improved community sewer system but to assume ownership of the existing system including the LCC's by April 30, 2010. Meanwhile, in 1998, the U.S. Environmental Protection Agency (EPA), promulgated regulations, 40 Code of Federal Regulations (CFR) 144,14, that require the elimination of LCCs. In 1999, EPA issued regulations under the Safe Drinking Water Act's (SDWA) Underground Injection Control (UIC) Program which prohibited the construction of new LCCs as of April 2000 and required the closure of all existing LCCs by April 5, 2005 (40 C.F.R. § 144.88). Under federal regulations, an LCC is a cesspool which serves multiple dwellings, or for non-residential facilities has the capacity to serve 20 or more persons per day. In June 2017, the EPA and the County entered into an Administrative Order on Consent (AOC) to close the LCCs serving the Na'alehu community by June 2021. Options considered by the County to close the LCCs include construction of a new sewer collection system located within public right-of-way (ROW) and replacement of the existing LCCs with a wastewater treatment plant (WWTP) to address the wastewater treatment and disposal needs of the N&Nehu community. A recently Amended AOC was agreed upon between EPA and County, and took in effect August 22, 2022, which requires the LCCs to be closed no later than December 31, 2027. As of August 22, 2022, the County of Hawaii and the EPA voluntarily entered into an Amended AOC for the purpose of bringing the County into compliance with the requirements of the SDWA, 42 U.S.C. § 300f, et seq. EPA has determined that the County, as the current owner and/or operator of two LCCs that serve approximately 109 private residences in the community of Pahala and three (3) LCCs that Na'alehu LCC Closure EID/ EA Early Consultation Package —March 2024 1 serve approximately 164 private residences in the community of Na'alehu, violated and continues to violate the SDWA and its Underground Injection Control program requirements for existing LCCs. The Amended AOC (Docket No. SDWA-UIC-AOC-09-2017-0002) LCC closure requirements for the Na'alehu community mandates that an EID be prepared by the County of Hawai'i for the EPA approval to meet Federal Environmental Review Requirements. The Amended AOC 31.a. requires evaluation of four feasible options: 1. A package plant and new collection system (Alternative 1) 2. A package plant connected to the existing collection system (Alternative 2) 3. A maintenance contract model Individual Wastewater System (IWS) program (Alternative 3) 4. An operating permit model IWS program (Alternative 4) In addition, to meet the requirements of the EPA, this EID / EA will also evaluate: 5. A No Action alternative. The subject EID intended to be consistent with requirements of the National Environmental Policy Act (NEPA) 42 U.S.C. § etseq. and will also provide documentation of necessary compliance with Section 7 of the Endangered Species Act and Section 106 of the National Historic Preservation Act. Further, the document shall be prepared pursuant to Hawai'i Revised Statutes (HRS) §343-5 (1) which outlines requirements for environmental disclosure for actions that propose the use of state or county lands or the use of state or county funds. This project may also be funded by the DOH Clean Water State Revolving Fund (CWSRF) Program. Under the CWSRF program, the project consists of two parts: Na'alehu Large Capacity Cesspool Conversion and NaWehu Wastewater Collection System. The CWSRF Program was created by the federal Water Quality Act of 1987 and authorizes low interest loans for the construction of publicly owned wastewater treatment works. Supporting studies, to be included within the EID / EA, are anticipated to include Archaeological and Cultural documentation, including a Ka Pa'akai Analysis, as well as Botanical /Faunal Surveys and regulatory coordination. The County will seek to coordinate with the State of Hawaii Department of Health (DOH) to ensure timely review and concurrence by the State of Hawaii State Historic Preservation Division (SHPD) and the US Fish and Wildlife Service (FWS). Na'alehu LCC Closure EID / EA Consultation Package —March 2024 �a 2. PROJECT DESCRIPTION AND ALTERNATIVES The Proposed Action includes the construction of facilities which would allow the County to close the three LCCs in NNNehu and thereby meet the compliance requirements of the Amended AOC and the applicable portions of the Clean Water Act. The Proposed Action would be achieved by any of the 4 alternatives set forth in the Revised AOC and described below. Alternative i - Package Plant with New Collection System Under Alternative 1, the County would construct a new sewer collection system in the Na'alehu community to replace the existing system of gravity lines that convey sewage to the three LCCs and connect it to the proposed wastewater treatment and disposal facility. The WWTP would serve the former Brewer lots as well as newly accessible parcels for future connection to the WWTP (See Figure 2). The potential connection of additional parcels may be further assessed by the County in the future. During constructuon, the County shall ensure that residential units can maintain access to the sewer system at all times. Alternative 1 involves utilizing the existing collection system within the Brewer Company house lots and constructing new gravity sewers, wastewater pump station, and force main to transport sewage from the LCCs to the new WWTP (See Figure 3). Alternative 1 also involves the installation of gravity sewers to replace the existing collection system (See Figure 4). Under this alternative, the County would perform the following actions: 1. Construct a new gravity sewer on Kaalaiki Road and Na'alehu Spur Road to the WWTP located on a portion of Tax Map Key (TMK) (3) 9-5-007:016I 2. Implement drainage improvements within the vicinity of the WWTP within TMKs (3) 9-5- 007:016 and (3) 9-5-021:015. 3. Construct a new pump station located on a portion of TMK (3) 9-5-008:048, and construct a new force main, which crosses an existing storm drainage channel at Melia Street, to connect to the Kaalaiki Road gravity sewer. 4. Construct a new gravity sewer on Opukea Street and Ohai Road to intercept existing flows entering the LCCs and divert sewage to the wastewater pump station (WWPS) and transport flows to the gravity sewer along Kaalaiki Road. 5. Install gravity sewers within the streets to replace the existing collection system. 6. Close and abandon the three LCCs. 7. Accomodate future expansion of subsurface effluent disposal located within a portion of TMK (3) 9-5-022:001 Na'alehu LCC Closure EID / EA Consultation Package —March 2024 3 Alternative 2 -Package Plant with Existing Collection System Under Alternative 2, the County would perform the same actions as described under Alternative 1; however, gravity sewers would not be installed within the streets to replave the existing system. Instead, the new wastewater treatment and disposal facility and pump station would be connected to the existing 80-year old collection system. Alternative 3 -Individual Wastewater System -Maintenance Contract Model Hawaii Revised Statutes, Title 14, Taxation, Chapter 235, Income Tax Law, § 235-16.5 defines a septic system as an individual wastewater system (IWS) that typically consists of a septic tank, piping, and a drainage field where there is natural biological decontamination as wastewater discharged into the system is filtered through soil. The August 2023 PER, stated the State DOH Wastewater Branch is responsible for regulating IWS systems. The Revised AOC sets forth that the County Hawaii must administer a more active management strategy than is typically found in Hawai'i IWS systems. The Revised AOC states either a Model 2 (Maintenance Contract) or a Model 3 (Operating Permit) must be used IWS systems at Pahala. Figure 4 shows the lots where the IWS systems shall be constructed. The April 2023 PER indicates for a Model 2 Alternative, the County is to: • Fund design and manage project construction of the IWS systems; • Administer and manage a maintenance program for IWS; o The maintenance program would entail establishing rules and regulations, for monthly fees/penalties, County monitoring and reporting, and IWS educational information for homeowners • Conduct routine maintenance and operate system, and respond to related trouble calls; and • Prepare and submit related notices and reports. Under Alternative 3, the County funds and manages project construction of the IWS which typically consist of a septic tank, disposal systems (leach field or seepage pit), and interconnecting piping between the IWS and the existing dwelling. The County will administer and manage a maintenance program for the IWS. The maintenance program will establish rules and regulations, monthly fees/ penalties, County monitoring and reporting, and IWS educational information for homeowners. Maintenance program includes County personnel being responsible for necessary maintenance to the IWS such as pumping the septic tanks. Na'alehu LCC Closure EID / EA Consultation Package —March 2024 0 Alternative 4 -Individual Wastewater System -Operating Permit to Homeowners UPI 2023 PER indicates for a Model 3 Alternative, the County is to: • Fund design and construction of the IWS systems; • Administer an operating permit program for the IWS system to the homeowners, • Issues maintenance notice to the homeowner. Under Alternative 4, the homeowners would be responsible for maintenance scheduling, contracting and paying for a service provider to conduct the necessary maintenance and/or responding to trouble calls, monitoring and record keeping of maintenance. Under Alternative 4, County is evaluating the possibility of either completing the project as a conventional Design/ Bid/ Build process, or under a voucher program, which the County would administer a voucher program which will grant homeowners with funding to hire Professional Engineer to design new IWS and hire Contractor to construct IWS. Under the voucher program homeowners will be responsible to hire and coordinate with Professional engineer for placement of IWS and overall design of IWS. 2.1. PROJECT LOCATION &SETTING The community of Na'alehu is located about 64 miles southwest of Hilo in the Ka'u District. Mamalahoa Highway (State Route 11) runs through the community from East to West. The community of Va lehu is about 2.06 miles from the shoreline. Most of the community lies between approximately 740 feet above mean sea level. Even though Kau was one of the originally settled areas in the Hawaiian Islands, it remains a vast remote area. Only a fraction of a percent of the Ka'u District has been developed with residential properties, and the remainder is largely used for agricultural purposes or is undeveloped. The Ka'u District covers about 922 square miles (approximately 590,000 acres), with over 80 miles of virtually undeveloped coastline. Nearly two-thirds of its total land area is in the Conservation District, The Ka'u District consists of several communities, including the NTilehu community, which has a population of approximately 810 persons according to the US Census Bureau American Community Survey, 2020. The distance to the communities of Hilo and Kailua- Kona means that the Ka'u District is relatively isolated from the major infrastructure systems found in those communities, including wastewater treatment and disposal facilities. 2.2. PURPOSE AND NEED DEM has outlined that the purpose and need for the Proposed Action is to comply with the requirements and mandates of the SDWA and AOC, and to ultimately close the three LCCs that serve Na'Mehu in accordance with the Revised AOC. Thus, the core purpose of this exercise is to evaluate, gather community input, and make an informed decision in selecting an option or Na`alehu LCC Closure EID / EA Consultation Package —March 2024 5 alternative that will allow the County to close the LCCs, and provide a new, SDWA compliant solution for handling wastewater generated by the Na alehu Community. Closure of the LCCs will eliminate the disposal of untreated sewage into the subsurface which will serve the County's mission to protect underground drinking water sources. 3. ENVIRONMENTAL CRITERIA TO BE ANALYZED The EID / EA will evaluate and compare the anticipated environmental impacts of each alternative on the following environmental resource criteria. • Climate • Physiography o Topography o Geology o Soils • Water Resources • Natural Hazards o Sea Level Rise o Flood and Tsunami Threat o Hurricane and Wind Hazard o Seismic Hazard o Volcanic Hazard o Fire Hazard • Flora & Fauna • Cultural, Historical, and Archaeological Resources • Air Quality & Odors • Noise • Energy and Natural Resources o Energy Sources o Water Resources o Land Use • Roadways And Traffic • Hazardous Materials • Socioeconomics & Environmental Justice • Sustainability • Human Health and Safety 4. CONSULTATION This Consultation Package has been circulated to the following parties: Federal Agencies US Army Corps of Engineers, Honolulu District US Department of Agriculture Natural Resources Conservation Service Na`alehu LCC Closure EID / EA Consultation Package —March 2024 t� US Environmental Protection Agency US Fish and Wildlife Service National Oceanic and Atmospheric Administration US Department of Transportation Federal Aviation Administration State Agencies Department of Agriculture Department of Accounting and General Services Department of Business, Economic Development & Tourism (DBED&T) DBED&T Land Use Commission DBED&T Office of Planning and Sustainable Development DBED&T State Energy Office Department of Hawaiian Home Lands (DHHL) DHHL — East Hawaii District Office Department of Health (DOH) DOH — Clean Water Branch DOH - Environmental Management Office DOH — Hazard Evaluation and Emergency Response DOH — Safe Drinking Water Branch DOH — Wastewater Branch Department of Land and Natural Resources (DLNR) DLNR State Historic Preservation Division DLNR Land Division Department of Transportation Office of Hawaiian Affairs University of Hawaii County of Hawaii Fire Department Police Department Planning Department Research and Development Department of Public Works Department of Parks and Recreation Department of Water Supply Environmental Management Commission Office of the Corporation Council Office of Housing and Community Development Na'alehu LCC Closure EID / EA Consultation Package —March 2024 n Elected Officials State Senator Dru Mamo Kanuha, Senate District 3 Representative Jeanne Kapela, House District 5 Councilmember Michelle Galimba, Council District 6 Public Utilities Hawaiian Electric Company Hawaiian Telcom Spectrum Hawaii Hawai'i Gas Other Parties Hawaii State Library 45lehu Public Library Hawaiian Civic Club of Ka'u Ka'u CDP Action Committee Ka'u Calendar 'O Ka'u Kakou Na'alehu LCC Closure EID / EA Consultation Package —March 2024 WL no 10 PROJECT VICINITY{� •' '• ♦ y sun'' SPS Approx. Area ONA!eR� .�' 4•, , �� .NAHELE ST �' " ' ' t/�'•- - �i�,, �o m C tiOKE�N15T ?,a, r rr.:-1` \ MPMP NO N ' � � ' ��►. ` y � KILIKA�ST • i Existing LLC (4) • • - Existing LLC wo Gravity Sewer to W WTP . AMA�AHOAw ,r`' MAKfAlLAHOA H ' Pon 0 PROPOSED DRAINAGE`. • Jr .* r••�. , �y MODIFICATION AREA .�• y� :+ •„. aft Existing LLC (3) , • - - • �� �� `. �. 'H . • . w . V, �• *46 0 PROPOSED WASTEWATER • .'� �� �,��. �.sa' .. :.��., - +� - TREAMENT PLANT • . � r� 1 a N 0' ' ' ' 525L0501,575- •,' +. Pill PROJECT LOCATION MAP FIGURE NA'ALEHU WASTEWATER TREATMENT PLANT 1 311, V Y � ,t sr- `-�,-,,,. � . - � x=�� . •�r. _` �{ - 9 �-_'4 ��� OHA R o c �oK '.� ,.�\ � . \\ t � "�� ���s- � / - 4 1 � ��' • r ' _ ��'�� • � _. , � _ _ - SPS Approx. Area � y � OPUKEA ST ..- ,-- _ ,, T �•► � ' � _ � ... � - mac' � - • - I - ` ,- MA_MALAHOA HWY - _ � � �� �"� � „ - - � • �'�� \ LEGEND �,. �'�� � f �. � . � � TMK Parcels �,,� � , '� !r � *. s �. 'ice' �, � _ � Roads � • � � • �.=_ `� • . : � M Existing Accessible Lots h' New Accessible Lots .. -• ' �� r. �� ,�:�� �', _ " �, ',�- rQ•'~er�'. .� Potentially Newly rE '+! • r' ® '�.'�*.�. _ .. Accessible 0' S2S 1,050' 1,575' ' � � � N � .i ,�,�y"',. �. - � . � WWTP SER�OICE AREA FIGURE 2 NA'ALEHU WASTEWATER TREATMENT PLANT +.. : ! KILIK� _f w 1t ,,�i SFM ��L �A- - poll L . � �.pp,U >1�+. • .I Existing LLC (4) Gravity Sewer to WWTP �pH�A MAMA ill OF IL N V SZS 1,050' 1,575' r • ", Existing LLC (3) dW MOL SPS ApprI Area r Existing LLC (5) ti „� LEGEND ' v - TMK Parcels NEW COLLECTION SYSTEM LAYOUT NAALEHU WASTEWATER TREATMENT PLANT - � Roads Existing Accessible Lots • Existing Sewer Manhole —►-- Existing Sewer Mains Existing Large Capacity Cesspool (LCC) Phase 1 Gravity Sewer Gravity Sewer To WWTP FIGURE 3 i In . �, re r /10 ma's iNq N •r lei IF WIN ft IIIIII "Opp "owe SPS A rox. Area 9� ` D Pilo *' - Via; ' H LEAST N.\ - - , PjA �� IN El•ANI.ST ��.PC IPN IF like _ �� • .�,.. w KILIKAST \ OP _ UK 61 ;tlt c AMA�PH 1 t _ No MAIVIALAHOA�HWAY • _ lot. � 40 ` Sir .• �- .j 1 L'." VL LEGEND IN so CIL 4 • ' i * •.0 ! �_ } • TMK Parcels 'IF* w • *1It � Roads .` • ` . + �_ . 4ANO t. i Existing Accessible Lots S* JibIt IN 0 New Accessible Lots :.;• War ' �•' .� � ry +f * • � �. ; � _ _ _ _ Private Lateral in Easement Y View , rIlk A. N 0' Gravity Sewer 525' 1,050' 1 ;7 1 k r4 II ` P I I ims EXISTING COLLECTION SYSTEM REPLACEMENT FIGURE 4 NAALEHU WASTEWATER TREATMENT PLANT qp • �" TIC- 46 � �4P 'F' �i s.. r '• ,' e. AL g �r'• •`�' �N HELEST �01O" f EOKEIANI STON „ . Oman ' -� t' , ` �_ � a Kll•IKA ST�r �� l it `� • `� .. wmar ► _ '.gyp PMp�AHOAH ► • +�• - — vi IVIq A�HOIq'H'WY } ` p410 r•iOle wIt a '.,t., IRON MI 0409 mw, A' NOW WIVI ��} •i'• �^ • .' tom# \ 1 • • I. . LEGEND low'{ ✓ r; • + : } TMK Parcels ANY •y� y • ` Roads IV at '« ` ._ ^0" �r • ;"- Existing Accessible Lots 0' 525' 11050' 1,575' ' w"~ IWS ALTERNATIVE FIGURE NA'ALEHU WASTEWATER TREATMENT PLANT 5