Loading...
HomeMy WebLinkAbout2023_04_Building_Division_implements_Cloud+Delta_formatCounty of Hawai‘i DEPARTMENT OF PUBLIC WORKS Aupuni Center 101 Pauahi Street, Suite 7 · Hilo, Hawai‘i 96720-4224 (808) 961-8321 · Fax (808) 961-8630 public_works@hawaiicounty.gov County of Hawai‘i is an Equal Opportunity Provider and Employer. Stephen M. Pause, P.E. Director Mitchell D. Roth Mayor Lee E. Lord Managing Director Malia A. Kekai Deputy Director MEMORANDUM No. BLD-23-003 Plan Format for Revisions and Resubmittals: Cloud + Delta Effective April 17, 2023, all permit plan resubmittals and revisions shall consist of the entire plan set which shall be formatted to facilitate identification of changes made to the previous plan set by using a “Cloud + Delta” drafting convention. The following “Cloud + Delta” format shall supersede the previous requirement for unmarked, “clean” plan sets; “clean” plan sets make it difficult to identify new changes and corrections compared to previous plan submittals. Additionally, all resubmittals shall include a correction response letter, and all revisions shall include a revision narrative that describes changes that have been made. Definitions: Approval Block Cloud Corrections Response Letter Delta Delta Number 6” x 6” table that summarizes all reviewer names and date of review. A closed series of arcs forming a cloud shape. A letter dated and signed by the licensed architect or engineer of record that describes corrections made in response to each plan review comment. A triangular symbol bearing the number assigned to a change. A sequential number assigned to each resubmittal or revision set. MEMORANDUM No. BLD-23-00 Page 2 Plan Set Revision Revision Narrative Resubmittal A compiled and sequenced set of plan sheets representing all drawings needed for permit review, construction, and inspection Changes submitted after a Building Permit has been issued that are usually generated by the applicant but could also be a result of a significant correction identified during inspections. A general description of reason(s) for the plan revision, dated and signed by the licensed architect or engineer of record. submitted before a Building Permit has been issued that are often in response to permit application plan review comments. Procedure: Each resubmittal or revision shall be compiled of both previously approved sheets already bearing stamps along with the new revised/resubmitted sheets annotated in the cloud and delta convention. Do NOT include with the resubmittal/revision set previous sheets that havebeen replaced by new sheets. Also, maintain the original drawing sheet numbering sequence, Use a cloud border around all changes that may appear throughout the plan set. Label each cloud with a delta symbol and inscribed delta number for the change depicted in the revision or resubmittal set. The delta number shall be the same for the entire set. For example, the first resubmittal set may include multiple unrelated changes, shall be known as Delta 1 (triangle with an inscribed number 1). Each plan sheet shall include a revision block that summarizes changes made and reason for the change. Each resubmittal or revision set shall have a new title sheet bearing an unfilled approval block. The approval block may be placed where space is available but preferred to be on the bottom right. Refer to the attached sample for clarification for the “Cloud +Delta”. Plan revisions and resubmittals that do not comply with the “Cloud+Delta” format and/ or not submitted with a corrections response letter or revision narrative shall be rejected at permit intake. Permit resubmittals and revisions received prior to April 17, 2023 will be processed without these requirements. County of Hawai`i is an Equal Opportunity Provider and Employer.