HomeMy WebLinkAboutBLG_Project_Declaration_051620Hawaiʻi County is an equal opportunity provider and employer Page 1 of 3
Project Declaration
Last Updated: 5-1-2023
TMK Property Owner Name Permit Number
Project Includes:
☐Building Work ☐Plumbing Work
☐4 bathrooms or more
☐Electrical Work
☐over 200 Amp service
STATEMENT ACCOMPANYING PERMIT APPLICATION PURSUANT TO CHAPTER 444, H.R.S. (RELATING TO CONTRACTORS)
SELECT BUILDING/GENERAL CONTRACTOR OR OWNER-BUILDER
☐BUILDING/GENERAL CONTRACTOR
I declare that I am licensed under the provisions of Chapter 444, HRS, of the Department of Commerce & Consumer Affairs,
State of Hawaii. My license# is in full force and in effect.
Signature of RME or Sole Proprietor Date
NOTE: RME (Responsible Managing Employee) or Sole Proprietor, is required to sign.
Building/General Contractor License Name License # Lic. Expiration
Date
Phone#
Business Address
RME Full Name RME Work Phone
RME Email Address RME Cell Phone
☐OWNER-BUILDER
Section 5-1-5 Definition “Owner-builder” means owners or lessees of property who build or improve buildings or structures
on their property for their own use, or for use by their immediate family. This definition shall not preempt owner-builder by
exemption as defined by section 444-2.5, Hawai`i Revised Statutes
I declare an exemption under Sec. 444-2(7) for the following reasons:
1) This exemption allows me, as the owner or lessee of the property, to act as my own general contractor without
possessing a license.
2) To supervise the construction myself
3) To hire licensed subcontractors
4) The building is for my personal use and not for the use or occupancy by the general public.
5) Building will not be built for sale or lease within one (1) year after construction is complete.
Property Owner Name Property Owner Signature Date
Hawaiʻi County is an equal opportunity provider and employer Page 2 of 3
TMK Property Owner Name Permit Number
LIST ALL SUBCONTRACTORS
Where electrical or plumbing work is included, applicant must identify all phases of such work to be covered and the contractor completing the
phase. Refer to page 3 of this form for a reference list of all phases of electrical and plumbing work.
Contractor License Name License # Lic. Expiration Date
Work Phone Cell Phone Phase(s) – See reference lists on page 3 of this form.
RME Full Name RME Work Phone
RME Email Address RME Cell Phone
Signature of RME or Sole Proprietor Date
Contractor License Name License # Lic. Expiration Date
Work Phone Cell Phone Phase(s) – See reference lists on page 3 of this form.
RME Full Name RME Work Phone
RME Email Address RME Cell Phone
Signature of RME or Sole Proprietor Date
Contractor Name License # Lic. Expiration Date
Work Phone Cell Phone Phase(s) – See reference lists on page 3 of this form.
RME Full Name RME Work Phone
RME Email Address RME Cell Phone
Signature of RME or Sole Proprietor Date
Contractor Name License # Lic. Expiration Date
Work Phone Cell Phone Phase(s) – See reference lists on page 3 of this form.
RME Full Name RME Work Phone
RME Email Address RME Cell Phone
Signature of RME or Sole Proprietor Date
Hawaiʻi County is an equal opportunity provider and employer Page 3 of 3
ELECTRICAL PHASES
LIST IS FOR REFERENCE ONLY. WRITE PHASE(S) WITHIN SUBCONTRACTOR’S SECTION ON PAGE 2.
PLUMBING PHASES
LIST IS FOR REFERENCE ONLY. WRITE PHASE(S) WITHIN SUBCONTRACTOR’S SECTION ON PAGE 2.
E1 Temporary Installations
E2 Service Equipment HELCO
E3 Feeder Wiring
E4 Branch Circuit Wiring
E5 Electrical Equipment Installation
E6 Device and Fixture Installation
E7 Fire Alarm System
E8 Swimming Pool Wiring
E9 Solar Water Heater Wiring
E10 Landscape Lighting and Sprinkler Wiring
E11 Sign Installation Connection
E12 Alt. Energy Installation (PV/Wind/Generator)
E13
Low Voltage Wiring
Audio/Visual Wiring
Security System Wiring
Data Communication/Computer Wiring
E14 Air Conditioning/Refrigeration Control Wiring
E15 Motor Installation
E16 Street Lighting/Traffic Signal Installation
E17 Empty Conduit Installation
E18 Site Work Utilities Installation
E19 As Built/Work Started Without Permits
E20 Demolition Work
P1 Temporary Water
P2 Plumbing Fixtures, Equipment
P3a Sanitary Piping System (Interior)
P3b Sanitary Piping System (Exterior)
P3c Grey Water Waste System
P3d Sewer Lateral Connection
(Including Interceptors, Clarifiers)
P3e Private Individual Waste System
(Including Interceptors, Clarifiers)
P3f Private Wastewater Treatment Plants
P4a Water Distribution System (Interior)
P4b Building Supply (Outside Water Piping)
P4c Water Distribution Main (Subdivision, piping)
P4d Water Equipment – Backflow Preventer,
Pressure Regulator
P4e Water Tank – (Pump/Filter/Water Treatment)
P4f Non Potable Water Distribution
P5c Standpipes
P6a Fuel Gas Piping System and fittings
P6b
Gas Appliance
Qty
P7a Solar Water Heating System (Except Water
Supply)
P7b Solar Water Heater – Water Supply
P9 Swimming Pool – Potable Water Supply,
Sanitary Drainage, Backflow
P10 Air Conditioning – Water Supply,
Including Backflow Preventer
P11 Alt. Energy (Heat Pumps, PV Hot Water)
P13 Gas Station Piping
P14 As-Built