HomeMy WebLinkAbout2024-10 EMC Meeting_Presentation SlidesEnvironmental Management Commission Briefing
County of Hawaii, Department of Environmental
Management
Wastewater Facilities and Cesspool
Conversion Plans
October 30, 2024
C A R O L L O / 2
updatefooter0323.pptx/2updatefooter0323.pptx/2Objectives
•Provide an overview of the components of the Wastewater Facilities and the
Cesspool Conversion Plans.
•Summarize public outreach efforts completed to date and feedback received.
•Present an update of cesspool conversion planning activities.
C A R O L L O / 3
updatefooter0323.pptx/3updatefooter0323.pptx/3Discussion Topics
•Wastewater Facilities and Cesspool Conversion Plan Overview
•Public Outreach Completed to Date
•Cesspool Conversion Plan Status Update
»Conversion categories
»Criteria for draft sewer extension projects
»Criteria for potential decentralized projects
»Summary of potential cesspool conversions by method
•Anticipated Schedule
1 Wastewater Facilities and Cesspool
Conversion Plan Overview
C A R O L L O / 5
updatefooter0323.pptx/5updatefooter0323.pptx/5The Wastewater Facilities and Cesspool Conversion Plans are Key Elements
of the Integrated Wastewater Master Plan
Cesspool Conversion Plan
Wastewater Facilities Plan
Integrated Wastewater Master Plan
Organizational Chart
Operations and Maintenance Manuals
Regional Plans
C A R O L L O / 6
updatefooter0323.pptx/6updatefooter0323.pptx/6Wastewater Facilities Plan
•Incorporates recommendations for extending
sewer service areas
•Identification of wastewater treatment plant
(WWTP) and sewage pump station (SPS)
improvements to address:
» Condition deficiencies
» Capacity for cesspool conversions
» Potential future regulations
• Development of a wastewater capital
improvement plan (CIP)
»Existing CIP
»New capital projects
Existing Hilo Sewer Service Area Wastewater Facilities Plan
C A R O L L O / 7
updatefooter0323.pptx/7updatefooter0323.pptx/7Cesspool Conversion Plan
•Findings and recommendations for:
» Extension of existing County sewer service areas
» Potential new decentralized system (with a new “package” WWTP or
connection to existing non-County WWTP)
» Conversions to upgraded individual wastewater systems (IWS)
https://www.epa.gov/septic/types-septic-systems
https://twri.tamu.edu/publications/txh2o/2022/winter-2022/bigger-is-not-always-better-decentralizing-texas-wastewater-infrastructure/
Decentralized Wastewater
Treatment System Cesspool Conversion PlanSeptic Tank and Leachfield
2 Public Outreach Completed to Date
C A R O L L O / 9
updatefooter0323.pptx/9updatefooter0323.pptx/9Attendance and Participation
Date Region Location Sign Ins1 Comment
Cards2
Survey
Responses3
2/13/2024 West Old Kona Airport Pavilion 56 9 19
2/15/2024 East Aunty Sally Kaleohano's Luʻau Hale 100 11 43
2/27/2024 South Naalehu Community Center 8 1 1
2/28/2024 North Kohala Intergenerational Center 24 7 13
Notes:
1 Some groups of 2 or more signed in under one name.
2 For general comments.
3 In response to following questions:
• Which community do you live in?
•What are your top 3 concerns about cesspool conversions?
•Is there anything else you would like to learn regarding
cesspool conversions?
C A R O L L O / 10
updatefooter0323.pptx/10updatefooter0323.pptx/10Common Questions/Comments
•Costs
•Concern about the costs of cesspool
conversions and requests for funding
support
•Concern for the risk of paying twice:
present conversion to upgraded IWS
and future sewer connection
C A R O L L O / 11
updatefooter0323.pptx/11updatefooter0323.pptx/11Common Questions/Comments (cont’d)
•IWS
•Requests for more information on conversion
technologies
•Concern that the effluent quality from septic
tanks is not significantly improved over
cesspools
•Concerns about site constraints (e.g., space)
and restoration for onsite conversions
•Concern about adequacy of workforce
availability
•General requests for homeowner resources (e.g.,
where to find contractors, engineers, how to
maintain IWSs)
•Questions on regulations related to composting
toilets and gray water for residential reuse
C A R O L L O / 12
updatefooter0323.pptx/12updatefooter0323.pptx/12Common Questions/Comments (cont’d)
•Centralized/decentralized options
•Questions if there are recycled water
opportunities
•Questions on the possibility of connecting
to decentralized/non-County WWTPs
•Questions on the County’s timeframe and
plans for sewering
•Provide more public information and
education on the improved water quality
C A R O L L O / 13
updatefooter0323.pptx/13updatefooter0323.pptx/13Tally: Which aspects of cesspool conversion are most important to you and your community?
Construction Cost
Annual Operation and Maintenance Cost
Compliance with
Legislative Requirement
Utilization and
Availability of Land
Environmental ConcernsResponsibility for Operation and
Maintenance
Kona Hilo Naalehu Kohala
31 55 12 25
Kona Hilo Naalehu Kohala
11 22 1 7
Kona Hilo Naalehu Kohala
15 24 1 8
Kona Hilo Naalehu Kohala
9 10 0 9
Kona Hilo Naalehu Kohala
19 11 3 7
Kona Hilo Naalehu Kohala
29 40 4 7
Highest 2nd Highest 3rd Highest
•Boxes were used to represent each aspect of cesspool conversion
•Participants were given three tickets to vote by placing a ticket in
their preferred boxes.
2 Cesspool Conversion Plan Status
Update
C A R O L L O / 15
updatefooter0323.pptx/15updatefooter0323.pptx/15The Cesspool Conversion Plan will Identify Potential Methods
for Conversion for the County’s ~48,600 Cesspools
Individual Wastewater System
≈70%
Existing Service Areas
≈20%
C A R O L L O / 16
updatefooter0323.pptx/16updatefooter0323.pptx/16Cesspool Conversion Categories for Existing Service Areas
•Sphere 1
»Within the initial sewer extension service area boundary.
»Must connect to the sewer system and treatment plant.
»Increased flows are within existing collection system and treatment plant capacities.
•Sphere 2
»Outside the initial sewer extension service area boundary.
»May connect to the sewer system and treatment plant but may require system
expansion.
»Decentralized sewer system potential.
»IWS potential.
•Sphere 3
»Outside the initial extension sewer service area boundary.
»IWS is the primary potential conversion method.
C A R O L L O / 17
updatefooter0323.pptx/17updatefooter0323.pptx/17WWTP
Existing sewer
system and WWTP
Conceptual Cesspool Conversion Categories – Existing
C A R O L L O / 18
updatefooter0323.pptx/18updatefooter0323.pptx/18WWTP
Conceptual Cesspool Conversion Categories – Sphere 1
Sewer system
extension
Sewer system
extension
C A R O L L O / 19
updatefooter0323.pptx/19updatefooter0323.pptx/19WWTP
WWTP
Conceptual Cesspool Conversion Categories – Sphere 2
Decentralized
system Sewer system
extension
IWS
WWTP expansion
& sewer system
upgrades
Sewer system
extension
C A R O L L O / 20
updatefooter0323.pptx/20updatefooter0323.pptx/20WWTP
WWTP
Conceptual Cesspool Conversion Categories – Sphere 3
IWS
IWS
IWS
C A R O L L O / 21
updatefooter0323.pptx/21updatefooter0323.pptx/21Criteria for Selection of Potential Sphere 1 Sewer Conversion Priority
Areas/Projects
•Selection Criteria
»Prior EPA grant commitments (Hilo service area)
»Lot size
»Proximity to an existing sewer
»Available WWTP capacity
»Department of Health (DOH) cesspool priority
»Cesspool density
»Logical neighborhood boundaries and contiguous areas
»Affordable housing
»DHHL and federal entities
»Commercial and Industrial entities high pollutants and under the pretreatment AOC
»Residential homes and small businesses
C A R O L L O / 22
updatefooter0323.pptx/22updatefooter0323.pptx/22Hilo Example - Existing
C A R O L L O / 23
updatefooter0323.pptx/23updatefooter0323.pptx/23Hilo Example – Sphere 1
Sewer system
extension
C A R O L L O / 24
updatefooter0323.pptx/24updatefooter0323.pptx/24Hilo Example – Sphere 2
Sewer system
extension/
Decentralized
WWTP
expansion
C A R O L L O / 25
updatefooter0323.pptx/25updatefooter0323.pptx/25Hilo Example – Sphere 3
IWS
IWS
C A R O L L O / 26
updatefooter0323.pptx/26updatefooter0323.pptx/26Draft Sphere 1 Sewer Extension Project Summary
Service Area No. of Projects No. of Cesspools
Hilo 14 4,320
Kealakehe 10 3,343
Honokaa 5 326
Papaikou 5 235
Kulaimano 3 31
Kapehu 0 0
Pahala 1 300
Naalehu 1 94
Total 39 8,649
C A R O L L O / 27
updatefooter0323.pptx/27updatefooter0323.pptx/27Criteria for Selection of Potential
New Decentralized Systems
•Identified areas with 50 cesspools within a 1/8 mile
radius
»66 areas, 17,390 cesspools
•Removed areas within proposed extension of
existing service area boundaries
•Reviewed each potential area; grouped if within 2
miles
»Cost of package WWTP vs. 2 miles of pipe
•Added the Puako community
•Resulted in 26 potential decentralized opportunities
C A R O L L O / 28
updatefooter0323.pptx/28updatefooter0323.pptx/28Potential Decentralized Project Opportunities
Location No. of
Cesspools
Puna 123
Puna 230
Puna 88
Puna 190
Hilo 3,079
Hilo 156
Hilo 92
Honomu 135
Laupahoehoe 86
Paauilo 136
Honokaa/Paauhau 126
Honokaa 335
Hawi 181
Hawi 180
Location No. of
Cesspools
Waimea 822
Waimea 445
Waikoloa Village 371
Kealekehe 1,609
South of Kealekehe/Honalo 273
South of Kealekehe/Kealakekua 56
South of Kealekehe/Captain Cook 191
South Captain Cook/Pebbles Beach 127
Ninole Cove 76
Puako 196
Hawi 281
Hawi 196
TOTAL 9,723
C A R O L L O / 29
updatefooter0323.pptx/29updatefooter0323.pptx/29Preliminary Summary of Potential Cesspool Conversions by Method
Cesspool Conversion Method No. of
Projects
No. of
Cesspools
Percent of
Total
County-Led Sewer Extension to Existing County WWTP 39 8,649 17.8%
Potential Community-Led New Decentralized
System/Extension to Existing Non-County WWTP 26 9,723 20.0%
Property Owner-Led IWS 30,224 62.2%
Total 48,596 100%
3 Anticipated Schedule
C A R O L L O / 31
updatefooter0323.pptx/31updatefooter0323.pptx/31Anticipated Schedule (pending County Management confirmation)
•Draft Cesspool Conversion Plan – Q2, 2025
•Draft Facilities Plan – Q3, 2025
•Draft Integrated Wastewater Management Plan – Q3, 2025
C A R O L L O . C O M
Mahalo!