Loading...
HomeMy WebLinkAbout2024-12-17 Water Board Agenda Kea Keolanui, Dist. 1, Board Member Stephen Kawena Lopez James Kimo Lee, Dist.2,Board Member Chairperson Dist. 8 Thomas Brown, Dist. 3, Board Member Emily Taaroa, Dist. 5, Board Member Keith Unger, Dist. 6, Board Member Michael Pono Kekela Vice Chairperson Michael Bell, Dist. 7, Board Member Dist. 4 Benjamin Ney, Dist. 9, Board Member DEPARTMENT OF WATER SUPPLY WATER BOARD MEETING AGENDA MEETING DATE: December 17, 2024 TIME: 10:00 a.m. IN-PERSON LOCATION: Department of Water Supply, Hilo Operations 889 Leilani Street, Hilo, REMOTE MEETING LINK: https://www.facebook.com/HawaiiDWS/live_videos/ STATEMENTS FROM THE PUBLIC: Public testimony may be done in person or in writing by email (dws@hawaiidws.org), fax (808-961-8657), or by regardless of time of receipt, will be part of the permanent record. Remote Oral Testimony: Telephone testimony may be presented by calling 1(669) 254-5252 and entering meeting ID 160 853 4368. Please wait for the Chair to ask for testimony on the item you are interested in. The Chair will unmute testifiers who call in, one phone number at a time. Optional Alternative to Present Remote Oral Testimony: If you would like to testify via an online video link, please email dws@hawaiidws.org at least 24 hours before the meeting to request the link. You may also email to pre-register to present telephone testimony if you wish to be called on by name or before those who have not pre-registered. Testifiers who wish to remain anonymous or have not pre-registered may still call the testimony phone number and follow the instructions listed above. ADDITIONAL INFORMATION: here General information about the board is available at About the Water Board. In the event the online remote connection is interrupted during the Water Board meeting, the Board shall recess for up to 30 minutes to allow for reestablishing the online remote connections. If the online remote connection cannot be reestablished after 30 minutes the meeting shall be adjourned and then reconvene per the following contingency plans: Board shall reconvene on: December 18, 2024, 10:00 a.m. Board shall reconvene at: DWS, Hilo Operations, 889 Leilani Street If you would like to testify via an online video link, please email dws@hawaiidws.org before the meeting to request the weblink or phone number to testify. 1) CALL TO ORDER 10:00 a.m. (please turn cell phones off or set to silent) 2) STATEMENTS FROM THE PUBLIC Pursuant to HRS §92-3, oral testimony may be provided entirely at the beginning of the meeting, or immediately preceding the agenda item. 3) APPROVAL OF MINUTES: Minutes of the November 26, 2024, Water Board Meeting 4) APPROVAL OF ADDENDUM AND/OR SUPPLEMENTAL AGENDA (if necessary) (Note: Roll Call Required) 5) SOUTH KOHALA: A. JOB NO. 2024-12, F&D WAIMEA WATER TREATMENT PLANT CHEMICAL INJECTORS: Chair: Is there any testimony for this item? This project generally consists of furnishing all labor, materials, tools, taxes, and equipment necessary to furnish and deliver chemical injection quills and PVC piping as specified within the Special Baseyard at 65-1234 Opelo Rd., Kamuela, Bids for this project were opened on November 7, 2024, at 1:30 p.m., and the following are the bid results: DWS Engineered Engineering Systems, Inc. Evaluation Item 1 - (3 Ea.) Saf-T-Flo HC-100-A-A-4-0-E high corrosion resistance retractable chemical injection quill with 1" valve x 1/2" tube and integrated check valve rated for 250 psi, for use with caustic soda, phosphate and ammonia solution with FHA-CLR- $20,874.33 $24,360.98 050-P-E flexible hose assembly. Flexible hose assembly shall include a true union ball valve, polypropylene hose barbs, braid reinforced vinyl hose, stainless steel hose clamps and FNPT outlet or equal by approval. Item 2 - (2 Ea.) 1/2" MNPT x 1" MNPT Sch. 80 PVC adapters. $0.00 $314.89 Item 3 - (1 Ea.) 1/2" MNPT x 3/4" MNPT Sch. 80 PVC adapter. $0.00 $9.37 Item 4 - (4 Ea.) 1" FNPT x FNPT Spears 2729T-010BL PVC true $0.00 $2,695.82 union diaphragm valves or equal by approval. Item 5 - (2 Ea.) 3/4" FNPT x FNPT Spears 2729T-007BL PVC $0.00 $1,153.24 true union diaphragm valve or equal by approval. Item 6 - (6 Ea.) 1" Sch. 80 PVC MNPT close nipples. $0.00 $13.08 Item 7 - (3 Ea.) 3/4" Sch. 80 PVC MNPT close nipples. $0.00 $22.07 Page 2 of 7 December 17, 2024, Water Board Agenda DWS Engineered Engineering Systems, Inc. Evaluation Item 8 - (2 Ea.) 1" FNPT x FNPT Spears 4529-010BL PVC true $0.00 $787.55 union ball check valves or equal by approval. Item 9 - (1 Ea.) 3/4" FNPT x FNPT Spears 4529-007BL PVC true $0.00 $343.85 union ball check valve or equal by approval. Item 10 - (2 Ea.) 1" 10-150psi Griffco back pressure valves, $1,403.14 $962.01 product code BPG100P or equal by approval. Item 11 - (1 Ea.) 3/4" 10-150psi Griffco back pressure valve, $564.40 $362.48 product code BPG075P or equal by approval. Item 12 - (2 Ea.) 1" MNPT x Socket Sch. 80 PVC adapters. $0.00 $10.06 Item 13 - (1 Ea.) 1" Socket x 3/4" MNPT Sch. 80 reducing $0.00 $13.06 adapter. RECOMMENDATION: It is recommended that the Board award the contract for F&D WAIMEA WATER TREATMENT PLANT CHEMICAL INJECTORS, JOB NO. 2024-12 (MAT) by Items to the following for the amounts shown above, and that either the Chairperson or the Vice-Chairperson be authorized to sign the contract, subject to review as to form and legality by Corporation Counsel. Items 1, 10, and 11 to Engineered Systems, Inc. For Items 2, 3, 4, 5, 6, 7, 8, 9, 12, and 13, no bids were received. Staff will seek alternative procurement pursuant to HAR 3-122-35 to secure pricing in the best interest of the Department. 6) NORTH KONA: A. JOB NO. 2016- REQUEST FOR EXTENSION: Chair: Is there any testimony for this item? extension of 71 calendar days, due to delays with submittals for the fabrication of the surface plate assembly, motor shroud assembly and check valve. These delays were beyond the control of the Contractor. Staff reviewed the request for the time extension and the accompanying supporting documentation and found 71 calendar days to be justified. Note: There are no additional costs associated with this time extension. Ext. Days From (Date) To (Date) Reason # (Calendar) Project completion date was revised as a part 1 7/31/2017 9/15/2024 2,603 of Change Order #2. Page 3 of 7 December 17, 2024, Water Board Agenda Ext. Days From (Date) To (Date) Reason # (Calendar) Manufacturer delays for submittals for surface 2 9/15/2024 12/19/2024 95 plate and motor shroud assemblies, and pump and motor testing. Manufacturer delays for submittals for surface 3 12/19/24 2/28/2025 71 plate and motor shroud assemblies, and check valve. Total Days (including this request) 2,769 RECOMMENDATION: It is recommended that the Board approve a contract time extension of 71 -1056, December 19, 2024, to February 28, 2025. B. JOB NO. 2021-1181, KEAUHOU BOOSTER A REPAIR REQUEST FOR EXTENSION: Chair: Is there any testimony for this item? The Contractor, Beylik/Energetic A JV, is requesting a contract time extension of 233 calendar days, due to delays by the pump manufacturer in providing submittals; fabrication error of the discharge head; scheduling conflicts with the Department; and a logistical error in shipment of materials. Some of these setbacks were beyond the control of the Contractor. Staff reviewed the request for the time extension and the accompanying supporting documentation and found only 163 calendar days to be justified. Note: There are no additional costs associated with this time extension. Ext. Days From (Date) To (Date) Reason # (Calendar) 1 3/31/2023 6/13/2023 74 Manufacturer delays in providing submittals. 2 6/13/2023 9/19/2023 98 Manufacturer delays in providing submittals. Manufacturer delays in providing submittals 3 9/19/2023 2/29/24 163 and scheduling conflict with the Department. Total Days (including this request) 335 RECOMMENDATION: It is recommended that the Board approve a contract time extension of 163 calendar days to Beylik/Energetic A JV, for JOB NO. 2021-1181, KEAUHOU BOOSTER A REPAIR. If approved, the contract completion date will be revised from September 19, 2023, to February 29, 2024. Page 4 of 7 December 17, 2024, Water Board Agenda 7) MISCELLANEOUS: A. DEDICATION OF WATER SYSTEMS: Chair: Is there any testimony for this item? The Department received the following document for action by the Water Board. The water system has dedication. 1. Grant of Easement and Bill of Sale Takamine, East Kahaopea Street Subdivision PL-SUB-2022-000091 Grantors: Steven H. Masumoto and Yvonne N. Estrada, Trustees of the Masumoto Family Irrevocable Trust dated July 1, 2022 Tax Map Key (3) 2-2-044:029 Waiakea, South Hilo, Island of Hawaii, Hawaii Facilities Charge: $91,425.00 Date Paid: 9/11/2024 Final Inspection Date: 12/4/2024 Water System Cost: $156,000.00 RECOMMENDATION: It is recommended that the Water Board accept these documents subject to the approval of the Corporation Counsel, and that either the Chairperson or the Vice-Chairperson be authorized to sign the documents. B. DEPARTMENT OF WATER SUPPLY COLLECTION AND DELINQUENCY POLICIES: Chair: Is there any testimony for this item? Information will be provided to the Board on status updates on collection efforts due to delinquent balances for water service charges with information on current policies and procedures in place for collection and water shut-offs. Discussion will follow along with any recommendations that should be considered for future action. C. MONTHLY PROGRESS REPORT: Chair: Is there any testimony for this item? Submission of Progress Report of Projects by the Department. Department personnel will be available to respond to questions by the Board regarding the status/progress of any project. D. REVIEW OF MONTHLY FINANCIAL STATEMENTS: Chair: Is there any testimony for this item? Submission of financial statements and information relating to the financial status of the Department. Department personnel will be available to respond to questions by the Board relating to the financial status of the Department. Page 5 of 7 December 17, 2024, Water Board Agenda E. ADOPTION OF PROPOSED FINDINGS OF FACT, CONCLUSIONS OF LAW AND DECISION AND ORDER FOR NOVEMBER 26, 2024, CONTESTED CASE HEARING REGARDING WATER SERVICE ACCOUNT NO. 0824400-11 (IN THE MATTER OF THE APPEAL OF ANNETTE LILLIAN KLIEFORTH): Chair: Is there any testimony for this item? The above Contested Case Hearing took place on November 26, 2024, in accordance with Chapter 91 of -5 of the Rules and Regulations of the Department of Water Supply. For review and adoption by the Board of the Findings of Fact, Conclusions of Law and Decision and Order. F. MANAGER-: The Manager-Chief Engineer to provide an update on the following: 1. North Kona Wells 2. Retiree of the Department of Water Supply - David G. Faisca, Building Maintenance Supervisor 3. Pacific Water Conference 6, 2025 G. EXECUTIVE SESSION: MANAGER-CHIEF ENGINEER AND DEPUTY EVALUATION AND COMPENSATION FOR CALENDAR YEAR 2024: The Board anticipates convening an executive meeting to consider the evaluations of the Manager-Chief Engineer and Deputy for its annual performance review, as authorized by County Charter Section 7-ions 92-4 and 92- liabilities pursuant to HRS Section 92-5(a)(4). A two-thirds vote of the members present, pursuant to HRS Section 92-4, is necessary to hold an executive meeting, provided that the affirmative vote constitutes a majority of the board. H. MANAGER-CHIEF ENGINEER AND DEPUTY EVALUATION AND COMPENSATION FOR CALENDAR YEAR 2024: Chair: Is there any testimony for this item? Discussion/action on Manager-Chief Engineer and Deputy evaluation and compensation. I. : 1. Board Members Kea Keolanui and Bejamin Ney terms are ending December 31, 2024 2. Chairperson to report on matters of interest to the Board 8) ANNOUNCEMENTS: Next Meeting January 28, 2025, 10:00 a.m., 74-5044 Ane - Page 6 of 7 December 17, 2024, Water Board Agenda 9) ADJOURNMENT: Anyone requiring an accommodation or auxiliary aid and/or services to participate in this meeting (i.e. sign language, interpreter, large print), please contact the Board Secretary, at (808) 961-8050 as soon as possible, but no later than five days before the scheduled meeting. Notice to Lobbyists of becoming a lobbyist. {Article 15, Section 2-any individual engaged for pay or other consideration who spends more than five hours in any month or $275 in any six-month period for the purpose of attempting to influence legislative or administrative action by communicating or urging others to communicate with public officials. 15, Section 2-91.3(a)(6), the County Clerk- Board Packet: Pursuant -7.5, the board packet provided to members of the board for this meeting is available for public inspection during regular business hours at the Department of Water Supply office, 345 Street, Suite Page 7 of 7 December 17, 2024, Water Board Agenda