Loading...
HomeMy WebLinkAbout2025_04_02_Permit_Applications_training_FINALPhotovoltaic Permit Application Training C O U N T Y O F H A W A I ’I Department of Public Works Building Division Learn how to navigate the PV permit application process efficiently. Understand the key requirements and documentation needed for permit approval. Gain insight into common errors and how to prevent them. Learn tips for submitting accurate and complete applications to streamline the approval process. Learning how to use Field Book Records to research Permit History Learning how to check Property Ownership on RPT. Learn how to navigate the PV permit application process efficiently. Training Overview 1. Open the COH Planning Department’s Field Book Records. 2. Using the Parcel Number, first select the correct Zone Number. Parcel Number Format: I-Z-S-PPP-ppp-CCCC I - Island Number (one digit) Not used in Field Book Records Z - Zone Number (one digit) S - Section Number (one digit) PPP - Plat Number (three digits) ppp - Parcel Number (three digits) CCCC - CPR or Condominium Number (four digits) Field Book Records COH Planning Department Real Property Tax Office Obtaining Property Ownership Search by Parcel Number or address Property Owner Information Permit History Check field records first, RPT history does not up-to-date permit information COMMON ERRORS FOUND IN PV PERMIT APPLICATIONS Property Owner Declaration Form Not provided Not signed Wrong owner per RPT Wrong TMK number Add Trust, LLC, INC DHHL properties needs DHHL signature Project Declaration Form · Not provided · Not signed · Wrong owner per RPT · Wrong TMK number · Selected Owner Builder and listed a Building Contractor · Wrong license number (RME license instead of Contractor license) How to apply for a Residential Photovoltaic Permit -# OF PANELS -WATTAGE PER PANEL -BATTERY / INVERTER -IF PV IS UNDER 10KW OR HIGHER Required information needed in Description section PV WORKSHEET (STRUCTURAL) IN LIEU OF ARCHITECT/STRUCTURAL STAMP, IS ATTACHED. BUILDING PLANS SHOULD HAVE OWNER NAME AND TMK PER RPT OTHER COMMON ERRORS FOUND IN PV PLANS · Not provided · Wrong owner per RPT · Wrong TMK number · Missing Site plan · Missing Design Professional Stamp/Signature (Electrical Engineer for PV systems greater than 10kw) · Missing Electrical Plans · Missing PV evaluation worksheet and/or building plans stamped by a structural/architect identifying racking system and installation details. a. Missing Roof Layout b. The number of panels is incorrect on plans · Missing Cloud + Delta for Revisions and Resubmittals IF AT ANYTIME YOU ARE NOT ABLE TO FINISH THE APPLICATION, YOU CAN SAVE AS A DRAFT. ATTACHMENTS DO NOT SAVE IN DRAFT. Application via EPIC · Custom fields in additional information not completed · Number of panels, Batteries, and valuation as applicable DHHL approval letter not provided AR/PE Correction Response letter AR/PE Revision Narrative letter Parent Building Permit Number · Wrong or missing · HELCO bill (wrong address / not latest) Permit History · Wrong permit type · Duplicate submittal from same company or different company OTHER COMMON ERRORS FOUND IN PV PERMIT APPLICATION MAHALO