Loading...
HomeMy WebLinkAbout2024-07-30 Preliminary Priority Ranking Submittal_final_with_appendices PRELIMINARY PRIORITY RANKING FOR DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WASTEWATER DIVISION ISLAND OF HAWAI‘I, HAWAI‘I County of Hawai‘i Department of Environmental Management Wastewater Division PAGE 1 Table of Contents 1. List of Capital Projects and Major Studies ..................................................................................................................................... 3 2. Ranking Criteria ................................................................................................................................................................................ 6 3. Project Justification & Project Prioritization .................................................................................................................................. 8 4. Technical project scope for the construction and completion timeframe ................................................................................. 10 Table 5 – Construction Scope and Timeframe ............................................................................................................................. 10 5. Projections for a 5-year timeframe and 20-year planning timeframe ......................................................................................... 12 6. Classification, itemization and explanation for project expenditures including workforce/staffing needs ............................ 13 7. Estimated operations and maintenance costs for each project. ................................................................................................ 21 8. Evaluation of current AMP and CIP efforts. .................................................................................................................................. 23 APPENDIX A APPENDIX B - APPENDIX C - PAGE 2 Preliminary Priority Ranking -WWD) The -WWD CIP -WWD County of --- CIP 1. List of Capital Projects and Major Studies -WWD PAGE 3 Table 1: Capital Improvement Projects Priority Capital Cost Est. per Project Comments Ranking COH ($Thousand) AOC -UIC-AOC- - AOC -UIC-AOC- - CWA--- (COH – 5 --- --- (COH – ‘o --- W(COH – o --- (COH – --- (COH – - --- Subtotal $634,790 PAGE 4 -WWD -WWD Table 2: Summary of Project Studies Project Studies Activity Comments – – 4 Preliminary Priority Ranking* Completed AOC by 7/30/2024* Asset Management Program PAGE 5 Project Studies Activity Comments *Per this document 2. Ranking Criteria CIP ) Goal 1: Goal 2: Goal 3: - Table 3 – Ranking Criteria Goal 1 Protect and improve public health/safety Criteria Criteria and improve community livability. Weight 4 --5 Goal 2 Enable safer and more efficient operations Criteria Criteria and maintenance (O&M). Weight PAGE 6 Goal 3 Build a self-sustaining wastewater Criteria Criteria system. Weight 4 - PAGE 7 3. Project Justification & Project Prioritization Table 4 – Project Justification & Prioritization Priority Project Justification Ranking - -UIC-AOC-- T - - (COH - 5 – 53 PAGE 8 Priority Project Justification Ranking - (COH – o P (COH – o - – H Design Phase Only – (COH – PAGE 9 4. Technical project scope for the construction and completion timeframe Table 5 – Construction Scope and Timeframe COH – DEM Estimated Implementation Project Description Priority Timeline Ranking -UIC- AOC-- -UIC- AOC-- e 3 -- - 4 -- - 5 -- - - -- - PAGE 10 COH – DEM Estimated Implementation Project Description Priority Timeline Ranking CWA-- - -- - - -- - - -- - PAGE 11 5. Projections for a 5-year timeframe and 20-year planning timeframe - - - e Table 6 – Six Year Capital Improvement Program 2024-25 FY FUNDING FUNDING FORECAST BY FISCAL YEARTOTAL (in thousands)(in thousands)ESTIMATED Prior This PROJECT Beyond 6 County G.O. Funds Request COST years BondAllotted 2024-25 PROJECT 2025-262026-272027-282028-292029-30 42,000 9,785 42,000 51,785 Pahala Wastewater System 11,500 2,034 11,500 94,500 108,034 Naalehu Wastewater System (reappr.) 110,000 27,066 110,000 137,066 Hilo WWTP Rehabilitation and Replacement 52,500 52,500 52,500 Kealakehe WWTP Rehabilitation and Replacement 10,000 7,736 10,000 10,000 10,000 10,000 10,000 10,000 67,736 Repair/Replacement of Wastewater Facilities 3,930 40,000 43,930 Pua Sewer Pump Station Force Main Replacement 300 8,000 8,000 16,300 Kulaimano & Papaikou Dewatering and Barminuter Replacement 2,000 20,000 22,000 Wailoa SPS Renovation & Dual Force Mains 600 6,000 6,600 Kaumana Gardens Collector Sewer 2,873 32,000 34,873 Pua SPS Renovation 250 10,000 10,250 Ainako Aina Nani Collector Sewer 200 10,000 10,200 Ainako Interceptor Sewer Phase 2 800 8,000 8,800 Paukaa SPS New Force Main 2,701 1,000 20,000 23,701 North Kona SPS, FM, Hina Lani Gravity Sewer, West Hawaii Business Park Gravity Sewer 1 2,000 12,000 Onekahakaha SPS Renovation and Dual Force Mains 1 0,000 10,000 Kolea SPS Renovation and Dual Force Mains 13,689 40,000 53,689 Kealakehe Wastewater Treatment Plant R-1 Upgrade 1 2,000 12,000 Kalanianaole Collector Sewer Phase II 3 7,000 37,000 Kulaimano WWTP Upgrade 2 0,000 20,000 Papaikou WWTP Upgrade 1 6,000 16,000 Wailuku Force Main and Gravity Sewer Replacement 2,000 2,000 Keopu FM Replacement/SPS Renovation and Relocation 1 5,000 15,000 Kealakehe SPS Renovation and Force Main Replacement 8,800 8,800 Puueo Gravity Sewer Replacement 3,000 3,000 Lanihau SPS Upgrade 783,264 TOTAL 226,000 70,114 226,000 104,500 58,000 20,600 44,250 86,000 173,800 PAGE 12 6. Classification, itemization and explanation for project expenditures including workforce/staffing needs Table 7 - Project Phase, Expenditures, Roles & Responsibilities Subtotal Cost per Staffing Roles & Priority Project Name Project Phase Cost Project Responsibilities - 1 Wastewater System - $47,000,000* Wastewater - 2 System - $103,500,000* Hilo WWTP Rehabilitation 3 & 4 and Replacement Phase I - & II - -- PAGE 13 Subtotal Cost per Staffing Roles & Priority Project Name Project Phase Cost Project Responsibilities – $355,925,000* Kealakehe WWTP 5 Rehabilitation and - Replacement - $57,500,000* Pua SPS Force Main - 6 Replacement - $46,000,000* Kula‘imano WWTP 7 Rehabilitation and - Replacement PAGE 14 Subtotal Cost per Staffing Roles & Priority Project Name Project Phase Cost Project Responsibilities - $9,700,000* WWTP 8 Rehabilitation and - Replacement - $9,700,000* - 13 Main Replacement - $3,680,000* Kealakehe SPS Force Main - 16 Replacement $1,785,000* $634,790,000 Total *Previous allotted funding, expended and future funding included PAGE 15 Wastewater Division Responsibilities 5 Wastewater-Division Administration Fiscal Year 2023-2024 Position Organization Chart PAGE 16 -WWD - WWD - - - Draft Reorganization and Staffing Needs - - PAGE 17 PAGE 18 PAGE 19 PAGE 20 7. Estimated operations and maintenance costs for each project. The - -- PAGE 21 Utilities Maintenance and Repairs Chemicals and Consumables Labor Administrative Costs Contract Services Insurance and Licenses Miscellaneous Expenses Estimated Wastewater Expenditures FY2024-25 - - Total $26,919,005 Table 8 – Operating & Maintenance Costs Associated Treatment Facility Effluent Discharge (MGD) O&M Costs WWTP PAGE 22 Total 4.691 $26,919,005.00 8. Evaluation of current AMP and CIP efforts. - - - -WWD PAGE 23 Vertical Assets Southwest Environmental Finance Center / PG Environmental under EPA Contract No. EP-R9-16-02 March 2019 Summary Under contract from the United States Environmental Protection Agency (EPA) Region 9, staff from PG Environmental and the Southwest Environmental Center (collectively, the PG Team) worked in coordination with staff from WWD to develop a framework and establish a standard operating procedure (SOP) for assessing the potential of failure (POF) and consequence of failure (COF) for the (WWD) vertical 1 wastewater assets. The resulting framework/SOP describes a 1 to 5 scale for both POF and COF as well as the process and different criteria to be used in determining how an asset should be ranked. To collect the information necessary to determine risk for vertical assets, the PG Team, along with WWD staff, visited each pump station and wastewater treatment plant on both sides of the island (east and west) and directly viewed each asset (when safely visible). Asset information was collected, and ratings were given for POF and COF, along with condition and useful life (additional attributes to be used to inform decision- performance, failure history, and maintenance history, as well as visual observations and any other performance-related information were taken into consideration for determining POF and COF. Once all data was collected, it was downloaded into an Excel spreadsheet to allow for further analysis. In all, the PG Team evaluated 1,026 separate vertical assets and found about 50% assets are in the low risk category, 36% are in the medium category, 9% are in the medium-high category, and 5% are in the high-risk category. -risk assets are located at the Hilo WWTP, with 36 of the 51 total high-risk assets at that facility (see Table A3 in Appendix A for additional details specific to the Hilo WWTP assets). The overall risk analysis demonstrates that while there are assets classified as high risk and medium-high risk, most of the assets are not in these categories. These results show WWD can take a prioritized approach to reducing overall risk that may not be as onerous as previously thought. 1 Included in the document, Asset Criticality SOP and Framework. 1 Vertical Asset Risk Assessment Report Introduction An asset management program includes five core components: current state of the assets; level of service; criticality / risk; life cycle costing; and long-term funding. The criticality component of asset management, also referred to as risk, is a fundamental component that helps inform decision-making in determining the most advantageous way to spend scarce resources both personnel and financial. While all portions of asset management are important, understanding criticality and using it in decision-making can have some of the most dramatic effects on the overall operation of the organization. Criticality is based on the idea that some assets are more critical to the sustained operations of the facility than others. Knowing which assets are more critical to an operation, or pose the most risk if they become inoperable, can aid in determining how to spend funds, where to deploy personnel resources, how to manage an individual asset or collection of assets over time, and how to plan for capital improvements. Two major components contribute to determining criticality. The first is probability of failure (POF), or how likely an individual asset is to fail. The second is consequence of failure (COF), or how significant are the impacts if the asset does fail. These two factors are ranked and then multiplied together to indicate an overall risk score. POF X COF = Risk POF and COF can be scored on any scale a utility chooses, based on the desired level of detail and complexity. Scales of 1 to 5 or 1 to 10 are typical, which will result in risk scores of 1 to 25 or 1 to 100 respectively, with the lowest outcomes being the lowest risk and the highest number being the highest ithout any risk of failure or consequence. Asset risk scores can be used to evaluate assets in various ways. Assets can be examined individually, as contributing to the risk assessment of an entire facility (e.g., pump station or treatment plant) or portion of a facility (e.g., headworks, primary treatment, etc.), or they can be used to show overall risk for the entire utility. The data included in this report can be used for any one of these analyses. 2 Vertical Asset Risk Assessment Report Visualizing Risk Risk can be depicted in a variety of ways. Figure 1 provides an example visual representation of how risk scores are distributed based on POF and COF. Visualizing risk allows a utility operator to quickly identify assets needing immediate or near-immediate attention (i.e., high risk). This also functions as a useful tool to quickly inform decision-makers on which assets to prioritize for more-thorough analysis to mitigate overall risk. CźŭǒƩĻ Њ͵ 9ǣğƒƦƌĻ ǝźƭǒğƌźǩğƷźƚƓ ƚŅ ƩźƭƉ ƭĭƚƩĻ ķźƭƷƩźĬǒƷźƚƓ͵ Iźŭŷ wźƭƉ In the example above, assets that are highly likely to fail and would cause serious consequences if they the upper right-hand corner. aƚķĻƩğƷĻ wźƭƉ Assets with 1) high probability of failure but a low consequence, 2) with a low probability of failure but a and appear in the boxes at the bottom right and top left, or near the center of the chart. \[ƚǞ wźƭƉ and fall within the box in the lower left-hand corner. Tables 1 through 3 provide additional examples of asset risk visualizations based on real-world examples. In the first example, each asset at the Banyan Sewage Pump Station (SPS) is listed in Table 1, in the order of its risk score. High-risk scores are highlighted in red, medium-high risk scores are highlighted in orange (Note: The Banyan SPS had no assets in this range), medium-risk assets are highlighted in yellow, and low-risk assets are highlighted in green. 3 Vertical Asset Risk Assessment Report Table 1. Banyan SPS Asset Risks in Order of Risk Score Risk Equipment Condition POF COF Score Fair 4 5 20 BAN0014 - PUMP #1 - CONTROLLER Fair 2 5 10 BAN0012 - PROPANE EMERGENCY BACK UP MOTOR Fair 3 3 9 BAN0015 - PUMP #2 - MOTOR Good 3 3 9 BAN0015 - PUMP #2 - PUMP Fair 3 2 6 BAN0014 - PUMP #1 - MOTOR Good 3 2 6 BAN0014 - PUMP #1 - PUMP Average 2 3 6 BAN0015 - PUMP #2 - CHECK VALVE Fair 2 3 6 BAN0026 - VALVE Fair 2 3 6 BAN0027 - VALVE Fair 2 3 6 BAN0028 - VALVE Fair 2 3 6 BAN0029 - VALVE Average 2 2 4 BAN0005 - AIR RELIEF VALVE #1 Average 2 2 4 BAN0006 - AIR RELIEF VALVE #2 Average 2 2 4 BAN0014 - PUMP #1 - CHECK VALVE Table 2 is another tabular representation that depicts the number and percentage of assets within each risk score. Table 2. Banyan SPS Asset Risks by Risk Score 5 e 0 1 (7%) 0 1 (7%) 0 c e n r e 4 0 0 0 0 0 u l u i q a 3 0 5 (36%) 2 (14%) 0 0 e F s f n 2 0 3 (21%) 2 (14%) 0 0 o o C 1 0 0 0 0 0 Total number of 1 2 3 4 5 assets: 14 Probability of Failure Table 3 provides another example, this time for the Hilo WWTP, which shows greater distribution of risk scores than for the Banyan SPS. Table 3. Hilo WWTP Asset Risks by Risk Score 5 e 1 (0.2%) 3 (0.8%) 22 (6%) 9 (2%) 6 (2%) c e n r e 4 2 (0.5%) 11 (3%) 41 (11%) 15 (4%) 21 (6%) u l u i q a 3 2 (0.5%) 29 (8%) 60 (17%) 30 (8%) 14 (4%) e F s f n 2 1 (0.2%) 16 (4%) 75 (21%) 2 (0.5%) 0 o o C 1 2 (0.5%) 0 1 (0.2%) 0 0 Total number of 1 2 3 4 5 assets: 363 Probability of Failure 4 Vertical Asset Risk Assessment Report The third example of risk visualization, a quad chart, is shown in Table 4. The highest risk assets are shown in the upper right and the lowest risk assets are shown in the lower left corner. 6 BAN0014 -PUMP #1 - BAN0012 -PROPANE CONTROLLER 5 EMERGENCY BACK UP MOTOR 4 BAN0015 -PUMP #2 - BAN0026 -VALVE PUMP F BAN0015 -PUMP #2 - BAN0027 -VALVE o BAN0015 -PUMP #2 - 3 C BAN0028 -VALVE CHECK VALVE MOTOR BAN0029 -VALVE BAN0006 -AIR RELIEF BAN0005 -AIR RELIEF BAN0014 -PUMP #1 - 2 VALVE #2VALVE #1MOTOR BAN0014 -PUMP #1 - BAN0014 -PUMP #1 - PUMP CHECK VALVE 1 0 12345 PoF CźŭǒƩĻ Ћ͵ .ğƓǤğƓ {t{ ğƭƭĻƷ ƩźƭƉ͵ 2 Determining Risk for Vertical Assets The PG Team and staff from the Wastewater Division (WWD) worked together to develop a framework and establish a standard operating procedure (SOP) for assessing POF and COF of vertical assets. For this project, vertical assets have been defined as those components that are primarily above ground and located within treatment facilities and pump stations. The framework describes a 1 to 5 scale for both POF and COF as well as different criteria to be used in determining how an asset should be ranked. To collect the information necessary to determine risk for vertical assets, the PG Team, along with WWD staff, visited each pump station and treatment plant on both sides of the island (east and west) and directly viewed each asset (except for submersible pumps). Asset information was collected, and ratings were given for POF and COF, along with condition and useful life (additional attributes to be used to inform decision-making). The operator and technical support staff knowledge of each asset performance, failure history, and maintenance history, as well as visual observations and any other performance-related information were taken into consideration for determining POF and COF. 2 This report focuses solely on vertical assets. The risk assessment of horizontal assets necessitated a slightly different approach, which is described in a separate document. 5 Vertical Asset Risk Assessment Report Probability of Failure (POF)Factors Table 4 describes the criteria for assessing the POF of an asset, which is included in more detail in Asset Criticality SOP and Framework. The document also describes the four basic ways an asset can fail (i.e., failure modes), which include: Mortality: Complete loss of use of an asset (e.g., collapsed pipe, fractured pump drive, etc.). Level of service the utility. This can be caused by the declining functionality of an asset or increased performance demands from the utility of its customers. Financial inefficiency: Maintaining or repairing an asset would be costlier than replacing it. For example, it may be financially more favorable to replace an older motor with a new, more energy-efficient motor that will provide operational savings over time, even though upfront costs would be greater. Capacity: The asset no longer performs at or provides sufficient capacity. For example, even if a pipe is in good condition, it may no longer provide enough capacity to meet volume demands. In collecting data, a failure mode code can be entered to indicate the predominant mode of failure. In many cases, the expected mode will be Mortality, but it is important to consider the other three. Table 4. Probability of Failure Criteria POF Criteria Comments Factor Failure not anticipated within the 1 Asset is brand new or like new. foreseeable future. Failure is not anticipated in the near Asset is not brand new but shows no more than 2 future (generally, not within the next 10 cosmetic signs of wear and tear. years or so). Asset shows signs of operational or physical decline but has not yet entered a potential failure state. needs to be reviewed to see if an 3 Asset may show light to moderate rust, some light increase is needed to sustain a factor of to moderate wear and tear, be nearing but not at 3 and prevent a condition of 4 or 5. physical capacity. Asset is in potential failureshowing signs of The potential failure issues will need to failure, such as cracks, root intrusions, I/I, vibration, be addressed to prevent a functional noise, excessive rustbut is still delivering all or failure. Functional failure occurs when 4 most of the required service (i.e., not in functional the asset is in one of the four failure failure mode). Functional failure not expected modes described above. within the next year, but within the next few years. A failure mode code can be added to Asset is already in failure mode (see failure mode note the means of failure (Level of 5 definitions above) or expected to fail within 1 year. Service, Mortality, Financial, Capacity) 6 Vertical Asset Risk Assessment Report Consequence of Failure (COF)Factors Table 5 describes the criteria developed for assessing the COF of an asset, which are included in more detail in the Asset Criticality SOP and Framework. The document also describes factoring in the ability to use redundant systems when considering COF. Table 5. Consequence of Failure Criteria COF Criteria Factor No identifiable consequences. 1 Less than $10,000 in repair costs. $10,000 to $49,999 in repair costs. 2 Short term disruption to traffic or business or operations (less than 4 hours). Bypassing (without violating permit) for less than 3 days. $50,000 to $99,999 in repair costs. Disruption to businesses. Disruption to traffic. 3 Disruption to septic haulers. Disruption to staff or regular operations. Bypassing (without violating permit) for more than 3 days. Damage to other assets and/or private property. Potential to negatively harm the environment; potential to cause impacts to 4 endangered species. $100,000 or more in costs related to repair. May make some minor news report. Health and safety of employees and/or public at risk. 5 Exceedance of permit limits. Politically problematic/becomes a major news story. Data Analysis and Results Once all data was collected, utilizing the Fulcrum data collection application, it was downloaded into an Excel spreadsheet to allow for further analysis. Several steps were taken to prepare the raw data to be used for risk assessment purposes, including consolidating entries into a more useful format, deleting - existing inventory data with more-recent data generated in the field during this effort), and reviewing data quality to identify and correct any apparent errors. 3 The PG Team collected data on 1,026 separate vertical assets. The inventory was completed by identifying the assets at each pump station and treatment plant within the WWD utility. There are assets from seven (7) wastewater treatment plants (WWTPs) and 16 pump stations included in the risk assessment. 3 Note that the vertical asset inventory shows over 1,400 assets. Parent assets that were broken into child assets were not evaluated at the parent level, but are included as separate in the inventory to show the relationship of the associated child assets; risk for the parent assets in these cases can be evaluated by analyzing the risk of all the child components. 7 Vertical Asset Risk Assessment Report Data analysis was compiled for each facility each pump station and WWTP as well as for the entire system (all pump stations and treatment plants on both sides of the island). Data for each individual facility is presented in Appendix A. A summary of the overall risk is provided is subsequent sections. Overall Risk As can be seen in Table 6, about 50% of the vertical assets are in the low risk category, 36% are in the medium category, 9% are in the medium-high category, and 5% are in the high-risk category. Table 7 shows the total number of WWTP assets in each risk category and Table 8 shows the same for pump station assets. The analysis also showed -risk assets are located at the Hilo WWTP (see Appendix A for additional details specific to the Hilo WWTP assets). The overall risk analysis demonstrates that while there are assets classified as high risk and medium-high risk, most of the assets are not in these categories. These results show WWD can take a prioritized approach to reducing overall risk that may not be as onerous as previously thought. Table 6. Summary of Risk for All WWD Vertical Assets Number of Vertical Percentage of Vertical Assets at Risk Level Risk Score Range* Assets at Each Risk Level Each Risk Level High 20 25 51 5% Medium - High 15 16 92 9% Medium 8 12 366 36% Low 1 6 517 50% Totals 1,026 100% * Note that the range values only represent the possible outcomes from multiplying POF x COF. Table 7. Summary of Risk for WWTP Assets Number of Vertical Assets Percentage of Vertical Assets at Risk Level Risk Score Range* at Each Risk Level Each Risk Level High 20 25 42 6% Medium - High 15 16 66 9% Medium 8 12 269 37% Low 1 6 346 48% Totals 723 100% * Note that the range values only represent the possible outcomes from multiplying POF x COF. Table 8. Summary of Risk for Pump Station Assets Number of Vertical Percentage of Vertical Assets at Risk Level Risk Score Range* Assets at Each Risk Level Each Risk Level High 20 25 9 3% Medium - High 15 16 26 9% Medium 8 12 97 32% Low 1 6 171 56% Totals 303 100% * Note that the range values only represent the possible outcomes from multiplying POF x COF. Tables 9 and 10 on the following pages show the total number of vertical assets with each risk score and the facilities where those assets are located. Figures 3 through 6 show the percentage of WWTP assets in each risk category relative to all WWTPs, and Figures 7 through 10 show the same for pump station assets. 8 Vertical Asset Risk Assessment Report Table 9. Risk Assessment Visualization: Total Number of Assets in Each Category 7 Assets 5 9 Assets 22 Assets 37 Assets 13 Assets 6 Hilo; 1 Wailoa 22 Hilo; 1 Kealakehe SPS; 1 1 Hilo; 1 Kealakehe SPS; 3 1 Banyan; 3 Hilo; 1 Kealakehe 1 Banyan, 9 Hilo; 2 Kolea, 1 Kealakehe WWTP; 1 Kulaimano; 1 Kealakehe WWTP; 1 Pua; 3 SPS; 6 Kulaimano; 7 Papaikou; 2 Papaikou Mill Pond; 1 Onekahakaha; 7 Pua; 1 Wailuku Paukaa; 2 Waiaha Waiaha; 1 Wailoa; 1 Wailuku 4 16 Assets 37 Assets 90 Assets 29 Assets 31 Assets 41 Hilo; 3 1 Hale Halawai; 15 Hilo; 3 Kealakehe (21 Hilo; 1 Holualoa; 1 SPS; 4 Kealakehe WWTP; 3 Paukaa; 3 Kealakehe SPS; 4 Kealakehe Kealakehe WWTP; 1 Kolea; 1 5 Kaloko; 1 Kealakehe WWTP; 3 Kealakehe WWTP; 1 Keopa; 2 Pua WWTP; 1 Kulaimano; 1 Kulaimano; 2 Pua Kulaimano; 1 Onekahakaha; 1 Kulaimano; 4 Onekahakaha; 4 Onekahakaha; 1 Pua, 1 Wailoa) Pahoehoe; 2 Pua; 4 Waiaha; 2 Pahoehoe; 2 Papaikou; 3 Project 19 Wailoa SPS; 3 Pua; 5 Waiaha; 1 Wailuku e 3 14 Assets 153 Assets 131 Assets 53 Assets 26 Assets r u 30 Hilo; 3 Kaloko; 2 Kapehu; 2 14 Hilo; 3 Kealakehe WWTP; 6 l 2 Hilo; 1 Kulaimano; 3 Paukaa; 7 5 Banyan; 4 Hale Halawai; 29 2 Banyan; 5 Hale Halawai; 60 i a Kealakehe SPS; 5 Kealakehe WWTP; Kulaimano; 1 Lanihau; 2 Pua Wailoa; 1 Wailuku Hilo; 2 Holualoa; 9 F 2 Keopa; 3 Kolea; 2 Kulaimano; 4 f Kaloko; 2 Kealakehe WWTP; 4 Kaloko; 2 Kapehu; 4 Kealakehe o Papaikou e Keopa; 11 Kulaimano; 10 SPS; 11 Kealakehe WWTP; 6 c n Lanihau; 6 Mill Pond; 10 Keopa; 5 Kulaimano; 2 Lanihau; e u Onekahakaha; 5 Pahoehoe; 34 2 Mill Pond; 2 Onekahakaha; 1 q e Papaikou; 1 Paukaa; 2 Pua; 9 Pahoehoe; 14 Papaikou; 1 Pua; 1 s n Wailoa; 1 Wailuku Waiaha; 4 Wailoa o C 2 34 Assets 103 Assets 164 Assets 21 Assets 13 Assets 3 Banyan; 16 Hilo; 1 Holualoa; 1 2 Banyan; 75 Hilo; 8 Holualoa; 3 1 Hale Halawai; 2 Hilo; 3 1 Hale Halawai; 1 Holualoa; Kealakehe WWTP; 3 Kolea; 1 Papaikou; 11 Pua; 2 Wailoa; 3 Kealakehe SPS; 4 Kealakehe Kealakehe WWTP; 1 Keopa; 2 Kealakehe WWTP; 10 Papaikou SPS; 2 Kealakehe WWTP; 1 Wailuku WWTP; 3 Kolea; 43 Kulaimano; 4 Kolea; 19 Kulaimano; 1 Lanihau; Kulaimano; 2 Papaikou; 1 Mill Pond; 2 Pahoehoe; 9 10 Pahoehoe; 20 Papaikou; 6 Project 19; 3 Waiaha Papaikou; 1 Project 19; 3 Wailoa; Project 19; 8 Waiaha; 1 Wailoa 2 Wailuku 1 10 Assets 3 Assets 6 Assets 0 Assets 4 Assets 2 Hilo; 2 Kealakehe WWTP; 6 2 Kulaimano; 1 Wailoa 1 Hilo; 1 Kapehu; 1 Kealakehe 1 Kealakehe WWTP; 2 Wailoa WWTP; 1 Kulaimano; 1 Wailoa; 1 Papaikou; 1 Waiaha Wailuku Total 1 2 3 4 5 Number of Assets: Probability of Failure 1,026 9 Vertical Asset Risk Assessment Report Table 10. Risk Assessment Visualization: Percentage of Assets in Each Category 5 0.9% 2.2% 3.6% 1.3% 0.7% 4 1.6% 3.6% 8.8% 2.8% 3.0% e r u l i a 3 F f o 1.4% 15% 13% 5.2% 2.5% e c n e u q e s n o 2 C 3.3% 10% 16% 2.0% 1.3% 1 1.0% 0.3% 0.5% 0.4% 0% Total 1 2 3 4 5 Number of Assets: Probability of Failure 1,026 10 Vertical Asset Risk Assessment Report Figure 3. Percentage of High Risk Assets by WWTP 2% 2% Hilo Honokaa 10% 0% 0% Kaloko 0% Kapehu Kealakehe Kulaimano Papaikoa 86% Figure 4. Percentage of Medium-HighRiskAssets by WWTP Hilo 0% Honokaa 11% Kaloko Kapehu 12% Kealakehe Kulaimano 0% Papaikoa 0% 0% 77% 11 Vertical Asset Risk Assessment Report Figure 5. Percentage of Medium RiskAssets by WWTP Hilo 15% Honokaa Kaloko Kapehu 7% Kealakehe Kulaimano Papaikoa 12% 55% 1% 6% 4% Figure 6. Percentage of Low Risk Assets by WWTP Hilo Honokaa 19% Kaloko Kapehu 37% Kealakehe Kulaimano Papaikoa 23% 5% 10%3% 3% 12 Vertical Asset Risk Assessment Report Figure 7. Percentage of High Risk Assets by Pump Station 25 20 15 10 5 0 Figure 8. Percentage of Medium-High Risk Assets by Pump Station 50 45 40 35 30 25 20 15 10 5 0 13 Vertical Asset Risk Assessment Report Figure 9. Percentage of Medium Risk Assets by Pump Station 16 14 12 10 8 6 4 2 0 Figure 10. Percentage of Low Risk Assets by Pump Station 20 18 16 14 12 10 8 6 4 2 0 14 Vertical Asset Risk Assessment Report Addressing High-Risk Assets There are multiple ways to address high-risk assets. These assets can be repaired, rehabilitated, or replaced. Further, the utility can act to reduce the consequences of failure in addition to or instead of actions to reduce the probability of failure. Determining which approach to take depends on many factors: Underlying integrity of the asset: Assets with a high degree of underlying integrity, can be repaired because after the repair, the asset will still have sufficient life to make the repair investment worthwhile. Cost: The cost of a repair versus rehabilitation versus replacement is a major factor, and there are a variety of scenarios to consider when deciding. For example, if the cost of replacement is much higher than rehabilitation, and rehabilitation will provide almost as much overall asset life as the replacement would, it is likely that rehabilitation is the best-case scenario. Additionally, if repair is very inexpensive and may result in a few years of extra life while the utility seeks funding for replacement, or if the repair will provide many more years of asset life (as described in the case above), repair may be a reasonable option. Further, if the additional asset life gained by replacement makes up for any additional cost of replacement, the asset should be replaced. Ability to tolerate failure: If the consequence of failure is so grave that failure cannot be tolerated, then the asset should probably be replaced or at least rehabilitated to reduce the overall risk. In these cases, repairing the asset may not be sufficient in reducing the risk. Level of service impacts: If continuing to repair the asset negatively impacts the utilities desired level of service, the asset may need to be rehabilitated or replaced. For example, if a pump failure causes backups in the sewer and repairs reduce but do not eliminate backups, a replacement that eliminates the backups (at least for the foreseeable future) may be more desirable from a customer perspective. Remaining useful life: The remaining useful life of the asset based on a repair, rehabilitation, and replacement should be considered in determining which option is best. For example, if the repair would provide two (2) years of remaining useful life, rehabilitation 50, and repair 65, rehabilitation may provide the most risk reduction at a reasonable cost. If the repair provides five (5) to 10 years of remaining useful life and greatly reduces the probability of failure, while the rehabilitation would provide 25, and the replacement would provide 40 years, the repair option may be the most favorable if cost of the other options is too high or the funding is not available. Reduction in consequence of failure: In addition to actions that can be taken to reduce the probability of failure (repair, rehabilitate, replace), actions can be taken to reduce the consequence of failure. These can include installing or increasing redundancy, having spare parts on hand, or providing specialized training to staff to make repairs easier and faster (i.e., being able to respond before a serious consequence has occurred). The factors discussed previously are just some that need to be considered in the decision-making; there is not always one correctsituation. Each case must be considered individually to determine the most favorable outcome for the given scenario. Specific actions for WWD will be evaluated and discussed with the utility before including them in the Condition Based Assessment report. 15 Vertical Asset Risk Assessment Report Using Risk Data to Inform Program Implementation Risk data can be used by utilities to inform modifications in program implementation with the goal of reducing risk of an asset, group of assets, or facility. For example, if pumps are typically showing up as high-risk assets, perhaps the maintenance program is insufficient to keep the pumps from failing prematurely. If this were to be the case, the maintenance program should be thoroughly evaluated to see if additional activities need to be done or if the frequency of the activities needs to change. To determine effectiveness, the pump life can be examined over time to see if it is increasing or to see if failures are decreasing due to the program adjustments. Risk data can also be used to help calibrate the anticipated useful life of a specific type of asset and inform long-term planning. For example, a utility may expect its pumps to last 20 years. However, the pumps may operate very well for 10 years but then increase in failures in years 11 through 15 until it is very difficult and financially inefficient to continue to keep the pumps running. In this case, the time horizon for pump replacement should be shortened. Next Steps While it is very important to assess the risk of the individual assets, it is also important to look at the risk in two additional ways: Risk related to subsystems of the overall facility or utility (i.e., the risk of an individual pump station failing or the headworks of a treatment facility failing). Risk related to the utility (i.e., the entire WWD utility, all assets on both the east and west sides of the island). Risk data for individual assets is not sufficient, by itself, to assess the risk of a system or subsystem. Additional considerations must be brought into the analysis to perform this type of risk assessment. This additional information would include: Type of redundancy for the overall system (e.g., can a pump station handle the load if another pump station is shut down). Consequences that happen if that subsystem is completely shut down. Other than asset failure, what could cause the pump station or WWTP to fail (e.g., flooding, tsunami, electricity failure). Damage that may occur to other subsystems based on the failure of that subsystem. Possibility of environmental damage due to the subsystem failure. Possibility of public health or employee harm. The PG Team will continue to work with WWD to review and verify the information contained in this report and use the data in addressing the items above. This more holistic analysis will be considered and included in the Condition Based Assessment report. 16 Vertical Asset Risk Assessment Report Recommended Additional Step As a recommended next step, WWD could evaluate system risk as a whole. This evaluation would involve looking at and incorporating entirely different factors than those evaluated for this effort, such as the ability of the entire system to withstand natural disasters hurricanes, tsunamis, volcanic eruptions, fires as well as other types of emergencies pandemics, vandalism, mass employee turnover. This would be an opportunity for the utility to consider how the utility has withstood these types of events in the past as well as the ability to withstand them in the future. This risk relies on and builds upon the risk assessments of individual assets and sub-systems. For example, if a tsunami were most likely to knock out ump Station A and ump Station A is highly critical as identified in the analysis of risk related to subsystems, it would be very problematic. If ump Station A also includes numerous assets with high risk, the potential for serious impacts would be even greater. This expanded risk analysis also attempts to consider the potential for events that the utility has not been thinking of or often come from what we are not expecting, rather than what we are. 17 Vertical Asset Risk Assessment Report Appendix A (Pump Station and WWTP Assets; Alphabetical by Location) 18 Vertical Asset Risk Assessment Report Table A1. Banyan SPS Useful Risk Equipment Condition POF COF Life Score 1 4 5 20 BAN0014 - PUMP #1 - CONTROLLER Fair 6 2 5 10 BAN0012 - PROPANE EMERGENCY BACK UP MOTOR Fair 2 3 3 9 BAN0015 - PUMP #2 - MOTOR Fair 3 3 3 9 BAN0015 - PUMP #2 - PUMP Good 2 3 2 6 BAN0014 - PUMP #1 - MOTOR Fair 3 3 2 6 BAN0014 - PUMP #1 - PUMP Good 6 2 3 6 BAN0015 - PUMP #2 - CHECK VALVE Average 6 2 3 6 BAN0026 - VALVE Fair 6 2 3 6 BAN0027 - VALVE Fair 6 2 3 6 BAN0028 - VALVE Fair 6 2 3 6 BAN0029 - VALVE Fair 6 2 2 4 BAN0005 - AIR RELIEF VALVE #1 Average 6 2 2 4 BAN0006 - AIR RELIEF VALVE #2 Average 6 2 2 4 BAN0014 - PUMP #1 - CHECK VALVE Average Table A2. Hale Halawai SPS Useful Risk Equipment Condition Life POF COF Score HAL0001 - AUTO DAILER ALARM SYSTEM Fair 1 4 4 16 AL0004 - PUMP #1 - ISOLATION VALVE Poor 0 5 2 10 HAL0004 - PUMP #1 - CHECK VALVE Fair 4 3 3 9 HAL0011 - ISOLATION VALVE Fair 3 3 3 9 HAL0018 - AUTOMATIC TRANSFER SWITCH Average 3 3 3 9 HAL0025 - PUMP #2 - CHECK VALVE Fair 4 3 3 9 HAL0025 - PUMP #2 - ISOLATION VALVE Fair 4 3 3 9 HAL0025 - PUMP #2 - PUMP Fair 3 4 2 8 HAL0004 - PUMPS (NON-PORTABLE) Excellent 6 2 3 6 HAL0006 - CONTROLLER - PUMP #1 & #2 Good 10 2 3 6 HAL0017 - GENERATOR Good 8 2 3 6 HAL0026-WET WELL LEVEL SENSOR Good 5 2 3 6 19 Vertical Asset Risk Assessment Report Table A3. Hilo WWTP Useful Risk Equipment Condition POF COF Life Score HIL0255 - BIOTOWER RECIRC PUMP #1 - DRIVE Poor 0 5 5 25 SHAFT HIL0256 - BIOTOWER RECIRC PUMP #2 - DRIVE Poor 0 5 5 25 SHAFT HIL0257 - BIOTOWER RECIRC PUMP #3 - DRIVE Poor 0 5 5 25 SHAFT Poor 0 5 5 25 HIL0306 - ROOF Poor 0 5 5 25 HIL0307 - ROOF Poor 0 5 5 25 HIL0403 - GATE HIL0210 - 4 ARM ROTARY DISTRIBUTOR ARM FOR Poor 1 4 5 20 BIOTOWE - INTERNAL STRUCTURES HIL0211 - 4 ARM ROTARY DISTRIBUTOR ARM FOR Poor 1 4 5 20 BIOTOWE - INTERNAL STRUCTURES HIL0259 - CLARIFIER SCUM/DRAIN PUMP - Poor 1 4 5 20 ISOLATION VALVE HIL0260 - CLARIFIER SCUM/DRAIN PUMP - Poor 1 4 5 20 ISOLATION VALVE HIL0261 - CLARIFIER SCUM/DRAIN PUMP - Poor 1 4 5 20 ISOLATION VALVE Fair 1 4 5 20 HIL0262 - EFFLUENT SAMPLER Poor 1 4 5 20 HIL0270 - RSS PUMPS - ISOLATION VALVE Poor 1 4 5 20 HIL0272 - RSS PUMPS - ISOLATION VALVE Poor 1 4 5 20 HIL0273 - RSS PUMPS - ISOLATION VALVE Poor 0 5 4 20 HIL0114 - GRIT TANK NO. 1 - CONTROLLER Poor 0 5 4 20 HIL0183 - SLIDE GATE VALVE - DRIVE SHAFT Poor 0 5 4 20 HIL0184 - SLIDE GATE VALVE - MOTOR Poor 0 5 4 20 HIL0185 - SLIDE GATE VALVE - PUMP Poor 0 5 4 20 HIL0186 - SLIDE GATE VALVE - CONTROLLER Poor 0 5 4 20 HIL0187 - SLIDE GATE VALVE - DRIVE SHAFT Poor 0 5 4 20 HIL0188 - SLIDE GATE VALVE - MOTOR Poor 0 5 4 20 HIL0190 - SLIDE GATE VALVE - CONTROLLER Poor 0 5 4 20 HIL0191 - SLIDE GATE VALVE - DRIVE SHAFT Poor 0 5 4 20 HIL0192 - SLIDE GATE VALVE - MOTOR Poor 0 5 4 20 HIL0193 - SLIDE GATE VALVE - PUMP Poor 0 5 4 20 HIL0194 - SLIDE GATE VALVE - CONTROLLER Poor 0 5 4 20 HIL0195 - SLIDE GATE VALVE - DRIVE SHAFT Poor 0 5 4 20 HIL0199 - SLIDE GATE VALVE - DRIVE SHAFT Poor 0 5 4 20 HIL0200 - SLIDE GATE VALVE - MOTOR Poor 0 5 4 20 HIL0269 - RSS PUMPS - PUMP Poor 0 5 4 20 HIL0271 - RSS PUMPS - PUMP Poor 0 5 4 20 HIL0274 - RSS PUMPS - PUMP Poor 0 5 4 20 HIL0380 - BUILDING - CRANE/HOIST Poor 0 5 4 20 HIL0380 - BUILDING - ROOF 20 Vertical Asset Risk Assessment Report Useful Risk Equipment Condition POF COF Life Score Poor 0 5 4 20 HIL0415 - METER Fair 3 4 4 16 HIL0078 - BAR SCREEN - MOTOR Poor 3 4 4 16 HIL0115 - GRIT TANK NO. 2 - DRIVE SHAFT Poor 1 4 4 16 HIL0123 - HYDROPRESS #1 - CONTROLLER Poor 1 4 4 16 HIL0124 - HYDROPRESS #2 - CONTROLLER Fair 1 4 4 16 HIL0255 - BIOTOWER RECIRC PUMP #1 - PUMP Fair 1 4 4 16 HIL0256 - BIOTOWER RECIRC PUMP #2 - PUMP Fair 1 4 4 16 HIL0257 - BIOTOWER RECIRC PUMP #3 - PUMP HIL0263 - GOULDS CENTRIFUGAL PUMP - Fair 2 4 4 16 CONTROLLER Poor 1 4 4 16 HIL0269 - RSS PUMPS - ISOLATION VALVE Poor 1 4 4 16 HIL0271 - RSS PUMPS - ISOLATION VALVE Poor 1 4 4 16 HIL0274 - RSS PUMPS - ISOLATION VALVE Fair 1 4 4 16 HIL0291 - SECONDARY CLARIFIER DIVERSION Fair 3 4 4 16 HIL0344 - SLUDGE MIX PUMP - PUMP Fair 3 4 4 16 HIL0345 - SLUDGE MIX PUMP - PUMP Fair 2 4 4 16 HIL0418 - CHLORINGE BLDG - ROOF HIL0208 - BIOTOWER #3 - INTERNAL STRUCTURES- Poor 2 3 5 15 CENTER COLUMN COMPONENTS HIL0209 - BIOTOWER #2 - INTERNAL STRUCTURES - Poor 2 3 5 15 CENTER COLUMN COMPONENTS HIL0252 - BIO-TOWER PUMP DISCHARGE PIPING - Fair 2 3 5 15 AIR DELIVERY MAINS/LATERALS/VAVLES HIL0259 - CLARIFIER SCUM/DRAIN PUMP - CHECK Poor 2 3 5 15 VALVE Fair 2 3 5 15 HIL0259 - CLARIFIER SCUM/DRAIN PUMP - PUMP HIL0260 - CLARIFIER SCUM/DRAIN PUMP - CHECK Poor 2 3 5 15 VALVE Fair 2 3 5 15 HIL0260 - CLARIFIER SCUM/DRAIN PUMP - PUMP HIL0261 - CLARIFIER SCUM/DRAIN PUMP - CHECK Poor 2 3 5 15 VALVE Fair 2 3 5 15 HIL0261 - CLARIFIER SCUM/DRAIN PUMP - PUMP Poor 2 3 5 15 HIL0270 - RSS PUMPS - CHECK VALVE Fair 2 3 5 15 HIL0270 - RSS PUMPS - PUMP Poor 2 3 5 15 HIL0272 - RSS PUMPS - CHECK VALVE Fair 2 3 5 15 HIL0272 - RSS PUMPS - PUMP Poor 2 3 5 15 HIL0273 - RSS PUMPS - CHECK VALVE Fair 2 3 5 15 HIL0273 - RSS PUMPS - PUMP Average 5 3 5 15 HIL0277 - OUTFALL FLOW RECORDER HIL0285 - SECONDARY CLARIFIER #1 - INTERNAL STRUCTURES-Poor 3 3 5 15 DRIVE/RAKE/SKIMMER/WEIR/LAUNDER/ETC 21 Vertical Asset Risk Assessment Report Useful Risk Equipment Condition POF COF Life Score HIL0286 - SECONDARY CLARIFIER #2 - INTERNAL STRUCTURES-Poor 3 3 5 15 DRIVE/RAKE/SKIMMER/WEIR/LAUNDER/ETC HIL0287 - SECONDARY CLARIFIER #3 - INTERNAL STRUCTURES-Poor 3 3 5 15 DRIVE/RAKE/SKIMMER/WEIR/LAUNDER/ETC Fair 2 3 5 15 HIL0349 - SLUDGE TRANSFER PUMP - MOTOR Fair 3 3 5 15 HIL0349 - SLUDGE TRANSFER PUMP - PUMP Good 8 3 5 15 HIL0401 - INFLOW METER Poor 0 5 3 15 HIL0077 - BAR SCREEN - CONTROLLER Poor 0 5 3 15 HIL0166 - SEPTAGE PUMP Poor 0 5 3 15 HIL0167 - SEPTAGE PUMP Poor 0 5 3 15 HIL0189 - SLIDE GATE VALVE - VALVE Poor 0 5 3 15 HIL0333 - ODOR TOWER - CONTROLLER HIL0337 - CHEMICAL DELIVERY SYSTEM - Poor 0 5 3 15 CONTROLLER Poor 0 5 3 15 HIL0338 - POLYMER BLEND - CONTROLLER HIL0345 - SLUDGE MIX PUMP - INFLUENT Poor 0 5 3 15 ISOLATION 2 HIL0346 - SLUDGE RECIRCULATOR PUMP - Poor 0 5 3 15 EFFLUENT ISOLATION 1 Poor 0 5 3 15 HIL0347 - SLUDGE RECIRCULATOR PUMP HIL0347 - SLUDGE RECIRCULATOR PUMP - Poor 0 5 3 15 EFFLUENT ISOLATION 1 Poor 0 5 3 15 HIL0348 - SLUDGE TRANSFER PUMP HIL0349 - SLUDGE TRANSFER PUMP - EFFLUENT Poor 0 5 3 15 ISOLATION Poor 0 5 3 15 HIL0358 - SLUDGE GRINDER Average 4 3 4 12 HIL0077 - BAR SCREEN - BARS/RAKE/DRIVES Fair 4 3 4 12 HIL0078 - BAR SCREEN - BARS/RAKE/DRIVES Poor 1 3 4 12 HIL0078 - BAR SCREEN - MOTOR HIL0104 - VENTILATION FAN - OLDER, CLOSE TO Fair 3 3 4 12 CLARIFIER HIL0140 - PRE-AERATION TANK NO. 1 - Fair 3 3 4 12 STRUCTURE/RAILS/STAIRS HIL0141 - PRE-AERATION TANK NO. 2 - Fair 3 3 4 12 STRUCTURE/RAILS/STAIRS Fair 3 3 4 12 HIL0149 - GRIT PUMP - MOTOR Fair 3 3 4 12 HIL0150 - GRIT PUMP - MOTOR Fair 4 3 4 12 HIL0172 - SUMP PUMP - CHECK VALVE Fair 4 3 4 12 HIL0172 - SUMP PUMP - CONTROLLER Average 3 3 4 12 HIL0172 - SUMP PUMP - MTR & PMP Fair 4 3 4 12 HIL0173 - SUMP PUMP - CHECK VALVE Fair 4 3 4 12 HIL0173 - SUMP PUMP - CONTROLLER 22 Vertical Asset Risk Assessment Report Useful Risk Equipment Condition POF COF Life Score Average 3 3 4 12 HIL0173 - SUMP PUMP - MTR & PMP Fair 3 3 4 12 HIL0196 - SLIDE GATE VALVE - MOTOR Fair 3 3 4 12 HIL0197 - SLIDE GATE VALVE - PUMP Fair 3 3 4 12 HIL0198 - SLIDE GATE VALVE - CONTROLLER HIL0255 - BIOTOWER RECIRC PUMP #1 - Average 3 3 4 12 CONTROLLER Average 3 3 4 12 HIL0255 - BIOTOWER RECIRC PUMP #1 - MOTOR HIL0256 - BIOTOWER RECIRC PUMP #2 - Average 3 3 4 12 CONTROLLER Average 3 3 4 12 HIL0256 - BIOTOWER RECIRC PUMP #2 - MOTOR HIL0257 - BIOTOWER RECIRC PUMP #3 - Average 3 3 4 12 CONTROLLER Average 3 3 4 12 HIL0257 - BIOTOWER RECIRC PUMP #3 - MOTOR Fair 1 3 4 12 HIL0263 - GOULDS CENTRIFUGAL PUMP - PUMP HIL0285 - SECONDARY CLARIFIER #1 - Fair 3 3 4 12 CONTROLLER Poor 2 3 4 12 HIL0285 - SECONDARY CLARIFIER #1 - GBX Poor 2 3 4 12 HIL0285 - SECONDARY CLARIFIER #1 - MOTOR HIL0286 - SECONDARY CLARIFIER #2 - Fair 3 3 4 12 CONTROLLER Poor 2 3 4 12 HIL0286 - SECONDARY CLARIFIER #2 - GBX Poor 2 3 4 12 HIL0286 - SECONDARY CLARIFIER #2 - MOTOR HIL0287 - SECONDARY CLARIFIER #3 - Fair 3 3 4 12 CONTROLLER Poor 2 3 4 12 HIL0287 - SECONDARY CLARIFIER #3 - GBX Poor 2 3 4 12 HIL0287 - SECONDARY CLARIFIER #3 - MOTOR HIL0337 - CHEMICAL DELIVERY SYSTEM - CHEM Average 3 3 4 12 PUMP Good 3 3 4 12 HIL0337 - CHEMICAL DELIVERY SYSTEM - MOTOR HIL0337 - CHEMICAL DELIVERY SYSTEM - Fair 4 3 4 12 POLYBLEND UNIT Fair 2 3 4 12 HIL0344 - SLUDGE MIX PUMP - MOTOR Fair 2 3 4 12 HIL0345 - SLUDGE MIX PUMP - MOTOR Fair 3 3 4 12 HIL0350 - SUMP PUMP - MTR & PMP Good 3 3 4 12 HIL0402 - CONTROLLER Fair 5 3 4 12 HIL0417 - CHLORINGE BLDG - BUILDING Fair 1 4 3 12 HIL0077 - BAR SCREEN - MOTOR HIL0123 - HYDROPRESS #1 - INTERNAL Fair 2 4 3 12 STRUCTURES Fair 2 4 3 12 HIL0124 - HYDROPRESS #2 - PUMP Fair 1 4 3 12 HIL0301 - CENTRIFUGE #1 Fair 1 4 3 12 HIL0301 - CENTRIFUGE #1 - MOTOR Fair 1 4 3 12 HIL0302 - CENTRIFUGE #1 BACK DRIVE - DRV Fair 1 4 3 12 HIL0302 - CENTRIFUGE #1 BACK DRIVE - MTR 23 Vertical Asset Risk Assessment Report Useful Risk Equipment Condition POF COF Life Score Fair 1 4 3 12 HIL0303 - CENTRIFUGE #2 Fair 1 4 3 12 HIL0303 - CENTRIFUGE #2 - MOTOR Fair 1 4 3 12 HIL0304 - CENTRIFUGE #2 BACK DRIVE - DRV Fair 1 4 3 12 HIL0304 - CENTRIFUGE #2 BACK DRIVE - MOTOR Poor 2 4 3 12 HIL0305 - CENTRIFUGE CONTROL PANEL Poor 1 4 3 12 HIL0312 - DAFT SKIMMER ARM - GBX Fair 1 4 3 12 HIL0312 - DAFT SKIMMER ARM - MOTOR Poor 1 4 3 12 HIL0338 - POLYMER BLEND - MOTOR Poor 1 4 3 12 HIL0338 - POLYMER BLEND - POLY BLEND UNIT HIL0344 - SLUDGE MIX PUMP - INFLUENT Poor 1 4 3 12 ISOLATION 1 HIL0345 - SLUDGE MIX PUMP - INFLUENT Poor 1 4 3 12 ISOLATION 1 Fair 2 4 3 12 HIL0346 - SLUDGE RECIRCULATOR PUMP - MOTOR Poor 3 4 3 12 HIL0346 - SLUDGE RECIRCULATOR PUMP - PUMP HIL0352 - THICKENED SLUDGE PUMP - Fair 1 4 3 12 CONTROLLER Fair 1 4 3 12 HIL0352 - THICKENED SLUDGE PUMP - MOTOR Fair 1 4 3 12 HIL0352 - THICKENED SLUDGE PUMP - PUMP HIL0353 - THICKENED SLUDGE PUMP - Fair 1 4 3 12 CONTROLLER Fair 1 4 3 12 HIL0353 - THICKENED SLUDGE PUMP - PUMP Poor 1 4 3 12 HIL0381 - BUILDING - ROOF Poor 1 4 3 12 HIL0404 - GATE Poor 1 4 3 12 HIL0405 - GATE Poor 1 4 3 12 HIL0406 - AIR DELIVERY HIL0417 - CHLORINGE BLDG - EXTERIOR Fair 2 4 3 12 STRUCTURE/RAIL/STAIRS Good 8 2 5 10 HIL0208 - BIOTOWER #3 - MEDIA HIL0209 - BIOTOWER #2 - Good 8 2 5 10 STRUCTURE/RAILS/STAIRS Excellent 9 2 5 10 HIL0426 - PUMPS (NON-PORTABLE) - CONTROLLER Good 5 3 3 9 HIL0113 - GRIT HOPPER - PUMP HIL0140 - PRE-AERATION TANK NO. 1 - AIR Poor 3 3 3 9 DELIVERY HIL0141 - PRE-AERATION TANK NO. 2 - AIR Poor 3 3 3 9 DELIVERY Fair 3 3 3 9 HIL0146 - DEWATERING PUMP - CONTROLLER Fair 4 3 3 9 HIL0146 - DEWATERING PUMP - ISOLATION VALVE Fair 4 3 3 9 HIL0146 - DEWATERING PUMP - ISOLATION VALVE Average 4 3 3 9 HIL0157 - PREAERATION SLUDGE PUMP - MOTOR Average 4 3 3 9 HIL0158 - PREAERATION SLUDGE PUMP - MOTOR HIL0161 - PRIMARY SLUDGE PUMP #1 - INFLUENT Average 4 3 3 9 ISOLATION 1 24 Vertical Asset Risk Assessment Report Useful Risk Equipment Condition POF COF Life Score HIL0161 - PRIMARY SLUDGE PUMP #1 - INFLUENT Average 4 3 3 9 ISOLATION 2 Average 3 3 3 9 HIL0161 - PRIMARY SLUDGE PUMP #1 - MOTOR Fair 4 3 3 9 HIL0161 - PRIMARY SLUDGE PUMP #1 - PUMP Average 4 3 3 9 HIL0162 - PRIMARY SLUDGE PUMP #2 - CKV HIL0162 - PRIMARY SLUDGE PUMP #2 - INFLUENT Average 4 3 3 9 ISOLATION 1 HIL0162 - PRIMARY SLUDGE PUMP #2 - INFLUENT Average 4 3 3 9 ISOLATION 2 Average 3 3 3 9 HIL0162 - PRIMARY SLUDGE PUMP #2 - MOTOR Fair 4 3 3 9 HIL0162 - PRIMARY SLUDGE PUMP #2 - PUMP HIL0163 - PRIMARY SLUDGE PUMP #3 - INFLUENT Average 4 3 3 9 ISOLATION 1 HIL0163 - PRIMARY SLUDGE PUMP #3 - INFLUENT Average 4 3 3 9 ISOLATION 2 Average 3 3 3 9 HIL0163 - PRIMARY SLUDGE PUMP #3 - MOTOR Fair 4 3 3 9 HIL0163 - PRIMARY SLUDGE PUMP #3 - PUMP Average 4 3 3 9 HIL0172 - SUMP PUMP - ISOLATION VALVE Average 4 3 3 9 HIL0173 - SUMP PUMP - ISOLATION VALVE Excellent 5 3 3 9 HIL0264 - NO. 3 WATER PUMP (HIGH PSI) - MOTOR Excellent 5 3 3 9 HIL0265 - NO. 3 WATER PUMP (LOW PSI) - MOTOR Fair 2 3 3 9 HIL0269 - RSS PUMPS - CHECK VALVE Fair 3 3 3 9 HIL0269 - RSS PUMPS - CONTROLLER Fair 2 3 3 9 HIL0271 - RSS PUMPS - CHECK VALVE Fair 3 3 3 9 HIL0271 - RSS PUMPS - CONTROLLER Fair 2 3 3 9 HIL0274 - RSS PUMPS - CHECK VALVE Fair 1 3 3 9 HIL0274 - RSS PUMPS - CONTROLLER HIL0312 - DAFT SKIMMER ARM - ARM REDUCTION Fair 2 3 3 9 BOX Good 2 3 3 9 HIL0312 - DAFT SKIMMER ARM - CONTROLLER Good 5 3 3 9 HIL0312 - DAFT SKIMMER ARM - RAKE AND SHAFT Average 3 3 3 9 HIL0338 - POLYMER BLEND - PUMP HIL0346 - SLUDGE RECIRCULATOR PUMP - CHECK Fair 3 3 3 9 VALVE HIL0346 - SLUDGE RECIRCULATOR PUMP - Good 3 3 3 9 EFFLUENT ISOLATION 2 HIL0346 - SLUDGE RECIRCULATOR PUMP - Average 3 3 3 9 INFLUENT ISOLATION HIL0347 - SLUDGE RECIRCULATOR PUMP - CHECK Fair 3 3 3 9 VALVE HIL0347 - SLUDGE RECIRCULATOR PUMP - Good 3 3 3 9 EFFLUENT ISOLATION 2 HIL0347 - SLUDGE RECIRCULATOR PUMP - Average 3 3 3 9 INFLUENT ISOLATION 25 Vertical Asset Risk Assessment Report Useful Risk Equipment Condition POF COF Life Score HIL0348 - SLUDGE TRANSFER PUMP - EFFLUENT Average 3 3 3 9 ISOLATION HIL0348 - SLUDGE TRANSFER PUMP - INFLUENT Average 3 3 3 9 ISOLATION HIL0349 - SLUDGE TRANSFER PUMP - INFLUENT Average 3 3 3 9 ISOLATION HIL0352 - THICKENED SLUDGE PUMP - VALVES - Fair 1 3 3 9 DAFT BOTTOM HIL0352 - THICKENED SLUDGE PUMP - VALVES - Fair 1 3 3 9 PRIMARY CLARIFIER HIL0352 - THICKENED SLUDGE PUMP - VAVES - Fair 1 3 3 9 DAFT BEACH HIL0352 - THICKENED SLUDGE PUMP - VAVLES - Fair 1 3 3 9 DIGESTOR ISOLATION Good 3 3 3 9 HIL0353 - THICKENED SLUDGE PUMP - MOTOR Fair 2 3 3 9 HIL0357 - SLUDGE GRINDER Fair 3 3 3 9 HIL0357 - SLUDGE GRINDER - MOTOR Good 2 3 3 9 HIL0408 - GATE Good 2 3 3 9 HIL0409 - GATE Good 2 3 3 9 HIL0410 - GATE Good 2 3 3 9 HIL0411 - GATE Good 2 3 3 9 HIL0412 - GATE Good 2 3 3 9 HIL0413 - GATE Good 2 3 3 9 HIL0414 - GATE HIL0417 - CHLORINGE BLDG - INTERNAL Average 3 3 3 9 STRUCTURES/WEIR/LAUNDER Fair 3 3 3 9 HIL0425 - CONTROLLER - CENTRIFUGE #2 Good 6 2 4 8 HIL0103 - VENTILATION FAN - NEWER Excellent 10 2 4 8 HIL0111 - GRIT CLASSIFIER - DRIVE SHAFT Excellent 10 2 4 8 HIL0112 - GRIT CLASSIFIER - MOTOR Fair 3 2 4 8 HIL0149 - GRIT PUMP - CHECK VALVE Good 6 2 4 8 HIL0149 - GRIT PUMP - PUMP Fair 3 2 4 8 HIL0150 - GRIT PUMP - CHECK VALVE Good 6 2 4 8 HIL0150 - GRIT PUMP - PUMP Good 6 2 4 8 HIL0292 - SECONDARY CLARIFIER DIVERSION Good 6 2 4 8 HIL0293 - SECONDARY CLARIFIER DIVERSION HIL0426 - PUMPS (NON-PORTABLE) - Excellent 9 2 4 8 CHLORINATION PUMP 1 HIL0426 - PUMPS (NON-PORTABLE) - Excellent 9 2 4 8 CHLORINATION PUMP 2 HIL0261 - CLARIFIER SCUM/DRAIN PUMP - Fair 1 4 2 8 CONTROLLER Poor 2 4 2 8 HIL0407 - AIR DELIVERY Good 6 2 3 6 HIL0137 - NO. 2 WATER SYSTEM 26 Vertical Asset Risk Assessment Report Useful Risk Equipment Condition POF COF Life Score HIL0146 - DEWATERING PUMP - INTERNAL Average 7 2 3 6 STRUCTURES Good 6 2 3 6 HIL0146 - DEWATERING PUMP - PUMP Fair 3 2 3 6 HIL0149 - GRIT PUMP - EFFLUENT ISOLATION Fair 3 2 3 6 HIL0149 - GRIT PUMP - INFLUENT ISOLATION 1 Fair 3 2 3 6 HIL0149 - GRIT PUMP - INFLUENT ISOLATION 2 Fair 3 2 3 6 HIL0150 - GRIT PUMP - EFFLUENT ISOLATION Fair 3 2 3 6 HIL0150 - GRIT PUMP - INFLUENT ISOLATION HIL0157 - PREAERATION SLUDGE PUMP - CHECK Average 4 2 3 6 VALVE HIL0157 - PREAERATION SLUDGE PUMP - Average 4 2 3 6 EFFLUENT ISOLATION HIL0157 - PREAERATION SLUDGE PUMP - INFLUENT Average 4 2 3 6 ISOLATION Average 6 2 3 6 HIL0157 - PREAERATION SLUDGE PUMP - PUMP HIL0158 - PREAERATION SLUDGE PUMP - CHECK Average 4 2 3 6 VALVE HIL0158 - PREAERATION SLUDGE PUMP - Average 4 2 3 6 EFFLUENT ISOLATION HIL0158 - PREAERATION SLUDGE PUMP - INFLUENT Average 4 2 3 6 ISOLATION Average 6 2 3 6 HIL0158 - PREAERATION SLUDGE PUMP - PUMP Good 6 2 3 6 HIL0161 - PRIMARY SLUDGE PUMP #1 - CKV HIL0161 - PRIMARY SLUDGE PUMP #1 - EFFLUENT Good 6 2 3 6 ISOLATION 1 HIL0161 - PRIMARY SLUDGE PUMP #1 - EFFLUENT Good 6 2 3 6 ISOLATION 2 HIL0162 - PRIMARY SLUDGE PUMP #2 - EFFLUENT Good 6 2 3 6 ISOLATION 1 HIL0162 - PRIMARY SLUDGE PUMP #2 - EFFLUENT Good 6 2 3 6 ISOLATION 2 HIL0163 - PRIMARY SLUDGE PUMP #3 - CHECK Good 6 2 3 6 VALVE HIL0163 - PRIMARY SLUDGE PUMP #3 - EFFLUENT Good 6 2 3 6 ISOLATION 1 HIL0163 - PRIMARY SLUDGE PUMP #3 - EFFLUENT Good 6 2 3 6 ISOLATION 2 HIL0253 - NO. 3 WATER SYSTEM - AIR DELIVERY Good 6 2 3 6 DIFFUSERS HIL0264 - NO. 3 WATER PUMP (HIGH PSI) - Good 6 2 3 6 CONTROLLER Excellent 6 2 3 6 HIL0264 - NO. 3 WATER PUMP (HIGH PSI) - PUMP HIL0265 - NO. 3 WATER PUMP (LOW PSI) - Good 6 2 3 6 CONTROLLER Excellent 6 2 3 6 HIL0265 - NO. 3 WATER PUMP (LOW PSI) - PUMP Average 5 3 2 6 HIL0061 - BLOWER - CONTROLLER 27 Vertical Asset Risk Assessment Report Useful Risk Equipment Condition POF COF Life Score Average 5 3 2 6 HIL0062 - BLOWER - CONTROLLER Average 5 3 2 6 HIL0063 - BLOWER - CONTROLLER Average 7 3 2 6 HIL0064 - BLOWER - BLOWER Average 5 3 2 6 HIL0064 - BLOWER - CONTROLLER Average 3 3 2 6 HIL0064 - BLOWER - MOTOR Average 7 3 2 6 HIL0065 - BLOWER - BLOWER Average 5 3 2 6 HIL0065 - BLOWER - CONTROLLER Average 3 3 2 6 HIL0065 - BLOWER - MOTOR Fair 3 3 2 6 HIL0079 - CROSS COLLECTOR #1 - GEAR REDUCER HIL0079 - CROSS COLLECTOR #1 - INTERNAL Fair 3 3 2 6 STRUCTURE/LINER/PIPING/VALVES/ETC Fair 3 3 2 6 HIL0079 - CROSS COLLECTOR #1 - MOTOR Fair 3 3 2 6 HIL0080 - CROSS COLLECTOR #2 - GEAR REDUCER HIL0080 - CROSS COLLECTOR #2 - INTERNAL Fair 3 3 2 6 STRUCTURE/LINER/PIPING/VALVES/ETC Fair 3 3 2 6 HIL0080 - CROSS COLLECTOR #2 - MOTOR Fair 3 3 2 6 HIL0081 - CROSS COLLECTOR #3 - GEAR REDUCER HIL0081 - CROSS COLLECTOR #3 - INTERNAL Fair 3 3 2 6 STRUCTURES Fair 3 3 2 6 HIL0081 - CROSS COLLECTOR #3 - MOTOR HIL0142 - PRIMARY CLARIFIER NO. 1 - GEAR Fair 3 3 2 6 REDUCER HIL0142 - PRIMARY CLARIFIER NO. 1 - GEAR Fair 3 3 2 6 REDUCER HIL0142 - PRIMARY CLARIFIER NO. 1 - INTERNAL Fair 4 3 2 6 STRUCTURES Average 3 3 2 6 HIL0142 - PRIMARY CLARIFIER NO. 1 - MOTOR HIL0142 - PRIMARY CLARIFIER NO. 1 - Fair 4 3 2 6 STRUCTURE/RAILS/STAIRS HIL0143 - PRIMARY CLARIFIER NO. 2 - Average 3 3 2 6 CONTROLLER HIL0143 - PRIMARY CLARIFIER NO. 2 - GEAR Fair 3 3 2 6 REDUCER HIL0143 - PRIMARY CLARIFIER NO. 2 - GEAR Fair 3 3 2 6 REDUCER HIL0143 - PRIMARY CLARIFIER NO. 2 - INTERNAL Fair 4 3 2 6 STRUCTURES HIL0144 - PRIMARY CLARIFIER NO. 3 - Good 4 3 2 6 CONTROLLER HIL0144 - PRIMARY CLARIFIER NO. 3 - GEAR Fair 3 3 2 6 REDUCER HIL0144 - PRIMARY CLARIFIER NO. 3 - GEAR Fair 3 3 2 6 REDUCER Average 3 3 2 6 HIL0144 - PRIMARY CLARIFIER NO. 3 - MOTOR Fair 3 3 2 6 HIL0146 - DEWATERING PUMP - MOTOR 28 Vertical Asset Risk Assessment Report Useful Risk Equipment Condition POF COF Life Score Fair 3 3 2 6 HIL0149 - GRIT PUMP - CONTROLLER Fair 3 3 2 6 HIL0150 - GRIT PUMP - CONTROLLER HIL0157 - PREAERATION SLUDGE PUMP - Average 4 3 2 6 CONTROLLER HIL0158 - PREAERATION SLUDGE PUMP - Average 4 3 2 6 CONTROLLER Fair 3 3 2 6 HIL0159 - PRIMARY SCUM PUMP HIL0161 - PRIMARY SLUDGE PUMP #1 - Fair 3 3 2 6 CONTROLLER HIL0162 - PRIMARY SLUDGE PUMP #2 - Fair 3 3 2 6 CONTROLLER HIL0163 - PRIMARY SLUDGE PUMP #3 - Fair 3 3 2 6 CONTROLLER HIL0163 - PRIMARY SLUDGE PUMP #3 - Fair 3 3 2 6 CONTROLLER Fair 3 3 2 6 HIL0177 - HELICAL SKIMMER - CONTROLLER Fair 2 3 2 6 HIL0177 - HELICAL SKIMMER - GBX HIL0177 - HELICAL SKIMMER - INTERNAL Fair 3 3 2 6 STRUCTURES Poor 2 3 2 6 HIL0177 - HELICAL SKIMMER - MOTOR Fair 3 3 2 6 HIL0178 - HELICAL SKIMMER - CONTROLLER Fair 2 3 2 6 HIL0178 - HELICAL SKIMMER - GBX HIL0178 - HELICAL SKIMMER - INTERNAL Fair 3 3 2 6 STRUCTURES Fair 2 3 2 6 HIL0178 - HELICAL SKIMMER - MOTOR Fair 3 3 2 6 HIL0179 - HELICAL SKIMMER - CONTROLLER Fair 2 3 2 6 HIL0179 - HELICAL SKIMMER - GBX HIL0179 - HELICAL SKIMMER - INTERNAL Fair 3 3 2 6 STRUCTURES Average 3 3 2 6 HIL0203 - SOLIDS CONTACT BLOWER - BLOWER HIL0203 - SOLIDS CONTACT BLOWER - Fair 3 3 2 6 CONTROLLER Fair 3 3 2 6 HIL0203 - SOLIDS CONTACT BLOWER - MOTOR Average 3 3 2 6 HIL0204 - SOLIDS CONTACT BLOWER - BLOWER HIL0204 - SOLIDS CONTACT BLOWER - Fair 3 3 2 6 CONTROLLER Average 3 3 2 6 HIL0205 - SOLIDS CONTACT BLOWER - BLOWER HIL0205 - SOLIDS CONTACT BLOWER - Fair 3 3 2 6 CONTROLLER Fair 3 3 2 6 HIL0205 - SOLIDS CONTACT BLOWER - MOTOR HIL0259 - CLARIFIER SCUM/DRAIN PUMP - Fair 3 3 2 6 CONTROLLER HIL0260 - CLARIFIER SCUM/DRAIN PUMP - Fair 3 3 2 6 CONTROLLER Fair 3 3 2 6 HIL0270 - RSS PUMPS - CONTROLLER 29 Vertical Asset Risk Assessment Report Useful Risk Equipment Condition POF COF Life Score Fair 3 3 2 6 HIL0272 - RSS PUMPS - CONTROLLER Fair 3 3 2 6 HIL0273 - RSS PUMPS - CONTROLLER Fair 2 3 2 6 HIL0275 - WSS PUMP - Fair 3 3 2 6 HIL0275 - WSS PUMP - CONTROLLER Fair 2 3 2 6 HIL0276 - WSS PUMP Fair 3 3 2 6 HIL0276 - WSS PUMP - CONTROLLER Poor 3 3 2 6 HIL0288 - SHREDDER/STRAINER - CONTROLLER Fair 3 3 2 6 HIL0288 - SHREDDER/STRAINER HIL0352 - THICKENED SLUDGE PUMP - CHECK Fair 2 3 2 6 VALVE HIL0353 - THICKENED SLUDGE PUMP - CHECK Fair 2 3 2 6 VALVE Fair 3 3 2 6 HIL0416 - CHLORINE SHREDDER Poor 3 3 2 6 HIL0416 - CHLORINE SHREDDER - CONTROLLER Excellent 4 1 5 5 HIL0151 - INFLUENT ISCO SAMPLER Fair 10 1 4 4 HIL0380 - BUILDING - STRUCTURE/RAILS/STAIRS Fair 10 1 4 4 HIL0381 - BUILDING - STRUCTURE/RAILS/STAIRS Average 7 2 2 4 HIL0061 - BLOWER - BLOWER Average 3 2 2 4 HIL0061 - BLOWER - MOTOR Average 7 2 2 4 HIL0062 - BLOWER - BLOWER Average 3 2 2 4 HIL0062 - BLOWER - MOTOR Average 7 2 2 4 HIL0063 - BLOWER - BLOWER Average 3 2 2 4 HIL0063 - BLOWER - MOTOR Fair 6 2 2 4 HIL0079 - CROSS COLLECTOR #1 - CONTROLLER Fair 6 2 2 4 HIL0080 - CROSS COLLECTOR #2 - CONTROLLER Fair 6 2 2 4 HIL0081 - CROSS COLLECTOR #3 - CONTROLLER HIL0142 - PRIMARY CLARIFIER NO. 1 - Fair 6 2 2 4 CONTROLLER Fair 6 2 2 4 HIL0143 - PRIMARY CLARIFIER NO. 2 - DRIVE SHAFT HIL0144 - PRIMARY CLARIFIER NO. 3 - Fair 6 2 2 4 STRUCTURE/RAILS/STAIRS Good 7 2 2 4 HIL0179 - HELICAL SKIMMER - MOTOR Poor 2 2 2 4 HIL0288 - SHREDDER/STRAINER - MOTOR Average 8 2 2 4 HIL0400 - FENCE Good 3 2 2 4 HIL0416 - CHLORINE SHREDDER - MOTOR Excellent 8 1 3 3 HIL0159 - PRIMARY SCUM PUMP - MOTOR Average 10 1 3 3 HIL0176 - SEPTAGE PIT FOR WASTE HAULERS Fair 5 3 1 3 HIL0419 - CRANE Excellent 6 1 2 2 HIL0204 - SOLIDS CONTACT BLOWER - MOTOR Excellent 10 1 1 1 HIL0066 - ODOR CONTROL SYSTEM - MOTOR Excellent 10 1 1 1 HIL0067 - ODOR CONTROL SYSTEM - MOTOR 30 Vertical Asset Risk Assessment Report Table A4. Holualoa SPS Useful Risk Equipment Condition POF COF Life Score Poor 0 5 4 20 HOL0004 - ODOR CONTROL SYSTEM #2 Average 5 3 4 12 HOL0002 - AUTOMATIC TRANSFER SWITCH Average 2 3 4 12 HOL0004 - ODOR CONTROL SYSTEM - BLOWER Average 3 3 4 12 HOL0004 - ODOR CONTROL SYSTEM - MOTOR Poor 0 5 2 10 HOL0036 - EFFLUENT FLOW METER Average 3 3 3 9 HOL0003 -PROCESS AIR - BLOWER Average 5 3 3 9 HOL0003 -PROCESS AIR - MOTOR HOL0011 - ISOLATION VALVE - BYPASS Average 3 3 3 9 PUMPING Average 5 3 3 9 HOL0035 - AIR RELIEF VALVE Good 10 2 4 8 HOL0001 - GENERATOR DIESEL Good 15 2 4 8 HOL0004 - ODOR CONTROL SYSTEM - MEDIA HOL0034 - LEVEL SENSOR FOR PUMP AND Good 5 2 4 8 ALARM ACTIVATION HOL0004 - ODOR CONTROL SYSTEM - AUTO Good 5 2 3 6 DAILER ALARM SYSTEM HOL0005 - PUMP CONTROLLER - PUMP #1 & #2 Good 5 2 3 6 & #3 Average 5 3 2 6 HOL0031 - PUMP #1 - PUMP Average 5 3 2 6 HOL0031 - PUMP #1 - CHECK VALVE Average 5 3 2 6 HOL0031 - PUMP #1 - ISOLATION VALVE Average 5 3 2 6 HOL0032 - Pump #2 - CHECK VALVE Average 5 3 2 6 HOL0032 - Pump #2 - ISOLATION VALVE Average 5 3 2 6 HOL0033 - Pump #3 - CHECK VALVE Average 5 3 2 6 HOL0033 - Pump #3 - ISOLATION VALVE Average 5 3 2 6 HOL0033 - Pump #3 - PUMP Good 8 2 2 4 HOL0032 - Pump #2 - PUMP 31 Vertical Asset Risk Assessment Report Table A5. Useful Risk Equipment Condition POF COF Life Score HON0003 - AUTO DAILER ALARM SYSTEM - Average 5 3 4 12 ALARM #2 HON0003 - AUTO DAILER ALARM SYSTEM - Average 5 3 4 12 ALARM #1 Poor 0 5 2 10 HON0001 - INFLUENT FLOW METER Average 2 3 3 9 HON0016 - EFFLUENT COMPOSITE SAMPLER Good 10 2 4 8 HON0004 - GENERATOR Good 10 2 4 8 HON0005 - AUTOMATIC TRANSFER SWITCH HON0008 - LAGOON #2 VALVE VAULT - Good 5 2 4 8 ISOLATION VALVE #1 HON0006 - MECHANICAL AERATOR - CELL #1, Fair 3 4 2 8 AERATOR#1 HON0006 - MECHANICAL AERATOR - CELL #1, Fair 3 4 2 8 AERATOR #2 HON0006 - MECHANICAL AERATOR - CELL #2, Fair 3 4 2 8 AERATOR #1 Good 8 2 3 6 HON0002 - MICROSTRAINER - CONTROLLER Good 6 2 3 6 HON0002 - MICROSTRAINER - GEAR REDUCER Good 6 2 3 6 HON0002 - MICROSTRAINER - MOTOR Good 6 2 3 6 HON0002 - MICROSTRAINER - SCREW HON0006 - TREATMENT LAGOON - Good 5 2 3 6 CONTROLLER 1 HON0006 - TREATMENT LAGOON - Good 5 2 3 6 CONTROLLER 2 HON0006 - TREATMENT LAGOON - Good 5 2 3 6 CONTROLLER 3 HON0009 - TREATMENT LAGOON - Good 5 2 3 6 CONTROLLER 1 HON0009 - TREATMENT LAGOON - Good 5 2 3 6 CONTROLLER 2 HON0009 - TREATMENT LAGOON CELL #3 - Average 2 3 2 6 MECHANICAL AERATOR HON0009 - TRTMENT LAGOON CELL #4 Average 10 3 2 6 COVER HON0009 - TREATMENT LAGOON CELL #4 - Average 2 3 2 6 SMALL MIXER Good 15 1 4 4 HON0006 - TREATMENT LAGOON #1 - LINER Excellent 10 1 4 4 HON0015 - ISOLATION VALVE HON0008 - LAGOON #2 VALVE VAULT - Good 5 2 2 4 ISOLATION VALVE #2 Good 15 1 2 2 HON0007 - WEIR CONTROLS LEVEL LAGOON 1 Good 15 1 2 2 HON0010 - TREATMENT LAGOON - WEIR 32 Vertical Asset Risk Assessment Report Table A6. Kaloko WWTP Useful Risk Equipment Condition POF COF Life Score Good 2 3 4 12 KXL0004-WET WELL LEVEL SENSOR - FLOATS KXL0006 - FLOW EQUALIZATION BASIN - PUMP Average 2 3 4 12 #1 KXL0006 - FLOW EQUALIZATION BASIN - PUMP Average 2 3 4 12 #2 Average 4 3 4 12 KXL0011 - AUTO DAILER ALARM SYSTEM Average 1 3 4 12 Kxl0009-DAF TREATMENT UNIT Good 4 3 4 12 Kxl0009-DAF Solids Pump Fair 1 4 3 12 KXL0009 - DAF CHEM PUMPS-ALUM Fair 1 4 3 12 KXL0009 - DAF CHEMP PUMPS-POLY Average 1 4 3 12 Kxl0013-Odor Control System - media Excellent 2 3 3 9 KXL0009 - DAF CHEM PUMPS-CHLORINE Average 2 3 3 9 Kxl0007-solids return pump #1 Average 2 3 3 9 Kxl0007-solids return pump #2 Good 6 2 4 8 KXL0003 - CONTROLLER - WET WELL PUMPS KXL0006 - FLOW EQUALIZATION BASIN - Good 5 2 4 8 CONTROLLER Good 10 2 4 8 Kxl0008-Air Compressor #1 Good 10 2 4 8 Kxl0008-Air Compressor #1 - mtr Good 10 2 4 8 Kxl0010- Air Compressor #2 - Motor Good 6 2 3 6 KXL0001 - PUMP #1 - PUMP Good 10 2 3 6 KXL0001 - PUMP #1- CHECK VALVE Good 10 2 3 6 KXL0001 - PUMP #1 - ISOLATION VALVE Good 6 2 3 6 KXL0002 - PUMP #2 - PUMP Good 10 2 3 6 KXL0002 - PUMP #2 - CHECK VALVE Good 10 2 3 6 KXL0002 - PUMP #2 - ISOLATION VALVE Good 10 2 3 6 Kxl0010- Air Compressor #2 Good 10 2 3 6 Kxl0013-Odor Control System - fan Good 5 2 3 6 Kxl0013-Odor Control System - motor Excellent 15 1 4 4 Kxl0005-Splitter Box Poor 6 1 2 2 Kxl0200-Treatment Train #2 33 Vertical Asset Risk Assessment Report Table A7. Kapehu WWTP Useful Risk Equipment Condition POF COF Life Score Fair 1 4 3 12 KAP0028 - SHREDDER #1 - SHREDDER Fair 1 4 3 12 KAP0029 - SHREDDER #2 - SHREDDER Average 2 3 3 9 KAP0028 - SHREDDER #1 - MOTOR Good 5 3 3 9 KAP0029 - SHREDDER #2 - MOTOR Good 6 2 2 4 KAP0001 - BLOWER #1 Good 6 2 2 4 KAP0001 - CONTROLLER Good 6 2 2 4 KAP0001 - MOTOR Good 6 2 2 4 KAP0002 - BLOWER #2 - BLOWER Good 6 2 2 4 KAP0002 - BLOWER #2 - CONTROLLER Good 6 2 2 4 KAP0002 - BLOWER #2 - MOTOR Good 6 2 2 4 KAP0023 - INFLUENT FLOWMETER Good 6 2 2 4 KAP0028 - SHREDDER #1 - CONTROLLER Good 6 2 2 4 KAP0029 - SHREDDER #2 - CONTROLLER Fair 5 3 1 3 KAP0003 - BLOWER #3 34 Vertical Asset Risk Assessment Report Table A8. Kealakehe SPS Useful Risk Equipment Condition POF COF Life Score Fair 0 5 4 20 KEA0002 - WET WELL #1 PUMP #2 - PUMP Fair 2 4 4 16 KEA0022 - PUMP (#5) - CHECK VALVE Fair 2 4 4 16 KEA0022 - PUMPS (#5) - PUMP Fair 3 4 4 16 KEA0030 - ODOR CONTROL SYSTEM - FAN Average 5 3 5 15 KEA0021 - AUTOMATIC TRANSFER SWITCH Good 1 3 4 12 KEA0030 - ODOR CONTROL SYSTEM - MEDIA Average 4 3 4 12 KEA0030 - ODOR CONTROL SYSTEM - MOTOR KEA0001 - WET WELL #1 PUMP #1 - CHECK Fair 1 4 3 12 VALVE KEA0001 - WET WELL #1 PUMP #1 - ISOLATION Poor 1 4 3 12 VALVE Good 10 2 5 10 KEA0020 - GENERATOR KEA0014 - WET WELL #1 INFLUENT SLUICE Poor 0 5 2 10 GATE-MOTOR KEA0014 - WET WELL #1 INFLUENT SLUICE Average 5 3 3 9 GATE - GATE KEA0015 - WET WELL #2 INFLUENT SLUICE Average 5 3 3 9 GATE - GATE Fair 3 3 3 9 KEA0022 - PUMPS (#5) - ISOLATION VALVE Average 3 3 3 9 KEA0032 - WET WELL LEVEL SENSOR KEA0002 - WET WELL #1 PUMP #2 - CHECK Poor 1 4 2 8 VALVE Fair 2 4 2 8 KEA0031 - ICE MACHINE KEA0014 - WET WELL #1 INFLUENT SLUICE Average 3 3 2 6 GATE-CONTROLLER KEA0015 - WET WELL #2 INFLUENT SLUICE Average 3 3 2 6 GATE - CONTROLLER KEA0015 - WET WELL #2 INFLUENT SLUICE Average 2 3 2 6 GATE - MOTOR Good 10 1 5 5 KEA0016 - EFFLUENT SLUICE GATE-GATE KEA0002 - WET WELL #1 PUMP #2 - ISOLATION Average 5 2 2 4 VALVE 35 Vertical Asset Risk Assessment Report Table A9. Kealakehe WWTP Useful Risk Equipment Condition POF COF Life Score Poor 0 5 4 20 KEA1004 - AIR COMPRESSOR (H) KEA1125 - MECHANICAL BAR SCREEN #1 - Poor 0 5 4 20 BARS/RAKE/DRIVES KEA1125 - MECHANICAL BAR SCREEN #1 - Poor 0 5 4 20 CONTROLLER Kea1163 - Lagoon 1, Flow Div Bx 1A, North - Poor 0 5 4 20 SLUICE GATE KEA1125 - MECHANICAL BAR SCREEN #1 - Fair 2 4 4 16 MOTOR KEA1126 - MECHANICAL BAR SCREEN #2 - Fair 1 4 4 16 BARS/RAKE/DRIVES Fair 2 4 4 16 KEA1133 - GRIT DEWATERING SCREW - MOTOR KEA1162 - GRIT PROCESS BYPASS - SLUICE Fair 3 4 4 16 GATE Fair 2 3 5 15 KEA1037 - EFFLUENT FLOW METER Poor 0 5 3 15 KEA1053 - GRIT PUMP #2 - PUMP Poor 0 5 3 15 KEA1116 - CHLORINE SUPPLY PUMP Poor 0 5 3 15 KEA1168-EFFLUENT COMPOSITE SAMPLER Average 3 3 4 12 KEA1005 - AIR COMPRESSOR - KAILUA Average 3 3 4 12 KEA1054 - GRIT PUMP #1 - PUMP Average 3 3 4 12 KEA1054 - GRIT PUMP #1 - CONTROLLER KEA1115 - CHLORINE MOTIVE WATER PUMP - Average 3 3 4 12 PUMP KEA1115 - CHLORINE MOTIVE WATER PUMP - Average 3 3 4 12 MOTOR Kea1125 - MECHANICAL BAR SCREEN #1 - Fair 4 3 4 12 INFLUENT GATE VALVE KEA1126 - MECHANICAL BAR SCREEN #2 - Fair 4 3 4 12 INFLUENT GATE VALVE KEA1126 - MECHANICAL BAR SCREEN #2 - Average 2 3 4 12 CONTROLLER KEA1126 - MECHANICAL BAR SCREEN #2 - Fair 4 3 4 12 EFFLUANT GATE VALVE KEA1126 - MECHANICAL BAR SCREEN #2 - Fair 2 3 4 12 MOTOR KEA1133 - GRIT DEWATERING SCREW - GEAR Average 2 3 4 12 REDUCER KEA1160 - SEPTAGE RECEIVING AREA - Average 2 4 3 12 ISOLATION VALVE KEA1164 - FLOW DIVERSION BOX 1B-E - - Poor 4 4 3 12 SLUICE GATE KEA1164 - FLOW DIVERSION BOX 1B-SW - - Fair 4 4 3 12 SLUICE GATE KEA1164 - FLOW DIVERSION BOX-1B-SE - - Fair 4 4 3 12 SLUICE GATE 36 Vertical Asset Risk Assessment Report Useful Risk Equipment Condition POF COF Life Score KEA1164 - FLOW DIVERSION BOX1B-W - SLUICE Fair 4 4 3 12 GATE Poor 0 5 2 10 KEA1038 - INFLUENET FLOW METER Kea1163 - Lag 1, Flow Div Bx 1A, South Gate - Poor 0 5 2 10 SLUICE GATE KEA1097 - GRIT CHAMBER - EFFLUANT GATE Average 4 3 3 9 VALVE KEA1097 - GRIT CHAMBER - INFLUENT GATE Average 4 3 3 9 VALVE KEA1098 - GRIT CHAMBER-KAILUA, grit Average 4 3 3 9 chamber #1 - EFFLUENT SLUICE GATE KEA1098 - GRIT CHAMBER-KAILUA, grit Average 4 3 3 9 chamber #1 - INFLUENT SLUICE GATE Kea1125 - MECHANICAL BAR SCREEN #1 - Fair 4 3 3 9 EFFLUANT GATE VALVE KEA1166 - FLOW DIVERSION BOX-3 - E - SLUICE Fair 4 3 3 9 GATE KEA1166 - FLOW DIVERSION BOX-3 - N - SLUICE Fair 4 3 3 9 GATE KEA1166 - FLOW DIVERSION BOX-3 - S - SLUICE Fair 4 3 3 9 GATE KEA1167 - FLOW DIVERSION BOX-4A-E - Fair 4 3 3 9 SLUICE GATE KEA1167 - FLOW DIVERSION BOX-4A-N - Fair 4 3 3 9 SLUICE GATE KEA1167 - FLOW DIVERSION BOX-4A-S - Fair 4 3 3 9 SLUICE GATE KEA1133 - GRIT DEWATERING SCREW - GRIT Average 5 2 4 8 CLASSIFIER KEA1050 - EFFLUENT PUMP (#2) - ISOLATION Fair 3 4 2 8 VALVE KEA1051 - EFFLUENT PUMP (#1) - ISOLATION Fair 3 4 2 8 VALVE KEA1052 - EFFLUENT PUMP (#3) - ISOLATION Fair 3 4 2 8 VALVE Good 5 2 3 6 KEA1013 - CHLORINE SYSTEM - Pump #1 Good 5 2 3 6 KEA1014 - CHLORINE SYSTEM - Pump #2 Fair 2 3 2 6 KEA1050 -EFFLUENT PUMP (#2) - CHECK VALVE KEA1051 - EFFLUENT PUMP (#1) - CHECK Fair 2 3 2 6 VALVE KEA1052 - EFFLUENT PUMP (#3) - CHECK Fair 2 3 2 6 VALVE Average 3 3 2 6 KEA1053 - GRIT PUMP #2 - CONTROLLER Kea1163 - Lagoon 1, Flow Div Bx 1A-WEST - Average 6 3 2 6 SLUICE GATE Excellent 20 1 5 5 KEA1060 - AERATED LAGOON #1 -HEADER Excellent 20 1 5 5 KEA1061 - AERATED LAGOON #2 - HEADER 37 Vertical Asset Risk Assessment Report Useful Risk Equipment Condition POF COF Life Score Excellent 20 1 5 5 KEA1062 - AERATED LAGOON #3 - HEADER Poor 0 5 1 5 KEA1114 - HOIST Excellent 20 1 4 4 KEA1060 - AERATED LAGOON #1 - LINER Excellent 20 1 4 4 KEA1061 - AERATED LAGOON #2 - LINER Excellent 20 1 4 4 KEA1062 - AERATED LAGOON #3 - LINER KEA1170 - AERATION BLOWER #1 - AIR Excellent 10 1 4 4 BLOWER Excellent 10 1 4 4 KEA1170 - AERATION BLOWER #1 - MOTOR Excellent 10 1 4 4 KEA1171 - AERATION BLOWER #2 - BLOWER Excellent 10 1 4 4 KEA1171 - AERATION BLOWER #2 - MOTOR Excellent 7 2 2 4 KEA1051 - EFFLUENT PUMP (#1) - CONTROLLER Excellent 8 2 2 4 KEA1060 - AERATED LAGOON #1 - LATERAL 1 Excellent 8 2 2 4 KEA1061 - AERATED LAGOON #2 - LATERAL #1 Excellent 8 2 2 4 KEA1062 - AERATED LAGOON #3 - LATERAL Good 4 3 1 3 KEA1161 - INF SAMPLER Excellent 10 1 2 2 KEA1050 - EFFLUENT PUMP (#2) - PUMP Excellent 5 1 2 2 KEA1050 - EFFLUENT PUMP (#2) - MOTOR Excellent 10 1 2 2 KEA1051 - EFFLUENT PUMP (#1) - PUMP Excellent 5 1 2 2 KEA1051 - EFFLUENT PUMP (#1) - MOTOR Excellent 10 1 2 2 KEA1050 - EFFLUENT PUMP (#3) - PUMP Excellent 5 1 2 2 KEA1052 - EFFLUENT PUMP (#3) - MOTOR KEA1170 - AERATION BLOWER #1 -HYDRAULIC Excellent 10 1 2 2 SUPPORT SYSTEM KEA1170 - AERATION BLOWER #1 - Excellent 15 1 2 2 CONTROLLER KEA1171 - AERATION BLOWER #2 - Excellent 15 1 2 2 CONTROLLER KEA1171 - AERATION BLOWER #2 - HYDRAULIC Excellent 10 1 2 2 SUPPORT SYSTEM Excellent 15 1 1 1 KEA1172 - BLOWER #1 - CRANE/HOIST Excellent 15 1 1 1 KEA1173 - BLOWER #2 - CRANE/HOIST 38 Vertical Asset Risk Assessment Report Table A10. Keopa SPS Useful Risk Equipment Condition POF COF Life Score Fair 2 3 4 12 KEO0006 - VENTILATION SYSTEM Fair 2 4 3 12 KEO0008 - SUMP PUMP Fair 2 3 3 9 KEO0001 - PUMP #1 Average 5 3 3 9 KEO0002 - PUMP #2 Average 2 4 3 9 KEO0002 - PUMP #2 - CHECK VALVE Average 3 3 3 9 KEO0002 - PUMP #2 - ISOLATION VALVE Fair 3 2 2 9 KEO0001 - PUMP #1 - MOTOR Good 5 2 2 9 KEO0002 - PUMP #2 - MOTOR Good 10 2 3 6 KEO0001 - PUMP #1 - ISOLATION VALVE Good 5 3 3 6 KEO0003 - CONTROLLER - BOTH PUMPS Good 5 4 3 6 KEO0004 - WET WELL SENSOR Good 7 2 3 6 KEO0005 - AUTO DAILER ALARM SYSTEM Good 10 2 3 6 KEO0007 - BYPASS VALVE - ISOLATION VALVE Good 10 2 2 6 KEO0001 - PUMP #1 - CHECK VALVE Table A11. Kolea SPS Useful Risk Equipment Condition POF COF Life Score Poor 2 4 5 20 KOL0017 - PUMP #2 - CONTROLLER Poor 2 4 5 20 KOL0018 - SUMP PUMP - CONTROLLER Fair 1 4 3 12 KOL0024 - MAIN LIFT - CONTROLLER Fair 1 4 3 12 KOL0024 - MAIN LIFT - GEAR REDUCER Fair 1 4 3 12 KOL0024 - MAIN LIFT - MOTOR Average 4 3 2 6 KOL0016 - PUMP #1 - MOTOR Average 4 3 2 6 KOL0017 - PUMP #2 - MOTOR Excellent 3 1 4 4 KOL0018 - MOTOR AND PUMP Fair 6 2 2 4 KOL0017 - PUMP #2 - CHECK VAVLE Fair 3 2 2 4 KOL0017 - PUMP #2 - PUMP Average 6 2 2 4 KOL0023 - LEVEL SENSOR - CONTROLLER Average 10 1 2 2 KOL0016 - PUMP #1 - ISOLATION INF KOL0017 - PUMP #2 - ISOLATION VALVE Average 10 1 2 2 EFFLUENT KOL0017 - PUMP #2 - ISOLATION VALVE Average 10 1 2 2 INFLUENT 39 Vertical Asset Risk Assessment Report Table A12. Kulaimano WWTP Useful Risk Equipment Condition POF COF Life Score Poor 0 5 4 20 KUL0051 - SECONDARY DIGESTER KUL0066 - CONTROLLER - clarifier solids valves Fair 2 3 5 15 #1-6 Poor 0 5 3 15 Kul0074-Motor - Clarifier #2, motor for valve #4 Poor 0 5 3 15 Kul0074-Valve - Clarifier #2, solids valve #4 Kul0075-Motor - Clarifier #2, motor for solids Poor 0 5 3 15 valve #5 Poor 0 5 3 15 Kul0075-Valve - Clarifier #2, Valve #5 Kul0076-Motor- Clarifier #2, motor for solids Poor 0 5 3 15 valve #6 Poor 0 5 3 15 Kul0076-Valve - Clarifier #2, solids valve #6 KUL0039 - GRIT TANK AIR LIFT - TANK/GEAR Fair 5 3 4 12 BOX/MOTOR Fair 8 3 4 12 KUL0044 - HEADWORKS BUILDING - ROOF Poor 3 4 3 12 KUL0036 - BARMINUTOR KUL0063 - CLARIFIER #1 - SOLIDS VALVE #1 - Fair 2 4 3 12 MOTOR KUL0080 - CHLORINATION PUMP - Excellent 10 2 5 10 CONTROLLER Excellent 10 2 5 10 KUL0080 - CHLORINATION PUMP - PUMP 1 Excellent 10 2 5 10 KUL0080 - CHLORINATION PUMP - PUMP 2 Excellent 10 2 5 10 KUL0081 - sodium bisulfite CONTROLLER Excellent 10 2 5 10 KUL0081 - sodium bisulfite PUMP 1 Excellent 10 2 5 10 KUL0081 - sodium bisulfite PUMP 2 Poor 0 5 2 10 KUL0011 - BLOWER #1 - ALL PARENT CHILD Average 10 3 3 9 KUL0015 - CENTRIFUGE - CENTRIFUGE Average 8 3 3 9 KUL0015 - CENTRIFUGE - MOTOR Good 3 3 3 9 KUL0036 - BARMINUTOR - MOTOR Fair 3 3 3 9 KUL0049 - BUILDING - FENCE KUL0063 - CLARIFIER #1 - SOLIDS VALVE #1 - Fair 2 3 3 9 VALVE Fair 9 2 4 8 KUL0052 - PRIMARY DIGESTER KUL0065 - CLARIFIER #1 - SOLIDS VALVE #3 - Good 6 2 4 8 MOTOR KUL0065 - CCLARIFIER #1 - SOLIDS VALVE #3 - Good 6 2 4 8 VALVE Average 9 2 3 6 KUL0013 - BLOWER #3 - BLOWER Average 9 2 3 6 KUL0014 - BLOWER #4 - BLOWER Good 10 2 3 6 KUL0015 - CENTRIFUGE - BACK DRIVE Average 8 2 3 6 KUL0019 - YALE 4000 - LB HOIST - BLOWER Average 5 2 3 6 KUL0024 - EFFLUENT PUMP #1 - MOTOR Average 5 2 3 6 KUL0024 - EFFLUENT PUMP #1 - PUMP 40 Vertical Asset Risk Assessment Report Useful Risk Equipment Condition POF COF Life Score KUL0064 - CLARIFIER #1 - SOLIDS VALVE #2 - Good 4 2 3 6 MOTOR KUL0064 - CLARIFIER #1- SOLIDS VALVE #2 - Good 4 2 3 6 VALVE KUL0079 - SOLIDS BELT DRIVE INTERNAL Average 8 2 3 6 STRUCTURES Good 6 2 3 6 KUL0082 - EFFLUENT SAMPLER Good 6 2 3 6 KUL0083 - EFFLUENT FLOW METER Average 2 3 2 6 KUL0012 - BLOWER #2 - CONTROLLER Average 2 3 2 6 KUL0013 - BLOWER #3 - CONTROLLER Average 2 3 2 6 KUL0014 - BLOWER #4 - CONTROLLER KUL0039 - GRIT TANK AIR LIFT - AIR LIFT PUMP Good 5 3 2 6 #1 KUL0039 - GRIT TANK AIR LIFT - AIR LIFT PUMP Good 5 3 2 6 #2 Fair 5 3 2 6 KUL0057 - AERATION #1 - GEAR REDUCER Fair 5 3 2 6 KUL0057 - AERATION #1 - MOTOR Fair 5 3 2 6 KUL0058 - AERATION #2 - GEAR REDUCER Fair 5 3 2 6 KUL0058 - AERATION #2 - MOTOR Fair 5 3 2 6 KUL0059 - AERATION #3 - GEAR REDUCER Fair 5 3 2 6 KUL0059 - AERATION #3 - MOTOR Fair 5 3 2 6 KUL0060 - AERATION #4 - GEAR REDUCER Fair 5 3 2 6 KUL0060 - AERATION #4 - MOTOR Fair 5 3 2 6 KUL0061 - AERATION #5 - GEAR REDUCER Fair 5 3 2 6 KUL0061 - AERATION #5 - MOTOR Fair 5 3 2 6 KUL0062 - AERATION #6 - GEAR REDUCER Fair 5 3 2 6 KUL0062 - AERATION #6 - MOTOR KUL0068 - CLARIFIER SOLIDS PUMP #1 - GEAR Fair 4 3 2 6 REDUCER KUL0072 - METER - WASTE SOLIDS FLOW Average 4 3 2 6 METER KUL0044 - BUILDING - Good 10 1 4 4 STRUCTURE/RAILS/STAIRS Average 9 2 2 4 KUL0012 - BLOWER #2 - BLOWER Average 8 2 2 4 KUL0012 - BLOWER #2 - MOTOR Average 8 2 2 4 KUL0013 - BLOWER #3 - MOTOR Average 8 2 2 4 KUL0014 - BLOWER #4 - MOTOR Good 9 2 2 4 KUL0015 - CENTRIFUGE - CONTROLLER Good 5 2 2 4 KUL0025 - EFFLUENT PUMP #2 - MOTOR Average 5 2 2 4 KUL0025 - EFFLUENT PUMP #2 - PUMP Good 5 2 2 4 KUL0057 - AERATION #1 - GATE Good 5 2 2 4 KUL0058 - AERATION #2 - GATE Good 5 2 2 4 KUL0059 - AERATION #3 - GATE Good 5 2 2 4 KUL0060 - AERATION #4 - GATE 41 Vertical Asset Risk Assessment Report Useful Risk Equipment Condition POF COF Life Score Good 5 2 2 4 KUL0061 - AERATION #5 - GATE Good 5 2 2 4 KUL0062 - AERATION #6 - GATE KUL0068 - CLARIFIER SOLIDS PUMP #1 - CHECK Average 4 2 2 4 VALVE KUL0068 - CLARIFIER SOLIDS PUMP #1 - Average 4 2 2 4 ISOLATION VALVE KUL0068 - CLARIFIER SOLIDS PUMP #1 - Average 4 2 2 4 MOTOR Fair 4 2 2 4 KUL0068 - CLARIFIER SOLIDS PUMP #1 - PUMP KUL0069 - CLARIFIER SOLIDS PUMP #2 - CHECK Average 4 2 2 4 VALVE KUL0069 - CLARIFIER SOLIDS PUMP #2 - GEAR Fair 4 2 2 4 REDUCER KUL0069 - CLARIFIER SOLIDS PUMP #2 - Average 4 2 2 4 ISOLATION VALVE KUL0069 - CLARIFIER SOLIDS PUMP #2 - Average 4 2 2 4 MOTOR Fair 4 2 2 4 KUL0069 - CLARIFIER SOLIDS PUMP #2 KUL0070 - CLARIFIER SOLIDS PUMP #3 - CHECK Average 4 2 2 4 VALVE KUL0070 - CLARIFIER SOLIDS PUMP #3 - Average 4 2 2 4 ISOLATION VALVE KUL0070 - CLARIFIER SOLIDS PUMP #3 - Average 4 2 2 4 MOTOR Fair 4 2 2 4 KUL0070 - CLARIFIER SOLIDS PUMP #3 KUL0071 - CLARIFIER SOLIDS PUMP #4 - CHECK Average 4 2 2 4 VALVE KUL0071 - CLARIFIER SOLIDS PUMP #4 - Average 4 2 2 4 ISOLATION VALVE KUL0071 - CLARIFIER SOLIDS PUMP #4 - Average 4 2 2 4 MOTOR Fair 4 2 2 4 KUL0071 - CLARIFIER SOLIDS PUMP #4 KUL0073 - METER - RETURN SOLIDS FLOW Average 4 2 2 4 METER KUL0077 - DIGESTER SLUDGE FEED PUMP #1 - Average 10 2 2 4 CHECK VALVE KUL0077 - DIGESTER SLUDGE FEED PUMP #1 - Average 10 2 2 4 GEAR REDUCER KUL0077 - DIGESTER SLUDGE FEED PUMP #1 - Average 10 2 2 4 ISO EFF KUL0077 - DIGESTER SLUDGE FEED PUMP #1 - Average 8 2 2 4 ISO INF KUL0077 - DIGESTER SLUDGE FEED PUMP #1 - Average 10 2 2 4 MOTOR KUL0077 - DIGESTER SLUDGE FEED PUMP #1 - Average 10 2 2 4 PUMP 42 Vertical Asset Risk Assessment Report Useful Risk Equipment Condition POF COF Life Score KUL0078 - DIGESTER SLUDGE FEED PUMP #2 - Average 10 2 2 4 CHECK VALVE KUL0078 - DIGESTER SLUDGE FEED PUMP #2 - Average 10 2 2 4 GEAR REDUCER KUL0078 - DIGESTER SLUDGE FEED PUMP #2 - Average 10 2 2 4 ISOLATION VALVE EFFLUENT KUL0078 - DIGESTER SLUDGE FEED PUMP #2 - Average 10 2 2 4 ISOLATION VALVE INFLUENT KUL0078 - DIGESTER SLUDGE FEED PUMP #2 - Average 10 2 2 4 MOTOR Average 10 2 2 4 KUL0078 DIG. SLUDGE FEED PUMP #2 - PUMP Good 10 1 3 3 KUL0079 - SOLIDS BELT DRIVE - MOTOR Fair 4 3 1 3 KUL0037 - HEADWORKS ODOR CONTROL FAN Good 6 2 1 2 KUL0005 - INFLUENT FLOW METER Average 5 2 1 2 KUL0020 - YALE 4000 - LB HOIST - CHLORINE 43 Vertical Asset Risk Assessment Report Table A13. Lanihau SPS Useful Risk Equipment Condition POF COF Life Score Poor 0 5 3 15 LAN0023 - PUMP #3 - PUMP Average 2 3 3 9 LAN0002 - AUTO DAILER ALARM SYSTEM Average 4 3 3 9 LAN0022 - PUMP #2 - PUMP Good 10 2 3 6 LAN0003 - GENERATOR Good 10 2 3 6 LAN0004 - AUTOMATIC TRANSFER SWITCH Average 10 2 3 6 LAN0021 - PUMP #1 - CHECK VALVE Good 5 2 3 6 LAN0021 - PUMP #1 - CONTROLLER LAN0021 - PUMP #1 - INFLUENT ISOLATION Average 10 2 3 6 VALVE Average 10 2 3 6 LAN0022 - PUMP #2 - CHECK VALVE Average 10 2 3 6 LAN0022 - PUMP #2 - ISOLATION VALVE Average 10 2 3 6 LAN0023 - PUMP #3 - CHECK VALVE Average 10 2 3 6 LAN0023 - PUMP #3 - ISOLATION VALVE Good 5 2 3 6 LAN0024 - WET WELL LEVEL SENSOR Good 5 3 2 6 LAN0021 - PUMP #1 - PUMP Table A14. Mill Pond SPS Useful Risk Equipment Condition POF COF Life Score Poor 2 3 5 15 MIL0003 - EMERGENCY GENERATOR Average 3 3 3 9 MIL0010 - CHECK VALVE #1 Average 3 3 3 9 MIL0011 - CHECK VALVE #2 Fair 7 2 3 6 MIL0001 - AUTOMATIC TRANSFER SWITCH Average 8 2 3 6 MIL0007 - PUMP #1 Average 6 2 3 6 MIL0007 - PUMP #1 - MOTOR Average 8 2 3 6 MIL0008 - PUMP #2 Average 6 2 3 6 MIL0008 - PUMP #2 - MOTOR Good 6 2 3 6 MIL0025 - CONTROLLER Good 6 2 2 4 MIL0019 - PUMP #1 ISOLATION VALVE - PLUG Good 6 2 2 4 MIL0020 - PUMP #2 ISOLATION VALVE - PLUG Good 6 2 2 4 MIL0021 - BYPASS VALVE - PLUG MIL0022 - FORCE MAIN ISOLATION - GATE Good 6 2 2 4 VALVE 44 Vertical Asset Risk Assessment Report Table A15. Onekahakaha SPS Useful Risk Equipment Condition POF COF Life Score Poor 0 5 4 20 ONE0007 - MAN LIFT - CONTROLLER ONE0008 - ENVIRONMENTAL CONTROL / Fair 3 3 5 15 EXHAUST BLOWER - EXHAUST BLOWER Fair 3 3 4 12 ONE0007 - MAN LIFT - GEAR BOX AND DRIVE Fair 3 3 4 12 ONE0007 - MAN LIFT - MOTOR Fair 3 3 4 12 ONE0012 - SUMP PUMP - CONTROLLER Fair 3 3 4 12 ONE0012 - SUMP PUMP - MOTOR AND PUMP Fair 5 3 3 9 ONE0010 - PUMP #1 - CHECK VAVLE Average 5 3 3 9 ONE0011 - PUMP #2 - CHECK VAVLE Average 9 2 4 8 ONE0015 - WET WELL SENSOR Average 7 2 3 6 ONE0010 - PUMP #1 - CONTROLLER ONE0010 - PUMP #1 - ISOLATION VALVE Average 7 2 3 6 EFFLUENT ONE0010 - PUMP #1 - ISOLATION VALVE Average 7 2 3 6 INFLUENT Average 9 2 3 6 ONE0010 - PUMP #1 - MOTOR Average 7 2 3 6 ONE0010 - PUMP #1 - PUMP Average 7 2 3 6 ONE0011 - PUMP #2 - CONTROLLER ONE0011 - PUMP #2 - ISOLATION VALVE Average 7 2 3 6 EFFLUENT ONE0011 - PUMP #2 - ISOLATION VALVE Average 7 2 3 6 INFLUENT Average 9 2 3 6 ONE0011 - PUMP #2 - MOTOR Average 7 2 3 6 ONE0011 - PUMP #2 - PUMP 45 Vertical Asset Risk Assessment Report Table A16. Pahoehoe SPS Useful Risk Equipment Condition POF COF Life Score Good 3 3 4 12 PAH0001 - AUTODIALER Average 3 3 4 12 PAH0006 - ODOR CONTROL SYSTEM - MEDIA Good 5 3 4 12 PAH0007 - WET WELL LEVEL SENSOR Average 5 3 4 12 PAH0020 - AUTOMATIC TRANSFER SWITCH Average 7 3 3 9 PAH0008 - ISOLATION VALVE FOR FORCE MAIN Good 8 2 4 8 PAH0019 - GENERATOR PAH0006 - ODOR CONTROL SYSTEM - BLOWER Good 6 2 3 6 #1 PAH0006 - ODOR CONTROL SYSTEM - BLOWER Good 6 2 3 6 #2 PAH0006 - ODOR CONTROL SYSTEM - BLOWER Good 6 2 3 6 #1 - MOTOR PAH0006 - ODOR CONTROL SYSTEM - BLOWER Good 6 2 3 6 #2 - MOTOR Good 5 2 3 6 PAH0022 - PUMP #1 - CONTROLLER PAH0009 - ISOLATION VALVE FOR BYPASS Average 7 3 2 6 PUMPING Good 5 3 2 6 PAH0012 - PROCESS AIR BLOWER - MOTOR Average 5 3 2 6 PAH0022 - PUMP #1 - CHECK VALVE Average 5 3 2 6 PAH0022 - PUMP #1 - ISOLATION VALVE Good 8 3 2 6 PAH0022 - PUMP #1 - PUMP Average 5 3 2 6 PAH0023 - PUMP #2 - CHECK VAVLE Average 5 3 2 6 PAH0023 - PUMP #2 - ISOLATION VALVE Average 5 3 2 6 PAH0024 - PUMP #3 - CHECK VALVE Average 5 3 2 6 PAH0024 - PUMP #3 - ISOLATION VALVE Average 4 3 2 6 PAH0024 - PUMP #3 - PUMP Good 5 2 2 4 PAH0012 - PROCESS AIR BLOWER - BLOWER Good 10 2 2 4 PAH0023 - PUMP #2 - PUMP 46 Vertical Asset Risk Assessment Report Table A17. Papaikou WWTP Useful Risk Condition POF COF Equipment Life Score PAP0074 - AIR DEVIVERY SYSTEM FOR BOTH Poor 3 4 5 20 AERATION BASINS Average 3 3 4 12 PAP0023 - EFFLUENT FLOW METER Average 2 3 4 12 PAP0063 - INFLUENT FLOW METER Fair 1 4 3 12 PAP0017 - DCG EQUIPMENT - SOLIDS REMOVAL Fair 1 4 3 12 PAP0066 - CLARIFIER #1 - GEARBOX PAP0066 - CLARIFIER #1 - INTERNAL STRUCTURES-Fair 1 4 3 12 DRIVE/RAKE/SKIMMER/WEIR/LAUNDER/ETC PAP0067 - CLARIFIER #2 - INTERNAL STRUCTURES-Fair 1 4 3 12 DRIVE/RAKE/SKIMMER/WEIR/LAUNDER/ETC Average 5 2 5 10 PAP0020 - GENERATOR DIESEL PAP0076 - CHLORINATION PUMPS - Excellent 10 2 5 10 CONTROLLER Excellent 10 2 5 10 PAP0076 -CHLORINATION PUMPS - PUMP 1 Excellent 10 2 5 10 PAP0076 - CHLORINATION PUMPS - PUMP 2 PAP0077 -DECHLORINATION PUMPS - Excellent 10 2 5 10 CONTROLLER Excellent 10 2 5 10 PAP0077 - DECHLORINATION PUMPS - PUMP 1 Excellent 10 2 5 10 PAP0077 - DECHLORINATION PUMPS - PUMP 2 Average 0 5 2 10 PAP0059 - BARMINUTOR Fair 0 5 2 10 PAP0059 - BARMINUTOR - MOTOR Good 3 3 3 9 PAP0012 - AIR BLOWER #2- CONTROLLER Good 3 3 3 9 PAP0013 - AIR BLOWER #3- CONTROLLER Fair 2 3 3 9 PAP0034 - SCUM PUMP #1 - CONTROLLER Good 5 3 3 9 PAP0034 - SCUM PUMP #1 - PUMP Fair 2 3 3 9 PAP0035 - SCUM PUMP #2 - CONTROLLER Good 5 3 3 9 PAP0035 - SCUM PUMP #2 - PUMP PAP0065 - INFLUENT ISCO DATA CHART Fair 2 3 3 9 RECORDER Fair 2 3 3 9 PAP0067 - CLARIFIER #2 - GEARBOX PAP0070 - INTERNAL Fair 3 3 3 9 STRUCTURES/PIPING/VALVES - DIGESTER Good 5 3 3 9 PAP0080 - GRIT SCREW - CONTROLLER Good 5 3 3 9 PAP0080 - GRIT SCREW - GEARBOX Good 5 3 3 9 PAP0080 - GRIT SCREW - MOTOR Average 3 3 3 9 PAP0084 - FACILITY PIT PUMP - CONTROLLER PAP0085 - FACILITY PIT PUMP #2 - Average 3 3 3 9 CONTROLLER Poor 2 4 2 8 PAP0019 - FROTH SPRAY - MOTOR Poor 2 4 2 8 PAP0019 - FROTH SPRAY - PUMP 47 Vertical Asset Risk Assessment Report Useful Risk Condition POF COF Equipment Life Score PAP0036 - SLUDGE PUMP #1 -EFFLUENT Fair 3 4 2 8 CHECK VALVE PAP0036 - SLUDGE PUMP #1 -INFLUENT CHECK Fair 3 4 2 8 VALVE PAP0036 - SLUDGE PUMP #1 - EFFLUENT Fair 3 4 2 8 ISOLATION VALVE PAP0036 - SLUDGE PUMP #1 - INFLUENT Fair 3 4 2 8 ISOLATION VALVE PAP0037 - SLUDGE PUMP #2 - EFFLUENT Fair 3 4 2 8 CHECK VALVE PAP0037 - SLUDGE PUMP #2 - INFLUENT Fair 3 4 2 8 CHECK VALVE PAP0037 - SLUDGE PUMP #2 - EFFLUENT Fair 3 4 2 8 ISOLATION VALVE PAP0037 - SLUDGE PUMP #2 - INFLUENT Fair 3 4 2 8 ISOLATION VALVE Good 5 2 3 6 PAP0032 - RAS PUMP #1 - CHECK VALVE Good 5 2 3 6 PAP0032 - RAS PUMP #1 - CONTROLLER PAP0032 - RAS PUMP #1 - GEAR BOX AND Good 5 2 3 6 DRIVE PAP0032 - RAS PUMP #1 - EFFLUENT Good 5 2 3 6 ISOLATION VALVE PAP0032 - RAS PUMP #1 - INFLUENT ISOLATION Good 5 2 3 6 VALVE Good 5 2 3 6 PAP0032 - RAS PUMP #1 - MOTOR Good 5 2 3 6 PAP0032 - RAS PUMP #1 - PUMP Good 5 2 3 6 PAP0033 - RAS PUMP #2 - CHECK VALVE Good 5 2 3 6 PAP0033 - RAS PUMP #2 - CONTROLLER PAP0033 - RAS PUMP #2 - GEAR BOX AND Good 5 2 3 6 DRIVE PAP0033 - RAS PUMP #2 - EFFLUENT Good 5 2 3 6 ISOLATION VALVE PAP0033 - RAS PUMP #2 - INFLUENT ISOLATION Good 5 2 3 6 VALVE Good 5 2 3 6 PAP0033 - RAS PUMPS #2 - MOTOR Good 5 2 3 6 PAP0033 - RAS PUMP #2 - PUMP Good 6 2 3 6 PAP0041 - WAS PUMP #1 - CHECK VALVE Good 6 2 3 6 PAP0041 - WAS PUMP #1 - CONTROLLER PAP0041 - WAS PUMP #1 - EFFLUENT Good 6 2 3 6 ISOLATION Average 6 2 3 6 PAP0041 - WAS PUMP #1 - GEAR BOX PAP0041 - WAS PUMP #1 - INFLUENT Good 6 2 3 6 ISOLATION Average 6 2 3 6 PAP0041 - WAS PUMP #1 - MOTOR Average 6 2 3 6 PAP0041 - WAS PUMP #1 - PUMP Good 6 2 3 6 PAP0042 - WAS PUMP #2 - CHECK VALVE 48 Vertical Asset Risk Assessment Report Useful Risk Condition POF COF Equipment Life Score Good 6 2 3 6 PAP0042 - WAS PUMP #2 - CONTROLLER PAP0042 -WAS PUMP #2 - EFFLUENT Good 6 2 3 6 ISOLATION Average 6 2 3 6 PAP0042 - WAS PUMP #2 - GEARBOX PAP0042 - WAS PUMP #2 - INFLUENT Good 6 2 3 6 ISOLATION Average 6 2 3 6 PAP0042 - WAS PUMP #2 - MOTOR Average 6 2 3 6 PAP0042 - WAS PUMP #2 - PUMP Average 3 2 3 6 PAP0066 - CLARIFIER #1 - CONTROLLER Good 3 2 3 6 PAP0066 - CLARIFIER #1 - MOTOR Average 3 2 3 6 PAP0067 - CLARIFIER #2 - CONTROLLER Good 3 2 3 6 PAP0067 - CLARIFIER #2 - MOTOR Good 5 2 3 6 PAP0081 - WAS FLOW METER Good 5 2 3 6 PAP0082 - RAS FLOW METER Fair 3 3 2 6 PAP0017 - DCG EQUIPMENT - CONTROLLER Average 2 3 2 6 PAP0018 - DCG CHEMICAL PUMP Fair 2 3 2 6 PAP0019 - FROTH SPRAY - CONTROLLER Fair 3 3 2 6 PAP0025 - COAGULANT MIXER Fair 3 3 2 6 PAP0026 - DCG ROOM #1 POLYMER MIXER Fair 3 3 2 6 PAP0027 - DCG ROOM #2 MIXER PAP0029 - CHLROINE SAMPLE PUMP #1 - Average 6 3 2 6 CONTROLLER PAP0030 - CHLORINE SAMPLE PUMP #2 - Average 6 3 2 6 CONTROLLER Fair 3 3 2 6 PAP0036 - SLUDGE PUMP #1 - MOTOR Fair 3 3 2 6 PAP0036 - SLUDGE PUMP #1 - PUMP Fair 3 3 2 6 PAP0037 - SLUDGE PUMP #2 - MOTOR Fair 3 3 2 6 PAP0037 - SLUDGE PUMP #2 - PUMP Average 5 3 2 6 PAP0083 - EFFLUENT SAMPLER Fair 5 3 2 6 PAP0084 - FACILITY PIT PUMP - CHECK VALVE PAP0084 - FACILITY PIT PUMP - FACILITY PIT Average 5 3 2 6 PUMP PAP0084 - FACILITY PIT PUMP - ISOLATION Fair 5 3 2 6 VALVE Average 5 3 2 6 PAP0084 - FACILITY PIT PUMP - MOTOR PAP0085 - FACILITY PIT PUMP #2 - CHECK Fair 5 3 2 6 VALVE PAP0085 - FACILITY PIT PUMP #2 - ISOLATION Fair 5 3 2 6 VALVE Average 5 3 2 6 PAP0085 - FACILITY PIT PUMP #2 - PUMP Poor 0 5 1 5 PAP0022 - HOIST Poor 0 5 1 5 PAP0086 - HOIST Average 5 2 2 4 PAP0011 - AIR BLOWER #1 - BLOWER Good 3 2 2 4 PAP0011 - AIR BLOWER #1 - CONTROLLER 49 Vertical Asset Risk Assessment Report Useful Risk Condition POF COF Equipment Life Score Good 3 2 2 4 PAP0011 - AIR BLOWER #1 - MOTOR Average 5 2 2 4 PAP0012 - AIR BLOWER #2 - BLOWER Excellent 5 2 2 4 PAP0012 - AIR BLOWER #2 - MOTOR Average 5 2 2 4 PAP0013 - AIR BLOWER #3 - BLOWER Excellent 5 2 2 4 PAP0013 - AIR BLOWER #3 - MOTOR PAP0029 - CHLORINE SAMPLE PUMP #1 - PUMP Good 5 2 2 4 & MOTOR PAP0030 - CHLORINE SAMPLE PUMP #2 - PUMP Good 7 2 2 4 AND MOTOR Excellent 10 1 2 2 PAP0085 - FACILITY PIT PUMP #2 - MOTOR 50 Vertical Asset Risk Assessment Report Table A18. Paukaa SPS Useful Risk Equipment Condition POF COF Life Score Poor 1 4 4 16 PAU0003 - AUTOMATIC TRANSFER SWITCH PAU0010 - SUBMERSIBLE PUMP #1 - Poor 1 4 4 16 CONTROLLER PAU0011 - SUBMERSIBLE PUMP #2 - Poor 1 4 4 16 CONTROLLER Average 9 2 5 10 PAU0002 - AUTO DAILER ALARM SYSTEM Average 5 2 5 10 PAU0018 - GENERATOR PAU0011 - SUBMERSIBLE PUMP #2 - ISOLATION Poor 2 3 3 9 VALVE Average 9 2 3 6 PAU0029 - MULTITRODE Excellent 10 1 3 3 PAU0010 - SUBMERSIBLE PMP #1 - CHECK VLV PAU0010 - SUBMERSIBLE PUMP #1 - ISOLATION Excellent 10 1 3 3 VALVE PAU0011 - SUBMERSIBLE PUMP #2 - CHECK Excellent 10 1 3 3 VALVE Table A19. Project 19 SPS Useful Risk Equipment Condition POF COF Life Score Good 3 3 4 12 PRO0004 - SUMP PUMP - CHECK VALVE Average 2 3 4 12 PRO0004 - SUMP PUMP - MOTOR AND PUMP Average 5 3 4 12 PRO0019 - AUTOMATIC TRANSFER SWITCH Poor 0 5 2 10 PRO0021 - PUMP #2 Fair 3 3 2 6 PRO0020 - PUMPS #1- CHECK VALVE Fair 3 3 2 6 PRO0020 - PUMPS #1 - EFF ISOLATION VALVE PRO0020 - PUMPS #1 - INFLUENT ISOLATION Fair 3 3 2 6 VALVE 3 3 2 6 PRO0020 - PUMPS #1 - MOTOR Fair 3 3 2 6 PRO0020 - PUMPS #1 - PUMP Fair 4 3 2 6 PRO0022 - PUMPS #2 - ISOLATION VALVE Fair 6 2 2 4 PRO0022 - PUMPS #2 - PUMP Excellent 51 Vertical Asset Risk Assessment Report Table A20. Pua SPS Useful Risk Equipment Condition POF COF Life Score Poor 0 5 4 20 PUA1036 - PUMP #2 - CONTROLLER Poor 1 4 4 16 PUA1036 - PUMP #2 - PUMP Poor 1 4 4 16 PUA1037 - PUMP #3 - PUMP Poor 1 4 4 16 PUA1037 - PUMP #3 - CONTROLLER Fair 3 3 5 15 PUA1007 - PUMP #2 - CHECK VALVE Good 5 3 5 15 PUA1035 - MCE PUMP #1 Good 8 3 5 15 PUA1053 - PUMP #1 - INFLUENT CONTROLLER Good 8 3 5 15 PUA1054 - PUMP #2 - CONTROLLER PUA1055 - PUMP #2 - EFFLURENT VALVE Good 8 3 5 15 CONTROLLER PUA1056 - PUMP #3 - INFLUENT VALVE Good 8 3 5 15 CONTROLLER PUA1057 - PUMP #3 - EFFLUENT VALVE Good 8 3 5 15 CONTROLLER Poor 0 5 3 15 PUA1019 - SLIDE GATE #1 Poor 0 5 3 15 PUA1020 - SLIDE GATE #2 Fair 3 3 4 12 PUA1006 - PUMP #1 - CHECK VALVE Fair 3 3 4 12 PUA1008 - PUMP #3 - CHECK VALVE Good 3 3 4 12 PUA1032 - PUMP CONTROL Average 3 3 3 9 PUA1049 - BUILDING - CRANE/HOIST Excellent 8 2 4 8 PUA1035 - MCE PUMP #1 - CONTROLLER Good 9 2 4 8 PUA1049 - BUILDING - FENCE Good 7 2 3 6 PUA1021 - SLUICE GATE Excellent 10 2 3 6 PUA1043 - VAR FREQ DRIVE PUA1049 - BUILDING - SPECIALIZED DOOR Good 20 1 5 5 OUTSIDE Average 20 1 4 4 PUA1049 - BUILDING - SPECIALIZED DOOR #2 Average 10 1 4 4 PUA1049 - BUILDING Good 8 1 2 2 PUA1052 - PUMP #1 - INFLUENT VAVLE Good 8 1 2 2 PUA1053 - PUMP #1 - EFFLUENT VALVE Good 10 1 2 2 PUA1053 - PUMP #1 - INFLUENT MOTOR Good 10 1 2 2 PUA1054 - PUMP #2 - MOTOR Good 8 1 2 2 PUA1054 - PUMP #2 - VALVE Good 8 1 2 2 PUA1055 - PUMP #2 - EFFLUENT VALVE Good 10 1 2 2 PUA1055 - PUMP #2 - EFFLUENT VALVE MOTOR Good 10 1 2 2 PUA1056 - PUMP #3 - INFLUENT VALVE MOTOR Good 8 1 2 2 PUA1056 - PUMP #3 - INFLUENT VALVE Good 8 1 2 2 PUA1057 - PUMP #3 - EFFLUENT VALVE Good 10 1 2 2 PUA1057 - PUMP #3 -EFFLUENT VALVE MOTOR 52 Vertical Asset Risk Assessment Report Table A21. Waiaha SPS Useful Risk Equipment Condition POF COF Life Score WAI0013 - NORTH FORCE MAIN ISOLATION Average 5 3 5 15 VALVE Average 3 3 4 12 WAI0001 - PA BLOWER Average 3 3 4 12 WAI0001 - PA BLOWER - MOTOR Fair 2 3 4 12 WAI0029 - ODOR CONTROL SYSTEM - FAN #2 Fair 1 3 4 12 WAI0029 - ODOR CONTROL SYSTEM - MEDIA #2 WAI0029 - ODOR CONTROL SYSTEM - MOTOR Average 3 3 4 12 #2 Good 10 2 5 10 WAI0026-AUTOMATIC TRANSFER SWITCH Fair 5 2 10 WAI0006 - PUMP #2 - PUMP Poor 5 2 10 WAI0029 - ODOR CONTROL SYSTEM - FAN #1 Poor 5 2 10 WAI0029 - ODOR CONTROL SYSTEM - MEDIA #1 Average 3 3 3 9 WAI0015 - BYPASS PUMPING ISOLATION VALVE Average 5 2 4 8 WAI0001 - PA BLOWER - CONTROLLER Good 10 2 4 8 WAI0025-GENERATOR - GENERATOR Good 5 2 4 8 WAI0028 - AUTO DAILER ALARM SYSTEM Good 5 2 4 8 WAI0030 - WET WELL LEVEL SENSOR Average 5 3 2 6 WAI0005 - PUMP #1 - ISOLATION VALVE Average 5 3 2 6 WAI0005 - PUMP #1 - PUMP Average 5 3 2 6 WAI0006 - PUMP #2 - CHECK VALVE Average 5 3 2 6 WAI0006 - PUMP #2 - ISOLATION VALVE Average 5 3 2 6 WAI0008 - PUMP #3 - CHECK VALVE Average 5 3 2 6 WAI0008 - PUMP #3 - ISOLATION VALVE Fair 2 3 2 6 WAI0008 - PUMP #3 - PUMP WAI0029 - ODOR CONTROL SYSTEM - MOTOR Poor 1 3 2 6 #1 Poor 5 1 5 WAI0027 - EFFLUENT FLOW METER 53 Vertical Asset Risk Assessment Report Table A22. Wailoa SPS Useful Risk Equipment Condition POF COF Life Score Poor 5 5 25 WAI1023 - FENCE Poor 0 5 4 20 WAI1010 - GENERATOR Fair 7 3 5 15 WAI1040 - AUTOMATIC TRANSFER SWITCH Fair 5 2 5 10 WAI1010- generator diesel storage Poor 2 3 3 9 WAI1009 - STATION EXHAUST FAN Fair 7 3 3 9 WAI1014 - PUMP #1 - CONTROLLER Fair 7 3 3 9 WAI1017 - PUMP #3 - FLOWMATCHER Fair 5 3 3 9 WAI1047 - CONTROLLER - MERCOID SWITCH WAI1014 - PUMP #1 - SUCTION ISOLATION Fair 10 2 4 8 VALVE WAI1015 - PUMP #2 - SUCTION ISOLATION Fair 10 2 4 8 VALVE WAI1017 - PUMP #3 - SUCTION ISOLATION Fair 10 2 4 8 VALVE Good 20 2 3 6 WAI1014 - PUMP #1 - CHECK VALVE Average 10 2 3 6 WAI1014 - PUMP #1 - MOTOR Good 20 2 3 6 WAI1015 - PUMP #2 - CHECK VALVE Average 10 2 3 6 WAI1015 - PUMP #2 - CONTROLLER Average 15 2 3 6 WAI1015 - PUMP #2 - MOTOR Good 20 2 3 6 WAI1017 - PUMP #3 - CHECK VALVE Average 15 2 3 6 WAI1017 - PUMP #3 - MOTOR Fair 20 2 3 6 WAI1024 - BUILDING Average 15 2 3 6 WAI1024 - BUILDING - STAIRS Average 10 3 2 6 WAI1014 - PUMP #1 - CONTROLLER WAI1009 - STATION EXHAUST FAN - Average 10 2 2 4 CONTROLLER Average 8 2 2 4 WAI1014 - PUMP #1 - DRIVE SHAFT Average 8 2 2 4 WAI1015 - PUMP #2 - DRIVE SHAFT Average 10 2 2 4 WAI1017 - PUMP #3 - CONTROLLER WAI1014 - PUMP #1 - DISCHARGE ISOLATION Good 20 1 3 3 VALVE Fair 10 1 3 3 WAI1014 - PUMP #1 - PUMP WAI1015 - PUMP #2 - DISCHARGE ISOLATION Good 20 1 3 3 VALVE Fair 10 1 3 3 WAI1015 - PUMP #2 - PUMP WAI1017 - PUMP #3 - DISCHARGE ISOLATION Good 20 1 3 3 VALVE Fair 10 1 3 3 WAI1017 - PUMP #3 - PUMP Good 15 1 3 3 WAI1024 - BUILDING - CRANE Fair 3 3 1 3 WAI1018 - SUMP PUMP Good 9 1 2 2 WAI1017 - PUMP #3 - DRIVE SHAFT Excellent 10 1 2 2 WAI1024 - BUILDING - ROOF 54 Vertical Asset Risk Assessment Report Useful Risk Equipment Condition POF COF Life Score Excellent 5 2 1 2 WAI1044 - PUMP 5 Excellent 10 1 1 1 WAI1042 - CAUSTIC TRANSFER PUMP 6 WAI1042 - CAUSTIC TRANSFER PUMP 6 - Excellent 10 1 1 1 MOTOR WAI1043 - CAUSTIC TRANSFER PUMP 7 - Excellent 10 1 1 1 MOTOR Excellent 20 1 1 1 WAI1045 - CAUSTIC TANK 1 Excellent 20 1 1 1 WAI1045 - CAUSTIC TANK 2 Excellent 15 1 1 1 WAI1048 - CAUSTIC SYSTEM CONTROLLER 55 Vertical Asset Risk Assessment Report Table A23. Wailuku SPS Useful Risk Equipment Condition POF COF Life Score Good 5 3 5 15 WAI2001 - AUTO DIALER ALARM SYSTEM Fair 5 3 4 12 WAI2006 - GENERATOR ELECTRIC Average 6 2 3 6 WAI2037 - AUTOMATIC TRANSFER SWITCH WAI2011 - SUBMERSIBLE PUMP #1 - Good 10 1 5 5 CONTROLLER WAI2012 - SUBMERSIBLE PUMP #2 - Good 10 1 5 5 CONTROLLER Good 15 1 5 5 WAI2038 - WET WELL Average 8 2 2 4 WAI2011 - SUBMERSIBLE PUMP #1 Average 8 2 2 4 WAI2012 - SUBMERSIBLE PUMP #2 Good 20 1 3 3 WAI2023 - BUILDING Average 5 3 1 3 WAI2015 - SUMP PUMP Fair 6 1 2 2 WAI2005 - EXHAUST FAN WAI2011 - SUBMERSIBLE PUMP #1 - CHECK Good 15 1 2 2 VALVE WAI2012 - SUBMERSIBLE PUMP #2- CHECK Good 15 1 2 2 VALVE 56 Wastewater Division Horizontal Assets Southwest Environmental Finance Center / PG Environmental under EPA Contract No. EP-R9-16-02 March 2019 Executive Summary The PG Team has been tasked with conducting a risk assessment of all wastewater assets in the County plants) and horizontal assets (e.g., conveyances and connections). This report focuses on the horizontal assets. The horizontal asset data most relevant to this report are related to pipes, manholes, services, and dischargesraphic information system (GIS) and closed-circuit television (CCTV) inspection videos/records. However, it has been found that there is only sufficient information to do a detailed analysis of pipe segments. The assessment revealed significant data gaps exist in GIS for characterizing services and discharges. Another major data gap observed is the lack of information showing whether pipe segment defects were repaired. A fair amount of data does exist for manholes; however, they are considered by WWD to be integrated into the pipe system and get managed accordingly (i.e., as part of the pipeline and not individually). The PG Team also found that the quantity of CCTV data is currently too low to be statistically significant, only about 5.7% of the entire collection system. Also, the same pipes are often televised multiple times due to concerns related to defects or clogs; therefore, a true risk assessment for every pipe segment is not possible due to limited documented and representative data. In order to make best use of the data that is Team rated potential of failure (POF) for those segments with existing CCTV data as well as implemented a process to prioritize segments in the entire collection system based on specific criteria defined by WWD staff. Discussions were also held with WWD staff to determine different criteria that may lead to problems in a pipe segment. Pipes with a greater likelihood of problems would be considered higher priority for further investigation using CCTV in the future. Of the pipes ranked from the CCTV data, 7% were high POF, 26% were medium POF, and the remaining 67% ranked low POF. The prioritization part of the assessment yielded 179 high priority segments, 1,136 medium priority pipes, and 2,418 low priority pipes. The PG Team found that high POF segments and high priority segments did necessarily correlate, meaning WWD may have to reconsider the ranking factors. More likely, a greater sample of CCTV data is needed to determine a meaningful correlation, or lack thereof. These efforts (described in more detail in the report below) should only be viewed as a starting point for risk assessment. Further data collection (extensive) and quality control is needed to perform a proper and complete risk assessment. A detailed description of the methods and preliminary analysis of priority pipe segments is presented in the report. Within this document, the PG Team has also offered recommendations for improving data collection, management, and analysis of horizontal asset data, as well as strategies for implementing a more effective CCTV program. 1 Risk Assessment Report: Horizontal Assets Background Horizontal assets refer to those assets that are located within the service area or what is commonly These types of assets are typically responsible for the linear conveyance of wastewater from the point of collection to the treatment facility. Typical assets of this type include pipe, manholes, pipeline valves (e.g., air release valves), and service connections. Vertical assets are those assets included within pump stations and treatment plants, such as such as pumps, motors, electrical controls, tanks, treatment units, blowers, and disinfection units. Horizontal and vertical assets are typically separated within asset management because managing the assets as well as data collection, storage, and analysis related to each set of assets, is considerably different. For example, there are often many, many identical horizontal assets (e.g., as many as several hundred pipe segments with the same material type, diameter, length, etc., installed at or around the same time) while there are often few identical within vertical asset categories (e.g., 2 or 3 pumps within a utility may be the same, while the rest are different sizes or types). For these reasons, as well as those listed below, the horizontal risk report is being prepared separately from the vertical risk report. It is relatively easy to visually inspect vertical assets because most often they are located above ground or able to be accessed/observed from ground level. Horizontal assets, on the other hand, can be very difficult to visually evaluate. In many cases horizontal assets are buried with limited access points, requiring some type of specialized electronic device (e.g., closed-circuit television (CCTV) camera) for inspection. Furthermore, operations and maintenance personnel often have greater knowledge of vertical assets because they interact with them on a more routine basis. This makes it easier to rate parameters related to asset management, including condition, useful life remaining, probability of failure (POF), and consequence of failure (COF). These assessments cannot generally be completed easily for individual horizontal assets. Operation and maintenance personnel do not typically have detailed information regarding the condition and performance of each piece of pipe or each manhole in the collection system. However, operation and maintenance personnel, as well as engineering personnel, may have a general knowledge of certain groups of assets or assets related to problem areas in the system. For example, clay pipes may outlive cast-iron pipes or pipes in a certain area under subject to certain conditions (e.g., closer to the coast) fail more often. Or pipes in certain areas may perform worse than other pipes in the system. Data regarding vertical assets is typically stored in a computer program such as a computerized maintenance management system (CMMS), an asset management system, a spreadsheet, or a database. Horizontal assets are often stored in a geographic information system (GIS) database of some type. This relates to the fact that horizontal assets are more spatially related than vertical assets. In the future, if and when WWD obtains a CMMS system, this system may interact with the GIS system in some way such that data on horizontal assets may be obtained through either the GIS or CMMS or both. Horizontal Asset Categories The horizontal asset categories were obtained from GIS. The data in the GIS system was obtained from the best available resources. There was no other written or electronic data that were considered better sources of information on horizontal assets. The PG Team was given access to the 2 Risk Assessment Report: Horizontal Assets entire GIS map and associated data,and all available information was downloaded into an electronic spreadsheet. Based on review of that data, the types of assets (also referred to as classes of assets) in the GIS included the following: chimneys, discharges (i.e., outfall pipes/pipelines), easements, grease interceptors, mains, manholes, plants, pump stations, pumps, services, and valves. Each class of asset represented in the GIS, along with a description of the available data is listed in Table 1. The table also includes a description of data gaps and the need for further work regarding that type of asset. Table 1: WWD Horizontal Asset Classes Data Gaps / Further Analysis Class of Comments GIS Data Needed Asset Chimney There are 59 total assets of this type in No further analysis required. the GIS database/inventory. Chimneys are no longer used and are not considered a separately managed asset from manholes. Discharges There are 10 total assets included 7 Only date installed No further analysis possible at this private gang cesspools, 2 active WWD and location. time due to lack of data. Given the 7 outfalls, and 1 active discharge private discharges, there are only 3 identified as unknown. that potentially need further analysis. However, there is extremely limited information on the outfalls in the database. Easements There are 460 easements in the GIS Limited. No further analysis possible or database. These easements may be on needed at this time. However, as a private or public land. WWD does not separate activity, the WWD may manage this type of asset per se; wish to determine who is therefore, no further analysis is responsible for maintaining necessary for this report. Additionally, easements and whether all there is almost no information on which easements are properly recorded to base an analysis. and up to date. Grease There are 32 grease interceptors in the No analysis required. Interceptors GIS database. The interceptors are not owned or maintained by the WWD. Mains After scrubbing and analyzing the Description and Data discussion and analysis existing data, it was determined there analysis included in included in this report. are 3,733 pipe segments in the GIS this report. database. This report includes extensive analysis of the mains. 3 Risk Assessment Report: Horizontal Assets Data Gaps /Further Analysis Class of Comments GIS Data Needed Asset Manholes There are 3,445 manholes included in Asset ID, status, If manholes continue to be the GIS database. The manholes are not owner, date installed, addressed as part of the pipe generally managed separately from the type, top elevation, (integral to the pipe, no further pipe. WWD inspects manholes when the invert elevation, analysis is required). If, however, pipe is televised. The manholes were rehabbed (17 listed as there are attributes that would discussed with staff and there were no distinguish the priority of one particular attributes that anyone rehabbed material manhole over another, and that thought would make one manhole (2 brick, 1 concrete, data is available for analysis, the higher in priority than another, other all others unknown), manholes can be analyzed as a than being associated with a high-depth (68 unknown, separate component. priority pipe segment. the rest range from 2.39 to 25.8 feet). Plants There are 9 plants listed in the GIS See Vertical Asset All included in the Vertical Asset database. These plants were all Report. Risk Assessment. analyzed during the Vertical Asset Risk Assessment. Pump There are 23 assets listed in the GIS See the Vertical Asset All included in the Vertical Asset Stations database. These pump stations were all Risk Assessment. Risk Assessment. analyzed during the Vertical Asset Risk Assessment. Pumps It is unclear what information is See the Vertical Asset All included in the Vertical Asset included here. There are 17 assets Risk Assessment. Risk Assessment. included in the GIS under this category. All pumps were included in the vertical asset analysis. Services There are 7,482 services listed in the GIS Status, date Further analysis is desired, but Database. This asset is one that WWD connected, cleanout), there is limited data about the would like to do an analysis of, but there account name, services that are included. This is is insufficient information to do the number and address. something that will have to be analysis. collected and updated over time. Some types of information that would be valuable include the GPS location of the cleanout, the material of the service line, and past problems with the service line. Valves There are 16 valves listed in the GIS Status, type of valve, If further analysis is required, field database, of these 12 are listed as and invert elevation. data collection would be required. private ownership. Therefore, there are only 4 air relief valves listed as owned by the WWD. There is essentially no information available about the air relief valves. 4 Risk Assessment Report: Horizontal Assets The horizontal asset data most relevant to this report are related topipes, manholes, services, and discharges. However, at this time, there is only sufficient information to do a detailed analysis of pipe segments. Data exists for manholes; however, they are considered by WWD to be integrated into the pipe system and get managed accordingly. Significant data gaps exist for services and discharges. Further analysis could be conducted if additional information is collected, or, in the case of the manholes, personnel can provide some indication of how the existing data can be used to indicate the criticality of individual manholes. As noted above, several asset classes have been addressed in the Vertical Asset Risk Assessment, and the remainder have been excluded for various reasons (e.g., not managed by WWD). Wastewater Pipe Data Sources and Information There are two sets of available data that can potentially be used to perform an assessment of the individual pipe segments within the WWD system the GIS system and the CCTV data. The best available data on individual pieces of pipe and manholes is the information that is produced from CCTV analysis. While this is the best available information, it does not mean that this data has been through a rigorous quality control process. Furthermore, the CCTV videos can be interpreted differently by different individuals so not all defects may be treated the same. There is no standard operating procedure for how the interpretations should be done, so the data is subject to differences. Nevertheless, at this point, this is the available data so it will be used for the analysis. In the future, more rigorous procedures can be adopted to improve the CCTV data quality. This CCTV data includes videos and, in some cases, hand written records. When the data is provided to the GIS personnel, this information is added to the defects layer. This level of data CCTV information is only available for a small percentage of the pipe about 5.7% (see Table 2). Table 3 provides similar data, further broken down by diameter of pipe (CCTV data is discussed further in the Pipe Analysis Using CCTV Data). The other source of data is the general information contained in the GIS database. This data was downloaded from GIS into an Excel spreadsheet. Additional analysis was completed for both the spreadsheet data and using the spatial information in the GIS. This analysis is discussed in Pipe Analysis Using GIS Data. The quantity of CCTV data is too low to be statistically significant. Furthermore, the pipes selected for CCTV were not selected such that they would represent a large cross-section of the collection system. Rather, these pipes were selected based on areas that operators knew or thought to be of concern. The same pipes are often televised due to concerns related to defects or clogs; there is no systematic approach for televising the entire collection system. A true risk assessment using POF and COF scores for every pipe segment is not possible because there is such limited documented and representative data. In order to make best use of the past CCTV efforts, the PG Team rated POF for those segments with existing CCTV data as well as implemented a process to prioritize segments in the entire collection system based on specific criteria defined by WWD. These efforts (described in the report below) should only be viewed as a starting point for risk assessment. Further data collection (extensive) and quality control is needed to perform a proper and complete risk assessment. 5 Risk Assessment Report: Horizontal Assets Table 2: Amount of Pipe Televised (total for collection system) Unit Total Pipe Length of Total Pipe Length Percentage of Pipe Collection System Televised Televised Feet 585,004 33,140 5.7% Miles 110.80 6.28 Table 3: Amount of Pipe Televised by Pipe Size Total Total Pipe Number of Pipe Total Pipe Pipe % of Total Pipe Length Segments Length Length in Pipe Size Televised Televised Televised (feet) System Televised (miles) (miles) 18 1,819 0.34 12.69 2.7 72 12,195 2.31 48.64 4.7 26 5,728 1.08 11.54 9.4 10 1,889 0.36 8.48 4.2 8 1,931 0.37 5.22 7.1 3 751 0.14 5.25 2.7 4 1,041 0.20 1.99 10.1 3 451 0.09 1.81 5.0 4 874 0.17 0.56 30.4 6 1,845 0.35 2.19 16.0 10 3,381 0.64 4.02 15.9 2 1,235 0.23 0.9 25.6 Unknown 9 N/A N/A N/A N/A Totals 169 33,140 6.28 106.16 bƚƷĻʹ bƚƷ ğƌƌ ƦźƦĻ ƭźǩĻƭ źƓ ƷŷĻ ƭǤƭƷĻƒ ğƩĻ ƌźƭƷĻķ ğĬƚǝĻ źƓ ƷŷĻ ƷğĬƌĻ ƭźƓĭĻ ƭƚƒĻ ƦźƦĻ ƭźǩĻƭ ŷğǝĻ ƓƚƷ ĬĻĻƓ ĻƌĻǝźƭĻķ͵ ŷĻƩĻŅƚƩĻͲ ƷŷĻ ƌĻƓŭƷŷƭ ƚƓ ƷŷĻ ƷğĬƌĻ ğĬƚǝĻ Ǟźƌƌ ƓƚƷ ğķķ ǒƦ Ʒƚ ƷŷĻ ƷƚƷğƌ ƚŅ ЊЉЏ͵ЊЏ͵ ŷğƷ ƷƚƷğƌ źƓĭƌǒķĻƭ ğƌƌ ƦźƦĻ ƭźǩĻƭͲ ǞŷĻƷŷĻƩ ƭĭƚƦĻķ ƚƩ ƓƚƷ͵ Pipe Analysis Using CCTV Data There were three basic sources of information for CCTV data: 1) paper records of CCTV work with some indication of start and stop manhole, 2) video recordings for most CCTV work, and 3) information from the defects layer of the GIS system that contains some information regarding defects observed through CCTV work. None of these three sources was comprehensive and it is unlikely, even collectively, that all three sources provide all of the information related to all of the CCTV work that has been done by WWD. For example, WWD has been inconsistent in getting all of the observed defects from the videos logged onto paper, and subsequently, into the GIS database. Another major data gap is the lack of information showing whether the defects were repaired. Almost all defects ugh it is highly likely that at least 6 Risk Assessment Report: Horizontal Assets some of the defects have been resolved. In some cases, the same pipe was surveyed on different dates and defects that appeared in the earlier survey are not evident in the later survey. This result provides some evidence that the defect was probably resolved but the GIS does not reflect that. Discussions with operators also indicated that certain types of defects are typically fixed soon after discovery. Therefore, it is highly likely that some of the defects discovered during the CCTV work have been repaired in some way whether a spot repair or partial pipe replacement but there is insufficient data to determine which ones have or have not been addressed. The type of pipe defects that were noted on either the paper forms or the CCTV videos include the following: Crack at joint: the pipe is cracked Offset: The pipe is not aligned properly and one where two pipes connect piece of pipe is off-set from the other so that there is not a smooth flow path between the Crack: the pipe is cracked somewhere neighboring pipes. between connections with neighboring pieces of pipe Point: A place in the sewer where a point repair has been made Infiltration/inflow (I/I): water can be seen flowing into the pipe through the Root Intrusion: Roots have infiltrated into the walls of the pipe sewer. Blockage: The flow is blocked with Sag: The pipe is sagging in one section where debris or fats, oils, and grease that that piece of pipe is lower than the ones before prevents either all or most of the and after it. This creates low spots where debris sewage flow can collect. Deformed: The pipe is not round all the Undercut: The material supporting the sewer way around; it is deformed from its has been undercut and is no longer able to hold original shape to something else. the sewer up properly or will not be in the future MSGPipe: MSG stands for missing pipe. Unknown: There is some type of defect in the Most likely the crown is missing from pipe but it does not fit one of the other sewer gases eroding it away but it can categories or it is not possible to identify what is be any missing piece of pipe where only causing the problem. This could be due to poor the dirt that used to be around the pipe video quality. is acting as pipe. The National Association of Sewer Service Companies (NASSCO) has established procedures for assigning ratings to sewer pipe related to condition and risk assessment, based on observations made during CCTV activities. These procedures, or similar procedures, have not been employed by WWD. As a result, there is no data to support this type of analysis. Developing this level of detail and rating of the sewer pipes would require a significant televising and re-televising effort, which cannot be completed with resources allocated for this project. Instead, a simpler approach has been employed using the available data and knowledge of the WWD operators. T: Discussions were held with WWD staff to determine if any of the defects noted in GIS were considered higher priority than any others or were considered to have more of an impact on the overall integrity or functioning of the pipe. The three defects selected as higher priority were: crack at joint, crack, and I/I. These defects were given higher rating in our analysis. 7 Risk Assessment Report: Horizontal Assets All available paper records of CCTV data were reviewed to determine which defects were noted during the CCTV work. These paper records were compared to the video footage to see if they matched up. All available CCTV data was reviewed to determine if defects were noted during the survey. All defects by pipe were noted on an Excel spreadsheet, including type of defect and position of defect along pipe (length from initial manhole). The start and stop manhole IDs were noted for each pipe. These manhole IDs were used to determine a pipe asset ID using GIS. There is no easy way to relate pipe lengths to manholes with ID information provided, so a manual process was used. The process involved selecting the entry and exit manholes on the GIS map and determining which pipe was in-between. The pipe asset ID was then taken off the GIS map and entered into the spreadsheet. The pipe type, size, and length of videoed pipe were noted whenever available on either the paper records or in text on the video. In cases where some or all of this information was missing, the pipe asset ID (found as described above) was used to look up information in the database. The pipe type, diameter, or pipe length were gained in this manner when possible. In some cases, the data did not exist in either the sIn cases where data existed in both places (GIS and video), spot checks were made of the two lengths to see how well they corresponded. In many cases, the distances were close. In others, they were different. The CCTV was generally used as more reliable data source given that the video may not have included the entire pipe segment, or the GIS may be incorrect for length. As an initial screening and prioritization of the televised pipe data, a ranking system was developed. Personnel at WWD were asked which defects were the most critical to the sewer condition and which were less critical. Based on those discussions, it was determined that the major defects were: crack at joint, crack, and Infiltrationand were given 5 points each, while other def and were given 1 point each. Table 4 describes the rating system. This rating system provides a starting point to rank sewers for future inspection and repair. It is a system that can be revised over time as WWD gains more experience with asset management and more knowledge about the sewer system. Table 4: Criteria for Probability of Failure for Wastewater Collection Pipes That Have Been Televised Description Number of Points Total Score Major defect: Crack at Joint 5 points per crack at joint 5 * Number of Cracks at Joint Major defect: Crack 5 points per crack 5 * Number of Cracks Major defect: I/I 5 points per I/I 5 * Number of I/I Minor Defects 1 point per defect identified 1 * Number of minor defects Each pipe segment that was Televised was assessed using the point totals in Table 4. Each major defect was given 5 points, each minor defect was given 1 point and the total number of points was calculated. The total scores ranged from a high of 121 to a low of 1. If all pipes were normalized together, the high scores would cause the vast majority of pipes to be a score of 1. This result does not help differentiate one pipe from another; rather it lumps a large number of pipes into the same category. To address this situation, the pipes were separated based on overall score first. Those pipes with a score 20 or greater 8 Risk Assessment Report: Horizontal Assets were considered high POF and those with scores of less than 20 would be medium and low POF. The high POF pipes were then normalized to a 1 to 10 scale. The medium and low POF pipes were then normalized, as a group, to a 1 to 10 scale. Those pipes that scored10 to 4 POF, were considered medium POF and those less than 4, low POF. It should be noted that the POF scores for the highPOF pipes should NOT be compared to those in the medium and low categories. The POFscores (1 to 10) indicate a probability of failure of the pipe segments, with higher scores indicating a greater risk of failure and lower scores indicating a lower risk of failure. The results of the analysis bypipe segment are contained in Appendix A, which has a table containing all pipe segments televised, their basin, location (generally indicated by streetname), type and diameter, the number of defects observed and the normalized probability of failure (POF) score. The breakdownof thepipe segments based on POF is shown in Figure 1 below. Of the pipes ranked, 7% were high POF, 26% were medium POF,and the remaining 67% ranked low POF. Figure 1: Percentage of Main Segment by POF (based on CCTV data) 7% 26% 67% High POFMedium POFLow POF A summary table and map are presented in Figure 2. The map shows locations of the 12 pipesegments with a high POF score. 9 Risk Assessment Report: Horizontal Assets Figure 2: Map of High POF Pipe from CCTV Data 10 Risk Assessment Report: Horizontal Assets Pipe Analysis Using GIS Data The entire wastewater collection system consists of approximately 111 miles of pipe, separated into 7 basins on the east and west sides of the island. The pipe is separated in the GIS database by pipe segment. A pipe segment is defined as the length of pipe between two manholes. Therefore, the pipe segments are not all the same length. The number of pipe segments found in each basin is shown in Table 5; there are 3,733 pipe segments in the collection system. However, the Heeia and Kilohana systems are not owned or maintained by the County. For this reason, no further analysis is provided for these basins. Table 5: Number of Pipe Segments by Basin East of West Basin Number of Segments East Hilo 1552 East Kulaimano 183 East Papaikou-Paukaa 286 West Heeia 251 West Kaloko 4 West Kealakehe 1401 West Kilohana 56 Totals 3,733 Each segment is given an asset ID number. In general, these asset IDs are unique. However, there are some situations in which duplicate ID numbers have been used. For example, 90000 series numbers were used at one time to indicate proposed pipe and, in some cases, pipe not owned by COH (e.g., private ownership.) The initial data dump with all pipes of all ownership types and including proposed pipes included 120 duplicate IDs. After further analysis, removing all proposed or inactive pipes and removing all pipes that were not owned by COH, there were still 11 pipes with duplicate asset IDs. The duplicates are shown below: Asset ID = 90007: 7 pipes listed as owned by the County with Active Status Asset ID = 9677: 2 pipes listed as owned by the County with Active Status Asset ID = 25335: 2 pipes listed as owned by the County with Active Status The pipe segments with duplicate IDs have been left in the database. Eventually, these pipe segments will need to be renamed with unique ID numbers, or if the information about the ownership and status is incorrect, they will need to be removed altogether. Method The PG Team used GIS data to help expand the risk assessment beyond what was possible through CCTV data alone. Given that the majority of pipes have not been inspected with CCTV, the only way to develop a more robust prioritization is to use existing information available in GIS or information that could be developed from manipulating GIS data. Discussions were also held with WWD staff to determine which factors most likely indicated potential problems in a pipe segment. Pipes with a greater likelihood of problems would be considered higher priority for further investigation using CCTV in the future. Alternatively, these pipes may require further analysis in terms of operations to see if they are causing more back-ups or overflows due to issues such as capacity, slope, etc. 11 Risk Assessment Report: Horizontal Assets The factors identified by WWD staff as potential indicators that impact POF include: pipe material, depth of bury, diameter, installation date, and proximity to the shore while also at a relatively low surface elevation. Appendix B contains a description of how the factors were applied in the analysis. Some factors, particularly the proximity to shore, required an extensive process to determine whether fer zone was the terminology used to indicate if the pipe was within 600 feet of the shoreline and within 20 feet of sea level elevation. Table 6 indicates the various factors that were used and how the points were applied. The factors were not given equal weight. The highest weight was given to concrete pipes in the buffer zone. This ranking was chosen in consultation with WWD staff. Based on their knowledge of pipes and how they perform throughout the system, pipes in the buffer zone were considered the most problematic because these pipes have the potential to be impacted by sea water, either sometimes or all the time. As sea level rises, this factor may become even more important. While high weight (5 points) was applied to any pipe in the buffer zone, a higher weight was given to the concrete pipes (5 extra points or 10 points total) based on discussions with WWD staff. While the initial assessment gave the highest ranking to pipes in the buffer zone, if future analysis or CCTV work determines that being close to the ocean has less impact than WWD initially thought, the weighting can be changed in the future to reflect this. Table 6: Criteria for Probability of Failure for Prioritization of Wastewater Collection Pipes Item Category for Points Number of Points Comments Concrete Pipe within the Buffer 10 The pipe is within 600 feet of Zone Pipe Within the the ocean in areas where the Any Other Pipe Type Within the Buffer Zone 5 elevation is 20 feet or less from Buffer Zone sea level Pipe Outside the Buffer Zone 0 VCP 5 Cast Iron 4 Unknown pipe type was given Pipe Type Concrete or Unknown 3 an average rating of 3. PVC 2 Any Other Pipe Type 1 Pipe that was more shallowly Less Than 5 Feet 2 buried was given a slightly higher rating given the Greater Than 10 Feet 1 potential for breaks to be Depth of Bury slightly higher due to root Unknown 1 intrusion, traffic, or potentially mechanical damage due to Between 5 Feet and 10 Feet 0 excavation. 2 Unknown was given a mid- Diameter Unknown 1 range number of 1 for this factor 0 Installed in 1950s, 1960s or In discussions with WWD 5 Time Period of 1970s personnel, pipe from the 50s, Pipe 60s, and 70s, has been Unknown date 3 Installation performing more poorly than Any other date of installation 0 other ages of installation 12 Risk Assessment Report: Horizontal Assets In cases where the pipe characteristics were unknown, a higher moderate number of points was assigned for that characteristic. For example, if the pipe diameter was unknown, it was given 1 point, while if it was 8 inches or below it was given 2 points or 0 points if it was above 8 inches. The unknowns were given higher weight than the lowest score because the fact that the information is unknown poses some problems for the system. For each pipe segment, the available data was assessed to determine which points should be applied. All points were added up to get a total score and then the highest total was used to normalize the scores from a 1 to 10 scale. The scores were normalized by Basin because the information will have greater meaning if pipes are compared to those in similar circumstances. The total score ranges, prior to normalization are shown in the table below. In two cases, Kaloko and Kilohana, all of the pipes had exactly the same characteristics (based on the chosen parameters) so all pipes scored the same number (10) on the normalization process. Further investigation may be necessary if there is a need to further differentiate this pipe. Because there are so few pipes in Kaloko it is probably not necessary. There are 56 segments in Kilohana so additional review may be warranted. Table 7: Total Scores and Normalized Score Ranges by Basin East or West Basin ID Total Score Range Normalized Score East Hilo 1-15 1-10 East Kulaimano 1-11 1-10 East Papaikou-Paukaa 1-14 1-10 West Kaloko 3 10 West Kealakehe 1-21 1-10 In general, the pipes on the west side of the island had slightly higher scores than the east side. Because pipes in different basins are subject to slightly different conditions than pipes in other basins, the pipes were ranked based on the basin. Tables 8 through 12 show the number of pipe segments by normalized score for each basin. Scores from 10 to 8 were considered high priority, scores from 7 to 4 were considered medium priority, and scores 3 or less were considered low priority. The tables are color-coded by priority (green = low, yellow = medium, red = high). Table 13 shows the number of segments overall by priority score. Appendix C contains maps of the pipes with medium to high priority by basin and Appendix D contains a listing of every pipe segment in the system as well as the factors that were used to develop the priority ranking. 13 Risk Assessment Report: Horizontal Assets Table 8: Pipe Scores for Hilo Normalized Score 10 9 8 7 6 5 4 3 2 1 (1 to 10) By Basin Number of Pipe 4 17 2 66 165 144 262 193 569 130 Segments Table 9: Pipe Scores for Kulaimano Normalized Score 10 9 8 7 6 5 4 3 2 1 (1 to 10) By Basin Number of Pipe 1 19 38 77 9 26 9 1 0 3 Segments Table 10: Pipe Scores for Papaikou-Paukaa Normalized Score 10 9 8 7 6 5 4 3 2 1 (1 to 10) By Basin Number of Pipe 6 2 0 0 9 1 44 98 113 13 Segments Table 11: Pipe Scores for Kaloko Normalized Score 10 9 8 7 6 5 4 3 2 1 (1 to 10) By Basin Number of Pipe 4 0 0 0 0 0 0 0 0 0 Segments Table 12: Pipe Scores for Kealakehe Normalized Score 10 9 8 7 6 5 4 3 2 1 (1 to 10) By Basin Number of Pipe 1 12 13 22 48 102 89 165 737 212 Segments 14 Risk Assessment Report: Horizontal Assets Table 13: Summary Pipe Scores for All Basins Normalized Score 10 9 8 7 6 5 4 3 2 1 (1 to 10) By Basin 4 Hilo 17 Hilo 2 Hilo 66 Hilo 165 Hilo 144 Hilo 262 Hilo 193 Hilo 569 Hilo 130 Hilo 1 Kulaimano 19 Kulaimano 38 Kulaimano 77 Kulaimano 9 Kulaimano 26 Kulaimano 9 Kulaimano 1 Kulaimano 113 Papaikou-3 Kulaimano Number of Pipe 6 Papaikou-2 Papaikou-13 Kealakehe 22 Kealakehe 9 Papaikou-1 Papaikou-44 Papaikou-98 Papaikou-Paukaa 13 Papaikou- Segments Included in Paukaa Paukaa Paukaa Paukaa Paukaa Paukaa 737 Kealakehe Paukaa The Score by Basin 4 Kaloko 12 Kealakehe 48 Kealakehe 102 Kealakehe 89 Kealakehe 165 Kealakehe 212 Kealakehe 1 Kealakehe Total Number of 16 ASSETS 50 ASSETS 53 ASSETS 165 ASSETS 231 ASSETS 273 ASSETS 404 ASSETS 457 ASSETS 1419 ASSETS 358 ASSETS Pipe Segments 15 Risk Assessment Report: Horizontal Assets Figure 3: Pipe Segments by Priority Score (all basins) 1600 1400 1200 s t n e m g e 1000 S f o r e b m 800 u N 600 400 200 0 10987654321 Normalized Score 16 Risk Assessment Report: Horizontal Assets The results of the prioritization scoring for wastewater collection pipe can be used to determine the highest priority for further analysis through future CCTV efforts or other means. This approach is described in Selection of Pipes for CCTV, below. Comparison of CCTV Data to Pipe Prioritization Although there is limited data from the CCTV work, the PG Team was able to perform some comparisons between pipes that were showing signs of distress (high numbers of defects) and how that same pipe ranked in the overall prioritization process utilizing GIS data. Table 16 compares high POF score pipe from the CCTV analysis with its score in the overall pipe prioritization. Table 17 compares medium and low POF score pipes to the overall pipe prioritization. The two groups were split because, as was discussed above, the two groups were normalized separately. Table 16: Comparison of High POF Pipes from CCTV Data to Overall Prioritization Basin ID Location Asset ID Type & Size of Pipe Normalized Prioritization Score Score Hilo Puueo / Ohai 31775 Vitrified Clay - 10" 10 3 Ululani St - Puna side Hilo of Ponahawai St Vitrified Clay - 8" 10 2 intersection 30946 Hilo Keawe St / Puueo St 9710 Vitrified Clay - 10" 7 3 Hoku St between Vitrified Salt Glaze - Hilo Akialoha and Derby 6 3 6" Ln 6734 Hilo Puueo / Ohai 3659 Vitrified Clay - 8" 5 4 Hilo Kuawa St. 7921 Vitrified Clay - 8" 4 4 Wailoa 48" Trunk Reinforced Concrete Hilo 2 5 Line 7888 - 48" Hilo Kinoole St. 9875 Vitrified Clay - 6" 2 4 Reinforced Concrete Hilo Wailoa 48" Transition 2 5 7886 - 48" Kapehu - Within Kapehu Vitrified Clay - 6" 2 N/A Parcel 3-5-007:028 1728 Hilo Banyan Dr. 5756 Vitrified Clay - 12" 2 6 Reinforced Concrete Hilo Kalanianaole Ave 2 8 18376 - 27" 17 Risk Assessment Report: Horizontal Assets Table 17: Comparison of Medium and Low POF Pipes from CCTV Data to Overall Prioritization Score Number of Scores from Overall Prioritization From Pipes with the Number of Number of Number of Number of Pipes CCTV CCTV Score Pipes with Pipes with Pipes with with Insufficient High Priority Medium Low Priority Information to (10 8) Priority (7 4) (Less than 3) Compare 10 3 1 1 1 9 1 1 8 6 1 5 7 4 4 6 6 3 3 5 3 3 4 14 1 2 11 3 15 12 2 1 2 13 8 5 1 98 8 44 20 26 The comparison described above is not intended to prove the accuracy of the prioritization process; however, it does indicate that the prioritization process may need to consider other factors or weight factors differently. The lower POF score pipe from CCTV analysis is showing up as higher priority and the higher POF score pipe is generally not showing up as high priority. There are two potential options: 1) continue with the prioritization as already conducted and do some random sampling of the pipe using CCTV to determine if there is sufficient correlation, or 2) revise the prioritization process and compare again with the CCTV data that already exists. Recommendations Based on the analyses described above, the PG Team offers the following recommendations for implementing better horizontal asset analysis processes in the future. 1. Implement a more robust strategy for CCTV prioritization: The most important recommendation is to implement a more robust process for selecting pipes to CCTV than what is used currently. Some of the pipes currently being televised more often do seem to have a considerable number of defects; however, others seem fine. WWD should review the factors selected for CCTV prioritization to determine if there are any factors that should be added, removed, or weighted differently. Following review, the analysis can be repeated. Implementing a more strategic prioritization approach will help assure that WWD is getting the most value out of its CCTV efforts. WWD should review the Selection of Pipes for CCTV section (below) for potential options to improve CCTV prioritization. The main issue is to use the CCTV as a tool to evaluate pipe condition and potential for failure and to ensure that the resources committed to CCTV are being well spent. 2. Separate CCTV prioritization and cleaning prioritization processes: It is important to distinguish between a pipe that needs to be cleaned often and one that needs to be televised often. Cleaning and CCTV activities should be separated into two functions. When pipes need to be cleaned often, they should be put into a rotation for cleaning, and should be televised only when other factors 18 Risk Assessment Report: Horizontal Assets indicate. CCTV should be used when detailed information about pipe status and condition is required or desired. Efficiencies should be gained by separating the two processes. 3. Close data gaps for manholes, discharges, services, and valves: There is insufficient data to fully assess POF and COF for horizontal assets, other than pipe. The assets of particular concern are manholes, discharges, services, and valves (those located in the field, not in treatment plants or pump stations). Basic data is missing for most of these assets and there is no useful operational data documented in an easily accessible manner for any of them. Going forward, WWD should take every opportunity to add basic characterization as well as operational data to the GIS database as described below. o For basic data: Any time field crews are working with horizontal assets, basic data should be collected for each asset and that data should be provided back to the GIS personnel. This data collection process can be completed using hand-held devices, or it can be written on paper and provided to the GIS personnel. In either case, a formalized procedure should be established. In particular, there is considerable missing data on discharges, services, and valves, and some missing data on manholes. Once this type of data is collected, an analysis of these types of horizontal assets can be performed. Developing a standard operating procedure (SOP) for this type of data collection, including what types of data to collect and how to collect it, should be considered. o Operational data regarding problems that have been experienced in the field, as well as the steps taken to correct the concerns, should be added to the database whenever possible. As an example, if a service has had issues and actions had to be taken to correct the problem, there needs to be a way to tie that information to the asset. When collecting data of all types, it is important to assure that the data is tied to the asset ID. 4. Implement field verification of GIS data: The GIS system is only as accurate as the information it was based on. Initially, this level of accuracy is the same as the accuracy of the sources, such as design drawings, as-builts an, which is going to be limited. Over time, the accuracy can be increased when field personnel provide information back to the GIS personnel regarding any inaccuracies. The inaccuracies may relate to size, material, location, length, slope, or depth, and may be identified through CCTV work, sewer cleaning, or repair work. It is not uncommon to have some wrong information in the GIS database initially, but the situation can only improve with the implementation of a robust process of field data verification. This type of process will require standard operating procedures for how field personnel should report data and an approach to hold individuals accountable for sharing the information between the field and GIS personnel. 5. Make sure operational data is available to inform prioritization: Operational data regarding pipes is very helpful in asset management analyses. For example, information regarding pipe segments that experience frequent overflows or clogs can inform prioritization efforts. Spills and overflows are required to be reported but other problems are not, such as clogs. Some of this information is contained in the spills and bypass layer in GIS, however, some of the data is missing. Similar to recommendation number 4, there should be standard operating procedures for ensuring that spills, overflows, clogs, areas cleaned and other operational data regarding sewers is conveyed in a timely 19 Risk Assessment Report: Horizontal Assets manner to the GIS personnel. There should be some type of accountability to ensure that the information is conveyed and that it is added to the system. 6. Create a CCTV data collection SOP: The CCTV process is an excellent time to learn information about the wastewater collection system. Sometimes, this information is collected either in paper or on the video, by adding text and sometimes it is not effectively captured. In addition, sometimes the An SOP should be written to require specific and consistent data capture during the CCTV process. The SOP should include a description of the type of information to collect, when to collect it, how to collect it, and how to provide it to the GIS personnel. At a minimum, it would be helpful to have, the following: pipe asset ID, start and stop manhole with ID, diameter, pipe type, length of pipe videoed and length of pipe segment if entire pipe is completed, and defects (type and location). 7. Verify the status of all defects included in GIS: For all work completed on pipes, such as the repair of the cracks, information should be provided to the GIS personnel in a readily usable format so that is labeled as e is evidence to suggest that it has been resolved (e.g., evidence from later CCTV video and discussions with field personnel.) Keeping up with the resolution of defects would allow the defects layer to be of greater value in future analysis of horizontal pipe assets. 8. Develop a condition rating process for evaluating the condition of sewer pipe using the CCTV data: There are already established processes that could be used (e.g., NASSCO) or WWD could develop one of their own. WWD may wish to determine what processes are used by other counties in Hawaii, if any, to see if one of those approaches might work. If a process from another county is used, it would give WWD peers to learn from as well as pose questions to if problems arise. In any case, the CCTV data can be more meaningful if it is used to develop a pipe condition rating. This rating should be added to the GIS. 9. Properly implementing a rating system for pipe using CCTV data is likely to require staff training. At a minimum, line maintenance personnel from both sides of the island should be trained. Additionally, supervisory staff may also benefit from attending this type of training. 10. Include depth of bury in GIS for pipe segments: The depth of bury should be included in GIS if it is a key criterion for identifying pipe segment POF. This data can be developed from manhole depths but not easily. If manholes are tied to a specific pipe, the depth field can be populated. 11. Add risk or priority data to GIS: Eventually, the risk or priority of the pipes needs to be added to the GIS database. The prioritization in this report is too preliminary to include. After a prioritization process is finalized and verified using CCTV, it can be added to the pipe assets using the asset ID. Pipes can then be color-coded based on priority to show that information visually. 12. Improve GIS symbology: The GIS symbology could be improved. There are some industry standard symbols that WWD might wish to use to make it easier for new personnel or contractors to work with the GIS maps and associated data. 20 Risk Assessment Report: Horizontal Assets 13. GIS could include different layers for different pipe types: The sewer mains layer may benefit from being split into different layers. The pipe could be placed in different layers that can be turned on or off as desired bas each of these was on a different layer, it would be easier to find certain types of pipe in the field as only those types would need to be displayed on the map. This can make easier for operators to target specific locations for specific maintenance activities. 14. Remove duplicate pipe IDs from GIS: As discussed in the report, there are duplicate asset ID numbers for some pipes, particularly in the Hilo Basin. Specifically, the duplicate pipe IDs were observed as follows: In Hilo: o Asset ID 90003: 45 pipes, proposed o Asset ID 90004: 64 pipes, proposed o Asset ID 90011: 7 pipes, active, and owned by WWD o Asset ID 9677: 2 pipes, active, but appear to be the same pipe entered twice o Asset ID 25335: 2 pipes, active, but appear to be the same pipe entered twice In Kealakehe: o Asset ID 90007: 9 pipes, active, but under private ownership o Asset ID 90009: 4 pipes, proposed In all, 133 pipe segments show up in the GIS data base with duplicate asset IDs. The duplicate IDs related to proposed pipe segments and private ownership can be eliminated by the filters that are normally put on the GIS system to keep field personnel from seeing these pipes. For the most part, they do not need to access the information. It is recommended that even these proposed pipes be given unique identifiers, but it is not absolutely necessary. For the pipes that are not proposed or under private ownership, the duplicate IDs should be eliminated. It is critical that all assets have unique ID numbers as it is the only way to distinguish one asset from another and is the key means of tying information together from one source to another. 15. For pipe that is proposed, an SOP should be established to describe how these pipes are to be entered, what the ID number will be, and how they will be distinguished from pipe that is active and installed in the system. The establishment of an SOP would help ensure that the procedure remains consistent even if there is staff turnover in the future. Selection of Pipes for CCTV The analysis described in this report should be used as a starting point for WWD to establish a more robust and proactive CCTV program. The success of a CCTV program is closely tied to the effectiveness 21 Risk Assessment Report: Horizontal Assets of the strategy used to select and prioritize pipe for televising. There are different ways pipes can be selected, and each method has its merits and shortcomings. Some useful approaches for implementing a successful CCTV program are included below: 1. Select a statistical sampling of the total pipes in the network: In this approach the pipe in the collection system is categorized based on pipe type, size, location, age, condition, and any other descriptive factors d be a set of pipes of similar characteristics. For example, all the 6-inch clay pipe in the Hilo basin of the age range 50 to 70 years old. The amount of pipe in each cohort would be identified by either pipe segment or pipe length. Then pipe can be selected at random from each cohort for CCTV analysis. Based on the results of the CCTV work, the condition of each sewer pipe televised would be assessed. Because this data would be statistically significant, the condition of the televised pipe could be used to provide an overall evaluation of the entire collection system. The benefit of this approach is that it would be possible to make some judgements about the overall -term pipe replacement program. The challenges with this approach include the need to categorize each pipe cohort. A fair amount of work would be required to complete that analysis. Pipes would then need to be selected at random in a quantity sufficient to have a statistical sampling. This work would need to be in addition to any CCTV work that is done on pipes with known problems so resources may be insufficient to complete the necessary work. 2. CCTV all the pipe in the system on a rotating basis: Based on the 110.8 miles of pipe in the WWD collection system, for the whole system to be reviewed even on a 10-year basis, 11 miles of pipe would have to be investigated every year. Given that only slightly more than 6 miles of pipe have been televised over the past several years, this pace of CCTV seems unrealistic. If half as much pipe was completed (5.5 miles per year), it would take 20 years to view every pipe. That schedule may not be fast enough to make the collection of the data useful. The benefit of this approach is that all the could be assessed with actual data from each pipe. Furthermore, the GIS system could be verified and corrected as the CCTV work was being completed. The challenges with this approach are the need for a much faster pace of work than is currently being achieved and the need for significant additional resources. It is hard to conclude that the money, personnel, equipment, and/or contracts that would be required to complete the work are the best expenditure of resources for the utility. The condition of vertical assets in some of the treatment plants and pump stations, as well as other resource needs, such as future regulatory compliance would be considered higher priorities than CCTV. 3. Use a prioritization approach of pipe to determine which pipes require the CCTV work the most: A prioritization approach should consider all that is readily known about the system and pipes. At this point, that information includes what is in the GIS database, which is limiting in many cases. 22 Risk Assessment Report: Horizontal Assets The benefit of this approach is that pipe would be televised based on thoughtful prioritization, completing those segments with a higher POF and/or COF first. The challenges of this approach are the establishment of the prioritization metrics. The approach outlined in this report provide a starting point, but would need further refinement before adoption and full implementation. The current information the GIS database does not include sufficient operational data to improve the prioritization process. In the future, this method would be greatly enhanced by combining operational data, operational experience, and basic attribute information from the GIS. 4. Select pipes for CCTV based only on past experience: This is the approach that is currently employed. There are some merits to this, but there are also some shortcomings. The positive of this approach is to directly tie operator experience to the CCTV process. The challenges of this approach are that experience is not always the best judge overall. 23 Risk Assessment Report: Horizontal Assets Appendix A: Pipe Segment POF based on CCTV Data 24 Risk Assessment Report: Horizontal Assets Table A-1: High POF Pipes from CCTV Data Basin Location Asset ID Type & Size of Pipe Number of Number Number Number Normalized ID Cracks at of Cracks of I/I of Other Score Joint Noted Defects Hilo Puueo / Ohai 31775 Vitrified Clay - 10" 8 8 0 41 10 Ululani St - Puna side of Hilo Ponahawai St Vitrified Clay - 8" intersection 30946 2 21 0 0 10 Hilo Keawe St / Puueo St 9710 Vitrified Clay - 10" 3 5 0 42 7 Hoku St between Hilo Vitrified Salt Glaze - 6" Akialoha and Derby Ln 6734 14 0 0 0 6 Hilo Puueo / Ohai 3659 Vitrified Clay - 8" 4 6 0 10 5 Hilo Kuawa St. 7921 Vitrified Clay - 8" 1 2 0 33 4 Hilo Wailoa 48" Trunk Line 7888 Reinforced Concrete - 48" 4 0 2 0 2 Hilo Kinoole St. 9875 Vitrified Clay - 6" 0 5 0 1 2 Hilo Wailoa 48" Transition 7886 Reinforced Concrete - 48" 4 0 1 0 2 Kapehu - Within Parcel Kapehu Vitrified Clay - 6" 3-5-007:028 1728 1 3 0 1 2 Hilo Banyan Dr. 5756 Vitrified Clay - 12" 0 4 0 1 2 Hilo Kalanianaole Ave 18376 Reinforced Concrete - 27" 4 0 0 0 2 25 Risk Assessment Report: Horizontal Assets Table A-2: Medium POF Pipes from CCTV Data Basin ID Location Asset ID Type & Size of Pipe Number of Number Number Number Normalized Cracks at of Cracks of I/I of Other Score Joint Noted Defects Hilo Ohai St / Wainaku St 21 VCP - 8" 1 2 0 1 10 Near 144 Kapiolani Hilo Street 1183 Unknown - Unknown 1 0 2 1 10 Kulaimano Kumula St near Kalika Pl 1430 Unknown - 8" 1 0 2 1 10 Kumula St near Kaakepa Kulaimano St intersection 1550 Unknown - 10" 0 0 3 0 9 Reinforced Concrete - Hilo Kalanianaole Ave 1656 48" 1 1 0 3 8 Kapehu Kapehu Camp / Latteral 1701 PVC - 6" 0 0 0 13 8 Kapehu Kapehu Camp 1702 PVC - 8" 0 2 0 2 8 Kapehu Kapehu Camp 1706 PVC - 8" 0 0 2 2 8 Kapehu - Within Parcel Kapehu 3-5-007:030 1729 VCP - 6" 0 2 0 2 8 Papaikou-Papaikou - Parcel 2-7- Paukaa 004:119 1781 PVC - 12" 0 1 1 2 8 Papaikou- Paukaa Papaikou 1783 PVC - 12" 0 2 0 1 7 Papaikou- Paukaa Mai Way 2113 Unkown - 8" 1 1 0 1 7 Papaikou- Paukaa Mai Way 2115 Unkown - 8" 0 2 0 1 7 Papaikou- Paukaa Mai Way 2117 Unkown - 8" 0 2 0 1 7 Papaikou- Paukaa Mai Way 2121 Unkown - 6" 0 2 0 0 6 Papaikou- Paukaa Mai Way 2122 Unkown - 8" 0 0 2 0 6 Papaikou- Paukaa Kulana St 3338 VCP - 6" 1 1 0 0 6 26 Risk Assessment Report: Horizontal Assets Basin ID Location Asset ID Type & Size of Pipe Number of Number Number Number Normalized Cracks at of Cracks of I/I of Other Score Joint Noted Defects Hilo Kauila St in Wainaku 3666 VCP - 8" 2 0 0 0 6 Hilo Amauulu Rd 3729 VSGD - 6" 2 0 0 0 6 Hilo Banyan Dr. 5760 RCP - 15" 1 0 0 4 6 Hilo Banyan Dr. 5762 RCP - 15" 1 0 0 3 5 Hilo Banyan Dr. 5764 RCP - 15" 1 0 0 3 5 Hilo Banyan Dr. 5766 RCP - 15" 0 0 0 8 5 Hilo Banyan Dr. 5768 RCP - 15" 0 0 0 7 4 Line leading into Hilo Banyan SPS 5771 Unknown - 15" 1 0 0 2 4 Kalanianaole near Hilo Banyan Way 5787 PVC - 12" 1 0 0 1 4 Banyan Way and Kalanianaole St Hilo intersection 5789 Unknown - 15" 0 0 0 6 4 Hilo Kalanianaole Ave 6142 CCRF - 36" 0 0 0 6 4 Hilo Kalanianaole Ave 6143 CCRF - 36" 0 0 0 6 4 Reinforced Concrete - Hilo Kalanianaole Ave 6144 42" 0 0 0 6 4 Reinforced Concrete - Hilo Kalanianaole Ave 6146 42" 0 0 1 1 4 Reinforced Concrete - Hilo Kalanianaole Ave 6148 42" 1 0 0 1 4 Reinforced Concrete - Hilo Kalanianaole Ave 6150 48" 0 0 1 1 4 Reinforced Concrete - Hilo Kalanianaole Ave 6152 48" 0 1 0 1 4 Reinforced Concrete - Hilo Kalanianaole Ave 6154 48" 0 1 0 1 4 Reinforced Concrete - Hilo Kalanianaole Ave 6156 48" 0 1 0 1 4 27 Risk Assessment Report: Horizontal Assets Basin ID Location Asset ID Type & Size of Pipe Number of Number Number Number Normalized Cracks at of Cracks of I/I of Other Score Joint Noted Defects Reinforced Concrete - Hilo Kalanianaole Ave 6158 48" 0 1 0 1 4 Reinforced Concrete - Hilo Kalanianaole Ave 6160 48" 0 1 0 0 3 Reinforced Concrete - Hilo Kalanianaole Ave 6162 48" 0 0 1 0 3 Reinforced Concrete - Hilo Kalanianaole Ave 6164 48" 0 1 0 0 3 Hilo Kalanianaole Ave. 6205 VCP - 8" 1 0 0 0 3 Hilo Kalanianaole Ave. 6207 VCP - 8" 0 0 0 5 3 Hilo Kalanianaole Ave. 6209 VCP - 8" 1 0 0 0 3 Hilo Kalanianaole Ave. 6211 VCP - 8" 0 0 0 5 3 Hilo Kalanianaole Ave. 6213 VCP - 8" 1 0 0 0 3 Hilo Kalanianaole Ave. 6215 VCP - 8" 0 1 0 0 3 28 Risk Assessment Report: Horizontal Assets Table A-3: Low POF Pipes from CCTV Data Basin ID Location Asset ID Type & Size of Pipe Number of Number Number Number Normalized Cracks at of Cracks of I/I of Other Score Joint Noted Defects Hilo Kalanianaole Ave. 6217 VCP - 10" 0 0 0 4 3 Hilo Kalanianaole Ave 6225 VCP - 10" 0 0 0 4 3 Hilo Kalanianaole Ave 6239 VCP - 8" 0 0 0 4 3 Hilo Kalanianaole Ave 6241 VCP - 8" 0 0 0 4 3 Hilo Kalanianaole Ave 6245 VCP - 8" 0 0 0 4 3 Hilo Kalanianaole Ave 6246 VCP - 8" 0 0 0 4 3 Hilo Kalanianaole Ave 6254 RCP - 10" 0 0 0 3 2 Hilo Kalanianaole Ave 6257 RCP - 10" 0 0 0 3 2 Hilo Kalanianaole Ave 6259 RCP - 10" 0 0 0 3 2 Hilo Dive Shop/Kojis 6410 PVC - 10" 0 0 0 3 2 Ponahawai Street - Hilo Kinoole St 6431 RCP - 24" 0 0 0 3 2 Hilo Ponahawai Street 6432 PVC - 8" 0 0 0 3 2 Hilo Beckley Ln 6439 PVC - 8" 0 0 0 3 2 Hilo Dive Shop/Kojis 6442 PVC - 10" 0 0 0 3 2 Kilauea Ave near 2-2- Hilo 008:001 6455 VCP - 8" 0 0 0 3 2 Hilo Ponahawai Street 6513 Clay - 6" 0 0 0 3 2 Kilauea Ave near 2-2- Hilo 008:048 6516 VCP - 8" 0 0 0 3 2 Hilo Kinoole St / Aala St 6541 Clay - 8" 0 0 0 3 2 Hilo Pauahi St. 6606 VCP - 8" 0 0 0 3 2 Hilo Pauahi St. 6611 VCP - 8" 0 0 0 2 1 Hilo Aupuni St. 6616 VCP - 8" 0 0 0 2 1 Hilo Aupuni St. 6622 VCP - 8" 0 0 0 2 1 Hilo Aupuni St. 6624 VCP - 8" 0 0 0 2 1 Hilo Aupuni St. 6626 VCP - 8" 0 0 0 2 1 Hilo Kilavea Ave. 6670 VCP - 8" 0 0 0 2 1 29 Risk Assessment Report: Horizontal Assets Basin ID Location Asset ID Type & Size of Pipe Number of Number Number Number Normalized Cracks at of Cracks of I/I of Other Score Joint Noted Defects Kilauea Ave between Hilo Wilson and Hoku St 6672 VSGD - 8" 0 0 0 2 1 Hilo Kilavea Ave. 6674 VSGD - 8" 0 0 0 2 1 Hilo Kilavea Ave. 6676 VCP - 8" 0 0 0 2 1 Hilo Aupuni St. 6678 VCP - 8" 0 0 0 2 1 Hilo Aupuni St. 6679 VCP - 8" 0 0 0 2 1 Hilo Pauahi St. 6712 VCP - 8" 0 0 0 2 1 Hilo 30 Waihau Ln, Hilo, HI 7458 UNK - UNK 0 0 0 2 1 Wailoa State Park along Hilo Park Rd 7881 VCP - 15" 0 0 0 2 1 Hilo Kuawa St 7902 UNK - 10" 0 0 0 2 1 Reinforced Concrete - Hilo Ponahawai Street 9978 24" 0 0 0 2 1 Hilo Kapiolani Street 10022 VCP - 6" 0 0 0 2 1 Waianuenue Ave near Hilo Hilo Annex 10055 VSGD - 10" 0 0 0 2 1 SMH # 10243 to SMH # 10245 by Kukuau St. - Hilo 2nd Sag 10246 VSGD - 8" 0 0 0 2 1 Hilo Kapiolani Street 10261 VSGD - 6" 0 0 0 2 1 Hilo 441 Haili St 10318 PVC - 18" 0 0 0 1 1 Halai Hill at end of Halai Hilo St 10422 VCP - 6" 0 0 0 1 1 Hilo 10426 VCP - 6" 0 0 0 1 1 235 feet from MH 10655 on Waianuenue Hilo Ave 10657 VCP - 10" 0 0 0 1 1 Waianuenue Ave near Hilo Rainbow Falls 10706 VCP - 10" 0 0 0 1 1 Kukuau St just mauka of Hilo SMH 29063 11002 VCP - 8" 0 0 0 1 1 30 Risk Assessment Report: Horizontal Assets Basin ID Location Asset ID Type & Size of Pipe Number of Number Number Number Normalized Cracks at of Cracks of I/I of Other Score Joint Noted Defects Pawai Pl at Kaiwi St Kealakehe intersection 11535 VCP - 6" 0 0 0 1 1 Hilo Lanihau 13697 VCP - 12" 0 0 0 1 1 Hilo Lanihau 13702 VCP - 8" 0 0 0 1 1 Kealakehe Alii Dr near Kahikina Ln 13816 VCP - 12" 0 0 0 1 1 Area between Hanama Kealakehe Pl and Alii Dr 13825 VCP - 8" 0 0 0 1 1 Kealakehe Alii Dr 14096 VCP - 12" 0 0 0 1 1 Hilo Pauahi St. 15256 VCP - 8" 0 0 0 1 1 Kilauea St 15325 VCP - 6" 0 0 0 1 1 Reinforced Concrete - Hilo Kalanianaole Ave 18286 42" 0 0 0 1 1 Reinforced Concrete - Hilo Kalanianaole Ave 18388 21" 0 0 0 1 1 Hilo Kalanianaole Ave 18564 RCP - 18" 0 0 0 1 1 Hilo Kalanianaole Ave 18566 RCP - 18" 0 0 0 1 1 Hilo Kalanianaole Ave 18708 Clay - 10" 0 0 0 1 1 Hilo Kalanianaole Ave. 18712 VCP - 10" 0 0 0 1 1 Hilo Kalanianaole Ave. 18714 VCP - 10" 0 0 0 1 1 Kal Ave near 2-1- Hilo 018:011 18715 Clay - 10" 0 0 0 1 1 Reinforced Concrete - Hilo Kalanianaole Ave 19135 27" 0 0 0 1 1 Hilo Kalanianaole Ave 19136 Unknown - 27" 0 0 0 1 1 Reinforced Concrete - Hilo Kalanianaole Ave 19146 24" 0 0 0 1 1 Hilo Nahale'a Ave. 19453 PVC - 8" 0 0 0 1 1 Hilo Banyan Dr. 19685 Unknown - Unknown 0 0 0 1 1 Hilo Puueo 20230 DIP - 10" 0 0 0 1 1 Hilo Banyan Dr. 20366 VCP - 8" 0 0 0 1 1 31 Risk Assessment Report: Horizontal Assets Basin ID Location Asset ID Type & Size of Pipe Number of Number Number Number Normalized Cracks at of Cracks of I/I of Other Score Joint Noted Defects Ululani St near Police Hilo Station 20599 PVC - 8" 0 0 0 1 1 Hilo Banyan Dr. 22449 VCP - 12" 0 0 0 1 1 Off Banyan Dr in golf Hilo course area 23132 Unknown - Unknown 0 0 0 1 1 Hilo Kalanianaole Ave 23285 VCP - 8" 0 0 0 1 1 Reinforced Concrete - Hilo Kalanianaole Ave 23300 27" 0 0 0 1 1 Hilo Kalanianaole Ave 23304 RCP - 18" 0 0 0 1 1 Hilo Kalanianaole Ave. 23306 VCP - 10" 0 0 0 1 1 Hilo Kalanianaole Ave. 23308 VCP - 10" 0 0 0 1 1 Hilo Kalanianaole Ave. 23310 VCP - 8" 0 0 0 1 1 Reinforced Concrete - Hilo Kalanianaole Ave 23312 27" 0 0 0 1 1 Kealakehe Kaahumanu Pl 23808 VCP - 12" 0 0 0 1 1 Reinforced Concrete - Hilo Wailoa 42" Trunk Line 24006 42" 0 0 0 1 1 Hilo Kapiolani St 24296 Unknown - 6" 0 0 0 1 1 Hilo Kukuau St 24299 VSGD - 8" 0 0 0 1 1 Hilo Kauila St in Wainaku 25362 VCP - 8" 0 0 0 1 1 Hilo Outfall - Station Hilo 5+95 27131 RCP - 48" 0 0 0 1 1 Hilo Outfall - Station Hilo 41+68 to 41+92 27142 RCP - 48" 0 0 0 1 1 Hilo Kilauea Ave 27325 VCP - 8" 0 0 0 1 1 Hilo Kawili St 28667 PVC - 8" 0 0 0 1 1 Honokaa / Mamane / Honokaa Rickard St 29261 PVC - 8" 0 0 0 1 1 Honokaa Honokaa / Mamane 29340 PVC - 8" 0 0 0 1 1 Honokaa Honokaa / Mamane St 29345 PVC - 8" 0 0 0 1 1 32 Risk Assessment Report: Horizontal Assets Basin ID Location Asset ID Type & Size of Pipe Number of Number Number Number Normalized Cracks at of Cracks of I/I of Other Score Joint Noted Defects Honokaa Honokaa / Mamane 29349 PVC - 10" 0 0 0 1 1 Honokaa Honokaa / Mamane 29350 PVC - 10" 0 0 0 1 1 Honokaa Honokaa / Mamane 29351 PVC - 10" 0 0 0 1 1 Honokaa Honokaa / Mamane 29352 PVC - 8" 0 0 0 1 1 Honokaa Honokaa / Mamane 29353 PVC - 10" 0 0 0 1 1 Honokaa Honokaa / Lehua 29355 PVC - 10" 0 0 0 1 1 Honokaa Honokaa / Lehua 29356 PVC - 10" 0 0 0 1 1 Honokaa Honokaa / Koniaka St 29357 PVC - 8" 0 0 0 1 1 Honokaa Honokaa / Puakalo 29360 PVC - 8" 0 0 0 1 1 Honokaa Honokaa Akia St 29362 PVC - 6" 0 0 0 1 1 Honokaa Honokaa / Pookalo 29363 PVC - 8" 0 0 0 1 1 Honokaa Honokaa Gym 29364 PVC - 6" 0 0 0 1 1 Honokaa Honokaa Gym 29365 PVC - 6" 0 0 0 1 1 Honokaa Honokaa / Pakalana 29372 PVC - 8" 0 0 0 1 1 Honokaa Honokaa / Pakalana 29373 PVC - 8" 0 0 0 1 1 Honokaa Honokaa / Pakalana 29374 PVC - 8" 0 0 0 1 1 Honokaa Honokaa / Pakalana 29375 PVC - 8" 0 0 0 1 1 Hilo Andrade Rd. 29459 PVC - 8" 0 0 0 1 1 Hilo Ponahawai Street 30839 Clay - 6" 0 0 0 1 1 Kukuau St - Just below Hilo SMH 29063 30889 Clay - 8" 0 0 0 1 1 Hilo Kalanianaole Ave 31890 Unknown - Unknown 0 0 0 1 1 Hilo Lanikaula St / Off-Site 31981 PVC - 21" 0 0 0 1 1 Hilo Lanikaula St / Off-Site 31982 PVC - 15" 0 0 0 1 1 Hilo Lanikaula St / Off-Site 31983 PVC - 15" 0 0 0 1 1 Kapehu Camp - Koi Kapehu Loop 32058 Unknown - Unknown 0 0 0 1 1 Hilo Banyan Dr. 32132 Unknown - Unknown 0 0 0 1 1 Hilo Kapiolani Street 32623 DIP - 8" 0 0 0 1 1 33 Risk Assessment Report: Horizontal Assets Appendix B: GIS Data Analysis 34 Risk Assessment Report: Horizontal Assets Obtaining Horizontal Asset Criticality Analysis Data through GIS The data required for the analys GIS. The GIS files were obtained by the PG Team and the underlying data behind the GIS data layers was downloaded to an Excel spreadsheet. The intent was to use the downloaded data to determine a prioritization and criticality of wastewater pipes, and determine the following aspects of the pipes: Pipe materials (pipe type) Pipe size Pipe age/date of installation Distance from ocean shoreline (t of the shoreline when it was also within 20 feet of sea level) Depth of bury (less than 5 feet, greater than 10 feet) These factors were applied to all pipes within the wastewater collection system. While some of the factors were easy to analyze using the Excel data generated from GIS (pipe type, size, and age of installation), two factors required a much more involved analysis: within the buffer zone and depth of bury. Neither of these attributes was directly in the database. The process used to gain this data is presented below. Within the uffer zone (distance from ocean shoreline and elevation within 20 feet of sea level): To find out whether the pipe segment was within the buffer zone, a polyline representing the shoreline was generated using the DEM (Digital Elevation Model) of the island. From this polyline, a duplicate was created and offset by 600 feet inland. Next a contour line at an elevation of 20 feet was generated from the same DEM. This contour line allowed for the exclusion of areas with elevations greater than 20 feet from the 600-foot shoreline buffer. The resulting buffer was used to capture all areas within 600 feet of the shore and at an elevation of 20 feet or less. Once this polyline was created, all the pipes within this buffer zone could be identified. All of these pipes were identified, and the data was captured within an Excel data table. Depth of bury: The depth of bury for the wastewater pipes was not available directly as an attribute in the database. The closest associated data was the depth of manholes. Unfortunately, this data could not be used directly because the manholes were not associated directly with the pipe segment ID numbers. Therefore, another means of determining depth of bury had to be employed. The manhole depths that were less than 5 or greater than 10 feet deep were highlighted on the map. Then the pipe segments that were between the manholes were highlighted manually. The pipe IDs were then associated with the manholes to gain a depth for the pipe IDs. This was a lengthy process to gain all the main depths that were less than 5 feet or greater than 10 feet. Analysis of remaining factors: For the analysis of the remaining factors, the associated Excel data tables were manipulated and sorted in various ways to give the pipes the appropriate scores. 35 Risk Assessment Report: Horizontal Assets Appendix C Sewer Main Priority Maps 36 Risk Assessment Report: Horizontal Assets 37 Risk Assessment Report: Horizontal Assets 38 Risk Assessment Report: Horizontal Assets 39 Risk Assessment Report: Horizontal Assets 40 Risk Assessment Report: Horizontal Assets 41 Risk Assessment Report: Horizontal Assets 42 Risk Assessment Report: Horizontal Assets 43 Risk Assessment Report: Horizontal Assets 44 Risk Assessment Report: Horizontal Assets 45 Risk Assessment Report: Horizontal Assets 46 Risk Assessment Report: Horizontal Assets 47 Risk Assessment Report: Horizontal Assets 48 Risk Assessment Report: Horizontal Assets Appendix D Horizontal Asset Priority by Pipe Segments and Basins 49 Risk Assessment Report: Horizontal Assets Table D-1: Hilo Basin Pipe Segments Points Assigned for Factors Prioritization Inside the 1 - 10 Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 6261 RCP - 18" 5 5 3 2 0 5 10 23304 RCP - 18" 5 5 3 2 0 5 10 18506 RCP - 18" 5 5 3 1 0 5 10 18508 RCP - 18" 5 5 3 1 0 5 10 5762 RCP - 15" 5 5 3 0 0 5 9 5764 RCP - 15" 5 5 3 0 0 5 9 5766 RCP - 15" 5 5 3 0 0 5 9 5768 RCP - 15" 5 5 3 0 0 5 9 18502 RCP - 18" 5 5 3 0 0 5 9 18504 RCP - 18" 5 5 3 0 0 5 9 18564 RCP - 18" 5 5 3 0 0 5 9 18565 RCP - 18" 5 5 3 0 0 5 9 18566 RCP - 18" 5 5 3 0 0 5 9 27131 RCP - 48" 5 5 3 0 0 5 9 27134 RCP - 48" 5 5 3 0 0 5 9 27136 RCP - 48" 5 5 3 0 0 5 9 27138 RCP - 48" 5 5 3 0 0 5 9 27142 RCP - 48" 5 5 3 0 0 5 9 27144 RCP - 48" 5 5 3 0 0 5 9 27146 RCP - 48" 5 5 3 0 0 5 9 27152 RCP - 48" 5 5 3 0 0 5 9 3655 DIP - 12" 5 0 4 1 0 5 8 32077 UNK - 6" 5 0 1 2 2 5 8 3726 VCP - 6" 0 0 5 2 2 5 7 4309 VCP - 8" 0 0 5 2 2 5 7 4315 VCP - 8" 0 0 5 2 2 5 7 18286 CCRF - 36" 5 5 3 1 0 0 7 50 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 18349 RCP - 48" 5 5 3 1 0 0 7 23561 RCP - 42" 5 5 3 1 0 0 7 23312 CCRF - 24" 5 5 3 1 0 0 7 23582 RCP - 42" 5 5 3 1 0 0 7 27117 RCP - 48" 5 5 3 1 0 0 7 6620 VCP - 0" 0 0 5 2 2 5 7 6670 VCP - 8" 0 0 5 2 2 5 7 6676 VCP - 8" 0 0 5 2 2 5 7 27120 RCP - 42" 5 5 3 1 0 0 7 27123 RCP - 30" 5 5 3 1 0 0 7 27125 RCP - 30" 5 5 3 1 0 0 7 27128 RCP - 42" 5 5 3 1 0 0 7 90011 CCRF - 42" 5 5 3 1 0 0 7 18351 CCRF - 42" 5 5 3 1 0 0 7 32645 CCRF - 42" 5 5 3 1 0 0 7 11367 VCP - 6" 0 0 5 2 2 5 7 24276 VCP - 8" 0 0 5 2 2 5 7 5135 VCP - 8" 0 0 5 1 2 5 7 3668 VCP - 8" 0 0 5 1 2 5 7 3670 VCP - 8" 0 0 5 1 2 5 7 4304 VCP - 8" 0 0 5 1 2 5 7 4306 VCP - 8" 0 0 5 1 2 5 7 4317 VCP - 8" 0 0 5 1 2 5 7 4319 VCP - 8" 0 0 5 1 2 5 7 4373 VCP - 8" 0 0 5 1 2 5 7 4580 VCP - 6" 0 0 5 1 2 5 7 4582 VCP - 6" 0 0 5 1 2 5 7 4584 VCP - 8" 0 0 5 1 2 5 7 51 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 7 4593 VCP - 6" 0 0 5 1 2 5 4595 VCP - 6" 0 0 5 1 2 5 7 7 4597 VCP - 6" 0 0 5 1 2 5 4599 VCP - 6" 0 0 5 1 2 5 7 4601 VCP - 6" 0 0 5 1 2 5 7 4602 VCP - 8" 0 0 5 1 2 5 7 4606 VCP - 8" 0 0 5 1 2 5 7 5046 VCP - 8" 0 0 5 1 2 5 7 5048 VCP - 8" 0 0 5 1 2 5 7 5050 VCP - 8" 0 0 5 1 2 5 7 5059 VCP - 8" 0 0 5 1 2 5 7 6215 VCP - 8" 0 0 5 1 2 5 7 6239 VCP - 8" 0 0 5 1 2 5 7 6241 VCP - 8" 0 0 5 1 2 5 7 6243 VCP - 8" 0 0 5 1 2 5 7 6245 VCP - 8" 0 0 5 1 2 5 7 6246 VCP - 8" 0 0 5 1 2 5 7 7224 VCP - 8" 0 0 5 1 2 5 7 7785 VCP - 8" 0 0 5 1 2 5 7 27127 RCP - 30" 5 5 3 0 0 0 7 27129 RCP - 48" 5 5 3 0 0 0 7 10940 VCP - 8" 0 0 5 1 2 5 7 11475 VCP - 8" 0 0 5 1 2 5 7 15256 VCP - 8" 0 0 5 1 2 5 7 17340 UNK - 8" 5 0 1 0 2 5 7 18424 VCP - 8" 0 0 5 1 2 5 7 20366 VCP - 8" 0 0 5 1 2 5 7 23104 VCP - 8" 0 0 5 1 2 5 7 52 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 23310 VCP - 8" 0 0 5 1 2 5 7 23422 VCP - 8" 0 0 5 1 2 5 7 23438 VCP - 8" 0 0 5 1 2 5 7 23440 VCP - 8" 0 0 5 1 2 5 7 28979 VCP - 8" 0 0 5 1 2 5 7 32075 UNK - 6" 5 0 1 0 2 5 7 5137 VCP - 8" 0 0 5 0 2 5 6 5139 VCP - 8" 0 0 5 0 2 5 6 5141 VCP - 8" 0 0 5 0 2 5 6 5143 VCP - 8" 0 0 5 0 2 5 6 5145 VCP - 8" 0 0 5 0 2 5 6 3632 VCP - 10" 0 0 5 2 0 5 6 3647 VCP - 8" 0 0 5 0 2 5 6 3664 VCP - 8" 0 0 5 0 2 5 6 3666 VCP - 8" 0 0 5 0 2 5 6 3671 VCP - 8" 0 0 5 0 2 5 6 4137 VCP - 8" 0 0 5 0 2 5 6 4139 VCP - 8" 0 0 5 0 2 5 6 4141 VCP - 8" 0 0 5 0 2 5 6 4143 VCP - 8" 0 0 5 0 2 5 6 4145 VCP - 8" 0 0 5 0 2 5 6 4147 VCP - 8" 0 0 5 0 2 5 6 4155 VCP - 8" 0 0 5 0 2 5 6 4157 VCP - 8" 0 0 5 0 2 5 6 4158 VCP - 8" 0 0 5 0 2 5 6 4296 VCP - 8" 0 0 5 0 2 5 6 4298 VCP - 8" 0 0 5 0 2 5 6 4300 VCP - 8" 0 0 5 0 2 5 6 53 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 4302 VCP - 8" 0 0 5 0 2 5 6 4311 VCP - 8" 0 0 5 0 2 5 6 4313 VCP - 8" 0 0 5 0 2 5 6 4366 VCP - 8" 0 0 5 0 2 5 6 4368 VCP - 8" 0 0 5 0 2 5 6 4576 VCP - 6" 0 0 5 0 2 5 6 4578 VCP - 6" 0 0 5 0 2 5 6 4586 VCP - 6" 0 0 5 0 2 5 6 4589 VCP - 6" 0 0 5 0 2 5 6 4591 VCP - 6" 0 0 5 0 2 5 6 4605 VCP - 6" 0 0 5 0 2 5 6 4608 VCP - 8" 0 0 5 0 2 5 6 4610 VCP - 8" 0 0 5 0 2 5 6 4612 VCP - 8" 0 0 5 0 2 5 6 4615 VCP - 8" 0 0 5 0 2 5 6 4617 VCP - 8" 0 0 5 0 2 5 6 4618 VCP - 8" 0 0 5 0 2 5 6 4621 VCP - 6" 0 0 5 0 2 5 6 4623 VCP - 6" 0 0 5 0 2 5 6 4625 VCP - 6" 0 0 5 0 2 5 6 4626 VCP - 6" 0 0 5 0 2 5 6 4815 VCP - 6" 0 0 5 0 2 5 6 4816 VCP - 6" 0 0 5 0 2 5 6 5034 VCP - 8" 0 0 5 0 2 5 6 5036 VCP - 8" 0 0 5 0 2 5 6 5042 VCP - 8" 0 0 5 0 2 5 6 5044 VCP - 8" 0 0 5 0 2 5 6 5061 VCP - 8" 0 0 5 0 2 5 6 54 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 6207 VCP - 8" 0 0 5 0 2 5 6 6209 VCP - 8" 0 0 5 0 2 5 6 6211 VCP - 8" 0 0 5 0 2 5 6 6213 VCP - 8" 0 0 5 0 2 5 6 6250 VCP - 8" 0 0 5 0 2 5 6 6514 VCP - 0" 0 0 5 0 2 5 6 6606 VCP - 8" 0 0 5 0 2 5 6 6611 VCP - 8" 0 0 5 0 2 5 6 6616 VCP - 8" 0 0 5 0 2 5 6 6622 VCP - 8" 0 0 5 0 2 5 6 6624 VCP - 8" 0 0 5 0 2 5 6 6626 VCP - 8" 0 0 5 0 2 5 6 6678 VCP - 8" 0 0 5 0 2 5 6 6679 VCP - 8" 0 0 5 0 2 5 6 6712 VCP - 8" 0 0 5 0 2 5 6 7287 VCP - 8" 0 0 5 0 2 5 6 7289 VCP - 8" 0 0 5 0 2 5 6 7729 VCP - 8" 0 0 5 0 2 5 6 7738 VCP - 8" 0 0 5 0 2 5 6 11001 VCP - 8" 0 0 5 0 2 5 6 11002 VCP - 8" 0 0 5 0 2 5 6 11016 VCP - 8" 0 0 5 0 2 5 6 11019 VCP - 8" 0 0 5 0 2 5 6 11021 VCP - 8" 0 0 5 0 2 5 6 11022 VCP - 8" 0 0 5 0 2 5 6 11024 VCP - 8" 0 0 5 0 2 5 6 11202 VCP - 8" 0 0 5 0 2 5 6 11298 VCP - 8" 0 0 5 0 2 5 6 55 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 11300 VCP - 8" 0 0 5 0 2 5 6 11302 VCP - 8" 0 0 5 0 2 5 6 11304 VCP - 8" 0 0 5 0 2 5 6 11306 VCP - 8" 0 0 5 0 2 5 6 16454 VCP - 8" 0 0 5 0 2 5 6 17333 UNK - 10" 5 0 1 1 0 5 6 25365 UNK - 30" 5 0 1 1 0 5 6 18363 UNK - 24" 5 0 1 1 0 5 6 18365 UNK - 24" 5 0 1 1 0 5 6 18420 VCP - 8" 0 0 5 0 2 5 6 18422 VCP - 8" 0 0 5 0 2 5 6 19146 UNK - 24" 5 0 1 1 0 5 6 23094 VCP - 8" 0 0 5 0 2 5 6 23105 VCP - 8" 0 0 5 0 2 5 6 23106 VCP - 8" 0 0 5 0 2 5 6 23107 VCP - 8" 0 0 5 0 2 5 6 23108 VCP - 8" 0 0 5 0 2 5 6 23234 UNK - 24" 5 0 1 1 0 5 6 23285 VCP - 8" 0 0 5 0 2 5 6 23372 VCP - 8" 0 0 5 0 2 5 6 23383 VCP - 8" 0 0 5 0 2 5 6 23426 VCP - 8" 0 0 5 0 2 5 6 23428 VCP - 8" 0 0 5 0 2 5 6 23436 VCP - 8" 0 0 5 0 2 5 6 23443 VCP - 8" 0 0 5 0 2 5 6 23445 VCP - 8" 0 0 5 0 2 5 6 23451 VCP - 8" 0 0 5 0 2 5 6 23455 VCP - 8" 0 0 5 0 2 5 6 56 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 23457 VCP - 8" 0 0 5 0 2 5 6 23462 VCP - 8" 0 0 5 0 2 5 6 23463 VCP - 8" 0 0 5 0 2 5 6 23464 VCP - 8" 0 0 5 0 2 5 6 23465 VCP - 8" 0 0 5 0 2 5 6 23458 VCP - 8" 0 0 5 0 2 5 6 23459 VCP - 8" 0 0 5 0 2 5 6 24182 VCP - 8" 0 0 5 0 2 5 6 24345 VCP - 8" 0 0 5 0 2 5 6 24347 VCP - 8" 0 0 5 0 2 5 6 24349 VCP - 8" 0 0 5 0 2 5 6 24351 VCP - 8" 0 0 5 0 2 5 6 24815 VCP - 8" 0 0 5 0 2 5 6 25360 VCP - 8" 0 0 5 0 2 5 6 25362 VCP - 8" 0 0 5 0 2 5 6 30889 VCP - 8" 0 0 5 0 2 5 6 3653 VCP - 12" 0 0 5 1 0 5 6 5681 VCP - 10" 0 0 5 1 0 5 6 5684 VCP - 10" 0 0 5 1 0 5 6 5688 VCP - 10" 0 0 5 1 0 5 6 5690 VCP - 10" 0 0 5 1 0 5 6 5692 VCP - 10" 0 0 5 1 0 5 6 5694 VCP - 10" 0 0 5 1 0 5 6 5696 VCP - 12" 0 0 5 1 0 5 6 5730 VCP - 10" 0 0 5 1 0 5 6 5756 VCP - 12" 0 0 5 1 0 5 6 5771 UNK - 15" 5 0 1 0 0 5 6 6217 VCP - 10" 0 0 5 1 0 5 6 57 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 6225 VCP - 10" 0 0 5 1 0 5 6 6248 VCP - 10" 0 0 5 1 0 5 6 6334 PVC - 6" 5 0 2 2 2 0 6 7100 VCP - 12" 0 0 5 1 0 5 6 7222 VCP - 10" 0 0 5 1 0 5 6 7229 VCP - 10" 0 0 5 1 0 5 6 7881 VCP - 15" 0 0 5 1 0 5 6 7883 VCP - 15" 0 0 5 1 0 5 6 7962 VCP - 12" 0 0 5 1 0 5 6 8016 VCP - 10" 0 0 5 1 0 5 6 8020 VCP - 10" 0 0 5 1 0 5 6 8399 VCP - 10" 0 0 5 1 0 5 6 8400 VCP - 10" 0 0 5 1 0 5 6 9679 UNK - 10" 5 0 1 0 0 5 6 9680 VCP - 12" 0 0 5 1 0 5 6 10941 VCP - 10" 0 0 5 1 0 5 6 17339 DIP - 4" 0 0 4 0 2 5 6 18376 CCRF - 27" 5 0 1 0 0 5 6 18388 UNK - 21" 5 0 1 0 0 5 6 18390 UNK - 12" 5 0 1 0 0 5 6 18708 VCP - 10" 0 0 5 1 0 5 6 18710 VCP - 10" 0 0 5 1 0 5 6 18712 VCP - 10" 0 0 5 1 0 5 6 19135 UNK - 27" 5 0 1 0 0 5 6 19136 UNK - 27" 5 0 1 0 0 5 6 23300 UNK - 27" 5 0 1 0 0 5 6 23306 VCP - 10" 0 0 5 1 0 5 6 23449 VCP - 12" 0 0 5 1 0 5 6 58 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 23515 VCP - 10" 0 0 5 1 0 5 6 25347 PVC - 6" 0 0 2 2 2 5 6 31527 VCP - 10" 0 0 5 1 0 5 6 5147 VCP - 10" 0 0 5 0 0 5 5 5149 VCP - 10" 0 0 5 0 0 5 5 3634 VCP - 12" 0 0 5 0 0 5 5 3638 VCP - 12" 0 0 5 0 0 5 5 3640 VCP - 12" 0 0 5 0 0 5 5 3642 VCP - 12" 0 0 5 0 0 5 5 3644 VCP - 12" 0 0 5 0 0 5 5 3649 VCP - 10" 0 0 5 0 0 5 5 3651 VCP - 10" 0 0 5 0 0 5 5 3657 VCP - 12" 0 0 5 0 0 5 5 3723 UNK - 0" 0 0 1 2 2 5 5 5052 VCP - 10" 0 0 5 0 0 5 5 5679 VCP - 10" 0 0 5 0 0 5 5 5726 VCP - 10" 0 0 5 0 0 5 5 5728 VCP - 10" 0 0 5 0 0 5 5 6319 UNK - 8" 5 0 1 2 2 0 5 6331 UNK - 8" 5 0 1 2 2 0 5 6332 UNK - 6" 5 0 1 2 2 0 5 6346 UNK - 8" 5 0 1 2 2 0 5 7101 VCP - 12" 0 0 5 0 0 5 5 7301 VCP - 12" 0 0 5 0 0 5 5 7828 VCP - 15" 0 0 5 0 0 5 5 7830 VCP - 15" 0 0 5 0 0 5 5 7832 VCP - 15" 0 0 5 0 0 5 5 7834 VCP - 15" 0 0 5 0 0 5 5 59 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 7877 VCP - 15" 0 0 5 0 0 5 5 7879 VCP - 15" 0 0 5 0 0 5 5 7942 VCP - 12" 0 0 5 0 0 5 5 7944 VCP - 12" 0 0 5 0 0 5 5 7952 VCP - 12" 0 0 5 0 0 5 5 7954 VCP - 12" 0 0 5 0 0 5 5 7956 VCP - 12" 0 0 5 0 0 5 5 7958 VCP - 12" 0 0 5 0 0 5 5 7960 VCP - 12" 0 0 5 0 0 5 5 8018 VCP - 10" 0 0 5 0 0 5 5 8306 VCP - 10" 0 0 5 0 0 5 5 8307 VCP - 10" 0 0 5 0 0 5 5 8327 VCP - 10" 0 0 5 0 0 5 5 8328 VCP - 10" 0 0 5 0 0 5 5 8403 VCP - 10" 0 0 5 0 0 5 5 8404 VCP - 10" 0 0 5 0 0 5 5 8509 VCP - 10" 0 0 5 0 0 5 5 8510 VCP - 10" 0 0 5 0 0 5 5 8519 VCP - 10" 0 0 5 0 0 5 5 8520 VCP - 10" 0 0 5 0 0 5 5 9669 CIP - 20" 5 0 4 1 0 0 5 18402 UNK - 6" 5 0 1 2 2 0 5 18404 UNK - 6" 5 0 1 2 2 0 5 18714 VCP - 10" 0 0 5 0 0 5 5 18715 VCP - 10" 0 0 5 0 0 5 5 18874 PVC - 6" 5 0 2 1 2 0 5 19807 UNK - 8" 5 0 1 2 2 0 5 23237 PVC - 6" 5 0 2 1 2 0 5 60 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 23293 PVC - 8" 5 0 2 1 2 0 5 23294 PVC - 8" 5 0 2 1 2 0 5 23308 VCP - 10" 0 0 5 0 0 5 5 24446 UNK - 8" 5 0 1 2 2 0 5 25373 UNK - 6" 5 0 1 2 2 0 5 25678 PVC - 6" 5 0 2 1 2 0 5 27149 DIP - 24" 5 0 4 1 0 0 5 27147 DIP - 30" 5 0 4 1 0 0 5 3636 VSGD - 8" 0 0 1 1 2 5 5 3731 PVC - 6" 0 0 2 0 2 5 5 4149 VCP - 8" 0 0 5 2 2 0 5 4151 VCP - 8" 0 0 5 2 2 0 5 4153 VCP - 8" 0 0 5 2 2 0 5 4321 VCP - 8" 0 0 5 2 2 0 5 5063 UNK - 8" 0 0 1 1 2 5 5 5870 VCP - 6" 0 0 5 2 2 0 5 6171 UNK - 8" 5 0 1 1 2 0 5 6402 PVC - 8" 5 0 2 0 2 0 5 6520 UNK - 8" 0 0 1 1 2 5 5 6751 VCP - 6" 0 0 5 2 2 0 5 6870 UNK - 8" 0 0 1 1 2 5 5 6958 UNK - 8" 0 0 1 1 2 5 5 7146 UNK - 8" 0 0 1 1 2 5 5 7235 PVC - 8" 0 0 2 0 2 5 5 7236 PVC - 8" 0 0 2 0 2 5 5 7310 DIP - 20" 0 0 4 0 0 5 5 5758 RCP - 15" 0 0 3 1 0 5 5 7886 RCP - 42" 0 0 3 1 0 5 5 61 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 7888 RCP - 42" 0 0 3 1 0 5 5 7968 RCP - 36" 0 0 3 1 0 5 5 7970 RCP - 36" 0 0 3 1 0 5 5 7972 RCP - 36" 0 0 3 1 0 5 5 7973 RCP - 36" 0 0 3 1 0 5 5 8022 RCP - 36" 0 0 3 1 0 5 5 8024 RCP - 36" 0 0 3 1 0 5 5 8025 RCP - 36" 0 0 3 1 0 5 5 8209 RCP - 36" 0 0 3 1 0 5 5 8211 RCP - 36" 0 0 3 1 0 5 5 8212 RCP - 36" 0 0 3 1 0 5 5 8630 RCP - 36" 0 0 3 1 0 5 5 8632 RCP - 36" 0 0 3 1 0 5 5 8633 RCP - 36" 0 0 3 1 0 5 5 8744 RCP - 36" 0 0 3 1 0 5 5 8746 RCP - 36" 0 0 3 1 0 5 5 8919 RCP - 36" 0 0 3 1 0 5 5 8937 RCP - 36" 0 0 3 1 0 5 5 9059 RCP - 36" 0 0 3 1 0 5 5 9061 RCP - 36" 0 0 3 1 0 5 5 9063 RCP - 36" 0 0 3 1 0 5 5 9738 RCP - 18" 0 0 3 1 0 5 5 9739 RCP - 24" 0 0 3 1 0 5 5 24006 RCP - 42" 0 0 3 1 0 5 5 10264 UNK - 8" 0 0 1 1 2 5 5 10294 UNK - 8" 0 0 1 1 2 5 5 10937 UNK - 8" 0 0 1 1 2 5 5 10949 UNK - 8" 0 0 1 1 2 5 5 62 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 11317 VCP - 8" 0 0 5 2 2 0 5 11318 VCP - 8" 0 0 5 2 2 0 5 18285 VCP - 6" 0 0 5 2 2 0 5 18454 PVC - 6" 5 0 2 0 2 0 5 18831 UNK - 8" 5 0 1 1 2 0 5 19140 PVC - 6" 5 0 2 0 2 0 5 19218 PVC - 10" 5 0 2 2 0 0 5 23213 PVC - 6" 5 0 2 0 2 0 5 23215 PVC - 6" 5 0 2 0 2 0 5 23221 PVC - 6" 5 0 2 0 2 0 5 23224 PVC - 6" 5 0 2 0 2 0 5 23231 PVC - 6" 5 0 2 0 2 0 5 23233 PVC - 6" 5 0 2 0 2 0 5 23239 PVC - 6" 5 0 2 0 2 0 5 23241 PVC - 6" 5 0 2 0 2 0 5 23261 PVC - 6" 5 0 2 0 2 0 5 23296 PVC - 8" 5 0 2 0 2 0 5 23447 UNK - 8" 0 0 1 1 2 5 5 23572 PVC - 10" 5 0 2 2 0 0 5 23597 UNK - 8" 0 0 1 1 2 5 5 23601 UNK - 8" 0 0 1 1 2 5 5 24283 UNK - 8" 0 0 1 1 2 5 5 24353 UNK - 8" 0 0 1 1 2 5 5 24453 UNK - 8" 0 0 1 1 2 5 5 24455 UNK - 8" 0 0 1 1 2 5 5 24457 UNK - 8" 0 0 1 1 2 5 5 25341 PVC - 6" 0 0 2 0 2 5 5 25346 PVC - 6" 0 0 2 0 2 5 5 63 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 25352 DIP - 24" 5 0 4 0 0 0 5 25366 DIP - 30" 5 0 4 0 0 0 5 25676 PVC - 6" 5 0 2 0 2 0 5 26197 UNK - 8" 0 0 1 1 2 5 5 26356 VCP - 6" 0 0 5 2 2 0 5 28691 UNK - 0" 0 0 1 1 2 5 5 31498 UNK - 6" 5 0 1 1 2 0 5 5155 VSGD - 8" 0 0 1 0 2 5 4 5157 VSGD - 8" 0 0 1 0 2 5 4 5160 VSGD - 8" 0 0 1 0 2 5 4 5161 VSGD - 8" 0 0 1 0 2 5 4 5163 VSGD - 8" 0 0 1 0 2 5 4 5165 VSGD - 8" 0 0 1 0 2 5 4 3757 VCP - 8" 0 0 5 1 2 0 4 3765 VCP - 8" 0 0 5 1 2 0 4 3767 VCP - 8" 0 0 5 1 2 0 4 3769 VCP - 8" 0 0 5 1 2 0 4 3932 VCP - 8" 0 0 5 1 2 0 4 5167 VSGD - 8" 0 0 1 0 2 5 4 5169 VSGD - 8" 0 0 1 0 2 5 4 6178 PVC - 36" 5 0 2 1 0 0 4 6317 UNK - 15" 5 0 1 2 0 0 4 6321 UNK - 8" 5 0 1 0 2 0 4 6336 UNK - 8" 5 0 1 0 2 0 4 6348 UNK - 8" 5 0 1 0 2 0 4 6350 UNK - 8" 5 0 1 0 2 0 4 6363 HDPE - 8" 5 0 1 0 2 0 4 6367 UNK - 8" 5 0 1 0 2 0 4 64 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 6369 UNK - 8" 5 0 1 0 2 0 4 6376 HDPE - 8" 5 0 1 0 2 0 4 6399 HDPE - 6" 5 0 1 0 2 0 4 6772 UNK - 8" 0 0 1 0 2 5 4 6781 UNK - 8" 0 0 1 0 2 5 4 6957 UNK - 8" 0 0 1 0 2 5 4 6971 UNK - 8" 0 0 1 0 2 5 4 7145 UNK - 8" 0 0 1 0 2 5 4 7302 PVC - 12" 0 0 2 1 0 5 4 7884 PVC - 36" 0 0 2 1 0 5 4 7949 UNK - 8" 0 0 1 0 2 5 4 8522 UNK - 8" 0 0 1 0 2 5 4 9065 PVC - 36" 0 0 2 1 0 5 4 9598 UNK - 8" 5 0 1 0 2 0 4 9633 UNK - 6" 0 0 1 0 2 5 4 9803 UNK - 6" 0 0 1 0 2 5 4 9806 UNK - 6" 0 0 1 0 2 5 4 9818 UNK - 8" 5 0 1 0 2 0 4 9871 UNK - 6" 0 0 1 0 2 5 4 10016 VCP - 6" 0 0 5 1 2 0 4 5760 RCP - 15" 0 0 3 0 0 5 4 6254 RCP - 10" 0 0 3 0 0 5 4 10241 UNK - 8" 0 0 1 0 2 5 4 6257 RCP - 10" 0 0 3 0 0 5 4 6259 RCP - 10" 0 0 3 0 0 5 4 6431 RCP - 24" 0 0 3 0 0 5 4 8918 RCP - 36" 0 0 3 0 0 5 4 9720 RCP - 18" 0 0 3 0 0 5 4 65 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 9722 RCP - 18" 0 0 3 0 0 5 4 11054 UNK - 8" 0 0 1 0 2 5 4 11056 UNK - 8" 0 0 1 0 2 5 4 11057 UNK - 8" 0 0 1 0 2 5 4 15208 VCP - 8" 0 0 5 1 2 0 4 15209 VCP - 8" 0 0 5 1 2 0 4 15255 UNK - 8" 0 0 1 0 2 5 4 15325 VCP - 6" 0 0 5 1 2 0 4 18277 UNK - 8" 5 0 1 0 2 0 4 18323 UNK - 6" 5 0 1 0 2 0 4 18325 UNK - 6" 5 0 1 0 2 0 4 18327 UNK - 6" 5 0 1 0 2 0 4 18330 UNK - 6" 5 0 1 0 2 0 4 18332 UNK - 6" 5 0 1 0 2 0 4 18333 UNK - 8" 5 0 1 0 2 0 4 0 UNK - 0" 5 0 1 0 2 0 4 18406 UNK - 6" 5 0 1 0 2 0 4 18408 UNK - 8" 5 0 1 0 2 0 4 18410 UNK - 8" 5 0 1 0 2 0 4 19808 UNK - 8" 5 0 1 0 2 0 4 19809 UNK - 8" 5 0 1 0 2 0 4 22591 HDPE - 0" 5 0 1 0 2 0 4 23518 UNK - 8" 0 0 1 0 2 5 4 23602 UNK - 8" 0 0 1 0 2 5 4 23603 UNK - 8" 0 0 1 0 2 5 4 23957 UNK - 8" 5 0 1 0 2 0 4 23996 UNK - 6" 0 0 1 0 2 5 4 24285 UNK - 0" 0 0 1 0 2 5 4 66 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 24329 UNK - 8" 0 0 1 0 2 5 4 24331 UNK - 8" 0 0 1 0 2 5 4 24333 UNK - 8" 0 0 1 0 2 5 4 24335 UNK - 8" 0 0 1 0 2 5 4 24459 UNK - 8" 5 0 1 0 2 0 4 24479 UNK - 8" 5 0 1 0 2 0 4 25371 UNK - 15" 5 0 1 2 0 0 4 26006 UNK - 2" 5 0 1 0 2 0 4 26360 VCP - 6" 0 0 5 1 2 0 4 26362 VCP - 6" 0 0 5 1 2 0 4 26364 VCP - 6" 0 0 5 1 2 0 4 26366 VCP - 6" 0 0 5 1 2 0 4 26685 VCP - 8" 0 0 5 1 2 0 4 26687 VCP - 8" 0 0 5 1 2 0 4 26689 VCP - 8" 0 0 5 1 2 0 4 26691 VCP - 8" 0 0 5 1 2 0 4 26693 VCP - 8" 0 0 5 1 2 0 4 26695 VCP - 8" 0 0 5 1 2 0 4 26697 VCP - 8" 0 0 5 1 2 0 4 26699 VCP - 8" 0 0 5 1 2 0 4 26701 VCP - 8" 0 0 5 1 2 0 4 26703 VCP - 8" 0 0 5 1 2 0 4 26705 VCP - 8" 0 0 5 1 2 0 4 26707 VCP - 8" 0 0 5 1 2 0 4 26709 VCP - 8" 0 0 5 1 2 0 4 26735 VCP - 8" 0 0 5 1 2 0 4 26737 VCP - 8" 0 0 5 1 2 0 4 26739 VCP - 8" 0 0 5 1 2 0 4 67 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 26741 VCP - 8" 0 0 5 1 2 0 4 26750 VCP - 6" 0 0 5 1 2 0 4 27121 UNK - 0" 5 0 1 0 2 0 4 32032 VCP - 6" 0 0 5 1 2 0 4 32041 UNK - 4" 5 0 1 0 2 0 4 32047 UNK - 4" 5 0 1 0 2 0 4 32079 UNK - 6" 0 0 1 0 2 5 4 32174 VCP - 8" 0 0 5 1 2 0 4 5151 PVC - 12" 0 0 2 0 0 5 4 3659 VCP - 8" 0 0 5 0 2 0 4 21 VCP - 8" 0 0 5 0 2 0 4 3740 VCP - 8" 0 0 5 0 2 0 4 3742 VCP - 8" 0 0 5 0 2 0 4 3771 VCP - 8" 0 0 5 0 2 0 4 3773 VCP - 8" 0 0 5 0 2 0 4 3833 VCP - 8" 0 0 5 0 2 0 4 3835 VCP - 8" 0 0 5 0 2 0 4 3837 VCP - 8" 0 0 5 0 2 0 4 3839 VCP - 8" 0 0 5 0 2 0 4 3841 VCP - 8" 0 0 5 0 2 0 4 3843 VCP - 8" 0 0 5 0 2 0 4 3845 VCP - 8" 0 0 5 0 2 0 4 3928 VCP - 8" 0 0 5 0 2 0 4 3930 VCP - 8" 0 0 5 0 2 0 4 4135 VCP - 8" 0 0 5 0 2 0 4 4347 VCP - 8" 0 0 5 0 2 0 4 4350 VCP - 6" 0 0 5 0 2 0 4 4352 VCP - 8" 0 0 5 0 2 0 4 68 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 4354 VCP - 6" 0 0 5 0 2 0 4 4357 VCP - 6" 0 0 5 0 2 0 4 5065 UNK - 10" 0 0 1 1 0 5 4 5067 UNK - 10" 0 0 1 1 0 5 4 5412 VCP - 6" 0 0 5 0 2 0 4 5414 VCP - 8" 0 0 5 0 2 0 4 5416 VCP - 8" 0 0 5 0 2 0 4 5596 VCP - 8" 0 0 5 0 2 0 4 5698 VCP - 8" 0 0 5 0 2 0 4 5700 PVC - 12" 0 0 2 0 0 5 4 5706 UNK - 18" 0 0 1 1 0 5 4 5708 UNK - 18" 0 0 1 1 0 5 4 5710 UNK - 18" 0 0 1 1 0 5 4 5712 UNK - 18" 0 0 1 1 0 5 4 5714 UNK - 18" 0 0 1 1 0 5 4 5716 UNK - 18" 0 0 1 1 0 5 4 5731 UNK - 15" 0 0 1 1 0 5 4 5742 UNK - 15" 0 0 1 1 0 5 4 5751 UNK - 12" 5 0 1 1 0 0 4 5787 PVC - 12" 5 0 2 0 0 0 4 6205 VCP - 8" 0 0 5 0 2 0 4 6410 PVC - 10" 5 0 2 0 0 0 4 6449 UNK - 30" 0 0 1 1 0 5 4 6455 VCP - 8" 0 0 5 0 2 0 4 6467 UNK - 30" 0 0 1 1 0 5 4 6516 VCP - 8" 0 0 5 0 2 0 4 6518 VCP - 8" 0 0 5 0 2 0 4 6527 UNK - 15" 0 0 1 1 0 5 4 69 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 6599 UNK - 30" 0 0 1 1 0 5 4 6656 UNK - 30" 0 0 1 1 0 5 4 6658 UNK - 30" 0 0 1 1 0 5 4 6663 UNK - 30" 0 0 1 1 0 5 4 6665 UNK - 30" 0 0 1 1 0 5 4 6667 UNK - 30" 0 0 1 1 0 5 4 6752 VCP - 6" 0 0 5 0 2 0 4 7097 UNK - 10" 0 0 1 1 0 5 4 7308 UNK - 21" 0 0 1 1 0 5 4 7312 UNK - 21" 0 0 1 1 0 5 4 7335 UNK - 21" 0 0 1 1 0 5 4 7487 UNK - 21" 0 0 1 1 0 5 4 7488 UNK - 21" 0 0 1 1 0 5 4 7747 UNK - 21" 0 0 1 1 0 5 4 7777 UNK - 24" 0 0 1 1 0 5 4 7778 UNK - 24" 0 0 1 1 0 5 4 7782 UNK - 21" 0 0 1 1 0 5 4 7783 UNK - 21" 0 0 1 1 0 5 4 7893 UNK - 42" 0 0 1 1 0 5 4 7900 UNK - 10" 0 0 1 1 0 5 4 7902 UNK - 10" 0 0 1 1 0 5 4 7904 UNK - 10" 0 0 1 1 0 5 4 7906 UNK - 10" 0 0 1 1 0 5 4 7908 UNK - 10" 0 0 1 1 0 5 4 7910 UNK - 10" 0 0 1 1 0 5 4 7915 UNK - 12" 0 0 1 1 0 5 4 7921 VCP - 8" 0 0 5 0 2 0 4 9592 PVC - 10" 5 0 2 0 0 0 4 70 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 9593 PVC - 10" 5 0 2 0 0 0 4 9671 UNK - 20" 5 0 1 1 0 0 4 9673 HDPE - 20" 5 0 1 1 0 0 4 9674 HDPE - 20" 5 0 1 1 0 0 4 9676 UNK - 10" 5 0 1 1 0 0 4 9707 VCP - 6" 0 0 5 0 2 0 4 9708 VCP - 6" 0 0 5 0 2 0 4 9762 UNK - 18" 0 0 1 1 0 5 4 9763 UNK - 24" 0 0 1 1 0 5 4 9795 UNK - 24" 0 0 1 1 0 5 4 9826 UNK - 24" 0 0 1 1 0 5 4 9829 UNK - 24" 0 0 1 1 0 5 4 9844 VCP - 6" 0 0 5 0 2 0 4 9875 VCP - 6" 0 0 5 0 2 0 4 9890 VCP - 6" 0 0 5 0 2 0 4 9931 VCP - 6" 0 0 5 0 2 0 4 10022 VCP - 6" 0 0 5 0 2 0 4 10239 UNK - 15" 0 0 1 1 0 5 4 10262 UNK - 15" 0 0 1 1 0 5 4 10266 UNK - 12" 0 0 1 1 0 5 4 10422 VCP - 6" 0 0 5 0 2 0 4 10424 VCP - 6" 0 0 5 0 2 0 4 10426 VCP - 6" 0 0 5 0 2 0 4 10698 VCP - 10" 0 0 5 2 0 0 4 10706 VCP - 10" 0 0 5 2 0 0 4 10710 VCP - 8" 0 0 5 0 2 0 4 10712 VCP - 8" 0 0 5 0 2 0 4 11308 VCP - 8" 0 0 5 0 2 0 4 71 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 11314 VCP - 8" 0 0 5 0 2 0 4 15251 VCP - 8" 0 0 5 0 2 0 4 18269 UNK - 12" 5 0 1 1 0 0 4 18375 PVC - 10" 5 0 2 0 0 0 4 18416 UNK - 21" 0 0 1 1 0 5 4 18417 UNK - 21" 0 0 1 1 0 5 4 18425 UNK - 21" 0 0 1 1 0 5 4 18510 UNK - 18" 0 0 1 1 0 5 4 18512 UNK - 18" 0 0 1 1 0 5 4 18514 UNK - 18" 0 0 1 1 0 5 4 18516 UNK - 18" 0 0 1 1 0 5 4 18517 UNK - 18" 0 0 1 1 0 5 4 19100 PVC - 10" 5 0 2 0 0 0 4 19322 PVC - 10" 5 0 2 0 0 0 4 19395 PVC - 10" 5 0 2 0 0 0 4 19779 VCP - 8" 0 0 5 0 2 0 4 19780 VCP - 8" 0 0 5 0 2 0 4 20365 VCP - 8" 0 0 5 0 2 0 4 23227 PVC - 10" 5 0 2 0 0 0 4 23302 UNK - 18" 0 0 1 1 0 5 4 23570 PVC - 10" 5 0 2 0 0 0 4 23997 UNK - 30" 0 0 1 1 0 5 4 24009 UNK - 30" 0 0 1 1 0 5 4 25364 UNK - 12" 5 0 1 1 0 0 4 25377 UNK - 12" 0 0 1 1 0 5 4 26711 VCP - 8" 0 0 5 0 2 0 4 26713 VCP - 8" 0 0 5 0 2 0 4 26715 VCP - 8" 0 0 5 0 2 0 4 72 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 26717 VCP - 8" 0 0 5 0 2 0 4 26719 VCP - 8" 0 0 5 0 2 0 4 26744 VCP - 8" 0 0 5 0 2 0 4 26746 VCP - 0" 0 0 5 0 2 0 4 26748 VCP - 0" 0 0 5 0 2 0 4 26752 VCP - 8" 0 0 5 0 2 0 4 26754 VCP - 8" 0 0 5 0 2 0 4 26756 VCP - 8" 0 0 5 0 2 0 4 26758 VCP - 8" 0 0 5 0 2 0 4 27325 VCP - 8" 0 0 5 0 2 0 4 28468 VCP - 0" 0 0 5 0 2 0 4 32033 VCP - 6" 0 0 5 0 2 0 4 32034 VCP - 6" 0 0 5 0 2 0 4 32169 VCP - 8" 0 0 5 0 2 0 4 32171 VCP - 8" 0 0 5 0 2 0 4 32173 VCP - 8" 0 0 5 0 2 0 4 30946 VCP - 8" 0 0 5 0 2 0 4 3934 VCP - 10" 0 0 5 1 0 0 3 4336 PVC - 8" 0 0 2 2 2 0 3 5739 UNK - 15" 0 0 1 0 0 5 3 5741 UNK - 15" 0 0 1 0 0 5 3 5745 UNK - 12" 5 0 1 0 0 0 3 5749 UNK - 18" 5 0 1 0 0 0 3 5785 UNK - 10" 5 0 1 0 0 0 3 5789 UNK - 15" 5 0 1 0 0 0 3 5792 UNK - 15" 5 0 1 0 0 0 3 5827 UNK - 10" 5 0 1 0 0 0 3 6170 UNK - 10" 5 0 1 0 0 0 3 73 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 6401 HDPE - 16" 5 0 1 0 0 0 3 6442 HDPE - 10" 5 0 1 0 0 0 3 6525 UNK - 15" 0 0 1 0 0 5 3 6601 UNK - 30" 0 0 1 0 0 5 3 7599 PVC - 8" 0 0 2 2 2 0 3 7603 PVC - 8" 0 0 2 2 2 0 3 7605 PVC - 8" 0 0 2 2 2 0 3 7648 PVC - 8" 0 0 2 2 2 0 3 7650 PVC - 8" 0 0 2 2 2 0 3 7860 PVC - 8" 0 0 2 2 2 0 3 7865 UNK - 24" 0 0 1 0 0 5 3 7922 VCP - 12" 0 0 5 1 0 0 3 7929 UNK - 10" 0 0 1 0 0 5 3 7930 UNK - 10" 0 0 1 0 0 5 3 8205 UNK - 24" 0 0 1 0 0 5 3 8207 UNK - 24" 0 0 1 0 0 5 3 9376 PVC - 8" 0 0 2 2 2 0 3 9588 HDPE - 16" 5 0 1 0 0 0 3 9590 HDPE - 16" 5 0 1 0 0 0 3 9594 UNK - 20" 5 0 1 0 0 0 3 9596 HDPE - 20" 5 0 1 0 0 0 3 9600 HDPE - 20" 5 0 1 0 0 0 3 9624 UNK - 18" 0 0 1 0 0 5 3 9628 UNK - 12" 0 0 1 0 0 5 3 9656 UNK - 15" 0 0 1 0 0 5 3 9665 UNK - 12" 0 0 1 0 0 5 3 9710 VCP - 10" 0 0 5 1 0 0 3 9760 UNK - 18" 0 0 1 0 0 5 3 74 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 9810 UNK - 24" 0 0 1 0 0 5 3 10225 UNK - 15" 0 0 1 0 0 5 3 10226 UNK - 15" 0 0 1 0 0 5 3 10235 UNK - 15" 0 0 1 0 0 5 3 10237 UNK - 15" 0 0 1 0 0 5 3 10428 DIP - 6" 0 0 4 0 2 0 3 10490 VCP - 12" 0 0 5 1 0 0 3 10491 VCP - 12" 0 0 5 1 0 0 3 10692 CIP - 12" 0 0 4 2 0 0 3 15253 UNK - 30" 0 0 1 0 0 5 3 18270 UNK - 15" 5 0 1 0 0 0 3 18271 UNK - 15" 5 0 1 0 0 0 3 18335 UNK - 12" 5 0 1 0 0 0 3 18337 UNK - 12" 5 0 1 0 0 0 3 18339 UNK - 12" 5 0 1 0 0 0 3 18341 UNK - 12" 5 0 1 0 0 0 3 19646 UNK - 10" 5 0 1 0 0 0 3 19804 UNK - 10" 5 0 1 0 0 0 3 23642 CIP - 12" 0 0 4 2 0 0 3 24011 UNK - 12" 0 0 1 0 0 5 3 28980 PVC - 8" 0 0 2 2 2 0 3 28981 PVC - 8" 0 0 2 2 2 0 3 28982 PVC - 8" 0 0 2 2 2 0 3 28983 PVC - 8" 0 0 2 2 2 0 3 28984 PVC - 8" 0 0 2 2 2 0 3 28985 PVC - 8" 0 0 2 2 2 0 3 28990 PVC - 8" 0 0 2 2 2 0 3 28992 PVC - 8" 0 0 2 2 2 0 3 75 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 28993 PVC - 8" 0 0 2 2 2 0 3 28995 PVC - 8" 0 0 2 2 2 0 3 28996 PVC - 8" 0 0 2 2 2 0 3 25300 PVC - 8" 0 0 2 2 2 0 3 25302 PVC - 8" 0 0 2 2 2 0 3 18301 UNK - 30" 0 0 1 0 0 5 3 25385 CIP - 8" 0 0 4 0 2 0 3 25386 CIP - 8" 0 0 4 0 2 0 3 26671 VCP - 10" 0 0 5 1 0 0 3 26683 VCP - 10" 0 0 5 1 0 0 3 28453 UNK - 24" 0 0 1 0 0 5 3 28960 CIP - 0" 0 0 4 0 2 0 3 28963 CIP - 4" 0 0 4 0 2 0 3 28962 CIP - 4" 0 0 4 0 2 0 3 28966 CIP - 4" 0 0 4 0 2 0 3 28968 CIP - 4" 0 0 4 0 2 0 3 31865 CIP - 0" 0 0 4 0 2 0 3 32623 DIP - 8" 0 0 4 0 2 0 3 90365 PVC - 8" 0 0 2 2 2 0 3 90364 PVC - 8" 0 0 2 2 2 0 3 90363 PVC - 8" 0 0 2 2 2 0 3 90362 PVC - 8" 0 0 2 2 2 0 3 5074 PVC - 8" 0 0 2 1 2 0 3 5075 PVC - 8" 0 0 2 1 2 0 3 3729 VSGD - 6" 0 0 1 2 2 0 3 3936 VCP - 10" 0 0 5 0 0 0 3 3938 VCP - 10" 0 0 5 0 0 0 3 3940 VCP - 10" 0 0 5 0 0 0 3 76 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 4050 VCP - 12" 0 0 5 0 0 0 3 4338 UNK - 8" 0 0 1 2 2 0 3 6507 PVC - 8" 0 0 2 1 2 0 3 6582 VCP - 10" 0 0 5 0 0 0 3 6672 VSGD - 8" 0 0 1 2 2 0 3 6674 VSGD - 8" 0 0 1 2 2 0 3 6728 UNK - 6" 0 0 1 2 2 0 3 6729 UNK - 6" 0 0 1 2 2 0 3 6732 VSGD - 6" 0 0 1 2 2 0 3 6734 VSGD - 6" 0 0 1 2 2 0 3 6735 VSGD - 6" 0 0 1 2 2 0 3 6744 UNK - 6" 0 0 1 2 2 0 3 6749 UNK - 6" 0 0 1 2 2 0 3 6756 UNK - 6" 0 0 1 2 2 0 3 7346 PVC - 8" 0 0 2 1 2 0 3 7364 PVC - 8" 0 0 2 1 2 0 3 7366 PVC - 8" 0 0 2 1 2 0 3 7443 PVC - 8" 0 0 2 1 2 0 3 3 7536 PVC - 8" 0 0 2 1 2 0 3 7552 PVC - 8" 0 0 2 1 2 0 7609 PVC - 8" 0 0 2 1 2 0 3 7610 PVC - 8" 0 0 2 1 2 0 3 3 7978 UNK - 8" 0 0 1 2 2 0 3 7980 UNK - 8" 0 0 1 2 2 0 3 8011 UNK - 8" 0 0 1 2 2 0 3 8014 UNK - 8" 0 0 1 2 2 0 8026 PVC - 8" 0 0 2 1 2 0 3 3 8334 UNK - 8" 0 0 1 2 2 0 77 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 3 8526 UNK - 8" 0 0 1 2 2 0 8527 UNK - 8" 0 0 1 2 2 0 3 3 8529 UNK - 8" 0 0 1 2 2 0 3 8783 PVC - 8" 0 0 2 1 2 0 3 8798 PVC - 8" 0 0 2 1 2 0 3 8848 PVC - 8" 0 0 2 1 2 0 8940 PVC - 8" 0 0 2 1 2 0 3 3 8942 PVC - 8" 0 0 2 1 2 0 3 9095 PVC - 8" 0 0 2 1 2 0 3 9243 PVC - 8" 0 0 2 1 2 0 9277 PVC - 8" 0 0 2 1 2 0 3 3 9379 PVC - 8" 0 0 2 1 2 0 3 9439 UNK - 8" 0 0 1 2 2 0 3 9441 UNK - 8" 0 0 1 2 2 0 3 9490 PVC - 8" 0 0 2 1 2 0 3 9725 UNK - 6" 0 0 1 2 2 0 10246 VSGD - 8" 0 0 1 2 2 0 3 3 10577 VCP - 10" 0 0 5 0 0 0 3 10656 VCP - 10" 0 0 5 0 0 0 10657 VCP - 10" 0 0 5 0 0 0 3 10659 VCP - 10" 0 0 5 0 0 0 3 3 10691 VCP - 10" 0 0 5 0 0 0 3 10695 VCP - 10" 0 0 5 0 0 0 3 10696 VCP - 10" 0 0 5 0 0 0 3 10701 VCP - 10" 0 0 5 0 0 0 10703 VCP - 10" 0 0 5 0 0 0 3 78 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 3 10705 VCP - 10" 0 0 5 0 0 0 18490 PVC - 6" 0 0 2 1 2 0 3 3 19022 PVC - 6" 0 0 2 1 2 0 3 19040 PVC - 6" 0 0 2 1 2 0 3 19064 PVC - 6" 0 0 2 1 2 0 3 19741 VCP - 10" 0 0 5 0 0 0 19760 VCP - 10" 0 0 5 0 0 0 3 3 20623 PVC - 8" 0 0 2 1 2 0 3 20625 PVC - 8" 0 0 2 1 2 0 3 20627 PVC - 8" 0 0 2 1 2 0 20628 PVC - 8" 0 0 2 1 2 0 3 3 22449 VCP - 12" 0 0 5 0 0 0 3 23478 UNK - 0" 0 0 1 2 2 0 3 23638 PVC - 8" 0 0 2 1 2 0 3 23644 VCP - 10" 0 0 5 0 0 0 3 24299 VSGD - 8" 0 0 1 2 2 0 28991 PVC - 8" 0 0 2 1 2 0 3 3 24761 PVC - 8" 0 0 2 1 2 0 3 25392 PVC - 8" 0 0 2 1 2 0 26673 VCP - 10" 0 0 5 0 0 0 3 26675 VCP - 10" 0 0 5 0 0 0 3 3 26677 VCP - 10" 0 0 5 0 0 0 3 26679 VCP - 10" 0 0 5 0 0 0 3 26681 VCP - 10" 0 0 5 0 0 0 3 26760 PVC - 8" 0 0 2 1 2 0 26762 PVC - 8" 0 0 2 1 2 0 3 79 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 3 26766 PVC - 8" 0 0 2 1 2 0 26768 PVC - 8" 0 0 2 1 2 0 3 3 26770 PVC - 8" 0 0 2 1 2 0 3 26772 PVC - 8" 0 0 2 1 2 0 3 26774 PVC - 8" 0 0 2 1 2 0 3 26799 PVC - 8" 0 0 2 1 2 0 26804 PVC - 8" 0 0 2 1 2 0 3 3 26806 PVC - 8" 0 0 2 1 2 0 3 31260 PVC - 8" 0 0 2 1 2 0 3 31770 VCP - 10" 0 0 5 0 0 0 31772 VCP - 10" 0 0 5 0 0 0 3 3 31775 VCP - 10" 0 0 5 0 0 0 90011 PVC - 6" 0 0 2 1 2 0 3 90011 PVC - 6" 0 0 2 1 2 0 3 90011 PVC - 6" 0 0 2 1 2 0 3 90011 PVC - 6" 0 0 2 1 2 0 3 90011 PVC - 6" 0 0 2 1 2 0 3 90011 PVC - 6" 0 0 2 1 2 0 3 3 32132 VCP - 12" 0 0 5 0 0 0 3 32648 PVC - 0" 0 0 2 1 2 0 5125 PVC - 8" 0 0 2 0 2 0 2 5126 PVC - 8" 0 0 2 0 2 0 2 4324 PVC - 8" 0 0 2 0 2 0 2 4326 PVC - 8" 0 0 2 0 2 0 2 4328 PVC - 8" 0 0 2 0 2 0 2 4330 PVC - 8" 0 0 2 0 2 0 2 4332 PVC - 8" 0 0 2 0 2 0 2 80 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 4333 PVC - 8" 0 0 2 0 2 0 2 4340 PVC - 8" 0 0 2 0 2 0 2 4342 PVC - 8" 0 0 2 0 2 0 2 4344 PVC - 8" 0 0 2 0 2 0 2 4364 UNK - 8" 0 0 1 1 2 0 2 5376 PVC - 8" 0 0 2 0 2 0 2 5423 PVC - 8" 0 0 2 0 2 0 2 5433 PVC - 8" 0 0 2 0 2 0 2 6267 PVC - 8" 0 0 2 0 2 0 2 6364 PVC - 8" 0 0 2 0 2 0 2 6420 PVC - 8" 0 0 2 0 2 0 2 6432 PVC - 8" 0 0 2 0 2 0 2 6439 PVC - 8" 0 0 2 0 2 0 2 6509 UNK - 8" 0 0 1 1 2 0 2 6532 VSGD - 8" 0 0 1 1 2 0 2 6653 PVC - 8" 0 0 2 0 2 0 2 6779 UNK - 8" 0 0 1 1 2 0 2 6872 UNK - 8" 0 0 1 1 2 0 2 6874 UNK - 8" 0 0 1 1 2 0 2 6876 UNK - 8" 0 0 1 1 2 0 2 6878 UNK - 8" 0 0 1 1 2 0 2 6912 UNK - 8" 0 0 1 1 2 0 2 6913 UNK - 8" 0 0 1 1 2 0 2 6976 UNK - 8" 0 0 1 1 2 0 2 7345 PVC - 8" 0 0 2 0 2 0 2 7368 PVC - 8" 0 0 2 0 2 0 2 7370 PVC - 8" 0 0 2 0 2 0 2 7378 PVC - 8" 0 0 2 0 2 0 2 81 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 7380 PVC - 8" 0 0 2 0 2 0 2 7381 PVC - 8" 0 0 2 0 2 0 2 7442 PVC - 8" 0 0 2 0 2 0 2 7445 PVC - 8" 0 0 2 0 2 0 2 7534 PVC - 8" 0 0 2 0 2 0 2 7541 PVC - 8" 0 0 2 0 2 0 2 7543 PVC - 8" 0 0 2 0 2 0 2 7545 PVC - 8" 0 0 2 0 2 0 2 7547 PVC - 8" 0 0 2 0 2 0 2 7549 PVC - 8" 0 0 2 0 2 0 2 7551 PVC - 8" 0 0 2 0 2 0 2 7601 PVC - 8" 0 0 2 0 2 0 2 7607 PVC - 8" 0 0 2 0 2 0 2 7651 PVC - 8" 0 0 2 0 2 0 2 7680 UNK - 8" 0 0 1 1 2 0 2 7749 UNK - 8" 0 0 1 1 2 0 2 7760 UNK - 8" 0 0 1 1 2 0 2 7767 UNK - 0" 0 0 1 1 2 0 2 7851 PVC - 8" 0 0 2 0 2 0 2 7853 PVC - 8" 0 0 2 0 2 0 2 7855 PVC - 8" 0 0 2 0 2 0 2 7857 PVC - 8" 0 0 2 0 2 0 2 7862 PVC - 8" 0 0 2 0 2 0 2 7863 PVC - 8" 0 0 2 0 2 0 2 8337 UNK - 8" 0 0 1 1 2 0 2 8682 PVC - 8" 0 0 2 0 2 0 2 8684 PVC - 8" 0 0 2 0 2 0 2 8685 PVC - 8" 0 0 2 0 2 0 2 82 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 8781 PVC - 8" 0 0 2 0 2 0 2 8795 PVC - 8" 0 0 2 0 2 0 2 8797 PVC - 8" 0 0 2 0 2 0 2 8850 PVC - 8" 0 0 2 0 2 0 2 8867 PVC - 8" 0 0 2 0 2 0 2 8943 PVC - 8" 0 0 2 0 2 0 2 9001 PVC - 8" 0 0 2 0 2 0 2 9003 PVC - 8" 0 0 2 0 2 0 2 9005 PVC - 8" 0 0 2 0 2 0 2 9092 PVC - 8" 0 0 2 0 2 0 2 9094 PVC - 8" 0 0 2 0 2 0 2 9143 PVC - 8" 0 0 2 0 2 0 2 9152 PVC - 8" 0 0 2 0 2 0 2 9153 PVC - 8" 0 0 2 0 2 0 2 9180 PVC - 8" 0 0 2 0 2 0 2 9229 PVC - 8" 0 0 2 0 2 0 2 9231 PVC - 8" 0 0 2 0 2 0 2 9242 PVC - 8" 0 0 2 0 2 0 2 9267 PVC - 8" 0 0 2 0 2 0 2 9275 PVC - 8" 0 0 2 0 2 0 2 9338 PVC - 8" 0 0 2 0 2 0 2 9340 PVC - 8" 0 0 2 0 2 0 2 9378 PVC - 8" 0 0 2 0 2 0 2 9445 UNK - 8" 0 0 1 1 2 0 2 9580 UNK - 8" 0 0 1 1 2 0 2 9616 UNK - 8" 0 0 1 1 2 0 2 9622 UNK - 8" 0 0 1 1 2 0 2 9667 PVC - 8" 0 0 2 0 2 0 2 83 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 9691 PVC - 8" 0 0 2 0 2 0 2 9767 UNK - 6" 0 0 1 1 2 0 2 9779 UNK - 6" 0 0 1 1 2 0 2 9804 PVC - 8" 0 0 2 0 2 0 2 9971 PVC - 6" 0 0 2 0 2 0 2 10045 UNK - 6" 0 0 1 1 2 0 2 10126 UNK - 6" 0 0 1 1 2 0 2 10191 PVC - 8" 0 0 2 0 2 0 2 10259 PVC - 6" 0 0 2 0 2 0 2 10431 PVC - 6" 0 0 2 0 2 0 2 4097 RCP - 15" 0 0 3 1 0 0 2 4099 RCP - 15" 0 0 3 1 0 0 2 6142 CCRF - 36" 0 0 3 1 0 0 2 6143 CCRF - 36" 0 0 3 1 0 0 2 6144 CCRF - 36" 0 0 3 1 0 0 2 6146 CCRF - 36" 0 0 3 1 0 0 2 6148 CCRF - 36" 0 0 3 1 0 0 2 6150 CCRF - 42" 0 0 3 1 0 0 2 6152 CCRF - 42" 0 0 3 1 0 0 2 10650 PVC - 8" 0 0 2 0 2 0 2 10652 PVC - 8" 0 0 2 0 2 0 2 10654 PVC - 8" 0 0 2 0 2 0 2 6154 CCRF - 42" 0 0 3 1 0 0 2 6156 CCRF - 42" 0 0 3 1 0 0 2 6158 CCRF - 42" 0 0 3 1 0 0 2 6160 CCRF - 42" 0 0 3 1 0 0 2 6162 CCRF - 42" 0 0 3 1 0 0 2 10000 RCP - 18" 0 0 3 1 0 0 2 84 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 15205 PVC - 8" 0 0 2 0 2 0 2 15220 PVC - 6" 0 0 2 0 2 0 2 15221 PVC - 6" 0 0 2 0 2 0 2 17338 DIP - 24" 0 0 4 0 0 0 2 18308 UNK - 6" 0 0 1 1 2 0 2 18412 UNK - 8" 0 0 1 1 2 0 2 18414 UNK - 8" 0 0 1 1 2 0 2 18457 PVC - 8" 0 0 2 0 2 0 2 10118 RCP - 18" 0 0 3 1 0 0 2 10158 RCP - 18" 0 0 3 1 0 0 2 10159 RCP - 18" 0 0 3 1 0 0 2 10304 RCP - 18" 0 0 3 1 0 0 2 19021 PVC - 6" 0 0 2 0 2 0 2 19037 PVC - 6" 0 0 2 0 2 0 2 19039 PVC - 6" 0 0 2 0 2 0 2 19063 PVC - 6" 0 0 2 0 2 0 2 19451 PVC - 8" 0 0 2 0 2 0 2 19453 PVC - 8" 0 0 2 0 2 0 2 19454 PVC - 8" 0 0 2 0 2 0 2 19455 PVC - 8" 0 0 2 0 2 0 2 19623 PVC - 8" 0 0 2 0 2 0 2 19625 PVC - 8" 0 0 2 0 2 0 2 10306 RCP - 18" 0 0 3 1 0 0 2 20230 DIP - 10" 0 0 4 0 0 0 2 10448 RCP - 15" 0 0 3 1 0 0 2 10507 RCP - 15" 0 0 3 1 0 0 2 20599 PVC - 8" 0 0 2 0 2 0 2 20646 PVC - 8" 0 0 2 0 2 0 2 85 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 22753 PVC - 6" 0 0 2 0 2 0 2 22935 PVC - 8" 0 0 2 0 2 0 2 23208 PVC - 6" 0 0 2 0 2 0 2 23266 PVC - 6" 0 0 2 0 2 0 2 23270 PVC - 6" 0 0 2 0 2 0 2 23274 PVC - 6" 0 0 2 0 2 0 2 23284 PVC - 8" 0 0 2 0 2 0 2 23288 PVC - 8" 0 0 2 0 2 0 2 23411 PVC - 2" 0 0 2 0 2 0 2 23480 UNK - 8" 0 0 1 1 2 0 2 23525 UNK - 6" 0 0 1 1 2 0 2 23526 UNK - 6" 0 0 1 1 2 0 2 23529 UNK - 6" 0 0 1 1 2 0 2 23531 UNK - 6" 0 0 1 1 2 0 2 23532 UNK - 6" 0 0 1 1 2 0 2 23536 UNK - 6" 0 0 1 1 2 0 2 23538 UNK - 6" 0 0 1 1 2 0 2 23542 UNK - 6" 0 0 1 1 2 0 2 23543 UNK - 6" 0 0 1 1 2 0 2 23544 UNK - 6" 0 0 1 1 2 0 2 23548 UNK - 6" 0 0 1 1 2 0 2 23549 UNK - 6" 0 0 1 1 2 0 2 23553 UNK - 6" 0 0 1 1 2 0 2 23554 UNK - 6" 0 0 1 1 2 0 2 23555 UNK - 6" 0 0 1 1 2 0 2 23557 UNK - 6" 0 0 1 1 2 0 2 23559 UNK - 6" 0 0 1 1 2 0 2 23640 UNK - 0" 0 0 1 1 2 0 2 86 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 23988 UNK - 6" 0 0 1 1 2 0 2 24046 UNK - 6" 0 0 1 1 2 0 2 24048 UNK - 6" 0 0 1 1 2 0 2 24072 PVC - 6" 0 0 2 0 2 0 2 24255 UNK - 8" 0 0 1 1 2 0 2 24257 UNK - 8" 0 0 1 1 2 0 2 24278 PVC - 8" 0 0 2 0 2 0 2 24301 PVC - 8" 0 0 2 0 2 0 2 24341 UNK - 0" 0 0 1 1 2 0 2 24343 UNK - 0" 0 0 1 1 2 0 2 24411 UNK - 6" 0 0 1 1 2 0 2 24413 UNK - 6" 0 0 1 1 2 0 2 24415 UNK - 6" 0 0 1 1 2 0 2 24427 UNK - 6" 0 0 1 1 2 0 2 24429 UNK - 6" 0 0 1 1 2 0 2 24451 CIP - 18" 0 0 4 0 0 0 2 28986 PVC - 8" 0 0 2 0 2 0 2 28987 PVC - 8" 0 0 2 0 2 0 2 28988 PVC - 8" 0 0 2 0 2 0 2 28989 PVC - 8" 0 0 2 0 2 0 2 28994 PVC - 8" 0 0 2 0 2 0 2 25317 PVC - 6" 0 0 2 0 2 0 2 25339 VSGD - 6" 0 0 1 1 2 0 2 25387 CIP - 10" 0 0 4 0 0 0 2 26309 PVC - 4" 0 0 2 0 2 0 2 26311 PVC - 6" 0 0 2 0 2 0 2 26467 UNK - 0" 0 0 1 1 2 0 2 26468 HDPE - 2" 0 0 1 1 2 0 2 87 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 26764 PVC - 8" 0 0 2 0 2 0 2 26802 PVC - 8" 0 0 2 0 2 0 2 26808 PVC - 8" 0 0 2 0 2 0 2 15224 RCP - 18" 0 0 3 1 0 0 2 19682 RCP - 42" 0 0 3 1 0 0 2 20268 RCP - 42" 0 0 3 1 0 0 2 20269 RCP - 42" 0 0 3 1 0 0 2 28665 PVC - 8" 0 0 2 0 2 0 2 28666 PVC - 8" 0 0 2 0 2 0 2 28667 PVC - 8" 0 0 2 0 2 0 2 28668 PVC - 8" 0 0 2 0 2 0 2 28669 PVC - 8" 0 0 2 0 2 0 2 28670 PVC - 8" 0 0 2 0 2 0 2 28524 UNK - 8" 0 0 1 1 2 0 2 28526 UNK - 0" 0 0 1 1 2 0 2 31072 DIP - 24" 0 0 4 0 0 0 2 18898 RCP - 42" 0 0 3 1 0 0 2 31496 UNK - 6" 0 0 1 1 2 0 2 31591 PVC - 4" 0 0 2 0 2 0 2 31594 PVC - 4" 0 0 2 0 2 0 2 31597 PVC - 4" 0 0 2 0 2 0 2 31599 PVC - 4" 0 0 2 0 2 0 2 31602 PVC - 4" 0 0 2 0 2 0 2 31605 PVC - 4" 0 0 2 0 2 0 2 31627 UNK - 8" 0 0 1 1 2 0 2 31629 UNK - 8" 0 0 1 1 2 0 2 31631 UNK - 8" 0 0 1 1 2 0 2 31633 UNK - 8" 0 0 1 1 2 0 2 88 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 31654 UNK - 8" 0 0 1 1 2 0 2 31656 UNK - 8" 0 0 1 1 2 0 2 31657 UNK - 8" 0 0 1 1 2 0 2 31665 UNK - 8" 0 0 1 1 2 0 2 31806 PVC - 8" 0 0 2 0 2 0 2 31878 PVC - 8" 0 0 2 0 2 0 2 31880 PVC - 8" 0 0 2 0 2 0 2 31882 PVC - 8" 0 0 2 0 2 0 2 25349 RCP - 42" 0 0 3 1 0 0 2 32624 PVC - 8" 0 0 2 0 2 0 2 90335 UNK - 8" 0 0 1 1 2 0 2 90336 PVC - 6" 0 0 2 0 2 0 2 90360 PVC - 8" 0 0 2 0 2 0 2 90361 PVC - 8" 0 0 2 0 2 0 2 10215 PVC - 8" 0 0 2 0 2 0 2 25351 RCP - 42" 0 0 3 1 0 0 2 31493 CCRF - 42" 0 0 3 1 0 0 2 4362 UNK - 8" 0 0 1 0 2 0 2 5070 UNK - 8" 0 0 1 0 2 0 2 5072 UNK - 8" 0 0 1 0 2 0 2 5284 VSGD - 8" 0 0 1 0 2 0 2 5286 VSGD - 8" 0 0 1 0 2 0 2 5298 UNK - 6" 0 0 1 0 2 0 2 5324 UNK - 6" 0 0 1 0 2 0 2 5337 UNK - 6" 0 0 1 0 2 0 2 5339 UNK - 6" 0 0 1 0 2 0 2 5402 UNK - 6" 0 0 1 0 2 0 2 5406 UNK - 6" 0 0 1 0 2 0 2 89 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 5408 UNK - 6" 0 0 1 0 2 0 2 5418 UNK - 8" 0 0 1 0 2 0 2 5420 UNK - 8" 0 0 1 0 2 0 2 5422 UNK - 6" 0 0 1 0 2 0 2 5425 UNK - 6" 0 0 1 0 2 0 2 5427 UNK - 6" 0 0 1 0 2 0 2 5429 UNK - 6" 0 0 1 0 2 0 2 5431 UNK - 6" 0 0 1 0 2 0 2 5434 UNK - 8" 0 0 1 0 2 0 2 5436 UNK - 6" 0 0 1 0 2 0 2 5456 UNK - 6" 0 0 1 0 2 0 2 5510 UNK - 6" 0 0 1 0 2 0 2 5511 UNK - 6" 0 0 1 0 2 0 2 5529 UNK - 8" 0 0 1 0 2 0 2 5598 UNK - 8" 0 0 1 0 2 0 2 5600 UNK - 8" 0 0 1 0 2 0 2 5603 UNK - 6" 0 0 1 0 2 0 2 5605 UNK - 6" 0 0 1 0 2 0 2 5608 UNK - 8" 0 0 1 0 2 0 2 5879 UNK - 6" 0 0 1 0 2 0 2 5881 UNK - 6" 0 0 1 0 2 0 2 6338 UNK - 8" 0 0 1 0 2 0 2 6340 UNK - 8" 0 0 1 0 2 0 2 6352 UNK - 8" 0 0 1 0 2 0 2 6353 UNK - 8" 0 0 1 0 2 0 2 6511 UNK - 8" 0 0 1 0 2 0 2 6513 UNK - 6" 0 0 1 0 2 0 2 6530 VSGD - 8" 0 0 1 0 2 0 2 90 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 6541 VSGD - 8" 0 0 1 0 2 0 2 6543 UNK - 8" 0 0 1 0 2 0 2 6583 UNK - 8" 0 0 1 0 2 0 2 6592 UNK - 6" 0 0 1 0 2 0 2 6593 UNK - 6" 0 0 1 0 2 0 2 6737 UNK - 8" 0 0 1 0 2 0 2 6738 UNK - 8" 0 0 1 0 2 0 2 6741 UNK - 6" 0 0 1 0 2 0 2 6742 UNK - 6" 0 0 1 0 2 0 2 6747 UNK - 6" 0 0 1 0 2 0 2 6755 UNK - 6" 0 0 1 0 2 0 2 6778 UNK - 8" 0 0 1 0 2 0 2 6809 UNK - 8" 0 0 1 0 2 0 2 6810 UNK - 8" 0 0 1 0 2 0 2 6837 UNK - 8" 0 0 1 0 2 0 2 6838 UNK - 8" 0 0 1 0 2 0 2 6911 UNK - 8" 0 0 1 0 2 0 2 6983 UNK - 8" 0 0 1 0 2 0 2 7058 UNK - 8" 0 0 1 0 2 0 2 7679 UNK - 8" 0 0 1 0 2 0 2 7762 UNK - 8" 0 0 1 0 2 0 2 7764 UNK - 8" 0 0 1 0 2 0 2 7769 UNK - 8" 0 0 1 0 2 0 2 7773 UNK - 15" 0 0 1 2 0 0 2 7925 UNK - 8" 0 0 1 0 2 0 2 7926 UNK - 8" 0 0 1 0 2 0 2 7981 UNK - 8" 0 0 1 0 2 0 2 8012 UNK - 8" 0 0 1 0 2 0 2 91 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 8251 UNK - 8" 0 0 1 0 2 0 2 8253 UNK - 8" 0 0 1 0 2 0 2 8254 UNK - 8" 0 0 1 0 2 0 2 8336 UNK - 8" 0 0 1 0 2 0 2 8410 UNK - 8" 0 0 1 0 2 0 2 8412 UNK - 8" 0 0 1 0 2 0 2 8413 UNK - 8" 0 0 1 0 2 0 2 8530 UNK - 8" 0 0 1 0 2 0 2 9279 PVC - 12" 0 0 2 1 0 0 2 9300 PVC - 12" 0 0 2 1 0 0 2 9356 PVC - 12" 0 0 2 1 0 0 2 9357 PVC - 12" 0 0 2 1 0 0 2 9411 UNK - 8" 0 0 1 0 2 0 2 9413 UNK - 8" 0 0 1 0 2 0 2 9420 UNK - 15" 0 0 1 2 0 0 2 9444 UNK - 6" 0 0 1 0 2 0 2 9447 UNK - 8" 0 0 1 0 2 0 2 9449 UNK - 8" 0 0 1 0 2 0 2 9499 PVC - 12" 0 0 2 1 0 0 2 9501 PVC - 12" 0 0 2 1 0 0 2 9502 PVC - 12" 0 0 2 1 0 0 2 9504 PVC - 12" 0 0 2 1 0 0 2 9506 PVC - 12" 0 0 2 1 0 0 2 9585 PVC - 12" 0 0 2 1 0 0 2 9586 PVC - 12" 0 0 2 1 0 0 2 9618 PCP - 8" 0 0 1 0 2 0 2 9626 UNK - 8" 0 0 1 0 2 0 2 9677 UNK - 0" 0 0 1 0 2 0 2 92 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 9689 UNK - 6" 0 0 1 0 2 0 2 9700 UNK - 6" 0 0 1 0 2 0 2 9705 PCP - 6" 0 0 1 0 2 0 2 9716 UNK - 6" 0 0 1 0 2 0 2 9718 UNK - 6" 0 0 1 0 2 0 2 9742 UNK - 0" 0 0 1 0 2 0 2 9765 UNK - 6" 0 0 1 0 2 0 2 9766 UNK - 6" 0 0 1 0 2 0 2 9778 UNK - 6" 0 0 1 0 2 0 2 9782 UNK - 6" 0 0 1 0 2 0 2 9783 UNK - 6" 0 0 1 0 2 0 2 9802 UNK - 6" 0 0 1 0 2 0 2 9807 UNK - 6" 0 0 1 0 2 0 2 9812 UNK - 6" 0 0 1 0 2 0 2 9815 UNK - 6" 0 0 1 0 2 0 2 9817 UNK - 8" 0 0 1 0 2 0 2 9820 UNK - 6" 0 0 1 0 2 0 2 9832 UNK - 6" 0 0 1 0 2 0 2 9833 UNK - 6" 0 0 1 0 2 0 2 90367 UNK - 0" 0 0 1 0 2 0 2 9870 VSGD - 6" 0 0 1 0 2 0 2 9874 UNK - 6" 0 0 1 0 2 0 2 9883 PCP - 6" 0 0 1 0 2 0 2 9884 UNK - 6" 0 0 1 0 2 0 2 9891 VSGD - 6" 0 0 1 0 2 0 2 9893 UNK - 6" 0 0 1 0 2 0 2 9929 VSGD - 6" 0 0 1 0 2 0 2 9977 UNK - 6" 0 0 1 0 2 0 2 93 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 9978 UNK - 6" 0 0 1 0 2 0 2 9981 UNK - 6" 0 0 1 0 2 0 2 9982 UNK - 6" 0 0 1 0 2 0 2 9984 UNK - 8" 0 0 1 0 2 0 2 9986 UNK - 8" 0 0 1 0 2 0 2 9988 UNK - 8" 0 0 1 0 2 0 2 9990 UNK - 8" 0 0 1 0 2 0 2 9992 UNK - 8" 0 0 1 0 2 0 2 9994 UNK - 8" 0 0 1 0 2 0 2 9995 UNK - 0" 0 0 1 0 2 0 2 9997 UNK - 0" 0 0 1 0 2 0 2 10020 UNK - 6" 0 0 1 0 2 0 2 10029 UNK - 6" 0 0 1 0 2 0 2 10041 VSGD - 10" 0 0 1 2 0 0 2 10044 UNK - 6" 0 0 1 0 2 0 2 10047 VSGD - 10" 0 0 1 2 0 0 2 10049 UNK - 6" 0 0 1 0 2 0 2 10055 VSGD - 10" 0 0 1 2 0 0 2 10059 VSGD - 10" 0 0 1 2 0 0 2 10061 VSGD - 10" 0 0 1 2 0 0 2 10063 VSGD - 10" 0 0 1 2 0 0 2 10065 VSGD - 10" 0 0 1 2 0 0 2 10072 FCP - 8" 0 0 1 0 2 0 2 10079 UNK - 6" 0 0 1 0 2 0 2 10080 UNK - 6" 0 0 1 0 2 0 2 10083 UNK - 8" 0 0 1 0 2 0 2 10085 UNK - 8" 0 0 1 0 2 0 2 10087 UNK - 8" 0 0 1 0 2 0 2 94 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 10120 UNK - 8" 0 0 1 0 2 0 2 10122 UNK - 8" 0 0 1 0 2 0 2 10125 UNK - 6" 0 0 1 0 2 0 2 10161 UNK - 8" 0 0 1 0 2 0 2 10162 UNK - 0" 0 0 1 0 2 0 2 10200 UNK - 6" 0 0 1 0 2 0 2 10229 VSGD - 8" 0 0 1 0 2 0 2 10230 VSGD - 8" 0 0 1 0 2 0 2 10261 VSGD - 6" 0 0 1 0 2 0 2 10297 UNK - 8" 0 0 1 0 2 0 2 10312 FCP - 8" 0 0 1 0 2 0 2 10314 FCP - 8" 0 0 1 0 2 0 2 10316 FCP - 8" 0 0 1 0 2 0 2 10317 FCP - 8" 0 0 1 0 2 0 2 10325 FCP - 6" 0 0 1 0 2 0 2 10328 UNK - 8" 0 0 1 0 2 0 2 10330 UNK - 8" 0 0 1 0 2 0 2 10331 UNK - 8" 0 0 1 0 2 0 2 10407 FCP - 6" 0 0 1 0 2 0 2 10409 FCP - 6" 0 0 1 0 2 0 2 10412 UNK - 6" 0 0 1 0 2 0 2 10413 UNK - 6" 0 0 1 0 2 0 2 10430 UNK - 6" 0 0 1 0 2 0 2 10433 UNK - 6" 0 0 1 0 2 0 2 10437 FCP - 6" 0 0 1 0 2 0 2 10439 FCP - 6" 0 0 1 0 2 0 2 10441 FCP - 6" 0 0 1 0 2 0 2 10442 FCP - 6" 0 0 1 0 2 0 2 95 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 10488 VSGD - 10" 0 0 1 2 0 0 2 4101 RCP - 15" 0 0 3 0 0 0 2 4103 RCP - 15" 0 0 3 0 0 0 2 10520 UNK - 8" 0 0 1 0 2 0 2 10575 UNK - 8" 0 0 1 0 2 0 2 10588 UNK - 8" 0 0 1 0 2 0 2 10598 UNK - 8" 0 0 1 0 2 0 2 10599 UNK - 8" 0 0 1 0 2 0 2 10838 UNK - 0" 0 0 1 0 2 0 2 10853 UNK - 0" 0 0 1 0 2 0 2 10877 UNK - 0" 0 0 1 0 2 0 2 11128 FCP - 6" 0 0 1 0 2 0 2 11129 FCP - 6" 0 0 1 0 2 0 2 15223 PVC - 18" 0 0 2 1 0 0 2 10002 RCP - 18" 0 0 3 0 0 0 2 15687 UNK - 8" 0 0 1 0 2 0 2 15688 UNK - 8" 0 0 1 0 2 0 2 17332 UNK - 6" 0 0 1 0 2 0 2 10004 RCP - 18" 0 0 3 0 0 0 2 10005 RCP - 18" 0 0 3 0 0 0 2 10074 RCP - 18" 0 0 3 0 0 0 2 10076 RCP - 18" 0 0 3 0 0 0 2 10116 RCP - 18" 0 0 3 0 0 0 2 10302 RCP - 15" 0 0 3 0 0 0 2 10321 RCP - 18" 0 0 3 0 0 0 2 10322 RCP - 18" 0 0 3 0 0 0 2 10444 RCP - 15" 0 0 3 0 0 0 2 10446 RCP - 15" 0 0 3 0 0 0 2 96 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 10509 RCP - 15" 0 0 3 0 0 0 2 10511 RCP - 15" 0 0 3 0 0 0 2 10514 RCP - 15" 0 0 3 0 0 0 2 10515 RCP - 15" 0 0 3 0 0 0 2 20356 UNK - 8" 0 0 1 0 2 0 2 20587 UNK - 8" 0 0 1 0 2 0 2 21334 UNK - 8" 0 0 1 0 2 0 2 22939 HDPE - 2" 0 0 1 0 2 0 2 10517 RCP - 15" 0 0 3 0 0 0 2 10592 RCP - 15" 0 0 3 0 0 0 2 23476 UNK - 8" 0 0 1 0 2 0 2 10593 RCP - 15" 0 0 3 0 0 0 2 10595 RCP - 15" 0 0 3 0 0 0 2 23646 UNK - 0" 0 0 1 0 2 0 2 24076 VSGD - 8" 0 0 1 0 2 0 2 23990 UNK - 6" 0 0 1 0 2 0 2 23991 UNK - 6" 0 0 1 0 2 0 2 10716 RCP - 15" 0 0 3 0 0 0 2 24022 VSGD - 6" 0 0 1 0 2 0 2 24023 VSGD - 6" 0 0 1 0 2 0 2 24026 VSGD - 6" 0 0 1 0 2 0 2 24027 VSGD - 8" 0 0 1 0 2 0 2 24030 VSGD - 6" 0 0 1 0 2 0 2 24032 VSGD - 6" 0 0 1 0 2 0 2 24034 VSGD - 6" 0 0 1 0 2 0 2 24035 VSGD - 8" 0 0 1 0 2 0 2 24038 VSGD - 6" 0 0 1 0 2 0 2 24044 UNK - 6" 0 0 1 0 2 0 2 97 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 24232 UNK - 8" 0 0 1 0 2 0 2 24234 UNK - 8" 0 0 1 0 2 0 2 24236 UNK - 8" 0 0 1 0 2 0 2 24238 UNK - 8" 0 0 1 0 2 0 2 24240 UNK - 8" 0 0 1 0 2 0 2 24242 UNK - 8" 0 0 1 0 2 0 2 24244 UNK - 8" 0 0 1 0 2 0 2 24246 UNK - 8" 0 0 1 0 2 0 2 24253 UNK - 8" 0 0 1 0 2 0 2 24294 UNK - 6" 0 0 1 0 2 0 2 24296 UNK - 6" 0 0 1 0 2 0 2 24304 VSGD - 8" 0 0 1 0 2 0 2 24365 UNK - 0" 0 0 1 0 2 0 2 24409 UNK - 6" 0 0 1 0 2 0 2 24417 UNK - 6" 0 0 1 0 2 0 2 24419 UNK - 6" 0 0 1 0 2 0 2 24421 UNK - 6" 0 0 1 0 2 0 2 24423 UNK - 6" 0 0 1 0 2 0 2 24431 UNK - 6" 0 0 1 0 2 0 2 24433 UNK - 6" 0 0 1 0 2 0 2 24435 UNK - 6" 0 0 1 0 2 0 2 24437 UNK - 6" 0 0 1 0 2 0 2 24439 UNK - 6" 0 0 1 0 2 0 2 24441 UNK - 6" 0 0 1 0 2 0 2 24443 UNK - 6" 0 0 1 0 2 0 2 24447 UNK - 10" 0 0 1 2 0 0 2 24481 UNK - 6" 0 0 1 0 2 0 2 24485 UNK - 0" 0 0 1 0 2 0 2 98 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 25333 VSGD - 8" 0 0 1 0 2 0 2 25335 VSGD - 8" 0 0 1 0 2 0 2 25337 VSGD - 6" 0 0 1 0 2 0 2 10718 RCP - 15" 0 0 3 0 0 0 2 10720 RCP - 15" 0 0 3 0 0 0 2 25393 HDPE - 8" 0 0 1 0 2 0 2 26001 UNK - 2" 0 0 1 0 2 0 2 26368 FCP - 6" 0 0 1 0 2 0 2 26370 FCP - 6" 0 0 1 0 2 0 2 26372 FCP - 6" 0 0 1 0 2 0 2 26374 UNK - 6" 0 0 1 0 2 0 2 26376 FCP - 6" 0 0 1 0 2 0 2 26378 FCP - 6" 0 0 1 0 2 0 2 26380 FCP - 6" 0 0 1 0 2 0 2 26465 UNK - 0" 0 0 1 0 2 0 2 10722 RCP - 15" 0 0 3 0 0 0 2 10724 RCP - 15" 0 0 3 0 0 0 2 10725 RCP - 15" 0 0 3 0 0 0 2 20253 RCP - 42" 0 0 3 0 0 0 2 20255 RCP - 42" 0 0 3 0 0 0 2 20257 RCP - 42" 0 0 3 0 0 0 2 20259 RCP - 42" 0 0 3 0 0 0 2 20261 RCP - 42" 0 0 3 0 0 0 2 20263 RCP - 42" 0 0 3 0 0 0 2 20265 RCP - 42" 0 0 3 0 0 0 2 20266 RCP - 42" 0 0 3 0 0 0 2 28675 PVC - 10" 0 0 2 1 0 0 2 28676 PVC - 10" 0 0 2 1 0 0 2 99 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 28678 PVC - 10" 0 0 2 1 0 0 2 28679 PVC - 10" 0 0 2 1 0 0 2 27252 UNK - 0" 0 0 1 0 2 0 2 27256 UNK - 0" 0 0 1 0 2 0 2 31971 PVC - 21" 0 0 2 1 0 0 2 31972 PVC - 21" 0 0 2 1 0 0 2 31973 PVC - 21" 0 0 2 1 0 0 2 31974 PVC - 21" 0 0 2 1 0 0 2 31975 PVC - 21" 0 0 2 1 0 0 2 31976 PVC - 21" 0 0 2 1 0 0 2 31977 PVC - 21" 0 0 2 1 0 0 2 31978 PVC - 21" 0 0 2 1 0 0 2 31979 PVC - 21" 0 0 2 1 0 0 2 31984 PVC - 21" 0 0 2 1 0 0 2 31985 PVC - 15" 0 0 2 1 0 0 2 31986 PVC - 15" 0 0 2 1 0 0 2 31987 PVC - 15" 0 0 2 1 0 0 2 31988 PVC - 15" 0 0 2 1 0 0 2 31989 PVC - 15" 0 0 2 1 0 0 2 31990 PVC - 15" 0 0 2 1 0 0 2 31991 PVC - 15" 0 0 2 1 0 0 2 31997 PVC - 15" 0 0 2 1 0 0 2 31998 PVC - 15" 0 0 2 1 0 0 2 30839 UNK - 6" 0 0 1 0 2 0 2 31651 UNK - 8" 0 0 1 0 2 0 2 31800 UNK - 0" 0 0 1 0 2 0 2 31804 UNK - 0" 0 0 1 0 2 0 2 90372 UNK - 6" 0 0 1 0 2 0 2 100 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 90354 UNK - 8" 0 0 1 0 2 0 2 90373 UNK - 0" 0 0 1 0 2 0 2 90374 UNK - 6" 0 0 1 0 2 0 2 90375 UNK - 0" 0 0 1 0 2 0 2 90359 UNK - 4" 0 0 1 0 2 0 2 6425 UNK - 24" 0 0 1 1 0 0 1 6427 UNK - 24" 0 0 1 1 0 0 1 6429 UNK - 30" 0 0 1 1 0 0 1 6521 UNK - 24" 0 0 1 1 0 0 1 6533 VSGD - 18" 0 0 1 1 0 0 1 6535 VSGD - 18" 0 0 1 1 0 0 1 6545 VSGD - 18" 0 0 1 1 0 0 1 7775 UNK - 15" 0 0 1 1 0 0 1 7912 UNK - 12" 0 0 1 1 0 0 1 7918 UNK - 12" 0 0 1 1 0 0 1 8861 PVC - 12" 0 0 2 0 0 0 1 8863 PVC - 12" 0 0 2 0 0 0 1 8865 PVC - 12" 0 0 2 0 0 0 1 9280 PVC - 12" 0 0 2 0 0 0 1 9312 PVC - 12" 0 0 2 0 0 0 1 9314 PVC - 12" 0 0 2 0 0 0 1 9559 PVC - 12" 0 0 2 0 0 0 1 9610 HDPE - 20" 0 0 1 1 0 0 1 9612 HDPE - 20" 0 0 1 1 0 0 1 9614 HDPE - 20" 0 0 1 1 0 0 1 9620 HDPE - 20" 0 0 1 1 0 0 1 9630 VSGD - 24" 0 0 1 1 0 0 1 9661 VSGD - 24" 0 0 1 1 0 0 1 101 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 9729 VSGD - 24" 0 0 1 1 0 0 1 9731 VSGD - 24" 0 0 1 1 0 0 1 9799 VSGD - 24" 0 0 1 1 0 0 1 9877 VSGD - 24" 0 0 1 1 0 0 1 9878 VSGD - 24" 0 0 1 1 0 0 1 18899 PVC - 10" 0 0 2 0 0 0 1 18904 PVC - 10" 0 0 2 0 0 0 1 18905 PVC - 10" 0 0 2 0 0 0 1 19213 PVC - 10" 0 0 2 0 0 0 1 19324 PVC - 10" 0 0 2 0 0 0 1 19326 PVC - 10" 0 0 2 0 0 0 1 19327 PVC - 10" 0 0 2 0 0 0 1 19393 PVC - 10" 0 0 2 0 0 0 1 19626 PVC - 10" 0 0 2 0 0 0 1 20374 UNK - 18" 0 0 1 1 0 0 1 20375 UNK - 18" 0 0 1 1 0 0 1 23299 PVC - 10" 0 0 2 0 0 0 1 25384 VSGD - 12" 0 0 1 1 0 0 1 28671 PVC - 10" 0 0 2 0 0 0 1 28672 PVC - 10" 0 0 2 0 0 0 1 28673 PVC - 10" 0 0 2 0 0 0 1 28674 PVC - 10" 0 0 2 0 0 0 1 28677 PVC - 10" 0 0 2 0 0 0 1 31980 PVC - 21" 0 0 2 0 0 0 1 31981 PVC - 21" 0 0 2 0 0 0 1 31982 PVC - 21" 0 0 2 0 0 0 1 31983 PVC - 21" 0 0 2 0 0 0 1 31992 PVC - 15" 0 0 2 0 0 0 1 102 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 31993 PVC - 15" 0 0 2 0 0 0 1 31994 PVC - 15" 0 0 2 0 0 0 1 31995 PVC - 15" 0 0 2 0 0 0 1 31996 PVC - 15" 0 0 2 0 0 0 1 28680 PVC - 10" 0 0 2 0 0 0 1 20 UNK - 15" 0 0 1 1 0 0 1 5953 UNK - 10" 0 0 1 0 0 0 1 5957 UNK - 10" 0 0 1 0 0 0 1 5959 UNK - 10" 0 0 1 0 0 0 1 5961 UNK - 10" 0 0 1 0 0 0 1 6003 UNK - 10" 0 0 1 0 0 0 1 6005 UNK - 10" 0 0 1 0 0 0 1 6387 UNK - 12" 0 0 1 0 0 0 1 6389 UNK - 18" 0 0 1 0 0 0 1 6391 UNK - 18" 0 0 1 0 0 0 1 6395 UNK - 18" 0 0 1 0 0 0 1 6396 UNK - 18" 0 0 1 0 0 0 1 6438 UNK - 20" 0 0 1 0 0 0 1 6441 UNK - 20" 0 0 1 0 0 0 1 6444 UNK - 10" 0 0 1 0 0 0 1 6536 UNK - 18" 0 0 1 0 0 0 1 6549 VSGD - 18" 0 0 1 0 0 0 1 6571 VSGD - 15" 0 0 1 0 0 0 1 6573 VSGD - 15" 0 0 1 0 0 0 1 6574 VSGD - 15" 0 0 1 0 0 0 1 6578 UNK - 10" 0 0 1 0 0 0 1 6580 UNK - 10" 0 0 1 0 0 0 1 7836 UNK - 15" 0 0 1 0 0 0 1 103 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 7838 UNK - 15" 0 0 1 0 0 0 1 7840 UNK - 15" 0 0 1 0 0 0 1 7842 UNK - 15" 0 0 1 0 0 0 1 7844 UNK - 15" 0 0 1 0 0 0 1 7846 UNK - 15" 0 0 1 0 0 0 1 7848 UNK - 15" 0 0 1 0 0 0 1 9606 HDPE - 20" 0 0 1 0 0 0 1 9698 UNK - 10" 0 0 1 0 0 0 1 9886 VSGD - 24" 0 0 1 0 0 0 1 9887 UNK - 24" 0 0 1 0 0 0 1 10038 VSGD - 10" 0 0 1 0 0 0 1 10039 UNK - 10" 0 0 1 0 0 0 1 10483 VSGD - 10" 0 0 1 0 0 0 1 10485 VSGD - 10" 0 0 1 0 0 0 1 10487 VSGD - 10" 0 0 1 0 0 0 1 10572 VSGD - 10" 0 0 1 0 0 0 1 10574 VSGD - 10" 0 0 1 0 0 0 1 15252 VSGD - 15" 0 0 1 0 0 0 1 18914 UNK - 10" 0 0 1 0 0 0 1 18916 UNK - 10" 0 0 1 0 0 0 1 18918 UNK - 10" 0 0 1 0 0 0 1 18920 UNK - 10" 0 0 1 0 0 0 1 18922 UNK - 10" 0 0 1 0 0 0 1 18923 UNK - 10" 0 0 1 0 0 0 1 19016 UNK - 10" 0 0 1 0 0 0 1 19506 UNK - 10" 0 0 1 0 0 0 1 19508 UNK - 10" 0 0 1 0 0 0 1 19510 UNK - 10" 0 0 1 0 0 0 1 104 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 19512 UNK - 10" 0 0 1 0 0 0 1 19514 UNK - 10" 0 0 1 0 0 0 1 19516 UNK - 10" 0 0 1 0 0 0 1 19518 UNK - 10" 0 0 1 0 0 0 1 19520 UNK - 10" 0 0 1 0 0 0 1 19521 UNK - 10" 0 0 1 0 0 0 1 19638 UNK - 10" 0 0 1 0 0 0 1 20308 HDPE - 20" 0 0 1 0 0 0 1 23578 UNK - 12" 0 0 1 0 0 0 1 24017 VSGD - 10" 0 0 1 0 0 0 1 24248 UNK - 15" 0 0 1 0 0 0 1 24250 UNK - 15" 0 0 1 0 0 0 1 24355 UNK - 10" 0 0 1 0 0 0 1 24357 UNK - 10" 0 0 1 0 0 0 1 24359 UNK - 10" 0 0 1 0 0 0 1 24361 UNK - 10" 0 0 1 0 0 0 1 24363 UNK - 10" 0 0 1 0 0 0 1 24367 UNK - 10" 0 0 1 0 0 0 1 24369 UNK - 10" 0 0 1 0 0 0 1 24371 UNK - 10" 0 0 1 0 0 0 1 24449 VSGD - 24" 0 0 1 0 0 0 1 25682 UNK - 10" 0 0 1 0 0 0 1 25684 UNK - 10" 0 0 1 0 0 0 1 105 Risk Assessment Report: Horizontal Assets Table D-2: Kulaimano Basin Pipe Segments Points Assigned for Factors Prioritization Type - Inside the 1 - 10 Asset ID Inside the Depth of Date of Diameter Normalized Buffer Pipe Type Diameter Buffer Bury Install by Basin Concrete 1536 PVC - 6" 0 0 2 2 2 5 10 175 UNK - 6" 0 0 1 2 2 5 9 298 UNK - 6" 0 0 1 2 2 5 9 325 UNK - 6" 0 0 1 2 2 5 9 812 UNK - 6" 0 0 1 2 2 5 9 814 UNK - 8" 0 0 1 2 2 5 9 822 UNK - 6" 0 0 1 2 2 5 9 1018 UNK - 6" 0 0 1 2 2 5 9 1065 UNK - 6" 0 0 1 2 2 5 9 1067 UNK - 6" 0 0 1 2 2 5 9 1534 UNK - 6" 0 0 1 2 2 5 9 1538 PVC - 6" 0 0 2 1 2 5 9 1540 PVC - 6" 0 0 2 1 2 5 9 1635 UNK - 6" 0 0 1 2 2 5 9 1636 UNK - 6" 0 0 1 2 2 5 9 25489 UNK - 8" 0 0 1 2 2 5 9 25577 UNK - 6" 0 0 1 2 2 5 9 25616 UNK - 6" 0 0 1 2 2 5 9 25618 UNK - 8" 0 0 1 2 2 5 9 26015 PVC - 8" 0 0 2 1 2 5 9 69 CIP - 12" 0 0 4 0 0 5 8 269 UNK - 8" 0 0 1 1 2 5 8 271 UNK - 6" 0 0 1 1 2 5 8 355 UNK - 6" 0 0 1 1 2 5 8 388 UNK - 8" 0 0 1 1 2 5 8 570 UNK - 6" 0 0 1 1 2 5 8 572 UNK - 6" 0 0 1 1 2 5 8 106 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization Type - 1 - 10 Inside the Asset ID Inside the Depth of Date of Diameter Normalized Buffer Pipe Type Diameter Buffer Bury Install by Basin Concrete 573 UNK - 6" 0 0 1 1 2 5 8 666 UNK - 8" 0 0 1 1 2 5 8 668 UNK - 8" 0 0 1 1 2 5 8 670 UNK - 8" 0 0 1 1 2 5 8 672 UNK - 8" 0 0 1 1 2 5 8 739 PVC - 6" 0 0 2 0 2 5 8 741 PVC - 6" 0 0 2 0 2 5 8 787 UNK - 6" 0 0 1 1 2 5 8 789 UNK - 6" 0 0 1 1 2 5 8 801 UNK - 6" 0 0 1 1 2 5 8 803 UNK - 6" 0 0 1 1 2 5 8 805 UNK - 6" 0 0 1 1 2 5 8 1153 UNK - 6" 0 0 1 1 2 5 8 1154 UNK - 6" 0 0 1 1 2 5 8 1157 UNK - 6" 0 0 1 1 2 5 8 1159 UNK - 6" 0 0 1 1 2 5 8 1161 UNK - 6" 0 0 1 1 2 5 8 1253 UNK - 6" 0 0 1 1 2 5 8 1265 UNK - 6" 0 0 1 1 2 5 8 1274 UNK - 6" 0 0 1 1 2 5 8 1410 UNK - 8" 0 0 1 1 2 5 8 1415 PVC - 8" 0 0 2 0 2 5 8 1423 PVC - 8" 0 0 2 0 2 5 8 1430 UNK - 8" 0 0 1 1 2 5 8 1431 UNK - 8" 0 0 1 1 2 5 8 1530 UNK - 6" 0 0 1 1 2 5 8 1651 DIP - 10" 0 0 4 0 0 5 8 25529 UNK - 6" 0 0 1 1 2 5 8 107 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization Type - 1 - 10 Inside the Asset ID Inside the Depth of Date of Diameter Normalized Buffer Pipe Type Diameter Buffer Bury Install by Basin Concrete 25538 PVC - 6" 0 0 2 0 2 5 8 25542 UNK - 8" 0 0 1 1 2 5 8 25598 DIP - 10" 0 0 4 0 0 5 8 22 UNK - 6" 0 0 1 0 2 5 7 24 UNK - 6" 0 0 1 0 2 5 7 26 UNK - 8" 0 0 1 0 2 5 7 132 UNK - 6" 0 0 1 0 2 5 7 134 UNK - 6" 0 0 1 0 2 5 7 136 UNK - 6" 0 0 1 0 2 5 7 137 UNK - 6" 0 0 1 0 2 5 7 176 UNK - 6" 0 0 1 0 2 5 7 219 UNK - 6" 0 0 1 0 2 5 7 296 UNK - 10" 0 0 1 2 0 5 7 327 UNK - 10" 0 0 1 2 0 5 7 328 UNK - 10" 0 0 1 2 0 5 7 392 UNK - 6" 0 0 1 0 2 5 7 394 UNK - 6" 0 0 1 0 2 5 7 396 UNK - 6" 0 0 1 0 2 5 7 398 UNK - 6" 0 0 1 0 2 5 7 404 UNK - 6" 0 0 1 0 2 5 7 406 UNK - 6" 0 0 1 0 2 5 7 408 UNK - 6" 0 0 1 0 2 5 7 497 UNK - 6" 0 0 1 0 2 5 7 499 UNK - 6" 0 0 1 0 2 5 7 501 UNK - 6" 0 0 1 0 2 5 7 503 UNK - 6" 0 0 1 0 2 5 7 737 UNK - 6" 0 0 1 0 2 5 7 743 UNK - 6" 0 0 1 0 2 5 7 108 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization Type - 1 - 10 Inside the Asset ID Inside the Depth of Date of Diameter Normalized Buffer Pipe Type Diameter Buffer Bury Install by Basin Concrete 744 UNK - 8" 0 0 1 0 2 5 7 779 UNK - 6" 0 0 1 0 2 5 7 791 UNK - 6" 0 0 1 0 2 5 7 793 UNK - 6" 0 0 1 0 2 5 7 796 UNK - 6" 0 0 1 0 2 5 7 799 UNK - 6" 0 0 1 0 2 5 7 806 UNK - 6" 0 0 1 0 2 5 7 808 UNK - 6" 0 0 1 0 2 5 7 810 UNK - 6" 0 0 1 0 2 5 7 815 UNK - 6" 0 0 1 0 2 5 7 1003 UNK - 6" 0 0 1 0 2 5 7 1005 UNK - 6" 0 0 1 0 2 5 7 1007 UNK - 6" 0 0 1 0 2 5 7 1014 UNK - 6" 0 0 1 0 2 5 7 1016 UNK - 6" 0 0 1 0 2 5 7 1061 UNK - 6" 0 0 1 0 2 5 7 1063 UNK - 6" 0 0 1 0 2 5 7 1069 UNK - 6" 0 0 1 0 2 5 7 1163 UNK - 6" 0 0 1 0 2 5 7 1165 UNK - 6" 0 0 1 0 2 5 7 1256 UNK - 6" 0 0 1 0 2 5 7 1257 UNK - 6" 0 0 1 0 2 5 7 1259 UNK - 6" 0 0 1 0 2 5 7 1261 UNK - 6" 0 0 1 0 2 5 7 1263 UNK - 6" 0 0 1 0 2 5 7 1267 UNK - 6" 0 0 1 0 2 5 7 1269 UNK - 6" 0 0 1 0 2 5 7 1273 UNK - 6" 0 0 1 0 2 5 7 109 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization Type - 1 - 10 Inside the Asset ID Inside the Depth of Date of Diameter Normalized Buffer Pipe Type Diameter Buffer Bury Install by Basin Concrete 1532 UNK - 6" 0 0 1 0 2 5 7 1544 UNK - 8" 0 0 1 0 2 5 7 1546 UNK - 6" 0 0 1 0 2 5 7 1548 UNK - 6" 0 0 1 0 2 5 7 1684 UNK - 12" 0 0 1 2 0 5 7 15096 UNK - 6" 0 0 1 0 2 5 7 20035 UNK - 12" 0 0 1 2 0 5 7 20441 UNK - 12" 0 0 1 2 0 5 7 20442 UNK - 12" 0 0 1 2 0 5 7 20444 UNK - 12" 0 0 1 2 0 5 7 20452 UNK - 12" 0 0 1 2 0 5 7 25487 UNK - 8" 0 0 1 0 2 5 7 25495 UNK - 6" 0 0 1 0 2 5 7 25497 UNK - 6" 0 0 1 0 2 5 7 25531 UNK - 6" 0 0 1 0 2 5 7 25533 UNK - 6" 0 0 1 0 2 5 7 25544 UNK - 6" 0 0 1 0 2 5 7 25546 UNK - 6" 0 0 1 0 2 5 7 25548 UNK - 6" 0 0 1 0 2 5 7 25550 UNK - 6" 0 0 1 0 2 5 7 25602 UNK - 8" 0 0 1 0 2 5 7 25604 UNK - 6" 0 0 1 0 2 5 7 25609 UNK - 8" 0 0 1 0 2 5 7 25610 UNK - 6" 0 0 1 0 2 5 7 28 UNK - 12" 0 0 1 1 0 5 6 30 UNK - 12" 0 0 1 1 0 5 6 32 UNK - 12" 0 0 1 1 0 5 6 353 UNK - 10" 0 0 1 1 0 5 6 110 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization Type - 1 - 10 Inside the Asset ID Inside the Depth of Date of Diameter Normalized Buffer Pipe Type Diameter Buffer Bury Install by Basin Concrete 472 PVC - 12" 0 0 2 0 0 5 6 1507 UNK - 10" 0 0 1 1 0 5 6 20451 UNK - 12" 0 0 1 1 0 5 6 29455 UNK - 10" 0 0 1 1 0 5 6 20450 UNK - 12" 0 0 1 1 0 5 6 39 UNK - 12" 0 0 1 0 0 5 5 50 UNK - 12" 0 0 1 0 0 5 5 54 UNK - 10" 0 0 1 0 0 5 5 56 UNK - 10" 0 0 1 0 0 5 5 62 UNK - 10" 0 0 1 0 0 5 5 64 UNK - 10" 0 0 1 0 0 5 5 65 UNK - 10" 0 0 1 0 0 5 5 237 UNK - 10" 0 0 1 0 0 5 5 471 UNK - 12" 0 0 1 0 0 5 5 1550 UNK - 10" 0 0 1 0 0 5 5 1551 UNK - 10" 0 0 1 0 0 5 5 1652 UNK - 12" 0 0 1 0 0 5 5 17450 UNK - 10" 0 0 1 0 0 5 5 20433 UNK - 14" 0 0 1 0 0 5 5 20434 UNK - 14" 0 0 1 0 0 5 5 20435 UNK - 12" 0 0 1 0 0 5 5 20436 UNK - 12" 0 0 1 0 0 5 5 20437 UNK - 12" 0 0 1 0 0 5 5 20438 UNK - 12" 0 0 1 0 0 5 5 20439 UNK - 12" 0 0 1 0 0 5 5 20443 UNK - 12" 0 0 1 0 0 5 5 25594 UNK - 12" 0 0 1 0 0 5 5 20446 UNK - 12" 0 0 1 0 0 5 5 111 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization Type - 1 - 10 Inside the Asset ID Inside the Depth of Date of Diameter Normalized Buffer Pipe Type Diameter Buffer Bury Install by Basin Concrete 20447 UNK - 12" 0 0 1 0 0 5 5 20448 UNK - 12" 0 0 1 0 0 5 5 1428 PVC - 8" 0 0 2 1 2 0 5 1417 PVC - 8" 0 0 2 0 2 0 4 1419 PVC - 8" 0 0 2 0 2 0 4 1421 PVC - 8" 0 0 2 0 2 0 4 1426 PVC - 8" 0 0 2 0 2 0 4 29457 PVC - 8" 0 0 2 0 2 0 4 29459 PVC - 8" 0 0 2 0 2 0 4 29461 PVC - 8" 0 0 2 0 2 0 4 29463 PVC - 8" 0 0 2 0 2 0 4 29465 PVC - 8" 0 0 2 0 2 0 4 25596 UNK - 0" 0 0 1 0 2 0 3 1647 UNK - 12" 0 0 1 0 0 0 1 1649 UNK - 12" 0 0 1 0 0 0 1 25600 UNK - 12" 0 0 1 0 0 0 1 112 Risk Assessment Report: Horizontal Assets Table D-3: Papaikou-Paukaa Basin Pipe Segments Points Assigned for Factors Prioritization Type - Inside the 1 - 10 Asset ID Inside the Depth of Date of Diameter Normalized Buffer Pipe Type Diameter Buffer Bury Install by Basin Concrete 3289 VCP - 6" 0 0 5 2 2 5 10 3297 VCP - 6" 0 0 5 2 2 5 10 3331 VCP - 6" 0 0 5 2 2 5 10 3333 VCP - 6" 0 0 5 2 2 5 10 3367 VCP - 6" 0 0 5 2 2 5 10 25633 VCP - 6" 0 0 5 2 2 5 10 3371 VCP - 6" 0 0 5 0 2 5 9 25629 VCP - 6" 0 0 5 0 2 5 9 3338 VCP - 6" 0 0 5 2 2 0 6 3340 VCP - 6" 0 0 5 2 2 0 6 3293 CIP - 6" 0 0 4 2 2 0 6 3295 CIP - 6" 0 0 4 2 2 0 6 3328 CIP - 6" 0 0 4 2 2 0 6 3334 CIP - 6" 0 0 4 2 2 0 6 3336 CIP - 6" 0 0 4 2 2 0 6 15187 VCP - 8" 0 0 5 1 2 0 6 25433 VCP - 8" 0 0 5 1 2 0 6 1784 VCP - 12" 0 0 5 2 0 0 5 3376 PVC - 8" 0 0 2 2 2 0 4 15186 PVC - 8" 0 0 2 2 2 0 4 25435 DIP - 12" 0 0 4 2 0 0 4 25650 DIP - 10" 0 0 4 2 0 0 4 3444851 CIP - 0" 0 0 4 0 2 0 4 4084933 CIP - 0" 0 0 4 0 2 0 4 1878 UNK - 6" 0 0 1 2 2 0 4 2018 UNK - 6" 0 0 1 2 2 0 4 2020 UNK - 6" 0 0 1 2 2 0 4 113 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization Type - 1 - 10 Inside the Asset ID Inside the Depth of Date of Diameter Normalized Buffer Pipe Type Diameter Buffer Bury Install by Basin Concrete 2031 UNK - 8" 0 0 1 2 2 0 4 2032 UNK - 8" 0 0 1 2 2 0 4 2232 UNK - 8" 0 0 1 2 2 0 4 2234 UNK - 8" 0 0 1 2 2 0 4 2274 UNK - 6" 0 0 1 2 2 0 4 2275 UNK - 8" 0 0 1 2 2 0 4 2287 UNK - 8" 0 0 1 2 2 0 4 2290 UNK - 6" 0 0 1 2 2 0 4 2292 UNK - 6" 0 0 1 2 2 0 4 2666 UNK - 8" 0 0 1 2 2 0 4 2668 UNK - 6" 0 0 1 2 2 0 4 2670 UNK - 8" 0 0 1 2 2 0 4 2710 PVC - 8" 0 0 2 1 2 0 4 2857 DIP - 12" 0 0 4 1 0 0 4 2878 UNK - 8" 0 0 1 2 2 0 4 2880 UNK - 8" 0 0 1 2 2 0 4 3129 UNK - 8" 0 0 1 2 2 0 4 3218 UNK - 6" 0 0 1 2 2 0 4 3372 PVC - 8" 0 0 2 1 2 0 4 3382 UNK - 8" 0 0 1 2 2 0 4 3384 UNK - 8" 0 0 1 2 2 0 4 3394 UNK - 6" 0 0 1 2 2 0 4 3399 UNK - 6" 0 0 1 2 2 0 4 3401 UNK - 6" 0 0 1 2 2 0 4 3402 UNK - 6" 0 0 1 2 2 0 4 3506 UNK - 8" 0 0 1 2 2 0 4 3525 UNK - 8" 0 0 1 2 2 0 4 22923 PVC - 8" 0 0 2 1 2 0 4 114 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization Type - 1 - 10 Inside the Asset ID Inside the Depth of Date of Diameter Normalized Buffer Pipe Type Diameter Buffer Bury Install by Basin Concrete 25399 UNK - 8" 0 0 1 2 2 0 4 25431 PVC - 8" 0 0 2 1 2 0 4 25437 UNK - 0" 0 0 1 2 2 0 4 25638 UNK - 6" 0 0 1 2 2 0 4 31069 UNK - 8" 0 0 1 2 2 0 4 90376 RCP - 0" 0 0 3 0 2 0 4 90377 RCP - 0" 0 0 3 0 2 0 4 1741 UNK - 6" 0 0 1 1 2 0 3 1743 UNK - 6" 0 0 1 1 2 0 3 1749 UNK - 6" 0 0 1 1 2 0 3 1751 UNK - 6" 0 0 1 1 2 0 3 1752 UNK - 8" 0 0 1 1 2 0 3 1766 UNK - 8" 0 0 1 1 2 0 3 1779 PVC - 12" 0 0 2 1 0 0 2 1781 PVC - 12" 0 0 2 1 0 0 2 1783 PVC - 12" 0 0 2 2 0 0 3 1787 UNK - 6" 0 0 1 0 2 0 2 1788 UNK - 6" 0 0 1 1 2 0 3 1792 UNK - 6" 0 0 1 1 2 0 3 1885 UNK - 6" 0 0 1 1 2 0 3 1886 UNK - 6" 0 0 1 1 2 0 3 1892 DIP - 12" 0 0 4 0 0 0 3 1894 DIP - 12" 0 0 4 0 0 0 3 1896 DIP - 12" 0 0 4 0 0 0 3 1938 UNK - 6" 0 0 1 1 2 0 3 1971 UNK - 8" 0 0 1 0 2 0 2 1973 UNK - 8" 0 0 1 0 2 0 2 1974 UNK - 8" 0 0 1 1 2 0 3 115 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization Type - 1 - 10 Inside the Asset ID Inside the Depth of Date of Diameter Normalized Buffer Pipe Type Diameter Buffer Bury Install by Basin Concrete 1976 UNK - 6" 0 0 1 0 2 0 2 1978 UNK - 6" 0 0 1 1 2 0 3 1980 UNK - 6" 0 0 1 1 2 0 3 1982 UNK - 6" 0 0 1 1 2 0 3 2007 UNK - 8" 0 0 1 0 2 0 2 2009 UNK - 8" 0 0 1 1 2 0 3 2011 UNK - 8" 0 0 1 1 2 0 3 2013 UNK - 8" 0 0 1 0 2 0 2 2015 UNK - 8" 0 0 1 1 2 0 3 2021 UNK - 6" 0 0 1 0 2 0 2 2029 UNK - 8" 0 0 1 1 2 0 3 2100 UNK - 6" 0 0 1 0 2 0 2 2102 UNK - 6" 0 0 1 0 2 0 2 2104 UNK - 8" 0 0 1 0 2 0 2 2107 UNK - 6" 0 0 1 0 2 0 2 2109 UNK - 6" 0 0 1 0 2 0 2 2110 UNK - 8" 0 0 1 0 2 0 2 2113 UNK - 8" 0 0 1 1 2 0 3 2115 UNK - 8" 0 0 1 1 2 0 3 2117 UNK - 8" 0 0 1 0 2 0 2 2118 UNK - 8" 0 0 1 0 2 0 2 2121 UNK - 6" 0 0 1 0 2 0 2 2122 UNK - 8" 0 0 1 0 2 0 2 2236 UNK - 8" 0 0 1 1 2 0 3 2238 UNK - 8" 0 0 1 1 2 0 3 2240 UNK - 8" 0 0 1 0 2 0 2 2248 UNK - 8" 0 0 1 0 2 0 2 2250 UNK - 8" 0 0 1 0 2 0 2 116 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization Type - 1 - 10 Inside the Asset ID Inside the Depth of Date of Diameter Normalized Buffer Pipe Type Diameter Buffer Bury Install by Basin Concrete 2258 UNK - 6" 0 0 1 0 2 0 2 2260 UNK - 6" 0 0 1 0 2 0 2 2262 UNK - 6" 0 0 1 1 2 0 3 2263 UNK - 6" 0 0 1 1 2 0 3 2266 UNK - 6" 0 0 1 0 2 0 2 2268 UNK - 6" 0 0 1 0 2 0 2 2270 UNK - 6" 0 0 1 0 2 0 2 2272 UNK - 6" 0 0 1 0 2 0 2 2278 UNK - 6" 0 0 1 0 2 0 2 2280 UNK - 6" 0 0 1 0 2 0 2 2282 UNK - 6" 0 0 1 0 2 0 2 2284 UNK - 8" 0 0 1 0 2 0 2 2294 UNK - 6" 0 0 1 0 2 0 2 2296 UNK - 6" 0 0 1 1 2 0 3 2297 UNK - 8" 0 0 1 0 2 0 2 2300 UNK - 8" 0 0 1 0 2 0 2 2302 UNK - 6" 0 0 1 0 2 0 2 2304 UNK - 6" 0 0 1 1 2 0 3 2306 UNK - 8" 0 0 1 1 2 0 3 2307 UNK - 8" 0 0 1 0 2 0 2 2310 UNK - 6" 0 0 1 1 2 0 3 2311 UNK - 8" 0 0 1 1 2 0 3 2514 UNK - 8" 0 0 1 0 2 0 2 2515 UNK - 8" 0 0 1 0 2 0 2 2527 UNK - 8" 0 0 1 1 2 0 3 2529 UNK - 8" 0 0 1 0 2 0 2 2533 UNK - 8" 0 0 1 0 2 0 2 2534 UNK - 8" 0 0 1 0 2 0 2 117 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization Type - 1 - 10 Inside the Asset ID Inside the Depth of Date of Diameter Normalized Buffer Pipe Type Diameter Buffer Bury Install by Basin Concrete 2547 UNK - 8" 0 0 1 1 2 0 3 2551 UNK - 8" 0 0 1 1 2 0 3 2555 UNK - 8" 0 0 1 0 2 0 2 2557 UNK - 8" 0 0 1 0 2 0 2 2559 UNK - 8" 0 0 1 0 2 0 2 2562 UNK - 8" 0 0 1 1 2 0 3 2564 UNK - 8" 0 0 1 1 2 0 3 2566 UNK - 8" 0 0 1 0 2 0 2 2568 UNK - 8" 0 0 1 0 2 0 2 2570 UNK - 6" 0 0 1 0 2 0 2 2573 UNK - 6" 0 0 1 0 2 0 2 2575 UNK - 6" 0 0 1 0 2 0 2 2576 UNK - 6" 0 0 1 0 2 0 2 2618 UNK - 8" 0 0 1 0 2 0 2 2622 UNK - 6" 0 0 1 0 2 0 2 2648 UNK - 8" 0 0 1 0 2 0 2 2649 UNK - 8" 0 0 1 0 2 0 2 2673 UNK - 6" 0 0 1 1 2 0 3 2674 UNK - 6" 0 0 1 1 2 0 3 2708 UNK - 8" 0 0 1 1 2 0 3 2715 UNK - 6" 0 0 1 0 2 0 2 2723 UNK - 8" 0 0 1 1 2 0 3 2734 PVC - 8" 0 0 2 0 2 0 3 2735 UNK - 8" 0 0 1 0 2 0 2 2763 UNK - 6" 0 0 1 0 2 0 2 2765 UNK - 6" 0 0 1 0 2 0 2 2767 UNK - 6" 0 0 1 0 2 0 2 2769 UNK - 6" 0 0 1 0 2 0 2 118 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization Type - 1 - 10 Inside the Asset ID Inside the Depth of Date of Diameter Normalized Buffer Pipe Type Diameter Buffer Bury Install by Basin Concrete 2771 UNK - 6" 0 0 1 0 2 0 2 2774 UNK - 6" 0 0 1 0 2 0 2 2776 UNK - 6" 0 0 1 0 2 0 2 2777 UNK - 6" 0 0 1 0 2 0 2 2779 UNK - 8" 0 0 1 0 2 0 2 2781 UNK - 6" 0 0 1 0 2 0 2 2783 UNK - 8" 0 0 1 1 2 0 3 2785 UNK - 8" 0 0 1 1 2 0 3 2786 UNK - 8" 0 0 1 0 2 0 2 2851 RCP - 12" 0 0 3 1 0 0 3 2853 RCP - 12" 0 0 3 1 0 0 3 2855 RCP - 12" 0 0 3 1 0 0 3 2859 DIP - 12" 0 0 4 0 0 0 3 2861 DIP - 12" 0 0 4 0 0 0 3 2863 DIP - 12" 0 0 4 0 0 0 3 2865 DIP - 12" 0 0 4 0 0 0 3 2870 UNK - 6" 0 0 1 0 2 0 2 2872 UNK - 6" 0 0 1 1 2 0 3 2874 UNK - 6" 0 0 1 1 2 0 3 2876 UNK - 6" 0 0 1 0 2 0 2 2883 UNK - 8" 0 0 1 1 2 0 3 2934 UNK - 6" 0 0 1 1 2 0 3 2936 UNK - 8" 0 0 1 1 2 0 3 2938 UNK - 8" 0 0 1 1 2 0 3 2941 UNK - 8" 0 0 1 1 2 0 3 2942 UNK - 8" 0 0 1 1 2 0 3 2962 UNK - 8" 0 0 1 1 2 0 3 2964 UNK - 8" 0 0 1 1 2 0 3 119 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization Type - 1 - 10 Inside the Asset ID Inside the Depth of Date of Diameter Normalized Buffer Pipe Type Diameter Buffer Bury Install by Basin Concrete 2966 UNK - 8" 0 0 1 1 2 0 3 3005 UNK - 6" 0 0 1 0 2 0 2 3007 UNK - 6" 0 0 1 0 2 0 2 3011 UNK - 6" 0 0 1 0 2 0 2 3013 UNK - 6" 0 0 1 0 2 0 2 3030 UNK - 6" 0 0 1 0 2 0 2 3041 UNK - 6" 0 0 1 0 2 0 2 3042 UNK - 6" 0 0 1 0 2 0 2 3060 UNK - 6" 0 0 1 1 2 0 3 3062 UNK - 8" 0 0 1 1 2 0 3 3067 UNK - 6" 0 0 1 1 2 0 3 3069 UNK - 6" 0 0 1 1 2 0 3 3071 UNK - 6" 0 0 1 0 2 0 2 3073 UNK - 6" 0 0 1 0 2 0 2 3077 UNK - 6" 0 0 1 0 2 0 2 3079 UNK - 6" 0 0 1 0 2 0 2 3081 UNK - 6" 0 0 1 0 2 0 2 3097 UNK - 8" 0 0 1 1 2 0 3 3099 UNK - 8" 0 0 1 1 2 0 3 3101 UNK - 8" 0 0 1 1 2 0 3 3103 UNK - 8" 0 0 1 1 2 0 3 3105 UNK - 8" 0 0 1 1 2 0 3 3106 UNK - 8" 0 0 1 1 2 0 3 3107 UNK - 8" 0 0 1 1 2 0 3 3117 UNK - 8" 0 0 1 1 2 0 3 3119 UNK - 8" 0 0 1 0 2 0 2 3121 UNK - 8" 0 0 1 0 2 0 2 3131 UNK - 8" 0 0 1 1 2 0 3 120 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization Type - 1 - 10 Inside the Asset ID Inside the Depth of Date of Diameter Normalized Buffer Pipe Type Diameter Buffer Bury Install by Basin Concrete 3133 UNK - 8" 0 0 1 0 2 0 2 3135 UNK - 8" 0 0 1 0 2 0 2 3138 UNK - 6" 0 0 1 0 2 0 2 3140 UNK - 6" 0 0 1 1 2 0 3 3141 UNK - 8" 0 0 1 1 2 0 3 3143 UNK - 8" 0 0 1 1 2 0 3 3146 UNK - 6" 0 0 1 0 2 0 2 3147 UNK - 8" 0 0 1 0 2 0 2 3149 UNK - 8" 0 0 1 0 2 0 2 3152 UNK - 6" 0 0 1 0 2 0 2 3220 UNK - 6" 0 0 1 1 2 0 3 3221 UNK - 6" 0 0 1 1 2 0 3 3237 UNK - 6" 0 0 1 0 2 0 2 3249 UNK - 8" 0 0 1 0 2 0 2 3250 UNK - 8" 0 0 1 1 2 0 3 3256 UNK - 6" 0 0 1 0 2 0 2 3258 UNK - 6" 0 0 1 0 2 0 2 3260 UNK - 6" 0 0 1 1 2 0 3 3261 UNK - 6" 0 0 1 1 2 0 3 3374 PVC - 8" 0 0 2 0 2 0 3 3380 UNK - 8" 0 0 1 1 2 0 3 3386 UNK - 6" 0 0 1 0 2 0 2 3389 UNK - 6" 0 0 1 0 2 0 2 3391 UNK - 6" 0 0 1 0 2 0 2 3392 UNK - 6" 0 0 1 0 2 0 2 3397 UNK - 6" 0 0 1 1 2 0 3 3504 UNK - 8" 0 0 1 1 2 0 3 3527 UNK - 8" 0 0 1 1 2 0 3 121 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization Type - 1 - 10 Inside the Asset ID Inside the Depth of Date of Diameter Normalized Buffer Pipe Type Diameter Buffer Bury Install by Basin Concrete 3528 UNK - 8" 0 0 1 1 2 0 3 6302 RCP - 12" 0 0 3 0 0 0 2 15116 UNK - 8" 0 0 1 0 2 0 2 15151 UNK - 8" 0 0 1 0 2 0 2 15174 UNK - 8" 0 0 1 0 2 0 2 15175 UNK - 8" 0 0 1 0 2 0 2 15179 UNK - 8" 0 0 1 1 2 0 3 15180 UNK - 8" 0 0 1 1 2 0 3 16030 UNK - 8" 0 0 1 0 2 0 2 16031 UNK - 8" 0 0 1 1 2 0 3 31068 UNK - 8" 0 0 1 0 2 0 2 24675 UNK - 8" 0 0 1 0 2 0 2 25397 UNK - 8" 0 0 1 1 2 0 3 25440 RCP - 12" 0 0 3 0 0 0 2 25441 UNK - 0" 0 0 1 0 2 0 2 25443 UNK - 0" 0 0 1 0 2 0 2 25451 UNK - 6" 0 0 1 1 2 0 3 25644 UNK - 8" 0 0 1 1 2 0 3 27530 PVC - 8" 0 0 2 0 2 0 3 17330 UNK - 8" 0 0 1 0 2 0 2 0 UNK - 0" 0 0 1 0 2 0 2 0 UNK - 0" 0 0 1 0 2 0 2 1768 UNK - 12" 0 0 1 1 0 0 1 1771 UNK - 10" 0 0 1 1 0 0 1 1773 UNK - 10" 0 0 1 1 0 0 1 1777 UNK - 10" 0 0 1 1 0 0 1 1790 UNK - 12" 0 0 1 1 0 0 1 1876 UNK - 12" 0 0 1 1 0 0 1 122 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization Type - 1 - 10 Inside the Asset ID Inside the Depth of Date of Diameter Normalized Buffer Pipe Type Diameter Buffer Bury Install by Basin Concrete 1880 UNK - 12" 0 0 1 1 0 0 1 1882 UNK - 12" 0 0 1 1 0 0 1 15183 UNK - 10" 0 0 1 1 0 0 1 15184 UNK - 10" 0 0 1 1 0 0 1 25652 UNK - 10" 0 0 1 1 0 0 1 1888 UNK - 12" 0 0 1 0 0 0 1 1890 UNK - 12" 0 0 1 0 0 0 1 123 Risk Assessment Report: Horizontal Assets Table D-4: Kaloko Basin Pipe Segments Points Assigned for Factors Prioritization Type - Inside the 1 - 10 Asset ID Inside the Depth of Date of Diameter Normalized Buffer Pipe Type Diameter Buffer Bury Install by Basin Concrete 0 UNK - 0" 0 0 1 1 1 0 10 0 UNK - 0" 0 0 1 1 1 0 10 0 UNK - 0" 0 0 1 1 1 0 10 0 UNK - 0" 0 0 1 1 1 0 10 124 Risk Assessment Report: Horizontal Assets Table D-5: Kealakehe Basin Pipe Segments Points Assigned for Factors Prioritization Inside the 1 - 10 Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 13942 RCP - 18" 5 5 5 1 0 5 10 13702 VCP - 8" 5 0 4 2 2 5 9 13706 VCP - 6" 5 0 4 2 2 5 9 13713 VCP - 8" 5 0 4 2 2 5 9 13726 VCP - 6" 5 0 4 2 2 5 9 13830 VCP - 8" 5 0 4 2 2 5 9 13924 VCP - 8" 5 0 4 2 2 5 9 13989 VCP - 8" 5 0 4 2 2 5 9 14029 VCP - 8" 5 0 4 2 2 5 9 14031 VCP - 8" 5 0 4 2 2 5 9 14033 VCP - 8" 5 0 4 2 2 5 9 23727 VCP - 8" 5 0 4 2 2 5 9 23745 VCP - 6" 5 0 4 2 2 5 9 13721 CIP - 6" 5 0 3 2 2 5 8 13693 VCP - 8" 5 0 4 0 2 5 8 13697 VCP - 12" 5 0 4 2 0 5 8 13705 VCP - 6" 5 0 4 0 2 5 8 13727 VCP - 8" 5 0 4 0 2 5 8 13783 VCP - 6" 5 0 4 0 2 5 8 14096 VCP - 12" 5 0 4 2 0 5 8 14097 VCP - 12" 5 0 4 2 0 5 8 14117 RCP - 36" 5 5 5 1 0 0 8 14119 RCP - 36" 5 5 5 1 0 0 8 14121 RCP - 36" 5 5 5 1 0 0 8 17402 RCP - 36" 5 5 5 1 0 0 8 17417 RCP - 36" 5 5 5 1 0 0 8 13687 CIP - 6" 5 0 3 0 2 5 7 125 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 13809 VCP - 12" 5 0 4 1 0 5 7 13811 VCP - 12" 5 0 4 1 0 5 7 13949 VCP - 12" 5 0 4 1 0 5 7 13950 VCP - 12" 5 0 4 1 0 5 7 13965 VCP - 12" 5 0 4 1 0 5 7 13667 UNK - 0" 5 0 1 2 1 5 7 13689 VCP - 12" 5 0 4 0 0 5 7 13691 VCP - 12" 5 0 4 0 0 5 7 13715 VCP - 12" 5 0 4 0 0 5 7 13717 VCP - 12" 5 0 4 0 0 5 7 13813 VCP - 12" 5 0 4 0 0 5 7 13815 VCP - 12" 5 0 4 0 0 5 7 13816 VCP - 12" 5 0 4 0 0 5 7 13943 CIP - 12" 5 0 3 1 0 5 7 13967 VCP - 12" 5 0 4 0 0 5 7 13969 VCP - 12" 5 0 4 0 0 5 7 14027 VCP - 10" 5 0 4 0 0 5 7 23808 VCP - 12" 5 0 4 0 0 5 7 23810 VCP - 12" 5 0 4 0 0 5 7 23811 VCP - 12" 5 0 4 0 0 5 7 23813 VCP - 12" 5 0 4 0 0 5 7 11535 VCP - 6" 0 0 4 2 2 5 6 11554 VCP - 6" 0 0 4 2 2 5 6 11555 VCP - 6" 0 0 4 2 2 5 6 11595 VCP - 8" 0 0 4 2 2 5 6 11620 VCP - 8" 0 0 4 2 2 5 6 11624 VCP - 8" 0 0 4 2 2 5 6 12353 VCP - 6" 0 0 4 2 2 5 6 126 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 13329 VCP - 8" 0 0 4 2 2 5 6 13331 VCP - 6" 0 0 4 2 2 5 6 13335 VCP - 6" 0 0 4 2 2 5 6 13339 VCP - 8" 0 0 4 2 2 5 6 13343 VCP - 8" 0 0 4 2 2 5 6 13345 VCP - 8" 0 0 4 2 2 5 6 13361 VCP - 6" 0 0 4 2 2 5 6 13662 CIP - 12" 5 0 3 0 0 5 6 13669 VCP - 8" 0 0 4 2 2 5 6 13671 VCP - 8" 0 0 4 2 2 5 6 13719 CIP - 12" 5 0 3 0 0 5 6 13767 VCP - 6" 0 0 4 2 2 5 6 13819 VCP - 6" 0 0 4 2 2 5 6 13823 VCP - 8" 0 0 4 2 2 5 6 13825 VCP - 8" 0 0 4 2 2 5 6 13828 VCP - 6" 0 0 4 2 2 5 6 13829 VCP - 6" 0 0 4 2 2 5 6 13850 VCP - 8" 0 0 4 2 2 5 6 13904 VCP - 6" 0 0 4 2 2 5 6 13911 VCP - 8" 0 0 4 2 2 5 6 13928 VCP - 8" 0 0 4 2 2 5 6 13931 VCP - 8" 0 0 4 2 2 5 6 13988 VCP - 6" 0 0 4 2 2 5 6 14035 VCP - 8" 0 0 4 2 2 5 6 14037 VCP - 8" 0 0 4 2 2 5 6 14417 VCP - 8" 0 0 4 2 2 5 6 14419 VCP - 6" 0 0 4 2 2 5 6 14423 VCP - 6" 0 0 4 2 2 5 6 127 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 23718 VCP - 8" 0 0 4 2 2 5 6 23720 VCP - 6" 0 0 4 2 2 5 6 23744 VCP - 6" 0 0 4 2 2 5 6 23767 VCP - 8" 0 0 4 2 2 5 6 23769 VCP - 8" 0 0 4 2 2 5 6 11567 CIP - 8" 0 0 3 2 2 5 6 11569 CIP - 8" 0 0 3 2 2 5 6 11571 CIP - 8" 0 0 3 2 2 5 6 11573 CIP - 8" 0 0 3 2 2 5 6 11622 VCP - 8" 0 0 4 1 2 5 6 12356 CIP - 8" 0 0 3 2 2 5 6 23648 VCP - 8" 0 0 4 1 2 5 6 23650 VCP - 8" 0 0 4 1 2 5 6 11527 VCP - 6" 0 0 4 0 2 5 5 11531 VCP - 6" 0 0 4 0 2 5 5 11533 VCP - 6" 0 0 4 0 2 5 5 11537 VCP - 6" 0 0 4 0 2 5 5 11539 VCP - 6" 0 0 4 0 2 5 5 11575 VCP - 8" 0 0 4 0 2 5 5 11577 VCP - 8" 0 0 4 0 2 5 5 11579 VCP - 8" 0 0 4 0 2 5 5 11589 VCP - 18" 0 0 4 2 0 5 5 11592 VCP - 18" 0 0 4 2 0 5 5 11593 VCP - 18" 0 0 4 2 0 5 5 11597 VCP - 8" 0 0 4 0 2 5 5 11600 VCP - 8" 0 0 4 0 2 5 5 11602 VCP - 8" 0 0 4 0 2 5 5 11632 VCP - 12" 0 0 4 2 0 5 5 128 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 11669 VCP - 6" 0 0 4 0 2 5 5 11670 VCP - 6" 0 0 4 0 2 5 5 11737 PVC - 4" 0 0 2 2 2 5 5 11739 PVC - 4" 0 0 2 2 2 5 5 11749 PVC - 4" 0 0 2 2 2 5 5 11764 PVC - 4" 0 0 2 2 2 5 5 11767 PVC - 4" 0 0 2 2 2 5 5 11787 PVC - 4" 0 0 2 2 2 5 5 11789 PVC - 4" 0 0 2 2 2 5 5 11803 PVC - 6" 0 0 2 2 2 5 5 11805 PVC - 6" 0 0 2 2 2 5 5 11809 PVC - 4" 0 0 2 2 2 5 5 11812 PVC - 4" 0 0 2 2 2 5 5 11814 PVC - 4" 0 0 2 2 2 5 5 11830 PVC - 6" 0 0 2 2 2 5 5 11831 PVC - 6" 0 0 2 2 2 5 5 11866 PVC - 4" 0 0 2 2 2 5 5 11868 PVC - 4" 0 0 2 2 2 5 5 11888 PVC - 6" 0 0 2 2 2 5 5 11894 PVC - 6" 0 0 2 2 2 5 5 11896 PVC - 6" 0 0 2 2 2 5 5 11898 PVC - 4" 0 0 2 2 2 5 5 11900 PVC - 6" 0 0 2 2 2 5 5 11948 PVC - 4" 0 0 2 2 2 5 5 11950 PVC - 4" 0 0 2 2 2 5 5 11981 PVC - 4" 0 0 2 2 2 5 5 12029 PVC - 4" 0 0 2 2 2 5 5 12053 PVC - 6" 0 0 2 2 2 5 5 129 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 12054 PVC - 6" 0 0 2 2 2 5 5 12089 PVC - 6" 0 0 2 2 2 5 5 12095 PVC - 6" 0 0 2 2 2 5 5 12097 PVC - 6" 0 0 2 2 2 5 5 12098 PVC - 6" 0 0 2 2 2 5 5 12103 PVC - 4" 0 0 2 2 2 5 5 12105 PVC - 4" 0 0 2 2 2 5 5 12196 PVC - 6" 0 0 2 2 2 5 5 12200 PVC - 4" 0 0 2 2 2 5 5 12202 PVC - 4" 0 0 2 2 2 5 5 12204 PVC - 4" 0 0 2 2 2 5 5 12206 PVC - 4" 0 0 2 2 2 5 5 12209 PVC - 6" 0 0 2 2 2 5 5 12210 PVC - 6" 0 0 2 2 2 5 5 12270 PVC - 4" 0 0 2 2 2 5 5 12272 PVC - 4" 0 0 2 2 2 5 5 12280 PVC - 6" 0 0 2 2 2 5 5 12282 PVC - 6" 0 0 2 2 2 5 5 12283 PVC - 6" 0 0 2 2 2 5 5 12354 VCP - 6" 0 0 4 0 2 5 5 12431 VCP - 8" 0 0 4 0 2 5 5 12433 VCP - 8" 0 0 4 0 2 5 5 12434 VCP - 8" 0 0 4 0 2 5 5 13337 VCP - 8" 0 0 4 0 2 5 5 13347 VCP - 10" 0 0 4 2 0 5 5 13355 VCP - 10" 0 0 4 2 0 5 5 13357 VCP - 10" 0 0 4 2 0 5 5 13364 VCP - 6" 0 0 4 0 2 5 5 130 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 13366 VCP - 6" 0 0 4 0 2 5 5 13400 VCP - 18" 0 0 4 2 0 5 5 13403 VCP - 18" 0 0 4 2 0 5 5 13404 VCP - 18" 0 0 4 2 0 5 5 13852 VCP - 8" 0 0 4 0 2 5 5 13879 VCP - 6" 0 0 4 0 2 5 5 13881 VCP - 6" 0 0 4 0 2 5 5 13882 VCP - 8" 0 0 4 0 2 5 5 14081 VCP - 10" 0 0 4 2 0 5 5 14084 VCP - 10" 0 0 4 2 0 5 5 14085 VCP - 10" 0 0 4 2 0 5 5 14472 VCP - 12" 0 0 4 2 0 5 5 23652 VCP - 8" 0 0 4 0 2 5 5 23654 VCP - 8" 0 0 4 0 2 5 5 23660 VCP - 8" 0 0 4 0 2 5 5 23662 VCP - 8" 0 0 4 0 2 5 5 23664 VCP - 8" 0 0 4 0 2 5 5 23666 VCP - 8" 0 0 4 0 2 5 5 23762 VCP - 8" 5 0 4 0 2 0 5 24789 PVC - 8" 5 0 2 2 2 0 5 24764 PVC - 8" 5 0 2 2 2 0 5 25715 PVC - 4" 0 0 2 2 2 5 5 25983 PVC - 4" 0 0 2 2 2 5 5 28538 VCP - 8" 5 0 4 0 2 0 5 28913 PVC - 4" 0 0 2 2 2 5 5 11565 DIP - 20" 0 0 3 2 0 5 5 11585 DIP - 20" 0 0 3 2 0 5 5 11587 DIP - 20" 0 0 3 2 0 5 5 131 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 13415 VCP - 18" 0 0 4 1 0 5 5 14087 UNK - 8" 0 0 1 2 2 5 5 14089 UNK - 8" 0 0 1 2 2 5 5 11581 PVC - 8" 0 0 2 0 2 5 4 11583 PVC - 8" 0 0 2 0 2 5 4 11692 PVC - 6" 0 0 2 0 2 5 4 11694 PVC - 6" 0 0 2 0 2 5 4 11696 PVC - 8" 0 0 2 0 2 5 4 11734 PVC - 4" 0 0 2 0 2 5 4 11761 PVC - 4" 0 0 2 0 2 5 4 11765 PVC - 4" 0 0 2 0 2 5 4 11769 PVC - 4" 0 0 2 0 2 5 4 11864 PVC - 4" 0 0 2 0 2 5 4 11883 PVC - 4" 0 0 2 0 2 5 4 11885 PVC - 4" 0 0 2 0 2 5 4 11902 PVC - 4" 0 0 2 0 2 5 4 11952 PVC - 4" 0 0 2 0 2 5 4 11971 PVC - 4" 0 0 2 0 2 5 4 11973 PVC - 4" 0 0 2 0 2 5 4 11975 PVC - 4" 0 0 2 0 2 5 4 11977 PVC - 4" 0 0 2 0 2 5 4 11979 PVC - 6" 0 0 2 0 2 5 4 12020 PVC - 6" 0 0 2 0 2 5 4 12022 PVC - 6" 0 0 2 0 2 5 4 12024 PVC - 4" 0 0 2 0 2 5 4 12027 PVC - 4" 0 0 2 0 2 5 4 12091 PVC - 4" 0 0 2 0 2 5 4 12101 PVC - 4" 0 0 2 0 2 5 4 132 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 12198 PVC - 4" 0 0 2 0 2 5 4 12264 PVC - 6" 0 0 2 0 2 5 4 12267 PVC - 4" 0 0 2 0 2 5 4 12268 PVC - 4" 0 0 2 0 2 5 4 12275 PVC - 4" 0 0 2 0 2 5 4 12277 PVC - 4" 0 0 2 0 2 5 4 12366 PVC - 8" 0 0 2 0 2 5 4 13351 VCP - 10" 0 0 4 0 0 5 4 13353 VCP - 10" 0 0 4 0 0 5 4 13358 VCP - 10" 0 0 4 0 0 5 4 13406 VCP - 18" 0 0 4 0 0 5 4 13408 VCP - 18" 0 0 4 0 0 5 4 13410 VCP - 18" 0 0 4 0 0 5 4 13412 VCP - 18" 0 0 4 0 0 5 4 13481 UNK - 8" 5 0 1 1 2 0 4 13483 UNK - 8" 5 0 1 1 2 0 4 13485 UNK - 8" 5 0 1 1 2 0 4 13487 UNK - 8" 5 0 1 1 2 0 4 13489 UNK - 8" 5 0 1 1 2 0 4 13495 UNK - 8" 5 0 1 1 2 0 4 14025 VCP - 10" 0 0 4 0 0 5 4 15764 UNK - 8" 5 0 1 1 2 0 4 16404 PVC - 8" 5 0 2 0 2 0 4 16406 PVC - 8" 5 0 2 0 2 0 4 16408 PVC - 8" 5 0 2 0 2 0 4 17353 PVC - 4" 5 0 2 0 2 0 4 25975 PVC - 4" 0 0 2 0 2 5 4 25977 PVC - 4" 0 0 2 0 2 5 4 133 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 25984 PVC - 4" 0 0 2 0 2 5 4 25986 PVC - 6" 0 0 2 0 2 5 4 25988 PVC - 4" 0 0 2 0 2 5 4 25990 VCP - 10" 0 0 4 0 0 5 4 26791 PVC - 4" 0 0 2 0 2 5 4 26792 PVC - 4" 0 0 2 0 2 5 4 28926 PVC - 6" 0 0 2 0 2 5 4 28955 PVC - 4" 0 0 2 0 2 5 4 30519 PVC - 4" 0 0 2 0 2 5 4 30799 VCP - 18" 0 0 4 0 0 5 4 90357 PVC - 8" 5 0 2 0 2 0 4 13663 PVC - 8" 5 0 2 0 2 0 4 13414 VCP - 18" 0 0 4 0 0 5 4 12349 VCP - 6" 0 0 4 2 2 0 4 12351 VCP - 6" 0 0 4 2 2 0 4 12362 VCP - 6" 0 0 4 2 2 0 4 13499 UNK - 8" 5 0 1 0 2 0 4 13501 UNK - 8" 5 0 1 0 2 0 4 13503 UNK - 8" 5 0 1 0 2 0 4 13505 UNK - 8" 5 0 1 0 2 0 4 14127 RCP - 8" 0 0 5 1 2 0 4 14980 PVC - 24" 5 0 2 1 0 0 4 14988 PVC - 24" 5 0 2 1 0 0 4 14995 PVC - 24" 5 0 2 1 0 0 4 16305 PVC - 24" 5 0 2 1 0 0 4 16307 PVC - 24" 5 0 2 1 0 0 4 16309 PVC - 24" 5 0 2 1 0 0 4 16311 PVC - 24" 5 0 2 1 0 0 4 134 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 16501 PVC - 15" 5 0 2 1 0 0 4 16544 PVC - 18" 5 0 2 1 0 0 4 16546 PVC - 18" 5 0 2 1 0 0 4 16547 PVC - 18" 5 0 2 1 0 0 4 23317 PVC - 12" 5 0 2 1 0 0 4 23656 UNK - 8" 0 0 1 0 2 5 4 23658 UNK - 8" 0 0 1 0 2 5 4 23761 VCP - 8" 0 0 4 2 2 0 4 24525 UNK - 24" 5 0 1 1 0 0 3 24527 UNK - 24" 5 0 1 1 0 0 3 24528 UNK - 24" 5 0 1 1 0 0 3 13986 VCP - 6" 0 0 4 1 2 0 3 14126 RCP - 8" 0 0 5 0 2 0 3 14897 PVC - 30" 5 0 2 0 0 0 3 14899 PVC - 36" 5 0 2 0 0 0 3 14901 PVC - 24" 5 0 2 0 0 0 3 14903 PVC - 24" 5 0 2 0 0 0 3 14935 PVC - 24" 5 0 2 0 0 0 3 14937 PVC - 24" 5 0 2 0 0 0 3 14939 PVC - 24" 5 0 2 0 0 0 3 14941 PVC - 24" 5 0 2 0 0 0 3 14966 PVC - 24" 5 0 2 0 0 0 3 14978 PVC - 24" 5 0 2 0 0 0 3 16297 PVC - 15" 5 0 2 0 0 0 3 16313 PVC - 24" 5 0 2 0 0 0 3 16315 PVC - 24" 5 0 2 0 0 0 3 16317 PVC - 30" 5 0 2 0 0 0 3 16319 PVC - 30" 5 0 2 0 0 0 3 135 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 16320 PVC - 30" 5 0 2 0 0 0 3 16410 PVC - 12" 5 0 2 0 0 0 3 16416 PVC - 12" 5 0 2 0 0 0 3 16418 PVC - 15" 5 0 2 0 0 0 3 16499 PVC - 15" 5 0 2 0 0 0 3 16526 PVC - 10" 5 0 2 0 0 0 3 16528 PVC - 10" 5 0 2 0 0 0 3 16530 PVC - 10" 5 0 2 0 0 0 3 20429 VCP - 8" 0 0 4 1 2 0 3 24763 PVC - 24" 5 0 2 0 0 0 3 26044 VCP - 8" 0 0 4 1 2 0 3 26046 VCP - 8" 0 0 4 1 2 0 3 26055 VCP - 8" 0 0 4 1 2 0 3 26060 VCP - 8" 0 0 4 1 2 0 3 27353 RCP - 8" 0 0 5 0 2 0 3 30956 UNK - 0" 5 0 1 0 1 0 3 24533 UNK - 10" 5 0 1 0 0 0 3 11541 VCP - 8" 0 0 4 0 2 0 3 12358 PVC - 6" 0 0 2 2 2 0 3 12360 PVC - 6" 0 0 2 2 2 0 3 12394 VCP - 6" 0 0 4 0 2 0 3 12395 VCP - 6" 0 0 4 0 2 0 3 12445 VCP - 18" 0 0 4 2 0 0 3 12447 VCP - 18" 0 0 4 2 0 0 3 13368 VCP - 6" 0 0 4 0 2 0 3 13370 VCP - 8" 0 0 4 0 2 0 3 13372 VCP - 8" 0 0 4 0 2 0 3 13374 VCP - 8" 0 0 4 0 2 0 3 136 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 13376 VCP - 8" 0 0 4 0 2 0 3 13984 VCP - 6" 0 0 4 0 2 0 3 14012 VCP - 10" 0 0 4 2 0 0 3 14014 VCP - 10" 0 0 4 2 0 0 3 14189 RCP - 36" 0 0 5 1 0 0 3 14191 RCP - 36" 0 0 5 1 0 0 3 14193 RCP - 36" 0 0 5 1 0 0 3 14195 RCP - 21" 0 0 5 1 0 0 3 14197 RCP - 21" 0 0 5 1 0 0 3 14199 RCP - 21" 0 0 5 1 0 0 3 14201 RCP - 21" 0 0 5 1 0 0 3 14461 PVC - 8" 0 0 2 2 2 0 3 14463 PVC - 8" 0 0 2 2 2 0 3 14465 PVC - 8" 0 0 2 2 2 0 3 15782 PVC - 8" 0 0 2 2 2 0 3 15835 PVC - 8" 0 0 2 2 2 0 3 16939 PVC - 8" 0 0 2 2 2 0 3 17331 UNK - 16" 5 0 1 0 0 0 3 17536 PVC - 8" 0 0 2 2 2 0 3 17538 PVC - 8" 0 0 2 2 2 0 3 17996 PVC - 8" 0 0 2 2 2 0 3 17998 PVC - 8" 0 0 2 2 2 0 3 18010 PVC - 8" 0 0 2 2 2 0 3 18012 PVC - 8" 0 0 2 2 2 0 3 18014 PVC - 8" 0 0 2 2 2 0 3 18024 PVC - 8" 0 0 2 2 2 0 3 18026 PVC - 8" 0 0 2 2 2 0 3 20428 VCP - 8" 0 0 4 0 2 0 3 137 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 20431 PVC - 8" 0 0 2 2 2 0 3 20769 PVC - 8" 0 0 2 2 2 0 3 20771 PVC - 8" 0 0 2 2 2 0 3 20913 PVC - 8" 0 0 2 2 2 0 3 20915 PVC - 8" 0 0 2 2 2 0 3 20917 PVC - 8" 0 0 2 2 2 0 3 20919 PVC - 8" 0 0 2 2 2 0 3 21357 PVC - 8" 0 0 2 2 2 0 3 21421 PVC - 8" 0 0 2 2 2 0 3 21581 PVC - 8" 0 0 2 2 2 0 3 22992 PVC - 8" 0 0 2 2 2 0 3 22993 PVC - 8" 0 0 2 2 2 0 3 22994 PVC - 8" 0 0 2 2 2 0 3 23361 UNK - 10" 5 0 1 0 0 0 3 23774 PVC - 8" 0 0 2 2 2 0 3 23776 PVC - 8" 0 0 2 2 2 0 3 23778 PVC - 8" 0 0 2 2 2 0 3 23782 PVC - 8" 0 0 2 2 2 0 3 23784 PVC - 8" 0 0 2 2 2 0 3 23789 RCP - 42" 0 0 5 1 0 0 3 24653 PVC - 8" 0 0 2 2 2 0 3 24655 PVC - 8" 0 0 2 2 2 0 3 24787 PVC - 8" 0 0 2 2 2 0 3 24788 PVC - 8" 0 0 2 2 2 0 3 24766 PVC - 8" 0 0 2 2 2 0 3 24779 PVC - 8" 0 0 2 2 2 0 3 26048 VCP - 8" 0 0 4 0 2 0 3 26050 VCP - 8" 0 0 4 0 2 0 3 138 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 26057 VCP - 8" 0 0 4 0 2 0 3 26059 VCP - 8" 0 0 4 0 2 0 3 26919 PVC - 8" 0 0 2 2 2 0 3 26970 PVC - 8" 0 0 2 2 2 0 3 27231 PVC - 6" 0 0 2 2 2 0 3 30318 PVC - 8" 0 0 2 2 2 0 3 30319 PVC - 8" 0 0 2 2 2 0 3 30321 PVC - 8" 0 0 2 2 2 0 3 30323 PVC - 8" 0 0 2 2 2 0 3 30324 PVC - 8" 0 0 2 2 2 0 3 30325 PVC - 8" 0 0 2 2 2 0 3 30334 PVC - 8" 0 0 2 2 2 0 3 30336 PVC - 8" 0 0 2 2 2 0 3 30337 PVC - 8" 0 0 2 2 2 0 3 30339 PVC - 8" 0 0 2 2 2 0 3 30340 PVC - 8" 0 0 2 2 2 0 3 30343 PVC - 8" 0 0 2 2 2 0 3 30355 PVC - 8" 0 0 2 2 2 0 3 30356 PVC - 8" 0 0 2 2 2 0 3 30358 PVC - 8" 0 0 2 2 2 0 3 30359 PVC - 8" 0 0 2 2 2 0 3 30360 PVC - 8" 0 0 2 2 2 0 3 30361 PVC - 8" 0 0 2 2 2 0 3 30363 PVC - 8" 0 0 2 2 2 0 3 30364 PVC - 8" 0 0 2 2 2 0 3 30368 PVC - 8" 0 0 2 2 2 0 3 30374 PVC - 8" 0 0 2 2 2 0 3 30375 PVC - 8" 0 0 2 2 2 0 3 139 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 30376 PVC - 8" 0 0 2 2 2 0 3 30377 PVC - 8" 0 0 2 2 2 0 3 30378 PVC - 8" 0 0 2 2 2 0 3 30379 PVC - 8" 0 0 2 2 2 0 3 30384 PVC - 8" 0 0 2 2 2 0 3 30392 PVC - 8" 0 0 2 2 2 0 3 30393 PVC - 8" 0 0 2 2 2 0 3 30394 PVC - 8" 0 0 2 2 2 0 3 30396 PVC - 8" 0 0 2 2 2 0 3 30397 PVC - 8" 0 0 2 2 2 0 3 30398 PVC - 8" 0 0 2 2 2 0 3 30399 PVC - 8" 0 0 2 2 2 0 3 30400 PVC - 8" 0 0 2 2 2 0 3 30401 PVC - 8" 0 0 2 2 2 0 3 30406 PVC - 8" 0 0 2 2 2 0 3 30410 PVC - 8" 0 0 2 2 2 0 3 30411 PVC - 8" 0 0 2 2 2 0 3 30412 PVC - 8" 0 0 2 2 2 0 3 30413 PVC - 8" 0 0 2 2 2 0 3 30719 PVC - 8" 0 0 2 2 2 0 3 30727 PVC - 8" 0 0 2 2 2 0 3 30728 PVC - 8" 0 0 2 2 2 0 3 29468 PVC - 8" 0 0 2 2 2 0 3 29469 PVC - 8" 0 0 2 2 2 0 3 29470 PVC - 8" 0 0 2 2 2 0 3 29471 PVC - 8" 0 0 2 2 2 0 3 29472 PVC - 8" 0 0 2 2 2 0 3 29473 PVC - 8" 0 0 2 2 2 0 3 140 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 29474 PVC - 8" 0 0 2 2 2 0 3 29475 PVC - 8" 0 0 2 2 2 0 3 29476 PVC - 8" 0 0 2 2 2 0 3 32644 PVC - 8" 0 0 2 2 2 0 3 32646 PVC - 8" 0 0 2 2 2 0 3 24512 VCP - 18" 0 0 4 1 0 0 2 24516 VCP - 18" 0 0 4 1 0 0 2 11543 PVC - 8" 0 0 2 1 2 0 2 11629 UNK - 8" 0 0 1 2 2 0 2 12439 VCP - 18" 0 0 4 1 0 0 2 12441 VCP - 18" 0 0 4 1 0 0 2 12443 VCP - 18" 0 0 4 1 0 0 2 12453 VCP - 27" 0 0 4 1 0 0 2 12455 VCP - 27" 0 0 4 1 0 0 2 12467 VCP - 27" 0 0 4 1 0 0 2 12469 VCP - 30" 0 0 4 1 0 0 2 12492 PVC - 8" 0 0 2 1 2 0 2 12494 PVC - 8" 0 0 2 1 2 0 2 12496 PVC - 8" 0 0 2 1 2 0 2 12498 PVC - 8" 0 0 2 1 2 0 2 12507 PVC - 8" 0 0 2 1 2 0 2 12509 PVC - 8" 0 0 2 1 2 0 2 12519 PVC - 8" 0 0 2 1 2 0 2 12521 PVC - 8" 0 0 2 1 2 0 2 12525 PVC - 8" 0 0 2 1 2 0 2 12527 PVC - 8" 0 0 2 1 2 0 2 12533 PVC - 8" 0 0 2 1 2 0 2 12540 PVC - 8" 0 0 2 1 2 0 2 141 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 12850 PVC - 8" 0 0 2 1 2 0 2 12852 PVC - 8" 0 0 2 1 2 0 2 12858 PVC - 8" 0 0 2 1 2 0 2 12860 PVC - 8" 0 0 2 1 2 0 2 12862 PVC - 8" 0 0 2 1 2 0 2 12870 PVC - 8" 0 0 2 1 2 0 2 12872 PVC - 8" 0 0 2 1 2 0 2 12874 PVC - 8" 0 0 2 1 2 0 2 12885 PVC - 8" 0 0 2 1 2 0 2 12891 PVC - 8" 0 0 2 1 2 0 2 12893 PVC - 8" 0 0 2 1 2 0 2 12895 PVC - 8" 0 0 2 1 2 0 2 12897 PVC - 8" 0 0 2 1 2 0 2 12903 PVC - 8" 0 0 2 1 2 0 2 12904 PVC - 8" 0 0 2 1 2 0 2 13655 UNK - 6" 0 0 1 2 2 0 2 13656 UNK - 8" 0 0 1 2 2 0 2 13884 UNK - 6" 0 0 1 2 2 0 2 14022 VCP - 10" 0 0 4 1 0 0 2 14091 UNK - 6" 0 0 1 2 2 0 2 14203 RCP - 21" 0 0 5 0 0 0 2 14457 PVC - 8" 0 0 2 1 2 0 2 14467 PVC - 8" 0 0 2 1 2 0 2 14488 PVC - 8" 0 0 2 1 2 0 2 14507 PVC - 8" 0 0 2 1 2 0 2 14517 PVC - 8" 0 0 2 1 2 0 2 14519 PVC - 8" 0 0 2 1 2 0 2 14521 PVC - 8" 0 0 2 1 2 0 2 142 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 14590 PVC - 8" 0 0 2 1 2 0 2 16072 VCP - 15" 0 0 4 1 0 0 2 16082 RCP - 30" 0 0 5 0 0 0 2 16943 PVC - 8" 0 0 2 1 2 0 2 17035 PVC - 8" 0 0 2 1 2 0 2 17037 PVC - 8" 0 0 2 1 2 0 2 17048 PVC - 8" 0 0 2 1 2 0 2 17050 PVC - 8" 0 0 2 1 2 0 2 17557 PVC - 8" 0 0 2 1 2 0 2 17559 PVC - 8" 0 0 2 1 2 0 2 17561 PVC - 8" 0 0 2 1 2 0 2 17563 PVC - 8" 0 0 2 1 2 0 2 17565 PVC - 8" 0 0 2 1 2 0 2 17569 PVC - 8" 0 0 2 1 2 0 2 17571 PVC - 8" 0 0 2 1 2 0 2 17583 PVC - 8" 0 0 2 1 2 0 2 17597 PVC - 8" 0 0 2 1 2 0 2 17599 PVC - 8" 0 0 2 1 2 0 2 18268 PVC - 8" 0 0 2 1 2 0 2 20044 VCP - 12" 0 0 4 1 0 0 2 20046 VCP - 12" 0 0 4 1 0 0 2 20052 VCP - 18" 0 0 4 1 0 0 2 20054 VCP - 18" 0 0 4 1 0 0 2 20056 VCP - 18" 0 0 4 1 0 0 2 20058 VCP - 18" 0 0 4 1 0 0 2 20067 VCP - 15" 0 0 4 1 0 0 2 20069 VCP - 15" 0 0 4 1 0 0 2 20070 VCP - 15" 0 0 4 1 0 0 2 143 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 20090 VCP - 10" 0 0 4 1 0 0 2 20091 VCP - 12" 0 0 4 1 0 0 2 20099 VCP - 10" 0 0 4 1 0 0 2 20101 VCP - 10" 0 0 4 1 0 0 2 20123 VCP - 10" 0 0 4 1 0 0 2 20124 VCP - 12" 0 0 4 1 0 0 2 20138 VCP - 12" 0 0 4 1 0 0 2 20142 VCP - 12" 0 0 4 1 0 0 2 20144 VCP - 12" 0 0 4 1 0 0 2 20146 VCP - 12" 0 0 4 1 0 0 2 20148 VCP - 12" 0 0 4 1 0 0 2 20150 VCP - 12" 0 0 4 1 0 0 2 20152 VCP - 12" 0 0 4 1 0 0 2 20154 VCP - 12" 0 0 4 1 0 0 2 20156 VCP - 12" 0 0 4 1 0 0 2 20158 VCP - 12" 0 0 4 1 0 0 2 20159 VCP - 15" 0 0 4 1 0 0 2 20189 VCP - 18" 0 0 4 1 0 0 2 20191 VCP - 18" 0 0 4 1 0 0 2 20193 VCP - 18" 0 0 4 1 0 0 2 20195 VCP - 18" 0 0 4 1 0 0 2 20197 VCP - 18" 0 0 4 1 0 0 2 20201 VCP - 18" 0 0 4 1 0 0 2 20203 VCP - 18" 0 0 4 1 0 0 2 20205 VCP - 18" 0 0 4 1 0 0 2 20207 VCP - 18" 0 0 4 1 0 0 2 20209 VCP - 18" 0 0 4 1 0 0 2 20211 VCP - 18" 0 0 4 1 0 0 2 144 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 20213 VCP - 18" 0 0 4 1 0 0 2 20215 VCP - 18" 0 0 4 1 0 0 2 20217 VCP - 18" 0 0 4 1 0 0 2 20219 VCP - 18" 0 0 4 1 0 0 2 20220 VCP - 18" 0 0 4 1 0 0 2 20238 CIPC - 12" 0 0 5 0 0 0 2 20409 VCP - 18" 0 0 4 1 0 0 2 20414 VCP - 15" 0 0 4 1 0 0 2 20903 PVC - 8" 0 0 2 1 2 0 2 21064 PVC - 8" 0 0 2 1 2 0 2 21065 PVC - 8" 0 0 2 1 2 0 2 21213 PVC - 8" 0 0 2 1 2 0 2 21215 PVC - 8" 0 0 2 1 2 0 2 22138 PVC - 8" 0 0 2 1 2 0 2 22225 PVC - 8" 0 0 2 1 2 0 2 22226 PVC - 8" 0 0 2 1 2 0 2 22394 PVC - 8" 0 0 2 1 2 0 2 22396 PVC - 8" 0 0 2 1 2 0 2 23175 PVC - 8" 0 0 2 1 2 0 2 22980 PVC - 8" 0 0 2 1 2 0 2 22988 PVC - 8" 0 0 2 1 2 0 2 22947 PVC - 8" 0 0 2 1 2 0 2 23098 PVC - 8" 0 0 2 1 2 0 2 23099 PVC - 8" 0 0 2 1 2 0 2 23102 PVC - 8" 0 0 2 1 2 0 2 23103 PVC - 8" 0 0 2 1 2 0 2 22995 PVC - 8" 0 0 2 1 2 0 2 23790 RCP - 42" 0 0 5 0 0 0 2 145 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 23875 UNK - 6" 0 0 1 2 2 0 2 23885 VCP - 15" 0 0 4 1 0 0 2 23887 VCP - 15" 0 0 4 1 0 0 2 23891 VCP - 15" 0 0 4 1 0 0 2 23893 VCP - 15" 0 0 4 1 0 0 2 23895 VCP - 15" 0 0 4 1 0 0 2 23897 VCP - 15" 0 0 4 1 0 0 2 23899 VCP - 15" 0 0 4 1 0 0 2 23917 VCP - 15" 0 0 4 1 0 0 2 23918 VCP - 15" 0 0 4 1 0 0 2 23926 PVC - 8" 0 0 2 1 2 0 2 24500 VCP - 12" 0 0 4 1 0 0 2 24502 VCP - 12" 0 0 4 1 0 0 2 24643 PVC - 8" 0 0 2 1 2 0 2 24657 PVC - 8" 0 0 2 1 2 0 2 24727 PVC - 8" 0 0 2 1 2 0 2 24756 PVC - 8" 0 0 2 1 2 0 2 27229 PVC - 8" 0 0 2 1 2 0 2 24800 PVC - 8" 0 0 2 1 2 0 2 24811 PVC - 8" 0 0 2 1 2 0 2 24813 PVC - 8" 0 0 2 1 2 0 2 26094 PVC - 8" 0 0 2 1 2 0 2 26095 PVC - 8" 0 0 2 1 2 0 2 26181 DIP - 30" 0 0 3 2 0 0 2 26183 DIP - 30" 0 0 3 2 0 0 2 26185 DIP - 30" 0 0 3 2 0 0 2 27589 PVC - 8" 0 0 2 1 2 0 2 27590 PVC - 8" 0 0 2 1 2 0 2 146 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 27336 VCP - 15" 0 0 4 1 0 0 2 27364 PVC - 8" 0 0 2 1 2 0 2 27366 PVC - 8" 0 0 2 1 2 0 2 27389 PVC - 8" 0 0 2 1 2 0 2 27444 PVC - 8" 0 0 2 1 2 0 2 30344 PVC - 8" 0 0 2 1 2 0 2 30345 PVC - 8" 0 0 2 1 2 0 2 30370 PVC - 8" 0 0 2 1 2 0 2 30371 PVC - 8" 0 0 2 1 2 0 2 30383 PVC - 8" 0 0 2 1 2 0 2 30385 PVC - 8" 0 0 2 1 2 0 2 30386 PVC - 8" 0 0 2 1 2 0 2 30387 PVC - 8" 0 0 2 1 2 0 2 28566 VCP - 18" 0 0 4 1 0 0 2 28635 UNK - 6" 0 0 1 2 2 0 2 29478 PVC - 8" 0 0 2 1 2 0 2 29479 PVC - 8" 0 0 2 1 2 0 2 31706 PVC - 8" 0 0 2 1 2 0 2 31708 PVC - 8" 0 0 2 1 2 0 2 31710 PVC - 8" 0 0 2 1 2 0 2 32628 PVC - 8" 0 0 2 1 2 0 2 90037 PVC - 8" 0 0 2 1 2 0 2 20140 VCP - 12" 0 0 4 1 0 0 2 32647 PVC - 8" 0 0 2 1 2 0 2 24514 VCP - 18" 0 0 4 0 0 0 2 11626 PVC - 15" 0 0 2 2 0 0 2 12449 VCP - 18" 0 0 4 0 0 0 2 12451 VCP - 27" 0 0 4 0 0 0 2 147 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 12457 VCP - 27" 0 0 4 0 0 0 2 12459 VCP - 27" 0 0 4 0 0 0 2 12461 VCP - 27" 0 0 4 0 0 0 2 12463 VCP - 27" 0 0 4 0 0 0 2 12465 VCP - 27" 0 0 4 0 0 0 2 12481 VCP - 15" 0 0 4 0 0 0 2 12484 PVC - 8" 0 0 2 0 2 0 2 12486 PVC - 8" 0 0 2 0 2 0 2 12488 PVC - 8" 0 0 2 0 2 0 2 12490 PVC - 8" 0 0 2 0 2 0 2 12500 PVC - 8" 0 0 2 0 2 0 2 12503 PVC - 8" 0 0 2 0 2 0 2 12505 PVC - 8" 0 0 2 0 2 0 2 12511 PVC - 8" 0 0 2 0 2 0 2 12513 PVC - 8" 0 0 2 0 2 0 2 12514 PVC - 8" 0 0 2 0 2 0 2 12517 PVC - 8" 0 0 2 0 2 0 2 12523 PVC - 8" 0 0 2 0 2 0 2 12529 PVC - 8" 0 0 2 0 2 0 2 12531 PVC - 8" 0 0 2 0 2 0 2 12535 PVC - 8" 0 0 2 0 2 0 2 12538 PVC - 8" 0 0 2 0 2 0 2 12542 PVC - 8" 0 0 2 0 2 0 2 12544 PVC - 8" 0 0 2 0 2 0 2 12545 PVC - 8" 0 0 2 0 2 0 2 12829 PVC - 8" 0 0 2 0 2 0 2 12844 PVC - 8" 0 0 2 0 2 0 2 12847 PVC - 8" 0 0 2 0 2 0 2 148 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 12854 PVC - 8" 0 0 2 0 2 0 2 12856 PVC - 8" 0 0 2 0 2 0 2 12864 PVC - 8" 0 0 2 0 2 0 2 12866 PVC - 8" 0 0 2 0 2 0 2 12868 PVC - 8" 0 0 2 0 2 0 2 12876 PVC - 8" 0 0 2 0 2 0 2 12878 PVC - 8" 0 0 2 0 2 0 2 12884 PVC - 8" 0 0 2 0 2 0 2 12889 PVC - 8" 0 0 2 0 2 0 2 12899 PVC - 8" 0 0 2 0 2 0 2 12901 PVC - 8" 0 0 2 0 2 0 2 13266 PVC - 8" 0 0 2 0 2 0 2 13267 PVC - 8" 0 0 2 0 2 0 2 13997 PVC - 21" 0 0 2 2 0 0 2 14018 VCP - 10" 0 0 4 0 0 0 2 14020 VCP - 10" 0 0 4 0 0 0 2 14274 PVC - 8" 0 0 2 0 2 0 2 14459 PVC - 8" 0 0 2 0 2 0 2 14513 PVC - 8" 0 0 2 0 2 0 2 14514 PVC - 8" 0 0 2 0 2 0 2 14515 PVC - 8" 0 0 2 0 2 0 2 14637 PVC - 8" 0 0 2 0 2 0 2 14648 PVC - 8" 0 0 2 0 2 0 2 14650 PVC - 8" 0 0 2 0 2 0 2 14652 PVC - 8" 0 0 2 0 2 0 2 14655 PVC - 8" 0 0 2 0 2 0 2 14656 PVC - 8" 0 0 2 0 2 0 2 14658 PVC - 8" 0 0 2 0 2 0 2 149 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 14660 PVC - 8" 0 0 2 0 2 0 2 14662 PVC - 8" 0 0 2 0 2 0 2 14664 PVC - 8" 0 0 2 0 2 0 2 14666 PVC - 8" 0 0 2 0 2 0 2 14765 PVC - 8" 0 0 2 0 2 0 2 14773 PVC - 8" 0 0 2 0 2 0 2 14775 PVC - 8" 0 0 2 0 2 0 2 14777 PVC - 8" 0 0 2 0 2 0 2 14779 PVC - 8" 0 0 2 0 2 0 2 14781 PVC - 8" 0 0 2 0 2 0 2 14783 PVC - 8" 0 0 2 0 2 0 2 14785 PVC - 8" 0 0 2 0 2 0 2 14787 PVC - 8" 0 0 2 0 2 0 2 15834 PVC - 8" 0 0 2 0 2 0 2 15837 PVC - 21" 0 0 2 2 0 0 2 15909 PVC - 12" 0 0 2 2 0 0 2 15955 PVC - 12" 0 0 2 2 0 0 2 15957 PVC - 12" 0 0 2 2 0 0 2 16039 PVC - 8" 0 0 2 0 2 0 2 16520 PVC - 8" 0 0 2 0 2 0 2 16522 PVC - 8" 0 0 2 0 2 0 2 16734 PVC - 8" 0 0 2 0 2 0 2 16736 PVC - 8" 0 0 2 0 2 0 2 16738 PVC - 8" 0 0 2 0 2 0 2 16740 PVC - 8" 0 0 2 0 2 0 2 16742 PVC - 8" 0 0 2 0 2 0 2 16745 PVC - 8" 0 0 2 0 2 0 2 16749 PVC - 8" 0 0 2 0 2 0 2 150 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 16751 PVC - 8" 0 0 2 0 2 0 2 16752 PVC - 8" 0 0 2 0 2 0 2 16755 PVC - 8" 0 0 2 0 2 0 2 16757 PVC - 8" 0 0 2 0 2 0 2 16758 PVC - 8" 0 0 2 0 2 0 2 16941 PVC - 8" 0 0 2 0 2 0 2 16945 PVC - 8" 0 0 2 0 2 0 2 16947 PVC - 8" 0 0 2 0 2 0 2 17026 PVC - 8" 0 0 2 0 2 0 2 17027 PVC - 8" 0 0 2 0 2 0 2 17029 PVC - 8" 0 0 2 0 2 0 2 17030 PVC - 8" 0 0 2 0 2 0 2 17032 PVC - 8" 0 0 2 0 2 0 2 17038 PVC - 8" 0 0 2 0 2 0 2 17040 PVC - 8" 0 0 2 0 2 0 2 17043 PVC - 8" 0 0 2 0 2 0 2 17045 PVC - 8" 0 0 2 0 2 0 2 17046 PVC - 8" 0 0 2 0 2 0 2 17280 PVC - 8" 0 0 2 0 2 0 2 17282 PVC - 8" 0 0 2 0 2 0 2 17284 PVC - 8" 0 0 2 0 2 0 2 17286 PVC - 8" 0 0 2 0 2 0 2 17288 PVC - 8" 0 0 2 0 2 0 2 17290 PVC - 8" 0 0 2 0 2 0 2 17292 PVC - 8" 0 0 2 0 2 0 2 17293 PVC - 8" 0 0 2 0 2 0 2 17518 PVC - 8" 0 0 2 0 2 0 2 17520 PVC - 8" 0 0 2 0 2 0 2 151 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 17522 PVC - 8" 0 0 2 0 2 0 2 17524 PVC - 8" 0 0 2 0 2 0 2 17526 PVC - 8" 0 0 2 0 2 0 2 17532 PVC - 8" 0 0 2 0 2 0 2 17534 PVC - 8" 0 0 2 0 2 0 2 17540 PVC - 8" 0 0 2 0 2 0 2 17542 PVC - 8" 0 0 2 0 2 0 2 17544 PVC - 8" 0 0 2 0 2 0 2 17546 PVC - 8" 0 0 2 0 2 0 2 17548 PVC - 8" 0 0 2 0 2 0 2 17550 PVC - 8" 0 0 2 0 2 0 2 17552 PVC - 8" 0 0 2 0 2 0 2 17555 PVC - 8" 0 0 2 0 2 0 2 17568 PVC - 8" 0 0 2 0 2 0 2 17573 PVC - 8" 0 0 2 0 2 0 2 17575 PVC - 8" 0 0 2 0 2 0 2 17579 PVC - 8" 0 0 2 0 2 0 2 17581 PVC - 8" 0 0 2 0 2 0 2 17586 PVC - 8" 0 0 2 0 2 0 2 17588 PVC - 8" 0 0 2 0 2 0 2 17590 PVC - 8" 0 0 2 0 2 0 2 17592 PVC - 8" 0 0 2 0 2 0 2 17594 PVC - 8" 0 0 2 0 2 0 2 17596 PVC - 8" 0 0 2 0 2 0 2 17601 PVC - 8" 0 0 2 0 2 0 2 17603 PVC - 8" 0 0 2 0 2 0 2 17605 PVC - 8" 0 0 2 0 2 0 2 17607 PVC - 8" 0 0 2 0 2 0 2 152 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 17610 PVC - 8" 0 0 2 0 2 0 2 17611 PVC - 8" 0 0 2 0 2 0 2 17616 PVC - 8" 0 0 2 0 2 0 2 17617 PVC - 8" 0 0 2 0 2 0 2 17619 PVC - 8" 0 0 2 0 2 0 2 17620 PVC - 8" 0 0 2 0 2 0 2 17622 PVC - 8" 0 0 2 0 2 0 2 17779 PVC - 8" 0 0 2 0 2 0 2 17780 PVC - 8" 0 0 2 0 2 0 2 17925 PVC - 8" 0 0 2 0 2 0 2 17926 PVC - 8" 0 0 2 0 2 0 2 17929 PVC - 8" 0 0 2 0 2 0 2 17931 PVC - 8" 0 0 2 0 2 0 2 17933 PVC - 8" 0 0 2 0 2 0 2 17935 PVC - 8" 0 0 2 0 2 0 2 17936 PVC - 8" 0 0 2 0 2 0 2 17971 PVC - 8" 0 0 2 0 2 0 2 17973 PVC - 8" 0 0 2 0 2 0 2 17975 PVC - 8" 0 0 2 0 2 0 2 17977 PVC - 8" 0 0 2 0 2 0 2 17979 PVC - 8" 0 0 2 0 2 0 2 17981 PVC - 8" 0 0 2 0 2 0 2 17983 PVC - 8" 0 0 2 0 2 0 2 17986 PVC - 8" 0 0 2 0 2 0 2 17988 PVC - 8" 0 0 2 0 2 0 2 17990 PVC - 8" 0 0 2 0 2 0 2 17992 PVC - 8" 0 0 2 0 2 0 2 17994 PVC - 8" 0 0 2 0 2 0 2 153 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 18001 PVC - 8" 0 0 2 0 2 0 2 18003 PVC - 8" 0 0 2 0 2 0 2 18005 PVC - 8" 0 0 2 0 2 0 2 18007 PVC - 8" 0 0 2 0 2 0 2 18009 PVC - 8" 0 0 2 0 2 0 2 18017 PVC - 8" 0 0 2 0 2 0 2 18019 PVC - 8" 0 0 2 0 2 0 2 18021 PVC - 8" 0 0 2 0 2 0 2 18023 PVC - 8" 0 0 2 0 2 0 2 18027 PVC - 8" 0 0 2 0 2 0 2 18267 PVC - 8" 0 0 2 0 2 0 2 19864 PVC - 8" 0 0 2 0 2 0 2 20080 VCP - 10" 0 0 4 0 0 0 2 20082 VCP - 10" 0 0 4 0 0 0 2 20084 VCP - 10" 0 0 4 0 0 0 2 20086 VCP - 10" 0 0 4 0 0 0 2 20088 VCP - 10" 0 0 4 0 0 0 2 20103 VCP - 10" 0 0 4 0 0 0 2 20105 VCP - 10" 0 0 4 0 0 0 2 20107 VCP - 10" 0 0 4 0 0 0 2 20109 VCP - 10" 0 0 4 0 0 0 2 20110 VCP - 10" 0 0 4 0 0 0 2 20119 VCP - 10" 0 0 4 0 0 0 2 20121 VCP - 10" 0 0 4 0 0 0 2 20199 VCP - 18" 0 0 4 0 0 0 2 20411 VCP - 15" 0 0 4 0 0 0 2 20412 VCP - 15" 0 0 4 0 0 0 2 20735 PVC - 8" 0 0 2 0 2 0 2 154 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 20737 PVC - 8" 0 0 2 0 2 0 2 20739 PVC - 8" 0 0 2 0 2 0 2 20740 PVC - 8" 0 0 2 0 2 0 2 20745 PVC - 8" 0 0 2 0 2 0 2 20746 PVC - 8" 0 0 2 0 2 0 2 20773 PVC - 8" 0 0 2 0 2 0 2 20774 PVC - 8" 0 0 2 0 2 0 2 20816 PVC - 8" 0 0 2 0 2 0 2 20818 PVC - 8" 0 0 2 0 2 0 2 20820 PVC - 8" 0 0 2 0 2 0 2 20822 PVC - 8" 0 0 2 0 2 0 2 20824 PVC - 8" 0 0 2 0 2 0 2 20825 PVC - 8" 0 0 2 0 2 0 2 20905 PVC - 8" 0 0 2 0 2 0 2 20907 PVC - 8" 0 0 2 0 2 0 2 20909 PVC - 8" 0 0 2 0 2 0 2 20911 PVC - 8" 0 0 2 0 2 0 2 20920 PVC - 8" 0 0 2 0 2 0 2 20922 PVC - 8" 0 0 2 0 2 0 2 21005 PVC - 8" 0 0 2 0 2 0 2 21006 PVC - 8" 0 0 2 0 2 0 2 21027 PVC - 8" 0 0 2 0 2 0 2 21050 PVC - 8" 0 0 2 0 2 0 2 21052 PVC - 8" 0 0 2 0 2 0 2 21054 PVC - 8" 0 0 2 0 2 0 2 21056 PVC - 8" 0 0 2 0 2 0 2 21058 PVC - 8" 0 0 2 0 2 0 2 21060 PVC - 8" 0 0 2 0 2 0 2 155 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 21173 PVC - 8" 0 0 2 0 2 0 2 21174 PVC - 8" 0 0 2 0 2 0 2 21203 PVC - 8" 0 0 2 0 2 0 2 21205 PVC - 8" 0 0 2 0 2 0 2 21207 PVC - 8" 0 0 2 0 2 0 2 21209 PVC - 8" 0 0 2 0 2 0 2 21211 PVC - 8" 0 0 2 0 2 0 2 21216 PVC - 8" 0 0 2 0 2 0 2 21360 PVC - 10" 0 0 2 2 0 0 2 21374 PVC - 8" 0 0 2 0 2 0 2 21376 PVC - 8" 0 0 2 0 2 0 2 21378 PVC - 8" 0 0 2 0 2 0 2 21380 PVC - 8" 0 0 2 0 2 0 2 21382 PVC - 8" 0 0 2 0 2 0 2 21384 PVC - 8" 0 0 2 0 2 0 2 21386 PVC - 8" 0 0 2 0 2 0 2 21388 PVC - 8" 0 0 2 0 2 0 2 21389 PVC - 8" 0 0 2 0 2 0 2 21395 PVC - 8" 0 0 2 0 2 0 2 21397 PVC - 8" 0 0 2 0 2 0 2 21399 PVC - 8" 0 0 2 0 2 0 2 21400 PVC - 8" 0 0 2 0 2 0 2 21405 PVC - 8" 0 0 2 0 2 0 2 21407 PVC - 8" 0 0 2 0 2 0 2 21408 PVC - 8" 0 0 2 0 2 0 2 21412 PVC - 8" 0 0 2 0 2 0 2 21413 PVC - 8" 0 0 2 0 2 0 2 21423 PVC - 8" 0 0 2 0 2 0 2 156 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 21424 PVC - 8" 0 0 2 0 2 0 2 21557 PVC - 8" 0 0 2 0 2 0 2 21580 PVC - 8" 0 0 2 0 2 0 2 21655 PVC - 8" 0 0 2 0 2 0 2 21657 PVC - 8" 0 0 2 0 2 0 2 21658 PVC - 8" 0 0 2 0 2 0 2 21729 PVC - 8" 0 0 2 0 2 0 2 21731 PVC - 8" 0 0 2 0 2 0 2 21733 PVC - 8" 0 0 2 0 2 0 2 21734 PVC - 8" 0 0 2 0 2 0 2 21819 PVC - 8" 0 0 2 0 2 0 2 21821 PVC - 8" 0 0 2 0 2 0 2 21822 PVC - 8" 0 0 2 0 2 0 2 21831 PVC - 8" 0 0 2 0 2 0 2 21833 PVC - 8" 0 0 2 0 2 0 2 21834 PVC - 8" 0 0 2 0 2 0 2 21944 PVC - 8" 0 0 2 0 2 0 2 21946 PVC - 8" 0 0 2 0 2 0 2 21948 PVC - 8" 0 0 2 0 2 0 2 21950 PVC - 8" 0 0 2 0 2 0 2 21951 PVC - 8" 0 0 2 0 2 0 2 21954 PVC - 8" 0 0 2 0 2 0 2 21955 PVC - 8" 0 0 2 0 2 0 2 21958 PVC - 8" 0 0 2 0 2 0 2 21959 PVC - 8" 0 0 2 0 2 0 2 21962 PVC - 8" 0 0 2 0 2 0 2 21963 PVC - 8" 0 0 2 0 2 0 2 22134 PVC - 8" 0 0 2 0 2 0 2 157 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 22136 PVC - 8" 0 0 2 0 2 0 2 22218 PVC - 8" 0 0 2 0 2 0 2 22220 PVC - 8" 0 0 2 0 2 0 2 22221 PVC - 8" 0 0 2 0 2 0 2 22222 PVC - 8" 0 0 2 0 2 0 2 22308 PVC - 8" 0 0 2 0 2 0 2 22309 PVC - 8" 0 0 2 0 2 0 2 22312 PVC - 8" 0 0 2 0 2 0 2 22313 PVC - 8" 0 0 2 0 2 0 2 23097 PVC - 8" 0 0 2 0 2 0 2 23100 PVC - 8" 0 0 2 0 2 0 2 23101 PVC - 8" 0 0 2 0 2 0 2 22397 PVC - 8" 0 0 2 0 2 0 2 23337 PVC - 8" 0 0 2 0 2 0 2 23780 PVC - 8" 0 0 2 0 2 0 2 23786 PVC - 8" 0 0 2 0 2 0 2 23867 UNK - 6" 0 0 1 1 2 0 2 23869 UNK - 6" 0 0 1 1 2 0 2 23889 PVC - 8" 0 0 2 0 2 0 2 23901 VCP - 15" 0 0 4 0 0 0 2 23903 VCP - 15" 0 0 4 0 0 0 2 23905 VCP - 15" 0 0 4 0 0 0 2 23907 VCP - 15" 0 0 4 0 0 0 2 23909 VCP - 15" 0 0 4 0 0 0 2 23911 VCP - 15" 0 0 4 0 0 0 2 23913 VCP - 15" 0 0 4 0 0 0 2 23915 VCP - 15" 0 0 4 0 0 0 2 24496 VCP - 21" 0 0 4 0 0 0 2 158 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 24498 VCP - 18" 0 0 4 0 0 0 2 24504 VCP - 10" 0 0 4 0 0 0 2 24645 PVC - 8" 0 0 2 0 2 0 2 24648 PVC - 8" 0 0 2 0 2 0 2 24659 PVC - 8" 0 0 2 0 2 0 2 24700 PVC - 8" 0 0 2 0 2 0 2 24702 PVC - 8" 0 0 2 0 2 0 2 24704 PVC - 8" 0 0 2 0 2 0 2 24706 PVC - 8" 0 0 2 0 2 0 2 24708 PVC - 8" 0 0 2 0 2 0 2 24710 PVC - 8" 0 0 2 0 2 0 2 24712 PVC - 8" 0 0 2 0 2 0 2 24719 PVC - 8" 0 0 2 0 2 0 2 24721 PVC - 8" 0 0 2 0 2 0 2 24723 PVC - 8" 0 0 2 0 2 0 2 24724 PVC - 8" 0 0 2 0 2 0 2 24732 PVC - 8" 0 0 2 0 2 0 2 24734 PVC - 8" 0 0 2 0 2 0 2 24736 PVC - 8" 0 0 2 0 2 0 2 24743 PVC - 8" 0 0 2 0 2 0 2 24748 PVC - 8" 0 0 2 0 2 0 2 24750 PVC - 8" 0 0 2 0 2 0 2 24792 PVC - 8" 0 0 2 0 2 0 2 24794 PVC - 8" 0 0 2 0 2 0 2 27200 PVC - 8" 0 0 2 0 2 0 2 27201 PVC - 8" 0 0 2 0 2 0 2 27202 PVC - 8" 0 0 2 0 2 0 2 27203 PVC - 8" 0 0 2 0 2 0 2 159 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 27204 PVC - 8" 0 0 2 0 2 0 2 27205 PVC - 8" 0 0 2 0 2 0 2 27206 PVC - 8" 0 0 2 0 2 0 2 27207 PVC - 8" 0 0 2 0 2 0 2 27208 PVC - 8" 0 0 2 0 2 0 2 27209 PVC - 8" 0 0 2 0 2 0 2 27210 PVC - 8" 0 0 2 0 2 0 2 27220 PVC - 8" 0 0 2 0 2 0 2 27221 PVC - 8" 0 0 2 0 2 0 2 27222 PVC - 8" 0 0 2 0 2 0 2 24809 PVC - 8" 0 0 2 0 2 0 2 25978 PVC - 4" 0 0 2 0 2 0 2 25979 PVC - 4" 0 0 2 0 2 0 2 26171 DIP - 30" 0 0 3 1 0 0 2 26173 DIP - 30" 0 0 3 1 0 0 2 26175 DIP - 30" 0 0 3 1 0 0 2 26177 DIP - 30" 0 0 3 1 0 0 2 26179 DIP - 30" 0 0 3 1 0 0 2 26281 PVC - 8" 0 0 2 0 2 0 2 26283 PVC - 8" 0 0 2 0 2 0 2 26285 PVC - 8" 0 0 2 0 2 0 2 26286 PVC - 8" 0 0 2 0 2 0 2 26508 PVC - 8" 0 0 2 0 2 0 2 26510 PVC - 8" 0 0 2 0 2 0 2 26512 PVC - 8" 0 0 2 0 2 0 2 26514 PVC - 8" 0 0 2 0 2 0 2 26516 PVC - 8" 0 0 2 0 2 0 2 26518 PVC - 8" 0 0 2 0 2 0 2 160 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 26520 PVC - 8" 0 0 2 0 2 0 2 26522 PVC - 8" 0 0 2 0 2 0 2 26524 PVC - 8" 0 0 2 0 2 0 2 26526 PVC - 8" 0 0 2 0 2 0 2 26528 PVC - 8" 0 0 2 0 2 0 2 26530 PVC - 8" 0 0 2 0 2 0 2 26532 PVC - 8" 0 0 2 0 2 0 2 26534 PVC - 6" 0 0 2 0 2 0 2 26536 PVC - 6" 0 0 2 0 2 0 2 26538 PVC - 4" 0 0 2 0 2 0 2 26540 PVC - 4" 0 0 2 0 2 0 2 26542 PVC - 8" 0 0 2 0 2 0 2 26544 PVC - 8" 0 0 2 0 2 0 2 26546 PVC - 8" 0 0 2 0 2 0 2 26548 PVC - 8" 0 0 2 0 2 0 2 26550 PVC - 6" 0 0 2 0 2 0 2 26552 PVC - 6" 0 0 2 0 2 0 2 26554 PVC - 6" 0 0 2 0 2 0 2 26556 PVC - 6" 0 0 2 0 2 0 2 26558 PVC - 8" 0 0 2 0 2 0 2 26779 PVC - 8" 0 0 2 0 2 0 2 26780 PVC - 3" 0 0 2 0 2 0 2 26818 PVC - 8" 0 0 2 0 2 0 2 26838 PVC - 8" 0 0 2 0 2 0 2 26840 PVC - 8" 0 0 2 0 2 0 2 26872 PVC - 8" 0 0 2 0 2 0 2 26874 PVC - 8" 0 0 2 0 2 0 2 26921 PVC - 8" 0 0 2 0 2 0 2 161 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 26923 PVC - 8" 0 0 2 0 2 0 2 26925 PVC - 8" 0 0 2 0 2 0 2 26972 PVC - 8" 0 0 2 0 2 0 2 26974 PVC - 8" 0 0 2 0 2 0 2 26976 PVC - 8" 0 0 2 0 2 0 2 26978 PVC - 8" 0 0 2 0 2 0 2 26980 PVC - 8" 0 0 2 0 2 0 2 27026 PVC - 8" 0 0 2 0 2 0 2 27028 PVC - 8" 0 0 2 0 2 0 2 27030 PVC - 8" 0 0 2 0 2 0 2 27032 PVC - 8" 0 0 2 0 2 0 2 27034 PVC - 8" 0 0 2 0 2 0 2 27036 PVC - 8" 0 0 2 0 2 0 2 27230 PVC - 8" 0 0 2 0 2 0 2 27339 PVC - 8" 0 0 2 0 2 0 2 27342 PVC - 6" 0 0 2 0 2 0 2 27346 PVC - 8" 0 0 2 0 2 0 2 27348 PVC - 8" 0 0 2 0 2 0 2 27358 PVC - 8" 0 0 2 0 2 0 2 27360 PVC - 8" 0 0 2 0 2 0 2 27362 PVC - 8" 0 0 2 0 2 0 2 27368 PVC - 8" 0 0 2 0 2 0 2 27385 PVC - 8" 0 0 2 0 2 0 2 27387 PVC - 8" 0 0 2 0 2 0 2 27391 PVC - 8" 0 0 2 0 2 0 2 27415 PVC - 8" 0 0 2 0 2 0 2 27417 PVC - 8" 0 0 2 0 2 0 2 27419 PVC - 8" 0 0 2 0 2 0 2 162 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 27421 PVC - 8" 0 0 2 0 2 0 2 27440 PVC - 8" 0 0 2 0 2 0 2 27442 PVC - 8" 0 0 2 0 2 0 2 27446 PVC - 8" 0 0 2 0 2 0 2 30320 PVC - 8" 0 0 2 0 2 0 2 30322 PVC - 8" 0 0 2 0 2 0 2 30326 PVC - 8" 0 0 2 0 2 0 2 30327 PVC - 8" 0 0 2 0 2 0 2 30328 PVC - 8" 0 0 2 0 2 0 2 30329 PVC - 8" 0 0 2 0 2 0 2 30330 PVC - 8" 0 0 2 0 2 0 2 30331 PVC - 8" 0 0 2 0 2 0 2 30332 PVC - 8" 0 0 2 0 2 0 2 30333 PVC - 8" 0 0 2 0 2 0 2 30335 PVC - 8" 0 0 2 0 2 0 2 30338 PVC - 8" 0 0 2 0 2 0 2 30341 PVC - 8" 0 0 2 0 2 0 2 30342 PVC - 8" 0 0 2 0 2 0 2 30346 PVC - 8" 0 0 2 0 2 0 2 30347 PVC - 8" 0 0 2 0 2 0 2 30348 PVC - 8" 0 0 2 0 2 0 2 30349 PVC - 8" 0 0 2 0 2 0 2 30350 PVC - 8" 0 0 2 0 2 0 2 30351 PVC - 8" 0 0 2 0 2 0 2 30352 PVC - 8" 0 0 2 0 2 0 2 30353 PVC - 8" 0 0 2 0 2 0 2 30354 PVC - 8" 0 0 2 0 2 0 2 30357 PVC - 8" 0 0 2 0 2 0 2 163 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 30362 PVC - 8" 0 0 2 0 2 0 2 30365 PVC - 8" 0 0 2 0 2 0 2 30366 PVC - 8" 0 0 2 0 2 0 2 30367 PVC - 8" 0 0 2 0 2 0 2 30369 PVC - 8" 0 0 2 0 2 0 2 30372 PVC - 8" 0 0 2 0 2 0 2 30373 PVC - 8" 0 0 2 0 2 0 2 30380 PVC - 8" 0 0 2 0 2 0 2 30381 PVC - 8" 0 0 2 0 2 0 2 30382 PVC - 8" 0 0 2 0 2 0 2 30388 PVC - 8" 0 0 2 0 2 0 2 30389 PVC - 8" 0 0 2 0 2 0 2 30390 PVC - 8" 0 0 2 0 2 0 2 30391 PVC - 8" 0 0 2 0 2 0 2 30395 PVC - 8" 0 0 2 0 2 0 2 30402 PVC - 8" 0 0 2 0 2 0 2 30403 PVC - 8" 0 0 2 0 2 0 2 30404 PVC - 8" 0 0 2 0 2 0 2 30405 PVC - 8" 0 0 2 0 2 0 2 30407 PVC - 8" 0 0 2 0 2 0 2 30408 PVC - 8" 0 0 2 0 2 0 2 30409 PVC - 8" 0 0 2 0 2 0 2 30720 PVC - 8" 0 0 2 0 2 0 2 30721 PVC - 8" 0 0 2 0 2 0 2 30722 PVC - 8" 0 0 2 0 2 0 2 30723 PVC - 8" 0 0 2 0 2 0 2 30724 PVC - 8" 0 0 2 0 2 0 2 30725 PVC - 8" 0 0 2 0 2 0 2 164 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 30726 PVC - 8" 0 0 2 0 2 0 2 30729 PVC - 8" 0 0 2 0 2 0 2 30730 PVC - 8" 0 0 2 0 2 0 2 30414 PVC - 8" 0 0 2 0 2 0 2 28555 UNK - 0" 0 0 1 2 1 0 2 28629 PVC - 6" 0 0 2 0 2 0 2 29467 PVC - 8" 0 0 2 0 2 0 2 29477 PVC - 8" 0 0 2 0 2 0 2 29480 PVC - 8" 0 0 2 0 2 0 2 29481 PVC - 8" 0 0 2 0 2 0 2 30415 PVC - 8" 0 0 2 0 2 0 2 30416 PVC - 8" 0 0 2 0 2 0 2 30792 UNK - 0" 0 0 1 2 1 0 2 30801 PVC - 8" 0 0 2 0 2 0 2 30803 PVC - 8" 0 0 2 0 2 0 2 30805 PVC - 8" 0 0 2 0 2 0 2 30807 PVC - 8" 0 0 2 0 2 0 2 30809 PVC - 8" 0 0 2 0 2 0 2 30811 PVC - 8" 0 0 2 0 2 0 2 30813 PVC - 8" 0 0 2 0 2 0 2 31018 PVC - 6" 0 0 2 0 2 0 2 31417 PVC - 8" 0 0 2 0 2 0 2 31419 PVC - 8" 0 0 2 0 2 0 2 31702 PVC - 12" 0 0 2 2 0 0 2 31704 PVC - 12" 0 0 2 2 0 0 2 31712 PVC - 12" 0 0 2 2 0 0 2 31726 PVC - 12" 0 0 2 2 0 0 2 31736 PVC - 2" 0 0 2 0 2 0 2 165 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 31737 PVC - 6" 0 0 2 0 2 0 2 90019 PVC - 8" 0 0 2 0 2 0 2 90027 PVC - 8" 0 0 2 0 2 0 2 90028 PVC - 8" 0 0 2 0 2 0 2 90334 PVC - 8" 0 0 2 0 2 0 2 90030 PVC - 8" 0 0 2 0 2 0 2 90031 PVC - 8" 0 0 2 0 2 0 2 90032 PVC - 8" 0 0 2 0 2 0 2 90033 PVC - 8" 0 0 2 0 2 0 2 90034 PVC - 8" 0 0 2 0 2 0 2 90035 PVC - 8" 0 0 2 0 2 0 2 90036 PVC - 8" 0 0 2 0 2 0 2 90038 PVC - 8" 0 0 2 0 2 0 2 90039 PVC - 8" 0 0 2 0 2 0 2 90040 PVC - 8" 0 0 2 0 2 0 2 90041 PVC - 8" 0 0 2 0 2 0 2 90042 PVC - 8" 0 0 2 0 2 0 2 90043 PVC - 8" 0 0 2 0 2 0 2 90044 PVC - 8" 0 0 2 0 2 0 2 90045 PVC - 8" 0 0 2 0 2 0 2 90046 PVC - 8" 0 0 2 0 2 0 2 90047 PVC - 8" 0 0 2 0 2 0 2 90048 PVC - 8" 0 0 2 0 2 0 2 6650677 PVC - 8" 0 0 2 0 2 0 2 5530881 PVC - 8" 0 0 2 0 2 0 2 4741041 PVC - 8" 0 0 2 0 2 0 2 4771060 PVC - 8" 0 0 2 0 2 0 2 7490524 PVC - 8" 0 0 2 0 2 0 2 166 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 8830279 PVC - 8" 0 0 2 0 2 0 2 3540446 PVC - 6" 0 0 2 0 2 0 2 4960480 PVC - 6" 0 0 2 0 2 0 2 9580742 PVC - 6" 0 0 2 0 2 0 2 9430768 PVC - 6" 0 0 2 0 2 0 2 6380743 PVC - 6" 0 0 2 0 2 0 2 8070436 PVC - 6" 0 0 2 0 2 0 2 5070461 PVC - 6" 0 0 2 0 2 0 2 9350782 PVC - 6" 0 0 2 0 2 0 2 9670725 PVC - 6" 0 0 2 0 2 0 2 6480748 PVC - 6" 0 0 2 0 2 0 2 9710119 PVC - 8" 0 0 2 0 2 0 2 90366 UNK - 2" 0 0 1 1 2 0 2 0 UNK - 8" 0 0 1 1 2 0 2 11545 PVC - 42" 0 0 2 1 0 0 1 11547 PVC - 42" 0 0 2 1 0 0 1 11549 PVC - 18" 0 0 2 1 0 0 1 11557 PVC - 15" 0 0 2 1 0 0 1 11611 PVC - 36" 0 0 2 1 0 0 1 11613 PVC - 36" 0 0 2 1 0 0 1 11615 PVC - 36" 0 0 2 1 0 0 1 11617 PVC - 36" 0 0 2 1 0 0 1 11627 PVC - 36" 0 0 2 1 0 0 1 11631 PVC - 36" 0 0 2 1 0 0 1 13301 PVC - 30" 0 0 2 1 0 0 1 13303 PVC - 30" 0 0 2 1 0 0 1 13305 PVC - 30" 0 0 2 1 0 0 1 13307 PVC - 30" 0 0 2 1 0 0 1 167 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 13309 PVC - 30" 0 0 2 1 0 0 1 13311 PVC - 30" 0 0 2 1 0 0 1 13314 PVC - 30" 0 0 2 1 0 0 1 13315 PVC - 30" 0 0 2 1 0 0 1 13317 PVC - 30" 0 0 2 1 0 0 1 13319 PVC - 30" 0 0 2 1 0 0 1 13321 PVC - 30" 0 0 2 1 0 0 1 13323 PVC - 30" 0 0 2 1 0 0 1 13342 PVC - 12" 0 0 2 1 0 0 1 13653 PVC - 42" 0 0 2 1 0 0 1 13993 PVC - 30" 0 0 2 1 0 0 1 14003 PVC - 21" 0 0 2 1 0 0 1 14007 PVC - 21" 0 0 2 1 0 0 1 14009 PVC - 21" 0 0 2 1 0 0 1 14130 DIP - 14" 0 0 3 0 0 0 1 14278 PVC - 12" 0 0 2 1 0 0 1 14280 PVC - 18" 0 0 2 1 0 0 1 14282 PVC - 18" 0 0 2 1 0 0 1 14284 PVC - 24" 0 0 2 1 0 0 1 14286 PVC - 24" 0 0 2 1 0 0 1 15840 PVC - 21" 0 0 2 1 0 0 1 15841 PVC - 21" 0 0 2 1 0 0 1 15913 PVC - 12" 0 0 2 1 0 0 1 15915 PVC - 12" 0 0 2 1 0 0 1 15931 PVC - 12" 0 0 2 1 0 0 1 15933 PVC - 12" 0 0 2 1 0 0 1 15935 PVC - 12" 0 0 2 1 0 0 1 15937 PVC - 12" 0 0 2 1 0 0 1 168 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 15961 PVC - 12" 0 0 2 1 0 0 1 15963 PVC - 12" 0 0 2 1 0 0 1 15969 PVC - 12" 0 0 2 1 0 0 1 15971 PVC - 18" 0 0 2 1 0 0 1 15973 PVC - 18" 0 0 2 1 0 0 1 16303 PVC - 24" 0 0 2 1 0 0 1 16534 PVC - 12" 0 0 2 1 0 0 1 16536 PVC - 15" 0 0 2 1 0 0 1 16538 PVC - 15" 0 0 2 1 0 0 1 16540 PVC - 15" 0 0 2 1 0 0 1 16542 PVC - 15" 0 0 2 1 0 0 1 17354 DIP - 14" 0 0 3 0 0 0 1 17361 PVC - 24" 0 0 2 1 0 0 1 21359 PVC - 10" 0 0 2 1 0 0 1 23000 UNK - 6" 0 0 1 0 2 0 1 23001 UNK - 6" 0 0 1 0 2 0 1 23002 UNK - 6" 0 0 1 0 2 0 1 23008 UNK - 8" 0 0 1 0 2 0 1 23009 UNK - 8" 0 0 1 0 2 0 1 23006 PVC - 24" 0 0 2 1 0 0 1 23010 UNK - 8" 0 0 1 0 2 0 1 23011 UNK - 8" 0 0 1 0 2 0 1 23419 PVC - 30" 0 0 2 1 0 0 1 23861 UNK - 8" 0 0 1 0 2 0 1 23863 UNK - 8" 0 0 1 0 2 0 1 23865 UNK - 8" 0 0 1 0 2 0 1 23871 UNK - 6" 0 0 1 0 2 0 1 23873 UNK - 6" 0 0 1 0 2 0 1 169 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 24506 UNK - 8" 0 0 1 0 2 0 1 27218 PVC - 10" 0 0 2 1 0 0 1 27223 PVC - 10" 0 0 2 1 0 0 1 27224 PVC - 10" 0 0 2 1 0 0 1 27225 PVC - 10" 0 0 2 1 0 0 1 27228 PVC - 15" 0 0 2 1 0 0 1 27582 PVC - 12" 0 0 2 1 0 0 1 27583 PVC - 12" 0 0 2 1 0 0 1 27584 PVC - 12" 0 0 2 1 0 0 1 27585 PVC - 12" 0 0 2 1 0 0 1 27586 PVC - 12" 0 0 2 1 0 0 1 27587 PVC - 12" 0 0 2 1 0 0 1 27588 PVC - 12" 0 0 2 1 0 0 1 25992 UNK - 6" 0 0 1 0 2 0 1 26187 DIP - 30" 0 0 3 0 0 0 1 26505 UNK - 0" 0 0 1 1 1 0 1 90368 UNK - 6" 0 0 1 0 2 0 1 90369 UNK - 6" 0 0 1 0 2 0 1 90370 UNK - 6" 0 0 1 0 2 0 1 90371 UNK - 6" 0 0 1 0 2 0 1 90022 PVC - 18" 0 0 2 1 0 0 1 90023 PVC - 18" 0 0 2 1 0 0 1 90024 PVC - 18" 0 0 2 1 0 0 1 90025 PVC - 18" 0 0 2 1 0 0 1 90026 PVC - 18" 0 0 2 1 0 0 1 90355 PVC - 12" 0 0 2 1 0 0 1 3430468 UNK - 6" 0 0 1 0 2 0 1 8160441 UNK - 6" 0 0 1 0 2 0 1 170 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 24531 UNK - 14" 0 0 1 1 0 0 1 11559 PVC - 18" 0 0 2 0 0 0 1 11561 PVC - 18" 0 0 2 0 0 0 1 11563 PVC - 18" 0 0 2 0 0 0 1 12475 PVC - 10" 0 0 2 0 0 0 1 12477 PVC - 10" 0 0 2 0 0 0 1 12479 PVC - 10" 0 0 2 0 0 0 1 13257 PVC - 12" 0 0 2 0 0 0 1 13259 PVC - 12" 0 0 2 0 0 0 1 13261 PVC - 12" 0 0 2 0 0 0 1 13269 PVC - 12" 0 0 2 0 0 0 1 13271 PVC - 12" 0 0 2 0 0 0 1 13273 PVC - 12" 0 0 2 0 0 0 1 13276 PVC - 12" 0 0 2 0 0 0 1 13278 PVC - 12" 0 0 2 0 0 0 1 13280 PVC - 12" 0 0 2 0 0 0 1 13281 PVC - 12" 0 0 2 0 0 0 1 13283 PVC - 12" 0 0 2 0 0 0 1 13285 PVC - 12" 0 0 2 0 0 0 1 13287 PVC - 12" 0 0 2 0 0 0 1 13289 PVC - 12" 0 0 2 0 0 0 1 13291 PVC - 12" 0 0 2 0 0 0 1 13293 PVC - 12" 0 0 2 0 0 0 1 13295 PVC - 12" 0 0 2 0 0 0 1 13297 PVC - 12" 0 0 2 0 0 0 1 13992 PVC - 30" 0 0 2 0 0 0 1 13995 PVC - 21" 0 0 2 0 0 0 1 14123 UNK - 36" 0 0 1 1 0 0 1 171 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 14131 PVC - 21" 0 0 2 0 0 0 1 14276 PVC - 10" 0 0 2 0 0 0 1 14789 PVC - 12" 0 0 2 0 0 0 1 14790 PVC - 12" 0 0 2 0 0 0 1 15836 PVC - 21" 0 0 2 0 0 0 1 15911 PVC - 12" 0 0 2 0 0 0 1 15917 PVC - 12" 0 0 2 0 0 0 1 15919 PVC - 12" 0 0 2 0 0 0 1 15921 PVC - 12" 0 0 2 0 0 0 1 15923 PVC - 12" 0 0 2 0 0 0 1 15925 PVC - 12" 0 0 2 0 0 0 1 15927 PVC - 12" 0 0 2 0 0 0 1 15929 PVC - 12" 0 0 2 0 0 0 1 15939 PVC - 12" 0 0 2 0 0 0 1 15941 PVC - 12" 0 0 2 0 0 0 1 15943 PVC - 12" 0 0 2 0 0 0 1 15945 PVC - 12" 0 0 2 0 0 0 1 15947 PVC - 12" 0 0 2 0 0 0 1 15949 PVC - 12" 0 0 2 0 0 0 1 15951 PVC - 12" 0 0 2 0 0 0 1 15953 PVC - 12" 0 0 2 0 0 0 1 15959 PVC - 12" 0 0 2 0 0 0 1 15965 PVC - 12" 0 0 2 0 0 0 1 15975 PVC - 18" 0 0 2 0 0 0 1 15977 PVC - 18" 0 0 2 0 0 0 1 15979 PVC - 18" 0 0 2 0 0 0 1 15981 PVC - 18" 0 0 2 0 0 0 1 15984 PVC - 21" 0 0 2 0 0 0 1 172 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 16299 PVC - 15" 0 0 2 0 0 0 1 16301 PVC - 24" 0 0 2 0 0 0 1 16524 PVC - 10" 0 0 2 0 0 0 1 16532 PVC - 12" 0 0 2 0 0 0 1 16548 UNK - 24" 0 0 1 1 0 0 1 20163 UNK - 12" 0 0 1 1 0 0 1 20165 UNK - 12" 0 0 1 1 0 0 1 20168 UNK - 12" 0 0 1 1 0 0 1 20171 UNK - 12" 0 0 1 1 0 0 1 23390 UNK - 0" 0 0 1 0 1 0 1 23759 PVC - 12" 0 0 2 0 0 0 1 23841 PVC - 10" 0 0 2 0 0 0 1 23842 PVC - 15" 0 0 2 0 0 0 1 23845 PVC - 10" 0 0 2 0 0 0 1 23857 UNK - 0" 0 0 1 0 1 0 1 23859 UNK - 0" 0 0 1 0 1 0 1 24510 UNK - 18" 0 0 1 1 0 0 1 27211 PVC - 10" 0 0 2 0 0 0 1 27212 PVC - 10" 0 0 2 0 0 0 1 27213 PVC - 10" 0 0 2 0 0 0 1 27214 PVC - 10" 0 0 2 0 0 0 1 27215 PVC - 10" 0 0 2 0 0 0 1 27216 PVC - 10" 0 0 2 0 0 0 1 27217 PVC - 10" 0 0 2 0 0 0 1 27219 PVC - 10" 0 0 2 0 0 0 1 27226 PVC - 12" 0 0 2 0 0 0 1 27227 PVC - 12" 0 0 2 0 0 0 1 27344 PVC - 10" 0 0 2 0 0 0 1 173 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 28464 UNK - 0" 0 0 1 0 1 0 1 28557 UNK - 0" 0 0 1 0 1 0 1 28559 UNK - 0" 0 0 1 0 1 0 1 28561 UNK - 0" 0 0 1 0 1 0 1 29449 UNK - 0" 0 0 1 0 1 0 1 30793 UNK - 0" 0 0 1 0 1 0 1 90358 PVC - 18" 0 0 2 0 0 0 1 90010 PVC - 15" 0 0 2 0 0 0 1 31529 UNK - 0" 0 0 1 0 1 0 1 31700 PVC - 12" 0 0 2 0 0 0 1 90012 PVC - 18" 0 0 2 0 0 0 1 90013 PVC - 18" 0 0 2 0 0 0 1 90014 PVC - 18" 0 0 2 0 0 0 1 90015 PVC - 18" 0 0 2 0 0 0 1 90016 PVC - 18" 0 0 2 0 0 0 1 90017 PVC - 18" 0 0 2 0 0 0 1 90018 PVC - 18" 0 0 2 0 0 0 1 90020 PVC - 18" 0 0 2 0 0 0 1 90021 PVC - 15" 0 0 2 0 0 0 1 90356 PVC - 12" 0 0 2 0 0 0 1 4250462 PVC - 12" 0 0 2 0 0 0 1 5930556 PVC - 12" 0 0 2 0 0 0 1 8250686 PVC - 12" 0 0 2 0 0 0 1 10610818 PVC - 12" 0 0 2 0 0 0 1 3730411 PVC - 15" 0 0 2 0 0 0 1 3830393 PVC - 15" 0 0 2 0 0 0 1 11760882 PVC - 12" 0 0 2 0 0 0 1 19 UNK - 0" 0 0 1 0 1 0 1 174 Risk Assessment Report: Horizontal Assets Points Assigned for Factors Prioritization 1 - 10 Inside the Asset ID Type - Inside the Depth of Date of Normalized Buffer Pipe Type Diameter Diameter Buffer Bury Install by Basin Concrete 24518 UNK - 12" 0 0 1 0 0 0 0 15783 UNK - 24" 0 0 1 0 0 0 0 175 Risk Assessment Report: Horizontal Assets 176