HomeMy WebLinkAboutWilson Okamoto - OH.2 Community Planning (Environmental Assessment)SF 330 Part I
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 1
ARCHITECT-ENGINEER QUALIFICATIONS
PART I – CONTRACT SPECIFIC QUALIFICATIONS
A. CONTRACT SPECIFIC INFORMATION
1. TITLE AND LOCATION (City & State) Professional Services FY 2024-2025 County of Hawaii, Housing and Community Development OH.2 Community Planning (EA/EIS)
2. PUBLIC NOTICE DATE
June 1, 2024
3. SOLICITATION OR PROJECT NUMBER
B. ARCHITECT-ENGINEER POINT OF CONTACT
4. NAME AND TITLE
Michael M. Fujita, PE, President
5. NAME OF FIRM
6. TELEPHONE NUMBER
808-946-2277
7. FAX NUMBER
808-946-2253
8. E-MAIL ADDRESS
mfujita@wilsonokamoto.com
C. PROPOSED TEAM
(Complete this section for the prime contractor and all key subcontractors)
PRIME J-V PARTNER SUBCON-TRACTOR 8. FIRM NAME 9. ADDRESS 10. ROLE IN THIS CONTRACT
a. Wilson Okamoto Corporation
CHECK IF BRANCH OFFICE
1907 S. Beretania Street, Suite 400 Honolulu, HI 96826
Civil Engineer, Transportation Engineer, and Planner
b.
Nakamura Oyama & Associates, Inc.
CHECK IF BRANCH OFFICE
1314 S. King Street, Suite 401 Honolulu, HI 96814 Electrical Engineering
c.
Ronald N.S. Ho & Associates, Inc.
CHECK IF BRANCH OFFICE
2153 N. King Street, Suite 201 Honolulu, HI 96819 Electrical Engineering
d. Power Engineers
CHECK IF BRANCH OFFICE
109 Holomua Street Hilo, HI 96720 Electrical Engineering
e.
Kraig K. Otani & Associates
CHECK IF BRANCH OFFICE
99-860 Iwaena Street, Suite #202
Aiea, HI 96701
Electrical Engineering
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 2
C. PROPOSED TEAM
(Complete this section for the prime contractor and all key subcontractors)
PRIME J-V PARTNER SUBCON-TRACTOR 8. FIRM NAME 9. ADDRESS 10. ROLE IN THIS CONTRACT
f. InSynergy Engineering, Inc.
CHECK IF BRANCH OFFICE
828 Fort Street Mall, Suite 500 Honolulu, HI 96813 Mechanical Engineering and Fire Protection
g. Notkin Hawaii, Inc.
CHECK IF BRANCH OFFICE
738 Kaheka Street, Suite 301 Honolulu, HI 96814 Mechanical Engineering
h.
Randolph Murayama & Associates, Inc.
CHECK IF BRANCH OFFICE
1267 Young Street Honolulu, HI 96826 Mechanical Engineering
i.
Thermal Engineering Corporation
CHECK IF BRANCH OFFICE
512 Kalihi Street Honolulu, HI 96819 Mechanical Engineering and Fire Protection
j. Brown and Caldwell Consultants
CHECK IF BRANCH OFFICE
737 Bishop Street, Suite 3000 Pacific Guardian Center
Mauka Tower Honolulu, HI 96813
Environmental Engineering
k. CH2M HILL
CHECK IF BRANCH OFFICE
1132 Bishop Street, #1100 Honolulu, HI 96813-2863 Water / Wastewater Engineering
l. Masa Fujioka & Associates
CHECK IF BRANCH OFFICE
98-021 Kamehameha Highway, #337 Aiea, HI 96701 Environmental / Hazardous Waste
m.
Myounghee Noh & Associates, LLC
CHECK IF BRANCH OFFICE
99-1046 Iwaena Street, 210A Aiea, HI 96701 Environmental / Hazardous Waste
n.
EnviroServices & Training Center, LLC
CHECK IF BRANCH OFFICE
505 Ward Avenue, Suite #202 Honolulu, HI 96814 Environmental / Hazardous Waste
o.
Haley & Aldrich
CHECK IF BRANCH OFFICE
500 Ala Moana Boulevard, Suite 6-250 Honolulu, HI 96813 Environmental / Hazardous Waste
p. ENPRO Consulting
CHECK IF BRANCH OFFICE
151 Hekili Street, Suite 210 Kailua, HI 96734 Environmental / Hazardous Waste
q. Geolabs, Inc.
CHECK IF BRANCH OFFICE
94-429 Koaki Street, Suite 200 Waipahu, HI 96797 Geotechnical / Soil Engineering
r. Pacific Geotechnical Engineers
CHECK IF BRANCH OFFICE
94-417 Akoki Street Waipahu, HI 96797 Geotechnical / Soil Engineering
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 3
C. PROPOSED TEAM
(Complete this section for the prime contractor and all key subcontractors)
PRIME J-V PARTNER SUBCON-TRACTOR 8. FIRM NAME 9. ADDRESS 10. ROLE IN THIS CONTRACT
s. Hirata & Associates, Inc.
CHECK IF BRANCH OFFICE
99-1433 Koaha Place Aiea, HI 96701 Geotechnical / Soil Engineering
t. Yogi Kwong Engineers, LLC
CHECK IF BRANCH OFFICE
677 Ala Moana Boulevard, Suite 710 Honolulu, HI 96813 Geotechnical / Soil Engineering
u. Mason Architects, Inc.
CHECK IF BRANCH OFFICE
119 Merchant Street, Suite 501 Honolulu, HI 96813 Historic Resource Analysis
v. PBR Hawaii
CHECK IF BRANCH OFFICE
1001 Bishop Street Pacific Tower, Suite 650 Honolulu, HI 96813 Landscape Architect
w. Walters Kimura Motoda, Inc.
CHECK IF BRANCH OFFICE
1148 3rd Avenue Honolulu, HI 96816 Landscape Architect
x. MGD Technologies
CHECK IF BRANCH OFFICE
770 Kapiolani Boulevard, Suite 401 Honolulu, Hawaii 96813 Pipeline Inspection
y. Underground Services, Inc.
CHECK IF BRANCH OFFICE
866 Iwilei Road, Unit 215 Honolulu, HI 96817 Pipeline Inspection & Utility Locating
z. Eckard Brandes, Inc.
CHECK IF BRANCH OFFICE
101-D Kainalu Drive Kailua, HI 96734 Pipeline Inspection
aa.
Hawaii Geophysical Services
CHECK IF BRANCH OFFICE
743 Waiakamilo Road, #E Honolulu, HI 96817 Utility Locating
bb. Moffatt & Nichol
CHECK IF BRANCH OFFICE
733 Bishop Street, Suite 1740 Honolulu, HI 96813 Coastal Engineering & Structural Engineering
cc.
Consulting Structural Hawaii, Inc.
CHECK IF BRANCH OFFICE
931 Hausten St. # 200 Honolulu, HI 96826 Structural Engineering
dd. KPFF Consulting Engineers
CHECK IF BRANCH OFFICE
1601 Fifth Avenue, Suite 1600 Seattle, WA 98101 Structural Engineering
ee. KSF, Inc.
CHECK IF BRANCH OFFICE
615 Piikoi Street, Suite 300 Honolulu, HI 96814 Structural Engineering
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 4
C. PROPOSED TEAM
(Complete this section for the prime contractor and all key subcontractors)
PRIME J-V PARTNER SUBCON-TRACTOR 8. FIRM NAME 9. ADDRESS 10. ROLE IN THIS CONTRACT
ff.
Nagamine Okawa Engineers,
Inc.
CHECK IF BRANCH OFFICE
1003 Bishop St., Suite 2025 Honolulu, HI 96813 Structural Engineering
gg. KAI Hawaii
CHECK IF BRANCH OFFICE
50 S. Beretania St C-119C, Honolulu, HI 9681 Structural Engineering
hh. Sea Engineering, Inc.
CHECK IF BRANCH OFFICE
41-305 Kalanianaole Hwy. Makai Research Center Waimanalo, HI 96795 Coastal Engineering
ii. AHL
CHECK IF BRANCH OFFICE
733 Bishop Street, #3100 Honolulu, HI 96813 Architect
jj.
WCIT Architecture
CHECK IF BRANCH OFFICE
725 Kapiolani Boulevard, 4th Floor Honolulu, HI 96813 Architect
kk.
Design Partners, Inc.
CHECK IF BRANCH OFFICE
1580 Makaloa Street, #1100 Honolulu, HI 96814 Architect
ll.
WATG (Wimberly Allison Tong & Goo)
CHECK IF BRANCH OFFICE
700 Bishop Street, #1800 Honolulu, HI 96813 Architect
mm.
Richard Matsunaga & Associates, Architects, Inc.
CHECK IF BRANCH OFFICE
1150 S. King Street, 8th Floor Honolulu, HI 96814 Architect
nn. Ushijima Architects
CHECK IF BRANCH OFFICE
2226 Young Street, Suite A Honolulu, HI 96826 Architect
oo.
Anbe, Aruga & Ishizu Architects, Inc.
CHECK IF BRANCH OFFICE
1441 Kapiolani Boulevard, Suite 206 Honolulu, HI 96814 Architect
pp. Ferraro Choi & Associates, Ltd.
CHECK IF BRANCH OFFICE
1240 Ala Moana Boulevard, #510 Honolulu, HI 96814 Architect
qq. Lowney Architecture
CHECK IF BRANCH OFFICE
76 N King Street, Suite 204 Honolulu, Hawaii 96817 Architect
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 5
C. PROPOSED TEAM
(Complete this section for the prime contractor and all key subcontractors)
PRIME J-V PARTNER SUBCON-TRACTOR 8. FIRM NAME 9. ADDRESS 10. ROLE IN THIS CONTRACT
rr. ControlPoint Surveying, Inc.
CHECK IF BRANCH OFFICE
615 Piikoi Street, Suite 700 Honolulu, HI 96814 Surveying & Mapping
ss.
Line of Sight LLC
CHECK IF BRANCH OFFICE
1088 Bishop Street Honolulu, HI 96813 Surveying & Mapping
tt. Rider Levett Bucknall, Ltd.
CHECK IF BRANCH OFFICE
1001 Bishop Street, Suite 1340 Honolulu, HI 96813 Cost Engineering
uu. J. Uno & Associates
CHECK IF BRANCH OFFICE
1210 Ward Avenue, Suite 204 Honolulu, HI 96814 Cost Engineering
vv. D.L. Adams Associates Ltd.
CHECK IF BRANCH OFFICE
970 N Kalaheo Avenue Suite A311 Kailua, HI 96734 Acoustic Engineering
ww. Y. Ebisu & Associates
CHECK IF BRANCH OFFICE
1126 12th Avenue, Room 305 Honolulu, HI 96816 Acoustic Engineering
xx.
Atmospheric Research & Technology, LLC
CHECK IF BRANCH OFFICE
P.O. Box 1808 Kailua-Kona, Hawaii 96745 Air Quality
yy. Pacific Legacy, Inc.
CHECK IF BRANCH OFFICE
332 Uluniu Street Kailua, HI 96734 Archaeological and Cultural Impact Assessment
zz. Cultural Surveys Hawaii
CHECK IF BRANCH OFFICE
P.O. Box 1114 Kailua, HI 96734 Archaeological and Cultural Impact Assessment
aaa. Honua Consulting
CHECK IF BRANCH OFFICE
4348 Waialae Ave #254, Honolulu, HI 96816 Archaeological and Cultural Impact Assessment
bbb. AECOS, Inc.
CHECK IF BRANCH OFFICE
970 N. Kalaheo Avenue Suite C311 Kailua, HI 96734
Biological Consultant – Avifauna, Botanica, Mammalian, Water Quality, Marine and Aquatic Biology
ccc. Hawaii Research Consultants
CHECK IF BRANCH OFFICE
4467 Sierra Drive Honolulu, HI 96816 Biological Consultant - Water Quality and Marine Biology
ddd. Decision Analysts Hawaii, Inc.
CHECK IF BRANCH OFFICE
1655 Kamoke Street Honolulu, HI 96813 Economic Impact Assessment
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 6
C. PROPOSED TEAM
(Complete this section for the prime contractor and all key subcontractors)
PRIME J-V PARTNER SUBCON-TRACTOR 8. FIRM NAME 9. ADDRESS 10. ROLE IN THIS CONTRACT
eee. Strategy Pacifica, Inc.
CHECK IF BRANCH OFFICE
700 Richards Street, Suite 709 Honolulu, HI 96813 Economic Impact Assessment
fff. Munekiyo & Hiraga, Inc.
CHECK IF BRANCH OFFICE
305 High Street Suite 104 Wailuku, HI 96793
Planning and Economic Impact Assessment
ggg. W-Trans
CHECK IF BRANCH OFFICE
490 Mendocino Ave., Suite 201 Santa Rosa, CA 95401 Traffic Engineering
hhh.
Hawaiian Corrosion Services
CHECK IF BRANCH OFFICE
PO Box 1781 Pearl City, HI 96782 Cathodic Protection
iii.
V&A Consulting Engineers
CHECK IF BRANCH OFFICE
11011 Via Frontera, Suite C San Diego, CA 92127 Cathodic Protection
D. ORGANIZATIONAL CHART OF PROPOSED TEAM (Attached)
SUB-CONSULTANTSCounty of Hawaii
Housing and Community
Development
WOC
Transportation
Engineer
WOC
Transportation/ Traffic Engineer
Electrical Engineer
Other
Sub-consultants, as needed
Civil Engineer
WOC
Architect
Structural Engineer
Geotechnical Engineer
Electrical Engineer
Environmental Engineer
Surveyor
Mechanical & Fire Protection
Eng.
Other
Sub-consultants, as needed
Planner
WOC
Archaeological/
Cultural
Biological
Noise Quality
Air Quality
Water Quality
Other
Sub-consultants, as needed
Admin. Support
WOC
D. ORGANIZATION CHART
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY (Complete one Section E for each key person.)
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 8
12. NAME
Michael M. Fujita, P.E.
13. TITLE SERVICE PROVIDED
President
14. YEARS EXPERIENCE
a. TOTAL 35
b. WITH CURRENT FIRM 35
15. FIRM NAME AND LOCATION (City and State)
Wilson Okamoto Corporation, Honolulu, Hawaii
16. EDUCATION (DEGREE AND SPECIALIZATION)
B.S., Civil Engineering, Loyola Marymount, 1988
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
PE-8303, Hawaii, Civil Engineering, 1994
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Certified Water Pollution Plan Preparer, City & County of Honolulu,12/31/2024 Certified Erosion and Sediment Control Plan Preparer, City & County of Honolulu, 12/31/2024 Mr. Fujita has more than 30 years of civil design experience. He has led multi-disciplinary teams for the planning and design of various types of projects, including residential developments, resorts/hotels, and commercial/retail buildings. Mr. Fujita has prepared engineering reports; construction documents for site; water, wastewater, roadway, drainage; cost estimates; and specifications for projects. He also provides technical advice on projects. As President, he’s responsible for on-going operations and long-term business development.
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
Waiea, Ward Village Kakaako, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) 2016
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Project Manager for the development of civil design and construction documents for the proposed Block “C”, a residential tower with retail and restaurant space. The project site is bounded by Auahi Street, Kamakee Street, Ala Moana Boulevard and Ward Warehouse. The project encompasses approximately 2 acres and is formerly the at grade parking lot. ECC: $430 Million
b.
(1) TITLE AND LOCATION (City and State)
Daniel K. Inouye College of Pharmacy at University of Hilo Hilo, Hawaii, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) 2020
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Sr. Civil Engineer for the design and preparation of construction documents for demolition, erosion control, site layout, grading, and utility plans. The College of Pharmacy will be a new, 2-story facility consisting of 46,000 SF and expansion of the existing at-grade parking lot. Scope also included the preparation and processing the NPDES and Grading Permits. ECC: $33 Million
c.
(1) TITLE AND LOCATION (City and State)
Thomas Square Improvements Honolulu, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Phase 1 – 2017 Phase 2 - 2018 Phase 3 - 2021
CONSTRUCTION (If applicable) Phase 1 – 2017 Phase 2 – 2018 Phase 3 – 2021
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Sr. Civil Engineer for the design and preparation of construction documents for the demolition, erosion control, site layout, grading, and utility plans. Improvements consisted of improving pedestrian access to the park, upgrading existing restroom facilities, restoring/improving existing fountain, and overall hardscape and landscape improvements. Scope included evaluating existing water, sewer and drainage systems, calculating demands for proposed improvements, develop alternatives and consult with various agencies.
d.
(1) TITLE AND LOCATION (City and State)
Marriott Vacation Resort Waikiki at 2080 Kalakaua Avenue (formerly Nike Town) Waikiki, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Design – 2023 CONSTRUCTION (If applicable) Under Construction
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
The former Nike Town in Waikiki is proposed to be converted to a 7-story mixed-use residential timeshare with 119 units, including retail on the ground level. The site encompasses approximately 0.9 acres and is currently a 4-story commercial property. Mr. Fujita provides technical assistance
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY (Complete one Section E for each key person.)
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 9
12. NAME
Keola M. Cheng
13. TITLE SERVICE PROVIDED
Director of Planning Group & Project Manager
14. YEARS EXPERIENCE
a. TOTAL 13 b. WITH CURRENT FIRM 13
15. FIRM NAME AND LOCATION (City and State)
Wilson Okamoto Corporation, Honolulu, Hawaii
16. EDUCATION (DEGREE AND SPECIALIZATION)
B.B.A., Business Administration, Finance, University of Hawaii at Manoa, 2009
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
Kona Village Resort - Entitlement Kona, Hawaii, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 6/2023 CONSTRUCTION (If applicable) 6/2023
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
WOC is assisting Kamehameha Schools with overseeing the redevelopment of the Kona Village Resort, which encompasses 90 acres of oceanfront property. Mr. Cheng assisted with overseeing the entitlement process for the project’s first phase. The entitlements in this phase are based on development replacing most of the previous uses that were approved through the Special Management Area Permit process.
b.
(1) TITLE AND LOCATION (City and State)
Hilo WWTP Headworks, Primary Clarifies and Septage Station Upgrades, Hilo, Hawaii, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) --
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
The COH is proposing to implement improvement at the Hilo WWTP. Keola is the Planning Project Manager conducting research, including verifying existing conditions, reviewing available documents, and consulting with agencies, to determine required permits and approvals.
c.
(1) TITLE AND LOCATION (City and State)
Wahiawa Center for Workforce Excellence (CWE) Wahiawa, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) --
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
State DOE is proposing the CWE adjacent to the new Wahiawa Civic Center. The facility will be used by three (3) major agencies Hawaiʽi State Public Library System, the DOE, and the University of Hawaiʽi Community Colleges. Each agency will be located separately and on separate floors with their own access control. It is recommended that the Library will be located on the ground floor, the DOE facilities on the second floor, and the UH facilities on the third floor. The project will also include an adjoining multi-level parking structure for both public and staff parking with access control. Keola is the Project Manager for the preparation of an Environmental Assessment and Zoning Waiver.
d.
(1) TITLE AND LOCATION (City and State)
Pahala Large Capacity Cesspool Replacement Kau, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2020
CONSTRUCTION (If applicable)
--
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Sr. Planner for the preparation and processing of an Environmental Assessment for a new wastewater collection system and treatment plant to serve the community of Pahala in the rural Kau District. The EA also met National Environmental Policy Act requirements. Mr. Sakaguchi also prepared Special Use Permit.
e.
(1) TITLE AND LOCATION (City and State)
Kona International Airport Master Plan Environmental Assessment, Kona, Hawaii
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2015 CONSTRUCTION (If applicable) --
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Planner for the preparation and processing of state and federal environmental assessments (EA) for proposed improvements at the Kona International Airport. In conjunction with the federal EA, consultation was coordinated for Section 7 of the ESAt and Section 106 of the NHPA Public meetings were held to present the proposed improvements and to solicit input, including for the aforementioned Section 106 process.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY (Complete one Section E for each key person.)
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 10
12. NAME
Dalton Beauprez
13. TITLE SERVICE PROVIDED
Planning Project Manager
14. YEARS EXPERIENCE
a. TOTAL 6 b. WITH CURRENT FIRM 6
15. FIRM NAME AND LOCATION (City and State)
Wilson Okamoto Corporation, Honolulu, Hawaii
16. EDUCATION (DEGREE AND SPECIALIZATION)
Post Graduate, Urban and Regional Planning, University of Hawaii at Manoa B.A., Hawaiian Studies & Psychology, University of Hawaii at Manoa, 2014
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
Kaimuki High School Girl’s Athletic Locker Room East and Central Maui, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2022 CONSTRUCTION (If applicable) --
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Project Manager for the preparation of an Environmental Assessment for proposed athletic locker room. The project will encompass approximately 5,000 square feet (SF) of lockers and meeting area, shower and toilet stalls, a drying room, a coach’s training room, a wet room, equipment storage rooms, janitorial closets, and a unisex room. It is also anticipated that the Proposed Project would include a trainer’s room and potentially a weight training area.
b.
(1) TITLE AND LOCATION (City and State)
Kawaihau-Mailihuna-Hauaala Complete Streets Phase 1B
East Kauai, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable)
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Sr. Planner assisting with community charrette to improve Kawaihau, Mailihuna and Hauaala Roads in East Kauai. The intent of the project is to provide safe routes for students to walk or bike to Kapa‘a Elementary School, Kapa‘a High School and St. Catherine School as well as for residents to get around their neighborhood with multiple transportation modes.
c.
(1) TITLE AND LOCATION (City and State)
Collection System Maintenance (CSM) Pearl City Warehouse Pearl City, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
Active CONSTRUCTION (If applicable)
--
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Dalton assisting with the preparation of an Environmental Assessment for the project. The CCH is proposing to construct a new warehouse in the Pearl City Industrial Park. The lot encompasses approximately 1 acre. The warehouse will house supplies and equipment (pumps, pipes, sand bags, etc.) needed in the event of an emergency.
d.
(1) TITLE AND LOCATION (City and State)
University of Hawaii Community Colleges Wahiawa Value Added Product Development Center Wahiawa, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) 2024
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Planner for the preparation and processing of an Environmental Assessment (EA). The University of Hawaii is proposing to repurpose an existing metal warehouse that formerly housed Tamura’s Wholesale Outlet and convert it to a new vocational school/education facility, aka Value Added Product Development Center. The parcel is approximately 1.5 acres. The new facility would serve as a multi-purpose facility for activities including, but not limited to, festivals, farmer’s markets or other similar market activities, tasting events, merchandising for food products from the facility, etc.
e.
(1) TITLE AND LOCATION (City and State)
Environmental Impact Statement: Proposed Lease (Water Lease) for the Nahiku, Keanae, Honomanu, and Huelo License Areas East and Central Maui, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2021 CONSTRUCTION (If applicable) --
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Planner for the preparation and processing of an Environmental Impact Statement (EIS). In May 2001 Alexander & Baldwin and East Maui Irrigation Company, Ltd. (collectively A&B) filed an application for the Sale of Lease at Public Auction with the Board of Land & Natural Resources (BLNR) seeking a long-term 30-year lease for the “right, privilege, and authority to enter and go upon” the Nahiku, Keanae, Honomanu, and Huelo license areas “for the purpose of developing, diverting, transportation, and using government-owned waters” through the existing East Maui Irrigation (EMI) Aqueduct System. Compliance with the requirements of Chapter 343, HRS is necessary prior to the BLNR’s consideration of the long-term lease request.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY (Complete one Section E for each key person.)
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 11
12. NAME
Harlee Meyers
13. TITLE SERVICE PROVIDED
Planner
14. YEARS EXPERIENCE
a. TOTAL 2 b. WITH CURRENT FIRM 2
15. FIRM NAME AND LOCATION (City and State)
Wilson Okamoto Corporation, Honolulu, Hawaii
16. EDUCATION (DEGREE AND SPECIALIZATION)
MURP, Urban and Regional Planning, University of Hawaii at Manoa, 2021 B.S., Global Environmental Science, University of Hawaii at Manoa, 2018
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
Makalawena Integrated Resource Management Plan Environmental Assessment & Entitlements, Kona, Hawaii, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) --
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Kamehameha Schools (KS) desires to formulate and implement an Integrated Resources Management Plan for property it owns at Makalawena makai of Queen Ka‘ahumanu Highway. The 353 acre parcel contains unique and sensitive natural, cultural and historical resources. Harlee is assisting with the preparation of an Environmental Assessment.
b.
(1) TITLE AND LOCATION (City and State)
Kahekili Highway Slope Repair Kahakuloa, Maui, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) --
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
The County of Maui is proposing roadway repairs along 1,300 feet of Kahekili Highway Milepost 15. Improvements include repairs to slope and pavement edge failure. Harlee is assisting with the preparation of environmental assessment and permits.
c.
(1) TITLE AND LOCATION (City and State)
Waipahu Refuse Facility & Convenience Center Waipahu, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) --
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Harlee is preparing an Environmental Assessment to meet Chapter 343, HRS requirements. The City is proposing to convert the existing Waipahu Incinerator facility into a multi-use refuse division facility to accommodate larger public demand of the Leeward Oahu; office and maintenance shop; and training/education center.
d.
(1) TITLE AND LOCATION (City and State)
Wahiawa Center for Workforce Excellence (CWE) Wahiawa, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) --
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
State DOE is proposing the CWE adjacent to the new Wahiawa Civic Center. The facility will be used by three (3) major agencies Hawaiʽi State Public Library System, the DOE, and the University of Hawaiʽi Community Colleges. Each agency will be located separately and on separate floors with their own access control. It is recommended that the Library will be located on the ground floor, the DOE facilities on the second floor, and the UH facilities on the third floor. The project will also include an adjoining multi-level parking structure for both public and staff parking with access control. Harlee is assisting with the preparation of an Environmental Assessment and Zoning Waiver.
e.
(1) TITLE AND LOCATION (City and State)
Waimea Canyon Drive/Kokee Road Improvements, Phase 2 (MP 4.6 and 4.10) Waimea, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) 2A - Awarded
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
HDOT proposes to upgrade/improve existing shoulders and guardrail systems along Waimea Canyon Road. State and federal funds will be used for the project, thereby triggering compliance with state environmental review laws and federal cross-cutting authorities. Harlee is assisting with preparing and processing permits including, but not limited to HRS Chapter 343 Environmental Assessment (Exemption), NHPA Section 106 consultation, and ESA, Section 7.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY (Complete one Section E for each key person.)
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 12
12. NAME
Brian Lock, P.E.
13. TITLE SERVICE PROVIDED
Vice President & Director of Civil Engineering Group
14. YEARS EXPERIENCE
a. TOTAL 29 b. WITH CURRENT FIRM 21
15. FIRM NAME AND LOCATION (City and State)
Wilson Okamoto Corporation, Honolulu, Hawaii
16. EDUCATION (DEGREE AND SPECIALIZATION)
B.S., Civil Engineering, University of Hawaii at Manoa, 1994
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
PE, 9867, Hawaii, Civil Engineering, 1999
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Certified Water Pollution Plan Preparer, City & County of Honolulu, 12/31/2024 Certified Erosion and Sediment Control Plan Preparer, City & County of Honolulu, 12/31/2024 American Society of Civil Engineers
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
Auahi Street Improvements, Ward Village Honolulu, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Phase 1- 2021/Active Phase 2 – Active
CONSTRUCTION (If applicable) Phase 1 – 2023 Phase 2 – under construction
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Project Manager for the preparation plans to redevelop Auahi Street from current 4-lane road to a Pedestrian and Bicycle friendly 2 -lane road that realigns to connect with Pohukaina Street west of Ward Avenue consistent. Roadway design includes constructing near existing grades, 44-foot curb to curb with two travel lanes, center turn lane, two bike lanes, and bus stops. A relocated mid-block crosswalk with relocated traffic signal will provide pedestrian access across Auahi Street. Associated design includes a new signalized intersection at Ward Ave, grading, curb ramp, landscaping, bike lanes with buffers, pavement marking and signs, water meter adjustments, and fire hydrant relocations
b.
(1) TITLE AND LOCATION (City and State)
Keaau-Pahoa Road Shoulder Improvements, Phases 1 & 2 Puna, Hawaii
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Phase 1 – 2015 Phase 2 - 2018
CONSTRUCTION (If applicable) Phase 1 - 2015 Phase 2 – 2018
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Project Manager for the design of the widening of a 2-mile portion if Keaau-Pahoa Road by installing an additional northbound lane; widening Waipahoehoe Bridge; extending existing culverts; and installing pavement marking, striping and signing. The project converted the shoulder lane into a permanent travel lane. Drainage improvements included lengthening and repair/replacement of existing culverts, and the installation of a new culvert to alleviate flooding conditions.
c.
(1) TITLE AND LOCATION (City and State)
Replace 6” Waterline, Whiskey 1 – 3, NAVMAG (Design-Build) West Loch, Pearl Harbor, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2014 CONSTRUCTION (If applicable) 2014
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Project Manager for the design to replace a 6-inch waterline on Whiskey 1-3. The existing line was replaced with an 8-inch waterline. Implementation of the project was phased so only one wharf would be out of service at one time allowing the Navy access to the remaining two wharves. ECC: $930,000
d.
(1) TITLE AND LOCATION (City and State)
Lahaina Bypass, Phase 1B-2 (Design-Build) Lahaina, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) 2018
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Project Manager for the design of the third phase of the overall Lahaina Bypass (Honoapiilani Highway Realignment) project. The civil design services include design and layout of the plan and profile of the new highway and preparing site plans, grading plans, typical sections, erosion control plans, pavement marking and sign plans, cross sections, hydraulic report, and drainage plans. Culvert design incorporated creative hydraulic techniques to regulate flow given limited available right-of-way. ECC: $39 million
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY (Complete one Section E for each key person.)
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 13
12. NAME
Glenn Kuwaye, P.E., LEED AP
13. TITLE SERVICE PROVIDED
Vice President & Director of Civil Engineering
14. YEARS EXPERIENCE
a. TOTAL 24 b. WITH CURRENT FIRM 19
15. FIRM NAME AND LOCATION (City and State)
Wilson Okamoto Corporation, Honolulu, Hawaii
16. EDUCATION (DEGREE AND SPECIALIZATION)
B.S., Civil Engineering, Santa Clara University, 2000
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
LEED Accredited Professional, 2009 PE-11817, Hawaii, Civil Engineering, 2005 PE-65310, California, Civil Engineer, 2003
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Member, Japanese Chamber of Commerce Certified Water Pollution Plan Preparer, City & County of Honolulu,12/31/2024 Certified Erosion and Sediment Control Plan Preparer, City & County of Honolulu, 12/31/2024
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
Waimano Ridge Sewer System Assessment Pearl City, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) NA
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Sr. Civil Engineer assisting with the preparation of an existing conditions report and Sewer Systems Study. Scope included researching available drawings and documents; CCTV inspection of existing sewer lines; and the preparation of a sewer master plan report. The Sewer System Report assessed existing conditions, identified constraints and maintenance issues, prepared hydraulic analysis to determine sewer improvements required to support the redevelopment outlined in DOH’s 2016 Master Plan Update, described proposed sanitary sewer improvements, including maintenance and rehabilitation recommendations, and rough order of magnitude cost for proposed improvements.
b.
(1) TITLE AND LOCATION (City and State)
Salt Lake/Moanalua Public Library – Parking Lot Improvements Moanalua, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) 2020
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Project Manager for the preparation of construction plans for demolition, site layout, and striping for the repaving of existing parking lot. The repaving consisted of a cold plane and overlay to match the existing AC pavement grades and thickness. ECC: $250K
c.
(1) TITLE AND LOCATION (City and State)
Waimano Ridge Site Water System Improvements, Assessment and Design Pearl City, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) 2016
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Project Manager and Senior Civil Engineer for the design of upgrades to an existing water system, owned by the Department of Health (DOH) and maintained under contract by the Board of Water Supply (BWS. Improvements to the system included the upgrade of 5,000 linear feet of transmission/distribution lines, upgrade of the existing well building and electrical system to meet BWS standards. The project also included the renovation of the existing booster pump station building, paving of 1,150 linear feet of access driveway to the water tank and the installation of 23 fire hydrants, water meters and back-flow preventers. ECC: $6 Million
d.
(1) TITLE AND LOCATION (City and State)
Iao Valley State Monument Phase 2 – Permanent Repairs Iao, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 5/2023 CONSTRUCTION (If applicable) 5/2023
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
The Iao Valley State Monument Park sustained flood damage due to the September 2016 heavy rains on Maui. The heavy rains caused the Wailuku River running through the park to rise, triggering flood damage and landslides along the banks of the park. First phase involved design and construction of remedial measures to stabilize the stream bank to avert further undercutting. Phase 2 involves permanent repairs to address the long-term stability of the parking lot. This will include installation of a series of 30-foot reinforcing bars grouted into drilled holes to stabilize the slope and placement of shotcrete and sculptured to improve the appearance of slope face.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY (Complete one Section E for each key person.)
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 14
12. NAME
Barry Toyota
13. TITLE SERVICE PROVIDED
Sr. Quality Control Specialist – Civil Engineering
14. YEARS EXPERIENCE
a. TOTAL 52 b. WITH CURRENT FIRM 43
15. FIRM NAME AND LOCATION (City and State)
Wilson Okamoto Corporation, Honolulu, Hawaii
16. EDUCATION (DEGREE AND SPECIALIZATION)
B.S., Civil Engineering, University of Hawaii at Manoa, 1980
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
PE-5502, Hawaii, Civil Engineering, 1983
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
American Society of Civil Engineers Mr. Toyota has substantial management and design experience for a broad range of engineering projects in Hawaii. Mr. Toyota's experience includes airports; facility plans; preliminary engineering reports; infrastructure system designs; world-class resorts such as the Grand Wailea and the Four Seasons Wailea; condominiums; agricultural, industrial, and residential subdivisions; golf courses; shopping centers; schools; hospitals; warehouses; and, sewer, roadway and flood control improvements. He has also worked on various military projects. With such experience he provides quality control by reviewing plans and reports for adherence to established standards, completeness and accuracy of work throughout the course of a project.
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
Honolulu Rail Transit Guideway and Transit Stations, Phase 3 Airport Section (Design-Build), Honolulu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) Under Construction
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
As Sr. Quality Control Specialist, Barry reviews civil construction plans for guideway and transit stations. Phase 3 consists of the construction of 5.2 mile long grade separated fixed guideway rail transit system, including four transit stations, beginning from Aloha Stadium to Middle Street. Scope of work includes civil design of widening of the roadways to accommodate the new elevated guideway and support columns and site plans for transit stations.
b.
(1) TITLE AND LOCATION (City and State)
Kapolei Interchange Phase 2 Kapolei, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2021 CONSTRUCTION (If applicable) 2020
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
As Sr. Quality Control Specialist, Barry reviewed construction plans for Kapolei Interchange Improvements, Phase 2. The Project
is located on Interstate Route H-1, between the existing Makakilo Interchange and existing Palailai Interchange. The Kapolei Interchange will provide an off ramp for West bound traffic on H-1 to access Wakea Street via a system of at grade ramps, elevated bridge/overpass roadway, and connections to Farrington Highway. Also included are connections to the improvements currently under construction for the Interstate Route H-1.
c.
(1) TITLE AND LOCATION (City and State)
P-209 Dry Dock No. 3 (future No.5) (NAVFAC Pacific) JBPHH, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) Under Construction
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm As Sr. Quality Control Specialist, Barry reviews construction plans for the project related to landside site features and below grade wet utilities (water, drainage, and gravity sanitary sewer). Also establishing project design storms for site and dry dock storm drainage system design.
d.
(1) TITLE AND LOCATION (City and State)
Ala Wai Bridge – Third Party Review Honolulu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2023 CONSTRUCTION (If applicable) --
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
WOC is a subconsultant providing third party review for the preliminary engineering of the Ala Wai Bridge, consisting of a new pedestrian and bicycle bridge that would connect the Waikiki, McCully and Moiliili neighborhoods, businesses, parks, schools and recreational activities. Barry is assisting the client with third party review.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY (Complete one Section E for each key person.)
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 15
12. NAME
Richard Harada, P.E.
13. TITLE SERVICE PROVIDED
Sr. Civil Project Manager
14. YEARS EXPERIENCE
a. TOTAL 40 b. WITH CURRENT FIRM 36
15. FIRM NAME AND LOCATION (City and State)
Wilson Okamoto Corporation, Honolulu, Hawaii
16. EDUCATION (DEGREE AND SPECIALIZATION)
B.S., Civil Engineering, University of Hawaii at Manoa, 1982
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
PE-6624, Hawaii, Civil Engineering, 1989
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
American Public Works Association, North American Society of Trenchless Technology, Hawaii Water Environment Federation Certified Water Pollution Plan Preparer, City & County of Honolulu,12/31/2024 Certified Erosion and Sediment Control Plan Preparer, City & County of Honolulu, 12/31/2024
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
Hart Street-Waiakamilo Sewer Improvements Honolulu, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Design – 2020 CONSTRUCTION (If applicable) Under Construction
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Project Manager for the preparation of design and construction plans to replace existing sewer line along Hart Street and Waiakamilo Street to Dillingham Boulevard. Design includes new 6-inch sewer line along Nimitz Highway, new 8-, 10- and 12-inch sewer lines along Hart Street which will replace the existing 24-inch sewer line; and new 24-inch sewer line at the intersection of Dillingham Boulevard and Waiakamilo Road.
b.
(1) TITLE AND LOCATION (City and State) Lualualei Wastewater Pump Station Force Main Lualualei, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) 2017
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project Manager and Civil Engineer for the preparation of a condition assessment, design alternatives report, and construction documents for the Lualualei Wastewater Pump Station Force Main project. Regulatory requirements necessitate the force main have bypass capability in the event of a force main break. The design alternatives report will look at options to accomplish this.
c.
(1) TITLE AND LOCATION (City and State)
Kaneohe-Kailua Wastewater Conveyance & Treatment Facilities Project Kaneohe and Kailua, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Planning - 2013 Civil – 2021
CONSTRUCTION (If applicable) 2018
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Project Manager for the planning and preparation of a Facilities Plan for the area serviced by the Kailua Wastewater Pre-Treatment Plant. The project included assessing existing conditions, projecting future population and land use demands on wastewater, and providing projects to address current and future deficiencies. It also included extensive work on a sewer flow analysis model to evaluate the system hydraulics, particularly the wet weather infiltration and inflow during peak storm events. Managed the design of construction plan for a 3-mile underground sewer tunnel from Kailua WWTP to Kaneohe Pre-Treatment Facility. Mr. Harada was also the Project Manager for the design phase of the project. ECC: $175 Million
d.
(1) TITLE AND LOCATION (City and State)
Kauai High School Athletic Courts, Parking and Drainage Improvements Lihue, Kauai, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Design – 12/2022 CONSTRUCTION (If applicable) Under Construction
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Project Manager for the preparation construction plans for new athletic courts to include tennis courts; reconfiguration of front parking are to create a safer drop-off and improve traffic circulation; and drainage improvements to include appropriate channeling for stormwater runoff to minimize flooding from heavy rain events.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY (Complete one Section E for each key person.)
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 16
12. NAME
Brett Kuamoo, P.E.
13. TITLE SERVICE PROVIDED
Sr. Civil Project Manager
14. YEARS EXPERIENCE
a. TOTAL 19 b. WITH CURRENT FIRM 16
15. FIRM NAME AND LOCATION (City and State)
Wilson Okamoto Corporation, Honolulu, Hawaii
16. EDUCATION (DEGREE AND SPECIALIZATION)
B.S., Civil Engineering, University of Hawaii at Manoa, 2010
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
PE-14289, Hawaii, Civil Engineering, 2010
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Certified Water Pollution Plan Preparer, City & County of Honolulu,12/31/2024 Certified Erosion and Sediment Control Plan Preparer, City & County of Honolulu, 12/31/2024
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
Waimano Ridge Water System - Assessment and Design Pearl City, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) 2016
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Sr. Civil Engineer for the design of upgrades to an existing water system. Improvements to the system included the upgrade of 5,000 linear feet of transmission/distribution lines, upgrade of the existing well building and electrical system to meet BWS standards. The project also included the renovation of the existing booster pump station building, paving of 1,150 linear feet of access driveway to the water tank and the installation of 23 fire hydrants, water meters and back-flow preventers. ECC: $6 Million
b.
(1) TITLE AND LOCATION (City and State)
Ilima & Melia, Ward Village Kakaako, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES In Design CONSTRUCTION (If applicable) --
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Sr. Civil Engineer for the preparation of construction plans for site water, sewer, drainage, road and sidewalk improvements for Ilima and companion tower, Melia. Melia will be 35 stories with 242 units and Ilima will be 33 stories with 148 units. Road and sidewalk improvements included new curb, gutter, sidewalks and driveways along Auahi Street and Ala Moana Boulevard. Estimated construction cost: not known at this time
c.
(1) TITLE AND LOCATION (City and State)
Nohona Hale Affordable Housing Kakaako, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) 2020
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Sr. Civil Engineer for the preparation of construction plans for demolition, site layout, water, sewer, grading, ingress/egress, and drainage for affordable housing project along Cooke Street. Nohona Hale is a 16-story tower offering affordable rental micro-units. ECC: $30M
d.
(1) TITLE AND LOCATION (City and State)
Queen Street 12-Inch Waterline, Ward Village Kakaako, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2022 CONSTRUCTION (If applicable) 2022
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Project Manager for the design of waterline improvements for the Ward Village. Work includes upgrading an existing 6-inch water main on Queen Street from Cooke Street to an existing 12-inch water main located between Cummins and Kamake`e Streets, to a 12-inch main.
e.
(1) TITLE AND LOCATION (City and State)
Kapalama Kai Utility Master Plan Honolulu, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2022 CONSTRUCTION (If applicable) NA
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Project Manager for the preparation of infrastructure master plan, including sewer, water, drainage, storm water, and electrical. Kamehameha Schools is proposing to redevelop approximately 25 acres of their property in Kapalama. The infrastructure master plan assesses existing conditions and determines necessary improvements needed to support each phase.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY (Complete one Section E for each key person.)
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 17
12. NAME
Mason Suga, P.E., LEED AP
13. TITLE SERVICE PROVIDED
Sr. Civil Project Manager
14. YEARS EXPERIENCE
a. TOTAL 16 b. WITH CURRENT FIRM 16
15. FIRM NAME AND LOCATION (City and State)
Wilson Okamoto Corporation, Honolulu, Hawaii
16. EDUCATION (DEGREE AND SPECIALIZATION)
B.S., Civil Engineering, University of Hawaii at Manoa, 2008
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
PE-15138, Civil Engineering, Hawaii, 2012
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
American Society of Civil Engineers Certified Water Pollution Plan Preparer, City & County of Honolulu,12/31/2024 Certified Erosion and Sediment Control Plan Preparer, City & County of Honolulu, 12/31/2024
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
Waimano Ridge Sewer System Assessment Pearl City, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) NA
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Associate Project Manager for the preparation of an existing conditions report and Sewer Master Plan Report for the State Department of Health. Scope included researching available drawings and documents; CCTV inspection of existing sewer lines; and the preparation of a sewer master plan report. The Sewer System Report assessed existing conditions, identified constraints and maintenance issues, prepared hydraulic analysis to determine sewer improvements required to support the redevelopment outlined in DOH’s 2016 Master Plan Update, recommended proposed sanitary sewer improvements, including maintenance and rehabilitation, and rough order of magnitude cost for proposed improvements.
b.
(1) TITLE AND LOCATION (City and State)
Collection System Maintenance (CSM) Pearl City Warehouse Pearl City, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) --
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Mason is the Civil Project Manager overseeing the preparation of construction plans for site grading, drainage, water, sewer, and egress/ingress. The CCH is proposing to construct a new warehouse in the Pearl City Industrial Park. The lot encompasses approximately 1 acre. The warehouse will house supplies and equipment (pumps, pipes, sand bags, etc.) needed in the event of an emergency.
c.
(1) TITLE AND LOCATION (City and State)
Manana Corporation Yard Honolulu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Design- 3/2020 / Active CONSTRUCTION (If applicable) Under Construction
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Project Manager for the preparation of construction plans for the redevelopment of the City’s Manana Corporation Yard. The project site will accommodate new facilities for the Department of Facility Maintenance, including new warehouse, parking structure, and storage areas. He also prepared and processed NPDES permit. Estimated construction cost: $25.2 million
d.
(1) TITLE AND LOCATION (City and State)
City & County of Honolulu’s Leeward Baseyard Ewa, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Design-2023/Active CONSTRUCTION (If applicable) Under Construction
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Project Manager preparing construction plans for the development of a new baseyard at James Campbell Industrial Park. The project will include a single story administration building, employee parking, covered parking bays for refuse truck fleet and other ancillary improvements. Construction plans include site demolition, site layout, grading, water, sewer and drainage.
e.
(1) TITLE AND LOCATION (City and State)
Keahuolu Judiciary Kona, Hawaii, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) 2019
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Project Engineer for a new Kona Judiciary located north of Makalapua Shopping Center in Kona. Civil scope included the preparation of construction plans for mass grading, site layout, drainage, water, wastewater and erosion control plans. Coordination was key as design and subdivision of the parcel was done simultaneously. Estimated construction cost $90 million
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY (Complete one Section E for each key person.)
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 18
12. NAME
Todd Yonamine, P.E.
13. TITLE SERVICE PROVIDED
Civil Project Manager
14. YEARS EXPERIENCE
a. TOTAL 31 b. WITH CURRENT FIRM 2
15. FIRM NAME AND LOCATION (City and State)
Wilson Okamoto Corporation
16. EDUCATION (DEGREE AND SPECIALIZATION)
Bachelor of Science – Civil Engineering (B.S.C.E.)
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
PE-9212, Civil Engineering, Hawaii, 1997
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Certified Water Pollution Plan Preparer, City & County of Honolulu,12/31/2024 Certified Erosion and Sediment Control Plan Preparer, City & County of Honolulu, 12/31/2024
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
Hawaii State Hospital Water System Improvements Kaneohe, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) --
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Project Manager overseeing the analysis of the existing water supply system and preparing construction plans for water system improvements. Improvements include a storage tank, new waterlines and booster pumps.
b.
(1) TITLE AND LOCATION (City and State)
Waikapu Town Center Water System Phase 1 10794-06 North Kona, Hawaii
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) --
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Design for installation of a private water system to meet DOH and County of Maui DPW requirements. Project includes two existing wells outfitted with new pumps and motors; 1.2 MG storage reservoir, electrical equipment building, control building with electrical, mechanical and SCADA equipment. Estimated construction cost: $12 M Role: Project manager & design engineer
c.
(1) TITLE AND LOCATION (City and State)
Hala’ula Well Development Phase 2 North Kona, Hawaii
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) 2023
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Design for the installation of 700 gpm pump and 200 hp motor, connecting pipeline, 0.5 MG reservoir, control building, access roadway, site work and appurtenances. Construction cost: $12.8M approx. Role: Project manager & design engineer
d.
(1) TITLE AND LOCATION (City and State) Kaʻupulehu Well No.8 Pump & Connecting Pipeline North Kona, Hawaii
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) 2017
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Design for the installation of 450 gpm pump and 250 hp motor, connecting pipeline, control building, access roadway, site work and appurtenances. Construction cost: $2.1M approx. Role: Project manager & design engineer
e.
(1) TITLE AND LOCATION (City and State) Kaupulehu Well No.8 Pump & Connecting Pipeline North Kona, Hawaii
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) 2017
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Design for the installation of 450 gpm pump and 250 hp motor, connecting pipeline, control building, access roadway, site work and appurtenances. Construction cost: $2.1M approx. Role: Project manager & design engineer
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY (Complete one Section E for each key person.)
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 19
12. NAME
Brennan Nacario, P.E.
13. TITLE SERVICE PROVIDED
Civil Project Manager
14. YEARS EXPERIENCE
a. TOTAL 12
b. WITH CURRENT FIRM 11
15. FIRM NAME AND LOCATION (City and State)
Wilson Okamoto Corporation, Honolulu, Hawaii
16. EDUCATION (DEGREE AND SPECIALIZATION)
M.S., Civil Engineering, Santa Clara University, 2013 B.S., Civil Engineering, Santa Clara University, 2012
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
PE-17830, Hawaii, Civil Engineering, 2017
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Certified Water Pollution Plan Preparer, City & County of Honolulu,12/31/2024 Certified Erosion and Sediment Control Plan Preparer, City & County of Honolulu, 12/31/2024
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
Halawa View Apartments, Phases 2 & 3 Aiea, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Design-2/2023 CONSTRUCTION (If applicable) Under Construction
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Civil Project Manager for the preparation of construction plans for the development of a 25-story, 302-unit apartment building in Halawa. The existing site contains existing multiple apartment buildings. The construction plans included demolition and mass grading site, as well as construction plans for the new building (water, sewer, drainage, ingress/egress, grading, etc.)
b.
(1) TITLE AND LOCATION (City and State)
Anaha, Ward Village Kakaako, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2017 CONSTRUCTION (If applicable) 2017
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Civil Engineer for the development of civil design and construction documents for the proposed Block “K”, a residential tower with retail space. The project site is located at the corner of Auahi Street and Kamakee Street next to Auahi Shops and parking garage. Scope included the preparation of schematic plans, preliminary, and final construction plans. ECC: $401 Million
c.
(1) TITLE AND LOCATION (City and State)
Ulana, Ward Village Kakaako, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) Under Construction
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Civil Project Manager for the development of civil design and construction documents for Ulana, a residential tower located at Auahi Street, Kamani Street and Pohukaina Street. The tower will consist of approximately 650 units and commercial space on the ground floor. Scope includes preparing construction plans site water, sewer, sidewalks, curb/gutter, drainage, and erosion control.
d.
(1) TITLE AND LOCATION (City and State)
Kalia Luau Waikiki Waikiki, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) --
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Project Civil Engineer to prepare construction plans for a new open-air entertainment center venue on the site formerly known as Kyo-Ya Restaurant. The project will consist of a large lawn area for guest seating, a stage, a two-story multi-purpose building with a lanai, additional space for restrooms, office/administration, bar, food preparation/buffet, enclosed seating areas, and a tech booth, as well as a pick-up/drop-off, and loading area. The construction plans include demolition and mass grading, site utilities.
e.
(1) TITLE AND LOCATION (City and State)
Marriott Vacation Resort Waikiki at 2080 Kalakaua Avenue (formerly Niketown) Waikiki, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Design-2023 Active
CONSTRUCTION (If applicable) Under Construction
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
The former Niketown in Waikiki is proposed to be converted to a 7-story mixed-use residential timeshare with 119 units, including retail on the ground level. The site encompasses approximately 0.9 acres and is currently a 4-story commercial property. Mr. Nacario is the Project Manager for preparation of construction plans, including demolition site layout, grading, and traffic control plans. Scope also included preparing sewer connection application and water adequacy request letter.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY (Complete one Section E for each key person.)
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 20
12. NAME
Tanner Cho, P.E.
13. TITLE SERVICE PROVIDED
Civil Project Manager
14. YEARS EXPERIENCE
a. TOTAL 19 b. WITH CURRENT FIRM 5
15. FIRM NAME AND LOCATION (City and State)
Wilson Okamoto Corporation, Honolulu, Hawaii
16. EDUCATION (DEGREE AND SPECIALIZATION)
B.S., Civil Engineering, Purdue University, 2005
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
PE-14039, Hawaii, Civil Engineering, 2010
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Certified Water Pollution Plan Preparer, City & County of Honolulu,12/31/2024 Certified Erosion and Sediment Control Plan Preparer, City & County of Honolulu, 12/31/2024 Erosion and Sediment Control Plan Coordinator, City & County of Honolulu, 12/31/2024
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
Kapolei Corporation Yard Phase 4 Kapolei, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Design – 2020 CONSTRUCTION (If applicable) Under Construction
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Sr. Civil Engineer for the design and preparation of construction plans for new facilities at Kapolei Corporation Yard. Proposed improvements include site layout, grading, and wet utilities. ECC: $12M
b.
(1) TITLE AND LOCATION (City and State)
Honolulu Rapid Transit & Guideway, Phase 3 (Design-Build) Honolulu, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) Under Construction
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Sr. Civil Engineer for the design of the Honolulu Rail Transit Guideway and Transit Stations, Phase 3 Airport Section. Phase 3 consists of the construction of 5.2 mile long grade separated fixed guideway rail transit system, including four transit stations, beginning from Aloha Stadium to Middle Street. Scope of work includes civil design of widening of the roadways to accommodate the new elevated guideway and support columns. Mr. Cho Providing construction support through RFI’s, FDC’s, and NDC’s.
c.
(1) TITLE AND LOCATION (City and State)
FY 21 MCON Project P-649 Guam Joint Communications Upgrade Joint Region Marianas, Naval Base, Guam
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Design 2024/Active CONSTRUCTION (If applicable) Ready to Advertise
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Sr. Civil Engineer assisting the preparation of construction documents to replace the existing Building 112 and supporting facilities at Naval Base Guam, NCTS Finegayan (Design-Bid-Build). The project consists of construction of a new multi-story Operations Center to replace Building 112; a new communications equipment storage warehouse; a new underground 288 strand fiber optic cable from Building 3012 at Naval Base Guam to the future J-755 project site at Andersen Air Force Base southern area (approximately 23 miles); and demolition of existing facilities as required to allow construction of new communications facility.
d.
(1) TITLE AND LOCATION (City and State)
P-760 Training Center (NAVFAC Pacific) Marine Corps Base Camp Blaz, Guam
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Design 2024/Active CONSTRUCTION (If applicable) Ready to Advertise
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Sr. Civil Engineer preparing preliminary design for new training center. Preparing preliminary basis of design (water, drainage, and gravity sanitary sewer) based on programming workshop.
e.
(1) TITLE AND LOCATION (City and State)
P-696 Inner Apra Harbor Resiliency Upgrades JBPHH, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Design 2024/Active CONSTRUCTION (If applicable) Ready to Advertise
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Taner is the Project Manager overseeing the preparation of a Design-Bid-Build (DBB) construction package consisting of full plans, specifications, cost estimate and participate in on site Concept Design Workshop (CDW) and virtual design review meetings. Project consists of a concrete building to house the 8MW/8MWhr Battery Energy Storage System (BESS) and switchgear within Phase 1; a second concrete building to house the 8MW/16MWhr BESS. Site improvements to include access road, site storm drainage, Low Impact Development, and Potable and Fire Protection Water system.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY (Complete one Section E for each key person.)
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 21
12. NAME
Kevin Higashi, P.E.
13. TITLE SERVICE PROVIDED
Associate Civil Project Manager
14. YEARS EXPERIENCE
a. TOTAL 15 b. WITH CURRENT FIRM 15
15. FIRM NAME AND LOCATION (City and State)
Wilson Okamoto Corporation, Honolulu, Hawaii
16. EDUCATION (DEGREE AND SPECIALIZATION)
B.S., Civil Engineering, University of Hawaii at Manoa, 2009
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
PE-16025, Civil Engineering, Hawaii, 2014
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Certified Water Pollution Plan Preparer, City & County of Honolulu,12/31/2024 Certified Erosion and Sediment Control Plan Preparer, City & County of Honolulu, 12/31/2024
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
Keaau-Pahoa Highway Improvements Puna, Hawaii
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2015 & 2018 CONSTRUCTION (If applicable) 2015 & 2018
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Sr. Civil Engineer for the design of the widening of a 2-mile portion of Keaau-Pahoa Road by installing an additional northbound lane; widening Waipahoehoe Bridge; extending existing culverts; and installing pavement marking, striping and signing. The project converted the shoulder lane into a permanent travel lane. Drainage improvements included lengthening and repair/replacement of existing culverts, and the installation of a new culvert to alleviate flooding conditions. Phase 2 included installation of a traffic signal and the restriping of the project corridor to a permanent 4-lane configurations. ECC: $22 Million
b.
(1) TITLE AND LOCATION (City and State)
P-307 Consolidated Armory (NAVFAC Pacific) Marine Corps Base, Guam
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Design – 2021 CA - Active
CONSTRUCTION (If applicable) Under Construction
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Sr. Engineer preparing Design-Bid-Build documents for a new low-rise consolidated armory facility at Naval Support Activity Marine Corps Base Guam. Civil scope included paving and site improvements, including access road, driveways, parking, stormwater depression and bioretention swales, sidewalks and ramps, and open storage area. ECC: $33 Million
c.
(1) TITLE AND LOCATION (City and State)
Hana Highway Improvements, Huelo to Hana, Phase 2A and 2B/2C Hana, Maui, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2014 & 2016 CONSTRUCTION (If applicable) 2017 & 2020
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Sr. Civil Engineer for the preparation of designs, plans, specifications, and cost estimates for roadside improvements along Hana Highway from Mile Post (MP) 8.1 in Huelo to MP 21.5 in Nahiku. Improvements include stabilizing roadside rock retaining walls with new soil nail retaining walls, repair/repave pavement cracking, installing drainage improvements, and installing/ upgrading guardrails. ECC 2A: $2 million ECC 2B/2C: $5.5 million
d.
(1) TITLE AND LOCATION (City and State)
Lahaina Bypass, Phase 1B-2 (Design-Build) Lahaina, Maui, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) 2018
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Sr. Civil Engineer for the design of the third phase of the overall Lahaina Bypass (Honoapiilani Highway Realignment) project. Responsible for the design and layout of the plan and profile of the new highway and preparing pavement marking and sign plans and cross sections. Design includes a bridge supported by geosynthetic reinforced soil (GRS) abutments. Culvert design incorporated creative hydraulic techniques to regulate flow given limited available right-of-way. ECC: $39 million
e.
(1) TITLE AND LOCATION (City and State)
P-209 Dry Dock No. 3 (future No.5) (NAVFAC Pacific) JBPHH, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) Under Construction
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Sr. Civil Engineer preparing Design-Bid-Build documents. Preparing designs related to landside site features and below grade wet utilities (water, drainage, and gravity sanitary sewer). Also establishing project design storms for site and dry dock storm drainage system design.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY (Complete one Section E for each key person.)
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 22
12. NAME
Cara Itai, P.E.
13. TITLE SERVICE PROVIDED
Associate Project Manager
14. YEARS EXPERIENCE
a. TOTAL 9
b. WITH CURRENT FIRM 9
15. FIRM NAME AND LOCATION (City and State)
Wilson Okamoto Corporation, Honolulu, Hawaii
16. EDUCATION (DEGREE AND SPECIALIZATION)
B.S., Civil Engineering, Gonzaga University, 2016
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
PE-19296, Hawaii, Civil Engineering, 2019
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Certified Water Pollution Plan Preparer, City & County of Honolulu,12/31/2024 Certified Erosion and Sediment Control Plan Preparer, City & County of Honolulu, 12/31/2024
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
Lot 70 Subdivision Kapolei, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) 2024
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Sr. Civil Engineer preparing construction plans for a new subdivision surrounded by Fort Barette Road, Kapolei Parkway, Kunehi Street and Hookele Elementary School. The commercial development includes construction of two access points/driveways and utility elements to provide necessary infrastructure to serve subdivided lots for individual development. Cara prepared construction plans for roadways and utility infrastructure, including use of recycled irrigation water for landscaping. ECC: $2.9M
b.
(1) TITLE AND LOCATION (City and State)
Ke Kilohana & 24-Inch Sewer, Ward Village Kakaako, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) 2019
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Civil Engineer for the development of civil design and construction documents for the Ke Kilohana, a residential tower with retail space. The project site is bounded by Halekauwila Street, Ward Avenue and Ilaniwai Street. The project site is approximately 1 acre and currently occupied by restaurants. Scope includes the preparation of schematic plans, preliminary, and final construction plans. Also prepared construction documents for plan layout and profile of a new 24-inch sewer main, including the re-connection of existing sewer laterals, and relocation of existing water main. ECC: $219 Million
c.
(1) TITLE AND LOCATION (City and State)
Auahi Street 18-Inch Sewer Main
Makaha, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) 2020
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Civil engineer for the preparation of construction plans for installation of an 18-inch sewer main within Auahi Street to serve the proposed Koula and Victoria Place high-rise condominium developments replacing an existing smaller sewer main. Approximately 400’ of 18” diameter pipe, 200’ of 12” diameter pipe and nine epoxy lined manholes were installed on 15’ deep jet grout cradle and column supports.
d.
(1) TITLE AND LOCATION (City and State)
The Park at Keeaumoku Honolulu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) Under Construction
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Sr. Civil Engineer prepared construction plans, including demolition, grading, utility, drainage, erosion control. She also assisted with the preparation and processing of Sidewalk Variance, Driveway Variance, Surface Encroachment, and NDPES Permit. The development encompasses 3.5 acres and will consist of two 42-story residential towers.
e.
(1) TITLE AND LOCATION (City and State)
West Loch Affordable Rental Housing West Loch, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) --
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Sr. Civil Engineer for the civil design and preparation of construction documents for a 3.7 acre affordable housing project at the corner of Fort Weaver Road and Renton Road. The development will consist of 10 buildings and 131 residential units.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY (Complete one Section E for each key person.)
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 23
12. NAME
Reyn Sugitaya, PE
13. TITLE SERVICE PROVIDED
Civil Engineer
14. YEARS EXPERIENCE
a. TOTAL 6 b. WITH CURRENT FIRM 6
15. FIRM NAME AND LOCATION (City and State)
Wilson Okamoto Corporation, Honolulu, Hawaii
16. EDUCATION (DEGREE AND SPECIALIZATION)
B.S., Civil Engineering, University of Hawaii at Manoa, 2017
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
PE-20684, Hawaii, Civil Engineering, 2023
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
Auahi Street Improvements, Ward Village Honolulu, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Phase 1- 2021/Active Phase 2 – Active
CONSTRUCTION (If applicable) Phase 1 – 2023
Phase 2 – under construction
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Civil Engineer assisting with the preparation plans to redevelop Auahi Street from current 4-lane road to a Pedestrian and Bicycle friendly 2 -lane road that realigns to connect with Pohukaina Street west of Ward Avenue consistent. Roadway design includes constructing near existing grades, 44-foot curb to curb with two travel lanes, center turn lane, two bike lanes, and bus stops. A relocated mid-block crosswalk with relocated traffic signal will provide pedestrian access across Auahi Street. Associated design includes a new signalized intersection at Ward Ave, grading, curb ramp, landscaping, bike lanes with buffers, pavement marking and signs, water meter adjustments, and fire hydrant relocations
b.
(1) TITLE AND LOCATION (City and State)
Lahaina Bypass Phase 1B-2 Lahaina, Maui, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) 2018
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Civil Engineer assisting with the design of the third phase of the overall Lahaina Bypass (Honoapiilani Highway Realignment) project. The civil design services include design and layout of the plan and profile of the new highway and preparing site plans, grading plans, typical sections, erosion control plans, pavement marking and sign plans, cross sections, hydraulic report, and drainage plans. Design includes a bridge supported by geosynthetic reinforced soil (GRS) abutments. Culvert design incorporated creative hydraulic techniques to regulate flow given limited available right-of-way. ECC: $39 million
c.
(1) TITLE AND LOCATION (City and State)
Kuhio Highway Short-Term Improvements, Kuamoo Road to Temporary Bypass Road Wailua-Kapaa, Kauai, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) 2024
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Civil engineer for the preparation of construction plans for the widening of Kuhio Highway between Temporary Bypass Road and Kuamoo Road. Improvements include adding an extra southbound lane for 0.64 miles to improve traffic congestion along this corridor; intersection improvements; and the addition of a turning lane along Kuamoo Road.
d.
(1) TITLE AND LOCATION (City and State)
P-224 Ammunition Pier & Turning Basin Seal Beach, CA
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) Under Construction
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Civil Engineer assisting with the preparation of construction plans for a new one-sided ammunition pier at Seal Beach, CA. Civil scope includes preparation of construction drawings for new access road, turnaround and building and infrastructure to support the new buildings; accessory buildings; utility improvements; and dredging and filling for new causeway.
e.
(1) TITLE AND LOCATION (City and State)
FY 21 MCON Project P-649 Guam Joint Communications Upgrade Joint Region Marianas, Naval Base, Guam
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) Ready to Advertise
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Civil Engineer assisting the preparation of construction documents to replace the existing Building 112 and supporting facilities at Naval Base Guam, NCTS Finegayan (Design-Bid-Build). The projects consists of construction of a new multi-story Operations Center to replace Building 112; a new communications equipment storage warehouse; a new underground 288 strand fiber optic cable from Building 3012 at Naval Base Guam to the future J-755 project site at Andersen Air Force Base southern area (approximately 23 miles); and demolition of existing facilities as required to allow construction of new communications facility.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY (Complete one Section E for each key person.)
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 24
12. NAME
Chase Kanekuni, PE
13. TITLE SERVICE PROVIDED
Civil Engineer
14. YEARS EXPERIENCE
a. TOTAL 6
b. WITH CURRENT FIRM 6
15. FIRM NAME AND LOCATION (City and State)
Wilson Okamoto Corporation, Honolulu, Hawaii
16. EDUCATION (DEGREE AND SPECIALIZATION)
B.S., Civil Engineering, Purdue University, 2018
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
PE-20724, Hawaii, Civil Engineering, 2024
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
Collection System Maintenance (CSM) Pearl City Warehouse Pearl City, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) --
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Chase is assisting with preparing construction plans for site grading, drainage, water, sewer, and egress/ingress. The CCH is proposing to construct a new warehouse in the Pearl City Industrial Park. The lot encompasses approximately 1 acre. The warehouse will house supplies and equipment (pumps, pipes, sand bags, etc.) needed in the event of an emergency.
b.
(1) TITLE AND LOCATION (City and State)
Waikoloa Affordable Housing Waikoloa, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) --
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
The proposed affordable housing project encompasses approximately 25 acres. The development will consist of 12 residential buildings serving 228 residential units. Civil engineer preparing construction plans for site water, wastewater, grading, roadway, and drainage.
c.
(1) TITLE AND LOCATION (City and State)
Manana Corporation Yard Honolulu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) Under Construction
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Civil engineer assisting with the preparation of construction plans for the redevelopment of the City’s Manana Corporation Yard. The project site will accommodate new facilities for the Department of Facility Maintenance, including new warehouse, parking structure, and storage areas. He also prepared and processed NPDES permit. Estimated construction cost: $25.2 million
d.
(1) TITLE AND LOCATION (City and State)
University of Hawaii Value Added Product Development Center Wahiawa, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 3/2021 CONSTRUCTION (If applicable) 2024
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Civil engineer assisting with the preparation of construction plans utilities (water, sewer, storm drainage) demolition, grading, site layout (parking improvements and sidewalks). The University of Hawaii is proposing the development of a new vocational school/educational facility for Leeward Community College in Wahiawa. The project site encompasses approximately 1.5 acres. The facility will serve as a multi-purpose facility for activities including, but not limited to, festivals, farmers markets, tasting events, merchandising for food products from the facility. Estimated construction cost: $12 million
e.
(1) TITLE AND LOCATION (City and State)
First Hawaiian Bank Lihue Branch Lihue, Kauai, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) Under Construction
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Civil engineer assisted with the preparation of construction plans for a new branch in Hokulei Village on Kauai. The project consists of a new, free standing bank branch and regional headquarters. Construction drawings include site water, wastewater, grading, erosion control, and egress/ingress.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY (Complete one Section E for each key person.)
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 25
12. NAME
Josh Inaba, PE
13. TITLE SERVICE PROVIDED
Civil Engineer
14. YEARS EXPERIENCE
a. TOTAL 5 b. WITH CURRENT FIRM 5
15. FIRM NAME AND LOCATION (City and State)
Wilson Okamoto Corporation, Honolulu, Hawaii
16. EDUCATION (DEGREE AND SPECIALIZATION)
B.S., Civil Engineering, Purdue University, 2019
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
PE-20695, Hawaii, Civil Engineering, 2024
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
University of Hawaii Community College Value Added Product Development Center Wahiawa, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 3/2021 CONSTRUCTION (If applicable) 2024
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Civil engineer for the preparation of construction plans for utilities (water, sewer, storm drainage) demolition, grading, site layout (parking improvements and sidewalks). University of Hawaii is proposing a new vocational school/educational facility for Leeward Community College in Wahiawa. The project site encompasses approximately 1.5 acres. The facility will serve as a multi-purpose facility for activities including, but not limited to, festivals, farmers markets, tasting events, merchandising for food products from the facility. Estimated construction cost: $12 million
b.
(1) TITLE AND LOCATION (City and State)
Hawaii State Hospital Water System Improvements Kaneohe, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) --
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Civil Engineer assisting with the analysis of the existing water supply system and preparing construction plans for water system improvements. Improvements include a storage tank, new waterlines and booster pumps.
c.
(1) TITLE AND LOCATION (City and State)
Turtle Bay Resort, Kamehameha Highway/Kuilima Drive Intersection Improvements North shore, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active/In Design CONSTRUCTION (If applicable) --
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Civil engineer preparing construction plans for intersection improvements at Turtle Bay Resort. Improvements consist of widening of Kamehameha Highway to accommodate additional lanes for turning and deceleration/acceleration as part of the proposed park entry. Improvements include the relocation of utility poles and an emergency warning siren.
d.
(1) TITLE AND LOCATION (City and State)
Innovation Center and Residences for Innovative Student Entrepreneurs (RISE) Honolulu, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2023 CONSTRUCTION (If applicable) 2023
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
The University of Hawaii is developing a mixed-use student housing project envisioned to bring an integrated live, learn, work, innovation. The facility will consist of 140,000 SF with housing, common areas, services areas, office/administration and on-site parking. Josh prepared construction plans for site utility improvements including water, sewer, ingress/egress, drainage, grading and demolition. ECC: $70 million
e.
(1) TITLE AND LOCATION (City and State)
City & County of Honolulu’s Leeward Baseyard North Shore, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) Under Construction
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Civil engineer preparing construction plans for the development of a new baseyard at James Campbell Industrial Park. The project will include a single story administration building, employee parking, covered parking bays for refuse truck fleet and other ancillary improvements. Construction plans include site demolition, site layout, grading, water, sewer and drainage.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY (Complete one Section E for each key person.)
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 26
12. NAME
Devan Lau
13. TITLE SERVICE PROVIDED
Civil Engineer
14. YEARS EXPERIENCE
a. TOTAL 6 b. WITH CURRENT FIRM 6
15. FIRM NAME AND LOCATION (City and State)
Wilson Okamoto Corporation, Honolulu, Hawaii
16. EDUCATION (DEGREE AND SPECIALIZATION)
B.S., Civil Engineering, University of Hawaii at Manoa, 2017
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
Kuhio Highway Short-Term Improvements, Kuamoo Road to Temporary Bypass Road Wailua-Kapaa, Kauai, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) 2024
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Civil engineer for the preparation of construction plans for the widening of Kuhio Highway between Temporary Bypass Road and Kuamoo Road. Improvements include adding an extra southbound lane for 0.64 miles to improve traffic congestion along this corridor; intersection improvements; and the addition of a turning lane along Kuamoo Road.
b.
(1) TITLE AND LOCATION (City and State)
H-1 Guardrail & Shoulder Improvements, Middle Street to Punchbowl Off-Ramp Honolulu, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) 2019
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Civil engineer for the design of Interstate Route H-1 Guardrail and Shoulder Improvements. The project entails the replacement of existing guardrail systems and crash cushions, and construction of new concrete barrier walls along the freeway between Middle Street and the Punchbowl Street Off-ramp. ECC: $6 Million
c.
(1) TITLE AND LOCATION (City and State)
Matson Navigation Company, Sand Island Wharf & Yard Improvements, Honolulu Harbor, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) 2020
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Civil engineer assisting with the preparation of construction drawings for site, demolition, grading, utility plan/profiles, electrical and erosion control; specifications; cost estimates; and limited construction services (RFI and submittal reviews).
d.
(1) TITLE AND LOCATION (City and State)
P-224 Ammunition Pier & Turning Basin Seal Beach, CA
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) Under Construction
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Civil Engineer assisting with the preparation of construction plans for a new one-sided ammunition pier at Seal Beach, CA. Civil scope includes preparation of construction drawings for new access road, turnaround and building and infrastructure to support the new buildings; accessory buildings; utility improvements; and dredging and filling for new causeway.
e.
(1) TITLE AND LOCATION (City and State)
MCON P-325 9th Engineer Support Battalion Camp Blaz, Guam
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) --
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Civil engineer assisting with the preparation of Design-Bid-Build construction package consisting of plans, specifications and cost estimates. Proposed project includes parking, auto shop, electrical/communications building, utility plant, vehicle basin and wash rack, site storm drainage, water, wastewater and Low Impact Development (LID).
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY (Complete one Section E for each key person.)
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 27
12. NAME
Tiffany Homma
13. TITLE SERVICE PROVIDED
Civil Engineer
14. YEARS EXPERIENCE
a. TOTAL 5 b. WITH CURRENT FIRM 5
15. FIRM NAME AND LOCATION (City and State)
Wilson Okamoto Corporation, Honolulu, Hawaii
16. EDUCATION (DEGREE AND SPECIALIZATION)
B.S., Civil Engineering, University of Hawaii at Manoa, 2019
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
P-209 Dry Dock No. 3 (future No. 5) (NAVFAC Pacific) JBPHH, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) Under Construction
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Civil Engineer assisting with the preparation of Design-Bid-Build documents. Preparing designs related to landside site features and below grade wet utilities (water, drainage, and gravity sanitary sewer). Also establishing project design storms for site and dry dock storm drainage system design.
b.
(1) TITLE AND LOCATION (City and State)
Kawaihau-Mailihuna-Hauaala Complete Streets Phase 1A East Kauai, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Planning & Design – 2021
CONSTRUCTION (If applicable) 2023
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Civil engineer for the preparation of construction plans to improve roadways in East Kauai. The intent of the project is to improve the safety and operation of the 5-way intersection of these three streets, and to provide safe routes for students to walk or bike to Kapa‘a Elementary School, Kapa‘a High School and St. Catherine School as well as for residents to get around their neighborhood with multiple transportation modes.
c.
(1) TITLE AND LOCATION (City and State)
FY 21 MCON Project P-649 Guam Joint Communications Upgrade Joint Region Marianas, Naval Base, Guam
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) Ready to Advertise
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Civil Engineer assisting the preparation of construction documents to replace the existing Building 112 and supporting facilities at Naval Base Guam, NCTS Finegayan (Design-Bid-Build). The projects consists of construction of a new multi-story Operations Center to replace Building 112; a new communications equipment storage warehouse; a new underground 288 strand fiber optic cable from Building 3012 at Naval Base Guam to the future J-755 project site at Andersen Air Force Base southern area (approximately 23 miles); and demolition of existing facilities as required to allow construction of new communications facility.
d.
(1) TITLE AND LOCATION (City and State)
FY 22 MCON P-309 GCE Infantry Battalions 1 & 2 Facilities Naval Support Activity, Marine Corps Base, Guam
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) Under Construction
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm NAVFAC Pacific is proposing a new GCE Infantry Battalions 1 & 2 Facilities Naval Support Activity (NSA), Marine Corps Base, Guam. Civil Engineer assisting with the preparation of construction plans for site improvements, including, roadways and fire lanes; site walkways; parking; enclosures for site equipment such as emergency generator fuel tank, transformer pads, concrete storage pad, perimeter security fencing and gates (for pedestrian & vehicle), drainage system, sanitary sewer system and potable water system. ECC: $126 million
e.
(1) TITLE AND LOCATION (City and State)
P-678 SATCOM Facility NBGTS, Finegayan, Guam
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) --
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
P-678 will provide a new secure, state of the art, SATCOM and administrative support facility and Naval Computer and Telecommunications Station (NCTS). An underground duct and manhole system will be used to reroute existing communications infrastructure to the new facility. Tiffany will be assisting with the preparation of civil site construction plans.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY (Complete one Section E for each key person.)
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 28
12. NAME
Darrian Cremer
13. TITLE SERVICE PROVIDED
Civil Engineer
14. YEARS EXPERIENCE
a. TOTAL 2 b. WITH CURRENT FIRM 2
15. FIRM NAME AND LOCATION (City and State)
Wilson Okamoto Corporation, Honolulu, Hawaii
16. EDUCATION (DEGREE AND SPECIALIZATION)
B.S., Civil Engineering, University of Hawaii at Manoa, 2022
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
P-309 GCE Infantry Battalions 1 & 2 Facilities (NAVFAC Pacific) Marine Corps Base, Camp Blaz, Guam
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) Under Construction
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Civil engineer assisting with the preparation of preliminary construction plans and DD1391 for a new low rise facilities to support two Infantry Battalions consisting of warehousing, electronics-communications maintenance shops, auto maintenance shops, vehicle wash racks and other support facilities.
b.
(1) TITLE AND LOCATION (City and State)
P-209 Dry Dock No. 3 (future No.5) (NAVFAC Pacific) JBPHH, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) Under Construction
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Civil Engineer assisting with preparation of Design-Bid-Build documents. Preparing designs related to landside site features and below grade wet utilities (water, drainage, and gravity sanitary sewer). Also establishing project design storms for site and dry dock storm drainage system design.
c.
(1) TITLE AND LOCATION (City and State)
Family of Advanced Beyond-Line-Of-Sight Terminal (FAB-T) Antenna Support Tower (AST) Marine Corps Base Hawaii, Camp Smith, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 4/2023 CONSTRUCTION (If applicable) Under Construction
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
The purpose of this project is to conduct site preparation and install infrastructure for one 20-foot AST and one 30-foot AST that provides connectivity to existing an existing building located at Camp Smith. Scope of work includes installation of retaining walls, several foundation pads, electrical and communication connectivity and electrical grounding. Darrian is assisting with the preparation of construction plans for grading, paving, erosion control.
d.
(1) TITLE AND LOCATION (City and State)
P-935 Phase Electrical Distribution Modernization Marine Corps Base Hawaii Kaneohe, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) --
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Civil engineer assisting with the preparation of civil plans and specifications for demolition, erosion control, traffic control, water lines, site improvements, and restoration of pavements and landscape for the underground duct bank system. NAVFAC Hawaii proposing to replace existing obsolete switching stations; relocate existing primary distribution circuits and associated equipment from overhead to underground, including existing communication overhead lines.
e.
(1) TITLE AND LOCATION (City and State)
MCON P-325 9th Engineer Support Battalion Camp Blaz, Guam
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) --
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Civil engineer assisting with the preparation of Design-Bid-Build construction package consisting of plans, specifications and cost estimates. Proposed project includes parking, auto shop, electrical/communications building, utility plant, vehicle basin and wash rack, site storm drainage, water, wastewater and Low Impact Development (LID).
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY (Complete one Section E for each key person.)
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 29
12. NAME
Brooks Martinez
13. TITLE SERVICE PROVIDED
Civil Engineer
14. YEARS EXPERIENCE
a. TOTAL 2 b. WITH CURRENT FIRM 2
15. FIRM NAME AND LOCATION (City and State)
Wilson Okamoto Corporation, Honolulu, Hawaii
16. EDUCATION (DEGREE AND SPECIALIZATION)
M.S., Civil Engineering, University of Hawaii at Manoa, 2022 B.S., Civil Engineering, University of Hawaii at Manoa, 2021
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
The Park Ward Village Honolulu, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) Under Construction
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Civil Engineer for the preparation of construction plans for site water, sewer, drainage, road and sidewalk improvements for new residential tower (lot formerly occupied by Sports Authority). Scope also includes off-site improvements for Halekauwila Extension at Ward Avenue and installation of 525 linear feat of 2 – 6-inch conduits encased in concrete near Queen Street and Aeo.
b.
(1) TITLE AND LOCATION (City and State)
Ulana, Ward Village Kakaako, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) Under Construction
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Civil Engineer for the preparation of construction plans for site water, sewer, drainage, road and sidewalk improvements for new
residential tower.
c.
(1) TITLE AND LOCATION (City and State)
Kawaihau-Mailihuna-Hauaala Complete Streets, Phase 1A East Kauai, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Planning & Design – 2021; 2023
CONSTRUCTION (If applicable) 2023
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Civil engineer assisting with the preparation of construction plans to improve roadways in East Kauai. The intent of the project is to improve the safety and operation of the 5-way intersection of these three streets, and to provide safe routes for students to walk or bike to Kapa‘a Elementary School, Kapa‘a High School and St. Catherine School as well as for residents to get around their neighborhood with multiple transportation modes.
d.
(1) TITLE AND LOCATION (City and State)
Kapalama Kai Utility Master Plan Honolulu, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2022 CONSTRUCTION (If applicable) NA
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Brooks assisted with the preparation of infrastructure master plan, including sewer, water, drainage, storm water, and electrical. Kamehameha Schools is proposing to redevelop approximately 25 acres of their property in Kapalama. The infrastructure master plan assessed existing conditions and determines necessary improvements needed to support each phase.
e.
(1) TITLE AND LOCATION (City and State)
Turtle Bay Resort – Kaihalulu East Drive North Shore, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) --
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Brooks is assisting with the preparation of construction plans for 2,500 roadway extension. The extension will provide access to future developments on the east side of Kuilima Drive. Improvements include drainage culverts crossing, walkways, share use path, golf cart path, emergency access road, sewer force main, and utilities (sewer, water, electrical and drain facilities).
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY (Complete one Section E for each key person.)
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 30
12. NAME
Ty Matsunami
13. TITLE SERVICE PROVIDED
Civil Engineer
14. YEARS EXPERIENCE
a. TOTAL 1 b. WITH CURRENT FIRM 1
15. FIRM NAME AND LOCATION (City and State)
Wilson Okamoto Corporation, Honolulu, Hawaii
16. EDUCATION (DEGREE AND SPECIALIZATION)
M.S., Civil Engineering, St. Martin’s University, 2022 B.S., Civil Engineering, St. Martin’s University, 2021
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
King Kekaulike High School Theatre Makawao, Maui, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES In Design CONSTRUCTION (If applicable) --
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Civil engineer assisting with the preparation of construction plans for a new 9,000 SF Black Box Theatre facility adjacent to the existing Performing Arts Center. Plans include site water, sewer, drainage, grading and utilities.
b.
(1) TITLE AND LOCATION (City and State)
HDOT Raised Crosswalks Statewide, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) --
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
HDOT proposes to implement crossing improvements for seventy-five (75) unsignalized crossings located on the islands of Oahu, Maui, Molokai, Hawaii, and Kauai, of which fifty-four (54) are school crossings while twenty-one (21) are non-school crossings. Ty assisted with doing traffic data collection for the project.
c.
(1) TITLE AND LOCATION (City and State)
Mauna Kea Beach Resort Renovation Waimea, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) --
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Ty is assisting with civil design for the new renovations for the Hau Tree Restaurant, including preliminary sewer and water connections, grading for drainage, and pre-construction BMP practices.
d.
(1) TITLE AND LOCATION (City and State)
Hawaii State Hospital Water System Improvements Kaneohe, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) --
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Civil Engineer assisting with the analysis of the existing water supply system and preparing construction plans for water system improvements. Improvements include a storage tank, new waterlines and booster pumps.
e.
(1) TITLE AND LOCATION (City and State)
Wailea Preliminary Engineering Report Wailea, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) --
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Owner of Wailea Resort is proposing residential uses on the property in Maui. Ty is assisting with the preparation of a Preliminary Engineering Report. The report evaluates existing conditions and determines recommended improvements to serve the proposed uses. Scope of work included researching available reports and resource documents, review existing infrastructure systems serving the area based on consultation with County of Maui agencies, estimate demands for proposed water and sewer, and determine infrastructure improvements to support design schemes.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY (Complete one Section E for each key person.)
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 31
12. NAME
Kassidy Mashiyama
13. TITLE SERVICE PROVIDED
Civil Engineer
14. YEARS EXPERIENCE
a. TOTAL 1 b. WITH CURRENT FIRM 1
15. FIRM NAME AND LOCATION (City and State)
Wilson Okamoto Corporation, Honolulu, Hawaii
16. EDUCATION (DEGREE AND SPECIALIZATION)
B.S., Civil Engineering, University of Hawaii at Manoa, 2023
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
The Park Ward Village Kakaako, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) Under Construction
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Civil Engineer for the preparation of construction plans for site water, sewer, drainage, road and sidewalk improvements for new residential tower (lot formerly occupied by Sports Authority). Scope also includes off-site improvements for Halekauwila Extension at Ward Avenue and installation of 525 linear feat of 2 – 6-inch conduits encased in concrete near Queen Street and Aeo.
b.
(1) TITLE AND LOCATION (City and State)
Launiu, Ward Village Kakaako, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) --
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Kassidy is assisting with the preparation of construction plans for a new residential tower at the corner of Ala Moana Boulevard, Ward Avenue and Auahi Street. The project will also provide commercial/retail uses on the ground level. Civil drawings include site demolition, site layout (driveways, sidewalks, walkways, curbs and ramps), grading, utilities (water, sewer, drainage).
c.
(1) TITLE AND LOCATION (City and State)
Halawa View Apartments, Phases 2 & 3 Aiea, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Design-2/2023 CONSTRUCTION (If applicable) Under Construction
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Civil Engineer assisting with the preparation of construction plans for the development of a 25-story, 302-unit apartment building in Halawa. The existing site contains existing multiple apartment buildings. The construction plans included demolition and mass grading site, as well as construction plans for the new building (water, sewer, drainage, ingress/egress, grading, etc.)
d.
(1) TITLE AND LOCATION (City and State)
Marriott Vacation Resort Waikiki at 2080 Kalakaua Avenue (formerly Nike Town) Waikiki, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Design – 2023 CONSTRUCTION (If applicable) Under Construction
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
The former Nike Town in Waikiki is proposed to be converted to a 7-story mixed-use residential timeshare with 119 units, including retail on the ground level. The site encompasses approximately 0.9 acres and is currently a 4-story commercial property. Kassidy is assisting with the preparation of construction plans for the project.
e.
(1) TITLE AND LOCATION (City and State)
Malama Honua Public Charter School Improvements Waimanalo, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) --
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Malama Honua Public Charter School is proposing to expand their facilities. Kassidy is the civil engineer assisting with the preparation of a preliminary engineering report and construction plans for demolition, erosion control, grading, drainage, utilities and site layout including driveways, sidewalks, curbs, pedestrian ramps, stairs and planters.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY (Complete one Section E for each key person.)
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 32
12. NAME
Pete Pascua, P.E.
13. TITLE SERVICE PROVIDED
Sr. Vice President & Director of Transportation Group
14. YEARS EXPERIENCE
a. TOTAL 40 b. WITH CURRENT FIRM 29
15. FIRM NAME AND LOCATION (City and State)
Wilson Okamoto Corporation, Honolulu, Hawaii
16. EDUCATION (DEGREE AND SPECIALIZATION)
B.S., Civil Engineering, University of Hawaii at Manoa, 1987
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
PE-7263, Hawaii, Civil Engineering, 1991
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
State of Hawaii Commission on Transportation, Commissioner - Appointment (2006-2014); Institute of Transportation Engineers – President (2001 and 2014), Director (2002, 2004, 2016); Waipahu High School Academy of Engineering – Vice Chair (2018-present), Advisor (2016-2018); American Society of Civil Engineers; University of Hawaii Engineering Alumni Association
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
Keoneula Boulevard Improvements Various Locations, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
Phase 1: 2018 Phase 2: 3/2022
CONSTRUCTION (If applicable)
Phase 1: 2019 Phase 2: NA
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Project Manager for the preparation of construction plans for Keoneula Boulevard Improvements. Improvements include the installation several driveways, curb ramps, crosswalks, traffic signal boxes and conduits along with other improvements in support of existing and future developments in the Hoakalei region. Median breaks are also included to facilitate left turns into the proposed driveways.
b.
(1) TITLE AND LOCATION (City and State)
Honolulu Rapid Transit Guideway, Phase 4 City Center (East) – Utility Relocation Honolulu, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) Under Construction
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Project Traffic Engineer for the project and is responsible for developing maintenance of traffic (MOT) plans, traffic control plans, detour plans, and temporary traffic signal plans to accommodate utility relocation and roadway work. In addition, Mr. Pascua is preparing a Transportation Management Plan for the project which includes traffic data collection, traffic analysis and simulation, and identification of traffic management strategies during construction. The project entails utility relocations and roadway work in advance of the installation of an approximately 3.9 mile long grade separated fixed guideway rail transit system, City Center Section.
c.
(1) TITLE AND LOCATION (City and State)
Ward Village Transportation Master Plan & Various Traffic Studies Honolulu, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) On-going
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Project Manager for the preparation of a Comprehensive Regional Traffic Study for the Ward Village project. The Ward Village project consists of the redevelopment of approximately 60 acres encompassing a wide range of residential, commercial, public, open spaces, and other land uses. One of the key essential components of a mixed-used community is a well-connected, multi-modal transportation system to provide and enhance mobility both internal and external to the project. The Comprehensive Regional Traffic Study shall incorporate and evaluate multi-modal transportation systems that promote safe and efficient balance of the various types of travel modes.
d.
(1) TITLE AND LOCATION (City and State)
Kaneohe-Kailua Wastewater Conveyance & Treatment Facilities Project- TIAR and CTMP Kaneohe and Kailua, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) 2018
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Sr. Traffic Engineer for the preparation of traffic impact assessment report in support of the Environmental Impact Statement for the Kaneohe-Kailua Wastewater Conveyance and Treatment Facilities project. Also prepared construction traffic management plan. ECC: $175 Million
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY (Complete one Section E for each key person.)
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 33
12. NAME
Cathy Leong, P.E.
13. TITLE SERVICE PROVIDED
Director of Transportation Group & Project Manager
14. YEARS EXPERIENCE
a. TOTAL 27 b. WITH CURRENT FIRM 27
15. FIRM NAME AND LOCATION (City and State)
Wilson Okamoto Corporation, Honolulu, Hawaii
16. EDUCATION (DEGREE AND SPECIALIZATION)
M.S., Civil Engineering (Transportation), University of California at Berkeley, 1997 B.S., Civil Engineering, University of Hawaii at Manoa, 1996
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
PE-10334, Hawaii, Civil Engineering, 2001
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
ITE Western District – International Director (2018 - 2021) President (2015-2016), Vice President (2015), Secretary (2014); Treasurer (2013); ITE Western District Student Endowment Fund Committee Chair, 2008 – 2013; ITE – Hawaii Section Past President (2003-2004); ITE Western District Mentor Award 2020ITE Western District Individual Achievement Award, 2012; Young Professional Achievement Award, 2008; Young Engineer of the Year Hawaii Society of Professional Engineers, 2007. Engineer of the Year, Hawaii Society of Professional Engineers, 2023
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
HDOT Raised Crosswalks Assessments (General Civil Engineering Open Ended Contract) Statewide, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) Under Construction
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
HDOT proposes to implement crossing improvements for seventy-five (75) unsignalized crossings located on the islands of Oahu, Maui, Molokai, Hawaii, and Kauai, of which fifty-four (54) are school crossings while twenty-one (21) are non-school crossings. Cathy is the Project Manager conducting pre- and post-construction speed evaluations to assess the effectiveness of the improvements after construction.
b.
(1) TITLE AND LOCATION (City and State)
Honolulu Rapid Transit Guideway and Transit Stations, Airport Section (Design-Build) Honolulu, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) Under Construction
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Project Manager/Sr. Traffic Engineer for the design of the Honolulu Rail Transit Guideway and Transit Stations, Phase 3 Airport Section. Phase 3 consists of the construction of 5.2 mile long grade separated fixed guideway rail transit system, including four transit stations, beginning from Aloha Stadium to Middle Street. Scope of work includes developing maintenance of traffic (MOT) plans, traffic control plans, detour plans, and traffic signal plans. In addition, WOC is preparing a Transportation Management Plan for the project which includes traffic data collection, traffic analysis and simulation, and identification of traffic management strategies during construction.
c.
(1) TITLE AND LOCATION (City and State)
Kaiaulu o Kakaako Phase 2 (Kakaako Mauka) Kakaako, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2022 CONSTRUCTION (If applicable) --
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Project Manager for the preparation of a TIAR incorporating the analyses of pedestrian, bicycle, surface transit, rail transit, para-transit, trolley service, and other modes of travel and forms of transportation systems, including recommendations to mitigate potential impacts that would guide the development of individual KS projects within Increment 2 and facilitate discussions with HDOT regarding KS’ fair share of any financial burden for regional mitigation measures
d.
(1) TITLE AND LOCATION (City and State)
H-1 Guardrail & Shoulder Improvement, Middle Street to Punchbowl Street Off-Ramp Honolulu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) 2019
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Sr. Transportation Engineer for the preparation of a transportation management plan for the Interstate Route H-1 Guardrail and Shoulder Improvements. The project entails the replacement of existing guardrail systems and crash cushions, and construction of new concrete barrier walls along the freeway between Middle Street and the Punchbowl Street Off-ramp. ECC: $6 Million
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY (Complete one Section E for each key person.)
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 34
12. NAME
Jennylyn Tapat-Morrill, P.E.
13. TITLE SERVICE PROVIDED
Transportation Project Manager
14. YEARS EXPERIENCE
a. TOTAL 8 b. WITH CURRENT FIRM 7
15. FIRM NAME AND LOCATION (City and State)
Wilson Okamoto Corporation, Honolulu, Hawaii
16. EDUCATION (DEGREE AND SPECIALIZATION)
B.S., Civil Engineering, University of Hawaii at Manoa, 2017 M.A., Teaching, Secondary Education, Whitworth University, 2008 B.A., History, George Fox University, 2007
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
PE-19655, Hawaii, Civil Engineering, 2021
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Institute of Transportation Engineers (ITE), Hawaii Section: President (2019-2020), Secretary-Treasurer (2018-2019) Institute of Transportation Engineers, Western District: Career Guidance Committee Chair (2020 – 2023) Individual Achievement Award, ITE Western District, 2023
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
Northwest Corner of Villages of Kapolei Traffic Impact Analysis Report Kapolei, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2022 CONSTRUCTION (If applicable) --
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Transportation Project Manager for the preparation of a Traffic Impact Analysis Report. The HHFDC plans to develop a portion of the property referred to as the “Northwest Corner of Villages of Kapolei” located on the southeast corner of the intersection of Farrington Highway and Fort Barrett Road. HHFDC plans to develop the remaining balance of the property to include approximately 800 residential units and 50,000 square feet (sf) of commercial uses.
b.
(1) TITLE AND LOCATION (City and State)
Keaau-Pahoa Shoulder Lane Improvements Keaau By-Pass Road to Shower Drive Speed Study, Keaau, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2017 CONSTRUCTION (If applicable) 2017
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Traffic engineer for the preparation of speed study. Purpose of the study was to conduct a qualitative and quantitative analysis along a 10-mile stretch of Keaau-Pahoa Road to adi the State DOT in their revaluation of the existing posted speed limit at two roadway segments.
c.
(1) TITLE AND LOCATION (City and State)
Honolulu Rapid Transit Guideway, Phase 4 City Center (East) – Utility Relocation, Honolulu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) Under Construction
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Transportation Engineer for the preparation of a Transportation Management Plan for the utilities relocation for City Center section of Honolulu Rail. Scope includes traffic data collection, traffic analysis and simulation, and identification of traffic management strategies during construction. .
d.
(1) TITLE AND LOCATION (City and State)
Kalia Luau Waikiki – Traffic Studies Waikiki, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES TIAR – 2023 CMTP - 2024 CONSTRUCTION (If applicable) --
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Owner of the former Kyo-Ya Restaurant site is proposing to redevelop the property into an open-air entertainment venue that will include a large open lawn, guest seating, stage with supporting facilities, restrooms, administration/office space; and pick-up/dropoff-off/loading area. Jenny is the Project Manager overseeing the preparation of a Traffic Impact Analysis Report (TIAR), Construction Management Plan and a Post Construction TIAR.
e.
(1) TITLE AND LOCATION (City and State)
HDOT Harbors - Oahu District Baseyard Relocation to Auiki Street TIAR Honolulu, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) --
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
HDOT is proposing to relocate baseyard facility. Jenny if the Transportation Project Manager overseeing the preparation of a Traffic Impact Study Report for the proposed project.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY (Complete one Section E for each key person.)
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 35
12. NAME
Michelle Lindsey, P.E.
13. TITLE SERVICE PROVIDED
Associate Transportation Project Manager
14. YEARS EXPERIENCE
a. TOTAL 7 b. WITH CURRENT FIRM 7
15. FIRM NAME AND LOCATION (City and State)
Wilson Okamoto Corporation, Honolulu, Hawaii
16. EDUCATION (DEGREE AND SPECIALIZATION)
B.S., Civil Engineering, University of Hawaii at Manoa, 2017 A.S., Natural Sciences, Leeward Community College, 2015
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
PE-19920, Hawaii, Civil Engineering, 2022
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Institute of Transportation Engineers (ITE), Hawaii Section Certified Water Pollution Plan Preparer, City & County of Honolulu, 12/31/2024 Certified Erosion and Sediment Control Plan Preparer, City & County of Honolulu, 12/31/2024
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
Honolulu Rail Transit Guideway and Transit Stations, Airport Section (Design-Build) Honolulu, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) Under Construction
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Traffic Engineer for the preparation of erosion control plans (ECPs) for the Honolulu Rail Transit Guideway and Transit Stations, Phase 3 Airport Section. Phase 3 consists of the construction of 5.2 mile long grade separated fixed guideway rail transit system, including four transit stations, beginning from Aloha Stadium to Middle Street.
b.
(1) TITLE AND LOCATION (City and State)
Waipio Interchange Improvements Waipio, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2022 CONSTRUCTION (If applicable) 2022
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Traffic Engineer assisting with the design of Waipio Interchange improvements for Castle & Cooke Homes Hawaii, as part of the mitigation necessary for the Koa Ridge development. The improvements generally include the provision of double left-turn lanes on the westbound approach of Ka Uka Boulevard at the Moaniani Street intersection, as well as double left-turn lanes on the eastbound approach of Ka Uka Boulevard at the Interstate H-2 freeway northbound on-ramp.
c.
(1) TITLE AND LOCATION (City and State)
HDOT Harbors - Oahu District Baseyard Relocation to Auiki Street TIAR Honolulu, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) --
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
HDOT is proposing to relocate baseyard facility. Jenny if the Transportation Michelle is assisting with the preparation of a Traffic Impact Study Report for the proposed project and preparing traffic related construction plans.
d.
(1) TITLE AND LOCATION (City and State)
Hale Mahana Student Housing Honolulu, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) 2018
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Traffic Engineer for the design of a traffic signal system at nearby intersection, preparation of traffic control plans, and traffic signal system details for a new student housing development at the corner of South King Street and University Avenue (formerly University Square). The project site encompasses 1.2-acres and consists of 189-units with retail space on the ground floor.
e.
(1) TITLE AND LOCATION (City and State)
Koa Ridge – Halewaiwai (“D”) and Waokoa (“Z”) Streets Waipio, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2022 CONSTRUCTION (If applicable) 2022
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Traffic Engineer for the design and preparation of construction plans for Roads “D” and “Z” for the Koa Ridge development in Central Oahu. Road “D” will be 500-ft long with four lanes (north-south direction) and Road “Z” will be 550-ft long with three lanes (east-west direction). Both roadways will be designed as two-way roadways. Scope of work also includes design of utilities, including water, sewer, drainage, and storm water quality. Roadway construction elements include driveways, curb ramps, sidewalks, curbs and gutters.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY (Complete one Section E for each key person.)
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 36
12. NAME
Chayson Dulatre
13. TITLE SERVICE PROVIDED
Transportation Engineer
14. YEARS EXPERIENCE
a. TOTAL 2 b. WITH CURRENT FIRM 2
15. FIRM NAME AND LOCATION (City and State)
Wilson Okamoto Corporation, Honolulu, Hawaii
16. EDUCATION (DEGREE AND SPECIALIZATION)
B.S., Civil Engineering, St. Martin’s University, 2022
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Institute of Transportation Engineers (ITE), Hawaii Section
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
Auahi Street Improvements, Ward Village Honolulu, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Phase 1- Active Phase 2 – Active
CONSTRUCTION (If applicable) Phase 1 – 2023 Phase 2 – under construction
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Howard Hughes Corporation is improving Auahi Street as part of the Ward Village development. Auahi Street will be transformed from current 4-lane road to a Pedestrian and Bicycle friendly 2 -lane road that realigns to connect with Pohukaina Street west of Ward Avenue consistent. Chayson is assisting with preparation of traffic control plans and traffic signal design.
b.
(1) TITLE AND LOCATION (City and State)
HDOT Raised Crosswalks Assessments (General Civil Engineering Open Ended Contract) Statewide, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) Under Construction
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
HDOT proposes to implement crossing improvements for seventy-five (75) unsignalized crossings located on the islands of Oahu, Maui, Molokai, Hawaii, and Kauai, of which fifty-four (54) are school crossings while twenty-one (21) are non-school crossings. Chayson is providing support in conducting pre- and post-construction speed evaluations to assess the effectiveness of the improvements after construction.
c.
(1) TITLE AND LOCATION (City and State)
Puunene Avenue Improvements, Wakea Avenue to Kuihelani Highway Wailuku, Maui, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Active CONSTRUCTION (If applicable) --
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
HDOT is proposing construction of 2 new travel lanes along Puunene Avenue. Improvements will include shared shoulder lane, speed tables, sidewalks, drainage facilities, and a retaining wall. Chayson is involved with traffic data collection and preparation of traffic control plans for the project.
d.
(1) TITLE AND LOCATION (City and State)
Queen Street/Waimanu Street Pedestrian Crossing Improvements Kakaako, Oahu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Phase 1 – 2022 Phase 2 – 2023
CONSTRUCTION (If applicable) Phase 1 – 2023 Phase 2 – Under Construction
(3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Chayson is assisting with preparing construction plans for an existing unmarked and unsignalized pedestrian crossing. The project will be implemented in two phases. Phase 1 consisted of preparing construction plans for signage and striping plans for a marked crosswalk and refigure area. Phase 2 includes permanent Rectangular Rapid Flashing Beacon (RRFB) and raised concrete median to provide pedestrian refuge.
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 37
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)
EXAMPLE PROJECT KEY NUMBER
1
21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED
Puuwai Momi Housing Redevelopment – Planning & Due Diligence Halawa, Oahu, HI PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
4/2023 --
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER
Hawaii Public Housing Authority Client Contact: Jeff Ramsey, Crawford Architects 816-421-2640
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
The State of Hawaii is seeking to pursue the redevelopment of a single parcel, encompassing approximately 12 acres in Halawa, with frontages along Kamehameha Highway to the west, Kohomua Street to the southwest, and Kalaloa Street to the south. The project site is currently dedicated towards public housing, owned and managed by the Public Housing Authority, with approximately 260 units. The state is seeking to study the viability of constructing 1,000 new affordable housing units on the project site. The Project Site is considered an especially attractive redevelopment candidate due to the higher density housing potentially available under the City and County of Honolulu (CCH) Hālawa Area TOD Plan recently adopted in December 2020, its proximity immediately south of the Aloha Stadium HART Transit Station and the NASED project. WOC’s planning scope included:
• Research and data gathering of available information relating to the project site and environs.
• Consultation with various agencies to discuss the project and identify permits and entitlements required for the development of the project.
• Evaluation of Utility Service Capacity.
• Preparation of a due diligence report.
The completed Due diligence report also included an archaeological literature review report.
25. FIRMS INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
Crawford Architects Kansas City, MO Prime Consultant - Architect
b.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
Honua Consulting Honolulu, HI Archaeological Resources and HRS 6E Compliance
c.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
d.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
e.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
f.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 38
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)
EXAMPLE PROJECT KEY NUMBER
2
21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED
Kona Village Resort Redevelopment Kaʻūpūlehu, Hawaiʻi, HI PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
7/2023 7/2023
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER
Kamehameha Schools Jennifer Tom 808-523-6249 jetom@ksbe.edu
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
WILSON OKAMOTO CORPORATION (WOC) assisted Kamehameha Schools (KS) with overseeing the redevelopment of the Kona Village Resort. KS is the landowner of the resort’s approximately 90 acres of oceanfront property in
Kaʻūpūlehu North Kona, Hawaii. In 2011, the site was devastated by the Japan tsunami which caused severe damage resulting in the shutdown of operations. In 2016, Kennedy Wilson (third-party developer) commenced early planning
stages to re-develop the resort.
Kennedy Wilson proposed to rebuild and improve the iconic resort with updated luxury amenities while retaining the original resort’s unique character and ambiance. The approximately 125 original low-density “hale” structures will be rebuilt, many in their previous locations with an additional 25 proposed under a second, later phase of development. Rebuilt and new amenities will include restaurants, recreational facilities, bars, pools, and spa, as well as a full complement of back-of-house support and infrastructure. Infrastructure improvements encompass new brackish water wells, an open reservoir/water feature, and a reverse osmosis desalination plant to produce water for landscape irrigation. WOC’s primary role was to oversee the entitlement process for the project’s first phase. Specifically, WOC was tasked with assuring that Kennedy Wilson’s redevelopment efforts aligned with Kamehameha School’s interests and cultural values. The entitlements in this phase were based on development replacing most of the previous uses that were approved through the Special Management Area Permit process. WOC also sub-contracted the services of a hydrologist to oversee the planning of the non-potable irrigation water system. As a transition to design review of the project, WOC coordinated the selection of an architectural firm by KS to provide oversight of Kennedy Wilson’s design profess and continued to coordinate sub-consultant services, attend meetings, and oversee the quality of work produced.
WOC also provided civil engineering services in oversight of Kennedy Wilson’s design team on behalf of KS.
25. FIRMS INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
Intera Waimanalo, Hawai‘i Hydrogeological Consultant
b.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
c.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
d.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
e.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
f.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 39
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)
EXAMPLE PROJECT KEY NUMBER
3
21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED
Wahiawa Civic Center: Environmental Impact Statement & Design Wahiawa, Oahu, HI PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Planning – 2023 Design - Active --
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER
Department of Accounting & General Services State of Hawaii Sally Tamai 808-586-0463 Sally.l.tamai@hawaii.gov
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
WILSON OKAMOTO CORPORATION (WOC) is a subconsultant providing planning, civil and traffic engineering services for the proposed Wahiawa Civic Center. The State of Hawaii Department
of Accounting & General Services (DAGS) is proposing a new facility in Wahiawa. The project site consists of five parcels,
encompassing approximately 4 acres and is bordered by California Avenue, Kilani Avenue, North Cane Street and Lehua Street. The new complex will consolidate various State and City services, including a civic center, district court facility, and future public library (new Resource and Education Center facility).
The new Wahiawā Civic Center will provide the Central O‘ahu, North Shore, and Wahiawā communities with a consolidated and centralized facility housing State, City and County of Honolulu (City), and Judicial services. The new Civic Center will include a new District Court Facility and a new State Office Complex that will house State offices and City offices such as a Satellite City Hall and Driver’s Licensing. This facility would be supported by on- and off-site infrastructure improvements, as well as on-site parking. The anticipated new Wahiawā Civic Center’s gross spatial programming needs include an area of approximately 61,000 SF for offices, courthouse space, and utilities. Of this 61,000 SF, the space requirements are anticipated to be approximately 39,000 SF for the Judiciary, and 22,000 SF for State and City agencies (the State Judiciary will be served by separate Utilities and Equipment).
WOC prepared and processed an Environmental Impact Statement (EIS) pursuant to Chapter 343, HRS and HAR Title 11 State Department of Health, Chapter 200. The project is utilizing State lands and funds and is thereby subject to
environmental review requirements. The Final EIS was published in the November 8, 2021 issue of The Environmental Notice.
WOC alongside Honua Consulting developed and led comprehensive, extensive community outreach and engagement efforts in partnership with the Wahiawā Neighborhood Board and the Wahiawā Community & Business Association to support the EIS and the overall project delivery process. WOC also prepared a traffic impact assessment report, parking adequacy report, and preliminary engineering report to address water, sewer, and storm drainage in support of the EIS.
WOC is processing a Joint Development Agreement (JDA) in association with a Conditional Use Permit that will adjoin the disparate parcels that comprise the project into one block of development, as well as process height and setback variances to accommodate the proposed design scheme for the project.
WOC is currently preparing construction documents for the project, including site demolition, grading, water, sewer,
drainage and water quality, ingress/egress, erosion control plans, specifications and cost estimates. Estimated construction cost: $76 million
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 40
25. FIRMS INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
ahl Honolulu, HI Prime Consultant - Architect
b.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
Honua Consulting Honolulu, HI Community Outreach, Archaeological & Cultural Resources Consultant
c.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
AECOS, Inc. Kailua, HI Biological Resources Consultant
d.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
ENPRO Kailua, HI Environmental Hazardous Materials Consultant
e.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
Munekiyo Hiraga Honolulu, HI Socio-Economic Consultant
f.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
Hirata & Associates, Inc. Honolulu, HI Geotechnical Engineer
g.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
ControlPoint Surveying, Inc. Honolulu, HI Surveyor
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 41
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY NUMBER
4
21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED
Wahiawa Center for Workforce Excellence Wahiawa, HI PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
EA-2024 Out to Bid
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER
Department of Education State of Hawaii Garret Horimoto, AHL William George, Project Coordinator – Office of Facilities and Operations
808-523-9636 808-784-5125 William.george@k12.hi.us
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
The Hawaiʻi State Department of Education (DOE), in conjunction with the University of Hawaiʽi Community
Colleges (UHCC) and Hawaiʽi State Public Library System (HSPLS), is proposing to construct the Wahiawā Center for Workforce Excellence (WCWE) at 820 California Avenue in Wahiawā on the island of Oʽahu, the site of the existing Wahiawā Public Library and DOE Learning Opportunity Academy High Core portables.
Specifically, the Proposed Project encompasses the demolition of the existing facilities at the Project Site and the subsequent construction of a new facility, the WCWE. The WCWE is anticipated to consist of a three-story facility with a parking structure that, at a minimum, will meet LEED Silver requirements as established by the US Green Building Council (USGBC) with a life expectancy of 50 years, or better. The WCWE is intended to provide space for the following three (3) agencies: the DOE, UHCC, and HSPLS. The facility is envisioned to accommodate HSPLS on the ground floor, DOE on the second floor, and the UHCC
on the top floor. The WCWE facility will accommodate the following:
1. Wahiawā Public Library functions;
2. DOE LMW Complex Area offices; 3. UHCC classrooms and administrative spaces; and
4. Restrooms and other support spaces
WILSON OKAMOTO CORPORATION (WOC) provided planning, civil engineering and transportation engineering
services. WOC prepared an Environmental Assessment (EA) pursuant to Chapter 343, Hawaiʽi Revised Statutes (HRS). WOC prepared a Traffic Impact Analysis Report (TIAR) and Preliminary Engineering Report in support of the EA and prepared a parking study to determine how many parking stalls are necessary to support the project.
The WCWE will be constructed under a Design-Build project development model. The programming criteria adapted from previously prepared UHCDC proof of concept studies will serve as the basis for the Environmental Assessment (EA),
and will also feed into the a subsequent Request for Proposals (RFP) process, during which prospective development teams (bidders) will prepare and present various design schemes to meet the RFP requirements. Any substantive divergence from the program outlined herein would be subject to supplemental / further environmental review.
WOC also provided civil engineering services for the development of bridging documents for the Request for Proposal package.
25. FIRMS INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
AHL Honolulu, HI Architect
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 42
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)
EXAMPLE PROJECT KEY NUMBER
5
21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED
Nohona Hale Affordable Rental Micro-Unit Housing Honolulu, Oahu, HI PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Planning – 2017 Engineering - 2020 2020
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER
Hawai‘i Community Development Authority Samantha Magistro, Bronx Pro Group (SM) Ron Steitzer, CM&D (RS)
SM: 718-294-2768 RS: 808-675-5605
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
Hawaii Housing Finance and Development Corporation (HHFDC) developed Nohona Hale project on land owned by the Hawaii Community Development Authority (HCDA). The project is located on a consolidated block within the Kakaako Community Development District (KCDD) Mauka Area where it is bounded by Cooke Street to the southeast and Coral Street to the northwest; Queen Street to the northeast and by Halekauwila Street to the southwest. Nohona Hale consists of approximately 110 affordable rental micro-units (approximately 300 sq. ft. each) in a 16-story tower, set upon a two-level podium that houses the lobby, living room, community spaces and management offices. The units will be marketed to qualified low-income individuals and couples earning 60% and below of the Area Median Income (AMI). WILSON OKAMOTO CORPORATION (WOC) provided planning services for the preparation and processing of an environmental assessment (EA) pursuant to Chapter 343, HRS and Title 11, Chapter 200 HAR. The processing of a HHFDC 201H application in support of the project was a key component of the EA process. The Approving Agency is the State of Hawai‘i Department of Business, Economic Development and Tourism’s (DBEDT), Hawai‘i Housing Finance and Development Corporation (HHFDC). HHFDC will utilize federal funding from the U.S. Department of Housing and Urban Development (HUD) WOC’s civil engineering scope includes the preparation of construction plans for demolition, site layout, grading, water, sewer, ingress/egress, and drainage. Estimated construction cost: $30 million
25. FIRMS INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
Cultural Surveys Hawaii Kailua, HI Archaeological and Cultural
Resources Consultant
b.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
Notkin Hawaii Inc. Honolulu, HI Mechanical Engineer
c.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
BASE Honolulu, HI Structural Engineer
d.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
Albert Chong Associates Inc. Honolulu, HI Electrical Engineer
Photo provided by WCIT Architecture
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 43
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)
EXAMPLE PROJECT KEY NUMBER
6
21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED
Ililani Residential Tower Kakaako, Oahu, HI PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Planning – 2018 Engineering – 2020 CA- Active
2024
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER
Ililani, LLC Henry Chang, AIA 808-277-1412
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
WILSON OKAMOTO CORPORATION (WOC) is providing planning, civil and traffic engineering services for a proposed residential tower located at the corner of Halekauwila and Keawe Streets. The project site is “L” shaped, encompassing 0.77 acres and is currently occupied by a vacant industrial
building. lilani is located within the Mauka area of the Kakaako Community Development District (KCDD) and is envisioned as a mixed-use development consisting of
approximately 328 affordable and market-rate for sale residential units in a 41 story tower with retail space on the ground floor (42-stories total). The project
includes an eight-story parking structure plus a recreational deck. One of the rail transit stations proposed by the Honolulu Authority for Rapid Transportation (HART) will be located on the ʻEwa side of the building along Halekauwila Street.
Planning services included the preparation and processing of an environmental assessment (EA) pursuant to Chapter 343, HRS and Title 11, Chapter 200 HAR. The Approving Agency is the State of Hawai‘i Department of Business, Economic Development and Tourism’s (DBEDT), Hawai‘i Housing Finance and Development Corporation (HHFDC). The processing of a HHFDC 201H application in support of the project was a key component of the EA
process. A Traffic Impact Report was prepared by WOC in conjunction with the EA. In addition, a Multi-Modal Traffic Assessment was also be prepared. Civil engineering scope includes the preparation of construction plans for demolition, site layout, grading, water, sewer, ingress/egress, and drainage. WOC also prepared an infrastructure availability report summarizing the availability of civil utilities (sewer, water, drainage, gas) to support the project. Estimate construction cost: $108 million
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
Notkin Hawaii Inc. Honolulu, HI Mechanical Engineer
b.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
BASE Honolulu, HI Structural Engineer
c.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
Coffman Engineers, Inc. Honolulu, HI Electrical Engineer
d.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
Hughes Landscape Architect LLC Honolulu, HI Landscape Architect
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 44
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)
EXAMPLE PROJECT KEY NUMBER
7
21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED
UHCC Wahiawa Value Added Product Development Center Wahiawa, Oahu, Hawaii PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Planning – 2019 Civil Design - 2021 CA - Active
2024
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER
University of Hawaii Office of the Vice President for Community Colleges Owner Contact: Michael Unebasami, Associate VP for Administrative Affairs 808-956-6280 mune@hawaii.edu
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
WILSON OKAMOTO CORPORATION (WOC) is a subconsultant providing planning, traffic and civil engineering services for the University of Hawaii’s (UH) new Value-Added Product Development Center (VAPDC) located at 1001 California Avenue in downtown Wahiawā. UH is proposing to repurpose an existing metal warehouse that formerly housed Tamura’s Wholesale Outlet and convert it to a new vocational school/education facility. The parcel is approximately 1.5 acres. The new facility, approximately 33,000 SF, would serve as a multi-purpose facility for activities including, but not limited to, festivals, farmer’s markets or other similar market activities, tasting events, merchandising for food products from the facility, etc. The 33,000-square-foot food production facility includes processing, packaging, shipping and receiving areas, as well as multiple kitchens, refrigerated storage, a lanai with a demonstration kitchen, and a
classroom, according to LCC's website. It will be used by entrepreneurs, farmers and students.
WOC prepared and processed an Environmental Assessment (EA) pursuant to Chapter 343, Hawai‘i Revised Statutes (HRS) and Title 11, Chapter 200, Hawai‘i Administrative Rules (HAR). WOC also prepared a Traffic Impact Analysis Report in support of the EA. WOC civil engineering services includes the preparation of sewer connection application; schematic plans and layouts; preliminary engineering report to address water, sewer, and storm drainage; and drainage report. Scope also included preparation of demolition plans, grading, erosion control, specifications and cost estimates. Site improvements also include parking improvements, new driveway and sidewalk improvements along Plum Street. Estimated construction cost: $12 million
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
Honua Consulting Honolulu, HI Historic & Archaeological Consultant (Chapter 6E, HRS)
b.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
c.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
d.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
e.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
f.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 45
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)
EXAMPLE PROJECT KEY NUMBER
8
21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED
New Aloha Stadium Entertainment District Environmental Impact Statement Honolulu, Oahu, HI
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2022 --
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER
State of Hawaii Department of Accounting & General Services/Hawaii Community Development Authority
Client Contact: Stacey Jones, Crawford Architects Owner Contact: Chris Kinimaka, DAGS
Client Phone: 816-421-2640 Owner Phone: 808-586-0499
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
The State of Hawai‘i Department of Accounting and General Services (DAGS) is proposing to construct a new stadium facility along with ancillary development to create a New Aloha Stadium Entertainment District (NASED).
WILSON OKAMOTO CORPORATION (WOC) is providing planning, traffic and civil engineering services for the redevelopment of Aloha Stadium as a subconsultant. The project encompasses the construction of a new, modern stadium facility that will be supported by complimentary mixed-use development. The build out of the project is anticipated to be accomplished through several construction phases and is intended to ultimately deliver a vibrant, thriving community-centric entertainment district that will offer a range of resident and visitor amenities, invigorate economic development and job creation, and celebrate Hawaii’s spirit of achievement and resiliency as well as the history and culture of Aloha Stadium and the communities that surround it. The development and construction of the project will be pursued under series of arrangements between DAGS and one or more private developers over a period of several years. The New Aloha Stadium’s design aims to set the stage for a uniquely crafted Hawaiian civic building destined to become a new community icon and anchor for a new urban district while continuing to serve as a gathering place for the State of Hawai‘i. Lifting of Federal and City Deed Restrictions combined with the new HART station create a unique opportunity to leverage the increased transit options for stadium operations, and for transit-oriented development. Once the new stadium is opened, the existing stadium would be demolished, presenting opportunities on the site for ancillary transit-oriented development, located in an optimal location next to the new HART station. The development of the NASED is being pursued by the State under a parallel Public-Private Partnership (P3) procurement process. This process will identify a P3 Developer who will be selected through a State driven Request for Qualifications (RFQ) / Request for Proposals (RFP) process. This State RFQ / RFP process will run concurrently with this EIS process due to the time critical and time sensitive nature of escalating construction costs in addition to mounting deferred maintenance expenses tied to the continued operation of the existing stadium facility. The P3 developer selected pursuant to this RFQ / RFP process will be bound to the findings of this programmatic EIS process. In conjunction with this procurement approach, WOC is preparing EIS documentation in the form of a “Programmatic” EIS, meaning it evaluates the effects of the proposed project broadly as it includes a wide range of individual projects and implementation will occur over a long timeframe. The level of detail that is presented is sufficient to allow for the development of broad mitigation strategies in response to anticipated impacts to environmental resources identified on a programmatic basis. This programmatic EIS does not evaluate project-level issues related to specific design details as those are not available for decision at this stage of project delivery. Design decisions will be defined once the
selected P3 Developer’s plans are finalized. Instead, this Programmatic EIS examines the broad interaction of the general project program with the environment. The purpose of this Programmatic EIS process is to disclose to government agencies, the general public, stakeholders, and decision-makers the anticipated impacts of the subject project on a programmatic basis in support of the
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 46
aforementioned parallel RFQ/RFP procurement process and to identify feasible measures that might be taken to mitigate potential impacts that may result from its implementation and operation.
WOC also prepared a traffic impact assessment report, on-site traffic access and circulation plan, transportation management strategy and preliminary engineering report in support of the EIS.
For the Preliminary Engineering Report, WOC provided a detailed evaluation of the project site related to the civil infrastructure and utility systems for the NASED redevelopment. The objective of the report is to assess existing site and infrastructure improvements, consult with various agencies including DAGS , Board of Water Supply, and the CCH Department of Environmental Services, determine the project requirements related to the roadway and parking facilities, site grading, storm drainage system, sanitary sewer system and water system, and, based on the project requirements,
determine required improvements, and identify possible opportunities and constraints for the redevelopment.
The EIS effort is presently ongoing, however, the Draft Programmatic EIS was published on December 23, 2020.
25. FIRMS INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
Cultural Surveys Hawaii, Inc. Kailua, HI Archaeological and Cultural Resources Consultant
b.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
AECOS, Inc. Kaneohe, HI Biological Resources Consultant
c.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
Y. Ebisu & Associates Honolulu, HI Acoustic Engineer
d.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
Munekiyo Hiraga Honolulu, HI Economic and Fiscal Consultant
e.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
f.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 47
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)
EXAMPLE PROJECT KEY NUMBER
9
21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED
University of Hawaii Innovation Center and Residences for Innovative Student Entrepreneurs (aka Atherton Mixed Use Student Housing) Honolulu, Oahu, HI
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Planning & Traffic – 5/2020 Civil – Active
2024
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER
University of Hawai‘i x Hunt Development Group – Public Private Partnership. Owner Contact: Jan Gouveia, VP for Administration – University of Hawaii Client Contact: Michael Lam, Senior VP – Development – Hunt Development Group
Owner Phone: 808.956.6405 Email: jgouveia@hawaii.edu Client Phone:808.792.3761 Email: michael.lam@huntcompanies.com
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
The University of Hawai‘i Foundation (UHF) has teamed with Hunt Development Group (HDG) under a Public-Private-Partnership (P3) to design, build, finance, operate, and maintain a Mixed Use Student Housing Innovation and Entrepreneurship
Center on UHF property in lower Mānoa located directly adjacent from the University of Hawai‘i at Mānoa (UHM) campus. The
proposed P3 action is envisioned to bring an integrated, live, learn, work, innovation center supporting the innovation and
entrepreneurship community at UHM. The proposed P3 project will consist of approximately 114,000 square feet, with
programming that will include student housing (350 units) and residential common areas, the innovation and entrepreneurship
center, project service areas, retail area, and on-site parking.
WILSON OKAMOTO CORPORATION (WOC) served as a subconsultant to HDG providing planning, civil and traffic engineering services. Planning scope included project management and entitlements consultation in conjunction with the preparation and processing of an Environmental Assessment, pursuant to Chapter 343, Hawaii Revised Statutes (HRS), and Title 11 Chapter 200, Hawaii Administrative Rules (HAR). This EA will support several forthcoming UHM Campus Plan Review Use Modification Applications, which will be separately prepared for HDG in association with the Atherton Project, and also by WOC for UH in conjunction with their ongoing 2019 LRDP Update process. These PRU Modification applications will be processed by the City & County of Honolulu’s Department of Planning and Permitting. WOC is also the P3 project’s civil engineer and prepared construction plans for site and utility improvements including water, sewer, ingress/egress, drainage, grading and demolition. WOC also prepared a traffic impact report in support of the EA and PRU modification process. Estimated construction cost: $58 million
25. FIRMS INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
Wilson Okamoto Corporation Honolulu, HI Planner, Civil Engineer and Traffic Engineer
b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
Design Partners, Inc. Honolulu, HI Prime Architect/Client
c.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
Honua Consulting Honolulu, HI Archaeological Resources Consultant
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 48
d.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
Mason Architects Honolulu, HI Historic Building Architect
e.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
Hunt Development Group Honolulu, HI P3 Partner (Developer)
f.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
PBR Hawaii Honolulu, HI Landscape Architect
g.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
InSynergy Honolulu, HI Mechanical Engineer
h.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
BASE Honolulu, HI Structural Engineer
i.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
j.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 49
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)
EXAMPLE PROJECT KEY NUMBER
10
21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED
Kaimukī High School Girl’s Athletic Locker Room Kaimukī, HI PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2022 --
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER
Department of Education, Facilities Development Branch State of Hawaii
Mitch Tamayori 808-784-5116
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
Currently, Kaimukī High School’s existing girl’s locker room is outdated and overcrowded. The Proposed Project will provide the school with a much-needed
modern facility that would serve its women’s sports teams. The existing locker room will continue to be used for the general women’s population at Kaimukī
High School to serve physical education classes and curriculum.
Moreover, the Proposed Project will help meet Title IX requirements. Title IX of the Education Amendments of 1972 prohibits discrimination on the basis of sex in any program or activity receiving Federal financial assistance. Title IX regulations require schools to achieve parity in terms of facilities that are provided for students. This includes facility elements such as locker rooms, bathrooms, showers, team rooms and lockers and pertains not only to quantity but also to quality of space and proximity to playing and practice fields. The intent of the Proposed Project is to provide gender equitable facility.
The Proposed Project, as envisioned, will encompass approximately 5,000 square feet (SF) of lockers and meeting area, shower and toilet stalls, a drying
room, a coach’s training room, a wet room, equipment storage rooms, janitorial closets, and a unisex room. It is also anticipated that the Proposed Project would
include a trainer’s room and potentially a weight training area. The Proposed Project would be an exclusive locker room for the female athletic teams offered at Kaimukī High School.
WILSON OKAMOTO CORPORATION (WOC) was a subconsultant providing planning services for the preparation and processing of an Environmental Assessment, pursuant to Chapter 343, HRS and Title 11, Chapter 200.1 HAR. Estimated construction cost: $4.7M
25. FIRMS INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
Ushijima Architects Honolulu, HI Prime – Architect (WOC’s Client)
b.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
c.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
d.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
e.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 50
G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS
26. NAMES OF KEY PERSONNEL (From Section E, Block 12)
27. ROLE IN EXAMPLE PROJECT
28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in "Example Projects Key" section below before completing table. Place "X" under project key number for participation in same or similar role.)
1 2 3 4 5 6 7 8 9 10
Michael Fujita, P.E. President
Keola Cheng Director of Planning & Project Manager
Dalton Beauprez Planning Project Manager
Harlee Meyers Planner
Brian Lock, P.E. Vice President & Director of Civil Engineering Group
Glenn Kuwaye, P.E., LEED AP
Vice President & Director of Civil Engineering Group
Barry Toyota, P.E. Sr. Quality Control Specialist
Richard Harada, P.E. Sr. Civil Project Manager
Brett Kuamoo, P.E. Sr. Civil Project Manager
Mason Suga, P.E., LEED AP
Sr. Civil Project Manager
Todd Yonamine, P.E. Civil Project Manager
Brennan Nacario, P.E.
Civil Project Manager
Tanner Cho, P.E. Civil Project Manager
29. EXAMPLE PROJECTS KEY
NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F)
1 Puuwai Momi Housing Redevelopment – Planning & Due Diligence, Halawa, Oahu, HI 6 Ililani Residential Tower Kakaako, Oahu, HI
2 Kona Village Resort Redevelopment - Entitlements Kona, HI 7 UHCC Wahiawa Value Added Product Development Center, Wahiawa, Oahu, Hawaii
3 Wahiawa Civic Center Environmental Impact Statement, Wahiawa, HI 8 New Aloha Stadium Entertainment District Honolulu, HI
4
Wahiawa Center for Workforce Excellence Wahiawa, HI 9
University of Hawaii Innovation Center and Residences for Innovative Student Entrepreneurs (aka Atherton Mixed Use Student Housing) Honolulu, Oahu, HI
5 Nohona Hale Affordable Rental Micro-Unit Housing Kakaako, Oahu, HI 10 Kaimukī High School Girl’s Athletic Locker Room Kaimukī, HI
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 51
G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS
26. NAMES OF KEY PERSONNEL (From Section E, Block 11)
27. ROLE IN EXAMPLE PROJECT
28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in "Example Projects Key" section below before completing table. Place "X" under project key number for participation in same or similar role.)
1 2 3 4 5 6 7 8 9 10
Kevin M. Higashi, P.E. Associate Civil Project Manager
Cara Itai, P.E. Associate Civil Project Manager
Reyn Sugitaya, P.E. Civil Engineer
Chase Kanekuni, P.E. Civil Engineer
Josh Inaba, P.E. Civil Engineer
Devan Lau Civil Engineer
Tiffany Homma Civil Engineer
Darrian Cremer Civil Engineer
Brooks Martinez Civil Engineer
Ty Matsunami Civil Engineer
Kassidy Mashiyama Civil Engineer
29. EXAMPLE PROJECTS KEY
NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F)
1 Puuwai Momi Housing Redevelopment – Planning & Due Diligence, Halawa, Oahu, HI 6 Ililani Residential Tower Kakaako, Oahu, HI
2 Kona Village Resort Redevelopment - Entitlements Kona, HI 7 UHCC Wahiawa Value Added Product Development Center, Wahiawa, Oahu, Hawaii
3 Wahiawa Civic Center Environmental Impact Statement, Wahiawa, HI 8 New Aloha Stadium Entertainment District Honolulu, HI
4
Wahiawa Center for Workforce Excellence Wahiawa, HI 9
University of Hawaii Innovation Center and Residences for Innovative Student Entrepreneurs (aka Atherton Mixed Use Student Housing) Honolulu, Oahu, HI
5 Nohona Hale Affordable Rental Micro-Unit Housing Kakaako, Oahu, HI 10 Kaimukī High School Girl’s Athletic Locker Room Kaimukī, HI
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 52
G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS
26. NAMES OF KEY PERSONNEL (From Section E, Block 11)
27. ROLE IN EXAMPLE PROJECT
28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in "Example Projects Key" section below before completing table. Place "X" under project key number for participation in same or similar role.)
1 2 3 4 5 6 7 8 9 10
Pete Pascua, P.E.
Sr. Vice President & Director of Transportation Group
Cathy Leong, P.E.
Director of Transportation Group & Project Manager
Jennylyn Morrill, P.E. Transportation Project Manager
Michelle Lindsey, P.E.
Associate Transportation Project Manager
Chayson Duarte Transportation Engineer
29. EXAMPLE PROJECTS KEY
NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F)
1 Puuwai Momi Housing Redevelopment – Planning & Due Diligence, Halawa, Oahu, HI 6 Ililani Residential Tower Kakaako, Oahu, HI
2 Kona Village Resort Redevelopment - Entitlements Kona, HI 7 UHCC Wahiawa Value Added Product Development Center, Wahiawa, Oahu, Hawaii
3 Wahiawa Civic Center Environmental Impact Statement, Wahiawa, HI 8 New Aloha Stadium Entertainment District Honolulu, HI
4
Wahiawa Center for Workforce Excellence Wahiawa, HI 9
University of Hawaii Innovation Center and Residences for Innovative Student Entrepreneurs (aka Atherton Mixed Use Student Housing) Honolulu, Oahu, HI
5 Nohona Hale Affordable Rental Micro-Unit Housing Kakaako, Oahu, HI 10 Kaimukī High School Girl’s Athletic Locker Room Kaimukī, HI
H. ADDITIONAL INFORMATION
30. PROVIDE ANY ADDITIONAL INFORMATION AT YOUR DISCRETION. ATTACH ADDITIONAL SHEETS AS NEEDED
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 53
WILSON OKAMOTO CORPORATION was established in 1947 in Honolulu, Hawai‘i and is a minority-owned small business offering planning, civil engineering, and traffic and transportation engineering consulting services to Federal, State and County government agencies. WOC also works with the private sector and has worked on projects in Hawaii and the Pacific Region. Our unique combination of professional capabilities permits participation in all phases of development projects, including:
Preliminary Engineering Design
Site Planning/Development
Infrastructure Planning
Construction Plans, Specifications and Cost Estimates
Subdivision Development
Contractor Coordination
Traffic Impact Assessment
Transportation Master Planning
Construction Traffic Management
Traffic Simulation
Traffic Demand Modeling
Intersection Design
Traffic Signal Design
Community Development Plans/Regional Plans
Environmental Assessment/Environment Impact Statements
Environmental Permits
Land Use/Rezoning WOC offers multi-disciplinary capabilities within a strong team approach that has proven successful in a range of both small and large government and private projects. Our comprehensive perspective of development in Hawaii has been critical in our ability to identify and resolve potential issues and concerns early in the process before they become “road blocks.” This perspective has been gained over lifetimes of collective experience in Hawaii and with the multitude of considerations unique to our island environment, community and government. It is woven in the inter-disciplinary working relationships of the staff in the services we offer. These services include, but are not limited to, project programming, design process and construction management, environmental impact documentation, land use entitlement, public consultation and community outreach. Civil Consulting Group: Civil engineering has long been one of WOC’s major strengths. The Civil Consulting Group has extensive experience in the planning and design of infrastructure and site work, including roads, highways, water and wastewater systems, and drainage and flood control. WOC utilizes state of the art computer hardware and specialized civil engineering software to serve clients with accuracy and speed. Planning Consulting Group: The Planning Consulting Group at WOC includes personnel with broad ranging experience in environmental analysis, master and land use planning, entitlements, permitting and geographic information systems. Because of our in-house multi-disciplinary capabilities, our planners routinely work with other disciplines in producing comprehensive planning documents such as infrastructural master plans and organization-wide needs assessments and programming. Traffic Engineering Consulting Group: WOC’s Traffic and Transportation Consulting Group includes seasoned personnel with a wide range of experience in the design of highways, intersections and traffic signals, traffic impact assessment, transportation master planning, and expert witness services. The traffic and transportation engineers are well established as experts in ADA compliance on a National, as well as Statewide level, and are well versed in the latest local and national policies, regulations, and trends, analytical models and innovative solutions. The multi-disciplinary experience of our traffic and transportation engineers offers a holistic problem solving approach to complex environmental, community and technical engineering issues. Computer Capabilities: WOC is proficient in the use of the latest specialized software required to provide effective and efficient engineering design solutions. WOC utilizes state-of-the-art project and information coordination procedures within our design organization. NEWFORMA software is an information management system used to assemble, manage, and group project teams; generate project team reports; and view the ongoing and completed activity associated with individual team members. Most importantly, it facilitates communication between internal and external team members when using functions such as Transmittals, Submittals, Action Items and integrated Info Exchange system. Newforma enables the design team to track and manage important project-specific events ranging from phases, tasks and milestones to meetings. This helps with the identification and management of critical issues, helping to keep the project on budget and on schedule. We are equipped and knowledgeable in Geographic Information Systems (GIS) using ArcGIS and AutoCAD software product. An important feature of the GIS is its interactive capability which can access a textual database directly from stored map data to answer queries based on spatial or tabular analysis. WOC design engineers will incorporate sustainable and Best Management Practice components, when appropriate. This will produce a more cost-effective design with increased project lifespan and reduced long-term maintenance. WOC constantly seeks out new technology and design concepts that will help our team produce more accurate, efficient and cost-effective solutions for our clients and our community.
H. ADDITIONAL INFORMATION
30. PROVIDE ANY ADDITIONAL INFORMATION AT YOUR DISCRETION. ATTACH ADDITIONAL SHEETS AS NEEDED
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 54
1. Technical Competency Staff Assignments WOC is fully committed to providing the highest quality professional services required for any projects we are selected to undertake. The Project Manager assigned to the project will participate in all major aspects of the project from its inception to completion. This includes contract management, project team coordination, overseeing the quality of work produced and taking an active role in all decisions affecting the course of the project. Adequate staff resources will be allocated to each project assuring that deadlines will be met. Moreover, with the depth of the staff available at WOC, additional staff can be assigned, to meet stringent deadlines or to address unforeseen needs. 2. Relevant Experience Similar Projects - Experience and Qualifications of Firm Section F summarizes past and current projects which demonstrate our experience with the types of projects for which we have expressed an interest in being considered. Communication is a key factor in any project and WOC brings extensive experience in agency consultation to all of our projects. We meet with all pertinent agencies prior to the permitting process to ensure that all potential and existing issues are addressed. Our staff ensures that all projects are in compliance with government standards to avoid any delays in the process down the line. In many projects, including those with a high level of public controversy, WOC has undertaken pro-active efforts to disseminate information and to create innovative forums for soliciting community input. Neighborhood Boards are regularly consulted on a diverse range of projects and, when deemed appropriate, we have convened community task forces, technical advisory committees, charettes and other special groups to focus on particular projects or aspects of projects. 3. Capacity to Accomplish the Work Size of Firm WOC offers approximately 55 full- and part-time professional and support staff, including 19 engineers with professional licenses (P.E.). Our firm is centralized in a single office building with adequate space and support facilities to accommodate significant additional staffing if the need arises. As discussed previously, we are fully equipped with a networked computer system providing direct access to a full range of equipment and information. Resources Available for this Project As mentioned previously in Item 1, WOC is fully committed to providing the highest quality professional services required for any projects we are selected to undertake. We have available 15 staff members capable of project management, some of whom have been identified in this submittal as particularly qualified for the projects for which we have expressed an interest in being considered. With our multi-disciplinary capabilities, more than one project manager may take a lead role as a project moves through its various phases of development. This includes master planning and conceptual design through environmental impact documentation and permit procurement, and on to final design and construction management. Project Managers will be supported by a highly competent staff of professionals and, as the need arises, our depth of staffing allows us to assign other qualified personnel to meet stringent deadlines or to address unforeseen manpower requirements. Past Performance Recent Client References Over the years, WOC has successfully completed planning design projects involving a variety of land uses, buildings, structures and infrastructure improvements for government agencies and private industry. These projects have all met stringent criteria for performance, cost control, schedule and quality of design. The planners, civil engineers, and transportation engineers are available for the projects in which we have expressed interest, bring with them the collective experience of having worked on these prior projects. Client references are listed in the cover letter.
H. ADDITIONAL INFORMATION
30. PROVIDE ANY ADDITIONAL INFORMATION AT YOUR DISCRETION. ATTACH ADDITIONAL SHEETS AS NEEDED
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 55
Control of Costs, Document Quality and Schedules Cost Control - In past projects, WOC has consistently completed projects within established budgets. Based on our experience, we are able to establish budgets that are commensurate with the expected product and, thereby, to stay within these limits while delivering high-quality products. Where the budget is severely limited, we devise alternate strategies in consultation with the client to achieve the desired outcome. To assure that our project managers are apprised of manpower and other expenditures, our Accounting Department continues to build upon its system for reporting current budget status. Thus, the project managers have the most timely information at-hand to judiciously allocate available resources and maximize the quality of products we deliver. Quality Assurance/Quality Control (QA/QC) - WOC understands the vital importance of QA/QC procedures required to manage diverse projects. Our multi-disciplinary approach allows us to take a project from conceptual design to environmental documentation and permit procurement, all the way through to final design and construction management. Through this process, we have developed and refined our quality control procedures for each of the respective stages of project development. WOC engineers and planners have developed a comprehensive quality control program utilizing Total Quality Management (TQM) principles which are applied to all projects. QC starts at the very beginning of the project, with Project Managers conducting initial meeting(s) to discuss goals, objectives and deliverables of the project. This allows for each team member of the project team to have an understanding of the process involved in the project. Throughout a project, periodic meetings are conducted with project team members, while keeping open communication with the Client. Frequent communication with the Client manages expectations and products. Quality control over design work is accomplished in a two-tiered program which includes: 1) adherence to established standards for quality and accuracy of the work; and 2) parallel review of the work by the Principal of the firm and/or Quality Control Specialist. Drawings, specifications, cost estimates and other technical documents are systematically checked for completeness and accuracy throughout the course of the design utilizing appropriate review methods and review checklists. Participation at all working levels encourages innovation and instills a sense of ownership and pride in the products delivered. Our engineers and planners have a clear understanding of each other's roles in the early stages of project development when environmental and community considerations must be taken into account. They have an established rapport which allows all aspects of projects to be reviewed to identify potential environmental and community issues and concerns, as well as governmental requirements for environmental impact documentation, site assessment and permits. This review assures that potential pitfalls and "show-stopping" concerns can be identified and resolved early-on, with the client's support, through appropriate design and pro-active measures such as early consultation with agencies and the affected community.
Schedules - WOC prides itself in delivering quality planning and engineering products in a timely and cost-efficient manner. We have an excellent track record of maintaining schedules and meeting deadlines for projects. It is noteworthy that this has been accomplished on even the largest and most complex projects which involved a multitude of disciplines and, in many cases, multi-firm teams of consultants. Our most notable recent example in this regard is the fast-tracked Waikiki Beach Walk Redevelopment project for which was successfully completed on an accelerated timeline. This was done despite substantial public concern and intense governmental agency scrutiny. Much of our success in maintaining project schedules is attributable to the professional ability of our planners and engineers to anticipate and address issues before they can stall or delay projects. In addition, we have established procedures to assure that project schedules are maintained. At the beginning of the project a senior-level staff planner or engineer is assigned to serve as the project manager to control work, maintain project schedules, coordinate with sub-consultants and agencies. The project manager prepares a detailed schedule and work program at the beginning of each project and constantly monitors the project to assure that each deadline is achieved. The schedule is revised and maintained throughout the duration of the project to support management efforts. Responsiveness to Client Concerns WOC prides itself on our ability to quickly respond to our clients' concerns regarding the progress of projects. Our project managers strive to maintain open communication with our clients to assure that issues and concerns are promptly identified and appropriately addressed. In many instances, their experience and knowledge allows our project managers to identify such issues and concerns early-on and call them to the attention of the clients. In seeking resolutions, they are often able to provide cost-effective alternatives that can keep projects within established budgets and on schedule. 5. Other Size of Firm Compared to Size of Project WOC is adequately staffed and supported to provide the services required. We also have long standing proven relationships with local, national and international engineering companies to provide us with their expertise and production capacity.
H. ADDITIONAL INFORMATION
30. PROVIDE ANY ADDITIONAL INFORMATION AT YOUR DISCRETION. ATTACH ADDITIONAL SHEETS AS NEEDED
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 56
Awards & Recognition AMERICAN COUNCIL OF ENGINEERING COMPANIES (ACEC) American Council of Engineering Companies of Hawaii, Grand Conceptor Award
• 2019: Kaneohe-Kailua Wastewater Conveyance & Treatment Facilities Project • 2017: H-1 PM Contraflow Project • 2014: Honoapiilani Highway Realignment, Phase 1A, Keawe Street Extension to Lahainaluna Road
• 2002: Hart Street Wastewater Pump Station and Force Main Replacement American Council of Engineering Companies of Hawaii, Engineering Excellence Award
• 2022: Kapolei Interchange Complex, Phase 2 American Council of Engineering Companies of Hawaii, Engineering Excellence Honor Award
• 2020: Lahaina Bypass Phase 1B2 and Ke Kilohana, Ward Village
• 2018: International Market Place, Waikiki, Oahu, HI
• 2016: Warriors in Transition Complex and Barracks
• 2015: University of Hawaii Warrior Recreation Center • 2013: Aulani Resort & Spa
• 2011: Kona Community Development Plan • 2010: Global Hawk Aircraft Maintenance and Operations Complex at Andersen Air Force Base, Guam
• 2009: P-431 Alpha and Bravo Wharf Improvements Project at Polaris Point, Guam
• 2005: Hanalei Bridge, Kuhio Highway, Remove/Repair/Replace Metal Members
• 2001: P-154 Central Receiving/Container Operations Facility, Pearl Harbor, HI American Council of Engineering Companies (National), Honor Award
• 2020: Kaneohe-Kailua Wastewater Conveyance & Treatment Facilities Project
• 2002: Hart Street Wastewater Pump Station and Force Main Replacement American Council of Engineering Companies (National), National Recognition Award
• 2015: Honoapiilani Highway Realignment, Phase 1A, Keawe Street Extension to Lahainaluna Road
• 2005: Hanalei Bridge, Kuhio Highway, Remove/Repair/Replace Metal Members AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE) American Society of Civil Engineers, Hawaii Section, Best Overall Project
• 2013: Honoapiilani Highway Realignment, Phase 1A, Keawe Street Extension to Lahainaluna Road American Society of Civil Engineers, Hawaii Section, Best Large Project
• 2013: Honoapiilani Highway Realignment, Phase 1A, Keawe Street Extension to Lahainaluna Road
• 2009: Global Hawk Aircraft Maintenance and Operations Complex at Andersen Air Force Base, Guam
American Society of Civil Engineers, Hawaii Section, Best Transportation Project
• 2016: H-1 PM Contraflow Project American Society of Civil Engineers, Hawaii Section, Best Green Project
• 2014: University of Hawaii Warrior Recreation Center American Society of Civil Engineers, Hawaii Section, Outstanding Civil Engineering Achievement Award
• 2013: Honoapiilani Highway Realignment, Phase 1A, Keawe Street Extension to Lahainaluna Road
• 1994: University of Hawaii at Manoa Special Events Arena, Oahu, HI American Society of Civil Engineers, Hawaii Section, Outstanding Civil Engineering Achievement – Honorable Mention Award
• 2009: P-431 Alpha and Bravo Wharf Improvements Project at Polaris Point, Guam American Society of Civil Engineers, Hawaii Section, Outstanding Civil Engineering Achievement Award of Merit
• 2002: Hart Street Wastewater Pump Station and Force Main Replacement American Society of Civil Engineers, Region 8, Project of the Year, More than $10 Million
• 2013: Honoapiilani Highway Realignment, Phase 1A, Keawe Street Extension to Lahainaluna Road AMERICAN PUBLIC WORKS ASSOCIATION (APWA) American Public Works Association, Hawaii Chapter, Project of the Year Transportation More than $75 Million
• 2017: H-1 PM Contraflow Project
H. ADDITIONAL INFORMATION
30. PROVIDE ANY ADDITIONAL INFORMATION AT YOUR DISCRETION. ATTACH ADDITIONAL SHEETS AS NEEDED
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 7/2021) PART I PAGE 57
American Public Works Association, Hawaii Chapter, Project of the Year, Environment More than $10 Million
• 2002: Hart Street Wastewater Pump Station and Force Main Replacement
• 2003: Hart Street Wastewater Pump Station and Force Main Replacement American Public Works Association, Hawaii Chapter, Project of the Year, Structures More than $10 Million • 2006: P-193 Waterfront Improvements at K10-K11, FISC, Pearl Harbor, HI
• 2004: Halawa Corporation yard, Honolulu, Oahu, HI American Public Works Association, Hawaii Chapter, Project of the Year, Historical Restoration/Preservation, More than $10 Million
• 2005: Hawaii Belt Road Kupapaulua Bridge Widening American Public Works Association, Hawaii Chapter, Project of the Year, Historical Restoration/Preservation, Less than $2 Million
• 2004: Hanalei Bridge, Kuhio Highway, Remove/Repair/Replace Metal Members American Public Works Association, Hawaii Chapter, Structures, Less than $2 Million • 2007: Anuenue Radio Facilities and Towers Statewide, Kahua Ranch Site American Public Works Association, National, National Project of the Year, Environment More than $10 Million
• 2002: Hart Street Wastewater Pump Station and Force Main Replacement AMERICAN PLANNING ASSOCIATION (APA) American Planning Association, Hawaii Chapter, Public Education and Outreach Award
• 2014: Honoapiilani Highway Realignment, Phase 1A, Keawe Street Extension to Lahainaluna Road American Planning Association, Hawaii Chapter, Outstanding Planning Award
• 2009: Kona Community Development Plan
• 2005: Aiea-Pearl City Livable Communities Plan OTHER Hawaii Historic Foundation, Preservation Award
• 2014: IBM Building Rehabilitation Federal Highways Administration Transportation Planning Excellence Awards, Honorable Mention
• 2005: Hanalei Bridge, Kuhio Highway, Remove/Repair/Replace Metal Members U.S. Department of Transportation, Design for Transportation, Merit Award
• 2000: H-3 Windward Viaduct, Oahu Excellence in Highway Design Biennial Awards, Merit Award
• 2004: Hanalei Bridge, Kuhio Highway, Remove/Repair/Replace Metal Members Design Award HQPACAF, Air Force
• 2005: C-17 Flight Simulator, Hickam Air Force Base, Hawai‘i (sub-consultant to RMAIA) Chief of Engineers Design and Environmental Award, Corps of Engineers
• 2004: C-17 Flight Simulator, Hickam Air Force Base, Hawai‘i (sub-consultant to RMAIA) Honolulu district Corps of Engineers, Award of Excellence
• 2005: C-17 Squadron Operations Facility, Hickam Air Force Base, Hawai‘i (sub-consultant to RMAIA) American Road & Transportation Builders Association and Transportation Development Foundation, Global Award Competition for Environmental Excellence
• 2000: H-3 Windward Viaduct, Oahu
Marvin M. Black Excellence in Partnering Award, Associated General Contractors of America
• 2007: P-431 Alpha and Bravo Wharf Improvements Design-Build Institute of America, National Design Build Award for Best Public Section Design-Build Project
• 1996: University of Hawaii at Manoa Special Events Area, Oahu, HI
SF 330 Part II
Attachment A
PE Registration List
PROFESSIONAL REGISTRATION LIST
PROFESSIONAL ENGINEERING LICENSE (PE)
ORIGINAL EXPIRE
NAME PE LIC # LIC DATE DATE 1. Barry Toyota 5502 09/15/83 04/30/26
2. Richard Harada** 6624 10/02/89 04/30/26
3. Pete Pascua 7263 09/06/91 04/30/26
4. Michael Fujita*** 8303 10/11/94 04/30/26
5. Todd Yonamine** 9212 06/27/97 04/30/26
6. Brian Lock** 9867 09/27/99 04/30/26
7. Cathy Leong 10334 07/30/01 04/30/26
8. Glenn Kuwaye** HI – 11817
CA-65310
10/26/05
06/27/03
04/30/26
09/30/25
9. Brett Kuamoo** 14289 01/12/11 04/30/26
10. Mason Suga** 15138 08/27/12 04/30/26
11. Kevin Higashi** 16025 06/10/14 04/30/26
12. Brennan Nacario** 17830 12/13/17 04/30/26
13. Tanner Cho*** 14039 07/01/10 04/30/26
14. Cara Itai** 19296 02/25/21 04/30/26
15. Jennylyn Tapat Morrill 19655 12/08/21 04/30/26
16. Michelle Agustin Lindsey** 19920 08/18/22 04/30/26
17. Josh Inaba 20695 1/02/24 04/30/26
18. Reyn Sugitaya 20684 12/12/23 04/30/26
19. Chase Kanekuni 20724 1/17/24 04/30/26
*Certified Water Pollution Plan Preparer, City & County of Honolulu, Exp 12/31/2024
*Certified Erosion & Sediment Control Plan Preparer, City & County of Honolulu, Exp 12/31/2024
*Erosion & Sediment Control Plan Coordinator, City & County of Honolulu, Exp 12/31/2024
LEED ACCREDITED PROFESSIONAL (LEED AP)
NAME DATE
1. Glenn Kuwaye 2009
2. Mason Suga 2009
Attachment B
Additional Information – WOC Company Profile
1
Delivering innovative engineering and planning solutions to fulfill our client’s vision
and enhance our community.
Service Quality Ethics Ohana
Serving Hawaii and the Pacific Area since 1947. WILSON OKAMOTO CORPORATION (WOC) was
established in Honolulu, Hawai‘i and is a minority-owned small business offering planning, civil
engineering, and traffic and transportation engineering consulting services to Federal, State and County
government agencies and private sector clients.
Our Team. WOC’s team consists of approximately 60 full-time and part-time staff, including nearly 20
Project Managers who are experienced and capable of managing a variety of projects. WOC’s in-house
combination of engineers and planners offers multi-disciplinary capabilities within a strong team
approach that has proven successful in a range of small and large projects.
Whether you are our client, sub-consultant or colleague, WOC aims to:
• Be highly responsive
• Commit to delivering the highest quality level of professional services. We want to meet and
exceed expectations
• Provide the highest value in the most cost-effective manner
Professional Experience. Given the nature of our firm’s multi-disciplinary composition, our collective
capabilities span all phases of development from conceptual planning and feasibility/due diligence to
design, permitting and construction, ensuring continuity and accountability from concept to completion
of construction. WOC has managed an assortment of project types, differing in size, scope, complexity
and cost.
Our ability to successfully manage complex projects was recently recognized when our Kaneohe-Kailua
Wastewater Conveyance and Treatment Facilities project received the Grand Conceptor Award from the
American Council of Engineering Consultants of Hawaii (ACECH), the top engineering project in 2019.
WOC also received the Grand Conceptor Award in 2014 and 2017 for the Lahaina Bypass Phase 1A and H-
1 PM Contraflow projects, respectively.
Civil Consulting Group: The Civil Consulting Group has extensive experience in the planning and design
of various types of projects including residential low- and high-rise condominiums; mixed-use
developments; commercial and office buildings; recreational facilities and parks; industrial properties;
agricultural subdivisions; golf courses; resorts/hotels; highways and roads; waterfront facilities;
educational facilities; and, medical facilities.
As part of the project design plans and specifications, WOC engineers provide conceptual, preliminary and
final design, value engineering, permits, bidding assistance and construction administration.
WILSON OKAMOTO CORPORATION
2
Capabilities include the following:
Feasibility Studies
Due Diligence Studies
Preliminary Engineering Reports
Site Planning and Development
Construction Plans, Specifications, and Cost Estimates
Construction Administration Services
Infrastructure Master Plans and design
Permitting, including National Pollutant Discharge Elimination System (General and Individual),
Underground Injection Control, U.S. Corps of Engineers, Water Quality Certifications, etc.
Planning Consulting Group: The Planning Consulting Group includes personnel with extensive experience
in environmental analysis and impact documentation, master planning, land use planning, land use
entitlements, permitting and geographic information systems. Because of our firm’s multi-disciplinary
structure and the close integration of our project teams, our planners routinely work with the other
disciplines in producing comprehensive planning documents such as infrastructure master plans and
organization-wide needs assessments and programming.
WOC has prepared environmental documents and navigated through an array of regulatory processes
while representing private clients as well as county, state and federal agencies. Our expertise includes,
but is not limited to the following:
Hawaii Revised Statutes, Chapter 343
Environmental Compliance, including
Declaration of Exemption, Environmental
Assessment, and Environmental Impact
Statement Preparation
Special Management Area (SMA) Permit
Shoreline Setback Variance
Special District Permit
State Land Use Boundary Amendment
Stream Channel Alteration Permit (SCAP)
Conservation District Use Permit (CDUP)
National Environmental Policy Act (NEPA)
Section 106, National Historic Preservation
Act (NHPA)
Section 7, Endangered Species Act (ESA)
Coastal Zone Management (CZM) Consistency
Review
Section 404, Clean Water Act
Section 401, Water Quality Certification
In order to streamline project management and ensure that projects are delivered on time and on budget,
our planning group is typically engaged at the early stages of a project to identify permitting requirements,
effectively evaluate potential options and assure that required permits are approvals are identified and
accounted for. Our Planning Group has worked closely with local, state and federal regulatory agencies
and has extensive understanding of the regulatory documents driving the permit requirements.
WOC understands that public outreach and community engagement are the basis of holistic and effective
planning. Towards that end, our planners have developed customized outreach and engagement
programs, and have coordinated, led, and conducted public meetings and events across numerous
platforms and formats.
Traffic and Transportation Engineering Consulting Group: The Traffic and Transportation Consulting
Group includes personnel with extensive experience in highway design, intersection and traffic signal
design, traffic impact assessment, transportation master planning, multi-modal analyses, and complete
WILSON OKAMOTO CORPORATION
3
streets analysis and design. The Traffic Group are also well established experts in public rights-or-way
ADA compliance on National, Statewide, and County levels, and for the past 20 years, accomplished the
implementation of the necessary ADA requirements in the State of Hawaii for the benefit of individuals
with mobility impairments. Our traffic and transportation engineers are well versed in the latest local and
national policies and regulations, national trends, analytical models and innovative solutions. Several
individuals of the Traffic and Transportation Group are national and international leaders of the Institute
of Transportation Engineers (ITE) at the forefront in the development and application of cutting-edge
traffic analysis methods and solutions. The multi-disciplinary experience of our traffic and transportation
engineers, along with other disciplines, offers a holistic problem-solving approach to complex
environmental, community and technical engineering issues.
Capabilities include the following:
Traffic Operational Analysis
Traffic Demand Modeling and Simulation
Roadway Master Planning
Traffic Signal System Design and Timing
Optimization
Traffic Calming Design
Travel Time Analyses and demand
forecasting
Roadway and intersection Design
Parking and Loading Analyses
Transportation Management Planning
Corridor and Network Analyses
Construction Traffic Management Planning
Multi-modal Transportation Analysis
Pedestrian Studies/ADA Compliance
Transit Operations and Route Structure
Studies
WILSON OKAMOTO CORPORATION
4
PROJECT EXPERIENCE
Kona Community Development Plan, Hawaii (2008); County of Hawaii Planning Department
North and South Kona Districts, Hawai‘i, HI
• WOC provided planning services
• The Kona CDP centered on a community
visioning process enhanced by visual
simulation technology to develop a
performance based plan.
• The CDP gave detail to the elements
addressed by the General Plan, such as
economy, energy, environmental quality,
flooding and natural hazards, historic sites,
natural beauty, natural resources and
shoreline, housing, public facilities, public
utilities, recreation, transportation, and land
use.
• There were many opportunities for the public to participate in the formulation of the CDP.
• Awards received: 2009 Outstanding Planning Award from the Hawai‘i Chapter of the American
Planning Association and the 2011 Engineering Excellence Honor Award from the American
Council of Engineering Companies of Hawai‘i.
Ellison Onizuka Kona International Airport Master Plan Environmental Assessment (2013)
Kona, Hawaii, HI
• WOC provided planning services for the preparation and processing of state and federal
environmental assessments (EA)
• EA complied with requirements of Chapter 343, Hawaii Revised Statutes (Hawaii EIS Law), as
well as the National Environmental Policy Act (NEPA) and Federal Aviation Administration (FAA)
Orders 5050.B and 1050.1D, respectively.
• In October 2010, the DOT-A completed the Kona International Airport at Keahole Airport Master
Plan, which provides a long-range vision of developments on airport property. The State EA
covers proposed improvements anticipated to be implemented within the next five to ten years,
while the federal EA covered those anticipated to be implemented within three to five years.
• In conjunction with the federal EA, consultation was coordinated for Section 7 of the
Endangered Species Act and Section 106 of the National Historic Preservation Act.
• Public meetings were held to present the proposed improvements and to solicit input, including
for the aforementioned Section 106 process.
• A website was developed and maintained to apprise the public and promote involvement in the
EA processes.
Pacific Regional Aircraft Rescue and Fire Fighting Training Center at Ellison Onizuka Kona
International Airport at Keahole (2018)
Kona, Hawaii, HI
• WOC prepared and processed an Environmental Assessment (EA) pursuant to the requirements
set forth by Section 102 (2) (c) of the National Environmental Policy Act of 1969 (NEPA) and
Section 509 (b) (5) of the Airport and Airway Improvement Act of 1982, as amended. The
WILSON OKAMOTO CORPORATION
5
Federal Aviation Administration (FAA) was the lead federal agency to ensure compliance with
NEPA for airport development actions. The EA was also prepared in accordance with FAA Order
1050.1F, Environmental Impacts: Policies and Procedures, and FAA Order 5050.4B, National
Environmental Policy Act Implementing Instructions for Airport Actions for the preparation of
Environmental Assessments.
• The Department of Transportation, Airports Division (HDOT-A) proposed a new PRATC on
approximately 25 acres at KOA. The proposed PRATC will serve the State of Hawai‘i as a
Regional Training Center for Hawaii aircraft rescue and firefighting personnel.
North Kona Sewage Pump Station Environmental Assessment (Active)
Hilo, HI
• The County of Hawaii Department of Environmental Management (DEM) is proposing to
construct a wastewater pump station on the mauka (east) side of Queen Kaahumanu Highway,
approximately 600 feet north of the Honokohau Street intersection.
• WOC is preparing and processing an environmental assessment pursuant to Chapter 343,
Hawai‘i Revised Statutes and Title 11, Chapter 200, Hawai‘i Administrative Rules, Department of
Health (DOH), State of Hawai‘i.
• The EA will include analysis of surrounding uses and zoning for the project site and to identify
any entitlements and/or discretionary permits that may be required to pursue its development.
Also, the study will identify and assess any environmental or cultural resources that may need to
be considered in conjunction with such decisions and approvals.
• Project may also use funds provided by the State of Hawai‘i Department of Health (DOH) Clean
Water State Revolving Fund (SRF) loan program, which requires compliance with the
Endangered Species Act and the National Historic Preservation Act and analysis of the various
cross cutter requirements. To meet the requirements the Clean Water SRF, the environmental
assessment will include discussion of 18 federal cross cutting environmental acts and executive
orders.
• The Draft EA was published in April 2021.
Hilo Wastewater Treatment Plant Headworks, Primary Clarifiers and Septage Receiving Station
Upgrades (Active)
Hilo, HI
• COH-DEM is proposing to undertake replacement and related improvements to critical facilities
and then subsequent improvements to the treatment processes at the WWTP. These
replacement facilities and subsequent improvements projects will be implemented in phases.
• The WWTP is located on lands classified as Agricultural by the State Land Use Commission (LUC)
and zoned Agriculture by the County.
• The County of Hawai'i Department of Environmental Management (DEM) intends the project to
be funded by federal funds through the State of Hawai'i Department of Health (DOH) Clean
Water State Revolving Fund (CWSRF) Program (SRF C150062-510), which will require the project
to meet all National Environmental Policy Act (NEPA) and Hawai'i CWSRF program requirements.
• WOC is a subconsultant providing planning services for conducting research, including verifying
existing conditions, reviewing available documents, and consulting with agencies, to determine
required permits and approvals.
WILSON OKAMOTO CORPORATION
6
South Hilo Sanitary Landfill Closure Environmental Assessment (2018)
Hilo, Hawaii, HI
• WOC provided planning and traffic engineering services for the preparation and processing of an
Environmental Assessment for the permanent closure of the South Hilo Sanitary Landfill (SHSL)
• The proposed project involves placing a final cover system on the top and side slopes of the
landfill, installing a new passive landfill gas venting system, and constructing a new storm water
detention and infiltration basin and other storm water management structures.
• WOC prepared and process and Environmental Assessment pursuant to Chapter 343, Hawaii
Revised Statutes (HRS) and Title 11, Chapter 200, Hawaii Administrative Rules (HAR).
• WOC also prepared a traffic assessment report in support of the EA.
• The EA also complied with CWSRF program requirements and cross-cutting federal authorities,
including Section 106 of the National Historic Preservation Act, Section 7 of the Endangered
Species Act, and Environmental Justice Executive Order 12898, set forth in the CWSRF
regulations at 40 CFR § 35.3145.
• WOC coordinated and conducted two public meetings to solicit comments on the Draft
Environmental Assessment (EA),
• The County also met with community groups at smaller meetings to go over the project, discuss
the Draft EA and answer questions.
Keei Village Management Plan (2010), Kamehameha Schools
Keei, Hawaii, HI
• WOC provided planning and civil engineering services.
• The Keei Village Management Plan focused on refining management practices, improving
infrastructure, protecting natural and cultural resources, and working with the community to
develop a long-term plan.
Keei Village Management Plan – Water and Wastewater Improvements (2013), Kamehameha
Schools
Keei, Hawaii, HI
WOC provided planning services for the preparation and procurement of a Special Management Area
Minor Permit and Conservation District Use Permit (separate applications were processed for
waterline and wastewater improvements). As part of the Keei Village Management Plan,
infrastructure improvements were proposed, including waterline improvements to the Village and
wastewater improvements at individual parcels.
• Waterline improvements included replacing 8, 1-inch “drisco” pipes with one, 8-inch
partially buried waterline.
• Wastewater improvements included replacing three residential cesspools with aerobic
septic systems.
Kealakehe Wastewater Treatment Plant Master Plan Environmental Impact Statement (2022)
Kona, Hawai‘i, HI
• WOC is providing planning services for the preparation of an Environmental Impact Statement
for master planned improvements at the Kealakehe Wastewater Treatment Plant (WWTP).
• The County of Hawai‘i Department of Environmental Management (DEM) is proposing
improvements to the Kealakehe Wastewater WWTP that will upgrade treatment to produce R-1
water suitable for reuse in accordance with the State of Hawai‘i, Department of Health (DOH)
Reuse Guidelines.
WILSON OKAMOTO CORPORATION
7
• WOC is also assisting the client with community outreach efforts.
• Implementation of recommended improvements will involve the use of state and county lands
and/or funds and, therefore, is subject to the requirements of Chapter 343, Hawaii Revised
Statutes (HRS) and Title 11, Chapter 200, Hawaii Administrative Rules (HAR), Hawaii Department
of Health (DOH).
• Moreover, since this project will receive a loan of federal funds through the DOH’s Clean Water
State Revolving Fund (CWSRF) Program, it must meet all National Environmental Policy Act
(NEPA) and Hawai'i CWSRF program requirements. Therefore, the EIS will additionally address
the federal “cross-cutting” authorities such as Section 106 of the National Historic Preservation
Act (NHPA) and Section 7 of the federal Endangered Species Act (ESA).
Lahaina Bypass Road (Honoapiilani Highway Realignment, Phase IA, Keawe Street Extension to
Lahainaluna Road) (2013)
Lahaina, Maui, HI
• WOC provided planning, civil, structural, and
traffic engineering services
• Design/Build
• Project included a new ¾-mile, two-lane
highway, 360-foot long single-span concrete
bridge at Kahoma Stream, single-span grade-
separated structure at Lahainaluna Rd., exit
ramp at the south end of the bypass to
Lahainaluna Rd. and northbound on-ramp from
Lahainaluna Rd. to the new highway. Project also
included a 1/3-mile, two-lane extension of
Keawe St.
• WOC successfully resolved unforeseen circumstances through effective coordination with
federal, state and county agencies, community organizations, and other stakeholders.
• Services included project management and coordination with DOT, FHWA, County, and other
agencies, developing and evaluating realignment alternatives, preparing and processing a State
Environmental Assessment under Chapter 343, Hawaii Revised Statutes, Categorical Exclusion
under the National Environmental Policy Act, conducting public informational meetings and
presentations to boards and commissions, and conducting extensive community outreach and
consultation with Native Hawaiian organizations (NHO) under Section 106 of the National
Historic Preservation Act. Additional regulatory requirements included compliance with the
National Environmental Policy Act, Hawaii Revised Statutes Chapter 343, Section 7 of the
Endangered Species Act, Section 402 of the Clean Water Act (CWA), Coastal Zone Management
Federal Consistency Certification, and Noise Variance ordinance.
• Awards received:
2013 Best Large Project and 2013 Best Overall Project from the American Society of Civil
Engineers (ASCE), Hawai‘i Section.
2013 Project of the Year (>$10M) from ASCE Region 8
2014 Engineering Excellence Grand Conceptor Award from the American Council of
Engineering Companies of Hawaii (ACECH)
Kahoma Stream
WILSON OKAMOTO CORPORATION
8
2014 Public Education and Outreach Award from the American Planning Association
Hawaii Chapter
2015 National Recognition Award from American Council of Engineering Companies
(National).
Kuhio Highway Short-Term Improvements, Kuamoo Road to Temporary Bypass Road. Kauai (2024);
State of Hawaii Department of Transportation
• WOC providing planning, traffic and civil engineering services.
• The proposed project includes widening a section along Kuhio Highway on the southbound side
from three to four lanes between Kuamoo Road and the Temporary Bypass Road, including
improvements to intersections along the project corridor.
• Consulted with US Fish & Wildlife Service for the relocation of overhead utility lines to
underground as mitigation efforts.
• WOC prepared and processed an Environmental Assessment and addressed Federal cross cutter
requirements (Section 106, Section 7, Section 4(f), etc.), Special Management Area Use Permit,
NPDES permit, Section 401 and 404 permits.
• Conducted public informational meetings and presentations to the Kauai/Niihau Islands burial
council and Kauai Historic Preservation Review Commission.
• Conducted extensive Section 106 consultation process, which resulted in a Memorandum of
Agreement (MOA). WOC assisted HDOT with implementation of the mitigation measures listed
in the MOA.
OTHER RELEVANT PROJECTS
Planning (EA/EIS, Regional Plans, Permitting)
• Hilo WWTP Retrofit/Upgrades Environmental Assessment, Hilo, HI
• Kona Village Resort – Entitlements, Kona, HI
• North Kona Pump Sewage Pump Station Environmental Assessment, HI
• Draft Environmental Impact Statement for Kealakehe Wastewater Treatment Plan
Improvements, Kona, Hawaii, HI
• Waiohinu Transfer Station Repairs and Enhancements Environmental Assessment, Naalehu, HI
• Pahala Large Capacity Cesspool Replacement Environmental Assessment, Pahala, HI
• Hilo Metal Salvage Facility Remediation & Closure Environmental Assessment, Hilo, HI
• S. Hilo Sanitary Landfill Closure Environmental Assessment, Hilo, HI
• Hilo Metal Salvage Facility Remediation and Closure Environmental Assessment, Hilo, HI
• Keaau-Pahoa Shoulder Lane Conversion Phases 1 & 2 Environmental Assessment, Keaau, HI
• Pacific Regional ARFF Training Center at Ellison Onizuka Kona International Airport Environmental Assessment, Kona, HI
• Ellison Onizuka Kona International Airport Master Plan Environmental Assessment, Kona, HI
• Keei Village Management Plan, Keei, HI; Kamehameha Schools
• Kona Lagoon Hotel Demolition, Keauhou, HI; Kamehameha Schools
• Kaimuki High School Girl’s Athletic Locker Room Environmental Assessment, Honolulu, HI
• A&B Environmental Impact Statement: Proposed Lease (Water Lease) for the Nāhiku, Ke‘anae,
Honomanū, and Huelo License Areas, East and Central Maui, HI
• Wahiawa Civic Center Environmental Impact Statement & Design, HI
• New Aloha Stadium Entertainment District Environmental Impact Statement, Honolulu, HI
• Environmental Assessment & Permitting for Kūlanihāko‘i Bridge Replacement, Kīhei, Maui, HI
WILSON OKAMOTO CORPORATION
9
• Permitting for Finance Factors at Kahului Center, Kahului, Maui
• Environmental Assessment for Lanai Community Health Center, Lanai City, Lanai, HI
• Environmental Assessment for University of Hawaii John A. Burns School of Medicine, Kakaako,
Oʻahu, HI
• Environmental Assessment for University of Hawaii Cancer Research Center, Kakaako, Oʻahu, HI
• Environmental Assessment for Hawaii Pacific University at Aloha Tower Market Place, Downtown
Honolulu, Oʻahu, HI
• Kona Community Development Plan, Kona, HI
• Primary Urban Center Development Plan Update, Honolulu, Oʻahu, HI
• Waikiki Livable Community Plan, Oʻahu, HI
• East Kauai Community Development Plan, Kauai, HI
Infrastructure – Water & Wastewater
• Hart Street – Waiakamilo Sewer Replacement, Honolulu, HI
• 42-Inch Force Main Feasibility Study, O‘ahu; Honolulu Board of Water Supply
• Kane‘ohe-Kailua Wastewater Conveyance and Treatment Facilities Project, Windward O‘ahu, HI
• Lualualei Pump Station Force Main, Waianae, HI
• Off Site 24-Inch Sewerline on Auahi Street- Ward Village, Kaka‘ako, HI
• Auahi 12- and 18-inch Sewerline, Kaka‘ako, HI
• Waimano Ridge Site Water System Improvements, Assessment and Design, Pearl City, HI
• Maui Community Plan Update Infrastructure Assessment, County of Maui
• Ka‘anapali 2020 Infrastructure Master Plan, Kaanapali, HI
• Kihei, Wailea and Makena Culvert Inventory, Maui, HI
• Waianae 242 Reservoir Site Selection Study and Preliminary Engineering Report, Waianae, HI
• Wildfire Dip Tank Sites, Various Sites, O‘ahu, HI
• Hart Street Pump Station and Force Main, Honolulu, HI
• West Mamala Bay Facilities Plan & Environmental Impact Statement, Honolulu, HI
• Kailua-Kane‘ohe-Kahalu‘u Wastewater Facilities Plan & Environmental Impact Statement,
Windward O‘ahu, HI
Government Facilities/Site Improvements
• Keahuolu Judiciary, Kona, HI
• Daniel K. Inouye College of Pharmacy and University of Hawaii Hilo, Hilo, HI
• Wahiawa Civic Center Master Plan
• New Aloha Stadium Entertainment District, Honolulu, O‘ahu, HI
• University of Hawai‘i Atherton Mixed-Use Student Housing
• University of Hawai‘i Multi-Family Mixed-Use Rental Project, Honolulu
• University of Hawai‘i Leeward Community College Value Added Development Center
• Iao Valley State Monument Emergency Repairs, Maui, State of Hawaii Department of Land &
Natural Resources
• Kapolei Public Library, Kapolei, O‘ahu, HI
• Kapolei Corporation Yard, Phase 4, Kapolei, HI
• Manana Corporation Yard, Pearl City, HI
• Kapolei Corporation Yard, Phases 1 – 3, Kapolei, HI
• Joint Traffic Management Center, Honolulu, HI
• Moanalua High School Performing Arts Center, Moanalua, HI
WILSON OKAMOTO CORPORATION
10
• University of Hawaii at Manoa Campus Center Expansion and Warrior Recreation Center,
Honolulu, HI
• Warriors in Transition Barracks and Complex, Wahiawa, HI
• Hawaii Convention Center, Honolulu, HI
• King Kekaulike High School Performing Arts Center, Pukalani, HI
• Puunene Army National Guard Armory Facility, Puunene, HI
• Lahainaluna High School Shower and Locker Room Building, Lahaina, HI
• Molokai Baseyard, Kaunakakai, HI
• Hilo Judiciary, Hilo, HI
• Kaunakakai Harbor Ferry Improvements, Moloka‘i; State of Hawai‘i Department of Land & Natural
Resources
• Ala Moana Park Irrigation Improvements, Honolulu, O‘ahu, HI
• Kalama Park Improvements, Kihei, Maui, HI
• Lahainaluna High School Softball Field Improvements, Maui, HI
• University of Hawai‘i at Mānoa Wahine Softball Stadium Improvements, Honolulu, O‘ahu, HI
Residential /Resort Site Development
• Ward Village Infrastructure Master Plan, Kakaako, HI
• Ward Village – Waiea, Anaha, Aeo, Ke Kilohana, Aalii, Koula
• Ward Village – Ulana, Victoria Place, and others
• Alii Subdivision, Kona
• Waikoloa Affordable Housing
• Sheraton Keauhou Resort, Keauhou, HI
• Kaloko Makai, Kona, HI
• Kulalani at Mauna Lani, N. Kona, HI
• Fairways at Mauna Lani, N. Kona, HI
• Azure Ala Moana, Honolulu, HI
• Sky Ala Moana, Honolulu, HI
• The Park at Ke‘eaumoku, Honolulu, HI
• Moana Pacific, Honolulu, HI
• Pacifica, Honolulu, HI
• 909 Ward, Honolulu, HI
• Ililani, Honolulu, HI
• Makaha Golf Course, Makaha, O‘ahu, HI
Roadway/Streets/Highways/Bridges
• Keaau-Pahoa Shoulder Lane Conversion Phases 1 & 2 Environmental Assessment, Puna, HI
• Design-Build Honolulu Rail Guideway and Transit Stations, Phase 3 Airport Section, O‘ahu;
Honolulu Authority for Rapid Transportation
• Design-Bid-Build Honolulu Rail Guideway, Phase 3 Airport Section, O‘ahu; Honolulu Authority for
Rapid Transportation
• Design-Bid-Build Honolulu Rail Guideway, Phase 4 City Center Section, O‘ahu; Honolulu Authority
for Rapid Transportation
• Design-Build Lahaina Bypass Phase 1A, Keawe Street to Lahainaluna Road, Maui; State of Hawai‘i
Department of Transportation
• Design-Build Lahaina Bypass Phase 1B-2, Maui; Central Federal Lands
WILSON OKAMOTO CORPORATION
11
• Design-Build H-1 PM Contraflow Lane Project, O‘ahu; State of Hawai‘i Department of
Transportation
• Waimea Bay Slope Repair, North Shore, HI
• Kahekili Highway Slope Repair, Maui
• Kawaihau-Hauaala-Mailihuna Complete Streets Project, East Kauai
• Hāna Highway Improvements, Huelo to Hāna, Maui; County of Maui Department of Public Works
• Waimea Canyon Road Phase 1, Kaua‘i
• Waimea Canyon Road Phase 2, Kauai
• Rehabilitation of ‘ḹao Bridge along Waiehu Road, Maui, State of Hawai‘i Department of
Transportation
• Kūhiō Highway Short-Term Improvements, Kuamo‘o Road to Temporary Bypass Road, Kaua‘i;
State of Hawai‘i Department of Transportation
• Kapolei Interchange, Phase 2, Honolulu, HI
• H-1 Guardrail and Shoulder Improvements, Middle Street to Punchbowl Street Off-ramp,
Honolulu, Oahu, HI
• Keoneula Boulevard Improvements, Kapolei, HI
• Auahi Street Improvements, Kaka‘ako, HI
• North King Street Improvements, Phases 1 – 3, Honolulu, O‘ahu, HI
• Kaholopoo Stream Bridge Replacement, Hana, HI
• Papaahawahawa Bridge Replacement, Hana, Maui, HI
• Keaau-Pahoa Shoulder Lane Conversions Phases 1 & 2, Keaau, HI
• Preservation Plan for County of Maui Bridges Within the Hana Highway Historic District, Maui
ADA PROJECTS
• ADA Implementation Plan, City & County of Honolulu
• Self-Evaluation and Transition Plan for Streets and Sidewalks, City & County of Honolulu
• Self-Evaluation and Transition Plan for Streets and Sidewalks, County of Hawaii
• Self-Evaluation and Transition Plan for Streets and Sidewalks, County of Maui
• Statewide HDOT ADA Compliance Program
• Pedestrian Facilities and ADA Compliance
• ADA Improvements at DOE Playgrounds, Various Locations; State of Hawaii Department of
Education
Communication Towers (provided civil engineering and/or planning services)
Department of Accounting & General Services
• Anuenue - Kahua Ranch
• Anuenue - Puu Nana
• Anuenue - Koko Head
• Kaupulehu
• Waiakea
• Kamehame Ridge
• Puu Kilea
• Roundtop
• Haleakala Tower Replacement
• Haleakala Generator Building
WILSON OKAMOTO CORPORATION
12
City & County of Honolulu, Department of Information Technology
• Kahuku Police Station
• Aliamanu Reservior
• Aikahi WWTP
• Wahiawa Police Station
• Puu Manawahua
• Waianae Police Station
• Waimanalo Ridge
County of Maui
• Kamalapau
• Kahakuloa
• Waiakeakua
• Lahainaluna Water Reservoir
• Mahinahina Water Reservior
• Makila
Hawaiian Electric Company
• Kalaheo Repater Replacement
• Koolau Substation
• Malae Comunication Site
• Puu Manawahua
• Waahila Ridge
Transportation Studies/Impact Studies
• Alii Drive Improvements Traffic Assessment Report, Kailua-Kona, Hawai‘i, HI
• Hilo Judiciary Traffic Impact Report, Hilo, Hawai‘i, HI
• Kaloko Industrial Park Traffic Volume Study & Traffic Impact Report, Kona, Hawai‘i, HI
• Traffic Signal Warrant Study Keaau-Pahoa Road, Pohaku Drive and Shower Drive Intersection,
Keaau, HI
• Kawaihae Road at Kohala Mountain Road Traffic Signal Warrant Study, Waimea, Hawai‘i, HI
• Kawaihae Road Waiaka Bridge Replacement and Realignment of Approaches, Waimea, Hawai‘i,
HI
• Kona Commons Traffic Impact Report, Kona, Hawai‘i, HI
• Traffic Impact Report for Kona International Airport, Kona, HI
• West Hawaii Business Park Traffic Impact Report, Kona, Hawai‘, HI
• Mauna Lani Site M Traffic Impact Report, Kohala, HI
• South Hilo Sanitary Landfill Traffic Assessment, Hilo, Hawai‘i, HI
• Pedestrian Assessment for Mauna Kea Beach Drive and Kaunaoa Drive, Kona, Hawai‘i, HI
• Keaau Longs Drugs Retail Center Traffic Impact Report, Keaau, HI
• Straub Medical Center Redevelopment Traffic Impact Study, Honolulu, Oʻahu, HI
• Kapolei Comprehensive Transportation Analysis Report, Kapolei, Oʻahu, HI
• University of Hawaii West Oʻahu Campus Traffic Impact Study, Kapolei, Oʻahu, HI
• Halekauwila Place Traffic Study, Oʻahu; Stanford Carr Development
• Keauhou Place Traffic Impact Assessment, Report, Kakaako, Oʻahu, HI, Stanford Carr Development
• Ocean Point Transportation Master Plan and Traffic Impact Assessment, Oʻahu; Haseko
• Koa Ridge Transportation Master Plan and Traffic Impact Assessment, Oʻahu; Castle & Cooke
WILSON OKAMOTO CORPORATION
13
• Traffic Assessment for Kaiulani Avenue and Kaiolu Street Two Way Conversion, Oʻahu; City &
County of Honolulu
• Kakaako Makai Transportation Study, Kakaako, Oʻahu, HI
• Traffic Signal Warrant Study for Pohukaina and Keawe Streets, Oʻahu; Stanford Carr Development
• Traffic Signal Warrant Study for Halekauwila Street and Keawe Street, Oʻahu; Stanford Carr
Development
• South Street Two-Way Conversion Traffic Assessment, Oʻahu; Stanford Carr Development
Traffic Signal Design
• Fort Weaver Road/Kaimalie Traffic Signal
• Keoneula Boulevard/Kapolei Parkway Traffic Signal
• Kuhio Avenue/Walina Street Traffic Signal
• Saratoga Road/Kalia Road Traffic Signal
• Kapiolani Boulevard/Ward Avenue Traffic Signal
• W. Wakea/S. Kamehameha Traffic Signal
• South Street Two-Way Conversion Traffic Signal System
• Ka Uka Boulevard/Moaniani Street
Other
• CityExpress! Bus Transit Project
• Traffic Congestion Mitigation, Islands of Oahu and Kauai
• Oahu Pedestrian Safety Study
• Manana Transportation Study
• Waipahu Town Plan Transportation Study
WILSON OKAMOTO CORPORATION
14
AWARDS & RECOGNITION
WILSON OKAMOTO CORPORATION has received numerous awards and commendations from
professional organizations and clients. Our most recent awards have included the following:
American Council of Engineering Companies of Hawaii, Grand Conceptor Award
• 2019: Kaneohe-Kailua Wastewater Conveyance & Treatment Facilities Project
• 2017: H-1 PM Contraflow Project
• 2014: Honoapiilani Highway Realignment, Phase 1A, Keawe Street Extension to Lahainaluna Road
• 2002: Hart Street Wastewater Pump Station and Force Main Replacement
American Council of Engineering Companies of Hawaii, Engineering Excellence Award
• 2022: Kapolei Interchange Complex, Phase 2
American Council of Engineering Companies of Hawaii, Engineering Excellence Honor Award
• 2020: Lahaina Bypass, Phase 1B-2
• 2020: Ke Kilohana, Ward Village
• 2018: International Market Place, Waikiki, Oahu, HI
• 2016: Warriors in Transition Complex and Barracks
• 2015: University of Hawaii Warrior Recreation Center
• 2013: Aulani Resort & Spa
• 2011: Kona Community Development Plan
• 2010: Global Hawk Aircraft Maintenance and Operations Complex at Andersen Air Force Base, Guam
• 2009: P-431 Alpha and Bravo Wharf Improvements Project at Polaris Point, Guam
• 2005: Hanalei Bridge, Kuhio Highway, Remove/Repair/Replace Metal Members
• 2001: P-154 Central Receiving/Container Operations Facility, Pearl Harbor, HI
American Council of Engineering Companies (National), Honor Award
• 2020: Kaneohe-Kailua Wastewater Conveyance & Treatment Facilities Project
• 2002: Hart Street Wastewater Pump Station and Force Main Replacement
American Council of Engineering Companies (National), National Recognition Award
• 2015: Honoapiilani Highway Realignment, Phase 1A, Keawe Street Extension to Lahainaluna Road
• 2005: Hanalei Bridge, Kuhio Highway, Remove/Repair/Replace Metal Members
WILSON OKAMOTO CORPORATION
15
American Society of Civil Engineers, Hawaii Section, Best Overall Project
• 2013: Honoapiilani Highway Realignment, Phase 1A, Keawe Street Extension to Lahainaluna Road
American Society of Civil Engineers, Hawaii Section, Best Large Project
• 2013: Honoapiilani Highway Realignment, Phase 1A, Keawe Street Extension to Lahainaluna Road
• 2009: Global Hawk Aircraft Maintenance and Operations Complex at Andersen Air Force Base, Guam
American Society of Civil Engineers, Hawaii Section, Best Transportation Project
• 2016: H-1 PM Contraflow Project
American Society of Civil Engineers, Hawaii Section, Best Green Project
• 2014: University of Hawaii Warrior Recreation Center
American Society of Civil Engineers, Hawaii Section, Outstanding Civil Engineering Achievement Award
• 2013: Honoapiilani Highway Realignment, Phase 1A, Keawe Street Extension to Lahainaluna Road
• 1994: University of Hawaii at Manoa Special Events Arena, Oahu, HI
American Society of Civil Engineers, Hawaii Section, Outstanding Civil Engineering Achievement –
Honorable Mention Award
• 2009: P-431 Alpha and Bravo Wharf Improvements Project at Polaris Point, Guam
American Society of Civil Engineers, Hawaii Section, Outstanding Civil Engineering Achievement Award
of Merit
• 2002: Hart Street Wastewater Pump Station and Force Main Replacement
American Society of Civil Engineers, Region 8, Project of the Year, More than $10 Million
• 2013: Honoapiilani Highway Realignment, Phase 1A, Keawe Street Extension to Lahainaluna Road
American Public Works Association, Hawaii Chapter, Project of the Year Transportation More than $75
Million
• 2017: H-1 PM Contraflow Project
American Public Works Association, Hawaii Chapter, Project of the Year, Environment More than $10
Million
• 2002: Hart Street Wastewater Pump Station and Force Main Replacement
• 2003: Hart Street Wastewater Pump Station and Force Main Replacement
WILSON OKAMOTO CORPORATION
16
American Public Works Association, Hawaii Chapter, Project of the Year, Structures More than $10
Million
• 2006: P-193 Waterfront Improvements at K10-K11, FISC, Pearl Harbor, HI
• 2004: Halawa Corporation yard, Honolulu, Oahu, HI
American Public Works Association, Hawaii Chapter, Project of the Year, Historical
Restoration/Preservation, More than $10 Million
• 2005: Hawaii Belt Road Kupapaulua Bridge Widening
American Public Works Association, Hawaii Chapter, Project of the Year, Historical
Restoration/Preservation, Less than $2 Million
• 2004: Hanalei Bridge, Kuhio Highway, Remove/Repair/Replace Metal Members
American Public Works Association, Hawaii Chapter, Structures, Less than $2 Million
• 2007: Anuenue Radio Facilities and Towers Statewide, Kahua Ranch Site
American Public Works Association, National, National Project of the Year, Environment More than $10
Million
• 2002: Hart Street Wastewater Pump Station and Force Main Replacement
American Planning Association, Hawaii Chapter, Public Education and Outreach Award
• 2014: Honoapiilani Highway Realignment, Phase 1A, Keawe Street Extension to Lahainaluna Road
American Planning Association, Hawaii Chapter, Outstanding Planning Award
• 2009: Kona Community Development Plan
• 2005: Aiea-Pearl City Livable Communities Plan