HomeMy WebLinkAboutRHA Construction Management Group, LLC - OH.6 General Engineering (Project Manager)June 30, 2024
Housing and Community Development
OH.4)
OH.5)
OH.6)
Construction Management/Inspector
General Engineering (Construction Inspector)*
General Engineering (Project Manager)*
Submitted by:
2153 North King Street, Suite 201
Honolulu, Hawaii 96819
Tel (808) 941-0577 | Fax (808) 945-2646
info@rhacm.com
County of Hawaii
Professional Services During the
Fiscal Year 2024 – 2025,
Beginning July 2024
2153 North King Street, Suite 201 | Honolulu, Hawaii 96819 | Tel (808) 941-0577 | Fax (808) 945-2646 | info@rhacm.com | www.rhacm.com
June 30, 2024
Housing and Community Development
County of Hawai‘i
1990 Kino‘ole Street, Suite 102
Hilo, Hawai‘i 96720
Attention: Ms. Susan Kunz, Administrator
Subject: Professional Services During the Fiscal Year 2024 –2025
Dear Ms. Kunz,
RHA Construction Management Group, LLC would like to be considered to provide professional engineering
services for the following category.
OH.4) Construction Management/Inspector
OH.5) General Engineering (Construction Inspector)*
OH.6) General Engineering (Project Manager)*
We have enclosed our Statement of Qualifications for your review. Should you have any questions regarding
our submittal, please feel free to contact me by email at bsekiguchi@rhacm.com or by telephone at
808) 941-0577.
Sincerely,
Brian Sekiguchi, CCM
President
BS/jc
Enclosure
Federal Standard Form 330
ARCHITECT-ENGINEER QUALIFICATIONS
STANDARD FORM 330 (REV. 8/2016) PAGE 1 1
PART I – CONTRACT-SPECIFIC QUALIFICATIONS
A. CONTRACT INFORMATION
1. TITLE AND LOCATION (City and State)
Professional Services for the State Fiscal Year 2024-2025
OH.4) Construction Management/Inspector
OH.5) General Engineering (Construction Inspector)*
OH.6) General Engineering (Project Manager)*
2. PUBLIC NOTICE DATE June 1, 2024
3. SOLICITATION OR PROJECT NUMBER 24-25
B. ARCHITECT-ENGINEER POINT OF CONTACT
4. NAME AND TITLE
Brian Sekiguchi, CCM, President
5. NAME OF FIRM
RHA Construction Management Group, LLC
6. TELEPHONE NUMBER 808-941-0577
7. FAX NUMBER
808-945-2646
8. EMAIL ADDRESS
bsekiguchi@rhacm.com
C. PROPOSED TEAM
(Complete this Section for the Prime Contractor and all Key Subcontractors.)
(Check)
9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT PRIME JV PARTNER SUB-CONTRACTOR a.
RHA Construction
Management Group, LLC
CHECK IF BRANCH OFFICE
2153 N. King Street,
Suite 201
Honolulu, Hawaii 96819
Construction
Management/Inspector
Project Manager
b.
CHECK IF BRANCH OFFICE
c.
CHECK IF BRANCH OFFICE
d.
CHECK IF BRANCH OFFICE
e.
CHECK IF BRANCH OFFICE
D. ORGANIZATIONAL CHART OF PROPOSED TEAM (Attached)
ARCHITECT-ENGINEER QUALIFICATIONS
STANDARD FORM 330 (REV. 8/2016) PAGE 2 1
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME
Brian Sekiguchi, CCM
13. ROLE IN THIS CONTRACT
President/Construction Manager
14. YEARS EXPERIENCE
a. TOTAL 36 b. WITH CURRENT FIRM 4
15. FIRM NAME AND LOCATION (City and State) RHA Construction Management Group, LLC, Honolulu, Hawaii
16. EDUCATION (Degree and Specialization)
Master of Engineering Management; Master of Business Administration;
Bachelor of Science, Civil Engineering
17. CURRENT PROFESSIONAL REGISTRATION
(State and Discipline)
N/A
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Project Management Institute, Hawaii; American Water Works Association; Construction Management Association of America; Society of
American Military Engineers; Building Owners and Managers Association; Quality Assurance Plan Training – AECOM; Honolulu Rail Transit Project
– Safety & Environmental Training; Construction Quality Management Training (USACE/NAVFAC); Oracle Primavera P6 Scheduling & Project
Management; USACE/NAVFAC Construction Scheduling Requirements; NAVFAC 40-Hour Construction Hazard Awareness Course; American Red
Cross First Aid/CPR/AED Course; Arc Flash & Electrical Safety Training; Erosion & Sediment Control Plan Coordinator 2024
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
Kawaihae Water Connection
Kailua-Kona, Hawaii
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Ongoing CONSTRUCTION (if applicable) Ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Manager. SCOPE: RHA CM is providing design, project management, engineering support
services and permitting to design properly sized water connection from main water line into the office trailer.
COST: N/A
b.
(1) TITLE AND LOCATION (City and State)
Kulani Correctional Facility Potable Water Supply
Hilo, Hawaii
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2021 CONSTRUCTION (if applicable) 2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Manager. SCOPE: RHA CM provided CM services for the County of Hawaii, Department of
Public Safety for the installation of a new water service lateral, meter and fill station at Kulani Correctional Facility.
COST: $1.2 million
c.
(1) TITLE AND LOCATION (City and State) BWS ESCO Electrical Engineering Support and CM Services,
BWS Contract No. C16000301, Honolulu, Hawaii
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Ongoing CONSTRUCTION (if applicable) Ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Principal. SCOPE: RHA Construction Management Group, LLC (formerly Ronald N.S. Ho & Associates, Inc.)
provided construction management services for BWS Energy Performance Contract projects. Services included
oversight and inspection of all construction activities, review material submittals and schedules, and assist in
closeout procedures. COST: $33 million
d.
(1) TITLE AND LOCATION (City and State) Sand Island Wastewater Treatment Plant Maintenance
Building Construction Management Services
Improvement Upgrades, Honolulu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
Ongoing
CONSTRUCTION (if applicable) Ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Engineer. SCOPE: RHA CM is providing observation and inspection of the rebar installation, and vapor barrier installation and maintenance. Responsibilities include scheduling, conducting, and documenting preconstruction and job-site meetings; processing, reviewing, and approving shop drawings, including critical items, as well as handling RFIs; and ensuring work follows contract documents and HIOSH standards. COST: N/A
ARCHITECT-ENGINEER QUALIFICATIONS
STANDARD FORM 330 (REV. 8/2016) PAGE 3 1
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.)
12. NAME
Michael P. Young, PE, CCM
13. ROLE IN THIS CONTRACT
Construction Manager
14. YEARS EXPERIENCE
a. TOTAL 27 b. WITH CURRENT FIRM 2
15. FIRM NAME AND LOCATION (City and State) Pono Consulting Management, Honolulu, Hawaii
16. EDUCATION (Degree and Specialization)
Bachelor of Science, Civil Engineering
17. CURRENT PROFESSIONAL REGISTRATION
(State and Discipline)
Hawaii, Washington, Professional
Engineer/Civil #13142
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Construction Manager Certification Institute, CCM; Water Environment Federation, member; Hawaii Water Environment Association, member;
Construction Management Association of America (CMAA), Hawaii Chapter, member/Past President
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) City and County of Honolulu, Department of Design and Construction,
Sand Island Wastewater Basin Odor Control, Honolulu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2023
CONSTRUCTION (if applicable) 2023
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Manager. SCOPE: Provided construction management services to upgrade and expand the existing WWTP. The project required the installation of electrical equipment, adjustable frequency drives,
instrumentation, structural concrete as well as a 2-inch force main, including dual bed carbon scrubbers, fiberglass
reinforced plastic duct, engineered aluminum covers, fans and blowers, and SCADA system. COST: $9.2 million
b.
(1) TITLE AND LOCATION (City and State) City and County of Honolulu, Department of Design and Construction,
Kailua Regional Wastewater Treatment Plant (KRWWTP) Tunnel
Influent Pump Station and Headworks, Kailua, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2019 CONSTRUCTION (if applicable) 2018
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
ROLE: Construction Manager. SCOPE: Provided construction management services for phase 2 of the Kaneohe-
Kailua (KK) Wastewater Conveyance and Treatment Facilities Project. Construction included a new Headworks,
Generator/Electrical Building, and a 6-story Tunnel Influent Pump Station to pull wastewater from the KK tunnel to
the KRWWTP. COST: $149 million
c.
(1) TITLE AND LOCATION (City and State)
City and County of Honolulu, Department of Design and Construction,
Kaneohe - Kailua (KK) Sewer Tunnel Project, Kaneohe and Kailua, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2018 CONSTRUCTION (if applicable) 2018
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Manager. SCOPE: Provided construction management services for construction of the KK
Wastewater Conveyance Tunnel, an approximately 3-mile-long 10-foot diameter gravity sewer tunnel to carry
wastewater from Kaneohe’s Wastewater Pre-Treatment Facility to KRWWTP. This gravity sewer tunnel will equalize flow and help prevent overflows and spills. Construction work also included new diversion structures, microtunneling, relocation of water, sewer, electrical and SCADA facilities. COST: $173 million
d.
(1) TITLE AND LOCATION (City and State)
City and County of Honolulu, Department of Design and Construction,
Waimalu WWPS FM and Waiau Sewer R/R, Phase 2, Pearl City, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2016 CONSTRUCTION (if applicable) 2016
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Manager. SCOPE: Provided construction management services for multiple improvements to
the wastewater collection system in the Waiau/Waimalu area. The Waimalu area improvements involved
replacing the existing 30" force main with approximately 1/2 mile of 30" diameter wastewater force main using
Horizontally Directional Drilling along Kamehameha Highway. The Waiau Sewer Rehabilitation project involved
reconstructing existing sewer lines along Kamehameha Highway using Pipe Bursting, Pilot Tube Microtunneling, and Cured in Place Pipe lining construction methods. Sewer bypasses were installed to prevent any service interruptions. The project also included NPDES compliance, traffic control, and public outreach. Continuous coordination was necessary due to concurrent work with HART on Kamehameha Highway. COST: $20.4 million
ARCHITECT-ENGINEER QUALIFICATIONS
STANDARD FORM 330 (REV. 8/2016) PAGE 4 1
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.)
12. NAME
Sean Sugai, PE
13. ROLE IN THIS CONTRACT
Vice President
14. YEARS EXPERIENCE
a. TOTAL 35 b. WITH CURRENT FIRM 4
15. FIRM NAME AND LOCATION (City and State) RHA Construction Management Group, LLC, Honolulu, Hawaii
16. EDUCATION (Degree and Specialization)
Bachelor of Science, Electrical Engineering
17. CURRENT PROFESSIONAL REGISTRATION
(State and Discipline)
Electrical License No. 9023, Hawaii
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Member: NSPE, NFPA, ACEC, AWWA, IES
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
City Hall Fire Alarm System Improvements (Project No. VI-34-14-C)
Honolulu, Hawaii
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2021 CONSTRUCTION (if applicable) 2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
ROLE: Principal. SCOPE: RHA Construction Management Group, LLC (formerly Ronald N.S. Ho & Associates, Inc.)
provided construction management services for the fire alarm system improvements at City Hall as part of a team
consisting of the City & County of Honolulu, Department of Design & Construction, the Contractor, the Design
Consultant, and the Testing Laboratories and Environmental Consultant. COST: $879,425
b.
(1) TITLE AND LOCATION (City and State) BWS ESCO Electrical Engineering Support and CM Services,
BWS Contract No. C16000301, Honolulu, Hawaii
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Ongoing CONSTRUCTION (if applicable) Ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Principal. SCOPE: RHA Construction Management Group, LLC (formerly Ronald N.S. Ho & Associates, Inc.)
provided construction management services for BWS Energy Performance Contract projects. Services included
oversight and inspection of all construction activities, review material submittals and schedules, and assist in
closeout procedures. COST: $33 million
c.
(1) TITLE AND LOCATION (City and State)
Construction Management for WSOIDIQ 17-6A, Roofing Repairs, Board
of Water Supply Contract No. C18001005, Honolulu, Hawaii
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2020 CONSTRUCTION (if applicable)
2020
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Principal. SCOPE: RHA Construction Management Group, LLC (Formerly Ronald N.S. Ho & Associates, Inc.) provided construction management services for various roofing repairs under an indefinite delivery, indefinite quantity (IDIQ) contract. Work issued for individual roofing projects include re-roofing of BWS buildings repairs to spalling concrete, structural repairs to the building structure and other associated repairs to water-damaged materials, re-sloping roofs, installing fall protection anchors and guard rails, and painting. COST: $25 million
d.
(1) TITLE AND LOCATION (City and State)
Construction of the Joint Traffic Management Center, Federal Aid
Project No. CMAQ-001(41)
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2020 CONSTRUCTION (if applicable)
2020
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Principal. SCOPE: RHA Construction Management Group, LLC (formerly Ronald N.S. Ho & Associates, Inc.)
provided construction management services as part of the R.M. Towill Corporation CM team for construction of
the Joint Traffic Management Center. Construction of this multi-agency operation to improve traffic management
and public safety on Oahu was recently completed. The Center facilitates coordination among six city and state
agencies. COST: $54 million
ARCHITECT-ENGINEER QUALIFICATIONS
STANDARD FORM 330 (REV. 8/2016) PAGE 5 1
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME
Bryan Bosworth
13. ROLE IN THIS CONTRACT
Construction Manager
14. YEARS EXPERIENCE
a. TOTAL 23 b. WITH CURRENT FIRM 4
15. FIRM NAME AND LOCATION (City and State) RHA Construction Management Group, LLC, Honolulu, Hawaii
16. EDUCATION (Degree and Specialization)
Bachelor of Fine Arts, Communication
17. CURRENT PROFESSIONAL REGISTRATION
(State and Discipline)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Certified California Traffic Control Technician (TCT); SOHDOT Hwys Field Sampling and Testing Bituminous (Field Sampling & Testing Module) Unit,
2021; SOHDOT Hwys Field Sampling and Testing Bituminous (Asphalt) Unit, 2021; Arc Flash and Electrical Safety Training; Occupational Safety and
Health Administration (OSHA) 30-Hr Construction Safety and Health; OSHA 29 CFR Fall Protection for the Competent Person; JS-US007 Level 1
Antiterrorism Awareness Training; USACE Construction Quality Management for Contractors; Associated General Contractors of America Safety
Management Training Course; American Society for Healthcare Engineering Health Care Construction; Construction Materials and Methods
(Auburn University); Structures in Architecture (University of Hawaii); Professional Construction Management (CMAA); State of Hawaii DOT
Construction Stormwater Training; American Red Cross CPR/First Aid/AED Course; Erosion & Sediment Control Plan Coordinator 2024
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) Kawaihae Maintenance & Repair Work
Kailua-Kona, Hawaii
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Ongoing
CONSTRUCTION (if applicable) Ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Manager. SCOPE: RHA CM is providing general project management services to perform
various work to replace flooring and install desks in the Manager's Office; replace windows/flooring in the
Container Station; and extend external deck and install an awning for the Break Room at the the Port of Kawaihae. COST: N/A
b.
(1) TITLE AND LOCATION (City and State)
Kulani Correctional Facility Potable Water Supply
Hilo, Hawaii
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2021 CONSTRUCTION (if applicable) 2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
ROLE: Construction Manager. SCOPE: RHA CM provided CM services for the County of Hawaii, Department of
Public Safety for the installation of a new water service lateral, meter and fill station at Kulani Correctional Facility.
COST: $1.2 million
c.
(1) TITLE AND LOCATION (City and State)
BWS ESCO Electrical Engineering Support and CM Services,
BWS Contract No. C16000301, Honolulu, Hawaii
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Ongoing CONSTRUCTION (if applicable) Ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Principal. SCOPE: RHA Construction Management Group, LLC (formerly Ronald N.S. Ho & Associates, Inc.)
provided construction management services for BWS Energy Performance Contract projects. Services included
oversight and inspection of all construction activities, review material submittals and schedules, and assist in
closeout procedures. COST: $33 million
d.
(1) TITLE AND LOCATION (City and State) Sand Island Wastewater Treatment Plant Maintenance
Building Construction Management Services
Improvement Upgrades, Honolulu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
Ongoing
CONSTRUCTION (if applicable) Ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
ROLE: Construction Engineer. SCOPE: RHA CM is providing observation and inspection of the rebar installation,
and vapor barrier installation and maintenance. Responsibilities include scheduling, conducting, and documenting
preconstruction and job-site meetings; processing, reviewing, and approving shop drawings, including critical
items, as well as handling RFIs; and ensuring work follows contract documents and HIOSH standards. COST: N/A
ARCHITECT-ENGINEER QUALIFICATIONS
STANDARD FORM 330 (REV. 8/2016) PAGE 6 1
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
Brad Takenaka, PE Construction Manager /
Project Engineer
a. TOTAL
27
b. WITH CURRENT FIRM
<1
15. FIRM NAME AND LOCATION (City and State) RHA Construction Management Group, LLC, Honolulu, Hawaii
16. EDUCATION (Degree and Specialization) Bachelor of Science, Environmental Engineering:
Water Resource Management
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Hawaii, Civil, #15760 / California, Civil, #C72056
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) CERTIFICATIONS/TRAINING: Coastal Engineering Certificate: 4 Graduate Level On-line Courses Completed, City & County of
Honolulu Certified Erosion and Sediment Control Plan Preparer/Coordinator, City & County of Honolulu Certified Water Pollu-
tion Plan Preparer. ORGANIZATIONS: Society of American Military Engineers (SAME), Hawaii Water Environment Association
(HWEA) Storm Water Workshop Committee Co-Chair, American Society of Civil Engineers (ASCE) Transportation Chair.
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Board of Water Supply Manana Corporation Yard Microbiology Lab
and Control Center Expansion, Honolulu, Hawaii
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Ongoing Ongoing
(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
ROLE: Construction Manager. SCOPE: Provided construction management services for the renovation of a portion
of the first floor of the administration building and the enclosure of an existing breezeway to accommodate the
construction of a secondary microbiology lab as well as a secondary data and control center for Water System
Operations; including the installation of appurtenances to support these functions and a fuel storage tank for
backup generator power. COST: $3.7 million
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
2153 North King Street Commercial Building Energy Efficiency
Improvement Upgrades, Honolulu, Hawaii
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Ongoing Ongoing
(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
ROLE: Construction Manager. SCOPE: Provided the design and overall project management, construction manage-
ment, commissioning, measurement and verification of system savings and performance for identifying and im-
plementing viable cost-effective measures for this commercial building. Work includes replacement of (2) 80-ton
air cooled condensing units and air handlers and control systems, interior and exterior LED lighting, lighting con-
trols, and photovoltaic system. COST: $3 million
(1) TITLE AND LOCATION (City and State)
BWS Waihee Line Booster Replacement Construction Oversight
Oahu HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES N/A
CONSTRUCTION (If applicable) N/A
(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
ROLE: Construction Manager. SCOPE: Reviewed Construction Environmental Hazard Management Plan (C-EHMP)
to ensure compliance during ground-breaking activities to keep the workers and environment safe from contact
with contamination on site and prevent contaminants from leaving the site without proper management. COST:
N/A
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Kunia Wastewater Treatment Plant (WWTP) Preliminary Engineering
Report, Waipahu, Oahu, HI
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
N/A N/A
(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
ROLE: Construction Manager. SCOPE: Prepared application to obtain funding from USDA to upgrade the WWTP.
This work included preparing a report that 1) analyzed alternative treatment options to upgrade the wastewater
effluent from R-2 to R-1; 2) cost estimate; 3) schedule; and 4) sustainability considerations. COST: N/A
ARCHITECT-ENGINEER QUALIFICATIONS
STANDARD FORM 330 (REV. 8/2016) PAGE 7 1
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME
Steven Chung, PE
13. ROLE IN THIS CONTRACT
Civil Engineer
14. YEARS EXPERIENCE
a. TOTAL 25 b. WITH CURRENT FIRM 4
15. FIRM NAME AND LOCATION (City and State) RHA Construction Management Group, LLC, Honolulu, Hawaii
16. EDUCATION (Degree and Specialization)
Bachelor of Science, Electrical Engineering, University of Hawaii at Manoa
17. CURRENT PROFESSIONAL REGISTRATION
(State and Discipline)
Civil License No. 10031, Hawaii
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Accugraph Corporation Certified HolguinCAD MTX900 Trainer; EIT; PE- Civil Engineer; OSHA 10
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
City Hall Fire Alarm System Improvements (Project No. VI-34-14-C)
Honolulu, Hawaii
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2021
CONSTRUCTION (if applicable) 2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
ROLE: Consultant. SCOPE: RHA Construction Management Group, LLC (formerly Ronald N.S. Ho & Associates, Inc.)
is providing construction management services for the fire alarm system improvements at City Hall as part of a
team consisting of the City & County of Honolulu, Department of Design & Construction, the Contractor, the
Design Consultant, and the Testing Laboratories and Environmental Consultant. COST: $879,425
b.
(1) TITLE AND LOCATION (City and State)
1411 South King Street Electrical Upgrades
Honolulu, Hawaii
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
Ongoing CONSTRUCTION (if applicable)
Ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Consultant. SCOPE: RHA Construction Management Group, LLC (formerly Ronald N.S. Ho & Associates, Inc.)
providing construction management services, including bid/contract packaging, project management, contract
administration, and construction management services for electrical upgrades at 1411 South King Street in
Honolulu, Hawaii. COST: $300,000
c.
(1) TITLE AND LOCATION (City and State) Construction Management for WSOIDIQ 17-6A,
Roofing Repairs, Board of Water Supply Contract No. C18001005,
Honolulu, Hawaii
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2020 CONSTRUCTION (if applicable) 2020
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Consultant. SCOPE: RHA Construction Management Group, LLC (Formerly Ronald N.S. Ho & Associates, Inc.)
provided construction management services for various roofing repairs under an indefinite delivery, indefinite
quantity (IDIQ) contract. Work issued for individual roofing projects include re-roofing of BWS buildings repairs to
spalling concrete, structural repairs to the building structure and other associated repairs to water-damaged
materials, re-sloping roofs, installing fall protection anchors and guard rails, and painting. COST: $25 million
d.
(1) TITLE AND LOCATION (City and State) 2153 North King Street Commercial Building Energy Efficiency
Improvement Upgrades & Building Repairs, Honolulu, Hawaii
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Ongoing CONSTRUCTION (if applicable) Ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Consultant. SCOPE: RHA Construction Management Group, LLC (formerly Ronald N.S. Ho & Associates, Inc.)
is providing the design and overall project management, construction management, commissioning,
measurement and verification of system savings and performance for identifying and implementing viable cost-
effective measures for this commercial building. Includes replacement of (2) 80-ton air cooled condensing units
and air handlers and control systems, interior and exterior LED lighting, lighting controls, and photovoltaic system.
COST: $3 million
ARCHITECT-ENGINEER QUALIFICATIONS
STANDARD FORM 330 (REV. 8/2016) PAGE 8 1
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME
Creighton Lee
13. ROLE IN THIS CONTRACT
Construction Inspector
14. YEARS EXPERIENCE
a. TOTAL 45 b. WITH CURRENT FIRM 3
15. FIRM NAME AND LOCATION (City and State) RHA Construction Management Group, LLC, Honolulu, Hawaii
16. EDUCATION (Degree and Specialization)
17. CURRENT PROFESSIONAL REGISTRATION
(State and Discipline)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Training: Electrical Power Line Specialist, Cable Splicing, Infrared Scanning, Protective Relay Calibration, Substation Maintenance, Airfield Lighting
Systems, Electrical Distribution, System Maintenance, Cathodic Protection, NEC Clearance, Asbestos Abatement, Hazardous Material Handling /
Management
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) Construction of the Joint Traffic Management Center, Federal Aid
Project No. CMAQ-001(41), District of Honolulu, Island of Oahu
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2020
CONSTRUCTION (if applicable) 2020
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Inspector. SCOPE: RHA Construction Management Group, LLC (formerly Ronald N.S. Ho & Associates, Inc.) provided construction management services as part of the R.M. Towill Corporation CM team for construction of the Joint Traffic Management Center. Construction of this multi-agency operation to
improve traffic management and public safety on Oahu was recently completed. The Center facilitates
coordination among six city and state agencies. COST: $54 million
b.
(1) TITLE AND LOCATION (City and State) 2153 North King Street Commercial Building Energy Efficiency
Improvement Upgrades & Building Repairs, Honolulu, Hawaii
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Ongoing CONSTRUCTION (if applicable) Ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Inspector. SCOPE: RHA Construction Management Group, LLC (formerly Ronald N.S. Ho &
Associates, Inc.) is providing the design and overall project management, construction management,
commissioning, measurement and verification of system savings and performance for identifying and
implementing viable cost-effective measures for this commercial building. Includes replacement of (2) 80-ton air
cooled condensing units and air handlers and control systems, interior and exterior LED lighting, lighting controls,
and photovoltaic system. COST: $3 million
c.
(1) TITLE AND LOCATION (City and State) 1411 South King Street Electrical Upgrades
Honolulu, Hawaii
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Ongoing CONSTRUCTION (if applicable) Ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Inspector. SCOPE: RHA Construction Management Group, LLC (formerly Ronald N.S. Ho &
Associates, Inc.) providing construction management services, including bid/contract packaging, project
management, contract administration, and construction management services for electrical upgrades at 1411
South King Street in Honolulu, Hawaii. COST: $300,000
d.
(1) TITLE AND LOCATION (City and State) Board of Water Supply Emergency Generators at Kalihi Yard and Shaft,
Halawa Shaft, and Kunia Wells I
Honolulu, Hawaii
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2021 CONSTRUCTION (if applicable) 2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
ROLE: Construction Inspector. SCOPE: RHA Construction Management Group, LLC. provided construction
management services to furnish, install, and maintain over a 2-year period, new stationary emergency power
generation facilities at three (3) BWS facilities to provide standby power for wells, pumps, and other equipment in
the event that Hawaiian Electric Company (HECO) power is temporarily out of service. COST: N/A
ARCHITECT-ENGINEER QUALIFICATIONS
STANDARD FORM 330 (REV. 8/2016) PAGE 9 1
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME
Bert Shiosaki
13. ROLE IN THIS CONTRACT
Construction Inspector
14. YEARS EXPERIENCE
a. TOTAL 36 b. WITH CURRENT FIRM 4
15. FIRM NAME AND LOCATION (City and State) RHA Construction Management Group, LLC, Honolulu, Hawaii
16. EDUCATION (Degree and Specialization)
17. CURRENT PROFESSIONAL REGISTRATION
(State and Discipline)
Hawaii, Contractor #C-18888
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Training: CM-ET Loadstar & Prostar Certified Hoist Technician, RTC Level #17C02695; American Trainco Power Quality Analyzing Fluke 435;
Infrared Level 1 Thermographer ITC ID #49036; Introspection Electrical Thermal Imaging Certification; Red Cross First Aid & CPR Certified; Arc
Flash & Electrical Safety
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) Board of Water Supply Emergency Generators at Kalihi Yard and Shaft,
Halawa Shaft, and Kunia Wells I
Honolulu, Hawaii
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2021
CONSTRUCTION (if applicable) 2022
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
ROLE: Construction Inspector. SCOPE: RHA Construction Management Group, LLC. provided construction
management services to furnish, install, and maintain over a 2-year period, new stationary emergency power
generation facilities at three (3) BWS facilities to provide standby power for wells, pumps, and other equipment in
the event that Hawaiian Electric Company (HECO) power is temporarily out of service. COST: N/A
b.
(1) TITLE AND LOCATION (City and State)
BWS ESCO Electrical Engineering Support and CM Services,
BWS Contract No. C16000301, Honolulu, Hawaii
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
Ongoing CONSTRUCTION (if applicable)
Ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Inspector. SCOPE: RHA Construction Management Group, LLC (formerly Ronald N.S. Ho &
Associates, Inc.) is providing construction management services for BWS Energy Performance Contract projects.
Services include oversight and inspection of all construction activities, review material submittals and schedules,
and assist in closeout procedures. COST: $33 million
c.
(1) TITLE AND LOCATION (City and State)
Construction of the Joint Traffic Management Center, Federal Aid
Project No. CMAQ-001(41), District of Honolulu, Island of Oahu
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2020 CONSTRUCTION (if applicable)
2020
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Inspector. SCOPE: RHA Construction Management Group, LLC (formerly Ronald N.S. Ho & Associates, Inc.) provided construction management services as part of the R.M. Towill Corporation CM team for construction of the Joint Traffic Management Center. Construction of this multi-agency operation to im-prove traffic management and public safety on Oahu was recently completed. The Center facilitates coordi-
nation among six city and state agencies. COST: $54 million
d.
(1) TITLE AND LOCATION (City and State)
City Hall Fire Alarm System Improvements (Project No. VI-34-14-C),
Honolulu, Hawaii
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2021 CONSTRUCTION (if applicable)
2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Inspector. SCOPE: RHA Construction Management Group, LLC (formerly Ronald N.S. Ho &
Associates, Inc.) is providing construction management services for the fire alarm system improvements at City
Hall as part of a team consisting of the City & County of Honolulu, Department of Design & Construction, the
Contractor, the Design Consultant, and the Testing Laboratories and Environmental Consultant. COST: $879,425
ARCHITECT-ENGINEER QUALIFICATIONS
STANDARD FORM 330 (REV. 8/2016) PAGE 10 1
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME
Randall Tamashiro
13. ROLE IN THIS CONTRACT
Construction Inspector
14. YEARS EXPERIENCE
a. TOTAL 25 b. WITH CURRENT FIRM 4
15. FIRM NAME AND LOCATION (City and State) RHA Construction Management Group, LLC, Honolulu, Hawaii
16. EDUCATION (Degree and Specialization)
Bachelor of Arts, University of Hawaii
17. CURRENT PROFESSIONAL REGISTRATION
(State and Discipline)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Arc Flash and Electrical Safety Training; Hawaii, Lineman Apprenticeship, 1991
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) 2153 North King Street Commercial Building Energy Efficiency
Improvement Upgrades & Building Repairs, Honolulu, Hawaii
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Ongoing
CONSTRUCTION (if applicable) Ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
ROLE: Construction Inspector. SCOPE: RHA Construction Management Group, LLC (formerly Ronald N.S. Ho &
Associates, Inc.) is providing the design and overall project management, construction management,
commissioning, measurement and verification of system savings and performance for identifying and
implementing viable cost-effective measures for this commercial building. Includes replacement of (2) 80-ton air
cooled condensing units and air handlers and control systems, interior and exterior LED lighting, lighting controls,
and photovoltaic system. COST: $3 million
b.
(1) TITLE AND LOCATION (City and State) 1411 South King Street Electrical Upgrades
Honolulu, Hawaii
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Ongoing CONSTRUCTION (if applicable) Ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
ROLE: Construction Inspector. SCOPE: RHA Construction Management Group, LLC (formerly Ronald N.S. Ho &
Associates, Inc.) providing construction management services, including bid/contract packaging, project
management, contract administration, and construction management services for electrical upgrades at 1411
South King Street in Honolulu, Hawaii. COST: $300,000
c.
(1) TITLE AND LOCATION (City and State)
Hawaiian Electric Company, Construction Inspection Services V2V Cable
Replacement Projects Village Park, Waipahu, Hawaii
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2021 CONSTRUCTION (if applicable) 2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
ROLE: Construction Inspector. SCOPE: RHA CM will provide construction inspection services for HECO's Direct
Bury Cable Replacement Program. The program will replace direct buried primary and secondary cables with
cables in concrete encased conduit. The project addresses the increasing amount of cable failures located in
the Village Park Unit 1 V4729A Kalae Street to V4729L Kamalo Street and Village Park Unit 2 & 4 V4817A Ku-
puna Loop to V4817O Kupuohi Place on the Kunia Makai 2 Circuit. COST: $2 million
d.
(1) TITLE AND LOCATION (City and State) HECO V2V Cable Replacement Projects Waihee 4 Circuit Ahuimanu Hills
Phase 3 V5446A to v5446E Nukupuu Street
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2021 CONSTRUCTION (if applicable) 2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Inspector. SCOPE: RHACM is providing construction management services to replace bur-
ied primary and secondary cables with cables in concrete encased conduit. The project addresses the in-
creasing amount of cable failures where the cable is directly buried. COST: N/A
ARCHITECT-ENGINEER QUALIFICATIONS
STANDARD FORM 330 (REV. 8/2016) PAGE 11 1
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME
Aaron Awaya
13. ROLE IN THIS CONTRACT Construction Inspector
14. YEARS EXPERIENCE
a. TOTAL 5 b. WITH CURRENT FIRM 2
15. FIRM NAME AND LOCATION (City and State) RHA Construction Management Group, LLC, Honolulu, Hawaii
16. EDUCATION (Degree and Specialization)
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
N/A
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Training: SII Excavation & Trenching Competent Person, 2024; SII Supported Scaffolding Competent Person, 2024;
OSHA Rigging Training, 2022; Crane Signal Person Course, 2022
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) 2153 North King Street Energy Efficient Improvement Upgrades,
Honolulu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Ongoing
CONSTRUCTION (if applicable) Ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Inspector. SCOPE: Provides overall project management, construction management,
commissioning, measurement and verification of system savings and performance for identifying and
implementing viable cost-effective measures for this commercial building. Services include installation of HVAC,
PV, concrete spalling repair, roofing, lighting, electrical upgrades, replumbing, windows, deck repairs and interior
renovations to retail and office spaces. COST: $10.7 million
b.
(1) TITLE AND LOCATION (City and State)
BWS Manana Corporation Yard Microbiology Lab and Control Center
Expansion, Honolulu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Ongoing CONSTRUCTION (if applicable) Ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
ROLE: Construction Inspector. SCOPE: Provided CM services for the renovation of a portion of the first floor of the
administration building and the enclosure of an existing breezeway to accommodate the construction of a
secondary microbiology lab as well as adata and control center for Water System Operations. The project also
included the installation of appurtenances to support these functions including a fuel storage tank for backup
generator power. COST: $3.7 million
c.
(1) TITLE AND LOCATION (City and State)
1411 South King Street
Honolulu, Hawaii
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Ongoing CONSTRUCTION (if applicable) Ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
ROLE: Construction Inspector. SCOPE: RHA Construction Management Group, LLC (Formerly Ronald N.S. Ho &
Associates, Inc.) is providing construction management services, including bid/contract packaging, project
management, contract administration, and construction management services for 1411 South King Street for new
electrical service in Honolulu, Hawaii. COST: $300,000
d.
(1) TITLE AND LOCATION (City and State) BWS ESCO Electrical Engineering Support and CM Services,
Contract No. C16000301, Honolulu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Ongoing CONSTRUCTION (if applicable) Ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Construction Inspector. SCOPE: Provided CM services for BWS Energy Performance Contract projects with oversight and inspection of all construction activities, review material submittals and schedules, and assist in closeout procedures. COST: $33 million
ARCHITECT-ENGINEER QUALIFICATIONS
STANDARD FORM 330 (REV. 8/2016) PAGE 12 1
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME
Oliver Pattavina
13. ROLE IN THIS CONTRACT
Construction Engineer
14. YEARS EXPERIENCE
a. TOTAL 5
b. WITH CURRENT FIRM 1
15. FIRM NAME AND LOCATION (City and State)
RHA Construction Management Group, LLC, Honolulu, Hawaii
16. EDUCATION (DEGREE AND SPECIALIZATION)
Bachelor of Science, Mechanical Engineering
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) N/A
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Training: Erosion and Sediment Control Plan Coordinator; OSHA Compliance Trained, OSHA 30 Certified; Arc Flash Electrical Safety Train-
ing; Trenching and Excavation for the Competent Person; Fall Protection for the Competent Person; Asbestos Safety for the Competent
Person
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) BWS ESCO Electrical Engineering Support and CM Services,
BWS Contract No. C16000301, Honolulu, Hawaii
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) Ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
ROLE: Construction Engineer. SCOPE: RHA Construction Management Group, LLC (Formerly Ronald N.S. Ho & Associ-
ates, Inc.) provided construction management services for BWS Energy Performance Contract projects. Services in-
cluded oversight and inspection of all construction activities, review material submittals and schedules, and assist in
closeout procedures. COST: $33 million
b.
(1) TITLE AND LOCATION (City and State) Board of Water Supply Manana Corporation Yard Microbiology
Lab and Control Center Expansion, Honolulu, Hawaii
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
Ongoing
CONSTRUCTION (If applicable)
Ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
ROLE: Construction Engineer. SCOPE: RHA Construction Management Group, LLC provided construction
management services for the renovation of a portion of the first floor of the administration building and
the enclosure of an existing breezeway to accommodate the construction of a secondary microbiology lab
as well as a secondary data and control center for Water System Operations. The project also included the
installation of appurtenances to support these functions including a fuel storage tank for backup genera-
tor power. COST: $3.7 million
c.
(1) TITLE AND LOCATION (City and State) Sand Island Wastewater Treatment Plant Maintenance
Building Construction Management Services
Improvement Upgrades, Honolulu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
Ongoing CONSTRUCTION (If applicable)
Ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
ROLE: Construction Engineer. SCOPE: RHA CM is providing observation and inspection of the rebar instal-
lation, and vapor barrier installation and maintenance. Responsibilities include scheduling, conducting,
and documenting preconstruction and job-site meetings; processing, reviewing, and approving shop
drawings, including critical items, as well as handling RFIs; and ensuring work follows contract documents
and HIOSH standards. COST: N/A
d.
(1) TITLE AND LOCATION (City and State)
Construction Management Engineering and Inspection Services
for Water Supply Operation Managed Projects under R.M.
Towill Corporation, Honolulu, Hawaii
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2022 CONSTRUCTION (If applicable)
2022
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
ROLE: Construction Engineer. SCOPE: RHA Construction Management Group, LLC provided construction
management and inspection as part of the R.M. Towill Corporation CM team for BWS Water System Oper-
ation Division projects including maintenance, repair, renovations and services for various BWS facilities.
Actual work includes rehabilitation of roofing, electrical, plumbing, masonry, HVAC, doors, windows, ceil-
ings, flooring, concrete, metal work, painting, fencing, paving, and all other work to maintain, repair and
rehabilitate BWS facilities. Work also includes emergency repairs to various BWS facilities including re-
pairs to pumping station equipment including motors, valves, water distribution systems and electrical
power sources. COST: $1 million
ARCHITECT-ENGINEER QUALIFICATIONS
STANDARD FORM 330 (REV. 8/2016) PAGE 13 1
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME
Aaron Corpuz
13. ROLE IN THIS CONTRACT Construction Inspector
14. YEARS EXPERIENCE
a. TOTAL
3
b. WITH CURRENT FIRM
1
15. FIRM NAME AND LOCATION (City and State) RHA Construction Management Group, LLC, Honolulu, Hawaii
16. EDUCATION (Degree and Specialization) Technologies; Architectural, Engineering, and CAD Technologies -
Construction Management
17. CURRENT PROFESSIONAL REGISTRATION (State and
Discipline) N/A
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Organization: Construction Management Associates of America (CMAA). Training: OSHA Compliance Trained, OSHA 30 Certified; Erosion and
Stormwater Control Plan Coordinator Certified; NAHB Student Competition
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
Sand Island Wastewater Treatment Plant Maintenance
Building Construction Management Services
Improvement Upgrades, Honolulu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
Ongoing
CONSTRUCTION (if applicable)
Ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Engineer. SCOPE: RHA CM is providing observation and inspection of the rebar installation,
and vapor barrier installation and maintenance. Responsibilities include scheduling, conducting, and documenting
preconstruction and job-site meetings; processing, reviewing, and approving shop drawings, including critical
items, as well as handling RFIs; and ensuring work follows contract documents and HIOSH standards. COST: N/A
b.
(1) TITLE AND LOCATION (City and State) BWS Manana Corporation Yard Microbiology Lab and
Control Center Expansion, Honolulu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Ongoing CONSTRUCTION (if applicable) Ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
ROLE: Construction Inspector. SCOPE: Provided CM services for the renovation of a portion of the first floor of the
administration building and the enclosure of an existing breezeway to accommodate the construction of a
secondary microbiology lab as well as data and control center for Water System Operations. The project also
included the installation of appurtenances to support these functions including a fuel storage tank for backup
generator power. COST: $3.7 million
c.
(1) TITLE AND LOCATION (City and State)
1411 South King Street
Honolulu, Hawaii
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Ongoing CONSTRUCTION (if applicable) Ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Inspector. SCOPE: RHA Construction Management Group, LLC (Formerly Ronald N.S. Ho & Associates, Inc.) is providing construction management services, including bid/contract packaging, project
management, contract administration, and construction management services for 1411 South King Street for new
electrical service in Honolulu, Hawaii. COST: $300,000
d.
(1) TITLE AND LOCATION (City and State) Young Brothers Project Management and Coordination Services
under General Services, Statewide, Hawaii
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2021 CONSTRUCTION (if applicable) 2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
ROLE: Construction Inspector. SCOPE: Provided CM services for the general maintenance and repair work on
structures and ports statewide to improve the overall function and appearance to service customers.
COST: $20 million
ARCHITECT-ENGINEER QUALIFICATIONS
STANDARD FORM 330 (REV. 8/2016) PAGE 14 1
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
Aaron Tolentino Construction Engineer a. TOTAL 1 b. WITH CURRENT FIRM <1
15. FIRM NAME AND LOCATION (City and State) RHA Construction Management Group, LLC, Honolulu, Hawaii
16. EDUCATION (Degree and Specialization) Bachelor of Science, Civil Engineering
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) N/A
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) N/A
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Sand Island Wastewater Treatment Plant Maintenance Building Con-
struction Management Services
Improvement Upgrades, Honolulu, HI
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Ongoing Ongoing
a. (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
ROLE: Construction Engineer. SCOPE: RHA CM is providing observation and inspection of the rebar installation,
and vapor barrier installation and maintenance. Responsibilities include scheduling, conducting, and document-
ing preconstruction and job-site meetings; processing, reviewing, and approving shop drawings, including critical
items, as well as handling RFIs; and ensuring work follows contract documents and HIOSH standards. COST: N/A
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
BWS Manana Corporation Yard Microbiology Lab
and Control Center Expansion, Honolulu, HI
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Ongoing Ongoing
b. (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
ROLE: Construction Engineer. SCOPE: Provided CM services for the renovation of a portion of the first floor of
the administration building and the enclosure of an existing breezeway to accommodate the construction of a
secondary microbiology lab as well as a data and control center for Water System Operations. The project also
included the installation of appurtenances to support these functions including a fuel storage tank for backup
generator power. COST: $3.7M
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Construction Management Engineering and Inspection
Services for Water Supply Operation Managed Projects, Honolulu, HI
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2022 2022
c. (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
ROLE: Construction Engineer. SCOPE: Provided construction management and inspection for the BWS
Water System Operation Division projects include maintenance, repair, renovations and services for various
BWS facilities. COST: N/A
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Young Brothers Project Management and Coordination Services un-
der General Services, Statewide, HI
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2021 Ongoing
d. (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Engineer. SCOPE: Provided CM services for the general maintenance and repair work on
structures and ports statewide to improve the overall function and appearance to service customers. COST: $20
million
ARCHITECT-ENGINEER QUALIFICATIONS
STANDARD FORM 330 (REV. 8/2016) PAGE 15 1
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME
Romy Polinar-Pascua
13. ROLE IN THIS CONTRACT Construction Engineer
14. YEARS EXPERIENCE
a. TOTAL 6 b. WITH CURRENT FIRM <1
15. FIRM NAME AND LOCATION (City and State) RHA Construction Management Group, LLC, Honolulu, Hawaii
16. EDUCATION (Degree and Specialization)
B.S. Electrical Engineering, University of Hawaii at Manoa,
17. CURRENT PROFESSIONAL REGISTRATION (State and
Discipline)
N/A
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
N/A
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) Sand Island Wastewater Treatment Plant Maintenance
Building Construction Management Services
Improvement Upgrades, Honolulu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Ongoing
CONSTRUCTION (if applicable) Ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
ROLE: Construction Engineer. SCOPE: RHA CM is providing observation and inspection of the rebar installation,
and vapor barrier installation and maintenance. Responsibilities include scheduling, conducting, and documenting
preconstruction and job-site meetings; processing, reviewing, and approving shop drawings, including critical
items, as well as handling RFIs; and ensuring work follows contract documents and HIOSH standards. COST: N/A
b.
(1) TITLE AND LOCATION (City and State)
Department of Hawaiian Home Lands Yorktown Building
Rehabilitation for Transitional Housing, Kalaeloa, Kapolei,
Hawaii
(2) YEAR COMPLETED
PROFESSIONAL SERVICES Ongoing CONSTRUCTION (if applicable) Ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Engineer. SCOPE: RHA CM is providing project/construction management, including contract
review and execution; onsite project management; assistance with CA phase to reach substantial and final
completion, i.e., answering RFI, reviewing submittals, reviewing payment applications, etc., ensure that work is in
accordance with engineering design intent as required by the City and County of Honolulu; and assistance to
obtain project close out documents. COST: N/A
c.
(1) TITLE AND LOCATION (City and State) BWS Manana Corporation Yard Microbiology Lab and
Control Center Expansion, Honolulu, HI
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
Ongoing
CONSTRUCTION (if applicable)
Ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
ROLE: Construction Inspector. SCOPE: Provided CM services for the renovation of a portion of the first floor
of the administration building and the enclosure of an existing breezeway to accommodate the construction
of a secondary microbiology lab as well as a data and control center for Water System Operations. The pro-
ject also included the installation of appurtenances to support these functions including a fuel storage tank
for backup generator power. COST: $3.7M
d.
(1) TITLE AND LOCATION (City and State)
Young Brothers Project Management and Coordination
Services under General Services, Statewide, Hawaii
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2021 CONSTRUCTION (if applicable)
2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
ROLE: Construction Engineer. SCOPE: Provided CM services for the general maintenance and repair work on
structures and ports statewide to improve the overall function and appearance to service customers.
COST: $20 million
ARCHITECT-ENGINEER QUALIFICATIONS
STANDARD FORM 330 (REV. 8/2016) PAGE 16 1
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY NUMBER
1
21. TITLE AND LOCATION (City and State) Kulani Correctional Facility Potable Water Supply,
Hilo, Hawaii
22. YEAR COMPLETED
PROFESSIONAL SERVICES
2021
CONSTRUCTION (if applicable)
2021
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
County of Hawaii, Department of Public Safety
b. POINT OF CONTACT NAME
Terry Visperas
c. POINT OF CONTACT TELEPHONE NUMBER
(808) 587-1247
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
SCOPE: The RHA Construction Management Group, LLC provided construction management services for the
Department of Public Safety, Project #: PSD 19-KSF-12. Scope of work consisted of the installation of a new water
service lateral, meter and fill station at Kulani Correctional Facility in Hilo, Hawaii.
PROJECT COST: $1.2 million
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
a. RHA Construction Management Group, LLC
(formerly Ronald N.S. Ho & Associates, Inc.) Honolulu, Hawaii Construction Manager
ARCHITECT-ENGINEER QUALIFICATIONS
STANDARD FORM 330 (REV. 8/2016) PAGE 17 1
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY NUMBER
2
21. TITLE AND LOCATION (City and State) Kawaihae Water Connection
Kailua-Kona, Hawaii
22. YEAR COMPLETED
PROFESSIONAL SERVICES
Ongoing CONSTRUCTION (if applicable)
Ongoing
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
Young Brothers
b. POINT OF CONTACT NAME
Tiffanie M. Whitworth
c. POINT OF CONTACT TELEPHONE NUMBER
(808) 543-9311
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
SCOPE: RHA Construction Management Group, LLC is providing engineering services to design properly sized
water connection from main water line into the office trailer. RHA CM will also provide all permitting and
engineering support required to install a new water line and further assess whether existing grey water tanks are
appropriately sized and if tanks need to be replaced for the new water connection.
PROJECT COST: N/A
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
a. RHA Construction Management Group, LLC Honolulu, Hawaii Construction Manager
ARCHITECT-ENGINEER QUALIFICATIONS
STANDARD FORM 330 (REV. 8/2016) PAGE 18 1
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY NUMBER
3
21. TITLE AND LOCATION (City and State) Kawaihae Maintenance & Repair Work
Kailua-Kona, Hawaii
22. YEAR COMPLETED
PROFESSIONAL SERVICES
Ongoing CONSTRUCTION (if applicable)
Ongoing
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
Young Brothers
b. POINT OF CONTACT NAME
Tiffanie M. Whitworth
c. POINT OF CONTACT TELEPHONE NUMBER
(808) 543-9311
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
SCOPE: RHA Construction Management Group, LLC is providing general project management services to perform
the following work at the the Port of Kawaihae:
• Manager's Office - Replace flooring; Procure and install desks for OPCs
• Container Station - Fill/seal gap on window on mauka side of building; Replace windows/flooring
• Break Room - Reinforce weak points of flooring substructure and replace with new flooring
• Freight Clerk Office - Extend external deck near door facing Manager's office; Install awning for newly
extended deck
PROJECT COST: N/A
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
a. RHA Construction Management Group, LLC Honolulu, Hawaii Construction Manager
ARCHITECT-ENGINEER QUALIFICATIONS
STANDARD FORM 330 (REV. 8/2016) PAGE 19 1
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY NUMBER
4
21. TITLE AND LOCATION (City and State) City and County of Honolulu, Department of Design and Construction,
Kailua Regional Wastewater Treatment Plant (KRWWTP) Tunnel Influent
Pump Station and Headworks
Kailua, HI
22. YEAR COMPLETED
PROFESSIONAL SERVICES
2019
CONSTRUCTION (if applicable)
2018
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER City and County of Honolulu
Dept. of Design & Construction
b. POINT OF CONTACT NAME Jon Yamane
c. POINT OF CONTACT TELEPHONE NUMBER (808) 768-8788
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
SCOPE: Construction management services for the second phase of the Kaneohe-Kailua (KK) Wastewater
Conveyance and Treatment Facilities Project. Construction at the Kailua Regional Wastewater Treatment Plant
(KRWWTP) included a new Headworks, new Generator/Electrical Building, and a 6-story Tunnel Influent Pump
Station to pull wastewater from the KK tunnel to the KRWWTP.
PROJECT COST: $149 million
*This project was completed under a former employer of Pono Consulting Management employee(s))
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
a. Pono Consulting Management Honolulu, Hawaii Construction Manager
ARCHITECT-ENGINEER QUALIFICATIONS
STANDARD FORM 330 (REV. 8/2016) PAGE 20 1
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY NUMBER
5
21. TITLE AND LOCATION (City and State) Board of Water Supply ESCO Electrical Engineering
Support and Construction Management Services,
BWS Contract No. C16000301
22. YEAR COMPLETED
PROFESSIONAL SERVICES
Ongoing
CONSTRUCTION (if applicable)
Ongoing
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER Board of Water Supply b. POINT OF CONTACT NAME Jordan Oue c. POINT OF CONTACT TELEPHONE NUMBER (808) 748-5834
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
SCOPE: RHA Construction Management Group, LLC (formerly
Ronald N.S. Ho & Associates, Inc.) provided construction
management services for various Energy Conservation
Measures (ECMs) proposed by the BWS energy savings
contractor on a BWS Energy Performance Contract (ESPC).
ECM projects include Lighting Retrofit Work on interior and
exterior LED Lighting Systems at the Beretania Complex and
Corporation Yards, involving retrofitting of lighting fixtures or
replacing lighting fixtures at the facility.
Power Factor Correction Retrofit Work at various wells and
pumping stations throughout the island of Oahu involves
removing existing capacitors and connecting new power factor capacitors to existing electrical equipment.
Conduit and conductors sized appropriate to the load are provided.
Rider M/TOU Pump Control Work will implement priority peak curtailment for HECO Rider M at identified sites.
Control equipment and programming to allow the identified sites to switch to the TOU-J rate schedule. Well
Pump Controls work identifies four (4) well pumps at two sites to be replaced.
Photovoltaic Systems NEM Work at the Beretania Complex and Corporation Yards. Reservoirs will require PV
systems to be ballast mounted. Ground-mounted PV systems will be installed including several arrays in the
Beretania Complex parking lots.
HVAC Upgrade work at Corporation Yards and Beretania Complex will include mechanical, electrical and structural
tasks involving concrete foundation equipment HK removal of existing packaged air conditioning unit, ductwork,
piping, fittings and electrical controls. The new equipment will be a split system type with separate condenser and
air handling units. Additional electrical power tie-in, conduit runs and disconnect installation will be required, as
well as the installation of new refrigerant lines, duct work and testing and balancing of the completed system.
PROJECT COST: $33 million
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
a. RHA Construction Management Group, LLC
(formerly Ronald N.S. Ho & Associates, Inc.) Honolulu, Hawaii Construction Manager
ARCHITECT-ENGINEER QUALIFICATIONS
STANDARD FORM 330 (REV. 8/2016) PAGE 21 1
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY NUMBER
6
21. TITLE AND LOCATION (City and State) Construction Management for WSOIDIQ 17-6A,
Roofing Repairs, BWS Contract No. C18001005
22. YEAR COMPLETED
PROFESSIONAL SERVICES
2021
CONSTRUCTION (if applicable)
2021
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
Board of Water Supply b. POINT OF CONTACT NAME
Ross Lum
c. POINT OF CONTACT TELEPHONE NUMBER
(808) 748-5835
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
SCOPE: RHA Construction Management Group, LLC (Formerly Ronald N.S. Ho & Associates, Inc.) provided
construction management (CM) services for various roofing repairs under an indefinite delivery, indefinite
quantity (IDIQ) contract. Work issued for individual roofing projects include reroofing of reservoirs and onsite
BWS buildings, repairs to spalling concrete, structural repairs to the building structure and other associated
repairs to water damaged materials, re-sloping reservoir roofs, installing fall protection anchors and guard rails on
reservoirs, and painting, as detailed in the specifications.
CM responsibilities in this contract include oversight and management of:
• Repair of different types of roofs as described in SP-4, Description of Work (in contract).
• Site work to include, where applicable, (1) testing, removing and disposal of asbestos materials, and (2)
removal and disposal of paint with lead.
• Carpentry to repair damaged wood (wood rot, termite damage, etc.) required for complete roofing
repair.
• Sheet metal work to repair flashings, gutters, and related roofing components.
• Repair/replacement of roof ventilators.
• Painting associated with roofing work.
• Necessary concrete repair work when required for roofing work.
PROJECT COST: $25 million
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
a. RHA Construction Management Group, LLC
(formerly Ronald N.S. Ho & Associates, Inc.) Honolulu, Hawaii Construction Manager
ARCHITECT-ENGINEER QUALIFICATIONS
STANDARD FORM 330 (REV. 8/2016) PAGE 22 1
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY NUMBER
7
21. TITLE AND LOCATION (City and State) Board of Water Supply Emergency Generators at
Kalihi Yard and Shaft, Halawa Shaft, and Kunia Wells I, Honolulu, HI
22. YEAR COMPLETED
PROFESSIONAL SERVICES
2021 CONSTRUCTION (if applicable)
2021
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
Board of Water Supply
b. POINT OF CONTACT NAME
Sandy Nahoopii-Soong
c. POINT OF CONTACT TELEPHONE NUMBER
(808) 748-5731
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
SCOPE: RHA Construction Management Group, LLC (formerly Ronald N.S. Ho & Associates, Inc.) provided
construction management services to furnish, install, and maintain over a 2-year period, new stationary
emergency power generation facilities at three (3) BWS facilities to provide standby power for wells, pumps, and
other equipment in the event that Hawaiian Electric Company (HECO) power is temporarily out of service.
The three BWS sites are: 1) Kalihi Yard and Shaft, 2) Halawa Shaft, and 3) Kunia Wells I. RNSHA and the contractor
are responsible for coordinating and scheduling all work in conjunction with the ongoing ESCO contract.
PROJECT COST: $5.7 million
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
a. RHA Construction Management Group, LLC
(formerly Ronald N.S. Ho & Associates, Inc.) Honolulu, Hawaii Construction Manager
ARCHITECT-ENGINEER QUALIFICATIONS
STANDARD FORM 330 (REV. 8/2016) PAGE 23 1
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY NUMBER
8
21. TITLE AND LOCATION (City and State) Sand Island Wastewater Treatment Plant Maintenance
Building Construction Management Services
Improvement Upgrades, Honolulu, HI
22. YEAR COMPLETED
PROFESSIONAL SERVICES
Ongoing CONSTRUCTION (if applicable)
Ongoing
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER Sand Island Wastewater Treatment Plant b. POINT OF CONTACT NAME Yogi Kwong Engineers
Jeff Kalani
c. POINT OF CONTACT TELEPHONE NUMBER (808) 942-0001
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
SCOPE: RHA Construction Management Group, LLC is providing observation and inspection of the rebar
installation and vapor barrier installation and maintenance in coordination with the Contractor and project team.
Responsibilities include scheduling, conducting, and documenting preconstruction and job-site meetings involving
the contractor, project team, and critical subcontractors/suppliers, and ensuring work follows contract
documents and HIOSH standards. RHA CM is conducting weekly quality control meetings with the general
contractor and consultant and is providing inspection of quality control items addressed by Contractor and
project team. Lastly, the scope involves processing, reviewing, and approving shop drawings, including critical
items, as well as handling RFIs.
PROJECT COST: N/A
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
a. RHA Construction Management Group, LLC Honolulu, Hawaii Construction Manager
ARCHITECT-ENGINEER QUALIFICATIONS
STANDARD FORM 330 (REV. 8/2016) PAGE 24 1
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY NUMBER
9
21. TITLE AND LOCATION (City and State) Construction Management Engineering and Inspection Services for Water
Supply Operation Managed Projects under R.M. Towill Corporation,
Honolulu, Hawaii
22. YEAR COMPLETED
PROFESSIONAL SERVICES
Ongoing CONSTRUCTION (if applicable)
Ongoing
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER Board of Water Supply b. POINT OF CONTACT NAME R.M. Towill Corporation
Greg Hiyakumoto, President
c. POINT OF CONTACT TELEPHONE NUMBER (808) 941-0577
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
SCOPE: RHA Construction Management Group, LLC provided construction management and inspection as part of
the R.M. Towill Corporation CM team for BWS Water System Operation Division projects including maintenance,
repair, renovations and services for various BWS facilities. Actual work includes rehabilitation of roofing,
electrical, plumbing, masonry, HVAC, doors, windows, ceilings, flooring, concrete, metal work, painting, fencing,
paving, and all other work to maintain, repair and rehabilitate BWS facilities. Work also includes emergency
repairs to various BWS facilities including repairs to pumping station equipment including motors, valves, water
distribution systems and electrical power sources.
PROJECT COST: $1 million
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
a. RHA Construction Management Group, LLC
(formerly Ronald N.S. Ho & Associates, Inc.) Honolulu, Hawaii Construction Manager
ARCHITECT-ENGINEER QUALIFICATIONS
STANDARD FORM 330 (REV. 8/2016) PAGE 25 1
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY NUMBER
10
21. TITLE AND LOCATION (City and State) Nawiliwili Container Station Build & M&R Work
Kauai, Hawaii
22. YEAR COMPLETED
PROFESSIONAL SERVICES
2023 CONSTRUCTION (if applicable)
2023
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
Young Brothers
b. POINT OF CONTACT NAME
Tiffanie M. Whitworth
c. POINT OF CONTACT TELEPHONE NUMBER
(808) 543-9311
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
SCOPE: RHA Construction Management Group, LLC provided general project management services to perform the
following work at the Port of Nawiliwili:
• Replace restroom fixtures in the restroom of the Manager's Office Trailer
• Design, build and install a container station with deck for operational use near comfort station
• Relocate existing combo structure to center of yard near comfort station
PROJECT COST: N/A
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
b. RHA Construction Management Group, LLC Honolulu, Hawaii Construction Manager
ARCHITECT-ENGINEER QUALIFICATIONS
STANDARD FORM 330 (REV. 8/2016) PAGE 26 1
G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS
26. NAMES OF KEY PERSONNEL (From Section E, Block 12) 27. ROLE IN THIS CONTRACT (From Section E, Block 13)
28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in “Example Projects Key” section below before completing table. Place “X” under project key number for participation in same or similar role)
1 2 3 4 5 6 7 8 9 10
Brian Sekiguchi, CCM President/
Construction Manager
Michael P. Young, PE, CCM Construction Manager
Sean Sugai, PE Vice President
Bryan Bosworth Construction Manager
Brad Takenaka, PE Construction Manager
/ Project Engineer
Steven Chung, PE Civil Engineer
Creighton Lee Construction Inspector
Bert Shiosaki Construction Inspector
Randall Tamashiro Construction Inspector
Hyung Kwan “HK” Pae, RA Construction Inspector
Aaron Awaya Construction Inspector
Oliver Pattavina Construction Engineer
Aaron Corpuz Construction Inspector
Aaron Tolentino Construction Engineer
Romy Polinar-Pascua Construction Engineer
29. EXAMPLE PROJECTS KEY
No. Title of Example Project (from Section F) No. Title of Example Project (from Section F)
1. Kulani Correctional Facility Potable Water
Supply, Hilo, Hawaii 6. Construction Management for WSOIDIQ 17-6A,
Roofing Repairs, BWS Contract No. C18001005
Honolulu, Hawaii
2. Kawaihae Water Connection
Kailua-Kona, Hawaii 7. Board of Water Supply Emergency Generators
at Kalihi Yard and Shaft, Halawa Shaft, and
Kunia Wells I, Honolulu, Hawaii
3. Kawaihae Maintenance & Repair Work
Kailua-Kona, Hawaii 8. Sand Island Wastewater Treatment Plant
Maintenance Building Construction Management
Services Improvement Upgrades, Honolulu, HI
4.
City and County of Honolulu, Department of
Design and Construction, Kailua Regional
Wastewater Treatment Plant (KRWWTP) Tunnel
Influent Pump Station and Headworks
Kailua, HI
9.
Construction Management Engineering and
Inspection Services for Water Supply Operation
Managed Projects under R.M. Towill Corporation,
Honolulu, Hawaii
5.
Board of Water Supply ESCO Electrical
Engineering Support and Construction
Management Services, BWS Contract No.
C16000301, Honolulu, Hawaii
10. Young Brothers Nawiliwili Container Station Build &
M&R Work, Kauai, Hawaii
ARCHITECT-ENGINEER QUALIFICATIONS
STANDARD FORM 330 (REV. 8/2016) PAGE 27 1
H. ADDITIONAL INFORMATION
30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. (Attach additional sheets as needed.)
RHA Construction Management Group, LLC (RHA CM) was created at the request of our clients to provide
professional project and construction management and inspection services for the various projects designed by
Ronald N.S. Ho & Associates. Established in 2020 with an experienced team of construction and project
managers, inspectors, and engineers, we provide project and construction management services for federal, state
and city government agencies and private and non-profit clients. Our market sector includes public and private
building structures, site infrastructure systems, lighting systems, electrical distribution systems, and water and
wastewater systems.
Our construction management team averages over 20 years of diverse construction and facility management, real
estate development, and redevelopment and renovation experience. Embodying an “owner’s mentality”, our CM
professionals undertake full responsibility for the oversight and management of the entire construction process,
from construction kick-off to project acceptance. We maintain the highest levels of communication with the latest
technology to ensure the successful execution of any project, regardless of size or complexity.
Serving as the single point of contact for our clients, our team ensures that its projects are completed on time and
within budget while minimizing risk. Our approach allows our clients to focus on their core business and strategies
in order for them to maximize their land-based assets while continuing to improve their facilities and
infrastructure. Our services include but are not limited to:
• Planning & Scheduling
• Budgeting
• Bid Packaging
• Contract Management
• Repair & Maintenance Inspection
• Project Management
• Construction Management and Inspection
• Building Inspection
• Tenant Coordination
• Project Closeout
• Commissioning
• Third Party Inspection
1. Name of the firm or individual, principal place of business, and location of all of its offices.
RHA Construction Management Group, LLC (RHA CM) is located at 2153 North King Street, Suite 201,
Honolulu, Hawaii 96819.
2. Age of the firm and its average number of employees over the past years.
RHA Construction Management Group, LLC was established on July 1, 2020 and has 17 employees.
3. Education, training, and qualifications of key members of the firm.
Please refer to SF330 Section E Resumes for the education, training, and qualifications of key members of our
firm.
ARCHITECT-ENGINEER QUALIFICATIONS
STANDARD FORM 330 (REV. 8/2016) PAGE 28 1
H. ADDITIONAL INFORMATION
30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. (Attach additional sheets as needed.)
4. Names and phone numbers of up to 5 clients who may be contacted, including two for whom services were
rendered during the preceding year.
Honolulu Board of Water Supply
Ross Lum, Project Coordinator
(808) 748-5835
Honolulu Board of Water Supply
Sandy Nahoopii-Soong, Civil Engineer V
(808) 748-5731
City & County of Honolulu,
Department of Design and Construction
Stanley Ige, Electrical Engineer V
(808) 768-6002
R.M. Towill Corporation
Greg Hiyakumoto, President
(808) 842-1133
5. Any promotional or descriptive literature which the individual or firm desires to submit.
CONSTRUCTION MANAGEMENT
• Punahou School Energy Efficiency Projects, Honolulu, Hawaii. Provided construction management for the
implementation of a number of campus-wide LED lighting retrofits, campus-wide building submetering
and energy monitoring platform, and various building HVAC retrofits.
• Ray & Joan Kroc Corps Community Center Energy Efficiency Projects, Kapolei, Hawaii. Provided
construction management for the implementation of energy efficiency projects at the Salvation Army’s
Ray and Joan Kroc Corps Community Center in Kapolei.
• Joint Traffic Management Center, Federal Aid Project #CMAQ-001(41), Honolulu, Hawaii. Provided
construction management services for the JTMC project in Honolulu.
• Condition Assessments and Inspections for Various Repairs at Franklin Tower Condominium, Honolulu,
Hawaii. Provided condition assessments and inspections for various repairs at the 41 story Franklin
Tower condominium in Salt Lake.
• Condition Assessments and Inspections for Various Plumbing and Building Repairs at Crosspointe
Community Association, Honolulu, Hawaii. Provided condition assessments and inspections for various
repairs at the Crosspointe Community Association in Honolulu.
• Board of Water Supply ESCO Electrical Engineering Support and Construction Management Services, BWS
Contract No. C16000301, Honolulu, Hawaii. Provided construction management and engineering services
for various energy Conservation Measures (ECMs) proposed by BWS energy savings contractor on the
BWS Energy Performance Contract (ESPC).
• Construction Management, Engineering and Inspection Services for Water Supply Operation Managed
Projects for the Board of Water Supply. Provided construction management and inspection as part of the
R.M. Towill Corporation CM team for the BWS Water System Operation Division projects including
maintenance, repair, renovations and services for various BWS facilities.
ARCHITECT-ENGINEER QUALIFICATIONS
STANDARD FORM 330 (REV. 8/2016) PAGE 29 1
H. ADDITIONAL INFORMATION
30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. (Attach additional sheets as needed.)
• Board of Water Supply Emergency Generators at Kalihi Yard and Shaft, Halawa Shaft, and Kunia Wells I,
Various Locations, Oahu, Hawaii. Provided construction management services to furnish, install, and
maintain over a 2-year period, new stationary emergency power generation facilities at three (3) BWS
facilities to provide standby power for wells, pumps, and other equipment in the event that Hawaiian
Electric Company (HECO) power is temporarily out of service.
• Construction Management for WSOIDIQ 17-6A, Roofing Repairs, BWS Contract No. C18001005, Various
Locations, Oahu, Hawaii. Provided construction management services for various roofing repairs under
and IDIQ contract.
• Board of Water Supply Manana Corporation Yard Diesel Fuel Tank Replacement, Pearl City, Hawaii.
Provided project and construction management services to support the fuel system improvements.
• Board of Water Supply Replacement of Electrical Utility Pole & Meter Servicing at Waihee Chlorinator,
Waihee Road, Kahaluu, Hawaii. Provided construction management services to remove the existing
electric meter and electrical service conduits servicing the Waihee Chlorinator.
• Board of Water Supply Kaimuki Pump Station Electrical Upgrades, Honolulu, Hawaii. Provided
construction management services for the upgrade and replacement of existing light fixtures, switches
and receptacles from the Kaimuki pump station.
• Board of Water Supply Kaimuki Pump Station Historic Preservation, Honolulu, Hawaii. Provided
construction management for the historic preservation of this pump station restoring the appearance of
this historic structure.
• Joint Base Pearl Harbor Hickam P-704 Sewer Lift Station and Relief Sewer Lines, JBPHH Hawaii. Provided
construction management and inspection services to Kiewet Infrastructure West Co. for a new
wastewater pump station replacing the existing pump station and a new gravity sewer main along South
Avenue.
• Hawaii Gas SNG Facility Above Ground Storage Tank, Kapolei, Hawaii. Provided project management and
construction management services for a new above ground storage tank system at the synthetic natural
gas (SNG) facility at Campbell Industrial Park.
• 1717 Ala Wai Replace Generator, Honolulu, Hawaii. Provided construction management and design to
replace existing standby generator in its current location to reconnect to the existing remote radiator,
design for remote fuel spout with connection to the base mounted fuel tank and temporary relocation
and replacement of existing circuits to accommodate structural spalling repair work.
• 851 Fort Street Mall Hawaiian Host Renovation, Honolulu, Hawaii. Provided construction management
and project management services for the renovation of commercial office spaces in a downtown facility.
• 1411 South King Street Electrical Upgrades, Honolulu, Hawaii. Provided construction management
services including bid/contract packaging, project management, contract administration, and
construction management services for new electrical service.
ARCHITECT-ENGINEER QUALIFICATIONS
STANDARD FORM 330 (REV. 8/2016) PAGE 30 1
H. ADDITIONAL INFORMATION
30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. (Attach additional sheets as needed.)
• E Noa Tours Electric Bus Chargers, Honolulu, Hawaii. Provided construction management services for the
installation of permanent bus chargers within the existing E Noa Tours building.
• Lanai Temporary Trailers, Lanai City, Hawaii. Provided construction management for the implementation
of electrical branch circuiting, underground electrical conduits and other electrical equipment requiring
power connections at the hangar facility, two (2) 40-foot office trailers, and two (2) portable trailers.
• Hilton Hawaiian Village Room Renovations, Honolulu, Hawaii. Provided QA/QC services for third party
inspection of the renovation work on the hotel rooms in the Hilton Hawaiian Village Renovation work
including new flooring, drywall, taping, plaster, wall covering, painting, counters and miscellaneous
electrical and mechanical work.
• HECO Construction Services – Kahe Halawa #1 / Kahe-Waiau, Kahe-Halawa 138kV Replacement
Foundation Installation Project. Provided construction management services for the installation of 39
new steel pole foundations.
• HECO Construction Inspection Services HECO V2V Cable Replacement Projects Kunia Makai 2 Circuit,
Village Park. Provided construction management services for the replacement of direct buried primary
and secondary cables with cables in concrete encased conduit.
• HECO Construction Inspection Services HECO V2V Cable Replacement Projects Ahuimanu Hills Phase III,
Kaneohe, HI. Provided construction management services for the replacement of direct buried primary
and secondary cables with cables in concrete encased conduit.
• HECO Construction Inspection Services – Ualena St. P18X & P20 Foundation Installation Project, Honolulu,
Hawaii. Provided construction management services for the installation of two (2) concrete foundations
for two (2) mono steel poles. Services included the oversight of excavation and installation of foundation
shafts, and final inspection.
• HECO Construction Inspection Services – AES-CEIP #1 138kV Line Relocation Installation Project,
Honolulu, Hawaii. Provided construction management services for the excavation and installation of the
new foundation shafts. Present during construction through completion and final inspection.
• Utility Toning for the Daniel K. Inouye International Airport (DKIIA) Ewa Chiller Vault & Vault H New
Generator Building Project, Honolulu, Hawaii. Provided construction management services to support
investigative toning work for the installation of anew generator building, manholes, and duct lines.
• Department of Education, Various Schools Statewide, Construct Temporary Facilities for FY2010, Fire
Alarm Testing, Hawaii. Provided construction management services to inspect the installation of fire
alarm devices in temporary classrooms throughout the state.
• Various Schools Statewide, Relocate/Construct Temporary Facilities for FY 2010, Solomon Elementary
School – Site Inspections, Honolulu, Hawaii. Provided construction management services for Solomon
Elementary School.
• Amerisource Bergen, HVAC Upgrade, Construction Observation. Provided construction management
services.
ARCHITECT-ENGINEER QUALIFICATIONS
STANDARD FORM 330 (REV. 8/2016) PAGE 31 1
H. ADDITIONAL INFORMATION
30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. (Attach additional sheets as needed.)
• Fire Alarm System Replacement at Laie Elementary School, Honolulu, Hawaii. Provided construction
management services to inspect the installation of a new fire alarm system for the Laie Elementary
School.
• Pohnpei Utilities Corporation (PUC) 6 MW Power Module Project. Provided quality control management
of the 6MW Power Module project at the PUC in the Federated States of Micronesia.
• Pohnpei Utilities Corporation (PUC) 4MW Power Module Project, Pohnpei State, Federated State of
Micronesia. Provided construction and quality control management services to PUC for the installation
and commissioning of (2) 2MW power generation modules to provide additional backup support to the
utility’s power generation system.
• Mahana Estates Development (Site Work). Currently providing project/ construction management of the
site work of the Mahana Estates Homesites in Kapalua, Maui.
• Mahana Estates Development (Residences) Currently providing project/construction management of the
residences at the Mahana Estates Homesites development in Kapalua, Maui.
• 2153 North King Street Lighting Retrofit, Honolulu, Hawaii. Provides engineering services for the
proposed lighting retrofit for the building at 2153 North King Street which included the following:
performed a lighting energy audit, designed energy efficient lighting systems for the subject building;
assisted in the selection of contractor and materials for use in the project; assisted with DREAL Hawaii to
finance the project; performed construction management for the project; and, worked with Hawaii
Energy to obtain incentives and rebates for the project. The three floors of retail and commercial space
are approximately 62,000 s.f. and the covered parking in the basement is approximately 20,000 s.f.
• Construction Management Services for 1411 South King Street Electrical Upgrades, Honolulu, Hawaii.
Provided bid/contract packaging, project management, contract administration, and construction
management services for electrical upgrades at 1411 South King Street in Honolulu, HI.
• City Hall Fire Alarm System Improvements, Honolulu, Hawaii. Provided construction management
services for the project.
• Traffic Improvements at Various Locations, Pedestrian Safety Pilot Project at 1772 South King Street, C&C
Consultant Contract No. SC-DTS-1000179. Provided design for the construction of a new solar powered
LED pedestrian warning system as a pilot project.
Please refer to APPENDIX: Company Brochure for additional information on RHA Construction Management
Group, LLC (formerly Ronald N.S. Ho & Associates Inc.).
I. Authorized Representative
The foregoing is a statement of facts.
31. SIGNATURE 32. DATE
June 30, 2024
33. NAME AND TITLE
Brian Sekiguchi, CCM, President
ARCHITECT-ENGINEER QUALIFICATIONS
STANDARD FORM 330 (REV. 8/2016) PAGE 32 1
ARCHITECT-ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (if any)
24-25
PART II - GENERAL QUALIFICATIONS
(If a firm has branch offices, complete for each specific branch office seeking work.)
2a. FIRM (OR BRANCH OFFICE) NAME
RHA Construction Management Group, LLC
3. YEAR ESTABLISHED
2020
4. UNIQUE ENTITY IDENTIFIER 85-1013091
2b. STREET 5. OWNERSHIP
2153 N. King Street, Suite 201 a. TYPE
Single Member LLC
2c. CITY
Honolulu 2d. STATE
Hawaii 2e. ZIP CODE
96819 b. SMALL BUSINESS STATUS
Self-Certified Small Business 6a. POINT OF CONTACT NAME AND TITLE
Brian Sekiguchi, CCM, President 7. NAME OF FIRM (If Block 2a is a Branch Office) N/A 6b. TELEPHONE NUMBER
808-941-0577
6c. E-MAIL ADDRESS info@rhacm.com
8a. FORMER FIRM NAME(S) (If any) 8b. YR. ESTABLISHED 8c: DUNS NUMBER
N/A N/A N/A
9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS
a. Func-tion Code b. Discipline c. No. of Employees a. Profile Code b. Experience c. Revenue In-dex Number (see below) (1) Firm (2) Branch
06 Architect 1 E03 Electrical Studies &
Design 2
21 Electrical Engineer 2
P12 Power Generator,
Transmission,
Distribution
4
16 Construction Manager 2
H11 Housing (Residential,
Multi-Family;
Apartments; Condos)
2
12 Civil Engineer 1 W03 Water Supply;
Treatment & Disposal 3
15 Construction Inspectors 10 S04 Sewage Collection;
Treatment & Disposal 4
A06 Airports; Terminals &
Hangars; Freight
Handling
2
H01 Harbors; Jetties; Piers,
Ship Terminal Facilities 3
Other Employees
Total 17
11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right)
PROFESSIONAL SERVICES REVENUE INDEX NUMBER
1. Less than $100,000 2. $100,00 to less than $250,000 3. $250,000 to less than $500,000 4. $500,000 to less than $1 million 5. $1 million to less than $2 million
6. $2 million to less than $5 million 7. $5 million to less than $10 million 8. $10 million to less than $25 million 9. $25 million to less than $50 million 10. $50 million or greater
a. Federal Work 2
b. Non-Federal Work 4
c. Total Work 5
12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts.
a. SIGNATURE b. DATE June 30, 2024
c. NAME AND TITLE
Brian Sekiguchi, CCM, President
Licenses
General License
Other Business/Person/DBA Names
Employees List
Employees
License ID
PE-13142
License Type
PROFESSIONAL ENGINEER
Legal License Name
MICHAEL P YOUNG
Status
CURRENT, VALID & IN GOOD STANDING
Entity Type
INDIVIDUAL
Active/Inactive
ACTIVE
Original License Date
11/10/2008
Expiration Date
04/30/2026
Restriction
--
Trade/Professional Name
--
Special Privilege
--
Conditions & Limitations
--
Class Prefix
--
Business Code
--
Educational Code
--
Business Address
--
Search:Filter...Records Per Page Columns to Show
Showing 0 to 0 of 0 entries
Name Effective Date Termination Date
NO DATA AVAILABLE IN TABLE
Previous Next
Show entries10
MyPVL
DCCA Professional Vocational Licensing
We are currently experiencing a high volume of users on this site resulting in unusually slow lag times.
We apologize and appreciate your patience as we work on resolving this issue. Please try again later.
General License
Other Business/Person/DBA Names
License ID
PE-10031
License Type
PROFESSIONAL ENGINEER
Legal License Name
STEVEN K L CHUNG
Status
CURRENT, VALID & IN GOOD STANDING
Entity Type
INDIVIDUAL
Active/Inactive
ACTIVE
Original License Date
07/19/2000
Expiration Date
04/30/2026
Restriction
--
Trade/Professional Name
--
Special Privilege
--
Conditions & Limitations
--
Class Prefix
--
Business Code
--
Educational Code
--
Business Address
--
Search:Filter...Records Per Page Columns to Show
Showing 0 to 0 of 0 entries
Name Effective Date Termination Date
NO DATA AVAILABLE IN TABLE
Previous Next
Feedback More
CLASSES (ACTIVE): CE Civil
BRAD P TAKENAKA
98-2034 KIPIKUA STREET
AIEA, HI 96701
CLASS(ES): CE CIVIL
PROFESSIONAL ENGINEER
STATE OF HAWAII DEPARTMENT OF COMMERCE AND CONSUMER AFFAIRS
Expiration date
4/30/2026
License Number
PE-15760
PROFESSIONAL ENGINEER
THIS POCKET ID CARD IDENTIFIES YOU TO THE PUBLIC AS BEING CURRENTLYNOTICE
LICENSED AND SHOULD BE KEPT IN YOUR POSSESSION AT ALL TIMES.
_____________________________________________
SIGNATURE OF LICENSEE
PE-15760
BRAD P TAKENAKA
98-2034 KIPIKUA STREET
AIEA, HI 96701
APPENDIX:
Company Brochure
Full-Service Professional Project
and Construction Management,
Inspection, and Supervision RHACM.COM
CONSTRUCTION
AND PROJECT
MANAGEMENT
WHO WE ARE
RHA Construction Management Group, LLC is a wholly owned
subsidiary of RHA Holdings and sister company to Ronald N.S. Ho &
Associates, Hawaii’s largest pure electrical engineering firm. We are
a service-oriented firm that delivers high-quality, cost-effective and
timely projects for our clients. Quality assurance and adhering to
schedules are important objectives for our staff.
In 2016, RHA Construction Management Group was created at
the request of our clients to provide professional construction
management and inspection services for electrical and
telecommunication projects.
PROJECT TYPES
Structures
• Educational Facilities
• Commercial Office and Retail
• Residential
• Hotels and Resorts
• Hospitals and Healthcare Facilities
Building Systems
• Power Distribution
• Emergency Power
• Fire Alarm
• Telecommunications
• Security
• Metering
• Data and Control
Exterior Lighting Systems
• Highways and Street Lighting
Systems
• Sports Facilities
• Recreational Playcourt, Ballfield
and Walkways
• Parking Lots and Structures
Water and Wastewater
• Deep Well and Booster Pumping
Facilities
• Treatment Facilities
• Controls and Instrumentation Site Development
• Power Distribution Systems
• Emergency Power Distribution
Systems
• Telecommunication Distribution
Systems
• Emergency Generation SystemsWe are an experienced team of
construction and project managers,
inspectors, and engineers with an
expanded capabilities of construction
and project management services.
Our market sectors include
commercial facilities, water
distribution facilities, government,
educational facilities, infrastructure
and transportation. Over the past 7
years, our team has overseen over
$500 million of contruction activity
throughout the state, including
wastewater systems, electrical
utilities, security and communication
systems, PV installations, etc.
With an experienced team of construction and project managers, inspectors, and
engineers, we provide construction and project management services for federal, state
and city government agencies and private clients. Our markets include commercial
facilities, water distribution facilities, government, educational facilities, infrastructure
and transportation.
EXPERIENCED & TASK-DRIVEN
EXPERIENCED PROFESSIONALS
Our construction management team averages
20 years of diverse construction and facility
management, real estate development, and
redevelopment and renovation experience.
Embodying an “owner’s mentality,” our CM
professionals undertake full responsibility for
the oversight and management of the entire
construction process, from construction kick-
off to project acceptance.
WE MEET DEADLINES
Serving as the single point of contact for our
clients, our team ensures that its projects are
completed on time and within budget while
minimizing risk.
ATTENTION TO DETAIL
We maintain the highest levels of
communication with the latest technology to
ensure the successful execution of any project,
regardless of size or complexity.
OUR APPROACH
Our approach allows our clients to focus on
their core business and strategies in order
for them to maximize their land-based assets
while continuing to improve their facilities and
infrastructure.
"The installation of the Energy Conservation Measures (ECMs) at various Board of Water Supply facilities have been positively received by the Board of Water Supply. This highly complex and leading-edge project required strategic and diligent planning for the extensive work done simultaneously at various sites. RHA CM was able to overcome the challenges and provide superb oversight and inspection by a team of qualified personnel to achieve these objectives. Job well done!"
~ Sandy Nahoopii-Song
Civil Engineer VI
Board of Water Supply
CASE STUDY
In 2016, the Honolulu Board of Water Supply (HBWS) awarded RHA CM a three-year construction management contract to
lead the coordination of work for their $33 million Energy Savings Performance Contract (ESPC). This was the first ESPC to be
awarded by a county water utility in Hawaii. The ESPC will facilitate and accelerate energy conservation measures (ECMs) to
achieve energy efficiencies and develop renewable energy to directly support the State of Hawaii’s goal to achieve 100 percent
of electricity generation from renewable energy by 2045.
Part of the challenge for RHA CM involved ramping up quickly with the necessary resources to oversee the construction for
several ongoing projects, including a lighting retrofit, power factor correction retrofit, rider M/TOU pump control, well pump
controls, and photovoltaic systems NEM projects at numerous HBWS locations and facilities with both day and nite work
schedules. RHA CM rapidly staffed up with qualified personnel to achieve these objectives.
RHA CM also provided an onsite physical presence at all times concurrent with any contractor activity while also providing all
necessary off-site support requirements such as office space, furniture, equipment, communications, and internet access to
enable staff to perform the required services.
2022 CMAA PROJECT ACHIEVEMENT AWARD WINNER
Category:
Water/Wastewater/Utility
Construction value greater
than $50 Million
“The ECMs that are being installed at
various HBWS facilities will reduce the
agency’s annual electrical usage by
approximately 8 million kilowatt hours
(kWh), or nine percent of the HBWS’s total
purchased electricity costs.
In maintaining the highest levels of
communication and oversight, RHA CM
helped to ensure that the HBWS’s primary
mission to provide clean drinking water
and supporting operational services to the
general public were never compromised.
HONOLULU BOARD OF WATER SUPPLY
CONSTRUCTION MANAGEMENT PROJECTS
Our services include but are not limited to:
• Planning
• Scheduling
• Budgeting
• Bid Packaging
• Contract Management
• Project Management
• Construction Management and Inspection
• LEED Advisory
• Tenant Coordination
• Project Closeout
• Commissioning
Here is a list of projects that we have provided professional construction management and
inspection services for public agencies and private industries across the State of Hawaii.
HBWS - Construction Management, Engineering and Inspection Services
HBWS Various Roofing Projects
1411 South King Street New Electrical Services
JBPHH P-704 Sewer Lift Station and Relief Sewer Lines
HBWS Emergency Generators at Kalihi, Halawa and Kunia
Ray & Joan Kroc Corps Community Center Energy Efficiency Projects List
Honolulu City Hall Fire Alarm System Improvements
Kulani Correctional Facility Potable Water Supply
Sand Island Wastewater
Punahou School Energy Efficiency Projects
Honolulu Joint Traffic Management Center
Hawaii Gas SNG Facility Above Ground Storage Tank
Young Brothers
2153 North King Street Commercial Building Energy Efficiency Improvements
HECO Kahe-Halawa/Kahe-Waiau 138 kV Replacement
HBWS Beretania Array
(808) 941-0577
info@rhacm.com
2153 N. King Street, Suite 201
Honolulu, HI 96819
RHACM.COM
CONTACT US