Loading...
HomeMy WebLinkAboutGCH Planning & Landscape Architecture - OH.1 Community Planning (Community Engagement, Strategic Planning)Geyer Coburn Hutchins LLC +1 206 285 4422 www.gchsite.com GCHgeyer coburn hutchins Professional Services Request for Qualifications Community Planning Services Fiscal Year 2025-2026 Prepared for the County of Hawai’i Office of Housing and Community Development July, 2025 1Community Planning Services - Statement of Qualifications Hawaii County - FY 25-26 Letter of Interest Ms. Kehaulani M. Costa, Administrator Housing and Community Development, County of Hawai‘i 1990 Kino‘ole Street, Suite 102 Hilo, Hawai‘i 96720 808-961-8379 ohcdprofserv@hawaiicounty.gov OH.1 | COmmunity PLanning (COmmunity EngagEmEnt and StratEgiC PLanning) Thank you for allowing Geyer Coburn Hutchins (GCH) to submit our professional landscape architectural service qualifications for the 2025-2026 Fiscal Year. As a general introduction to our firm, GCH is a award-winning landscape architecture and planning office who originated in Honolulu before relocating our offices to Seattle, Washington. We strive to create places that are socially equitable, embrace the complex challenges that our contemporary built environment requires, provide lasting value to our clients and the community, and thoughtfully incorporate stakeholder concerns and aspirations into the final solution. As a small business we rely on our relationships and reputation for work, so we aim to be consistent, responsive, and communicative to all our clients. We also have an ability to be agile and quickly respond to our client’s needs, moving staff and adjusting workflows to suit the specific circumstances of clients’ and projects’ ever changing needs. We have collaborated with communities, municipalities, engineers, artists, architects, developers, and individuals to create places that serve and elevate the stakeholder’s goals. No matter the client, GCH always strives to ensure creative, constructible, and on-budget solutions to unique, complex, and varied design challenges. It our belief that the no matter the particulars of the project you may present to us, the following elements will likely be a focus to its success: • Equitable use: A public space is a real opportunity to be welcoming and should be designed in a way that makes everyone feel comfortable. • Flexibility in use: It is critical that open space in a public setting be able to accommodate a number of different activities to maximize its use. • Safety and Environment: This is a pressing concern for any public space. We prefer to use CPTED principals to creating a site that is open, welcoming, and also safe. If you have any questions related to the content of this SOQ please do not hesitate to reach out. I would be honored to discuss our work, design philosophy, and approach further with you. Respectfully Submitted, GCH Planning & Landscape Architecture Jerry Coburn, PLA, ASLA Principal Geyer Coburn Hutchins LLC 2Community Planning Services - Statement of Qualifications Hawaii County - FY 25-26 Executive Summary Geyer Coburn Hutchins (GCH) is a planning and landscape architecture firm, originally founded as a Hawaiian corporation. The founding partners met and worked together at Belt Collins in Honolulu from the late 1980s until 1997, when they relocated to Seattle, Washington; ultimately acquiring their division and formally rebranding as GCH. Our portfolio encompasses a diverse range of projects, including recreation, open space, hospitality, urban design, and community planning. Having its origins in Hawaii, GCH possesses an in-depth understanding of the distinct characteristics of the Hawaiian Islands, including their unique climates, industries, and culture. Our team also worked closely with various industry professionals and institutional organizations in the testing and trials to establish which hardy and native plant materials are most appropriate for use throughout the islands. For over two decades, GCH has provided innovative, environmentally sensitive, and iconic design solutions in more than forty countries worldwide. Our firm’s approach is informed by a deep respect for each project’s individual context, with particular attention to the unique challenges and attributes of the site. GCH’s commitment to excellence extends from the early project analysis, through established design phases, and ultimately through the construction observation process, ensuring the delivery of high- quality projects that align with our client’s aspirations. GCH adheres to a holistic approach throughout all phases of planning and landscape design. This approach involves a meticulous analysis of both short and long-term goals; integrating the physical, environmental, social, cultural, and economic elements crucial for a project’s success. We are unwavering in our commitment to delivering designs that integrate creativity, sustainability, and practicality; always prioritizing environmentally responsible solutions that are both innovative and feasible. At the core of GCH’s process is comprehensive site analysis and robust collaboration with our clients and the larger design team. It is only through the alignment of site-specific characteristics, various stake-holder perspectives, and the client’s objectives and capabilities, that we are able to derive the most fitting and enduring design solutions. We also maintain a hands-on approach throughout project construction, ensuring that the principles and vision of the design are meticulously executed into the final built environment. Ultimately, GCH measures its success not only by the completion of its projects, but by the satisfaction and trust of its clients. We strive for excellence in every aspect of our work, consistently exceeding expectations and delivering impactful spaces that stand the test of time. Firm Contact Information Firm Profile Information Major Contracts - 2024 Geyer Coburn Hutchins LLC6101 22nd Avenue Northwest Seattle, Washington 98107 Contact: Jerry Coburn(206) 285 4422 gch@gchsite.com Year Founded: 1997 Years in Business: 28 Office Locations: 1, Seattle Employee Count: < 10 QuIL CEda VILLaGE Tulalip, Washington Resort Expansion and Community Village Master Plan 338 acres MC GatEway CoMMunIty Walla Walla, Washington Community Master Plan 357 acres SouL RESoRt CoMMunIty El Dabaa, Egypt Resort Community Master Plan 517 acres okanaGan EStatES Okanagan, Washington Community Master Plan 230 acres 3Community Planning Services - Statement of Qualifications Hawaii County - FY 25-26 Project References PaRk at PaRk StREEt City of Chelan - Parks & Recreation Paul Horne - (509) 682 8015 Scope: Landscape Architecture Project Features: Municipal park, shoreline setting, universally accessible site, community focused tEHaLEH Brookfield Development Tammy Braun - (253) 275 3361 Scope: Community Planning, Landscape Architecture Project Features: Universally accessible site, play areas, public involvement, community focused, multiple uses tHE Lookout Chelan Lookout Ted Schroth - (509) 682 0885 Scope: Community Planning, Landscape Architecture Project Features: Open play, universally accessible site, community focused, multiple uses LakEPoIntE uRban VILLaGE Brookfield Development Marita Benedict - (253) 275 3357 Scope: Design Guidelines, Landscape Architecture Project Features: Community focused, universally accessible site RoCky Pond RESoRt Rocky Pond Hospitality Ventures LLC David Dufenhorst - (206) 458 9119 Scope: Community Planning, Landscape Architecture Project Features: Shoreline setting, community focused, universally accessible, play areas, multi-use areas HIGHLand FaRMS Selland Construction Charley Underwood - (509) 662 7119 Scope: Community Planning, Landscape Architecture Project Features: Community focused, play areas, multi-use areas 4Community Planning Services - Statement of Qualifications Hawaii County - FY 25-26 Project approach and Methodology The following is a standard approach to GCH projects: CooRdInatIon and CoLLaboRatIon Collaboration is at the heart of GCH’s design practice and reflects our commitment to ensuring all stakeholders, including the owner, extended consultant team, and other professionals or governing agencies the owner deems appropriate, are involved throughout the design process. We believe a thoughtful and methodical process involving this extended group ensures that all options and possibilities for design solutions are fully vetted. This process allows for the best solutions, given the unique circumstances of every project, to rise to the top. Coordination and open communication among each professional discipline, the County of Hawai’i, and additional stakeholders or representatives identified, will be crucial for the success of the project. The scheduling and implementation of various services, the exploration of program elements, the visioning of the site, and the prioritization of the needs of the community will be required of all of us involved. All of our team members understand that without this crucial element to the design process, the project cannot succeed. anaLySIS The first step for our team would be to conduct a site analysis of existing conditions both on and off site, and review all existing documents and reports to better understand site opportunities and constraints. As part of the analysis we would also look at adjacent properties and their connections to the site. The analysis information would be documented graphically for review with stakeholders. The creation of a site survey will be crucial for this stage and the resulting drawings will be paramount to the creation of the design going forward. The goal of the analysis is to understand the site; its constraints, assets, and potentials. It will also give the design team an insight into the prior approaches to the site that have failed. MaStER PLannInG PRoCESS In the Master Planning process, GCH’s planning team exhaustively considers all potential options for the property through a series of interactive meetings with the owner and their extended team. All relevant planning and budgetary criteria are considered through this process, always seeking to find the highest value and optimal utilization of a property given this information. Multiple submittals are typically presented until the owner selects a preferred option. 5Community Planning Services - Statement of Qualifications Hawaii County - FY 25-26 Project approach and Methodology Once the preferred option is selected GCH develops this option to the desired degree of detail that the Owner requires for the specifics of each project. LandSCaPE aRCHItECt PRoCESS In the Landscape Architectural process our team goes through a methodical process of discovery, development, and implementation to ensure the highest quality project is realized. All relevant physical, environmental, governmental, market driven, and budget elements are creatively and technically considered through the design process. Typically GCH’s design stages are as follows depending on the owner’s requirements for each project: • Conceptual Design: Flushing out of initial goals and establishing a vision for the project. • Schematic Design: Elaboration and further detailing of the project’s goals and vision. • Design Development: Further detailing of approved project direction. • Construction Documentation: Final detailing of project for construction. • Services During Construction: Assisting the owner with matters related to the landscape bidding and construction. QuaLIty aSSuRanCE and ContRoL While ISO Certification for Quality Assurance is not typical as a disciplinary practice in our region, GCH places major emphasis on our in-house Quality Assurance/Quality Control (QA/QC) program that adheres to the highest standards of landscape discipline protocols. The objective of our internal quality control review process is to identify conflicts, to ask questions, and to raise issues regarding design features that have the potential to present a future problem. It is the policy of GCH that no professional design document for a project shall be distributed until its contents have been reviewed and approved in accordance with our QA/QC processes. All GCH project managers and staff work together to ensure that the adequacy, suitability, and quality of our work meets or exceeds the highest level of industry standards. 6Community Planning Services - Statement of Qualifications Hawaii County - FY 25-26 key Staff Murray has extensive experience creating unique and successful communities and community centers throughout the world, from small 10-acre mixed-income neighborhoods to large 4,000-acre towns. A recent notable project of Murray’s includes the planning of a 260 acre reclaimed waterfront hazardous site in DuPont to create an urban village that compliments the city’s existing character. Boo has successfully led a variety of project types from the early design phases through to construction. Recent project include the creation of new community amenities for Rocky Pond Resort, including new parks, street fronts, and a community pool for the lakefront development; and working with a local Seattle shipyard owner on a revisioning of their dock facilities into a rejuvenation hub for maritime visitors and a new gateway jewel for the community. Boo Y. Jang, PLA Role: Principal Experience: 18 years / GS-9 Robey Willis Role: Project Manager Experience: 21 years / GS-7 Murray Hutchins Role: Principal Experience: 35 years / GS-9 Jerry Coburn, PLA, ASLA Role: Principal Experience: 37 years / GS-9 Jerry has worked with many municipalities and private developers across the US to landscape architecture projects for thriving communities. These notably include the Park at Park Street for the City of Chelan, turning a small lakefront area into a charming street-end park with community amenities and improved water access; and Discovery Park at Tehaleh for Brookfield Properties, a 20 acre STEAM focused community park which was awarded the 2023 Award of Excellence by the Washington chapter of the American Society of Landscape Architects. Robey has worked on destination, recreation, and mixed-use community planning projects throughout the US and the world. He has overseen large scale regional planning studies ranging from a few hundred acres to several hundred square miles, as well as the landscape design of many exclusive hotels, resorts, and residential communities. Recently Robey has been working with a major MENA area developer on the master planning of several destination resort communities in the Persian Gulf, Red Sea, and Mediterranean Sea. 7Community Planning Services - Statement of Qualifications Hawaii County - FY 25-26 GCHgeyer coburn hutchins Murray Hutchins Principal 35 years experience / GS-9 key Staff Resumes geyer Coburn Hutchins, Seattle, Washington Principal Lmn architects, Seattle, Washington Design Consultant EdaW inc, Seattle, Washington Design Consultant Belt Collins, Honolulu, Hawaii Planner Ecosign mountain resort Planners, Whistler, Canada Planner university of Washington Master of Architecture university of guelph Graduate Studies in Planning university of guelph Bachelor of Landscape Architecture experience education selected projects murray Hutchins is a partner with GCH and has worked in the mixed use, residential community and resort planning field for over thirty years with projects throughout North America and the world. He is formally educated in land planning, architecture and landscape architecture, combining these complementary skills with a comprehensive approach to planning and problem solving. Murray has also lead charettes focusing on sustainability and eco-tourism as well as integration of communities within environmentally and culturally sensitive areas. Semiahmoo Spit Blaine, Washington GCH was involved in the reimagining and integration of the existing Semiahmoo Spit and the Inn at Semiahmoo into a residential and retail village. This rare piece of land contains approx. 3,000 linear feet of prime waterfront property and potential links to the city of Blaine directly across the water. Soul resport Community El Dabaa, Egypt GCH has been working on Egypt’s idyllic North Coast of the Mediterranean Sea providing master planning for the extraordinary, “Soul” destination. Working alongside the Emaar Misr/Eagle Hills team, the group has envisioned a destination of unsurpassed elegance, innovation and sustainability throughout the region. The EcoLuxe destination includes more than 20 kilometers of water frontage and 1.5 kilometers of sandy coastline. mC gateway Community Walla Walla, Washington This community program includes single family and town homes, resort hotel with amenities, and a commercial zone including winery, event spaces, and retail. The community will be integrated with 145 acres of public open space, including parks, nature preserve, vineyards, recreation, amenities, and trails. Bellingham Sculpture garden Bellingham, Washington GCH has been the planner and landscape architect for a private sculpture park and retreat. The project includes varies art-walks and nature trails, art installations, 3,000 sf studio, chefs’ kitchen and garden, wildflower nursery and events cabin. The ongoing landscape design also includes creation and restoration of river, forest and meadow habitats. 8Community Planning Services - Statement of Qualifications Hawaii County - FY 25-26 GCHgeyer coburn hutchins Robey Willis Project Manager 21 years experience / GS-7 key Staff Resumes geyer Coburn Hutchins, Seattle, Washington Project Manager r. m. towill Corporation, Honolulu, Hawaii Landscape Architect university of Washington Bachelor of Landscape Architecture experience education Old Fort Lake mixed-use Community DuPont, Washington This comprehensive planning project involving the analysis and design of a 260 acre piece of land in the city of DuPont. The project owner is currently working with the Department of Ecology and Attorney General to cleanup and reclaim the hazardous site that surrounds Old Fort Lake, much of The Home Course golf course, and abuts Nisqually tribal lands. tehaleh Pierce County, Washington This comprehensive planning process involved integration of all aspects for a new community from the ground up, including 9,000 residential units, business parks, schools, neighborhood retail and civic centers, parks and trail systems, transportation, etc. Chambers Bay Community Steilacoom, Washington The Chambers Bay Community development plan is based on a diverse and complimentary mix of uses. The intent is to create a place with a broad blend of residents and visitors to activate the public places through various times of the day and year. Materials, style and facade treatment are intended to be unifying factors in knitting the collective identity together. Strong connections to the site’s heritage, hillside, forests, stream and Chambers Bay are expressed in the site planning and design. Chelan Bay Community Chelan, Washington GCH developed a master plan and subsequent landscape architectural design for Chelan Bay. The project includes 12 exclusive waterfront properties on Lake Chelan, a commercial area, and a public park. Community amenities include water access, docks, public beach, and a linear public park. selected projects robey Willis is a project manager at Geyer Coburn Hutchins with wide experience working on projects throughout the world. His collaborative approach to all aspects of design and management ensures success in a range of projects including urban design, neighborhood planning, recreational and commercial projects. With every design he strives to develop site specific design solutions that emphasize the uniqueness of each project. 9Community Planning Services - Statement of Qualifications Hawaii County - FY 25-26 GCHgeyer coburn hutchins Jerry Coburn Principal 37 years experience / GS-9 PLA, ASLA key Staff Resumes geyer Coburn Hutchins, Seattle, Washington Principal Belt Collins, Honolulu, Hawaii Project Landscape Architect Oy m&SF design Partnership, taipei, taiwan Project Landscape Architect maisema ja Suunnittelu, Helsinki, Finland Design Landscape Architect Jerry Coburn is a founding partner of GCH and has helped to shape the vision of the firm since its inception. With over three decades of planning and landscape architectural experience, Jerry has been fortunate enough to work on a large variety of project types from large scale master planning to detailed landscape architectural design. Jerry has also been involved with the long range visioning and design for community and recreational developments adjacent to coastal and environmentally sensitive areas. Harvard graduate School of design Master of Design California Polytechnic State university Bachelor of Science in Landscape Architecture Professional Landscape Architect - Licensed in Hawaii, Washington, Oregon, and Colorado Member - American Society of Landscape Architects experience education licenses and registrations Kohala ranch residence Kamuela, Hawai’i GCH worked with the property owner and architect on the landscape design surrounding an addition to the existing home. The project involved the transition from an existing tennis court into a pickle ball court with new surrounding landscape, new site lighting, and new landscape plantings for the areas of disturbance. Park at Park Street Chelan, Washington The Park at Park Street proposed a redevelopment of a City-ownded right-of- way adjacent to the lake, and turning it into a charming public park. The project involves the removal of the existing asphalt and curbs at the high water mark and creating a beach front style shoreline instead, as well as installation of native plants and new site amenities. discovery Park at tehaleh Pierce County, Washington Discovery Park is a 19 acre open space located in the central portion of the Tehaleh Phase 1 community. The park design includes a comprehensive list of amenities that were gathered through community engagement efforts and serves as the primary stormwater facility for the Tehaleh community. Discovery Park was awarded the 2023 Award of Excellence by the WASLA. Chambers Bay University Place, Washington The Chambers Bay Golf Course, Soundview Trail, Central Meadow Park and North Meadow Park sit on two miles of uninterrupted Puget Sound shoreline. Immense concrete mining relics are strategically incorporated into the design creating an exciting contrast between the soft green of the turf and the rough grey of the industrial structures. selected projects 10Community Planning Services - Statement of Qualifications Hawaii County - FY 25-26 GCHgeyer coburn hutchins Boo Y. Jang Principal 17 years experience / / GS-9 PLA key Staff Resumes geyer Coburn Hutchins, Seattle, Washington Principal rhodeswork design Studio, Seattle, Washington Landscape Consultant Bennitt design group, Long Beach, California Senior Associate/Project Manager university of Washington Master of Landscape Architecture Otis College of art and design Bachelor of Fine Arts in Architecture, Landscape and Interiors Professional Landscape Architect - Licensed in Washington, pursuing in California experience education licenses and registrations Private residence Maui, Hawai’i GCH worked with the new owners of a private hillside home in Maui to refresh the property. The new design maximizes the property views, enlarges the home’s existing lanai, refreshes the plant pallette, and creates multiple areas for secluded relaxation. The design also includes new access pathways, outdoor kitchen and dining area, and new sports courts. the Lookout at Lake Chelan Chelan, Washington Located on the southern shore of Lake Chelan, “The Lookout” development provides breathtaking views of the adjacent clear blue water and sandy beaches. The goal of this mixed-use residential project is to create a unique environment that fosters a strong sense of community. rocky Pond Orondo, Washington Rocky Pond Resort is located in Eastern Washington along the Columbia River. GCH has assisted with the overall master plan for the entire property and the landscape design for exterior amenities. The Upper Pool is sited to take advantage of territorial views on the property. The pool facility includes private cabanas, chaise lounge seating, fire pits, a spa, outdoor showers and a bocce court. Crescent ridge resort Grant County, Washington GCH worked on the development of several new communities for Crescent Ridge Resort, including the recently available The Ranch, The View, and The Vineyards. New resort amenities include pools, pickleball courts, parks, open spaces, a community center, vineyards, a wine bar, trails, and an outdoor music venue. selected projects Boo y. Jang is a principal at GCH with wide experience working on projects throughout the western US and the world. Her collaborative approach to all aspects of design and management ensures success in a range of projects, including multi-family and mixed-use housing, corporate office parks, public plazas and recreational and resort planning. Boo’s attention to site specific issues ensures thorough and unique design solutions for each project on which she works. GCHgeyer coburn hutchins Professional Services Request for Qualifications Appendix A - DPW 120 Geyer Coburn Hutchins LLC +1 206 285 4422 www.gchsite.com Community Planning Services Fiscal Year 2025-2026 DPW FORM 120 (Rev. 6/99) STATE OF HAWAIIDEPARTMENT OF ACCOUNTING AND GENERAL SERVICES QUESTIONNAIRE FOR ARCHITECTS, ENGINEERS AND OTHER PROFESSIONAL SERVICESQUESTIONNAIRE FOR: (LIST DISCIPLINE) OTHER QUESTIONNAIRES SUBMITTED: (LIST DISCIPLINES) DATEFIRM NAMEESTABLISHEDYEAR STATETYPE OF ORGANIZATION (Underline)INDIVIDUAL PARTNERSHIP CORPORATION JOINT VENTURE OTHERBUSINESS ADDRESS, TELEPHONE & FAX NO. OF HAWAII OFFICE AGE OF FIRM FEDERAL ID NO. YEARSESTABLISHED IN HAWAIIPRINCIPALS OF FIRM: (NAMES) ASSOCIATE MEMBERS OF FIRM: (NAMES)PRESENT BRANCH OFFICE(s): (ADDRESS, TELEPHONE & FAX NO.) PERSON IN CHARGE: (NAMES)NUMBER OF PERSONNEL IN YOUR PRESENT ORGANIZATIONLOCATEDATPRINCIPALS & KEYPERSONNELOTHER PERSONNELTOTALArchitectEngineerOthersArchitectEngineersDraftsmenSpec.WriterEstimatorInspectorSurveyorBalanceMech.ElectriCivilOthers HOME OFFICEBRANCH IN TOTALTECHNICAL PERSONNEL:NUMBER OF PERSONNEL WITH HAWAII LICENSESNUMBER OF PERSONNEL WITHOUT HAWAII LICENSESPage 1 of 9Page 1 of 11OH.1 - COMMUNITY PLANNING PL.4 - COMMUNITY PLANNINGPW.8 - LANDSCAPE ARCHITECTUREPW.8 - LANDSCAPE ARCHITECTURE - GOLF LANDSCAPE DESIGN07/2025GEYER COBURN HUTCHINS LLC1997 HI28 99-0347964JERRY COBURNMURRAY HUTCHINSBOO Y. JANG6101 22ND AVE NW SEATTLE, WA 98107 (206) 285 4422 JERRY COBURN211482114817 DPW FORM 120 (Rev. 6/99) PERSONAL HISTORY STATEMENT OF PRINCIPALS AND ASSOCIATES WITHIN YOUR FIRMNAME RESIDENT OF NAME RESIDENTTITLETITLEYEARS OF EXPERIENCEAS PRINCIPALIN THIS FIRMAS PRINCIPALIN OTHER FIRMSOTHER THANPRINCIPALYEARS OFEXPERIENCEAS PRINCIPALIN THIS FIRMAS PRINCIPAL IN OTHER FIRMSOTHER THAN PRINCIPALEDUCATION (COLLEGE, DEGREE, YEAR, SPECIALIZATION) EDUCATION (COLLEGE, DEGREE, YEAR, SPECIALIZATION)MEMBERSHIP IN PROFESSIONAL ORGANIZATIONS MEMBERSHIP IN PROFESSIONAL ORGANIZATIONSREGISTRATION (TYPE, YEAR, STATE) REGISTRATION (TYPE, YEAR, STATE)NAME RESIDENT OF NAME RESIDENT OFTITLETITLEYEARS OFEXPERIENCEAS PRINCIPALIN THIS FIRMAS PRINCIPAL INOTHER FIRMSOTHER THAN PRINCIPALYEARS OF EXPERIENCEAS PRINCIPALIN THIS FIRMAS PRINCIPAL IN OTHER FIRMSOTHER THAN PRINCIPALEDUCATION (COLLEGE, DEGREE, YEAR, SPECIALIZATION) EDUCATION (COLLEGE, DEGREE, YEAR, SPECIALIZATION)MEMBERSHIP IN PROFESSIONAL ORGANIZATIONS MEMBERSHIP IN PROFESSIONAL ORGANIZATIONSREGISTRATION (TYPE, YEAR, STATE) REGISTRATION (TYPE, YEAR, STATE) Page 2 of 9Page 2 of 11JERRY COBURN WASHINGTON MURRAY HUTCHINS WASHINGTONFOUNDING PRINCIPAL FOUNDING PRINCIPAL37 28 0 11 35 28 0 7HARVARD GRADUATE SCHOOL OF DESIGN, MASTER OF DESIGN,1998, LANDSCAPE ARCHITECTUREUNIVERSITY OF WASHINGTON, MASTER OF SCIENCE1997, ARCHITECTUREAMERICAN SOCIETY OF LANDSCAPE ARCHITECTSPLA, 2002, HI PLA, 2002, WA PLA, 2019, OR PLA, 2022, COBOO Y. JANG WASHINGTONPRINCIPAL174013UNIVERSITY OF WASHINGTON, MASTER OF SCIENCE2018, LANDSCAPE ARCHITECTUREPLA, 2023, WA DPW Form 120 (Rev. 6/99) PERSONAL HISTORY STATEMENT OF TECHNICAL PERSONNEL WITHIN YOUR FIRMNAME STATUS (Underline)Full-Time Part-TimeNAMESTATUS (Underline)Full-Time Part-TimeTITLE OR POSITIONYEARS OF EXPERIENCE TITLE OR POSITION YEARS OF EXPERIENCEWITH THIS FIRM WITH LAST FIRM(NAME & NO. OF YEARS)WITH OTHER FIRMSWITH THIS FIRMWITH LAST FIRM(NAME & NO. OF YEARS)WITH OTHER FIRMSEDUCATION (COLLEGE, DEGREE, YEAR, SPECIALIZATION)EDUCATION (COLLEGE, DEGREE, YEAR, SPECIALIZATION)REGISTRATION (TYPE, YEAR, STATE)REGISTRATION (TYPE, YEAR, STATE)NAME STATUS (Underline)Full-Time Part-TimeNAME STATUS (Underline)Full-Time Part-TimeTITLE OR POSITION YEARS OF EXPERIENCE TITLE OR POSITION YEARS OF EXPERIENCEWITH THIS FIRMWITH LAST FIRM(NAME & NO. OF YEARS)WITH OTHER FIRMS WITH THIS FIRM WITH LAST FIRM(NAME & NO. OF YEARS)WITH OTHER FIRMSEDUCATION (COLLEGE, DEGREE, YEAR, SPECIALIZATION)EDUCATION (COLLEGE, DEGREE, YEAR, SPECIALIZATION)REGISTRATION (TYPE, YEAR, STATE)REGISTRATION (TYPE, YEAR, STATE)NAME STATUS (Underline)Full-Time Part-TimeNAME STATUS (Underline)Full-Time Part-TimeTITLE OR POSITIONYEARS OF EXPERIENCE TITLE OR POSITIONYEARS OF EXPERIENCEWITH THIS FIRM WITH LAST FIRM(NAME & NO. OF YEARS)WITH OTHER FIRMS WITH THIS FIRMWITH LAST FIRM(NAME & NO. OF YEARS)WITH OTHER FIRMSEDUCATION (COLLEGE, DEGREE, YEAR, SPECIALIZATION) EDUCATION (COLLEGE, DEGREE, YEAR, SPECIALIZATION)REGISTRATION (TYPE, YEAR, STATE) REGISTRATION (TYPE, YEAR, STATE)Page 3 of 9Page 3 of 11RICHARD EVERINGHAMROBEY WILLISDESIGN COORDINATOR32 PROJECT MANAGER 2125BELT COLLINS, 4320R. M. TOWILL CORP., 10MARCUS OLDHAM COLLEGE, BACHELOR OF AGRICULTURAL MANAGE., 1992UNIVERSITY OF WASHINGTON, BACHELOR OF LANDSCAPE ARCH., 2004CHIH-PING (KAREN) CHEN SU LILANDSCAPE ARCHITECT 9 LANDSCAPE DESIGNER 27LOTUS LANDSCAPE DESIGN, 201LANDDESIGN 10UNIVERSITY OF WASHINGTON, MASTER OF LANDSCAPE ARCH., 2016UNIVERSITY OF WASHINGTON, MASTER OF LANDSCAPE ARCH., 2023PLA, 2023, WA DPW FORM 120 (Rev. 6/99) OUTSIDE ASSOCIATES AND CONSULTANTS USUALLY EMPLOYED DISCIPLINENAME OF FIRM OR INDIVIDUALDISCIPLINENAME OF FIRM OR INDIVIDUALERRORS AND OMISSIONS INSURANCEDOES YOUR FIRM HAVE ERRORS & OMISSION (E&O) INSURANCE? (Underline)AMOUNT OF COVERAGEPER CLAIMAMOUNT OF DEDUCTIBLEYES NO PROJECT INSURANCE $ $ Submit proof of insurance or insurability from your insurance carrier with this form. Page 4 of 9 Page 4 of 112,000,000.00 10,000.00 DPW FORM 120 Rev. 6/99) SUMMARY OF YOUR FIRM’S COMPLETED AND PRESENT PROJECTS DURING THE LAST TEN YEARSAS A PRIME A/E CONSULTANTTOTAL NUMBER OF COMPLETED PROJECTSTOTAL ESTIMATED CONSTRUCTION COST OF COMPLETED PROJECTS$TOTAL NUMBER OF PRESENT PROJECTSTOTAL ESTIMATED CONSTRUCTION COST OF PRESENT PROJECTS$AS AN ASSOCIATE WITH OTHER A/E CONSULTANTSTOTAL NUMBER OF COMPLETED PROJECTSTOTAL ESTIMATED CONSTRUCTION COST OF COMPLETED PROJECTS (ONLY THE PORTION OF WORK FOR WHICH YOUR FIRM WAS RESPONSIBLE)$TOTAL NUMBER OF PRESENT PROJECTSTOTAL ESTIMATED CONSTRUCTION COST OF PRESENT PROJECTS (ONLY THE PORTION OF WORK FOR WHICH YOUR FIRM IS RESPONSIBLE)$CLASS OF WORK AND PROJECT TYPE SPECIALIZATIONTYPE OF PROJECT TOTAL NO. OF COMPLETED PROJECTS TOTAL ESTIMATED CONSTRUCTION COST TOTAL ESTIMATED PROJECT SIZE (G.S.F.)Categorize your firm’s class for work during the last ten years by project type. Examples of project types include Educational, Commercial, Industrial, Residential, Health Care, Correctional and Judicial Facilities. Work may also be categorized as planning,civil sitework, renovation/alteration, architectural barrier removal, fire alarm system, etc. Page 5 of 9GCH NOTE: Numbers provided are best estimates based on known data, Landscape Architect not typically provided final construction costs.Page 5 of 1153,130,500394366,775,000RESIDENTIAL LANDSCAPE (Apts, Condos, Single Family, etc.) 117 17,360,000 NOT AVAILABLERESIDENTIAL COMMUNITY PLANNING 94 N / A NOT AVAILABLECOMMERCIAL LANDSCAPE (Office, Retail, Industrial, etc.) 98 15,175,000 NOT AVAILABLECOMMERCIAL / MIXED-USE PLANNING 43 N / A NOT AVAILABLEPARKS & OPEN SPACES - LANDSCAPE 35 16,800,000 NOT AVAILABLEINSTITUTIONAL - LANDSCAPE 7 3,795,500 NOT AVAILABLE DPW FORM 120 (Rev. 6/99) PRESENT/COMPLETED PROJECTS IN WHICH YOUR FIRM IS/WAS DESIGNATED THE PRIME CONSULTANT (BY TYPE) (LIST A MAXIMUM OF 10 PROJECTS FOR EACH DISCIPLINE/TYPE OF WORK BEING APPLIED FOR. LIST PROJECTS THAT REFLECT YOUR ABILITY TO PROVIDE QUALITYWORK FOR YOUR REQUESTED PROJECTS.)TYPE:YEARNAME AND LOCATIONOF THE PROJECTNAME OF LEADDESIGNERNAME, ADDRESS, PHONE & FAX NO.OF THE OWNERESTIMATEDCONST. COST($)DURATION FORDESIGN(MONTHS)%COMPLETEDDESIGNCONST.Page 6 of 9 Page 6 of 11 DPW FORM 120 (Rev. 6/99) PRESENT/COMPLETED PROJECTS THAT YOUR FIRM IS/WAS ASSOCIATED WITH OTHERS (BY TYPE) (LIST A MAXIMUM OF 10 PROJECTS FOR EACH DISCIPLINE/TYPE OF WORK BEING APPLIED FOR. LIST PROJECTS THAT REFLECT YOUR ABILITY TO PROVIDE QUALITYWORK FOR YOUR REQUESTED PROJECTS.)TYPE:YEARNAME AND LOCATIONOF THE PROJECTNAME, ADDRESS, PHONE &FAX NO. OF THE OWNERESTIMATED CONSTRUCTION COSTDURATION FORDESIGN(MONTHS)PRIME FIRM ASSOCIATED WITH%COMPLETEDENTIREPROJECTYOUR FIRM’SWORKDESIGNCONST.Page 7 of 9 Page 7 of 11MASTER AND COMMUNITY PLANNING SERVICESCURR.--------CURR.--------CURR.--------2024--------2024--------2024--------2024--------2023--------2023--------2021Semiahmoo Spit UpdatesBlaine, WA--------------------------------------Bellingham Old Town VillageBellingham, WA--------------------------------------M.C. Gateway CommunityWalla Walla, WA--------------------------------------Soul Resort CommunityEl Dabaa, Egypt--------------------------------------Old Fort Lake Mixed-UseCommunityDupont, WA--------------------------------------Elysian Fields WellnessRetreatSnohomish, WA--------------------------------------SilverhawkFerndale, WA--------------------------------------Cava MinePierce County, WA--------------------------------------Riverfront DevelopmentKura River, Georgia--------------------------------------Chelan BayChelan, WAWise Enterprise Group, LLCScottsdale, Arizona-----------------------------------------Nor Pac Equities Dev. IncSeattle, WA-----------------------------------------Withheld-----------------------------------------Eagle Hills Egypt forManagement& Investment of Projects S.A.ECairo, Egypt-----------------------------------------Copperleaf Investments-----------------------------------------Withheld-----------------------------------------Cultivate DevelopmentBellingham, WA-----------------------------------------Terragon LLCSeattle, WA-----------------------------------------Eagle Hills InternationalProperties LLCAbu Dhabi, UAE-----------------------------------------Tripen, INCWenatchee, WAN/A-------------------N/A-------------------N/A-------------------N/A-------------------N/A-------------------N/A-------------------N/A-------------------N/A-------------------N/A-------------------N/AN/A TOPLANNING-------------------N/A TOPLANNING-------------------N/A TOPLANNING-------------------N/A TOPLANNING-------------------N/A TOPLANNING-------------------N/A TOPLANNING-------------------N/A TOPLANNING-------------------N/A TOPLANNING-------------------N/A TOPLANNING-------------------N/A TOPLANNING1-----------------------23-----------------------11-----------------------19-----------------------8-----------------------4-----------------------27-----------------------2-----------------------4-----------------------37N/A----------------------------------N/A----------------------------------N/A----------------------------------N/A----------------------------------N/A----------------------------------N/A----------------------------------N/A----------------------------------N/A----------------------------------N/A----------------------------------N/A5%-----------80%-----------90%-----------100%-----------100%-----------100%-----------100%-----------100%-----------25%-----------100%N/A-----------N/A-----------N/A-----------N/A-----------N/A-----------N/A-----------N/A-----------N/A-----------N/A-----------N/A DPW FORM 120 (Rev. 6/99) Explain firm’s individual project assignment, project management structure, project execution (work flow and responsibilities) and quality control process.In the event the spaces provided on this form are not sufficient for entries, or if you wish to furnish additional information, it may be inserted here or on separate sheets, with appropriate references.As of this date ____________________________ the foregoing is a true statement of facts.NAME OF FIRM OR INDIVIDUAL SUBMITTING QUESTIONNAIRE TYPE NAME AND TITLE OF PERSON SIGNING SIGNATURENOTE: It is to a firm’s advantage to maintain its experience record on a current basis. This may be accomplished by periodically forwarding current data to DAGS.Page 8 of 9 DPW FORM 120 SUPPLEMENT 1(Rev. 6/99) Page 8 of 11TUREAt the core of GCH’s process is comprehensive site analysis and robust collaboration with our clients and the larger design team. It is only through the alignment of site-specificcharacteristics, various stake-holder perspectives, and the client’s objectives and capabilities, that we are able to derive the most fitting andenduring design solutions. We alsomaintain a hands-on approach throughout project construction, ensuringthat the principles and vision of the design are meticulously executed into the final built environment.It is the policy of GCH that no professional design document for a project shall be distributed until its contents have been reviewed and approved in accordance with our QA/QCprocesses. All GCH project managers and staff work together to ensure thatthe adequacy, suitability and quality of our work meets or exceeds the highest level of industrystandards.The objective of our internal quality control review process is to identify conflicts, to ask questions and to raise issues regarding design features that have the potential to present afuture problem. To ensure sound organization and management throughout our projects, a formal review system is utilized. Critical elements of our QA/QC program are:• A GCH Founding Principal is involved in every project as overall Project Lead and is responsible for the successful outcome of that project’s design.• A GCH Senior Project Manager/Designer is involved in every project and isresponsible for the successful management of the project design.• The Graphics and Design Team provide a wide breadth of creative and technical knowledge to each project and answer to the Project Manager and Partner.• All project designs include the above groups working together as a team towards the common goals defined by the client at the beginning of the project.• Prior to each stage of design delivery, Designs go thru a review system including the above groups. Each individual within these groups has their ownassigned color codingsystem so all participants are aware of who is notating, reviewing, clarifying and back-checking; and if any reviewer’s input is still needed. Finalreview is always completed by aGCH Principal or the Landscape Architect of Record.• A GCH Site Construction Coordinator is available to GCH clients on each ofour projects to ensure that the designs are properly implemented by the contractor on site during theimplementation stage.GEYER COBURN HUTCHINS LLC JERRY COBURN, FOUNDING PRINCIPAL PRINCIPALS ONLY - ADDITIONAL INFORMATIONNAMETITLE AND POSITION YEARS WITH FIRMMAJOR RESPONSIBILITIES WITH THIS FIRMPRIOR EMPLOYMENT(START WITH LATEST EMPLOYMENT PRIOR TO JOINING THIS FIRM AND PROVIDE SIMILAR INFORMATION FOR EACH SEPARATE EMPLOYMENT OR MAJOR CHANGES IN DUTIES WITH THE SAME EMPLOYER.)FIRM: DATEFROM: TO:FIRM: DATEFROM: TO:ADDRESS:ADDRESS:JOB TITLE:JOB TITLE:SUPERVISOR’S NAME AND TITLE: SUPERVISOR’S NAME AND TITLE:MAJOR DUTIES:MAJOR DUTIES:FIRM: DATEFROM: TO:FIRM: DATEFROM: TO:ADDRESS:ADDRESS:JOB TITLE:JOB TITLE:SUPERVISOR’S NAME AND TITLE: SUPERVISOR’S NAME AND TITLE:MAJOR DUTIES:MAJOR DUTIES:Page 9 of 9Page 9 of 11JERRY COBURNFOUNDING PRINCIPAL 28INCREASE BRAND RECOGNITION AND FINANCIAL GROWTH, INCLUDING ESTABLISHMENT AND TRACKING OF BUSINESS GOALS ; MANAGE PROJECTS AND STAFF1994 1997 1992 1994HONOLULU, HAWAI'I TAIPEI, TAIWANPROJECT LANDSCAPE ARCHITECT PROJECT LANDSCAPE ARCHITECTMANAGE PROJECTS FROM CONCEPTUAL DESIGN THROUGH CONSTRUCTIONDOCUMENTS AND CONSTRUCTION ADMINISTRATION.MANAGE PROJECTS FROM CONCEPTUAL DESIGN THROUGH CONSTRUCTIONDOCUMENTS AND CONSTRUCTION ADMINISTRATION.1991 1992 1990 1991HONOLULU, HAWAI'I HELSINKI, FINLANDPROJECT LANDSCAPE ARCHITECT DESIGN LANDSCAPE ARCHITECTMANAGE PROJECTS FROM CONCEPTUAL DESIGN THROUGH CONSTRUCTIONDOCUMENTS AND CONSTRUCTION ADMINISTRATION.MANAGE PROJECTS FROM CONCEPTUAL DESIGN THROUGH CONSTRUCTIONDOCUMENTS AND CONSTRUCTION ADMINISTRATION.BELT COLLINSOY M&SF DESIGN PARTNERSHIPMAISEMA JA SUUNNITTELU FAIRHURSTBELT COLLINS PRINCIPALS ONLY - ADDITIONAL INFORMATIONNAMETITLE AND POSITION YEARS WITH FIRMMAJOR RESPONSIBILITIES WITH THIS FIRMPRIOR EMPLOYMENT(START WITH LATEST EMPLOYMENT PRIOR TO JOINING THIS FIRM AND PROVIDE SIMILAR INFORMATION FOR EACH SEPARATE EMPLOYMENT OR MAJOR CHANGES IN DUTIES WITH THE SAME EMPLOYER.)FIRM: DATEFROM: TO:FIRM: DATEFROM: TO:ADDRESS:ADDRESS:JOB TITLE:JOB TITLE:SUPERVISOR’S NAME AND TITLE: SUPERVISOR’S NAME AND TITLE:MAJOR DUTIES:MAJOR DUTIES:FIRM: DATEFROM: TO:FIRM: DATEFROM: TO:ADDRESS:ADDRESS:JOB TITLE:JOB TITLE:SUPERVISOR’S NAME AND TITLE: SUPERVISOR’S NAME AND TITLE:MAJOR DUTIES:MAJOR DUTIES:Page 9 of 9Page 10 of 11MURRAY HUTCHINSFOUNDING PRINCIPAL 28INCREASE BRAND RECOGNITION AND FINANCIAL GROWTH, INCLUDING ESTABLISHMENT AND TRACKING OF BUSINESS GOALS ; MANAGE PROJECTS AND STAFF1996 1997 1995 1996SEATTLE, WASEATTLE, WADESIGN CONSULTANT DESIGN CONSULTANTADVISE FIRM ON MASTER AND COMMUNITY PLANNING PROJECTS. ADVISE FIRM ON MASTER AND COMMUNITY PLANNING PROJECTS.1991 1995 1986 1991HONOLULU, HAWAI'I WHISTLER, BRITISH COLUMBIA, CANADAPLANNERPLANNERMANAGE PROJECTS FROM EARLY VISIONING THROUGH PERMITTING. MANAGE PROJECTS FROM EARLY VISIONING THROUGH PERMITTING.LMN ARCHITECTSEDAW INC.ECOSIGN MOUNTAIN RESORT PLANNERSBELT COLLINS PRINCIPALS ONLY - ADDITIONAL INFORMATIONNAMETITLE AND POSITION YEARS WITH FIRMMAJOR RESPONSIBILITIES WITH THIS FIRMPRIOR EMPLOYMENT(START WITH LATEST EMPLOYMENT PRIOR TO JOINING THIS FIRM AND PROVIDE SIMILAR INFORMATION FOR EACH SEPARATE EMPLOYMENT OR MAJOR CHANGES IN DUTIES WITH THE SAME EMPLOYER.)FIRM: DATEFROM: TO:FIRM: DATEFROM: TO:ADDRESS:ADDRESS:JOB TITLE:JOB TITLE:SUPERVISOR’S NAME AND TITLE: SUPERVISOR’S NAME AND TITLE:MAJOR DUTIES:MAJOR DUTIES:FIRM: DATEFROM: TO:FIRM: DATEFROM: TO:ADDRESS:ADDRESS:JOB TITLE:JOB TITLE:SUPERVISOR’S NAME AND TITLE: SUPERVISOR’S NAME AND TITLE:MAJOR DUTIES:MAJOR DUTIES:Page 9 of 9Page 11 of 11BOO Y. JANGPRINCIPAL 7INCREASE BRAND RECOGNITION AND FINANCIAL GROWTH, INCLUDING ESTABLISHMENT AND TRACKING OF BUSINESS GOALS ; MANAGE PROJECTS AND STAFF2016 2018 2007 2016SEATTLE, WALONG BEACH, CALANDSCAPE DRAFTER PROJECT MANAGERPROVIDE TECHNICAL CAD DRAWINGS, TEMPLATES AND 3D MODELS FORPRODUCTION AND ASSEMBLY.MANAGEMENT/PRODUCTION OF DESIGN PROJECTS, COORDINATION WITHCLIENTS, AND PROPOSALS/MARKETING MATERIALSRHODESWORK DESIGN STUDIOBENNITT DESIGN GROUP Professional Services Request for Qualifications Appendix B - Company Brochure Community Planning Services Fiscal Year 2025-2026 Geyer Coburn HutCHins Landscape Architecture Land Planning Golfscape Design International GCH is committed to the highest quality of work, focusing on seeing our client’s projects from the early planning studies, through design phases, and ultimately through the construction supervision process. The firm has an extensive portfolio working for both private and public clients in the land planning and landscape architectural roles throughout the US and the world. We offer client and site specific planning and design solutions, understanding that each project is distinctively characterized by its own unique set of challenges and attributes. At GCH, we underscore a holistic approach to all planning and landscape design phases. This involves a meticulous examination of short and long-term goals, encompassing physical, environmental, social, cultural, and economic elements crucial for successful development. We are unwaveringly committed to providing innovative, environmentally conscious, and sustainable design solutions that blend creativity with feasibility. Our process involves in-depth site analysis, coupled with robust client and design team collaboration, to derive the most fitting and enduring design solutions that align with the client’s objectives and capabilities. Utilizing our extensive experience, we conduct on-site reviews during construction to ensure the seamless translation of design principles into the final built environment. GCH measures our success by the achievements of our completed projects and the satisfaction of our clients. We pride ourselves on demonstrating a commitment to excellence in every facet of our work; and not just meeting, but exceeding our client’s expectations. Relevant expeRience Location: Tierra del Fuego, Argentina Scope: Land analysis Program: Residential communities, resorts, remote lodging, commercial center and trails Size: 250,000 Acres Description: GCH conducted a conservation and development feasibility analysis studying over 250,000 acres of land in Tierra del Fuego, Argentina, with the goal of preserving more than 94% of the total area in perpetuity. This area comprises part of the Patagonia region and is considered one of the world’s premier trekking and eco-tourism destinations. Sensitive ecosystems, plant species, soil and tree types, wild life and view corridors were studied as a whole to identify critical areas and patterns of preservation. Areas of local ongoing farming and sustainable forestry were analyzed for conservation as well as to promote local economic stability. A trail route is also integrated within the overall planning study, linking the Atlantic and Pacific oceans through Argentina and Chile. National Geographic is currently assembling a documentary which will highlight the areas to be under conservation, and the process preserving this sensitive region. PATAgOniA cOnseRVATiOn ReseRVe seA TO seA TRAil Dupont mixeD-use community olD Fort lake Location: DuPont, Washington Scope: Master planning Program: Residential lots, commercial zones, neighborhood retail centers, hospitality, schools, road and trail system, parks and open spaces, cultural resource zones Size: 262 acres Description: This comprehensive planning project involved the analysis and design of a 260 acre piece of land in the city of DuPont, Washington. The project owner is currently working with the Department of Ecology and the Attorney General to cleanup and reclaim the hazardous site that surrounds Old Fort Lake, much of The Home Course golf course, and abuts Nisqually tribal lands. The project goal is ultimately to create a legacy project that compliments the city’s character and offers new housing and amenity opportunities for the public. Location: Tanjung, Malaysia Scope: Master planning, site planning Program: Civic buildings, retail, golf course, marina, residential districts Size: 300 Hectares Description: This 300 hectare project off the coast of Penang is a landfill project consisting of three inter-connected islands for which GCH is providing master planning and site planning services. The project’s entertainment district includes a conference and exhibition facility, sports stadium, 18-hole golf course, recreation complex, as well as cultural and religious centers. The commercial district includes hotels, retail and restaurants, shopping center, civic buildings and marinas. Residential districts are integrated throughout the islands as multifamily, condominium, townhouses and villas. seRi TAnjung PenAng M.C. Gateway CoMMunity Location: Walla Walla, Washington Scope: Concept master plan Program: Residential parcels, hospitality zone, commercial hub, parks and open spaces, circulation Size: 357 acres, 670 residential units Description: GCH worked closely with Jensen Design Architects on the master plan for a new Urban Planned Development in Walla Walla, Washington. The community program includes single family and town homes, resort hotel with amenities, and a commercial zone including winery, event spaces, and retail. The community will be integrated with 145 acres of public open space, including parks, nature preserve, vineyards, recreation, amenities, and trails. Location: Ferndale, Washington Scope: Site analysis, concept master plan Program: Residential parcels, parks and open spaces, circulation Size: 25 acres, 310 residential units Description: GCH provided planning services on this multi-family residential community in Ferndale. Silverhawk is a mixed-use development including apartments, townhomes, and live/work units with small zones also set aside for commercial and retail use. Special attention was given to the existing wetlands which make up roughly six areas of the site and will now create focal points for the park and trail system. A careful balance of preservation and strategic development enhances this environmentally sensitive area, ensuring its long-term sustainability. Silverhawk Location: Foshan City, China Scope: Master planning, concept design, schematic design, design development Program: Public trail system around lake, public parks, waterfront terraces, water features, private gardens, entry courts, plazas, tree-lined residential streets, lookout tower Size: 70 hectares Description: The vision for the Foshan Residential Development is the creation of a premier community that complements the existing beauty of the land and highlights the spectacular waterways throughout. Residential areas will be connected to each other as well as to amenities of the overall development by various trails systems along roadways. Existing landscape features will be preserved and integrated into the overall development as much as possible. fOshAn ResidenTiAl cOmmuniTY Old TOwn Urban CenTer Location: Bellingham, Washington Scope: Planning, city meetings, public hearings, concept design, design guidelines, landscape design (certain development blocks) Size: 8.5 acres Description: GCH has been working with the project developer and the City of Bellingham to transform an industrial area adjacent to the city’s waterfront into a new urban center. Through thoughtful integration of historical buildings and features, multi-modal circulation patterns, and amenities for both residents and commercial tenants, a vibrant and pedestrian- centered community concept has emerged. Design guidelines for the overall development and early phase landscape design were also created to ensure a consistent aesthetic throughout the district. soul luxury resort community Location: North Coast, Egypt Scope: Innovation strategy, design narrative, development opportunities, site analysis, land use planning, long-range planning Size: 517 acres Program: Stand-alone villas, townhomes, chalets, apartments, circulation systems, hotels, cabanas, commercial areas, sports fields, open spaces, green cooridors Description: GCH has been working on Egypt’s idyllic North Coast of the Mediterranean Sea providing master planning for the extraordinary, “Soul” destination. Working alongside the Emaar Misr/Eagle Hills team, the group has envisioned a destination of unsurpassed elegance, innovation and sustainability throughout the region. The EcoLuxe destination includes more than 20 kilometers of water frontage and 1.5 kilometers of sandy coastline. A never seen before, elevated “infinity beach” in the property’s interior doubles the project’s sandy beach experience and provides stunning views up and down the coastline of this already sought after destination. Ravenwing ResoRt Location: Malaga, Washington Scope: Concept design, schematic design, design development, construction documentation Description: GCH has assisted the Owner’s with the landscape design of a neighborhood entry and several homes within the community. The site is one of the most dramatic and unique community in the Northwest. Through a detailed design process, the homes, trails, and amenities of the community are nestled into the landscape while creating minimal impact to the site. Firewise landscape principals are used for each home and a mix of plants that are fire resistant. Tehaleh Location: Pierce County, Washington Scope: Master planning Program: Public parks, trail systems, schools, employment center, wetland preservation, road network. Size: 4,200 Acres Description: This comprehensive planning process involved integration of all aspects for a new community from the ground up, including 9,000 residential units, business parks, schools, neighborhood retail and civic centers, parks and trail systems, transportation, etc. The site’s natural characteristics such as preserved open space, Rainier views, and wetlands were woven into the fabric of the infrastructure, roads, and development. Small residential neighborhoods have been set within existing stands of trees and natural open space corridors to create a sense of scale and connection to the environment. Location: Dubai, Unites Arab Emirates Scope: Master planning, site planning, concept design, schematic design, design development, construction documentation Size: 46 Hectares land in 186 hectares of ocean Description: Perhaps the most aggressive development project currently underway in the World is a project in Dubai known by those same words, “The World”. A destination residential resort located seven kilometers off the coast of Dubai in the UAE. Our portion of the project, known as “Oqyana” is the region designated in the “The World” for Australia, New Zealand and the Island communities of the South Pacific. Land fill aspects of the project are well underway and the landscape design is in the design development phase currently. OQYAnA wORld fiRsT Location: Pierce County, Washington Scope: Development Concept Program: Residential community, trails, open spaces, recreation areas, community features Size: 220 acres, 917 residential units Description: The Cava Mine development plan is based on a diverse and complimentary mix of adaptive reuse for a former mining operation. The intent is to create a place with a broad blend of residents and visitors to activate the development through various times of the day and year. The general program includes low and mid density single family homes, as well as a multi-family zone with resident clubhouse amenities. Open space and “green boulevard” connections are intended to be unifying factors in knitting the community identity together. CAVA Mine Location: Failaka Island, Kuwait Scope: Master planning, site planning Program: Retail districts, residential communities, educational center, sports facilities, two Robert Trent Jones II golf courses, zoo, large scale native gardens, parks, water park, villages, multiple hotels, marinas, science center, heritage village Size: 4,600 hectares Description: Failaka Island is located just off the coast of Kuwait in the Persian Gulf. This large scale planning project sets out to create a national and international world class destination. This master plan sets out to create several very different but cohesive nodes of interest on the island with vibrant corridors that will transform the currently barren landscape through restoration of the island’s history and culture. The client’s vision included an island that would be free of cars for visitors to enhance the unique experience. FAILAKA ISLAND SEmiAhmoo rESort SEMIAHMOO WEST SEMIAHMOO GOLF COURSE THE CANNERY BIRCH POINT LUMMI MEMORIAL SEMIAHMOO SPITLocation: Blaine, Washington Scope: Regional planning, site design, concept design, schematic design, design development Program: Hotel, residential, resort retail, market, amphitheater, historic buildings, public waterfront, trails, monuments and signage, campus planning Size: 2,400 acres Description: Semiahmoo Resort is one of the leading destination resorts in the Pacific Northwest. Adjacent to the Canada-US border, the resort covers several hundred acres of prime waterfront property. GCH has assisted Semiahmoo Resort in all stages of planning, site design and landscape architecture over the past several years. Work for Semiahmoo has included long range feasibility and planning studies covering several hundred acres, historic waterfront re-use programming and design, hotel amenity design, waterfront trail systems and revegetation, entry monuments, site planning for a destination golf academy and numerous residential community designs. SEMIAHMOO SPIT Rocky Pond ResoRt Location: Orondo, Washington Scope: Master planning and site planning. Program: Hotel, winery, spa, event pavilion, residences, trails, event lawn, culinary gardens, vineyards, orchards, pools, parking and roadways. Size: 50 acres Description: Rocky Pond Resort is located on the cliffs of the Columbia River in eastern Washington. GCH has assisted with the overall master plan for the entire property, as well as the site planning for exterior amenities and all program elements. The focal point of the resort will be a destination event venue with adjacent hotel and gardens; the site will also boast state-of-the-art conference facilities, winery and distillery tasting rooms, a spa, multiple pools, trails, parks, and various indoor and outdoor performance venues. The resort, as well as the surrounding small clusters of homes and amenities, are integrated within the rugged natural landscape of the surrounding area. Location: Hainan, China Scope: Resort planning, community planning Program: Entertainment and commercial hubs, marina, hotels, residential, open spaces, amenities Size: 158 Hectares Description: The long range vision for Nanli is the creation of a destination resort and regional tourism hub. The resort is anchored by a marina and entertainment/commercial/retail core surrounded by various recreational/leisure amenities and residential communities. There is an open space and trail network linking all parts of the community together and providing access to the several parks and places along the waterfront. Careful site analysis and integration of development within the lake front topography was critical in preserving the natural shoreline and character of the site. lAke nAnli ocotiLLo community Location: Chandler, Arizona Scope: Planning, city meetings, public hearings, concept design, schematic design, design development Size: 100 acres Description: GCH provided planning and landscape architectural services on this project which covers over 100 acres within the city of Chandler. Ocotillo is a mixed-use residential development including 1,000 total residential units of villas, apartments and condominiums with a commercial/retail core. The community has a fully integrated green system of parks, trails and pedestrian ways internally connecting the entire community. The project is designed around waterways sourced from the City of Chandler’s treated effluent which is also used to irrigate all landscape areas within the project. Location: Great Exuma, Bahamas Scope: Site planning, concept design, detailed plans, & schematic design Size: 34 Hectares Description: GCH was hired by a private equity firm to provide master planning and landscape architecture to sustainably develop their property on Stocking Island into an exclusive hotel and private residential club. The site includes a rare combination of pristine, calm “bay side” beaches and Atlantic facing beaches connected by significant elevation change, indigenous plant material and unique limestone formations. The master plan was designed to maximize on exclusivity to the private estates while providing a vibrant and versatile boutique hotel and spa of the highest caliber. Preservation and enhancement of the unique and precious marine and plant life was integral to the design as is the historic significance of the island. sTOcking islAnd cluB POINT ROBERTS Location: Whatcom County, Washington Scope: Master planning Program: Marina, beach/yacht club, residential, open space, public & private parks, trail systems, parking, retail, restaurant Size: 152 Acres Description: The vision for the Point Roberts waterfront development was the creation of a premier destination water-front resort community that compliments the existing beauty of the region while maintaining economic profit and sustainability. This involved the analysis and re-envisioning of the current marina and marina facilities, as well as the 150 acres of surrounding land. The master plan included a beach/yacht club, marina village, recreation center, and 250 residential units. These program elements were to be integrated while maintaining the existing marina and marina circulation including parking and access. There was an extensive wetland an natural drainage network the was enhanced and integrated within the community open space and trail system, creating natural habitats and amenities for visitors and residents to experience. Location: Beijing, China Scope: Master planning Size: 105 Hectares Description: A competition for a new urban development on the edge of Beijing, The Grand Wangjing Business District is envisioned to be a community where ecology and economics go hand in hand. Working closely with NBBJ, GCH assisted in the planning and conceptual landscape design of this area, with a special emphasis on the use of sustainable features such as green roofs, bio filter zones, multi-modal transit, and energy generation systems. The overall plan incorporates retail, civic and residential elements all working together to create a vision of vitality, community and inspiration in harmony with nature. wAngjing Business disTRicT thE LooKout A LAKESidE ViLLAgE Location: Chelan, Washington Scope: Land analysis, site planning, concept design, schematic design, design development, construction documentation, construction observation Program: Residential cottages, parks, pools, playfields, trail system Size: 60 acres Description: Located on the southern shore of Lake Chelan, “The Lookout” development provides breathtaking views of the adjacent clear blue water and sandy beaches. The goal of this mixed-use residential project is to create a unique environment that fosters a strong sense of community. The landscape design includes several parks, a marina, swimming pools and open space. An extensive trail system creates a walkable neighborhood with access to the lake, throughout the site and to adjacent vineyards. Location: Hanoi, Vietnam Scope: Master planning Program: Hotels, convention center, corporate campus, commercial, mixed-use residential, extensive public park system, natural preservation areas. Size: 150 Hectares Description: Located within the urban core of Hanoi this project covers over 150 hectares of land surrounding a series of existing lakes. Envisioned to be the new business center and gathering place of Hanoi this project features a 34 acre commercial core area which includes a centrally located convention center and hotel as its iconic focal point supported by symmetrically designed commercial, multi-use and park developments. The plan includes the addition of the largest and most significant public park system in Hanoi which is designed around the project’s existing lakes with direct links to the commercial core and residential areas. The park system includes a botanical garden, arboretum, heritage park, cultural gardens and events square to complement the development. Yen sO PARk Location: Kailua Kona, Hawaii Course Architect: Nicklaus Design Scope: Concept design, schematic design, design development, construction documentation, construction observation Size: 620 acres Description: Assisting in the transformation of this ocean-side site from an existing lava flow on the island of Hawaii to golf resort was an important role for our designers. We worked with Jack Nicklaus Design on the landscape aspects of this project which include preservation of lava areas, recreation of lava areas and planting of native trees and ground covers throughout the course. GCH planning staff played a key pivotal role in the careful integration of the course routings as they interacted with shoreline, alkaline ponds, historic trails, residential, hotel and arrival experience. Holes were analyzed and strategically placed to create ocean view corridors from upland residential parcels. Hualalai FOuR SEaSONS GOlF RESORT MaSTER PlaNNiNG thank you Geyer Coburn HutCHins LLC + 206 285 4422 www.gchsite.com GCHgeyer coburn hutchins