Loading...
HomeMy WebLinkAboutRHA Construction Management - OH.5 General Engineering (Construction Inspector)Submitted by: 2153 North King Street, Suite 201 Honolulu, Hawaii 96819 Tel (808) 941-0577 | Fax (808) 945-2646 info@rhacm.com County of Hawaii Professional Services During the Fiscal Year 2025 –2026, Beginning July 2025 June 30, 2025 Housing and Community Development OH.4)Construction Management/Inspector OH.5)General Engineering (Construction Inspector)* OH.6) General Engineering (Project Manager)* 2153 North King Street, Suite 201 | Honolulu, Hawaii 96819 | Tel (808) 941-0577 | Fax (808) 945-2646 | info@rhacm.com | www.rhacm.com June 30, 2025 Housing and Community Development County of Hawai‘i 1990 Kino‘ole Street, Suite 102 Hilo, Hawai‘i 96720 Attention: Ms. Kehaulani M. Costa, Administrator Subject: Professional Services During the Fiscal Year 2025 –2026 Dear Ms. Costa, RHA Construction Management Group, LLC would like to be considered to provide professional engineering services for the following category. OH.4) Construction Management/Inspector OH.5) General Engineering (Construction Inspector)* OH.6) General Engineering (Project Manager)* We have enclosed our Statement of Qualifications for your review. Should you have any questions regarding our submittal, please feel free to contact me by email at bsekiguchi@rhacm.com or by telephone at (808) 941-0577. Sincerely, Brian Sekiguchi, CCM President BS/jc Enclosure Federal Standard Form 330 ARCHITECT-ENGINEER QUALIFICATIONS STANDARD FORM 330 (REV. 8/2016) PAGE 1 1 PART I – CONTRACT-SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 1. TITLE AND LOCATION (City and State) Professional Services for the State Fiscal Year 2025-2026 OH.4) Construction Management/Inspector OH.5) General Engineering (Construction Inspector)* OH.6) General Engineering (Project Manager)* 2. PUBLIC NOTICE DATE June 1, 2025 3. SOLICITATION OR PROJECT NUMBER 25-26 B. ARCHITECT-ENGINEER POINT OF CONTACT 4. NAME AND TITLE Brian Sekiguchi, CCM, President 5. NAME OF FIRM RHA Construction Management Group, LLC 6. TELEPHONE NUMBER 808-941-0577 7. FAX NUMBER 808-945-2646 8. EMAIL ADDRESS bsekiguchi@rhacm.com C. PROPOSED TEAM (Complete this Section for the Prime Contractor and all Key Subcontractors.) (Check) 9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT PRIME JV PARTNER SUB-CONTRACTOR a. RHA Construction Management Group, LLC CHECK IF BRANCH OFFICE 2153 N. King Street, Suite 201 Honolulu, Hawaii 96819 Construction Management b. CHECK IF BRANCH OFFICE c. CHECK IF BRANCH OFFICE d. CHECK IF BRANCH OFFICE e. CHECK IF BRANCH OFFICE D. ORGANIZATIONAL CHART OF PROPOSED TEAM (Attached) ARCHITECT-ENGINEER QUALIFICATIONS STANDARD FORM 330 (REV. 8/2016) PAGE 2 1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Brian Sekiguchi, CCM 13. ROLE IN THIS CONTRACT President/Construction Manager 14. YEARS EXPERIENCE a. TOTAL 38 b. WITH CURRENT FIRM 5 15. FIRM NAME AND LOCATION (City and State) RHA Construction Management Group, LLC, Honolulu, Hawaii 16. EDUCATION (Degree and Specialization) Master of Engineering Management; Master of Business Administration; Bachelor of Science, Civil Engineering 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) N/A 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) American Council of Engineering Companies of Hawaii (ACECH) Honolulu Board of Water Supply (BWS) Liaison Committee Chairperson; Project Management Institute, Hawaii; American Water Works Association; Construction Management Association of America; Society of American Military Engineers; Building Owners and Managers Association; Quality Assurance Plan Training – AECOM; Honolulu Rail Transit Project – Safety & Environmental Training; Construction Quality Management Training (USACE/NAVFAC); Oracle Primavera P6 Scheduling & Project Management; USACE/NAVFAC Construction Scheduling Requirements; NAVFAC 40-Hour Construction Hazard Awareness Course; American Red Cross First Aid/CPR/AED Course; Arc Flash & Electrical Safety Training; Erosion & Sediment Control Plan Coordinator 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Hilo Wastewater Treatment Plant Rehabilitation and Replacement Phase 1, Job No. WW- 4705R, Waiakea, Hawaii (2) YEAR COMPLETED PROFESSIONAL SERVICES N/A CONSTRUCTION (if applicable) N/A (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Principal-in-Charge. SCOPE: Construction management services for the construction, testing, startup, and commissioning of a new replacement septage receiving facility and a new headworks facility, including an electrical building. Work includes the installation of a new odor control system; modifications to existing structures including the primary sedimentation tanks, primary and secondary facilities buildings, and secondary clarifiers; upgrades to supporting systems such as return secondary sludge pumps, scum pumps, waste sludge pumps, and the disinfection system. Additionally, a new sludge blending system with integrated odor control will be implemented. COST: $340 million b. (1) TITLE AND LOCATION (City and State) Department of Hawaiian Home Lands Yorktown Building Rehabilitation for Transitional Housing, Kalaeloa, Kapolei, HI (2) YEAR COMPLETED PROFESSIONAL SERVICES 2024 CONSTRUCTION (if applicable) 2025 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Principal-in-Charge. SCOPE: Developed comprehensive construction documents and coordinated with consultants; assisted in expediting the permit process during the design phase; provided project/construction management, including contract review and execution; onsite project management; assistance with CA phase to reach substantial and final completion; ensured that work followed the engineering design intent as required by the City and County of Honolulu; and assisted to obtaining project close out documents. COST: $8 million c. (1) TITLE AND LOCATION (City and State) Kawaihae Water Connection Kailua-Kona, Hawaii (2) YEAR COMPLETED PROFESSIONAL SERVICES 2022 CONSTRUCTION (if applicable) 2022 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Manager. SCOPE: RHA CM provided design, project management, engineering support services and permitting to design an appropriately sized water connection from the main water line into the office trailer. COST: N/A d. (1) TITLE AND LOCATION (City and State) Kulani Correctional Facility Potable Water Supply Hilo, Hawaii (2) YEAR COMPLETED PROFESSIONAL SERVICES 2021 CONSTRUCTION (if applicable) 2021 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Manager. SCOPE: RHA CM provided construction management services for the County of Hawaii, Department of Public Safety for the installation of a new water service lateral, meter and fill station at Kulani Correctional Facility. COST: $1.2 million ARCHITECT-ENGINEER QUALIFICATIONS STANDARD FORM 330 (REV. 8/2016) PAGE 3 1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Michael P. Young, PE, CCM, FCMAA 13. ROLE IN THIS CONTRACT Construction Manager 14. YEARS EXPERIENCE a. TOTAL 29 b. WITH CURRENT FIRM 4 15. FIRM NAME AND LOCATION (City and State) Pono Consulting Management, Honolulu, Hawaii 16. EDUCATION (Degree and Specialization) Bachelor of Science, Civil Engineering 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Hawaii/Washington, Civil #13142 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Construction Manager Certification Institute, CCM; Water Environment Federation Member; Hawaii Water Environment Association Member; Construction Management Association of America (CMAA) Hawaii Chapter, Member/Past President 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) US Army Corps of Engineers (USACE), Hawaii Water Infrastructure Program, Honolulu, HI (2) YEAR COMPLETED PROFESSIONAL SERVICES 2021 CONSTRUCTION (if applicable) 2025 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Manager. SCOPE: Providing technical, engineering and management support for numerous water line and water system, water treatment and wells projects as the programmatic technical lead for the USACE Hawaii Water Infrastructure Program. Tasks include technical quality assurance, budget preparation, project scheduling, project management and construction management, administration and civil engineering services for various projects from cradle to grave in Hawaii, Asia and the Pacific. Services also include providing Contracting Officer Representative (COR) representation and duties for various AE contracts. COST: $1 billion b. (1) TITLE AND LOCATION (City and State) City and County of Honolulu, Department of Design and Construction, Sand Island Wastewater Basin Odor Control, Honolulu, HI (2) YEAR COMPLETED PROFESSIONAL SERVICES 2023 CONSTRUCTION (if applicable) 2023 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Manager. SCOPE: Provided construction management services to upgrade and expand the existing WWTP. The project required the installation of electrical equipment, adjustable frequency drives, instrumentation, structural concrete as well as a 2-inch force main, including dual bed carbon scrubbers, fiberglass reinforced plastic duct, engineered aluminum covers, fans and blowers, and SCADA system. COST: $9.2 million c. (1) TITLE AND LOCATION (City and State) City and County of Honolulu, Department of Design and Construction, Kailua Regional Wastewater Treatment Plant (KRWWTP) Tunnel Influent Pump Station and Headworks, Kailua, HI (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (if applicable) 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Manager. SCOPE: Provided construction management services for phase 2 of the Kaneohe-Kailua (KK) Wastewater Conveyance and Treatment Facilities Project. Construction included a new Headworks, Generator/Electrical Building, and a 6-story Tunnel Influent Pump Station to pull wastewater from the KK tunnel to the KRWWTP. COST: $149 million d. (1) TITLE AND LOCATION (City and State) Hilo Wastewater Treatment Plant Rehabilitation and Replacement Phase 1, Job No. Ww- 4705R, Waiakea, Hawaii (2) YEAR COMPLETED PROFESSIONAL SERVICES N/A CONSTRUCTION (if applicable) N/A (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Manager. SCOPE: Construction management services for the construction, testing, startup, and commissioning of a new replacement septage receiving facility and a new headworks facility, including an electrical building. Work includes the installation of a new odor control system; modifications to existing structures including the primary sedimentation tanks, primary and secondary facilities buildings, and secondary clarifiers; upgrades to supporting systems such as return secondary sludge pumps, scum pumps, waste sludge pumps, and the disinfection system. Additionally, a new sludge blending system with integrated odor control will be implemented. COST: $340 million ARCHITECT-ENGINEER QUALIFICATIONS STANDARD FORM 330 (REV. 8/2016) PAGE 4 1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Sean Sugai, PE 13. ROLE IN THIS CONTRACT Vice President 14. YEARS EXPERIENCE a. TOTAL 36 b. WITH CURRENT FIRM 5 15. FIRM NAME AND LOCATION (City and State) RHA Construction Management Group, LLC, Honolulu, Hawaii 16. EDUCATION (Degree and Specialization) Bachelor of Science, Electrical Engineering 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Hawaii, Electrical, #9023 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Member: NSPE, NFPA, ACEC, AWWA, IES 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Department of Hawaiian Home Lands Yorktown Building Rehabilitation for Transitional Housing, Kalaeloa, Kapolei, HI (2) YEAR COMPLETED PROFESSIONAL SERVICES 2024 CONSTRUCTION (if applicable) 2025 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Inspector. SCOPE: Developed comprehensive construction documents and coordinated with consultants; assisted in expediting the permit process during the design phase; provided project/construction management, including contract review and execution; onsite project management; assistance with CA phase to reach substantial and final completion; ensured that work followed the engineering design intent as required by the City and County of Honolulu; and assisted to obtaining project close out documents. COST: $8 million b. (1) TITLE AND LOCATION (City and State) BWS ESCO Electrical Engineering Support and CM Services, BWS Contract No. C16000301, Honolulu, Hawaii (2) YEAR COMPLETED PROFESSIONAL SERVICES 2024 CONSTRUCTION (if applicable) 2024 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Principal. SCOPE: Provided construction management services for BWS Energy Performance Contract projects. Services included oversight and inspection of all construction activities, reviewing material submittals and schedules, and assisting in closeout procedures. COST: $33 million c. (1) TITLE AND LOCATION (City and State) City Hall Fire Alarm System Improvements (Project No. VI-34-14-C) Honolulu, Hawaii (2) YEAR COMPLETED PROFESSIONAL SERVICES 2021 CONSTRUCTION (if applicable) 2021 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Principal. SCOPE: Provided construction management services for the fire alarm system improvements at City Hall as part of a team consisting of the City & County of Honolulu, Department of Design & Construction, the Contractor, the Design Consultant, and the Testing Laboratories and Environmental Consultant. COST: $879,425 d. (1) TITLE AND LOCATION (City and State) Construction Management for WSOIDIQ 17-6A, Roofing Repairs, Board of Water Supply Contract No. C18001005, Honolulu, Hawaii (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (if applicable) 2020 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Principal. SCOPE: Provided construction management services for various roofing repairs. Work issued for individual roofing projects include re-roofing of BWS buildings repairs to spalling concrete, structural repairs to the building structure and other associated repairs to water-damaged materials, re-sloping roofs, installing fall protection anchors and guard rails, and painting. COST: $25 million e. (1) TITLE AND LOCATION (City and State) Construction of the Joint Traffic Management Center, Federal Aid Project No. CMAQ-001(41) (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (if applicable) 2020 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Principal. SCOPE: Provided construction management services as part of the R.M. Towill Corporation CM team for construction of this multi-agency operation to improve traffic management and public safety on Oahu. COST: $54 million ARCHITECT-ENGINEER QUALIFICATIONS STANDARD FORM 330 (REV. 8/2016) PAGE 5 1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Bryan Bosworth, CSSM 13. ROLE IN THIS CONTRACT Construction Manager 14. YEARS EXPERIENCE a. TOTAL 24 b. WITH CURRENT FIRM 5 15. FIRM NAME AND LOCATION (City and State) RHA Construction Management Group, LLC, Honolulu, Hawaii 16. EDUCATION (Degree and Specialization) Bachelor of Fine Arts, Communication 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Construction Management Association of America (CMAA) Hawaii Chapter Past President. Certified California Traffic Control Technician (TCT); SOHDOT Hwys Field Sampling and Testing Bituminous (Field Sampling & Testing Module) Unit, 2021; SOHDOT Hwys Field Sampling and Testing Bituminous (Asphalt) Unit, 2021; Arc Flash and Electrical Safety Training; Occupational Safety and Health Administration (OSHA) 30-Hr Construction Safety and Health; OSHA 29 CFR Fall Protection for the Competent Person; JS-US007 Level 1 Antiterrorism Awareness Training; USACE Construction Quality Management for Contractors; Associated General Contractors of America Safety Management Training Course; American Society for Healthcare Engineering Health Care Construction; Construction Materials and Methods (Auburn University); Structures in Architecture (University of Hawaii); Professional Construction Management (CMAA); State of Hawaii DOT Construction Stormwater Training; American Red Cross CPR/First Aid/AED Course; Erosion & Sediment Control Plan Coordinator. 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Kawaihae Maintenance & Repair Work Kailua-Kona, Hawaii (2) YEAR COMPLETED PROFESSIONAL SERVICES 2022 CONSTRUCTION (if applicable) 2022 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Manager. SCOPE: Provided general project management services to perform various work to replace flooring and install desks in the Manager's Office; replace windows/flooring in the Container Station; and extend external deck and install an awning for the Break Room at the Port of Kawaihae. COST: N/A b. (1) TITLE AND LOCATION (City and State) Kulani Correctional Facility Potable Water Supply Hilo, Hawaii (2) YEAR COMPLETED PROFESSIONAL SERVICES 2021 CONSTRUCTION (if applicable) 2021 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Manager. SCOPE: RHA CM provided CM services for the County of Hawaii, Department of Public Safety for the installation of a new water service lateral, meter and fill station at Kulani Correctional Facility. COST: $1.2 million c. Hilo Wastewater Treatment Plant Rehabilitation and Replacement Phase 1, Job No. Ww- 4705R, Waiakea, Hawaii PROFESSIONAL SERVICES N/A N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Inspector. SCOPE: Construction management services for the construction, testing, startup, and commissioning of a new replacement septage receiving facility and a new headworks facility, including an electrical building. Work includes the installation of a new odor control system; modifications to existing structures including the primary sedimentation tanks, primary and secondary facilities buildings, and secondary clarifiers; upgrades to supporting systems such as return secondary sludge pumps, scum pumps, waste sludge pumps, and the disinfection system. Additionally, a new sludge blending system with integrated odor control will be implemented. COST: $340 million d. (1) TITLE AND LOCATION (City and State) Department of Hawaiian Home Lands Yorktown Building Rehabilitation for Transitional Housing, Kalaeloa, Kapolei, HI (2) YEAR COMPLETED PROFESSIONAL SERVICES 2024 CONSTRUCTION (if applicable) 2025 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Manager. SCOPE: Developed comprehensive construction documents and coordinated with consultants; assisted in expediting the permit process during the design phase; provided project/construction management, including contract review and execution; onsite project management; assistance with CA phase to reach substantial and final completion; ensured that work followed the engineering design intent as required by the City and County of Honolulu; and assisted to obtaining project close out documents. COST: $8 million ARCHITECT-ENGINEER QUALIFICATIONS STANDARD FORM 330 (REV. 8/2016) PAGE 6 1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Brad Takenaka, PE 13. ROLE IN THIS CONTRACT Construction Manager/ Project Engineer 14. YEARS EXPERIENCE a. TOTAL 27 b. WITH CURRENT FIRM 1 15. FIRM NAME AND LOCATION (City and State) RHA Construction Management Group, LLC, Honolulu, Hawaii 16. EDUCATION (Degree and Specialization) Bachelor of Science, Environmental Engineering: Water Resource Management 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Hawaii, Civil, #15760 California, Civil, #C72056 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Hawaii Society of Healthcare Engineering (HISHE); Society of American Military Engineers (SAME), Hawaii Water Environment Association (HWEA) Storm Water Workshop Committee Co-Chair, American Society of Civil Engineers (ASCE) Transportation Chair. Coastal Engineering Certificate: 4 Graduate Level On-line Courses Completed, City & County of Honolulu Certified Erosion and Sediment Control Plan Preparer/Coordinator, City & County of Honolulu Certified Water Pollution Plan Preparer. 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Department of Hawaiian Home Lands Yorktown Building Rehabilitation for Transitional Housing, Kalaeloa, Kapolei, HI (2) YEAR COMPLETED PROFESSIONAL SERVICES 2024 CONSTRUCTION (if applicable) 2025 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Engineer. SCOPE: Developed comprehensive construction documents and coordinated with consultants; assisted in expediting the permit process during the design phase; provided project/construction management, including contract review and execution; onsite project management; assistance with CA phase to reach substantial and final completion; ensured that work followed the engineering design intent as required by the City and County of Honolulu; and assisted to obtaining project close out documents. COST: $8 million b. (1) TITLE AND LOCATION (City and State) 2153 North King Street Commercial Building Energy Efficiency Improvement Upgrades, Honolulu, Hawaii (2) YEAR COMPLETED PROFESSIONAL SERVICES 2024 CONSTRUCTION (if applicable) 2024 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Manager. SCOPE: Provided the design, project management, construction management, commissioning, measurement and verification of system savings and performance for identifying and implementing viable cost-effective measures for this commercial building. Work includes replacement of (2) 80- ton air cooled condensing units and air handlers and control systems, interior and exterior LED lighting, lighting controls, and photovoltaic system. COST: $3 million c. Hilo Wastewater Treatment Plant Rehabilitation and Replacement Phase 1, Job No. Ww- 4705R, Waiakea, Hawaii PROFESSIONAL SERVICES N/A N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Project Engineer. SCOPE: Construction management services for the construction, testing, startup, and commissioning of a new replacement septage receiving facility and a new headworks facility, including an electrical building. COST: $340 million d. (1) TITLE AND LOCATION (City and State) Sand Island Wastewater Treatment Plant Maintenance Building Construction Management Services Improvement Upgrades Honolulu, HI (2) YEAR COMPLETED PROFESSIONAL SERVICES 2024 CONSTRUCTION (if applicable) 2025 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Engineer. SCOPE: Scheduled and documented preconstruction and job-site meetings; processing, reviewing, and approving shop drawings, including critical items, as well as handling RFIs; and ensuring work follows contract documents and HIOSH standards. COST: $174 million ARCHITECT-ENGINEER QUALIFICATIONS STANDARD FORM 330 (REV. 8/2016) PAGE 7 1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Steven Chung, PE 13. ROLE IN THIS CONTRACT Civil Engineer 14. YEARS EXPERIENCE a. TOTAL 25 b. WITH CURRENT FIRM 4 15. FIRM NAME AND LOCATION (City and State) RHA Construction Management Group, LLC, Honolulu, Hawaii 16. EDUCATION (Degree and Specialization) Bachelor of Science, Electrical Engineering, University of Hawaii at Manoa 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Civil License No. 10031, Hawaii 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Accugraph Corporation Certified HolguinCAD MTX900 Trainer; EIT; PE- Civil Engineer; OSHA 10 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) City Hall Fire Alarm System Improvements (Project No. VI-34-14-C) Honolulu, Hawaii (2) YEAR COMPLETED PROFESSIONAL SERVICES 2021 CONSTRUCTION (if applicable) 2021 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Engineer. SCOPE: RHA Construction Management Group, LLC provided construction management services for the fire alarm system improvements at City Hall as part of a team consisting of the City & County of Honolulu, Department of Design & Construction, the Contractor, the Design Consultant, and the Testing Laboratories and Environmental Consultant. COST: $879,425 b. (1) TITLE AND LOCATION (City and State) 1411 South King Street Electrical Upgrades Honolulu, Hawaii (2) YEAR COMPLETED PROFESSIONAL SERVICES Ongoing CONSTRUCTION (if applicable) Ongoing (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Engineer. SCOPE: RHA Construction Management Group, LLC providing construction management services, including bid/contract packaging, project management, contract administration, and construction management services for electrical upgrades at 1411 South King Street in Honolulu, Hawaii. COST: $300,000 c. (1) TITLE AND LOCATION (City and State) Construction Management for WSOIDIQ 17-6A, Roofing Repairs, Board of Water Supply Contract No. C18001005, Honolulu, Hawaii (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (if applicable) 2020 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Engineer. SCOPE: RHA Construction Management Group, LLC provided construction management services for various roofing repairs under an indefinite delivery, indefinite quantity (IDIQ) contract. Work issued for individual roofing projects include re-roofing of BWS buildings repairs to spalling concrete, structural repairs to the building structure and other associated repairs to water-damaged materials, re-sloping roofs, installing fall protection anchors and guard rails, and painting. COST: $25 million d. (1) TITLE AND LOCATION (City and State) 2153 North King Street Commercial Building Energy Efficiency Improvement Upgrades & Building Repairs, Honolulu, Hawaii (2) YEAR COMPLETED PROFESSIONAL SERVICES 2024 CONSTRUCTION (if applicable) 2024 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Engineer. SCOPE: RHA Construction Management Group, LLC provided the design and overall project management, construction management, commissioning, measurement and verification of system savings and performance for identifying and implementing viable cost-effective measures for this commercial building. Includes replacement of (2) 80-ton air-cooled condensing units and air handlers and control systems, interior and exterior LED lighting, lighting controls, and photovoltaic system. COST: $3 million ARCHITECT-ENGINEER QUALIFICATIONS STANDARD FORM 330 (REV. 8/2016) PAGE 8 1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Randall Tamashiro 13. ROLE IN THIS CONTRACT Construction Inspector 14. YEARS EXPERIENCE a. TOTAL 25 b. WITH CURRENT FIRM 4 15. FIRM NAME AND LOCATION (City and State) RHA Construction Management Group, LLC, Honolulu, Hawaii 16. EDUCATION (Degree and Specialization) Bachelor of Arts, University of Hawaii 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Arc Flash and Electrical Safety Training; Hawaii, Lineman Apprenticeship, 1991 19. RELEVANT PROJECTS a. Hilo Wastewater Treatment Plant Rehabilitation and Replacement Phase 1, Job No. Ww- 4705R, Waiakea, Hawaii PROFESSIONAL SERVICES PROFESSIONAL SERVICES N/A CONSTRUCTION (if applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Inspector. SCOPE: Construction management services for the construction, testing, startup, and commissioning of a new replacement septage receiving facility and a new headworks facility, including an electrical building. Work includes the installation of a new odor control system; modifications to existing structures including the primary sedimentation tanks, primary and secondary facilities buildings, and secondary clarifiers; upgrades to supporting systems such as return secondary sludge pumps, scum pumps, waste sludge pumps, and the disinfection system. Additionally, a new sludge blending system with integrated odor control will be implemented. COST: $340 million b. (1) TITLE AND LOCATION (City and State) 2153 North King Street Commercial Building Energy Efficiency Improvement Upgrades & Building Repairs, Honolulu, Hawaii (2) YEAR COMPLETED PROFESSIONAL SERVICES 2024 CONSTRUCTION (if applicable) 2024 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Inspector. SCOPE: RHA Construction Management Group, LLC provided the design and overall project management, construction management, commissioning, measurement and verification of system savings and performance for identifying and implementing viable cost-effective measures for this commercial building. Includes replacement of (2) 80-ton air-cooled condensing units and air handlers and control systems, interior and exterior LED lighting, lighting controls, and photovoltaic system. COST: $3 million c. (1) TITLE AND LOCATION (City and State) Hawaiian Electric Company, Construction Inspection Services V2V Cable Replacement Projects Village Park, Waipahu, Hawaii (2) YEAR COMPLETED PROFESSIONAL SERVICES 2021 CONSTRUCTION (if applicable) 2021 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Inspector. SCOPE: RHA CM will provide construction inspection services for HECO's Direct Bury Cable Replacement Program. The program will replace direct buried primary and secondary cables with cables in concrete encased conduit. The project addresses the increasing amount of cable failures located in the Village Park Unit 1 V4729A Kalae Street to V4729L Kamalo Street and Village Park Unit 2 & 4 V4817A Ku- puna Loop to V4817O Kupuohi Place on the Kunia Makai 2 Circuit. COST: $2 million d. (1) TITLE AND LOCATION (City and State) HECO V2V Cable Replacement Projects Waihee 4 Circuit Ahuimanu Hills Phase 3 V5446A to v5446E Nukupuu Street (2) YEAR COMPLETED PROFESSIONAL SERVICES 2021 CONSTRUCTION (if applicable) 2021 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Inspector. SCOPE: RHACM provided construction management services to replace buried primary and secondary cables with cables in concrete encased conduit. The project addressed the increasing amount of cable failures where the cable is directly buried. COST: N/A ARCHITECT-ENGINEER QUALIFICATIONS STANDARD FORM 330 (REV. 8/2016) PAGE 9 1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Aaron Awaya 13. ROLE IN THIS CONTRACT Construction Inspector 14. YEARS EXPERIENCE a. TOTAL 5 b. WITH CURRENT FIRM 2 15. FIRM NAME AND LOCATION (City and State) RHA Construction Management Group, LLC, Honolulu, Hawaii 16. EDUCATION (Degree and Specialization) N/A 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) N/A 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Training: SII Excavation & Trenching Competent Person, 2024; SII Supported Scaffolding Competent Person, 2024; OSHA Rigging Training, 2022; Crane Signal Person Course, 2022 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Hilo Wastewater Treatment Plant Rehabilitation and Replacement Phase 1, Job No. WW- 4705R, Waiakea, Hawaii (2) YEAR COMPLETED PROFESSIONAL SERVICES N/A CONSTRUCTION (if applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Inspector. SCOPE: Construction management services for the construction, testing, startup, and commissioning of a new replacement septage receiving facility and a new headworks facility, including an electrical building. Work includes the installation of a new odor control system; modifications to existing structures including the primary sedimentation tanks, primary and secondary facilities buildings, and secondary clarifiers; upgrades to return secondary sludge pumps, scum pumps, waste sludge pumps, and the disinfection system; and implementation of a new sludge blending system with integrated odor control. COST: $340 million b. (1) TITLE AND LOCATION (City and State) BWS Manana Corporation Yard Microbiology Lab and Control Center Expansion, Honolulu, HI (2) YEAR COMPLETED PROFESSIONAL SERVICES Ongoing CONSTRUCTION (if applicable) Ongoing (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Inspector. SCOPE: Provided CM services for the renovation of a portion of the first floor of the administration building and the enclosure of an existing breezeway to accommodate the construction of a secondary microbiology lab as well as adata and control center for Water System Operations. The project also included the installation of appurtenances to support these functions including a fuel storage tank for backup generator power. COST: $3.7 million c. (1) TITLE AND LOCATION (City and State) Koa Ridge – Walea Multi-Family Units Waipahu, Hawaii (2) YEAR COMPLETED PROFESSIONAL SERVICES 2023 CONSTRUCTION (if applicable) 2025 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Inspector. SCOPE: Provided construction management services for 16 buildings and 237 units. The buildings include two types, six-Building A: 10-plex and ten-Building B: 8-plex. Responsibilities included providing quality assurance and quality control services with inspection and oversight of construction to ensure procedures and materials complied with plan and specification documents. COST: $40 million. d. (1) TITLE AND LOCATION (City and State) BWS ESCO Electrical Engineering Support and CM Services, Contract No. C16000301, Honolulu, HI (2) YEAR COMPLETED PROFESSIONAL SERVICES 2024 CONSTRUCTION (if applicable) 2024 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Construction Inspector. SCOPE: Provided CM services for BWS Energy Performance Contract projects with oversight and inspection of all construction activities, reviewing material submittals and schedules, and assist in closeout procedures. COST: $33 million ARCHITECT-ENGINEER QUALIFICATIONS STANDARD FORM 330 (REV. 8/2016) PAGE 10 1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Oliver Pattavina 13. ROLE IN THIS CONTRACT Construction Engineer 14. YEARS EXPERIENCE a. TOTAL 5 b. WITH CURRENT FIRM 1 15. FIRM NAME AND LOCATION (City and State) RHA Construction Management Group, LLC, Honolulu, Hawaii 16. EDUCATION (DEGREE AND SPECIALIZATION) Bachelor of Science, Mechanical Engineering 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) N/A 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Training: Erosion and Sediment Control Plan Coordinator; OSHA Compliance Trained, OSHA 30 Certified; Arc Flash Electrical Safety Train- ing; Trenching and Excavation for the Competent Person; Fall Protection for the Competent Person; Asbestos Safety for the Competent Person 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Hilo Wastewater Treatment Plant Rehabilitation and Replacement Phase 1, Job No. WW- 4705R, Waiakea, Hawaii (2) YEAR COMPLETED PROFESSIONAL SERVICES N/A CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Inspector. SCOPE: Construction management services for the construction, testing, startup, and commissioning of a new replacement septage receiving facility and a new headworks facility, including an electrical building. Work includes the installation of a new odor control system; modifications to existing structures including the primary sedimentation tanks, primary and secondary facilities build- ings, and secondary clarifiers; upgrades to return secondary sludge pumps, scum pumps, waste sludge pumps, and the disinfection system; and implementation of a new sludge blending system with integrated odor control. COST: $340 million b. (1) TITLE AND LOCATION (City and State) Board of Water Supply Manana Corporation Yard Microbiology Lab and Control Center Expansion, Honolulu, Hawaii (2) YEAR COMPLETED PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) Ongoing (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Engineer. SCOPE: RHA Construction Management Group, LLC provided construction management services for the renovation of a portion of the first floor of the administration building and the enclosure of an existing breezeway to accommodate the construction of a secondary microbiology lab as well as a secondary data and control center for Water System Operations. The project also included the installation of appurtenances to support these functions including a fuel storage tank for backup genera- tor power. COST: $3.7 million c. (1) TITLE AND LOCATION (City and State) Sand Island Wastewater Treatment Plant Maintenance Building Construction Management Services Improvement Upgrades, Honolulu, HI (2) YEAR COMPLETED PROFESSIONAL SERVICES 2024 CONSTRUCTION (If applicable) 2025 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Engineer. SCOPE: Responsibilities include scheduling, conducting, and documenting preconstruction and job-site meetings; processing, reviewing, and approving shop drawings, including critical items, as well as handling RFIs; and ensuring work follows contract documents and HIOSH stand-ards. COST: $174 million d. (1) TITLE AND LOCATION (City and State) Department of Hawaiian Home Lands Yorktown Building Reha- bilitation for Transitional Housing, Kalaeloa, Kapolei, HI (2) YEAR COMPLETED PROFESSIONAL SERVICES 2024 CONSTRUCTION (If applicable) 2025 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Inspector. SCOPE: Developed comprehensive construction documents and coordi- nated with consultants; assisted in expediting the permit process during the design phase; provided pro- ject/construction management, including contract review and execution; onsite project management; as- sistance with CA phase to reach substantial and final completion; ensured that work followed the engineering design intent as required by the City and County of Honolulu; and assisted to obtaining pro- ject close out documents. COST: $8 million ARCHITECT-ENGINEER QUALIFICATIONS STANDARD FORM 330 (REV. 8/2016) PAGE 11 1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Loren Taguchi 13. ROLE IN THIS CONTRACT Construction Inspector 14. YEARS EXPERIENCE a. TOTAL 33 b. WITH CURRENT FIRM 1 15. FIRM NAME AND LOCATION (City and State) RHA Construction Management Group, LLC, Honolulu, Hawaii 16. EDUCATION (Degree and Specialization) N/A 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) N/A 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) N/A 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) BWS Manana Corporation Yard Microbiology Lab and Control Center Expansion, Honolulu, HI (2) YEAR COMPLETED PROFESSIONAL SERVICES Ongoing CONSTRUCTION (if applicable) Est. 2026 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Inspector. SCOPE: Provided construction management services for the renovation of a portion of the first floor of the administration building and the enclosure of an existing breezeway to accommodate the construction of a secondary microbiology lab as well as data and control center for Water System Operations. The project also included the installation of appurtenances to support these functions including a fuel storage tank for backup generator power. COST: $3.7 million b. (1) TITLE AND LOCATION (City and State) 2153 North King Street Commercial Building Energy Efficient Improvement Upgrades, Honolulu, HI (2) YEAR COMPLETED PROFESSIONAL SERVICES 2024 CONSTRUCTION (if applicable) 2024 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Inspector. SCOPE: RHA Construction Management Group, LLC provided the design and overall project management, construction management, commissioning, measurement and verification of system savings and performance for identifying and implementing viable cost-effective measures for this commercial building. Also includes replacement of (2) 80-ton air cooled condensing units and air handlers and control systems, interior and exterior LED lighting, lighting controls and photovoltaic systems. COST: $3 million c. (1) TITLE AND LOCATION (City and State) DKIIA Airfield Lighting Circuit Verification – Field Check Light- ing, Honolulu, HI (2) YEAR COMPLETED PROFESSIONAL SERVICES 2023 CONSTRUCTION (if applicable) 2023 ROLE: Construction Inspector. SCOPE: This project entailed the replacement of all L-824 primary cables between all airfield lights, signs, handholes and homeruns to vaults. Services included verifying and identifying existing airfield lighting locations, labeling airfield lighting fixtures, and updating the existing as-built documents; performing site investigations to identify the routing of the airfield lighting circuits; coordinating schedules, runway closures, shutdowns and teams; and attending /facilitating meetings as necessary. COST: N/A d. (1) TITLE AND LOCATION (City and State) BWS Emergency Generators at Kalihi Yard and Shaft, Halawa Shaft, and Kunia Wells I, Honolulu and Kunia, HI (2) YEAR COMPLETED PROFESSIONAL SERVICES 2021 CONSTRUCTION (if applicable) 2021 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Inspector. SCOPE: Provided construction management services to furnish, install, and maintain over a 2-year period, new stationary emergency power generation facilities to provide standby power for wells, pumps, and other equipment if HECO power is temporarily out of service. COST: $5.7 million ARCHITECT-ENGINEER QUALIFICATIONS STANDARD FORM 330 (REV. 8/2016) PAGE 12 1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Kirk Kodama Construction Inspector a. TOTAL 11 b. WITH CURRENT FIRM 1 15. FIRM NAME AND LOCATION (City and State) RHA Construction Management Group, LLC, Honolulu, Hawaii 16. EDUCATION (Degree and Specialization) Associate of Arts, Liberal Arts and General Studies 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) N/A 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) N/A 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED BWS Manana Corporation Yard Microbiology Lab and Control Center Expansion, Honolulu, HI PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Ongoing Est. 2026 a. (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Engineer. SCOPE: Provided construction management services for the renovation of the admin building and the enclosure of an existing breezeway to accommodate the construction of a secondary microbiol- ogy lab as well as a secondary data and control center for Water System Operations; including the installation of appurtenances to support these functions and a fuel storage tank for backup generator power. COST: $3.7 million (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED 2153 North King Street Commercial Building Energy Efficient Improvement Upgrades, Honolulu, HI PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2024 2024 b. (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Inspector. SCOPE: RHA Construction Management Group, LLC provided the design and overall project management, construction management, commissioning, measurement and verification of system savings and performance for identifying and implementing viable cost-effective measures for this commercial building. Also includes replacement of (2) 80-ton air cooled condensing units and air handlers and control systems, interior and exterior LED lighting, lighting controls and photovoltaic systems. COST: $3 million (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Honolulu Board of Water Supply IDIQ Corrosion Control & Repairs Inspection, Various Locations, Oahu, HI PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2024 2024 c. (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Engineer. SCOPE: The project involved corrosion control and repair services for 12 Granulated Activated Charcoal (GAC) water treatment stations on Oahu. Work included rust removal, surface cleaning, and applying protective coatings to GAC vessels, piping, valves, and associated components. It also includes repair or replacement of deteriorated system parts to maintain system integrity. The team coordinated with the BWS Pro- ject Manager and conducted during specified weekday hours to avoid service disruption, as the systems are criti- cal for public water supply and fire protection. COST: N/A (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Construction Management Engineering and Inspection Services for Water Supply Operation Managed Projects, Honolulu, HI PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2022 2022 d. (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Engineer. SCOPE: Provided construction management and inspection for the BWS Water System Operation Division projects include maintenance, repair, renovations and services for various BWS facilities. COST: N/A ARCHITECT-ENGINEER QUALIFICATIONS STANDARD FORM 330 (REV. 8/2016) PAGE 13 1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS SERVICE CATEGORY (Complete one Section E for each key person.) 12. NAME 13. ROLE IN SERVICE CATEGORY 14. YEARS EXPERIENCE James Park Construction Inspector a. TOTAL 28 b. WITH CURRENT FIRM 2 15. FIRM NAME AND LOCATION (City and State) RHA Construction Management Group, LLC, Honolulu, Hawaii 16. EDUCATION (DEGREE AND SPECIALIZATION) Bachelor of Science, Mechanical Engineering 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) N/A 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Training: Erosion and Sediment Control Plan Coordinator; OSHA Compliance Trained, OSHA 30 Certified; Arc Flash Electrical Safety Training; Trenching and Excavation for the Competent Person; Fall Protection for the Competent Person; Asbestos Safety for the Competent Person 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Honolulu Board of Water Supply IDIQ Corrosion Control & Re- pairs Inspection, Various Locations, Oahu, HI (2) YEAR COMPLETED PROFESSIONAL SERVICES 2024 CONSTRUCTION (If applicable) 2024 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Inspector. SCOPE: The project involved corrosion control and repair services for 12 Granulated Activated Charcoal (GAC) water treatment stations on Oahu, managed by the Honolulu Board of Water Supply. Work included rust removal, surface cleaning, and applying protective coatings to GAC vessels, piping, valves, and associated components. It also includes repair or replacement of deteriorated system parts to maintain system in- tegrity. The team coordinated with the BWS Project Manager and conducted during specified weekday hours to avoid service disruption, as the systems are critical for public water supply and fire protection. COST: N/A b. (1) TITLE AND LOCATION (City and State) 2153 North King Street Commercial Building Energy Efficiency Improvement Upgrades, Honolulu, HI (2) YEAR COMPLETED PROFESSIONAL SERVICES 2024 CONSTRUCTION (If applicable) 2024 (3) BRIEF DESCRIPTION(Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Inspector. SCOPE: RHA Construction Management Group, LLC provided the design and overall project management, construction management, commissioning, measurement and verification of system savings and performance for identifying and implementing viable cost-effective measures for this commercial building. Work includes replacement of (2) 80-ton air cooled condensing units and air handlers and control systems, interior and exterior LED lighting, lighting controls, and photovoltaic system. COST: $3 million c. (1) TITLE AND LOCATION (City and State) Department of Hawaiian Home Lands Yorktown Building Rehabilitation for Transitional Housing, Kalaeloa, Kapolei, HI (2) YEAR COMPLETED PROFESSIONAL SERVICES 2024 CONSTRUCTION (If applicable) 2025 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Inspector. SCOPE: Developed comprehensive construction documents and coordinated with consultants; assisted in expediting the permit process during the design phase; provided project/construction man- agement, including contract review and execution; onsite project management; assistance with CA phase to reach substantial and final completion; ensured that work followed the engineering design intent as required by the City and County of Honolulu; and assisted to obtaining project close out documents. COST: $8 million d. (1) TITLE AND LOCATION (City and State) Department of Commerce and Consumer Affairs (DCCA) King Kalakaua Building Project Structural Repairs (2) YEAR COMPLETED PROFESSIONAL SERVICES 2024 CONSTRUCTION (If applicable) 2025 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Inspector. SCOPE: Provided on-site and off-site construction management services throughout the Contractor’s scheduled work periods. Responsibilities include coordinating with the Contractor and Client, con- ducting and documenting preconstruction and job-site meetings, and ensuring compliance with contract docu- ments and HIOSH standards. RHACM monitored construction activities, resolved project-related issues, and verified proper permitting and protection of infrastructure. Additional tasks included reviewing shop drawings, RFIs, and coordinating with adjacent property stakeholders as needed. COST: $20 million ARCHITECT-ENGINEER QUALIFICATIONS STANDARD FORM 330 (REV. 8/2016) PAGE 14 1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Romy Polinar-Pascua 13. ROLE IN THIS CONTRACT Construction Engineer 14. YEARS EXPERIENCE a. TOTAL 6 b. WITH CURRENT FIRM <1 15. FIRM NAME AND LOCATION (City and State) RHA Construction Management Group, LLC, Honolulu, Hawaii 16. EDUCATION (Degree and Specialization) B.S. Electrical Engineering, University of Hawaii at Manoa, 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) N/A 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) N/A 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Hilo Wastewater Treatment Plant Rehabilitation and Replacement Phase 1, Job No. WW- 4705R, Waiakea, Hawaii (2) YEAR COMPLETED PROFESSIONAL SERVICES N/A CONSTRUCTION (if applicable) 2025 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Inspector. SCOPE: Construction management services for the construction, testing, startup, and commissioning of a new replacement septage receiving facility and a new headworks facility, including an electrical building. Work includes the installation of a new odor control system; modifications to existing structures including the primary sedimentation tanks, primary and secondary facilities buildings, and secondary clarifiers; upgrades to return secondary sludge pumps, scum pumps, waste sludge pumps, and the disinfection system; and implementation of a new sludge blending system with integrated odor control. COST: $340 million b. (1) TITLE AND LOCATION (City and State) BWS Manana Corporation Yard Microbiology Lab and Control Center Expansion, Honolulu, HI (2) YEAR COMPLETED PROFESSIONAL SERVICES Ongoing CONSTRUCTION (if applicable) Ongoing (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Inspector. SCOPE: Provided CM services for the renovation of a portion of the first floor of the administration building and the enclosure of an existing breezeway to accommodate the construction of a secondary microbiology lab as well as a data and control center for Water System Operations. The project also included the installation of appurtenances to support these functions including a fuel storage tank for backup generator power. COST: $3.7M c. (1) TITLE AND LOCATION (City and State) Sand Island Wastewater Treatment Plant Maintenance Building Construction Management Services Improvement Upgrades, Honolulu, HI (2) YEAR COMPLETED PROFESSIONAL SERVICES 2024 CONSTRUCTION (if applicable) 2025 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Engineer. SCOPE: Responsibilities include scheduling, conducting, and documenting preconstruction and job-site meetings; processing, reviewing, and approving shop drawings, including critical items, as well as handling RFIs; and ensuring work follows contract documents and HIOSH standards. COST: $174 million d. (1) TITLE AND LOCATION (City and State) Young Brothers Project Management and Coordination Services under General Services, Statewide, Hawaii (2) YEAR COMPLETED PROFESSIONAL SERVICES 2021 CONSTRUCTION (if applicable) 2021 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Engineer. SCOPE: Provided CM services for the general maintenance and repair work on structures and ports statewide to improve the overall function and appearance to service customers. COST: $20 million ARCHITECT-ENGINEER QUALIFICATIONS STANDARD FORM 330 (REV. 8/2016) PAGE 15 1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.)y person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Eric Ventura Construction Inspector a. TOTAL 1 b. WITH CURRENT FIRM <1 15. FIRM NAME AND LOCATION (City and State) RHA Construction Management Group, LLC, Honolulu, Hawaii 16. EDUCATION (Degree and Specialization) Bachelor of Science, Civil Engineering 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) N/A 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) N/A 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Department of Commerce and Consumer Affairs King Kalakaua Building Project Structural Repairs, Honolulu, HI PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2024 Est. Aug. 2025 a. (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Inspector. SCOPE: Provide project/construction management services, including contract re- view and execution; onsite project management; assistance with CA phase to reach substantial and final comple- tion; ensure that work is in accordance with engineering design intent as required by the City and County of Honolulu; and assist to obtain and oversee project close out. COST: N/A (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Department of Hawaiian Home Lands Yorktown Building Rehabilitation for Transitional Housing, Kalaeloa, Kapolei, HI PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2024 2025 b. (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Inspector. SCOPE: Developed comprehensive construction documents and coordinated with consultants; assisted in expediting the permit process during the design phase; provided project/construction management, including contract review and execution; onsite project management; assistance with CA phase to reach substantial and final completion; ensured that work followed the engineering design intent as required by the City and County of Honolulu; and assisted to obtaining project close out documents. COST: $8 million (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Honolulu Board of Water Supply IDIQ Corrosion Control & Repairs Inspection, Various Locations, Oahu, HI PROFESSIONAL SERVICES 2024 PROFESSIONAL SERVICES 2024 c. (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Inspector. SCOPE: The project involved corrosion control and repair services for 12 Granu- lated Activated Charcoal (GAC) water treatment stations on Oahu. Work included rust removal, surface cleaning, and applying protective coatings to GAC vessels, piping, valves, and associated components. It also includes re- pair or replacement of deteriorated system parts to maintain system integrity. The team coordinated with the BWS Project Manager and conducted during specified weekday hours to avoid service disruption, as the systems are critical for public water supply and fire protection. COST: N/A (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Young Brothers Project Management and Coordination Services under General Services - Neighbor Island Facility Enhancement Project, Statewide, Hawaii PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2021 2021 d. (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Construction Inspector. SCOPE: Provided construction management services, planning, and design for the general maintenance and repair work on structures and ports statewide to improve the overall function and ap- pearance to service customers. COST: $20 million ARCHITECT-ENGINEER QUALIFICATIONS STANDARD FORM 330 (REV. 8/2016) PAGE 16 1 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 1 21. TITLE AND LOCATION (City and State) Kulani Correctional Facility Potable Water Supply, Hilo, Hawaii 22. YEAR COMPLETED PROFESSIONAL SERVICES 2021 CONSTRUCTION (if applicable) 2021 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER County of Hawaii, Department of Public Safety b. POINT OF CONTACT NAME Terry Visperas c. POINT OF CONTACT TELEPHONE NUMBER (808) 587-1247 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) SCOPE: The RHA Construction Management Group, LLC provided construction management services for the Department of Public Safety, Project #: PSD 19-KSF-12. Scope of work consisted of the installation of a new water service lateral, meter and fill station at Kulani Correctional Facility in Hilo, Hawaii. PROJECT COST: $1.2 million 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. RHA Construction Management Group, LLC Honolulu, Hawaii Construction Manager ARCHITECT-ENGINEER QUALIFICATIONS STANDARD FORM 330 (REV. 8/2016) PAGE 17 1 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 2 21. TITLE AND LOCATION (City and State) Kawaihae Water Connection Kailua-Kona, Hawaii 22. YEAR COMPLETED PROFESSIONAL SERVICES Ongoing CONSTRUCTION (if applicable) Ongoing 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER Young Brothers b. POINT OF CONTACT NAME Tiffanie M. Whitworth c. POINT OF CONTACT TELEPHONE NUMBER (808) 543-9311 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) SCOPE: RHA Construction Management Group, LLC is providing engineering services to design properly sized water connection from main water line into the office trailer. RHA CM will also provide all permitting and engineering support required to install a new water line and further assess whether existing grey water tanks are appropriately sized and if tanks need to be replaced for the new water connection. PROJECT COST: N/A 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. RHA Construction Management Group, LLC Honolulu, Hawaii Construction Manager ARCHITECT-ENGINEER QUALIFICATIONS STANDARD FORM 330 (REV. 8/2016) PAGE 18 1 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 3 21. TITLE AND LOCATION (City and State) Kawaihae Maintenance & Repair Work Kailua-Kona, Hawaii 22. YEAR COMPLETED PROFESSIONAL SERVICES Ongoing CONSTRUCTION (if applicable) Ongoing 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER Young Brothers b. POINT OF CONTACT NAME Tiffanie M. Whitworth c. POINT OF CONTACT TELEPHONE NUMBER (808) 543-9311 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) SCOPE: RHA Construction Management Group, LLC is providing general project management services to perform the following work at the the Port of Kawaihae: • Manager's Office - Replace flooring; Procure and install desks for OPCs • Container Station - Fill/seal gap on window on mauka side of building; Replace windows/flooring • Break Room - Reinforce weak points of flooring substructure and replace with new flooring • Freight Clerk Office - Extend external deck near door facing Manager's office; Install awning for newly extended deck PROJECT COST: N/A 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. RHA Construction Management Group, LLC Honolulu, Hawaii Construction Manager ARCHITECT-ENGINEER QUALIFICATIONS STANDARD FORM 330 (REV. 8/2016) PAGE 19 1 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 4 21. TITLE AND LOCATION (City and State) City and County of Honolulu, Department of Design and Construction, Kailua Regional Wastewater Treatment Plant (KRWWTP) Tunnel Influent Pump Station and Headworks Kailua, HI 22. YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (if applicable) 2018 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City and County of Honolulu Dept. of Design & Construction b. POINT OF CONTACT NAME Jon Yamane c. POINT OF CONTACT TELEPHONE NUMBER (808) 768-8788 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) SCOPE: Construction management services for the second phase of the Kaneohe-Kailua (KK) Wastewater Conveyance and Treatment Facilities Project. Construction at the Kailua Regional Wastewater Treatment Plant (KRWWTP) included a new Headworks, new Generator/Electrical Building, and a 6-story Tunnel Influent Pump Station to pull wastewater from the KK tunnel to the KRWWTP. PROJECT COST: $149 million *This project was completed under a former employer of Pono Consulting Management employee(s)) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. Pono Consulting Management Honolulu, Hawaii Construction Manager ARCHITECT-ENGINEER QUALIFICATIONS STANDARD FORM 330 (REV. 8/2016) PAGE 20 1 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 5 21. TITLE AND LOCATION (City and State) Board of Water Supply ESCO Electrical Engineering Support and Construction Management Services, BWS Contract No. C16000301 22. YEAR COMPLETED PROFESSIONAL SERVICES 2024 CONSTRUCTION (if applicable) 2024 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER Board of Water Supply b. POINT OF CONTACT NAME Jordan Oue c. POINT OF CONTACT TELEPHONE NUMBER (808) 748-5834 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) SCOPE: RHA Construction Management Group, LLC (formerly Ronald N.S. Ho & Associates, Inc.) provided construction management services for various Energy Conservation Measures (ECMs) proposed by the BWS energy savings contractor on a BWS Energy Performance Contract (ESPC). ECM projects include Lighting Retrofit Work on interior and exterior LED Lighting Systems at the Beretania Complex and Corporation Yards, involving retrofitting of lighting fixtures or replacing lighting fixtures at the facility. Power Factor Correction Retrofit Work at various wells and pumping stations throughout the island of Oahu involves removing existing capacitors and connecting new power factor capacitors to existing electrical equipment. Conduit and conductors sized appropriate to the load are provided. Rider M/TOU Pump Control Work will implement priority peak curtailment for HECO Rider M at identified sites. Control equipment and programming to allow the identified sites to switch to the TOU-J rate schedule. Well Pump Controls work identifies four (4) well pumps at two sites to be replaced. Photovoltaic Systems NEM Work at the Beretania Complex and Corporation Yards. Reservoirs will require PV systems to be ballast mounted. Ground-mounted PV systems will be installed including several arrays in the Beretania Complex parking lots. HVAC Upgrade work at Corporation Yards and Beretania Complex will include mechanical, electrical and structural tasks involving concrete foundation equipment HK removal of existing packaged air conditioning unit, ductwork, piping, fittings and electrical controls. The new equipment will be a split system type with separate condenser and air handling units. Additional electrical power tie-in, conduit runs and disconnect installation will be required, as well as the installation of new refrigerant lines, duct work and testing and balancing of the completed system. PROJECT COST: $33 million 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. RHA Construction Management Group, LLC Honolulu, Hawaii Construction Manager ARCHITECT-ENGINEER QUALIFICATIONS STANDARD FORM 330 (REV. 8/2016) PAGE 21 1 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 6 21. TITLE AND LOCATION (City and State) Department of Hawaiian Home Lands Yorktown Building Rehabilitation for Transitional Housing, Kalaeloa, Kapolei, HI 22. YEAR COMPLETED PROFESSIONAL SERVICES 2024 CONSTRUCTION (if applicable) 2025 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER Board of Water Supply b. POINT OF CONTACT NAME Ross Lum c. POINT OF CONTACT TELEPHONE NUMBER (808) 748-5835 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) SCOPE: Developed comprehensive construction documents and coordinated with consultants; assisted in expediting the permit process during the design phase; provided project/construction management, including contract review and execution; onsite project management; assistance with CA phase to reach substantial and final completion; ensured that work followed the engineering design intent as required by the City and County of Honolulu; and assisted to obtaining project close out documents. PROJECT COST: $8 million 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. RHA Construction Management Group, LLC Honolulu, Hawaii Construction Manager b. R&D Contractors Honolulu, Hawaii General Contractor ARCHITECT-ENGINEER QUALIFICATIONS STANDARD FORM 330 (REV. 8/2016) PAGE 22 1 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 7 21. TITLE AND LOCATION (City and State) Board of Water Supply Emergency Generators at Kalihi Yard and Shaft, Halawa Shaft, and Kunia Wells I, Honolulu, HI 22. YEAR COMPLETED PROFESSIONAL SERVICES 2021 CONSTRUCTION (if applicable) 2021 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER Board of Water Supply b. POINT OF CONTACT NAME Sandy Nahoopii-Soong c. POINT OF CONTACT TELEPHONE NUMBER (808) 748-5731 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) SCOPE: RHA Construction Management Group, LLC (formerly Ronald N.S. Ho & Associates, Inc.) provided construction management services to furnish, install, and maintain over a 2-year period, new stationary emergency power generation facilities at three (3) BWS facilities to provide standby power for wells, pumps, and other equipment in the event that Hawaiian Electric Company (HECO) power is temporarily out of service. The three BWS sites are: 1) Kalihi Yard and Shaft, 2) Halawa Shaft, and 3) Kunia Wells I. RNSHA and the contractor are responsible for coordinating and scheduling all work in conjunction with the ongoing ESCO contract. PROJECT COST: $5.7 million 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. RHA Construction Management Group, LLC Honolulu, Hawaii Construction Manager ARCHITECT-ENGINEER QUALIFICATIONS STANDARD FORM 330 (REV. 8/2016) PAGE 23 1 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 8 21. TITLE AND LOCATION (City and State) Sand Island Wastewater Treatment Plant Maintenance Building Construction Management Services Improvement Upgrades, Honolulu, HI 22. YEAR COMPLETED PROFESSIONAL SERVICES 2024 CONSTRUCTION (if applicable) 2025 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City & County of Honolulu b. POINT OF CONTACT NAME Yogi Kwong Engineers Jeff Kalani c. POINT OF CONTACT TELEPHONE NUMBER (808) 942-0001 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) SCOPE: Responsibilities include scheduling, conducting, and documenting pre-construction and job-site meetings involving the contractor, project team, and critical subcontractors/suppliers, and ensuring work follows contract documents and HIOSH standards. RHA CM conducted weekly quality control meetings with the general contractor and consultant and provided inspection of quality control items addressed by Contractor and project team. Lastly, the scope involved processing, reviewing, and approving shop drawings, including critical items, as well as handling RFIs. PROJECT COST: $174 million 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. RHA Construction Management Group, LLC Honolulu, Hawaii Construction Manager ARCHITECT-ENGINEER QUALIFICATIONS STANDARD FORM 330 (REV. 8/2016) PAGE 24 1 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 9 21. TITLE AND LOCATION (City and State) Construction Management Services for the Hilo Wastewater Treatment Plant Rehabilitation and Replacement Phase 1, Job No. WW- 4705R Waiakea, Hawaii 22. YEAR COMPLETED PROFESSIONAL SERVICES Ongoing CONSTRUCTION (if applicable) Ongoing 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER County of Hawai'i, Department of Environmental Management, Wastewater Division (DEM-WWD) b. POINT OF CONTACT NAME R.M. Towill Corporation Greg Hiyakumoto, President c. POINT OF CONTACT TELEPHONE NUMBER (808) 941-0577 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) SCOPE: Provide construction management services to oversee the construction of the Hilo Wastewater Treatment Plant Rehabilitation and Replacement - Phase 1, Job No. WW-4705R (Project). The general project scope includes: • Construction, testing, startup, and commissioning of a new replacement septage receiving facility. • New replacement headworks facility. • New replacement odor control system for the headworks and existing primary sedimentation tanks. • New headworks electrical building. • Modifications to the existing primary sedimentation tanks; modifications to the existing primary and secondary facilities buildings; modifications to the existing secondary clarifiers and associated return secondary sludge pumps, secondary scum pumps, and waste secondary sludge pumps; modifications to the disinfection system; a new sludge blending system with odor control. PROJECT COST: $340 million 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. RHA Construction Management Group, LLC Honolulu, Hawaii Construction Manager b. R.M. Towill Corporation Honolulu, Hawaii Prime Construction Manager ARCHITECT-ENGINEER QUALIFICATIONS STANDARD FORM 330 (REV. 8/2016) PAGE 25 1 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 10 21. TITLE AND LOCATION (City and State) Nawiliwili Container Station Build & M&R Work Kauai, Hawaii 22. YEAR COMPLETED PROFESSIONAL SERVICES 2023 CONSTRUCTION (if applicable) 2023 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER Young Brothers b. POINT OF CONTACT NAME Tiffanie M. Whitworth c. POINT OF CONTACT TELEPHONE NUMBER (808) 543-9311 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) SCOPE: RHA Construction Management Group, LLC provided general project management services to perform the following work at the Port of Nawiliwili: • Replace restroom fixtures in the restroom of the Manager's Office Trailer • Design, build and install a container station with deck for operational use near comfort station • Relocate existing combo structure to center of yard near comfort station PROJECT COST: N/A 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. RHA Construction Management Group, LLC Honolulu, Hawaii Construction Manager ARCHITECT-ENGINEER QUALIFICATIONS STANDARD FORM 330 (REV. 8/2016) PAGE 26 1 G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 26. NAMES OF KEY PERSONNEL (From Section E, Block 12) 27. ROLE IN THIS CONTRACT (From Section E, Block 13) 28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in “Example Projects Key” section below before completing table. Place “X” under project key number for participation in same or similar role) 1 2 3 4 5 6 7 8 9 10 Brian Sekiguchi, CCM President/ Construction Manager Michael P. Young, PE, CCM, , FCMAA Construction Manager Sean Sugai, PE Vice President Bryan Bosworth, CSSM Construction Manager Brad Takenaka, PE Construction Manager / Project Engineer Steven Chung, PE Civil Engineer Randall Tamashiro Construction Inspector Aaron Awaya Construction Inspector Oliver Pattavina Construction Inspector Loren Taguchi Construction Inspector Kirk Kodama Construction Inspector James Park Construction Inspector Romy Polinar-Pascua Construction Inspector Eric Ventura Construction Inspector 29. EXAMPLE PROJECTS KEY No. Title of Example Project (from Section F) No. Title of Example Project (from Section F) 1. Kulani Correctional Facility Potable Water Supply, Hilo, Hawaii 6. Department of Hawaiian Home Lands Yorktown Building Rehabilitation for Transitional Housing Kalaeloa, Kapolei, HI 2. Kawaihae Water Connection Kailua-Kona, Hawaii 7. Board of Water Supply Emergency Generators at Kalihi Yard and Shaft, Halawa Shaft, and Kunia Wells I, Honolulu, Hawaii 3. Kawaihae Maintenance & Repair Work Kailua-Kona, Hawaii 8. Sand Island Wastewater Treatment Plant Maintenance Building Construction Management Services Improvement Upgrades, Honolulu, HI 4. City and County of Honolulu, Department of Design and Construction, Kailua Regional Wastewater Treatment Plant (KRWWTP) Tunnel Influent Pump Station and Headworks Kailua, HI 9. Construction Management Services for the Hilo Wastewater Treatment Plant Rehabilitation and Replacement Phase 1, Job No. WW- 4705R Waiakea, Hawaii 5. Board of Water Supply ESCO Electrical Engineering Support and Construction Management Services, BWS Contract No. C16000301, Honolulu, Hawaii 10. Young Brothers Nawiliwili Container Station Build & M&R Work, Kauai, Hawaii ARCHITECT-ENGINEER QUALIFICATIONS STANDARD FORM 330 (REV. 8/2016) PAGE 27 1 H. ADDITIONAL INFORMATION 30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. (Attach additional sheets as needed.) 1. Name of the firm or person, contact information including email address, principal place of business, and location of all of its offices. RHA Construction Management Group, LLC Brian Sekiguchi, CCM, President bsekiguchi@rhacm.com | (808) 941-0577 2153 North King Street, Suite 201, Honolulu, Hawaii 96819 2. Age of the firm and its average number of employees over the past five years. RHA Construction Management Group, LLC was established on July 1, 2020 and has maintained an average of 15 employees over the past years. 3. Education, training, and qualifications of the individual or firm. Please refer to SF330 Section E Resumes for the education, training, and qualifications of key members of our firm. 4. A list of recent projects and the names of up to five clients who may be contacted, including at least two for whom services were rendered during the preceding year. CONSTRUCTION MANAGEMENT PROJECTS: • Young Brothers Various Maintenance and Repair Projects, Statewide, Hawaii. RHA CM provided construction management services, planning, and design for the general maintenance and repair work on structures and ports statewide to improve the overall function and appearance to service customers. Repair work on structures and ports statewide was required to improve the overall function and appearance to service customers. • Keolu at Koa Ridge, Parcel A13a & A13b, Affordable Multi-Family - Construction Management/Third Party QA/QC Services, Waipahu, Hawaii. Review project scope and site with owner representative and provide third party QA/QC of construction per plan documents for the following: Grade Level Foundation (S.O.G./Pre-Slab), Window/Door/Preliminary Weatherproofing, Structural (Wood) Framing, & Mechanical, Electrical, Plumbing, Shower/Tub Substrate Waterproofing, Exterior Weather Barrier, Roofing System/Flashings, and Solar Panels (as applicable). Provide inspection and oversight of construction to ensure procedures and materials comply with plan and specification documents. • Department of Commerce and Consumer Affairs (DCCA) King Kalakaua Building Project Structural Repairs, Honolulu, Hawaii. Provided on-site and off-site construction management services throughout the Contractor’s scheduled work periods. Responsibilities include coordinating with the Contractor and Client, conducting and documenting preconstruction and job-site meetings, and ensuring compliance with contract documents and HIOSH standards. RHACM monitored construction activities, resolved project- related issues, and verified proper permitting and protection of infrastructure. Additional tasks included reviewing shop drawings, RFIs, and coordinating with adjacent property stakeholders as needed. ARCHITECT-ENGINEER QUALIFICATIONS STANDARD FORM 330 (REV. 8/2016) PAGE 28 1 H. ADDITIONAL INFORMATION 30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. (Attach additional sheets as needed.) • Daniel K. Inouye International Airport (DKIIA) Airfield Lighting Circuit Verification – Field Check Locations, Honolulu, Hawaii. Provided services to verify and identify existing airfield lighting locations, label airfield lighting fixtures, and update the existing as-built documents. Performed site investigations to identify the routing of the airfield lighting circuits; coordinated schedules, runway closures, shutdowns and teams. Daniel K. Inouye International Airport (DKIIA) Ewa Chiller Vault & Vault H New Generator Building Project, Honolulu, Hawaii. Provided project management and construction management services to support investigate toning work for the installation of a new generator building, manholes, and duct lines. • Honolulu Authority for Rapid Transportation (HART) Contractor Safety & Security Representative for Various Projects, Honolulu, Hawaii. Provided Safety and Security certified personnel (CSSM/CSSR) to monitor various types of work at the HART rail stations and related areas. Staff needed to be knowledgeable with AHAs (for multi-discipline tasks) and LOTTOs (Log-Out-Tag-Out) procedures. Included training and familiarity on Hitachi procedures and protocol for any rail work activity. • Punahou School Energy Efficiency Projects, Honolulu, Hawaii. Provided construction management for the implementation of several campus-wide LED lighting retrofits, campus-wide building submetering and energy monitoring platform, and various building HVAC retrofits. • Ray & Joan Kroc Corps Community Center Energy Efficiency Projects, Kapolei, Hawaii. Provided construction management for the implementation of energy efficiency projects at the Salvation Army’s Ray and Joan Kroc Corps Community Center in Kapolei. • Joint Traffic Management Center, Federal Aid Project #CMAQ-001(41), Honolulu, Hawaii. Provided construction management services for the JTMC project in Honolulu. • Condition Assessments and Inspections for Various Repairs at Franklin Tower Condominium, Honolulu, Hawaii. Provided condition assessments and inspections for various repairs at the 41 story Franklin Tower condominium in Salt Lake. • Condition Assessments and Inspections for Various Plumbing and Building Repairs at Crosspointe Community Association, Honolulu, Hawaii. Provided condition assessments and inspections for various repairs at the Crosspointe Community Association in Honolulu. • Board of Water Supply ESCO Electrical Engineering Support and Construction Management Services, BWS Contract No. C16000301, Honolulu, Hawaii. Provided construction management and engineering services for various energy Conservation Measures (ECMs) proposed by BWS energy savings contractor on the BWS Energy Performance Contract (ESPC). • Construction Management, Engineering and Inspection Services for Water Supply Operation Managed Projects for the Board of Water Supply. Provided construction management and inspection as part of the R.M. Towill Corporation CM team for the BWS Water System Operation Division projects including maintenance, repair, renovations and services for various BWS facilities. • Board of Water Supply Emergency Generators at Kalihi Yard and Shaft, Halawa Shaft, and Kunia Wells I, Various Locations, Oahu, Hawaii. Provided construction management services to furnish, install, and maintain over a 2-year period, new stationary emergency power generation facilities at three (3) BWS facilities to provide standby power for wells, pumps, and other equipment if Hawaiian Electric Company (HECO) power is temporarily out of service. ARCHITECT-ENGINEER QUALIFICATIONS STANDARD FORM 330 (REV. 8/2016) PAGE 29 1 H. ADDITIONAL INFORMATION 30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. (Attach additional sheets as needed.) • Construction Management for WSOIDIQ 17-6A, Roofing Repairs, BWS Contract No. C18001005, Various Locations, Oahu, Hawaii. Provided construction management services for various roofing repairs under and IDIQ contract. • Board of Water Supply Manana Corporation Yard Diesel Fuel Tank Replacement, Pearl City, Hawaii. Provided project and construction management services to support the fuel system improvements. • Board of Water Supply Replacement of Electrical Utility Pole & Meter Servicing at Waihee Chlorinator, Waihee Road, Kahaluu, Hawaii. Provided construction management services to remove the existing electric meter and electrical service conduits servicing the Waihee Chlorinator. • Board of Water Supply Kaimuki Pump Station Electrical Upgrades, Honolulu, Hawaii. Provided construction management services for the upgrade and replacement of existing light fixtures, switches and receptacles from the Kaimuki pump station. • Board of Water Supply Kaimuki Pump Station Historic Preservation, Honolulu, Hawaii. Provided construction management for the historic preservation of this pump station restoring the appearance of this historic structure. • Joint Base Pearl Harbor Hickam P-704 Sewer Lift Station and Relief Sewer Lines, JBPHH Hawaii. Provided construction management and inspection services to Kiewet Infrastructure West Co. for a new wastewater pump station replacing the existing pump station and a new gravity sewer main along South Avenue. • Hawaii Gas SNG Facility Above Ground Storage Tank, Kapolei, Hawaii. Provided project management and construction management services for a new above ground storage tank system at the synthetic natural gas (SNG) facility at Campbell Industrial Park. • 1717 Ala Wai Replace Generator, Honolulu, Hawaii. Provided construction management and design to replace existing standby generator in its current location to reconnect to the existing remote radiator, design for remote fuel spout with connection to the base mounted fuel tank and temporary relocation and replacement of existing circuits to accommodate structural spalling repair work. • 851 Fort Street Mall Hawaiian Host Renovation, Honolulu, Hawaii. Provided construction management and project management services for the renovation of commercial office spaces in a downtown facility. • 1411 South King Street Electrical Upgrades, Honolulu, Hawaii. Provided construction management services including bid/contract packaging, project management, contract administration, and construction management services for new electrical service. • E Noa Tours Electric Bus Chargers, Honolulu, Hawaii. Provided construction management services for the installation of permanent bus chargers within the existing E Noa Tours building. • Lanai Temporary Trailers, Lanai City, Hawaii. Provided construction management for the implementation of electrical branch circuiting, underground electrical conduits and other electrical equipment requiring power connections at the hangar facility, two (2) 40-foot office trailers, and two (2) portable trailers. ARCHITECT-ENGINEER QUALIFICATIONS STANDARD FORM 330 (REV. 8/2016) PAGE 30 1 H. ADDITIONAL INFORMATION 30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. (Attach additional sheets as needed.) Hilton Hawaiian Village Room Renovations, Honolulu, Hawaii. Provided QA/QC services for third party inspection of the renovation work on the hotel rooms in the Hilton Hawaiian Village Renovation work in- cluding new flooring, drywall, taping, plaster, wall covering, painting, counters and miscellaneous electri- cal and mechanical work. • HECO Construction Services – Kahe Halawa #1 / Kahe-Waiau, Kahe-Halawa 138kV Replacement Foundation Installation Project. Provided construction management services for the installation of 39 new steel pole foundations. • HECO Construction Inspection Services HECO V2V Cable Replacement Projects Kunia Makai 2 Circuit, Village Park. Provided construction management services for the replacement of direct buried primary and secondary cables with cables in concrete encased conduit. • HECO Construction Inspection Services HECO V2V Cable Replacement Projects Ahuimanu Hills Phase III, Kaneohe, HI. Provided construction management services for the replacement of direct buried primary and secondary cables with cables in concrete encased conduit. • HECO Construction Inspection Services – Ualena St. P18X & P20 Foundation Installation Project, Honolulu, Hawaii. Provided construction management services for the installation of two (2) concrete foundations for two (2) mono steel poles. Services included the oversight of excavation and installation of foundation shafts, and final inspection. • HECO Construction Inspection Services – AES-CEIP #1 138kV Line Relocation Installation Project, Honolulu, Hawaii. Provided construction management services for the excavation and installation of the new foundation shafts. Present during construction through completion and final inspection. • Utility Toning for the Daniel K. Inouye International Airport (DKIIA) Ewa Chiller Vault & Vault H New Generator Building Project, Honolulu, Hawaii. Provided construction management services to support investigative toning work for the installation of anew generator building, manholes, and duct lines. • Department of Education, Various Schools Statewide, Construct Temporary Facilities for FY2010, Fire Alarm Testing, Hawaii. Provided construction management services to inspect the installation of fire alarm devices in temporary classrooms throughout the state. • Various Schools Statewide, Relocate/Construct Temporary Facilities for FY 2010, Solomon Elementary School – Site Inspections, Honolulu, Hawaii. Provided construction management services for Solomon Elementary School. • Amerisource Bergen, HVAC Upgrade, Construction Observation. Provided construction management services. • Fire Alarm System Replacement at Laie Elementary School, Honolulu, Hawaii. Provided construction management services to inspect the installation of a new fire alarm system for the Laie Elementary School. • Pohnpei Utilities Corporation (PUC) 6 MW Power Module Project. Provided quality control management of the 6MW Power Module project at the PUC in the Federated States of Micronesia. • ARCHITECT-ENGINEER QUALIFICATIONS STANDARD FORM 330 (REV. 8/2016) PAGE 31 1 H. ADDITIONAL INFORMATION 30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. (Attach additional sheets as needed.) • Pohnpei Utilities Corporation (PUC) 4MW Power Module Project, Pohnpei State, Federated State of Mi- cronesia. Provided construction and quality control management services to PUC for the installation and commissioning of (2) 2MW power generation modules to provide additional backup support to the util- ity’s power generation system. • Mahana Estates Development (Site Work). Currently providing project/ construction management of the site work of the Mahana Estates Homesites in Kapalua, Maui. • Mahana Estates Development (Residences) Currently providing project/construction management of the residences at the Mahana Estates Homesites development in Kapalua, Maui. • 2153 North King Street Lighting Retrofit, Honolulu, Hawaii. Provides engineering services for the proposed lighting retrofit for the building at 2153 North King Street which included the following: performed a lighting energy audit, designed energy efficient lighting systems for the subject building; assisted in the selection of contractor and materials for use in the project; assisted with DREAL Hawaii to finance the project; performed construction management for the project; and, worked with Hawaii Energy to obtain incentives and rebates for the project. The three floors of retail and commercial space are approximately 62,000 s.f. and the covered parking in the basement is approximately 20,000 s.f. • Construction Management Services for 1411 South King Street Electrical Upgrades, Honolulu, Hawaii. Provided bid/contract packaging, project management, contract administration, and construction management services for electrical upgrades at 1411 South King Street in Honolulu, HI. • City Hall Fire Alarm System Improvements, Honolulu, Hawaii. Provided construction management services for the project. • Traffic Improvements at Various Locations, Pedestrian Safety Pilot Project at 1772 South King Street, C&C Consultant Contract No. SC-DTS-1000179. Provided design for the construction of a new solar powered LED pedestrian warning system as a pilot project. CLIENT REFERENCES Honolulu Board of Water Supply Ross Lum, Project Manager (808) 748-5835 Honolulu Board of Water Supply Sandy Nahoopii-Soong Civil Engineer V (808) 748-5731 Yogi Kwong Engineers Jeff Kalani, PE President / CEO (808) 942-0001 City & County of Honolulu Department of Design and Con- struction Stanley Ige, Electrical Engineer V (808) 768-6002 R.M. Towill Corporation Greg Hiyakumoto, President (808) 842-1133 ARCHITECT-ENGINEER QUALIFICATIONS STANDARD FORM 330 (REV. 8/2016) PAGE 32 1 H. ADDITIONAL INFORMATION 30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. (Attach additional sheets as needed.) 5. Any promotional or descriptive literature which the individual or firm desires to submit. RHA Construction Management Group, LLC (RHA CM) was created at the request of our clients to provide professional project and construction management and inspection services for the various projects designed by Ronald N.S. Ho & Associates. Established in 2020 with an experienced team of construction and project managers, inspectors, and engineers, we provide project and construction management services for federal, state and city government agencies and private and non-profit clients. Our market sector includes public and private building structures, site infrastructure systems, lighting systems, electrical distribution systems, and water and wastewater systems. Our construction management team averages over 20 years of diverse construction and facility management, real estate development, and redevelopment and renovation experience. Embodying an “owner’s mentality”, our CM professionals undertake full responsibility for the oversight and management of the entire construction process, from construction kick-off to project acceptance. We maintain the highest levels of communication with the latest technology to ensure the successful execution of any project, regardless of size or complexity. Serving as the single point of contact for our clients, our team ensures that its projects are completed on time and within budget while minimizing risk. Our approach allows our clients to focus on their core business and strategies in order for them to maximize their land-based assets while continuing to improve their facilities and infrastructure. Our services include but are not limited to: • Planning & Scheduling • Budgeting • Bid Packaging • Contract Management • Repair & Maintenance Inspection • Project Management • Construction Management and Inspection • Building Inspection • Tenant Coordination • Project Closeout • Commissioning • Third Party Inspection Please refer to APPENDIX: Company Brochure for additional information on RHA Construction Management Group, LLC. I. Authorized Representative The foregoing is a statement of facts. 31. SIGNATURE 32. DATE June 30, 2025 33. NAME AND TITLE Brian Sekiguchi, CCM, President ARCHITECT-ENGINEER QUALIFICATIONS STANDARD FORM 330 (REV. 8/2016) PAGE 33 1 ARCHITECT-ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (if any) 25-26 PART II - GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM (OR BRANCH OFFICE) NAME RHA Construction Management Group, LLC 3. YEAR ESTABLISHED 2020 4. UNIQUE ENTITY IDENTIFIER 85-1013091 2b. STREET 5. OWNERSHIP 2153 N. King Street, Suite 201 a. TYPE Single Member LLC 2c. CITY Honolulu 2d. STATE Hawaii 2e. ZIP CODE 96819 b. SMALL BUSINESS STATUS Self-Certified Small Business 6a. POINT OF CONTACT NAME AND TITLE Brian Sekiguchi, CCM, President 7. NAME OF FIRM (If block 2a is a branch office) N/A 6b. TELEPHONE NUMBER 808-941-0577 6c. E-MAIL ADDRESS bsekiguchi@rhacm.com 8a. FORMER FIRM NAME(S) (If any) 8b. YR. ESTABLISHED 8c: DUNS NUMBER N/A N/A N/A 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Func-tion Code b. Discipline c. No. of Employees a. Profile Code b. Experience c. Revenue Index Number (see below) (1) Firm (2) Branch 06 Architect 1 A06 Airports; Terminals & Hangars; Freight Handling 2 16 Construction Manager 1 E03 Electrical Studies & Design 2 12 Civil Engineer 2 H01 Harbors; Jetties; Piers, Ship Terminal Facilities 3 15 Construction Inspectors 16 H11 Housing (Residential, Multi-Family; Apartments; Condos) 2 P12 Power Generator, Transmission, Distribution 4 S04 Sewage Collection; Treatment & Disposal 4 W03 Water Supply; Treatment & Disposal 3 Other Employees Total 20 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) PROFESSIONAL SERVICES REVENUE INDEX NUMBER 1. Less than $100,000 2. $100,00 to less than $250,000 3. $250,000 to less than $500,000 4. $500,000 to less than $1 million 5. $1 million to less than $2 million 6. $2 million to less than $5 million 7. $5 million to less than $10 million 8. $10 million to less than $25 million 9. $25 million to less than $50 million 10. $50 million or greater a. City Work 2 b. Non-City Work 5 c. Total Work 5 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. a. SIGNATURE b. DATE June 30, 2025 c. NAME AND TITLE Brian Sekiguchi, CCM, President Licenses General License Other Business/Person/DBA Names  Employees List Employees License ID PE-13142 License Type PROFESSIONAL ENGINEER Legal License Name MICHAEL P YOUNG Status CURRENT, VALID & IN GOOD STANDING Entity Type INDIVIDUAL Active/Inactive ACTIVE Original License Date 11/10/2008 Expiration Date 04/30/2026 Restriction -- Trade/Professional Name -- Special Privilege -- Conditions & Limitations -- Class Prefix -- Business Code -- Educational Code -- Business Address -- Search:Filter...Records Per Page Columns to Show Showing 0 to 0 of 0 entries Name Effective Date Termination Date NO DATA AVAILABLE IN TABLE Previous Next Show entries10 CLASSES (ACTIVE): CE Civil BRAD P TAKENAKA 98-2034 KIPIKUA STREET AIEA, HI 96701 CLASS(ES): CE CIVIL PROFESSIONAL ENGINEER STATE OF HAWAII DEPARTMENT OF COMMERCE AND CONSUMER AFFAIRS Expiration date 4/30/2026 License Number PE-15760 PROFESSIONAL ENGINEER THIS POCKET ID CARD IDENTIFIES YOU TO THE PUBLIC AS BEING CURRENTLYNOTICE LICENSED AND SHOULD BE KEPT IN YOUR POSSESSION AT ALL TIMES. _____________________________________________ SIGNATURE OF LICENSEE PE-15760 BRAD P TAKENAKA 98-2034 KIPIKUA STREET AIEA, HI 96701 APPENDIX: Company Brochure RHACM.COM RHACM.COM CONSTRUCTION AND PROJECT MANAGEMENT Full-Service Professional Project and Construction Management, Inspection, and Supervision WHO WE ARE RHA Construction Management Group, LLC is a wholly owned subsidiary of RHA Holdings and sister company to Ronald N.S. Ho & Associates, Hawaii’s largest pure electrical engineering firm. We are a service-oriented firm that delivers high-quality, cost-effective and timely projects for our clients. Quality assurance and adhering to schedules are important objectives for our staff. In 2016, RHA Construction Management Group was created at the request of our clients to provide professional construction management and inspection services for electrical and telecommunication projects. PROJECT TYPES Structures •Educational Facilities •Commercial Office and Retail •Residential •Hotels and Resorts •Hospitals and Healthcare Facilities Building Systems •Power Distribution •Emergency Power •Fire Alarm •Telecommunications •Security •Metering •Data and Control Exterior Lighting Systems •Highways and Street Lighting Systems •Sports Facilities •Recreational Playcourt, Ballfield and Walkways •Parking Lots and Structures Water and Wastewater •Deep Well and Booster Pumping Facilities •Treatment Facilities •Controls and Instrumentation Site Development •Power Distribution Systems •Emergency Power Distribution Systems •Telecommunication Distribution Systems •Emergency Generation SystemsWe are an experienced team of construction and project managers, inspectors, and engineers with an expanded capabilities of construction and project management services. Our market sectors include commercial facilities, water distribution facilities, government, educational facilities, infrastructure and transportation. Since 2016 our team has overseen over $500 million of contruction activity throughout the state, including wastewater systems, electrical utilities, security and communication systems, PV installations, etc. With an experienced team of construction and project managers, inspectors, and engineers, we provide construction and project management services for federal, state and city government agencies and private clients. Our markets include commercial facilities, water distribution facilities, government, educational facilities, infrastructure and transportation. EXPERIENCED & TASK-DRIVEN EXPERIENCED PROFESSIONALS Our construction management team averages 20 years of diverse construction and facility management, real estate development, and redevelopment and renovation experience. Embodying an “owner’s mentality,” our CM professionals undertake full responsibility for the oversight and management of the entire construction process, from construction kick- off to project acceptance. WE MEET DEADLINES Serving as the single point of contact for our clients, our team ensures that its projects are completed on time and within budget while minimizing risk. ATTENTION TO DETAIL We maintain the highest levels of communication with the latest technology to ensure the successful execution of any project, regardless of size or complexity. OUR APPROACH Our approach allows our clients to focus on their core business and strategies in order for them to maximize their land-based assets while continuing to improve their facilities and infrastructure. "The installation of the Energy Conservation Measures (ECMs) at various Board of Water Supply facilities have been positively received by the Board of Water Supply. This highly complex and leading-edge project required strategic and diligent planning for the extensive work done simultaneously at various sites. RHA CM was able to overcome the challenges and provide superb oversight and inspection by a team of qualified personnel to achieve these objectives. Job well done!" ~ Sandy Nahoopii-SongCivil Engineer VIBoard of Water Supply CASE STUDY In 2016, the Honolulu Board of Water Supply (HBWS) awarded RHA CM a three-year construction management contract to lead the coordination of work for their $33 million Energy Savings Performance Contract (ESPC). This was the first ESPC to be awarded by a county water utility in Hawaii. The ESPC will facilitate and accelerate energy conservation measures (ECMs) to achieve energy efficiencies and develop renewable energy to directly support the State of Hawaii’s goal to achieve 100 percent of electricity generation from renewable energy by 2045. Part of the challenge for RHA CM involved ramping up quickly with the necessary resources to oversee the construction for several ongoing projects, including a lighting retrofit, power factor correction retrofit, rider M/TOU pump control, well pump controls, and photovoltaic systems NEM projects at numerous HBWS locations and facilities with both day and nite work schedules. RHA CM rapidly staffed up with qualified personnel to achieve these objectives. RHA CM also provided an onsite physical presence at all times concurrent with any contractor activity while also providing all necessary off-site support requirements such as office space, furniture, equipment, communications, and internet access to enable staff to perform the required services. 2022 CMAA PROJECT ACHIEVEMENT AWARD WINNER Category: Water/Wastewater/Utility Construction value greater than $50 Million “The ECMs that are being installed at various HBWS facilities will reduce the agency’s annual electrical usage by approximately 8 million kilowatt hours (kWh), or nine percent of the HBWS’s total purchased electricity costs. In maintaining the highest levels of communication and oversight, RHA CM helped to ensure that the HBWS’s primary mission to provide clean drinking water and supporting operational services to the general public were never compromised. HONOLULU BOARD OF WATER SUPPLY CONSTRUCTION MANAGEMENT PROJECTS Our services include but are not limited to: •Planning •Scheduling •Budgeting •Bid Packaging •Contract Management •Project Management •Construction Management and Inspection •LEED Advisory •Tenant Coordination •Project Closeout •Commissioning Here is a list of projects that we have provided professional construction management and inspection services for public agencies and private industries across the State of Hawaii. HBWS - Construction Management, Engineering and Inspection Services HBWS Various Roofing Projects 1411 South King Street New Electrical Services JBPHH P-704 Sewer Lift Station and Relief Sewer Lines HBWS Emergency Generators at Kalihi, Halawa and Kunia Ray & Joan Kroc Corps Community Center Energy Efficiency Projects List Honolulu City Hall Fire Alarm System Improvements Kulani Correctional Facility Potable Water Supply Sand Island Wastewater Punahou School Energy Efficiency Projects Honolulu Joint Traffic Management Center Hawaii Gas SNG Facility Above Ground Storage Tank Young Brothers 2153 North King Street Commercial Building Energy Efficiency Improvements HECO Kahe-Halawa/Kahe-Waiau 138 kV Replacement HBWS Beretania Array (808) 941-0577 info@rhacm.com 2153 N. King Street, Suite 201 Honolulu, HI 96819 RHACM.COM CONTACT US