HomeMy WebLinkAbout2025-08-29 PL-CRC-2025-000034 Section 106 Consult Waikaumalo Stream Bridge Rehab Project DeVera, Ashley
From: Kaneshina, Jennifer N <Jennifer.N.Kaneshina@hawaii.gov>
Sent: Friday, August 29, 2025 8:16 AM
To: Planning Internet Mail
Cc: Hirano, Andrew J
Subject: HWY-DS 2.21046 BR-019-2(087)-WaikaumaloBr-106NHOLtr-106
Attachments: HWY-DS 2.21046 BR-019-2(087)-WaikaumaloBr-106NHOLtr-106 (part 8) - signed.pdf;
HWY-DS 2.21046 BR-019-2(087)-WaikaumaloBr-106NHOLtr-106 (part 23) -
signed.pdf
Aloha,
Issuing HWY-DS 2.21046 BR-019-2(087)-WaikaumaloBr-106NHOLtr-106.
Mahalo,
Jenny Kaneshina
DOT- Design Branch-Technical Design Services
Office Assistant
Phone: (808) 692-7549
JOSH GREEN,M.D. EDWIN H.SNIFFEN
GOVERNOR DIRECTOR
KE KIA'AINA ' KA LUNA HO'OKELE
� ": Deputy Directors
DESIGN BRANCH,ROOM 688A q ( r. � ' .' Na Hope Luna Ho oke e
BRIDGE DESIGN SECTION,ROOM 611 • ',i�Lf'y f, Y DREANALEE K.KALILI
CADASTRAL DESIGN SECTION,ROOM 600 =�';:' TAMMY L.LEE
ENVIRONMENTAL DESIGN SECTION,ROOM 688A "- -•"
HIGHWAY DESIGN SECTION,ROOM 609 .,,y ;;;w' CURT T.OTAGURO
HYDRAULIC DESIGN SECTION,ROOM 636 ROBIN K.SHISHIDO
TECHNICAL DESIGN SECTION,ROOM 688
STATE OF HAWAII I KA MOKU`AINA'0 HAWAII IN REPLY REFER TO:
DEPARTMENT OF TRANSPORTATION I KA`OIHANA ALAKAU
601 KAMOKILA BOULEVARD HWY-DS 2.21046
KAPOLEI, HAWAII 96707
August 28, 2025
Mr. Matthew Clark, Chairperson
Hawaii County Cultural Resources Commission
Hawaii County Department of Planning
Aupuni Center, 101 Pauahi Street, Suite No. 3
Hilo, Hawaii 96720
Dear Mr. Clark:
Subject: National Historic Preservation Act(NHPA) Section 106 Consultation
with Native Hawaiian Organizations (NHO) and Potential Consulting Parties
Waikaumalo Stream Bridge Rehabilitation Project
Puaakuloa, Kapena and Piha, Kahuku Ahupuaa, Hilo Moku, Hawaii Island
Federal-Aid Project No. BR-019-2(087)
Tax Map Key (TMKs): Parcels Hawaii Belt Road Right-Of-Way (ROW)
(3)3-2-002:999 and Portions of TMKs: (3)3-2-002:029 AND (3)3-2-002:032
On behalf of the Federal Highway Administration (FHWA), the State of Hawaii Department of
Transportation (HDOT) is hereby notifying you that on August 21, 2025, Section 106 of the
NHPA of 1966 (amended, 2006), was initiated with the Department of Land and Natural
Resources, State Historic Preservation Officer(SHPO) for the Waikaumalo Stream Bridge
Rehabilitation Project along Hawaii Belt Road in the North Hilo District of Hawaii Island.
The proposed federally funded HDOT project is considered a federal action and undertaking as
defined in Title 36 Code of Federal Regulations (CFR) § 800.16(y). Effective May 1, 2016,
FHWA has issued a Programmatic Delegation of Authority allowing the HDOT and local public
agencies to conduct NHPA Section 106 consultations with the SHPO, NHO, and other
consulting parties per Title 36 CFR § 800.2(c)(4). The FHWA will remain responsible for all
findings and determinations charged to the agency during the Section 106 process.
Overview of the Undertaking
HDOT proposes to rehabilitate the Waikaumalo Stream Bridge, (Bridge No. 001000190308092)
along Hawaii Belt Road (Route 19), in the vicinity of Ninole on the Hamakua Coast, Island of
Hawaii. The bridge is located around milepost(MP) 18.5 at the approximate coordinates of
North 19° 56' 01.1" and West 155° 09' 42.6". See Attachment 1: Area of Potential Effect(APE)
Map. The primary purpose of the project is to address deficiencies identified during the latest
Mr. Matthew Clark, Chairperson HWY-DS 2.21046
August 28, 2025
Page 2
bridge inspection conducted by the Hawaii Department of Transportation (HDOT). The project
activities will consist of the following:
• Repairing/replacing and repainting all deteriorated steel members
• Repairing spalls and delamination in the abutments,pier, concrete deck, sidewalk, and
bridge railing
• Repairing cracks in the abutments,piers, concrete deck, sidewalk, and bridge railings
• Repairing/replacing bridge bearings
• Replacing deck joins/joint seal
• Evaluating and rehabilitating concrete rubble masonry wingwall
• Spalling on pier caps and changing bearings
Additionally, if scour issues are discovered during bridge inspections, the project may consist of
footing upgrades and addressing scour issues for the bridge foundation. If footing upgrades or
scour countermeasures are required, in-water work will occur. No other project activities will
require in-water work. If any other additional deteriorating bridge elements are discovered
during field studies, the project will also consist of replacing or repairing these elements.
Furthermore, the bridge deck may need to be widened to accommodate Americans with
Disabilities Act-compliant sidewalks. Widening will not increase capacity of the bridge or add
additional traveling lanes. Railings will also be replaced to meet current design standards.
The majority of work will be completed during working hours and one lane of contraflow traffic
would be allowed during construction. Repairing and replacing the bridge bearings will require
full bridge closure which will warrant night work in order to prevent major traffic impacts.
Consultations
Entitled consulting parties during the Section 106 process includes the Advisory Council of
Historic Preservation, SHPO, NHO, and if applicable, local governments and applicants for
federal assistance,permits, licenses and other approvals.
NHO and/or Hawaiian Descendants
NHO and Native Hawaiian descendants with ancestral, lineal, or cultural ties to, cultural and
historical property knowledge of and/or concerns for, and cultural or religious attachment to the
proposed APE are asked to provide a response to this letter within 30 days of notification.
Other Individuals and Organizations
Individuals and organizations with legal, economic, or historic preservation interest are requested
to respond within 30 days of notification, demonstrate interest in the proposed undertaking, and
provide intent to participate in the Section 106 process. Your participation is subject to FHWA
approval.
APE
We would like to invite you to comment on the proposed APE. See Attachment 1.
Mr. Matthew Clark, Chairperson HWY-DS 2.21046
August 28, 2025
Page 3
The APE is approximately 3.8 acres, located mostly within Hawaii Belt Road and is designated
for working areas, construction staging, and material stockpiling. Most of the APE is located
within the Hawaii Belt Road ROW (3-2-002:999). However, two parcels mauka of the highway
ROW (3-2-002:029 and :032)will be used to access the foundations of the bridge and for
staging. Vegetation clearing within the APE may be necessary to provide access to bridge
foundations and stage equipment and materials.
Identification of Historic Properties within the APE
We welcome any information you may have on historical and cultural sites that have been
recorded in or which you may have knowledge of within the proposed APE. In addition, if you
are acquainted with any persons or organization that is knowledgeable about the proposed APE,
or and descendants with ancestral, lineal or cultural ties to or cultural knowledge and/or historic
properties information of or concerns for, and cultural or religious attachment to the proposed
project area, we would appreciate receiving their names and contact information within 30 days
of notice.
Conclusion
On behalf of FHWA, HDOT by way of this letter is notifying you of the proposed Waikaumalo
Stream Bridge Rehabilitation Project. Should you want to participate in the Section 106 process,
we request your written intent. Please also provide your comments on the proposed APE, any
information you may have on cultural and/or historical sites that have been recorded within the
APE, as well as the names and contact information of people/organizations who may have
cultural affiliations and historical properties information in the vicinity of the proposed APE.
We would appreciate a written response within thirty (30) days from date of receipt to our
HDOT Project Manager, Andrew Hirano, at(808) 692-7546, from our Highways Desing Branch,
Technical Design Services Section or by email at andrew.j.hirano@hawaii.gov or by mail to the
State of Hawaii, Department of Transportation, 601 Kamokila Boulevard, Room 688, Kapolei,
Hawaii 96707.
Sincerely,
HENRY KENNEDY
Engineering Program Manager
Design Branch
Attachment
c ra
0 0
ra
ro its
_ �1 l! v. 1o0''L�pO
a) ~, 33
ro
a) /111F.,",, %00
ro
z
flO
s767'‘1,,,\_...,2S
ro
co
o
rAt
o
11/ c'IrN ""li ,..,,,,,,.,_-__,,,,, ;),,,re, .
11
c cn
cn
o
crl
o
o
p ch
O
rn
qf
4!: n) 4
- -
�P
^:; ,.
• o
M
O
O -_
VO
O11,
40
M CO
��� \
o° z
ti
o
o �o
O h^ a)
�o 0 �P moo. )
s'o cn
M ,a1P Q�P 33 Z� o OS
fp
LLJ aa) oeD ^� -
a w �Z££ N bi
Q"_' M
To
a-+ 0k covp
o s3
o
}1 O N r O-o
I
y
iv cf,
tc cu 45 riz, ,,,,- '''''''')r'l 411 /1.1 ro
r• V Q o O�oo
to MIFF
a 4, M
ss0zooz
4 o —
Attachment 2: Site Photos
of. 0 "1r °
y
IL ' r a.
, 4
J:401- -.- l k5�
' i ' 'RR "i. • " it
Dol IY"° 2
thrti:ii
'* t,.m art` °fir ,' ro
�`.
Photo 1: Waikaumalo Stream Bridge, Looking North East
1 "
41,
Iftl.
f 1
,
.. °ter � V .
i `
A 1• I". k 4 Y 111111
17
PPyy! p i
n' rkt Jr' M a
Photo 2: Waikaumalo Stream Bridge, Looking South East
Attachment 2: Site Photos
04406
SY 1.4.-4400',4'4'
y F'544
a
, r -r a... .
Photo 3: Waikaumalo Stream Bridge Railings
II
\ -
hil
Photo 4: Waikaumalo Stream Bridge Deck