HomeMy WebLinkAbout2007-11-27 Water Board MinutesMINUTES
DEPARTMENT OF WATER SUPPLY
COUNTY OF HAWAII
WATER BOARD MEETING
November 27, 2007
Hawaiian Ocean View Community Center
MEMBERS PRESENT: Mr. Thomas Goya, Chairman
Mr. Riley Smith, Vice - Chairman
Mr. George Harai
Mr. Loren Heck
Ms. Millie Kim
Mr. Francis Kuailani (10:43 a.m.)
Mr. Dwayne Mukai
Mr. Milton Pavao, Manager, Department of Water Supply
(ex- officio member)
ABSENT: Ms. Paula Helfrich, Water Board Member
Mr. Bernard Konanui, Water Board Member
Mr. Bruce McClure, Director, Department of Public Works
(ex- officio member)
Mr. Christopher Yuen, Director, Planning Department
(ex- officio member)
OTHERS PRESENT: Ms. Katherine Garson, Deputy Corporation Counsel
Ms. Molly Lugo, Deputy Corporation Counsel
Ms. Emarie Kawaauhau, Legal Clerk, Corporation Counsel's Office
Mr. William DeMent, SSFM International
Councilman Bob Jacobson
David Baglow
Carole Baker
Beatrice Bowman
Bruce Coates
Donna Durgin
Antonio Grafilo
Mr. Dick Hershberger
Gary & Gene Hughes
Karen Ingraham
George Lacy
Robin Lamson
Barbara Lively
Michael L. Lastipe
Dennis Lomas
Page 1 of30 11- 27- 07— Minutes(Ocean View).doc
Frank Musacchio
Carol Nehaus
Don Nitsche
Stephen Sampson
Donald Schenkein
Jim Stutheit
Leslie Summerfield
Evelyn Thompson
Antonio Vergina
Conrad Wareham
Pat Wheeler
Ken Wicks
Bob & Phoenicia Zeller
Don Zimbeck
Department of Water Supply Staff
Mr. Quirino Antonio, Jr., Deputy Manager
Ms. Kris "Kanani" Aton, Public Information and Education Specialist
Mr. Kurt Inaba, Engineering Division Head
Mr. Lawrence Beck, Engineering Division
Ms. Shari Komata, Engineering Division
Mr. Richard Tsunoda, Waterworks Controller
Mr. Daryl Ikeda, Chief of Operations
CALL TO ORDER - Chairman Goya called the meeting to order at 10:00 a.m.
STATEMENTS FROM THE PUBLIC
Robin Lamson:
CHAIRMAN GOYA: The first person is Robin Lamson, and he is here representing the
Friends of Kahuku Park. Robin, good morning.
R. LAMSON: Thank you Mr. Chairman. I'll be very brief. My interest in appearing today is
to make a formal request that when and if a well is dug here in Ocean View that a line be run to
the Kahuku Park. Aside from this building (Ocean View Community Center), it's the only
facility we have for children. We have three or four hundred kids dumped off there a day, after
school, in summer programs. And we have a pavilion which is half bathrooms and picnic
tables and half water tank. It's a 30' x 32' room. If we could get a waterline up there, we
could eliminate that water tank and have a nice enclosed facility for our meetings as well as for
children's activities. So I'm hopeful if I came and made a formal request -, I have conducted a
conversation with Mr. Pavao and Mr. Heck; but I hope that might get put in a footnote
somewhere and remembered. We'd appreciate it very much because that would make a big
Page 2 of30 11- 27- 07— Minutes(Ocean View).doc
difference for us, rather than to have to build a whole new building, we could redo the other.
Thank you.
CHAIRMAN GOYA: Thank you for your comments Mr. Lamson.
2. Carol Joan Nehaus
Ms. Nehaus stated that she was not prepared to make a presentation today but requested if the
Board could move the Ocean View part of its Agenda to the front, it would be appreciated.
3. Don Nitsche
CHAIRMAN GOYA: Our third person is Don Nitsche, and I guess he needs no further
introduction. Good morning Don.
D. NITSCHE: I guess you can refer to me as the nag. Anyway, I represent Ocean View
Community Development Corporation. I'm the chairman of the water committee and have
been for a number of years. And we have a few questions we'd like to ask. One thing is what
is the estimated start of the project for the test well -, for the exploratory well? We'd like to
find that out. It seems to be the contract was let a while back, and we were kind of wondering
when it might go forward or what the -, if there is a penalty if they go beyond a certain date.
Another thing we'd like to know is how much of the funds are still available -, how much have
been spent so far for the studies and the engineering and the EIS and how much of the funds are
actually left to let out contracts with? Because I understand that the contract -, there will have
to be another contract after the exploratory well, if it's successful, to ream the exploratory well
into a production well. And we don't quite understand why it wasn't all one contract; but
anyway, what would the timeframe for that be and the actual timeframe possibility of getting
water flowing in Ocean View? Another factor we are very concerned about, we had hoped
there would be enough funds left over and with the contractor on site, a second well could be
put in because our understanding now is that the new policy of the Department of Water Supply
is there has to be two wells before we can have meters. And so we're concerned about that.
We'd like to have our business community be able to get water, to start with, and then
eventually we understand we could develop our own systems and come out into the community
and supply people with their own water meters. Another question that we have is are the
temporary meters that are in Naalehu and Waiohinu at the present time, are they all going to be
moved up to the loading site for the spigots, so to speak, and will the water haulers be charged
the same as they have in the past for the water like they have been where their existing meters
are? And is there going to be -, what are -, has it been given much thought about the
regulations for people getting their own water from the spigot - -if there's going to be a certain
amount or quantity that they can haul away on their own or if they get charged for it after a
point or if there has been much thought put into that? That's kind of an interesting factor.
Maybe some of these could be answered quickly, I'm not sure. But those are the main factors
we're concerned about, is the second well and kind of when things would be getting underway
in which we are very happy they are finally getting underway, and how much of the funds are
left to put the second well in. Do you have any questions of us - -of the community?
Page 3 of30 11- 27- 07— Minutes(Ocean View).doc
CHAIRMAN GOYA: We will take that up when we discuss the project and address some of
your concerns and questions that you have provided us with at this time, and I think that the
consultant and the Department heads prepared information and responses to some of the
questions that we have as well.
D. NITSCHE: Okay.
CHAIRMAN GOYA: So we'll take that up probably first on the Agenda.
D. NITSCHE: Thank you. And I'd like to add one other thing. We certainly are behind the
Friends of Kahuku Park. That's another branch of our Ocean View Community Development
Corporation -, another committee. So we'd like -, we certainly think that makes common sense
to give access to the park right off the bat instead of waiting for a second well or that sort of a
thing. Thank you for your time.
APPROVAL OF MINUTES
ACTION: Mr. Heck moved for approval of the Minutes of the October 23, 2007, Water Board
Meeting; seconded by Ms. Kim and carried unanimously by voice vote.
ACTION TO MOVE UP AGENDA ITEM:
ACTION: Mr. Heck moved to move Agenda Item 7(A) Hawaiian Ocean View Estates Water
Facilities Project, to above Item No. 5; seconded by Ms. Kim and carried unanimously by voice
vote.
KA`TT-
A. HAWAIIAN OCEAN VIEW ESTATES (HOVE) WATER FACILITIES
PROJECT (JOB NO. 2007 -922):
The Manager introduced the project engineer from the Department, Ms. Shari Komata, and
Mr. William DeMent from SSFM International, Inc. (SSFM), the consultant for the project. They
will be providing information on the budget and the scheduling. The Manager addressed a couple
of the issues that Mr. Nitsche mentioned this morning. One was the estimated start of the
exploratory well. He explained that the delay has been that the contract had to be sent to the State
of Hawaii, Department of Accounting and General Services (DAGS), for review and approval
because the funding is State appropriation; and it took a while for the contract to come back from
them. As he understands, the contract needs to be signed by the County of Hawaii because the
monies were appropriated to the County, not the Department of Water Supply (DWS). Although
DWS is administering and preparing everything, it has to get approval from the State and the
County. It is DWS' hope that the actual onsite drilling can begin soon. Regarding service to the
community center, as mentioned, the DWS would like to have a second well in place before
granting any domestic service because should something happen, then DWS would need to haul
water if there is no second well. That also goes for the park. Maybe something could be worked
out with the park; and this will be explored with the Department of Parks and Recreation to see
what can be done - -if there is an agreement that can be made. As far as the temporary meters in
Page 4 of 30 11- 27- 07— Minutes(Ocean View).doc
Naalehu and Waiohinu being relocated to Hawaiian Ocean View Estates, the DWS will have
standpipe meters available at Hawaiian Ocean View once the project is completed. It depends on
whether or not the water haulers in Waiohinu and Naalehu want to relocate their meters to
Hawaiian Ocean View. It will be their decision. DWS will have meters available at the standpipe
for truckers; and they would have to come in and apply for the meter to use that standpipe from
Hawaiian Ocean View. As far as the regulation for spigots, there are spigots islandwide; and there
are no regulations on any spigot except for the fact that at each spigot, there is a sign that limits
use to a certain amount of water. You cannot come there with a truck and fill up from a spigot.
There will be no other regulations for the spigots other than what already exists for the rest of the
island. Also, the Department of Public Works (DPW) pays DWS for the consumption from the
spigots. Each spigot will have a meter and that meter reading is taken and sent to DPW.
Mr. Smith stated that the DPW was previously authorized by Civil Defense as the permittee, or
the meter account holder, on the emergency spigots and that all DWS does is provide the water to
the meter. The administration, rules, and clean -up of the sites fall under DPW's responsibility. If
the community has issues such as abuse or cleanliness at any of the sites, they should contact any
one of DPW's offices and maybe their baseyards can address them.
Mr. Heck asked if the Manager knew if DPW would be signing off on this spigot and would be
paying for the water.
The Manager replied that is something DWS would need to discuss with DPW. As he mentioned,
every other spigot on the island is treated that way, and he did not see why Hawaiian Ocean View
would be treated any differently.
Mr. Heck stated he knew there was federal funding for that purpose, and he wondered if this
spigot would apply.
The Manager thought it would be the same. DWS is also working with some federal funds to
provide additional spigots around the island (the $1 million grant). Again, this will be treated like
every other spigot on the island.
In response to Mr. Heck's question if that would be followed up on quickly, the Manager replied
that the DWS needs to schedule formal meetings with the Mayor's Office and the DPW.
Mr. Smith stated that if the community has issues about whether that would be enacted, they need
to follow up with the Mayor's Office and DPW; and when the application comes in from those
offices to the DWS, then they can process it.
The Manager added that this project will provide for the spigots.
Ms. Kim asked the Manager for clarification on the difference between a standpipe and a spigot.
The Manager explained that a spigot is basically a hose bibb that is made to fill up a one - gallon or
five- gallon jug, and it is low to the ground. A standpipe is a 2 -inch pipe that goes above the
height of a typical water hauling truck so that it can fill from the top. The normal resident would
Page 5 of30 11- 27- 07— Minutes(Ocean View).doc
not take water from a standpipe because each standpipe must be assigned a specific meter to a
specific hauler. Residents can get water from a spigot. There is a big difference between the two.
Ms. Komata came forward to provide the Board with the scope of the Hawaiian Ocean View
project. Currently, this project is based on the initial request to the Mayor, asking for a well site, a
fill station, and to provide fire protection to the commercial district in this area. She pointed out
the park where, as part of the project, the County acquired property near to it so the well could be
drilled. What is planned is to install a transmission line down to the fill station off Lehua Lane.
After that is a fire protection line to the community area. This was the initial idea of what the
project would entail. The DWS has been working on simultaneously doing two contracts at once.
The contract the Manager spoke of earlier that was awaited from DAGS was for the exploratory
well - -to drill the first test well to see what can be achieved from it. That contract took a while to
come back and has just been received by DWS. She will work on getting that contract out, so
based on this week, the contractor will probably start January of 2008.
Chairman Goya asked Ms. Komata to describe the streets that are being discussed in this project.
Ms. Komata stated that the park is on Paradise Circle. From there, the transmission line will come
out and head towards Keaka Parkway. From there it goes down Lehua Lane to the fill station and
will continue down Keaka Parkway, and the plan is to cross the highway and go down towards
Prince Kuhio Boulevard with fire hydrants for the fire protection for the commercial area. The
first stage was to put out a contract for the driller to drill the exploratory well, and that is the
contract the DWS just got back yesterday. They will be starting to drill; and in the meantime,
because the funds have to be encumbered by June of 2008, and realizing how long this contract
took to get executed, DWS is working on a design -build project for the production well phase,
which will include constructing the reservoir, the fill station site, and all of the transmission lines.
Currently, the DWS has a Request for Qualifications out that staff is in the process of reviewing;
and from that stage, DWS will do a Request for Proposals the beginning part of next year. Based
on the Request for Proposals, the DWS hopes to select a team which will comprise of a contractor
and a consultant to develop the rest of the design and construct it. Selection would need to be
done by the middle of April 2008 so that a contract can be in place by June 2008.
The Manager stated that if it was not done this way, the DWS would never be able to encumber
the funds by June 30, 2008. If the DWS went with the conventional design -build method, it
would not have gotten through with the design prior to that deadline, let alone trying to get the
contract. The Request for Proposals and the design -build process was the only way to give a
better chance of encumbering the funds by June 30, 2008. The DWS already has the funds
encumbered for Phase 1, which is the exploratory drilling. They key right now is to get
everything in place such that the remaining funds can be encumbered by the deadline. Going back
to Mr. Nitsche's question of why the DWS does not do the exploratory well and the development
at the same time, he explained that it is not done that way because you need the information from
the exploratory well to actually design the development of the production well, and that is the
reason why every well on this island has two phases. If the two projects were done at once, you
would be taking an uneducated guess as to how much water is there and you would be probably
choosing the wrong size pump and casing. This way, the well can be efficiently outfitted.
Page 6 of30 11- 27- 07— Minutes(Ocean View).doc
Councilman Bob Jacobsen asked if the pumps will be designed to withstand high pressures
because he had a constituent who was very concerned that the cast iron pumps that are being used
throughout the State are not able to withstand some of the pressures that a Stainless Steel pump or
a high- strength tensile steel pump would actually withstand. There are a lot of breakdowns, and
the cost of pulling the pump out of the well and downtime are excessive because of pumps that are
not adequate.
The Manager stated that the pressures are an inherent part of the design. He was not sure how
many bowls this particular pump would have, but each bowl is capable of producing a certain
amount of energy or pressure to take the water up. The bottom bowl has the least amount of
pressure, and the highest bowl has the greatest amount of pressure. They are designed to
withstand the pressure necessary to take the water from ground level all the way into the tank.
That is not to say that impalas and bowls do not break, because they do; but it is not because they
are not designed properly.
Mr. Heck stated that he had spoken with the same person Mr. Jacobsen mentioned, and that
individual seemed very knowledgeable. His concern was the depth of the well. Mr. Heck asked if
any up -to -date specifications could be obtained somewhere if anyone wished to see them.
The Manager replied that the successful team that will be selected from the Request for Proposals
will have the responsibility of designing the pump; and as soon as they have the design made, that
information will be available.
Mr. Heck asked if that would come through the biweekly reviews that come from this Department,
through Ms. Komata.
Ms. Komata replied that the Request for Proposals will be in April 2008 so that a contract can be
awarded. Once the contract is done, then the team can work on the design. Right now, that type
of information would not be known. The team that is selected will be relying on this first phase
(exploratory well), which includes the pump test. The drilling contract is almost a one -year
contract, so it will be a little bit down the road.
The Manager mentioned the USGS monitoring well. There is some idea of where the water level
is, which was about 3.8 feet above sea level. It is not unlikely that the exploratory well will
probably hit the same type of water level.
Mr. Smith asked about where the reservoir would be placed in relation to Kahuku Park and what
the elevation difference would be between the reservoir spillway and the park.
Ms. Komata replied that the reservoir would be on the next lot right above the park.
The Manager stated that it would be less than 40 pounds per square inch (psi).
Mr. Smith stated that if water was provided to the park, right from the beginning, it would be
substandard, below 40 psi, so there would be a lot of conditions. You would not get fire flow or
minimum pressure required for most appliances, sprinkler heads, etc.
Page 7 of 30 11- 27- 07— Minutes(Ocean View).doc
The Manager stated that this type of situation occurs elsewhere, and the Department has the
applicant sign an elevation agreement where they acknowledge the fact that the water pressure is
below standard.
Mr. Smith wanted the community to understand that, should the community be provided with
water, it is not going to be standard pressure; and it may come out very slowly from the spigot.
He also commented, just for clarification, that the Manager had mentioned the Request for
Proposals (RFP) process; and the reason the DWS is going through that is to comply with the
State Procurement rules about encumbering the funds prior to the deadline, thereafter, they would
lapse. The RFP process is not new in the State or the County. As with the recent project on
Queen Kaahumanu Highway, Wesley R. Segawa & Associates, Inc., got the job for widening of
that highway through an RFP process to meet the same kind of procurement requirements to
encumber the funds and do the design at the same time, so this is not anything new. It is just a
matter of following the State's rules so that you can utilize the money and get the job done;
otherwise there is no project. That is the reality of dealing with State or County funding. You
need to follow Procurement rules. The other thing it is important to understand is that in the RFP
and in the selection of the team, which would include a contractor and a consultant, the consultant
does the design similar to Phase 1, SSFM is responsible for the design; and then they would be
teamed with a contractor that builds the resulting design. Just as the contractor is responsible if
there are any construction problems, the consultant is responsible if there are any design problems.
There are remedies to problems like improper pump specifications or improper installation.
Mr. Heck asked if there was anything Kahuku Park could do to increase the water pressure, such
as putting in their own pump or something to bring the pressure up.
The Manager replied that they could, but it would be very expensive and would probably be the
same situation they have now because the Department's rules do not allow any direct pumping
from its system. That means they would have to put up a small tank, fill it with DWS' water, and
ensure that there is a sufficient air gap so there is no possibility of backflow. From that tank, they
would need a separate booster pump where they could boost it to the pressures they need.
Mr. Heck mentioned there is a system that they have installed already.
The Manager stated it is like every other homeowner that has a catchment tank with a pump,
except DWS would be filling that catchment tank.
Mr. Heck stated that he hoped the water would be considerably less expensive than what they are
currently paying.
The Manager stated that they would have to pay for the water from DWS, plus pay for the energy
for their own booster pump so it would be more expensive than just a catchment system.
Mr. Heck asked about the budget because there is $6 million to do as much as could be done. The
community is a little concerned about what has been spent, what is left, and if there is going to be
enough money for the fire hydrants. He asked if the Manager could give an idea of where the
budget is right now.
Page 8 of30 11- 27- 07— Minutes(Ocean View).doc
The Manager stated that Mr. DeMent would be including that in his presentation. Before turning
it over to Mr. DeMent, he voiced his concern about the unexpected delay with DAGS and the
contract which held this back several weeks. The time schedules were meant to comply with
procuring the money and having it encumbered by June 30, 2008. The plan is to select a team in
April and hopefully get an executed contract and send it to DAGS for review and execution. At
that time, the funds are obligated. He is concerned that if there is another delay like this one, it
may jeopardize the scheduling. He suggested if there was anyone who could assist with having
DAGS speed up their process, that will certainly ensure that the funds will be encumbered. The
scheduling was not meant to cover the delay that was recently experienced with DAGS and the
contract.
Mr. DeMent reviewed the budget for the project. Procurement of the land was about $200,000.00.
Design fees so far, or the total contract amount, is $440,000.00; and they are about halfway
through that, so about $220,000.00 for design fees right now. The design shown in his handout to
the Board is what they call a "Cadillac" design, which gives the community everything it wanted,
from a tank, a control building, 12 -inch line, all the way down to all the commercial centers,
except for the ones more toward Kona that would not be serviced by this project. There is an
8 -inch line down Lehua Lane connecting into twenty water meters. It was found that there is not
enough money for this "Cadillac" project so the process they are in now is a value engineering
exercise, which means taking a look at the design and hacking away at it to get within the
$6 million. They can only estimate at this point in time and will find out the true cost when they
start with the design -build team. What they hope to do is get a commitment from them that they
will provide a product within the budget. There may come a need to reduce the size of the
reservoir from the 1.5 million gallons down to something smaller, or drop fire service beyond
Keaka Parkway, or possibly even reduce the size and number of meters within the fill and spigot
site. All of these things have to be considered to get within the $6 million budget.
Chairman Goya noted that what was handed out to the Board Members today was a preliminary
budget; and for that "Cadillac" system, it is approximately $13.5 million. It is broken down into
well site, fill site, water transmission, and project -wide categories. The other document is a
timeline for the project.
Mr. Heck asked how they will determine what will be hacked off first, or how they determine their
priorities.
Mr. DeMent replied that generally, the tail end of things get hacked off. He would ask what the
community's priority would be. It probably is getting water down at the fill and spigot site.
Mr. Heck stated that was the original plan and then the community started coming up with some
very good ideas.
The Manager stated that no matter what happens, the DWS feels confident that it will be able to
give the community what they had wanted from the very beginning, which is a well, a tank, and a
fill station. As Mr. DeMent said, it depends on when the actual bids come in to determine what
can be done. They will takeout whatever is needed to maintain the initial intent of the project.
Page 9 of30 11- 27- 07— Minutes(Ocean View).doc
Mr. Smith noted for clarification that the typical process the consultant would follow is to do its
best estimate on a project cost but what it really boils down to is what the contractor can build it
for. One of the options the consultant can put together in their package is additive alternates that
would include a base bid and then a menu of options and what they would cost. When the firm
prices come in, then they could be chosen by working together with the Department and the
community and gathering input before deciding on the scope of work to be contracted.
Mr. DeMent agreed that putting together the RFP to get the most flexibility and value for the
dollar is a challenge. They have considered all of these additive alternates; but with a $7.5 million
shortfall, it would be impossible to get the full "Cadillac" so they have to be prudent and drop a
lot of things. Their goal is to get as close as they can to get a good useable, workable budget to
pass on to the design builder so they can analyze it and perhaps find cost savings or ways to get
more done. It is a give and take situation.
Mr. Mukai noted that the "Cadillac" version includes a second well, if anyone in the audience was
wondering why the price was so high.
Mr. DeMent stated that it is about $2.8 million for the first well, and that includes electrical
power. The additional well is a little over $2 million. When wells are 2,100 feet deep, they get to
be very expensive. They are relying on their initial exploratory drilling contract, which came in at
about $1.9 million. That will be used as the basis of cost for the second well, plus the outfitting,
which is a little over $300,000.00. The electrical portion is over $600,000.00.
Chairman Goya noted that for members of the public, the Department and the Board would like to
have them understand the process of developing the project in a timely manner. The consultant
has been informed to make sure they take input from the community, but the consultant and the
Department also need to be given time to work on and develop these numbers and take input at the
appropriate time. Now that the consultant has some numbers put together in their presentation
today, they should be willing to come out and discuss this in more detail with the community. As
far as the Board is concerned, it would like to make sure that the $6 million for the initial phase of
the project is taken care of and that it moves forward as expeditiously as possible. He asked for
the public's patience and to provide their input at the appropriate time and not delay the project
any more than it has been. The intent today was to have the Department and the consultant
answer all of the questions the public had today and to meet with the community when it is
appropriate. He emphasized that the consultant's engineering work requires some technical
review before sharing that information with the public.
Mr. Heck stated that he thinks this community has proven, and will continue to prove, to be
helpful in the process rather than getting in the way. As far as DAGS is concerned, if the
community can do anything, a little direction as to how to go about it would be good. He knew
one real concern the community has about the "Cadillac" version of the project is the thought that
maybe the Ocean View Community Development Corporation can work with the House
Representatives and the Senate and get more funding. That is why they need to know what can
and cannot be done under the current budget before the Session starts.
Page 10 of30 11- 27- 07— Minutes(Ocean View).doc
The Manager stated that he was almost certain that the second well will not be able to be included
with the funds available.
Mr. Heck noted that something else that has been mentioned is that the power cost is going to be
tremendous and that there could be a specific charge just for that water that might be above
normal. He asked if the Department could possibly look into funding a power source such as solar
or wind. The Department has an energy specialist on staff, and he thought it would be good to
have it researched.
The Manager stated that the Department could have it researched. However, the initial investment
to go into alternative power would probably far exceed what it would cost to bring in Hawaii
Electric Light Company, Inc. (HELCO), power.
Mr. Heck stated that he would appreciate it if the Department would look into it and also provide
what the payback period would be.
Chairman Goya took questions from the audience.
Mr. Dennis Lomas asked about the earlier mention of 40 psi and wondered how the fire hydrants
would be filled up if there are to be hydrants out there. Also, out of that $13.5 million, if all the
costs are not in yet, he wondered how they came up with that figure and what percentage of it is
going to the consultants.
Mr. DeMent replied that $441,000.00 is their contract for the design of Phase 1. There is some
design in Phase 2, which is estimated to be between $100,000.00 and $150,000.00 for that portion
of the design. Every component was assigned a value, plus the land acquisition and the design
cost. That is how they came up with a spreadsheet that added up all the different components- -
everything from equipment, labor, general expenses, and contractor costs.
Mr. Dick Hershberger mentioned that the last time the Water Board held a meeting in Ocean View
(October 24, 2006), the words that were constantly used during the course of that meeting,
especially by the consultants, were "fast track." Those words have not been used here today at all.
"Expeditious" was as close to fast track as was heard today. He asked if the name of the person at
DAGS the Department has been dealing with could be provided to Mr. Heck so he could
disseminate that information to the community. That way, they could ensure that DAGS is made
aware of the fast -track nature of this project. Without that, there could be another unexpected
delay.
The Manager responded that this project has been fast tracked whether the community believed it
or not. The Department has one engineer fully dedicated to this project and a consultant that
meets with the Department almost every week. The fact that the Department went non - traditional
on the design in the RFP process indicates its desire to have this done as soon as possible. The
key factor for the Department is when the funds expire (June 30, 2008). He could not imagine
how this Department could do it any faster. This Department has done everything possible to
make this happen as soon as it possibly can.
Page 11 of30 11- 27- 07— Minutes(Ocean View).doc
Mr. Hershberger accepted the fact that the Department has been "fast- tracking" this; but
obviously, there was no taking into consideration the situation with DAGS, which apparently is
something that is repeated in these programs; and that should have been foreseen in this process,
and it cost the engineer in terms of time about four weeks to get their approval.
The Manager stated that the next time, the Department will stay on top of it and find out when the
contract can be returned.
Mr. Bruce Coates stated that he is the president of the Ocean View Community Association. He
was shocked at the leisurely manner in which this new price tag of $13.5 million was presented
today and that items would have to be trimmed. This new price is more than double the original
price, and he wondered how much would have to be trimmed to get to $6 million. He added that
he has a little experience in drilling wells and laying lines, and these numbers seem extraordinary.
His second question was how many drilling contractors submitted bids on this job.
Mr. DeMent replied that two drilling contractors submitted bids for the drilling of the exploratory
well. For the Request for Qualifications, there are four teams signed up. All four teams are
utilizing the same driller, Beylik Drilling & Pump Service. He added that he also was shocked at
the cost.
Mr. Jim Stutheit asked for clarification on the cost for the first well and when the start date would
be.
Mr. DeMent stated it was $2.8 million just for the drilling of the exploratory well. The casing is
$1.9 million.
Ms. Komata added that the Department still needs to talk to the contractor, but they have
anywhere from now until mid January 2008 to start the drilling.
Mr. Michael Lastipe stated that he is a professional engineer and asked if the exploratory well
does produce enough volume, will it then be transitioned into a production well and also when
they do the design, how much in gallons per day (gpd) would they be looking for per household,
or meter, to find an adequate supply.
The Manager stated that if the exploratory well is successful, it will be turned into a production
well. That is normal procedure. The gpd is determined by what the safe yield of the well is and
then it is designed to accommodate the safe yield. The safe yield is an amount of water that you
can pull out of a well continually without having any detrimental affect on the aquifer. Every well
is different, and the well determines how many gpd can be used. The Department has some wells
that can produce 1,400 gallons per minute, which is two million a day. For this particular well,
you are probably looking at 150 to 200 gallons per minute. It differs by climate, region, and by
rainfall.
In response to Mr. Lastipe's question of whether the number of meters would be cut back if the
well does not produce as much as desired, the Manager replied in the affirmative. The usage
would be cut back by the Department.
Page 12 of 30 11- 27- 07— Minutes(Ocean View).doc
In response to a question by Ms. Evelyn Thompson of what the Department paid for the property
for the well, per acre, Mr. DeMent replied that the cost on the fill site (three acres) was
$125,000.00. Ms. Thompson thought that was high because her lot was $8,000.00.
Mr. Heck noted that was a great deal for property right on the highway. He thought it would have
been a higher price for three acres along the highway.
In response to Ms. Ingraham's question of why it took DAGS so long to respond, Chairman Goya
stated that the Department would try to have an answer for her at the next consultant meeting.
Mr. Leslie Summerfield asked how confident the Department is that it will hit potable water
within budget based on the sea level of the test well and also what the physical dimensions of the
reservoir would be.
Mr. DeMent replied that a.5-million gallon tank is roughly 60 feet in diameter and 20 feet high.
As far as hitting good water, it is a gamble; and there are a lot of things that can go wrong with a
deep well. However, they have to rely on earlier experiences and go ahead. They will actually
have a signed design -build contract before the well gets tested.
In response to Mr. Summerfield's question of whether the project would be abandoned if good
water is not found, Mr. DeMent replied that they would probably pull the plug and stop
immediately if the well does not prove out.
In response to a question of whether any property owners of Hawaiian Ocean View Estates will
ever have to contribute monies to this project, now or in the future, the Manager replied not for
this project.
Mr. Conrad Wareham stated that he was curious about the location of the well and why that site
was chosen. There is speculation from DWS about a yield of 150 to 200 gpm from this particular
location, which is not known yet. If you get into this location and find you may have a higher
yield like 600 or 800 gpm, if there would there be anything in there where if you find it does
produce that much that you would drill a well because it would seem more logical if you build a
well that would have a greater yield than this one here.
The Manager replied that one of the reasons this site was chosen was because it was near the
County park. Unfortunately, park lands could not be obtained, so it had to go one lot above the
park. The reason it is in that vicinity is because it was the Department's understanding that is
where the community wanted the well to be. As far as electrical, it does not make a difference if it
is there or down where the USGS well was because you still need the same amount of energy to
lift the water the same amount of feet.
Mr. Heck mentioned that in the Kau to South Kona Water Master Plan, Mr. Steve Bowles of
Waimea Water Services had two suggested well sites - -one was near the Community Center and
the other was at the park. The community chose between those two sites.
Page 13 of30 11- 27- 07— Minutes(Ocean View).doc
Mr. Wareham stated that his most important question was if it is found that the yield could be
more than 200 gpm, if it would produce more. It seems logical because of the amount of return on
the investment.
The Manager replied the Department definitely would.
Mr. Lomas stated that he was still hung up on the $13.5 million. The first thing he understood the
community was supposed to have was six water fills for the trucks and twelve spigots. He
wondered why things are added into the plan if it is going to make the price increase so much.
Mr. DeMent replied that as far as the meters and the standpipes go, it is a modular system so they
could just drop five meters off at a time. What they are probably looking at, realistically, is
keeping between five and ten meters for the standpipes and the number of spigots is something
like six or ten, and they can be easily added or dropped.
Mr. Lomas asked what the price would be for just drilling and equipment and if it would be below
the $6 million.
Mr. DeMent replied that it might save $50,000.00 to $60,000.00 by dropping meters. That is not
really where the big money would be saved. It would be saved by dropping transmission lines,
not having to dig up the roads and putting in pipe. You would also save money on reducing the
size of the reservoir.
Mr. Lomas clarified that they had asked for twelve spigots and six spouts for the trucks. If that is
all that was asked for, he asked how much it would be to put that in plus the tank and the pumps.
Mr. DeMent replied that he did not have those figures today, and would have to look at it very
closely.
In response to Mr. Lomas' question of whether it would be under $6 million, Mr. DeMent replied
it would not be at this time.
The Manager could see what Mr. Lomas was getting at, and he assured him that the Department
would cut things back but that there would be a well, a tank, and a fill station.
Mr. Lomas asked if it could include a second well, if possible.
The Manager replied that was impossible at this point; however, the community would be assured
of getting what it had asked for in the first place. Everything extra has evolved over a period of
time. Now the Department has included what the community has added on, but then they are
shocked to learn the cost.
Mr. Nitsche stated that he would like to back the Department on this. The community's original
intent was to have a source of water, a well, a tank, and a place to load. It looks like that is what
the community is going to get. As it has unfolded, the community has asked for more because the
$6 million was more than they thought was necessary for that phase, and he still believed it was.
Page 14 of 30 11- 27- 07— Minutes(Ocean View).doc
One thing they would like to do as soon as possible is get an idea of what it will cost them to put
the second well in so they can go to the Legislature and ask for more money. They do not have
any idea how much to ask for. It does not have to be an exact amount--just a ballpark figure.
They did ask a long time ago to be kept abreast of what is going on and have been to some degree
but not as fully as they would have liked. They would like to and have a little more input into
some decisions that are made along the way or if there is going to be some time delay, to be
informed what they can do to help. He realized working with a bureaucracy is not easy and they
have to work within their rules. They are going to get what they asked for in the beginning; but if
everyone could be a little more patient as far as getting the additional things included so they can
have water down the line, that is what they are looking at. It is always human desire to get a little
more than you start out with. He added that he thought the DWS has done as good as it can with
what they have to work with.
Mr. Donald Schenkein asked if this should have been two separate projects. The first project has
become very complicated by adding more and more to it. It could have been simplified by having
two separate projects - -one for the system that everyone wanted initially, and then another project
for the extras.
The Manager stated that the Department would have stuck to the original project; but because the
community was asking for more, it was incorporated into the plans and that is how the so- called
"Cadillac" evolved.
Mr. David Baglow stated that he was sure it was a very complicated design, but it seemed a little
naive that whatever things they have asked for are in Phase 1. He hears nothing about Phases 1, 2,
and 3.
The Manager stated that there was some concern about the fees assessed by the consultant. He
explained that the consultant is not only doing the design, but is responsible for the Environmental
Assessment, the RFP submittal and formulation, plan review, and construction review. For all
that the consultant is doing, $400,000.00 is very reasonable.
RECESS: Mr. Smith moved for a 10- minute recess; seconded by Mr. Heck and carried
unanimously by voice vote. (Recess from 11:28 a.m. to 11:38 a.m.)
Chairman Goya commented that the Board has accommodated the community's input here as part
of the public process and has worked with the community in a number of cases to allow the public
time to address the Board so they can make better decisions regarding the project. As Mr. Nitsche
mentioned earlier, this money came out of a Legislative appropriation to the County of Hawaii.
It did not come directly to the Department of Water Supply. The Mayor assigned the project to
the DWS to administer. What was seen today was the Department working with the consultant
trying to expedite this project amid all of its other projects that the Board approved last year. In
addition to the existing workload, this project has been added to it. The Board is mindful of the
needs of this community. He thanked members of the Board for listening to the issues and
concerns of the community today; and hopefully, in the future, the community's questions can be
addressed by the Department and the consultant. He added that, personally, he would like to see
Page 15 of30 11- 27- 07— Minutes(Ocean View).doc
the park get water as it serves the community and there is a great need for it. If you have 300
children who need an after - school program, it would serve a major need for this community.
Ms. Kim thanked the group for coming out today; and as a Board Member, she assured the public
that this subject comes up regularly at its meetings and the Department provides status reports. It
has been her observation that the Department is working as hard as it can to try and get this Ocean
View project going and on track. The Board had discussed the delay with DAGS at its last
meeting and being a State agency, it makes it twice as hard for a County department to get them to
hurry up and not delay a project. She appreciated one suggestion from an individual today that
maybe the Department could let the community know and they could start calling that agency if
that problem is encountered again in the future. There is always the downside where an agency
does not appreciate having 10 or 20 calls a day because they feel it has been orchestrated by yet
another agency.
Mr. Heck mentioned that he has been on the Water Board for five years. From his own point of
view, this is a learning curve for the DWS to reach out and have meetings in the community where
the work is to be done. There have been three meetings at this location, and the entire Board,
engineers, and management have come out here. What he hears from the public is not an
outpouring of anger but more of a curiosity about the project; and the more facts that are provided,
the better it is. He thinks everyone understands now that $6 million is going to get the community
what it originally asked for, and the budget that was given today can be figured out by trying to
get additional funding from the State. In his last year as a Board Member, he is very much
appreciative of all of the effort that the Department of Water Supply has put in this project.
Mr. Kuailani stated that he is from the Kona district; and just in talking with some of the residents
today, he was really surprised to learn that other associations or subdivisions were represented
here today, and not only Ocean View. Hopefully, getting water here will bring unity within this
whole area, as well as Naalehu and Pahala. He thought it was great that other subdivisions in the
area would be be utilizing the water resources once it is on line.
Mr. Harai stated that he is also from Kona and, like Mr. Nitsche, he believes that if you have an
idea and you pursue it, things will happen. He thanked everyone for the hard work and effort put
into this project.
Councilman Jacobson stated that there have been a lot of people in this community who worked
tirelessly for many years. He sees this moving forward and that this revised price tag is going to
allow the community to do some lobbying to get the extra money. He fully supports it,
particularly supplying water to the park, to meet the needs for a lot of people. He was also
grateful to the Manager and his staff for their efforts and sees progress and that the community is
going to get a well, the supply lines, and the spigots. He wished some of the unpleasant delays
and the high cost could be avoided; but unfortunately, as costs have doubled or tripled in the last
couple of years, it is not just here but all across the country. He appreciated the Board's help, and
in particular, Mr. Heck in his position here.
Page 16 of 30 11- 27- 07— Minutes(Ocean View).doc
HAMAKUA:
A. JOB NO. 2007 -923, AHUALOA WELL DEVELOPMENT — PHASE 2 (PRODUCTION
WELL AND 1.0 MG RESERVOIR):
This project is a follow -up to Phase 1 of this project (approved at the October 26, 2004, Water
Board Meeting), which involved the drilling, casing, and testing of an exploratory well near the
Department's existing Ahualoa Backwash and Filter tanks. The well tests proved the well to be a
reliable source. Therefore, the Department is pursuing outfitting the well and construction of a
1.0 MG reservoir for Phase 2 of the project. The project also includes the construction of
approximately 1,100 L.F. of access road and 12 -inch ductile iron waterline from Old Mamalahoa
Highway to the site.
The estimated construction cost for this project is $4,000,000.00. This project is NOT on the
Department's existing C.I.P. list; therefore, Water Board approval is necessary to proceed. The
project is on the DWS 20 -year Water Master Plan. Funding for this project will initially be from
DWS' C.I.P. budget; however, DWS is currently pursuing funding from the State Drinking Water
Revolving Fund program for reimbursement.
The Manager recommended that the Board approve this project, JOB NO. 2007 -923, AHUALOA
WELL DEVELOPMENT — PHASE 2 (PRODUCTION WELL AND 1.0 MG RESERVOIR), and
have the Department proceed with its design and implementation.
ACTION: Mr. Heck moved for approval of the Manager's recommendation; seconded by
Mr. Mukai and carried unanimously by voice vote.
NORTH KONA:
A. JOB NO. 2006 -898, KALOKO TANK #2 HYDROELECTRIC GENERATION PROJECT:
The Board considered a time extension request of 60 calendar days from the contractor, Aloha
Machine and Welding, Ltd., due to delays in the testing phase of the hydro generator equipment.
The original contract completion date is December 11, 2007. The proposed new contract
completion date is February 12, 2008. This is the first time extension request.
Originally the equipment was to be built and tested by August 8, 2007. There were delays in the
testing phase due to low water levels at the testing facility. Eventually, a large pump was brought
in to complete the testing of the equipment. The equipment was shipped from the manufacturer
on October 26, 2007. If approved, there is no change to the contract cost.
The Manager recommended that the Board grant a contract time extension of 60 calendar days to
Aloha Machine and Welding, Ltd., for JOB NO. 2006 -898, KALOKO TANK #2
HYDROELECTRIC GENERATION PROJECT.
ACTION: Ms. Kim moved for approval of the Manager's recommendation; seconded by
Mr. Kuailani and carried unanimously by voice vote.
Page 17 of 30 11- 27- 07— Minutes(Ocean View).doc
B. JOB NO. 2003 -834 (REVISED), CONSTRUCTION OF THE KONA BASEYARD
FACILITY IMPROVEMENTS:
The Board considered a request from the contractor, Central Construction, Incorporated. This is
the contractor's fourth time extension request to allow the Department of Water Supply additional
time to secure the necessary building permit for the project. The consultant engineer has informed
DWS staff that the variance process includes an additional 30 -day comment period once he has
received the approval from the Planning Department to send letters to the surrounding property
owners. Upon completion of the 30 -day comment period, DWS will have to address any concerns
or comments received by the Planning Department and then they will finalize the variance
application. Therefore, staff has evaluated this request and finds that the 65- calendar day
extension is justified.
Previously approved time extensions by the Water Board:
• First time extension 64 calendar days (May 11, 2007, to July 14, 2007)
• Second time extension 60 calendar days (July 14, 2007, to September 12, 2007)
• Third time extension 60 calendar days (September 12, 2007, to November 11, 2007)
This is the recommended time extension for Water Board approval:
• Fourth time extension 65 calendar days (November 11, 2007, to January 15, 2008)
The Manager recommended that the Board grant Central Construction, Incorporated, a
65- calendar day extension for JOB NO. 2003 -834 (REVISED), CONSTRUCTION OF THE
KONA BASEYARD FACILITY IMPROVEMENTS.
MOTION: Mr. Kuailani moved for approval of the Manager's recommendation; seconded by
Mr. Smith.
Mr. Mukai noted this is the fourth time extension request to allow DWS additional time to secure
the necessary building permit. He asked why it is taking so long.
Mr. Inaba explained that initially when DWS checked with the Planning Department, they said it
would be an estimated six weeks before they would approve a variance; but now it is the
understanding that once they get the variance application and they respond to it, then DWS has a
30 -day comment period where its consultant would have to take the variance application and send
out notices to the surrounding neighbors. The DWS did not initially foresee the requirement for a
variance until applying for the building permit.
Chairman Goya noted there are now four time extensions of 60 or more calendar days.
Mr. Smith commented that from a Department of Public Works' point of view, if the existing
structure met the existing setback requirements, there would be no need for a variance. What
happened was the structure was not compliant so the Department had to get a building permit.
The Planning Department requires a setback so that means either moving the building or getting a
variance; and this all takes time.
ACTION: A vote was taken on the Motion. Motion was carried unanimously by voice vote.
Page 18 of 30 11- 27- 07— Minutes(Ocean View).doc
C. JOB NO. 2002 -806, MAMALAHOA HIGHWAY WATERLINE IMPROVEMENTS —
PHASE 2:
Due to unforeseen site conditions at the Holualoa Well and Reservoir site, the contractor, Isemoto
Contracting Co., Inc., issued a Request for Information (RFI) to determine the appropriate course
of action. In response to the RFI, our consultant BK, Inc., determined that a special pipe fitting
could remedy the situation.
The contractor has submitted a request for time extension to the contract completion date of 152
days. The completion date for this project is set for November 30, 2007. The contractor has
indicated that the number of days requested is largely due to a delivery time of 10 to 12 weeks for
the special fitting. The Department and its consultant are currently working on a change in the
overall design to expedite remedy of the situation.
Therefore, the Department recommends a time extension of 90 calendar days to finish the design,
implement the required work, and proceed with the remainder of the work required for this
contract.
This would be the third time extension to the contract. The first time extension request was for
180 calendar delays due to the consultant's preparation of additional plans and specifications for
addition of inlet control units and check valves at Holualoa #1 and Kahaluu #1 tank sites, which
were not included in the original plans, and the contractor's additional time required for
installation of same. There were also delays in review and revisions to submittals for the project.
The second time extension was for 180 calendar days due to revisions to the project plans, scope
of work, and project scheduling. The contractor could not proceed with construction until the
Department determined the appropriate design and sequencing of construction for the project.
Engineering staff has reviewed this third time extension request and finds that the 90 calendar
days are justified. If approved, the contract completion date will be extended from November 30,
2007, to January 29, 2008.
The Manager recommended that the Board grant this extension of contract time of 90 calendar
days to Isemoto Contracting Co., Ltd., for JOB NO. 2002 -806, MAMALAHOA HIGHWAY
WATERLINE IMPROVEMENTS — PHASE 2.
MOTION: Mr. Heck moved for approval of the Manager's recommendation; seconded by
Mr. Kuailani.
Mr. Smith asked why the request in the contractor's letter was for 152 days, but the Department is
only asking for 90 days.
Mr. Inaba explained that the 152 days was based on a change proposal from the consultant
engineer, which required a special fitting. What staff decided and discussed with the consultant
engineer was to look at an alternate resolution. No proposal was received from the contractor, but
staff feels that the additional 90 days should be adequate. It will be a simpler solution; but the
contractor needs to be provided with that design, and they have to submit a request at that point.
Page 19 of 30 11- 27- 07— Minutes(Ocean View).doc
The Manager added that the Department thought that modifying the connection was simpler than
waiting for that special fitting.
ACTION: A vote was taken on the Motion. Motion was carried unanimously by voice vote.
KA`U:
A. HAWAIIAN OCEAN VIEW ESTATES (HOVE) WATER FACILITIES
PROJECT (JOB NO. 2007 -922):
Discussed earlier.
MISCELLANEOUS:
A. DEDICATION OF WATER SYSTEMS:
The Department received the following documents for action by the Water Board. The water
systems have been constructed in accordance with the Department's standards and are in
acceptable condition for dedication.
GRANT OF EASEMENT
(For Water Meters)
Grantor: Sandy's Drive -in, Inc.
TMK: (3) 7 -9- 007:065
2. GRANT OF EASEMENT
(For Water Meters)
Grantor: The Sullivan Family Limited Partnership
TMK: (3) 7 -9- 007:036
GRANT OF EASEMENT
(For Waterline Purposes)
Grantors: Richard Ha Jr. and June Dale Ha
TMK: (3) 7 -9- 007:036
E.W.O.: 2007 -008
The Manager recommended that the Water Board accepts these documents subject to the approval
of the Corporation Counsel and that either the Chairman or the Vice - Chairman be authorized to
sign the documents.
ACTION: Mr. Smith moved for approval of the Manager's recommendation; seconded by
Mr. Heck.
Page 20 of 30 11- 27- 07— Minutes(Ocean View).doc
B. FOSTER KERN LLC, TAX MAP KEY (3) 1 -6- 003:005 (PORTION) AND 108 ULUPONO
CENTER:
Mr. Inaba stated that this is a request from the developer, Foster Kern LLC, to cancel a waterline
easement and to provide the Department a right -of- entry. It is kind of a swap, but it will not be a
legal recordation for that easement, which would allow them to complete their subdivision.
Ms. Garson added that the Department did not have a recommendation at this point. This is a
request from the developer to the Board to cancel the easement and give the Board, instead, a
right -of- entry. She was told that the project was almost completed although that was not
confirmed. She had asked the developer if they would be present at this meeting so they could
plead their case to the Board, and they chose not to come.
The Manager recommended that the Board defer this until the developer can physically appear
and give the Board reasons to approve this request.
MOTION FOR DEFERRAL: Mr. Smith moved that this item be deferred until the owner or
representative has an opportunity to brief the Board on the specifics of the project; seconded by
Mr. Mukai.
Mr. Mukai stated that he seconded the Motion because from what little information he had, he
would be against granting of the right -of -way versus the easement.
Mr. Smith commented that if the Board rescinds the easement, then they do not get service.
ACTION: A vote was taken on the Motion to defer. Motion was carried unanimously by voice
vote.
C. PROFESSIONAL SERVICES AGREEMENT:
Professional Services Agreement contracts for the following Department of Water Supply project
is currently being processed. However, the project is not listed on the Department's current 5 -year
Capital Improvement Projects list.
1) Kona Ocean View Improvements - this project has been initiated by a County Council's
Improvement District process. It consists of the installation of a new water system meeting
the Department's Water System Standards to serve about 80 lots within the subdivision.
Through the Improvement District process, the Department administers the project.
Therefore, DWS needs to advance design funds to procure professional engineer to
prepare /assist with the following in order to apply for funding through USDA's Rural
Utilities Water and Waste Disposal Loan and Grant Program:
i. Preliminary Engineering Report
ii. NEPA / 343 Environmental Assessment
iii. USDA R.U.S. application
iv. Construction documents
Page 21 of 30 11- 27- 07— Minutes(Ocean View).doc
The Department is to get reimbursed the design funds from the Improvement District process.
Design and Construction cost estimate: $400,000.00
The Manager recommended that the Board approve the new project, the professional services
contract, subject to results of the procurement process and that either the Chairman or the
Vice - Chairman be authorized to sign the necessary documents, subject to approval of Corporation
Counsel.
MOTION: Mr. Mukai moved for approval of the Manager's recommendation; seconded by
Ms. Kim.
The Manager noted that this is almost similar to Kona Ocean View/Wonderview Subdivisions,
except on a much smaller scale. It is an Improvement District process. The Department will get
reimbursed, but it has to front the money.
Mr. Smith stated that just learning from the experience with Kona Ocean View /Wonderview
Subdivisions, even though the Department got reimbursed, the community had the time value of
the money that the Department fronted. In addition to that, the DWS had to expend staff time to
administer and monitor the project and there were surprises that came up about resurfacing the
road and other issues so it was not a really clean project. Overall, the community benefited from
DWS' involvement in that project.
Chairman Goya asked if the Department could provide the Board with the costs it incurred with
the Kona Ocean View/Wonderview Subdivisions project so that when addressing these kinds of
issues in the future, although money is available through external funding, there are some internal
costs and materials that the DWS is responsible for that comes out of its own budget.
Mr. Smith asked if this was also similar to Kona Ocean View/Wonderview Subdivisions where
there is a private master meter system that is being revamped to provide individual meters.
The Manager replied it was not. This is a situation where the residents have individual meters
along the highway with separate waterlines going to their property. In fact, there was so much
that about four years ago, the Department of Transportation stopped the DWS from allowing any
further services there. This new system will be built to standards and dedicated to the Department
after completion.
In response to Chairman Goya's question of how long the project will take, the Manager stated
that the timetable to award the contract will be about two years from now because the Council has
to get involved with a Resolution and the whole Improvement District process.
ACTION: A vote was taken on the Motion. Motion was carried unanimously by voice vote.
Page 22 of 30 11- 27- 07— Minutes(Ocean View).doc
D. WATER RATE STUDY 2007:
Chairman Goya entertained a Motion to defer this item, as well as Items E and F, to the next
meeting.
ACTION TO DEFER: Ms. Kim so moved; seconded by Mr. Heck and carried unanimously by
voice vote.
E. BANKING AND CASH MANAGEMENT:
Deferred (see Item D).
F. DEPARTMENT OF WATER SUPPLY MOTTO:
Deferred (see Item D).
G. MONTHLY PROGRESS REPORT:
Chairman Goya mentioned that on an individual basis, these project delays present cash now
problems when they all come to fruition. He thought somewhere down the road, the Department
needs to analyze its cash flow situation. There are still projects outstanding on the list from 2001.
The Manager added that some are completed, but the paperwork has not been completed to
actually accept the project.
H. AUTOMATIC METER READING (AMR) SYSTEM CONTRACT — NEPTUNE
TECHNOLOGY GROUP (ADDITIONAL 1,000 UNITS):
Attached to the Agenda was an "Agreement For Sale And Installation Of Automatic Meter
Reading System And Replacement Of Meters." This agreement with Neptune is to have them
install an additional 1,000 AMR units in addition to the 2,200 previously installed by contract
dated September 19, 2006. These meters will allow meter readers to obtain meter readings via
radio signal to either a handheld device or drive -by receiver. Meter readings are then loaded
directly into the billing system providing clerical, in addition to field efficiencies. Cost to the
Department for 1,000 AMR meters and installation is $293,000.00. Total contract cost for 3,200
meters is $942,000.00.
The Department recommends approval of the AMR contract with Neptune Technology Group and
that either the Chairman or the Vice - Chairman be authorized to sign the contract, subject to
review as to form and legality of the contract by Corporation Counsel.
MOTION: Mr. Smith moved for approval of the Department's recommendation; seconded by
Mr. Kuailani.
The Manager explained that the Board had appropriated $1 million for AMR's, and the
Department found there was money left over after installing the first phase. It went ahead with an
Page 23 of 30 11- 27- 07— Minutes(Ocean View).doc
additional 1,000 meters. However, it was found that by doing that with the same initial contract
would be a violation of Procurement Rules; and that is the reason why a separate contract is
needed.
Ms. Garson noted that there was a provision for additional meters in the original contract of 10 %,
but the 1,000 meters went over the 10 %. She had the Department do a new exemption for sole
source; and this is the second contract, so everything is on track.
Mr. Smith recalled that the AMR program was done in unsafe areas so that employees could
efficiently read meters without being put in unsafe predicaments. There were some glitches in the
beginning, but the vendor was responsive in addressing them so the accounting information
download has been working. There were sufficient funds to increase the scope of work, so that
was pursued because it seemed the prudent thing to do.
Chairman Goya noted that the Board has received positive reports from the Department as to the
AMR program's effectiveness.
In response to Mr. Kuailani's question of whether there were any customer complaints, the
Manager replied that there were a few in the initial period because there were a few incorrect
readings that were reflected on the customer's bill. However, it was nothing that could not be
remedied.
Chairman Goya noted that the original installer was not necessarily skilled in this particular area
so there were some glitches in installations. In fact, for the meter that was installed at his
residence, they used the old gasket, which gave way; but it was a learning experience, and the
Department learned that it should hold Neptune responsible for its installations, including
transition on billing.
The Manager noted that during the second phase when Neptune handled the installations itself, it
went smoothly.
In response to Chairman Goya's question of whether there were any recommendations for future
installments now that this pilot portion is completed, the Manager stated that staff has been in
contact with Neptune as to what makes sense for the future and will hold a meeting with them. At
some point in time, the Department will have to come back to the Board for appropriation to
purchase another 5,000 or 6,000 units at a time to make it worthwhile on Neptune's part and on
the Department's part.
In response to Chairman Goya's question of whether the Department had some inventory on hand
for replacements, the Manager replied that the Department purchased some replacement units to
have on hand in both Hilo and Kona.
Mr. Smith noted that the AMR product only takes the readout from the meter and transmits it; but
even if the transmission is faulty, the mechanical reader is still tracking the amount of water usage
so it can always be read manually.
Page 24 of 30 11- 27- 07— Minutes(Ocean View).doc
Mr. Mukai suggested that when the Department comes back to the Board with the next Neptune
proposal, he would be curious to see roughly how many man -hours are being saved by this project
and if there is a reduction in injuries to employees.
The Manager stated that he could have the Customer Service Supervisor present for the next
meeting, if time allows, to provide information.
Chairman Goya added that she had provided information to the Board at a previous meeting.
In response to Ms. Kim's question of whether the contract includes maintenance, the Manager
replied that it covers the meter unit and the installation but the Department is responsible for
maintenance. However, meters nowadays are so sophisticated, they need very little repair.
Mr. Smith stated that he knew Neptune was chosen out of a couple of vendors when this was put
out for bid. The Department has been very satisfied with their product and customer support. He
asked what would be involved if the Department wanted to do a soul source bid to have a
consistent product.
The Manager replied that this is a sole source bid because when the initial study was done to
determine what handheld unit to buy, the Department went through a list of vendors and selected
Neptune at that time for various reasons. Since it already had the handheld units, it went with a
sole source contract with Neptune because they were compatible with the handheld units. That
sole source issue has already been addressed so the next time the Department puts out bids, it
would have to go sole source again.
Mr. Smith asked if this is compliant with the Procurement rules.
The Manager replied that it is. If a vendor comes out with a product that is universal, it may be
different; but until that happens, the Department will do a sole source bid.
Mr. Smith stated he thought a good decision was made.
The Manager added that he had attended an AMR conference and had spoken with a lot of people.
Nobody had anything negative to say about Neptune and in fact complimented them on a good
product.
ACTION: A vote was taken on the Motion. Motion was carried unanimously by voice vote.
REVIEW OF MONTHLY FINANCIAL STATEMENTS:
Chairman Goya noted that salaries and benefits are on the higher level already and there is still
some flexibility in the budget but not too much. Otherwise, the Financial Statements looked fine.
Page 25 of30 11- 27- 07— Minutes(Ocean View).doc
MANAGER'S REPORT:
1) Palani Road Transmission Waterline Project - Mr. Beck reported that both of the private
easement owners are currently working with their attorneys. For the major easement coming
down from the highway, the owners are willing to negotiate with the DWS. Some minor
alterations have been requested by the DWS regarding increases to the size of the easement.
On another easement, the owners did not like the appraisal price given by DWS so they were
informed that they could get their own appraisal done for consideration by DWS or they
would have to accept the price given to them or the condemnation process would be pursued.
In response to Chairman Goya's question of how long the delay has been for this project, the
Manager replied that the plans are complete, and the project was supposed to have been
advertised December 2006. The issue of the easements is holding it up.
2) Hawaiian Ocean View exploratory well - discussed earlier.
3) Kona Water Quality - the Manager reported that the Department is still working with various
individuals in the area and continuing with the modifications to the Kahaluu Shaft in an effort
to improve the water quality in the Kailua -Kona area. The north side -- Palisades, Kalaoa, and
the south side have good water quality. It is the Manager's hope that the Palani Road
Transmission Waterline project moves first, followed by Mr. Bolton's project, which the
Board approved. Those two projects would greatly enhance the Department's ability to bring
the mauka water to the area.
4) Kamehameha Investment Corporation - Mr. Smith mentioned that Mr. Gregory Chun had
indicated that a draft term sheet was submitted and he was waiting to hear from the DWS.
The Manager stated the Department has not received it but would follow up with Mr. Chun.
5) Update on Meeting with State Agencies in North Kona - the Manager stated that he attended
a meeting, along with Mr. Larry Beck, which was spearheaded by Mr. Jim Frazier, who is
this island's representative on the Commission on Water Resource Management (CWRM).
Also present were Mr. Roy Hardy and Mr. Ken Kawahara of CWRM as well as Mr. Ron
Baird of Natural Energy Labs of Hawaii Authority ( NELHA), and Mr. Chauncey Wong Yuen
of the Department of Transportation, Airports Division. The meeting was held at NELHA,
and the purpose was to bring State agencies together to see how DWS could provide
additional service to them. Back in the early 1990's, the State commissioned Fukunaga &
Associates, Inc., to prepare a North Kona Water Master Plan. In it were several
improvements that the State would have done. If they had been done, on that same plan was
a listing of water allocations to different State agencies- -NELHA being one of them. Over
the years, with the bad economy, nothing from this Plan ever materialized. This meeting was
to discuss how to pursue improvements so agencies like NELHA and the airport could get
additional water. DWS provided them with what would need to be done, such as additional
wells, transmission, and capacity on private lines along Queen Kaahumanu Highway to
NELHA and the airport. Representative Cindy Evans was involved in the meeting by way of
conference call, and she was going to ask all of the Big Island Legislators to have a meeting
so the DWS could explain to them what was needed and how they could help. As the Board
will recall, the DWS put in a $12 million State Legislature C.I.P. request; and it is hoped that
Page 26 of 30 11- 27- 07— Minutes(Ocean View).doc
the Big Island delegation will realize the importance of the projects. What also came up in
that meeting was a concern from Kaloko National Park that the alkaline ponds are being
detrimentally affected by the withdrawal in groundwater in the North Kona area. They
initially wanted to petition CWRM to designate the aquifer, which means the State would
then allocate water from the aquifer. He thinks it is almost impossible to do because as the
rules are written, the State cannot designate an aquifer unless 90% of the safe yield is
reached; and that is not the case. A letter was written to the CWRM by the national park
ranger to set up something similar to the Waimea Water Roundtable, made up of all
interested parties to address the water situation in Kona in lieu of asking the State to
designate the Kona aquifer.
Mr. Mukai suggested that in future meetings, the Department may want to invite the Water
Board's Chairperson as the Board represents the Big Island.
Mr. Kuailani stated that he is retired from the National Park Service, and one of the biggest
problems they had was with deaths of native birds. One of the problems was stagnant water
in the ponds. With the amount of development on the mauka side of the Queen Kaahumanu
Highway, everybody is throwing their stuff into the ground. That is why Ms. Geraldine Bell
is very concerned.
The Manager stated that the thing Ms. Bell eluded to was not so much what is being put into
the ground and coming to the ponds, but more of the withdrawal of groundwater, which is
taken out by the Department to provide water for the developers. The issue of what is going
back into the ground and reaching the ponds is not this Department's responsibility. Ms. Bell
petitioned the CWRM to designate the aquifers, but the suggestion of forming a roundtable
was mentioned instead.
Ms. Kim asked what the purpose of the roundtable would be. All that is needed is State
funding for those improvements if the aquifer is, in fact, being overdrawn.
The Manager stated there is no indication that it is overdrawn.
Chairman Goya asked the Manager to report on the Waimea Roundtable discussion by
CWRM and Mr. Steve Bowles of Waimea Water Services.
The Manager reported that CWRM commissioned the University of Hawaii to look at safe
yields of the different aquifers in areas with high growth and the findings were presented at
the Waimea Roundtable meeting. In some places, it was 45% of what the DWS envisions
right now. Geologists and hydro - geologists disagreed with what the State came out with so
there is a petition before CWRM to establish a task group made up of hydro - geologists to
take a look it and come up with what they would consider a reasonable sustainable yield. The
University of Hawaii came up with what they thought it is, a range of numbers, and the
CWRM plans to publish the low end of the range, which would probably alarm people
because the numbers are greatly different in three of the aquifers on the west side that
stretches from Kawaihae all the way to the Keaholu area. In that area, the numbers change
drastically; and if they publish that, then we might be real close to having certain aquifers
Page 27 of 30 11- 27- 07— Minutes(Ocean View).doc
designated because if 90% of the safe yield is reached, then the State comes in and starts
doing the allocation instead of this Department.
Mr. Beck stated that the big change that caused these numbers was the amount of recharge.
Based on the data they had, they were interpolating a lot as they moved down into areas
where they did not have any real data, and now they have kind of done a revision. They are
trying to take the most conservative approach possible and actually that is probably not the
best approach.
Chairman Goya stated that what he got from attending the meeting was that information
being used to determine the sustainable yield did not even take into account people who have
been studying this for a longer period time, knowing that Hawaii is unique hydrologically.
His first concern was that the State was taking this information to the public in Hilo and in
Kona and how they presented it at the Waimea Roundtable meeting was more in negative
manner than positive. The number of test wells on this island was no more than a dozen, and
to determine the sustainable yield in specific areas would be difficult at best to come up with
without appropriate information. He felt that it would be dangerous for the State to take the
information out to the public without qualifying their research or the use of that information
and that they should consider the input of more people in a hydrological background. He
asked if the Manager had anything to add.
The Manager stated that he thought that one of the hydro - geologists who has a lot of
experience kind of stressed the fact that there is a lot of information in private hands that has
not been released to any public entity and they would be remiss by not including that type of
information. That is the reason why this particular individual suggested a task force be
formed to do the study instead of having the State do it by themselves; and, hopefully, they
can gain all the private information that at this point has not been given to the State.
Whatever this Department does as a government agency is public knowledge and is reported
to CWRM; but private entities do not. These figures should be comprised of practicing
hydro - geologists and include as much information as there is out there because the numbers
they came up with are alarming because it is so much less than what DWS was lead to
believe. As a government agency, especially as a water supply, DWS has no choice but to
use the numbers that the State comes up with.
Mr. Harai asked how many private wells were in the area.
The Manager replied there is Waikoloa Water Company, Waiki Ranch, Kohala Ranch,
Kukui, and Hualalai.
Mr. Smith stated that there are no DWS facilities from Mauna Lani and south to Kaiminani
and the airport. Everything between is private water system.
Mr. Goya stated that this is where the numbers changed most.
The Manager stated that it affects DWS' Kawaihae Lalamilo wells that are currently serving
Mauna Lani and Mauna Kea; it affects the new proposed wells by Ouli Development that
Page 28 of30 11- 27- 07— Minutes(Ocean View).doc
were negotiated with DWS; and it would also affect the wells intended for development on
Kawaihae Road. It might also affect North Kohala were the DWS has two wells already,
with the intent to drill two more. The east side of the island remains the same. Those
numbers have not been drastically changed.
Mr. Mukai asked if CWRM did this only for the Big Island or if they did it statewide.
The Manager replied they did this only for the Big Island. He was sure they would take this
to the other islands because would not make sense for them to just redo one island.
Chairman Goya asked if the Manager would be attending the meetings -- Waiakea High
School Cafeteria, 6:00 p.m., December 13, and Kealakehe High School, December 14,
6:00 p.m.
The Manager indicated he would attend the one in Hilo, and Mr. Beck indicated he would
attend the one in Kona. The Manager added that Mr. Beck is drafting some comments to the
CWRM about accepting a range rather than taking the low end of it. CWRM is taking the
low end just to be conservative.
Mr. Goya asked if the Board could be provided with a copy of that letter.
Mr. Smith added that Mr. Beck would also be giving an update at the South Kohala
Community Development Plan Steering Committee meeting on November 28, 2007, which
will cover sustainable yield.
The Manager stated that when the Kohala Watershed Committee was first developed and was
actually started by some of the people in Waimea and directed by Mr. Manabu Tagomori, he
had a lot to do with it. DWS is a partner and one of the things in protecting the watershed is
keeping invasive animals out like pigs, wild cattle, etc.; and that is the intent of the fencing.
Chairman Goya stated that when he and Mr. Mukai attended the last water conference in
Honolulu, one of the speakers spoke about how important it is to protect the watershed and
the damage that can be done by animals. He thinks the DWS' participation is worthy and
asked if there were any financial expense.
The Manager replied he was sure there they will be requesting funding; and if that occurs, he
certainly will come back to the Board for approval for funding. He added that it is
unbelievable what damage pigs can do. Once you prevent foliage from growing, they lose
the ability to capture the rainfall and soak back into the ground. The other thing pigs do is
mess up the ground so much that they prevent the infiltration of water. It is more conducive
to runoff and runoff does not help anything. That is why it is important to keep those animals
out of the watershed.
6) Big Island Pipetapping Team - as a result of the recent interest in the pipetapping
competition, as discussed last month, the Waimea Baseyard has set up a demonstration for
Thursday, November 29, 2007, 10:00 a.m., at their office. Various department heads have
Page 29 of 30 11- 27- 07— Minutes(Ocean View).doc
been invited to attend, along with Mayor Kim, the Water Board, the County Council,
Mr. Derek Kirisu, Ms. Helen Hemmes, Mr. Hugh Ono, and Mr. Delbert Nishimura. The
Tribune Herald and the West Hawaii were sent press releases. The event will be videotaped
to show on the public community channel. Ms. Aton will also send information from the
event to the newspapers and hopefully it will be included in their publications. Early in 2008,
the Department is looking into housing a demonstration in Hilo and then one in Kona.
K. CHAIRMAN'S REPORT:
Chairman Goya announced that the terms of Mr. Heck and Ms. Helfrich will end December 31,
2007. He added that Mr. Heck has served this community well. Mr. Mukai added that he was
thankful to Mr. Heck for helping bring him up to speed on the Ocean View project, since he has
just begun his term on the Board this year.
Mr. Heck stated that he would be happy stay on for the 90 -day extension because it may take that
long to get a replacement for the Water Board.
Ms. Kim announced that all of the evaluation forms on the Manager came in except for one or
two. By next month's meeting, she will have a report ready. If there is anything else that Board
Members need from either herself or the Secretary regarding decisions about the Manager's
evaluation to please let her know.
ANNOUNCEMENTS:
1. Next Meeting:
The next meeting of the Water Board will be held on December 18, 2007, 10:00 a.m., in the
Department of Water Supply, Hilo Operations Center Conference Room, 889 Leilani Street,
Hilo, Hawaii.
The January 22, 2008, Water Board Meeting will be held at Hilo Operations Center,
889 Leilani Street, Hilo, Hawaii, at 10:00 a.m.
STATEMENTS FROM THE PUBLIC: None.
ADJOURNMENT
ACTION: Mr. Smith moved for adjournment of the Meeting; seconded by Mr. Mukai and carried
unanimously by voice vote. (Meeting adjourned at 12:52 p.m.)
Secretary