Loading...
HomeMy WebLinkAboutPD Background Report CU Hawaii Federal Credit Union (PL-REZ-2025-000090)BCUHawaiiFCUAmendREZ.11-04-2025 COUNTY OF HAWAIʻI PLANNING DEPARTMENT BACKGROUND REPORT CU HAWAIʻI FEDERAL CREDIT UNION (FORMERLY S. RUSSELL & AKIKO ODA) AMENDMENT TO CHANGE OF ZONE ORDINANCE NO. 09-44 (PL-REZ-2025-000090/AMEND REZ 2008-000088) ___________ CU HAWAIʻI FEDERAL CREDIT UNION has submitted an application for a 10-year time extension to Condition C (complete project), an amendment to Condition D (dedication of road widening) to remove roadway improvements and deletion of Condition E (roadway improvements) to remove requirement of curb, gutter and sidewalk improvements of Change of Zone Ordinance No. 09-44, which rezoned a 22,500-square foot parcel of land from a Single-Family Residential (RS-10) to Neighborhood Commercial-10,000 square feet (CN-10) zoning district. The subject property is located at 533 Manono Street, approximately 300 feet north of its intersection with Hualani Street, Waiākea House Lots, Waiākea, South Hilo, Hawaiʻi, TMK: (3) 2-2-034:036. PROPOSED ACTION 1. Applicant’s Request: The applicant is requesting the following amendments to Change of Zone Ordinance No. 09-44: ▪ A 10-year time extension to Condition C (complete project) from the effective date of this amendment. ▪ An amendment to Condition D (dedication of road widening) to remove the inclusion of roadway improvements. ▪ Deletion of Condition E (roadway improvements) to remove the requirement of the applicant to construct curb, gutter and sidewalk improvements along the property’s Manono Street frontage. Instead, the applicant proposes to pay a ‘pro-rata’ share to the County for the cost of the improvements when the County widens and improves Manono Street. The following are the applicant’s specific amendment requests (material to be deleted is bracketed/struck through, material to be added is underscored): Amend Condition C: [Conversion of the existing dwelling to office uses shall be completed within five -2- (5) years from the effective date of this ordinance. Prior to conversion and/or construction, the applicant, successors or assigns shall secure Final Plan Approval for the proposed development from the Planning Director in accordance with Section 25-2-70, Chapter 25 (Zoning Code), Hawaiʻi County Code.]Construction of the proposed development shall be as substantially represented by the Applicants, or as permitted by the zoning district classification, and shall be completed within ten (10) years from the effective date of this ordinance. The time during which required plans, reports, studies or relevant permit applications are under review for approvals by government agencies shall not count towards the deadline established in this ordinance. To justify this tolling, the Applicants shall provide evidence of the excluded time period to the planning department for its review and approval, which shall consist of dates obtained from a government agency website, permitting program, or office indicating when the required plans, reports, studies or permit applications were submitted, approved, denied, or returned by the government agency. Amend Condition D: A five-foot future road widening strip along Manono Street shall be delineated on the plans submitted for Plan Approval review. The five-foot wide future road widening section [with roadway improvements] shall be subdivided and dedicated to the County within five (5) years from the effective date of this ordinance. Delete Condition E: [The applicant(s) shall provide improvements to the entire frontage of Manono Street consisting of, but not limited to, pavement widening with concrete curb, gutter and sidewalk, drainage improvements, and any required utility relocation, meeting the requirements of the Department of Public Works. All roadway improvements to Manono Street shall be completed prior to a Certificate of Occupancy.] It should be noted that if the applicant’s requested amendments are approved, the existing CN-10 zoning would allow for the construction of 18 double-family or multiple-family residential units on the subject property. -3- 2. Applicant’s Reasons for the Request: The applicant acquired the property in March 2025, well after the April 23, 2014, deadline to complete the project which, as proposed by the previous landowner, would have converted a single-family dwelling on the property into an office building. The current applicant has since demolished the dwelling with the objective of constructing a new, member-facing credit union branch facility on the subject property in conjunction with establishing a 41-stall parking lot on the adjacent property (TMK 2-2-034:045) for member and employee parking. The applicant proposes to consolidate the subject property with TMK 2-2-034:045. The existing branch facility at 476 Hīnano Street will be maintained and utilized for administrative, back-office operations. According to the applicant, the requested 10-year time extension to complete construction is needed to carefully plan and customize the new building at their own pace, ensuring it is tailored to the needs of their members and the community, and to manage the building process effectively. As a non-profit, they also require flexibility to manage the financial aspects of the project, such as securing optimal financing and construction contracts, given internal priorities like a core system conversion and other potential contingencies. Additionally, the applicant requests to remove the requirement of curb, gutter and sidewalk improvements on the property’s frontage at Manono Street and to dedicate a road widening strip without such shoulder improvements. Instead, the applicant has offered to pay a pro-rata share of the cost of roadway improvements to the county, to be allocated in conjunction with a comprehensive improvement of Manono Street. The applicant’s stated reason for the request to amend Condition D and delete Condition E is that the surrounding area along Manono and Hīnano Streets do not currently have such shoulder improvements, that they will be non-functional as a sidewalk and potentially create a tripping hazard. 3. Construction Timetable and Cost: The applicant anticipates that completing the proposed project will take about 10 years from the approval date of the amended Change -4- of Zone, at an estimated cost of $4 million. 4. Landowner: CU Hawaiʻi Federal Credit Union. 5. Supporting Information: The applicant has submitted the attached in support of the request. (Planning Department Exhibit 1 - Change of Zone Amendment Application dated August 8, 2025 and Additional Information dated November 14, 2025) STATE & COUNTY PLANS 6. State Land Use District: Urban. 7. General Plan Land Use Pattern Allocation Guide (LUPAG) MAP: Medium Density Urban (mdu). These areas include uses such as village and neighborhood commercial and single family and multiple family residential and related functions (multiple family residential - up to 35 units per acre). 8. County Zoning: Neighborhood Commercial-10,000 square feet (CN-10). 9. Hilo Community Development Plan (CDP): The Hilo CDP, adopted by Resolution No. 1 on May 21, 1975, identifies the area as Multiple-Family Residential-4,000 square feet (RM-4). 10. Special Management Area (SMA): The Special Management Area is a part of the Coastal Zone Management Program and regulated by the County. The subject property is not located within the Special Management Area and is situated approximately 0.6 miles from the nearest coastline. DESCRIPTION OF SUBJECT PROPERTY AND SURROUNDING AREA 11. Subject Property: The subject, 22,500-square foot, rectangularly shaped property is located at the 10-foot elevation level and was developed with a single-family dwelling, built in 1927, that has since been demolished and the property has been graded. 12. Surrounding Zoning/Land Uses: Surrounding lands are zoned Single-Family Residential (RS-7.5, RS-10), Neighborhood Commercial (CN-7.5, CN-10), and General Commercial (CG-7.5). Existing surrounding land uses include residential, retail, restaurant, office, and church uses. 13. Flood Insurance Rate Map (FIRM): The subject property is situated within Zone “X” on the Flood Insurance Rate Map (FIRM) by FEMA, an area determined to be outside the 500-year flood plain. -5- 14. Flora/Fauna Resources: No formal flora/fauna study was submitted with the application. The applicant notes the property has been extensively improved and given the development of the surrounding area, it is unlikely that there are endangered species of plants or animals on the subject property. 15. Archaeological/Cultural/Historical Resources: No formal archaeological or cultural studies were conducted as the subject property has been impacted by ground-disturbing activities associated with previous residential development. The subject property is not adjacent and/or proximate to the shoreline, therefore, marine life and coastal access for Native Hawaiian gathering and fishing rights is not an issue and the applicant states there are no known customary or cultural rights exercised on the subject property. By letter dated December 22, 2008, the Department of Land and Natural Resources – State Historic Preservation Division (SHPD) indicated no objection to the change of zone, citing previous grubbing and grading, with a determination that no historic properties remain on the property that would be affected. 16. Public Access: There is no public access to the mountains or the shoreline that runs through the property. PUBLIC UTILITIES AND SERVICES 17. Vehicular Access/Traffic: Access to the subject property is from Manono Street, a County-owned and maintained collector road with compacted gravel and grass shoulders and an approximately 22-foot-wide pavement within a 50-foot-wide right-of-way. As a collector road, Manono Street requires a 60-foot right-of-way and an existing condition of Ordinance No. 09-44 requires that the applicant subdivide and dedicate a 5-foot-wide future road widening lot, with roadway improvements, at the County’s request. According to the Department of Public Works (DPW), Engineering Division, multiple properties in the area have built or are in the process of building curb, gutter and sidewalk roadway improvements as were required in Ordinance No. 09-44 and DPW recommends that the required roadway improvements remain as conditions. Based on subsequent communication, however, DPW is open to the applicant’s proposal of paying a pro-rata share of the required roadway improvements along Manono Street. The applicant commissioned a traffic impact analysis report (TIAR) for the proposed project, prepared in -6- June 2025, which found that traffic movements at the intersections studied operate at LOS D or better during AM, PM and weekend peak hours of traffic, with the exception of the westbound approach at the Manono Street/Piʻilani Street intersection operating at LOS E during the weekend peak hour. The TIAR found that the project is not expected to add new trips to area traffic, rather that it will reroute some trips to the new Manono Street driveway. As such, no improvements are recommended by the TIAR as a result of the project. In addition, the study found that the proposed 49 parking stalls, including 3 accessible stalls, exceeds the 30 stalls required by code, and that the drive-up teller vehicle storage provides adequate space to serve existing demand. Finally, a request for comment was sent to DPW, Traffic Division, but no response has been received at the time of this writing. 18. Water: According to the Department of Water Supply (DWS), water is available from an existing 8-inch water line within Manono Street. The subject parcel is currently served by 1 existing service with a 5/8-inch meter connected, limited to an average daily usage of 400 gallons. DWS has no objection to the proposed amendment requests, however DWS requests that the applicant submit estimated maximum daily water usage calculations for the proposed use including the total estimated daily water usage in gallons per day and the estimated peak flow in gallons per minute, including irrigation use. Upon receipt of the water usage calculations, DWS will determine the prevailing facilities charge as well as the appropriate meter-size required. Additionally, DWS notes that existing service laterals on Hīnano Street must be cut and plugged at the main, that the proposed zoning will require installation of a reduced pressure type backflow prevention assembly, meeting DWS approval, and that the applicant shall be responsible for relocation and adjustment of DWS’s affected water system facilities, as necessary. Finally, DWS notes that the existing 8-inch water line within Manono Street is looped and therefore adequate to provide 2,000 gallons per minute for fire protection, as required by DWS standards. The applicant has responded that they understand the requirements as stated by DWS and requests that the 2 existing service laterals on Hīnano Street only be cut and plugged if the services are abandoned by the applicant. 19. Wastewater: According to the applicant, the subject property is serviced by the County’s sewer system with an existing connection located within Manono Street. Although the -7- Department of Environmental Management, Wastewater Division, had no comments on the proposed change of zone, any future development on the subject property that will generate wastewater will be required to connect to the existing sewer system for wastewater disposal. 20. Solid Waste: The applicant states that solid waste will be properly disposed of at an authorized county waste disposal or recycling facility. 21. Essential Utilities and Services: Police, Fire and medical services are available nearby in Hilo. Electrical and telephone services are available to the site. AGENCY COMMENTS 22. Department of Health: (Planning Department Exhibit 2 – August 28, 2025 letter) 23. Department of Environmental Management: (Planning Department Exhibit 3 – October 2, 2025 memo) 24. Department of Water Supply: (Planning Department Exhibit 4 – October 14, 2025 letter) 25. Department of Public Works – Engineering Division: (Planning Department Exhibit 5 – November 17, 2025 memo) AGENCIES – NO COMMENT/CONCERNS 26. Department of Land and Natural Resources – Engineering Division, Police Department, Department of Finance – Real Property Tax. AGENCIES – NO RESPONSE 27. Department of Land and Natural Resources –Land Division, Department of Land and Natural Resources – State Historic Preservation Division, Department of Public Works – Traffic Division, Fire Department, Office of Housing and Community Development. APPLICANT’S RESPONSE TO AGENCY COMMENTS 28. Applicant’s Response to Multiple Agency Comments: (Planning Department Exhibit 6 – October 28, 2025 letter) PUBLIC COMMENTS 29. As of the date of this writing, the Planning Department has received no public comments on this application. Daryn Arai Land Use Planning Consultant P.O. BOX 4501, HILO HAWAII 96720 PHONE: (808) 895-3218 EMAIL: DARYN.ARAI@OUTLOOK.COM August 8, 2025 Mr. Jeffrey Darrow, Director County of Hawaiʻi Planning Department 101 Pauahi Street, Suite 3 Hilo, HI 96720 Dear Director Darrow: Subject: Change of Zone Application Applicant: CU Hawaii Federal Credit Union Requests: Amendments to Ordinance 09 44 (Parcel 036) and change of zone to CN-10 (Parcel 045) to allow for construction of a new member-facing credit union branch facility and related improvements TMK: 2-2-034:036 & 045; Waiakea Houselots, 1st Series, Waiākea, South Hilo Accompanying this letter, we present for your consideration and processing before the Windward Planning Commission and Hawaiʻi County Council the request by CU Hawaii Federal Credit Union for amendments to Ordinance No. 09 44 affecting Parcel 036 and a change of zone for 22,500 square feet of land to the Neighborhood Commercial (CN-10) zoning district for Parcel 045 to accommodate the construction of a new member-facing credit union branch facility along with associated drive-thru teller operations and a new parking area for both members and staff. The subject properties are located within the City of Hilo and situated between Manono and Hinano Streets approximately 400 feet south from their intersections with Piilani Street. Pursuant to your application requirements to be filed via the EPIC system, please find accompanying this letter the following: a.Original of the completed Change of Zone application form, questionnaire, and Background and County environmental report that includes a location map and site plan; b.Description of the subject property in map and written form by metes & bounds as prepared by a licensed surveyor; and c.List of the surrounding property owners within 300 feet of the subject property. Should you have questions on this matter, please feel free to contact me. Thank you very much. Sincerely, Daryn Arai copy via email: CU Hawaii FCU (attn: Rebecca Choi, VP) AMENDMENTS TO ORDINANCE 09 44 and CHANGE OF ZONE APPLICATION Applicant: CU Hawaii Federal Credit Union Requests: Time extension and delete shoulder improvements; rezoning from RS-10 to CN-10 Prepared by: Daryn Arai, Planning Consultant August 2025 Tax Map Keys: (3) 2-2-034:036 & 045 Waiakea Houselots, 1st Series, Waiākea, South Hilo District Hawaiʻi Island CU Hawaii Federal Credit Union (see attached authorization letter) August 8, 2025 476 Hinano Street Hilo, HI 96720 attn: Rebecca Choi, Executive Vice President (rchoi@cuhawaii.com) James Takamine, President & CEO (808) 933-6700 (808) 935-7793 CU Hawaii Federal Credit Union (see attached authorization letter) August 8, 2025 476 Hinano Street Hilo, HI 96720 RS-10 Neighborhood Commercial (CN-10) (3) 2 - 2 - 034 : 045 Parcel 045 (494 Hinano Street) Hilo, HI 96720 22,500 square feet Daryn Arai PO Box 4501 Hilo, Hawaii 96720 email: Daryn.Arai@outlook.com (808) 895-3218 Applicant Agent - 1 - ATTACHMENT Commercial, RM, Resort & Industrial PLANNING DEPARTMENT COUNTY OF HAWAII APPLICATION FOR CHANGE OF ZONE 1. If your request is approved, do you intend to subdivide the subject land in accordance with the approve change of zone? Consolidate If yes, please answer the rest of question 1 and then to question 3 a. How many acres of the requested area do you intend to subdivide? 45,000sf b. Into what lot sizes? 45,000sf c. If your request is approved, approximately how long after the date of approval do you expect to submit your subdivision plans to the Planning Department for preliminary approval? ~1 year If you intend to subdivide, please submit a preliminary schematic subdivision plan together with your change of zone application form. 2. If you have no firm plans of subdividing the subject area, do you intend to: a. Sell or lease the land to someone who has firm plans? No b. Sell or lease the land to someone who has tentative plans? No c. Sell or lease the land to someone who has no plans? No d. Keep it? YES e. other (please state) - 2 - f. If you intend to do either a, b, or c, please elaborate on the kind of plans the other party has. Please, also, include in your answer approximately how soon after approval of your rezoning do you expect to transfer the subject land to another party. N/A 3. What specific building plans do you have for the subject land? Include in your answer the following: type of building (apartment, office, launderette, etc.); financing arrangement; timetable for construction; and any other information which you feel might help us in evaluating your request. Consolidation of subject properties into a single 45,000 square foot parcel to accommodate the proposed construction of a new member-facing facility and related drive-thru and parking area for CU Hawaii Federal Credit Union. Administrative functions of the credit union will be maintained at the existing branch complex located on the adjoining property. 4. Have you performed any study which would demonstrate a need for Your proposed building and/or development? No If so, please elaborate on your findings in the space provided Below. No specific study was commissioned as practical needs demanded this opportunity to expand the existing credit union branch facilities, which currently house both its administrative functions as well as providing for member services. - 3 - 5. Have you performed any study which discusses the Environmental impacts your request would have on the surrounding area and/or the County? YES If so, please elaborate on your findings in the space provided below. Environmental report is included as part of change of zone application, which finds that the proposed request will not result in a significant adverse effect upon the surrounding community or public facilities or services. 6. Are there any buildings on the subject area? No If so, what kind? Both properties are currently vacant of any structures. What do you intend to do with those buildings if your request is approved? N/A 7. Is the subject land currently being used for any agricultural activity? No If so, please list the kinds of products grown on and How many square feet or acres of land per product? - 4 - 8. To your knowledge, has there been any flooding and/or drainage problem on the subject area? No If so, please describe the problem. 9. Do you think that the roads leading to the subject area needs improvement? No If so, what kind? Is the road adequate for the proposed traffic volume or bad? YES 10. What sort of governmental assistance and/or improvements do you feel will be needed in the subject area when developed? Yes No a. Schools X b. Roads X c. Sewer X d. Drainage X e. Police Protection X f. Fire Protection X g. Recreational Facilities X h. Other - 5 - For those checked “yes”, please elaborate what type or kinds of improvements and/or assistance is needed. 11. Have you performed any historic sites study and/or survey of the subject area? If so, what were the results? Please, also, submit a copy of the study together with this change of zone supplement. No historic study was conducted due to the extensively improved nature of both properties as former residential homesites. Signature: (see attached authorization letter) Address: 476 Hinano Street, Hilo 96720 Telephone: (808) 933-6700 Date: August 8, 2025 6338A/50A P.D. 5/84 AMEMDNENTS TO ORDINANCE NO. 09 44 and CHANGE OF ZONE APPLICATION Applicant: CU Hawaii Federal Credit Union Requests: Time extension and delete shoulder improvements; rezoning from RS-10 to CN-10 Prepared by: Daryn Arai, Planning Consultant August 2025 Tax Map Key: (3) 2-2-034:036 & 045 Waiakea Houselots, 1st Series, Waiākea, South Hilo District Hawaiʻi Island ENVIRONMENTAL REPORT In support of Table of Contents A. PURPOSE OF REQUEST ................................................................................................................1 1. Applicant’s Request .......................................................................................................................... 1 2. Statement of Objectives ................................................................................................................... 3 3. Location of Property ......................................................................................................................... 4 4. Proposed Project Details ................................................................................................................... 6 5. Timeframe and cost .......................................................................................................................... 8 B. LAND USE AND OTHER REGULATORY CONSIDERATIONS ..............................................................8 6. State Land Use Designation .............................................................................................................. 8 7. General Plan Land Use Pattern Allocation Guide (LUPAG) Map ....................................................... 9 8. Current County Zoning .................................................................................................................... 10 9. Coastal Zone Management, HRS, Chapter 205A............................................................................. 11 10. Special Management Area (SMA) ................................................................................................... 11 C. DESCRIPTION OF PROPERTIES AND SURROUNDING AREA .......................................................... 11 11. Subject Properties ........................................................................................................................... 11 12. Surrounding Zoning/Land Uses ....................................................................................................... 12 13. US Soil Survey .................................................................................................................................. 13 14. FIRM ................................................................................................................................................ 13 15. Flora/Fauna Resources.................................................................................................................... 13 16. Archaeological Resources ............................................................................................................... 13 17. Cultural or Native Gathering Rights ................................................................................................ 14 18. Public Access ................................................................................................................................... 14 D. PUBLIC UTILITIES AND SERVICES ................................................................................................ 14 19. Access: ............................................................................................................................................. 14 20. Traffic: ............................................................................................................................................. 14 21. Water .............................................................................................................................................. 17 22. Wastewater ..................................................................................................................................... 17 24. Essential Utilities and Services ........................................................................................................ 17 25. Public Safety .................................................................................................................................... 17 E. FINDINGS IN SUPPORT OF CHANGE OF ZONE REQUEST .............................................................. 18 26. HAWAIʻI COUNTY GENERAL PLAN .................................................................................................. 18 27. PUBLIC SERVICES AND UTILITIES ..................................................................................................... 19 28. COASTAL ZONE MANAGEMENT ...................................................................................................... 21 29. CONCLUSION ................................................................................................................................... 22 1 | P a g e COUNTY ENVIRONMENTAL REPORT IN SUPPORT OF AN AMENDMENT TO ORDINANCE NO. 09 44 AND CHANGE OF ZONE APPLICATION FOR CU HAWAII FEDERAL CREDIT UNION Affecting Tax Map Keys: (3) 2-2-034: 036 and 045; Waiakea Houselots, 1st Series, Waiākea, South Hilo A. PURPOSE OF REQUEST 1. Applicant’s Request CU Hawaii Federal Credit Union, hereinafter referred to as the “Applicant”, has resided at 476 Hinano Street for almost 45 years and remains a valued and respected member of the Waiakea Houselots community. Within the past several years, the Applicant has acquired adjoining properties in the hopes of expanding its operations and facilities. The following actions affecting these separate and recently acquired parcels of land are presented below: a) Parcel 036 (Manono property) – amendments to Ordinance No 09 44, which rezoned 22,500 square feet of land to the Neighborhood Commercial-10,000 square feet minimum lot size (CN-10) zoning district. Requested amendments are: 1) Amend Condition C to allow a period of ten (10) years to establish commercial uses upon the subject property. Applicant acquired this property in March 2025, long after the April 23, 2019 deadline to complete the conversion of a dwelling on the property into a commercial office as required by Condition C. This abandoned dwelling was recently demolished and this property remains vacant of any uses. Given these circumstances, the following suggested amendment to Condition C is offered: (material to be deleted is bracketed & struck-out, material added is underscored) C. [Conversion of the existing dwelling to office uses shall be completed within five (5) years from the effective date of this ordinance. Prior to conversion and/or construction, the applicant, successors or assigns shall secure Final Plan Approval for the proposed development from the Planning Director in accordance with Section 25-2-70, Chapter 25 (Zoning Code), Hawaiʻi County Code.]Construction of the proposed development shall be as substantially represented by the Applicants, or as permitted by the zoning district 2 | P a g e classification, and shall be completed within ten (10) years from the effective date of this ordinance. The time during which required plans, reports, studies, or relevant permit applications are under review for approvals by government agencies shall not count towards the deadline established in this ordinance. To justify this tolling, the Applicants shall provide evidence of the excluded time period to the planning department for its review and approval, which shall consist of dates obtained from a government agency website, permitting program, or office indicating when the required plans, reports, studies, or permit applications were submitted, approved, denied, or returned by the government agency. 2) Amend Condition D to require the dedication to the County of a 5-foot future road widening along Manono Street frontage with no shoulder improvements. Aside from approved driveway access to the subject property from Manono Street, the Applicant requests that no additional shoulder improvements be required prior to the dedication of the future road widening strip to the County. The Applicant believes that fragmented roadway shoulder improvements are inefficient and potentially hazardous, with numerous such cases throughout Hilo. The Applicant believes that a County-initiated, comprehensive roadway shoulder improvement program to Manono Street is the best approach to ensure effective design and implementation of curb, gutter, sidewalk and drainage improvements along the length of Manono Street from the Atebara Chips facility to the south to Piilani Street to the north, a distance of about 1,450 lineal feet. The Applicant is willing to agree to a condition that will require payment of its pro-rata share of any such future roadway shoulder improvements when implemented by the County of Hawaiʻi. Given these circumstances, the following suggested amendment to Condition D is offered: (material to be deleted is bracketed, material added is underscored): D. A five-foot future road widening strip along Manono Street shall be delineated on the plans submitted for Plan Approval review. The five-foot wide future road widening section[ with roadway improvements] shall be subdivided and dedicated to the County within five (5) years from the effective date of this ordinance. 3 | P a g e 3) Delete Condition E regarding curb, gutter and sidewalk improvements along the entire Manono Street frontage of the subject property. As explained above, the Applicant believes that these roadway shoulder improvements not be required of the Applicant in deference to a County-initiated, comprehensive roadway shoulder improvement program to Manono Street, with the Applicant willing to agree to a condition that will require payment of its pro-rata share of any such future roadway shoulder improvements when implemented by the County of Hawaiʻi. b) Parcel 045 (Hinano property) – change of zone for 22,500 square feet of land from its current Single Family Residential-10,000 square feet minimum lot size (RS-10) zoning district to a Neighborhood Commercial-10,000 square feet minimum lot size (CN-10) zoning district. All structures on this property has been demolished and remains vacant of any improvements beyond the laying of gravel throughout the property and its use as temporary employee or overflow parking associated with the Applicant’s operations at its existing CU Hawaii Federal Credit Union branch facility adjacent to the north. As discussed later in this report, this property is intended to be a parking area that will support the new member-facing branch facility on the adjoining Parcel 035 (Manono property) as well as employee and overflow parking for the existing branch facility on Parcel 043 (476 Hinano Street). 2. Statement of Objectives The Applicant is the owner of both Parcels 036 and 045 that are situated adjacent to each other and collectively situated between Manono and Hinano Streets. The Applicant’s existing main branch operations is located directly adjacent to the north of Parcel 045 at 476 Hinano Street. The purpose of the requested zoning amendments is to accommodate a new member-facing credit union branch facility on Parcel 036 and its associated parking area on Parcel 045. The existing branch facility at 476 Hinano Street will be maintained and utilized solely for administrative and “back-office” operations. 4 | P a g e For the sake of simplicity and clarity, this environmental report will comprehensively analyze and mitigate the effects of the amendment requests to both Parcels 036 and 045, especially since the intended outcome of these requests is for both properties to maintain a CN-10 zoning district in support of the establishment of a financial institution (credit union) and supporting improvements and facilities upon both properties. 3. Location of Property The subject properties are located within the City of Hilo, within a portion of Waiakea Houselots, 1st Series and situated between Manono and Hinano Streets and approximately 400 feet south from their intersections with Piilani Street, and identified as TMKs: 2-2-034:036 and 045 (refer to Figure 1 - Location Map and Figure 2 - Tax Map below and on the following page). Figure 1 - Location Map 5 | P a g e Figure 2 - Tax Map 6 | P a g e 4. Proposed Project Details (see Figure 3 –Site Plan) a. Parcel 036 (22,500 square feet) 1) On Parcel 036 fronting Manono Street, construct a two-story, 8,832-square feet branch facility that will primarily service credit union members with their financial needs. The second level is intended as offices, staff break room, and meeting rooms for use by members and by community organizations. Driveway circulation will provide for two (2) teller drive-thru lanes. An 8-stall parking area will be provided at the Manono Street frontage of the new branch facility. 2) Two (2) separate driveway entrances onto Manono Street are planned, each allowing for both ingress and egress. b. Parcel 045 (22,500 square feet) 1) On Parcel 045, a new 41-stall parking lot will be constructed for credit union member and employee parking. 2) Two (2) separate driveway entrances onto Hinano Street are planned, one allowing for both ingress and egress and the other limited to just ingress. c. Additional Site Development Considerations 1) Both Parcels 036 and 045 will likely be consolidated into a 45,000 square-foot parcel, excluding any required road widening. 2) The intent of the proposed site configuration and traffic flow is to direct most of the member traffic to Manono Street, which is a collector roadway, versus Hinano Street which is a narrower minor roadway. 3) Internal driveway network will provide thru vehicular circulation between Manono and Hinano Street, thereby distributing the generated vehicular load between these two roadways. 4) Similarly, the single-family dwelling is serviced by the County’s sewer system via an existing connection with a sewer main located within Manono Street fronting the subject property. 5) As necessary, the Applicant will comply with appropriate landscaping elements along the adjoining perimeter boundaries in accordance with Planning Department Rule No. 17. 7 | P a g e Figure 3 - Site Plan 8 | P a g e d. Operational details: 1) The proposed new branch facility will be supported by 15 employees. 2) Hours of Operation: • Lobby Hours o Monday thru Friday - 9:00am to 5:00pm o Saturday - 9:00am to 12:00pm o Sunday - Closed • Drive-Up Hours o Monday thru Friday - 8:00am to 5:00pm o Saturday - 8:00am to 12:00pm o Sunday - Closed • ATM - Walk-up and Drive-up - Open 24 Hours 3) Use of the meeting room(s) on the second level will be available for use by credit union members and community organizations during normal business hours, at the discretion of the credit union. These meeting room(s) will be provided as a member and community benefit and will not be promoted for uses or activities that are inconsistent with credit union branch operations or the surrounding community. 5. Timeframe and cost Upon approval of the change of zone request, the Applicant anticipates that it will take about 10 years to complete the proposed project, which may include the consolidation of the subject properties, design work, permitting and construction. Associated cost with this project will be in the neighborhood of $4 million, more or less. B. LAND USE AND OTHER REGULATORY CONSIDERATIONS 6. State Land Use Designation: Urban The subject properties, as well as the entire City of Hilo, are situated within the State Land Use Urban District. Therefore, no State Land Use District boundary amendment is necessary to accommodate the requested CG-10 zoning. 9 | P a g e 7. General Plan Land Use Pattern Allocation Guide (LUPAG) Map: Medium Density The County of Hawaiʻi General Plan is the policy document for the long-range comprehensive development of the island of Hawaiʻi. The General Plan Land Use Pattern Allocation Guide (LUPAG) map classifies the subject property and immediately surrounding area for Medium Density Urban uses according to the County’s Geographic Information System (GIS), which allows for village and neighborhood commercial activities, and single family and multiple family residential use and related functions with a maximum multiple family residential unit density of 35 units per acre). (see Figure 4-General Plan LUPAG Map) The requested CN-10 zoning district for the subject properties is appropriate and consistent within the Medium Density Urban areas designated by the General Plan and is an appropriate land use pattern given the similar zoning pattern on Parcel 035 that was approved in 1998 and scattered throughout the Waiakea Houselots region as shown of Figure 5-Current Area Zoning. Figure 4 – General Plan LUPAG Map 10 | P a g e 8. Current County Zoning: Single Family Residential-10,000sf minimum lot size (RS-10) Parcel 036 is situated along Manono Street and is zoned Neighborhood Commercial-10,000 square feet minimum lot size (CN-10) via Ordinance No. 09 44 effective April 23, 2009 (see Exhibit A). The proposed conversion of an existing dwelling on the property to an office failed to be completed by its deadline of April 23, 2019. While Parcel 036 still maintains its CN-10 zoning district, the lapsed performance deadlines within the ordinance will require an amendment. The Applicant is therefore requesting a 10-year time extension to Condition C and the deletion of road shoulder improvements as required by Conditions D and E of Ordinance No. 09 44. Parcel 045 is zoned as Single Family Residential-10,000 square feet minimum lot size (RS-10) zoning (see Figure 5 - Current Area Zoning). Figure 5 – Current Area Zoning The concurrency provision of Section 25-2-46 of the Hawaiʻi County Zoning Code establishes standards for roads, water supply, and civil defense sirens that must be met 11 | P a g e and/or addressed as part of all rezoning applications. Suffice to say, the request is consistent with these standards and will be discussed in detail relative to the water, traffic, and public safety portions of this report. 9. Coastal Zone Management, HRS, Chapter 205A The entire State of Hawaiʻi lies within the Coastal Zone Management area. The intent of the Coastal Zone Management Program is to guide and regulate public and private uses in the coastal zone management area with respect to recreational resources, historic resources, public access to the shoreline, scenic and open space resources, coastal ecosystems, marine resources, economic uses, coastal hazards, managing development, public participation, and beach protection. 10. Special Management Area (SMA) The Special Management Area (SMA) is a part of the Coastal Zone Management Program that is regulated by the County, established to promote the State’s policy to preserve, protect, and where possible, to restore the natural resources of the coastal zone of Hawaiʻi. Therefore, special controls on development within the area along the shoreline are necessary to avoid permanent loss of valuable resources and the foreclosure of management options, and to ensure that adequate public access is provided to public-owned or used beaches, recreation areas, and natural reserves, by dedication or other means. The subject properties are not situated within the SMA and is located at least 500 feet to the east from the nearest SMA boundary situated near Waiākea Pond and the Wailoa State Park complex. C. DESCRIPTION OF PROPERTIES AND SURROUNDING AREA 11. Subject Properties The subject properties are each rectangular in shape and adjoining each other in a manner that spans the distance between Manono and Hinano Streets. Both properties individually have a width of 100 feet and a depth of 225 feet, with each parcel being 22,500 square feet in size. Each parcel was fully improved as a single-family residential homesites in the early to mid-1900s. These homes have since been demolished. Parcel 036 along Manono Street remains vacant of any structure or use. 12 | P a g e Parcel 045 has been graded and used as an informal employee parking area for the Applicant’s existing credit union operations on the adjoining property. (see Figure 6 - Aerial Site Map) Figure 6 – Aerial Site Map 12. Surrounding Zoning/Land Uses The subject properties are located within a portion of the Waiakea House Lots, 1st Series, and along the east side of Manono Street in an area comprised of a mix of single- and multiple-family residential dwellings, retail establishments, restaurants, professional services and a church. Adjacent to the north of the subject properties along Hinano Street is the existing main branch of CU Hawaii Federal Credit Union that 13 | P a g e has been at this location for almost 45 years. On the other side of Hinano Street is Don’s Grill, a popular restaurant established in 1988. As shown on Figure 5-Current Area Zoning, parcels immediately adjacent to the north of the subject properties and extending all the way to Piilani Street are zoned CG- 7.5, as being requested by the Applicant. Given the location of the subject properties in close proximity to these long-established businesses and civic facilities such as the Hilo Civic Auditorium and the Edith Kanakaole Tennis Stadium, the requested CN-10 zoning is not out of character and consistent with the zoning pattern in this particular area of Hilo, and could even be viewed as a transitional zoning between the existing CG-7.5 zoning to the north and RS-10 zoning to the south. 13. US Soil Survey: Keaukaha extremely stony muck, 6-20 percent slopes (rKFD) These soils consist of well drained, thin organic soils over pahoehoe lava bedrock. Permeability is rapid, runoff is slow, and the erosion hazard is slight. 14. FIRM Zone "X" - determined to be outside the 500-year flood plain. There are no known existing drainageways that traverse through the subject property. However, the subject properties are located within the tsunami evacuation area. 15. Flora/Fauna Resources No professional flora or faunal surveys were conducted of the subject properties due to their past use as single family residential homesites and extensively improved nature. No endangered species of plants or animals have been observed or known to inhabit the subject properties. 16. Archaeological Resources No archaeological features are known to exist on the subject properties due to the extensively improved nature previously as homesites. Grading is expected to be limited due to the relatively flat topography. The State Historic Preservation Division will be notified and all work shall immediately cease upon inadvertent discovery of any archaeological feature during land alteration activities. 14 | P a g e 17. Cultural or Native Gathering Rights According to the Applicant, there are no known customary or Native Hawaiian cultural rights exercised within the subject properties due to its historical use as single- family residential homesites. 18. Public Access There is no record of a designated public access to the shoreline or mountain areas that traverses the subject properties. D. PUBLIC UTILITIES AND SERVICES 19. Access: Access to the subject properties is from Manono and Hinano Streets, both two- lane County-maintained roadways. Manono Street has an approximately 22-foot wide paved travel way and compacted gravel and grass shoulders within a 50-foot wide right- of-way. Manono Street is designated as a "collector" road on the City of Hilo District Zone Map. Such a designation requires a sixty (60) foot wide right-of-way and the Applicant is prepared to set aside five (5) feet of their property to accommodate this designation. Hinano Street is a minor roadway with an approximately 18 to 20-foot wide paved travel way with compacted grass and gravel shoulders within a 40-foot wide right-of-way. Minor roads typically have a 50-foot wide right-of-way and the Applicant is prepared to set aside five (5) feet of their property to accommodate this designation. 20. Traffic: Section 25-2-46(d)(1) of the concurrency provision requires a Traffic Impact Analysis Report (TIAR) as part of any rezoning application in situations where the projected use can generate 50 or more peak hour trips. The Applicant commissioned a traffic impact analysis report (TIAR) prepared in June 2025 by Austin, Tsutsumi & Associates, Inc. (attached to this report as Exhibit B) which arrived at the following findings regarding traffic movements at the following area intersections: 1. Piilani Street/Manono Street 2. Piilani Street/Hinano Street 3. Hualani Street/Manono Street 15 | P a g e 4. Hualani Street/Hinano Street 5. 476 Hinano Street/Project Driveway Egress-Only 6. 476 Hinano Street/Project Driveway Ingress-Only 7. 494 Hinano Street/Project Driveway Parking Lot The TIAR then looked at the existing the intersection operations during the AM, PM, and weekend peak hours of traffic at the time of data collection and found that at the Manono Street-Piilani Street intersection, all movements at this intersection operate at Level of Service (LOS) D or better during the AM, PM, and weekend peak hours of traffic, with the exception of the westbound approach operating at LOS E during the weekend peak hour. Occasionally, the westbound vehicle queue was observed to be roughly seven (7) to eight (8) vehicles but cleared within about one (1) minute. During the weekend peak hour, a special event was held at a nearby retail establishment, thus, traffic volumes to/from the retail establishment could have been higher than a typical Saturday. Additionally, there are other nearby commercial and recreational uses that were observed to be relatively high trip generators. The TIAR also found that all movements at the remaining study intersections operate at LOS C or better during the AM, PM, and weekend peak hours of traffic. The County’s concurrency standards require mitigation prior to occupancy if the LOS for any transportation facility in the project area is (A) currently worse than the acceptable level of service, or (B) projected to become worse than the acceptable level of service during the five-year period of the TIAR. Since the proposed project will relocate its member services from its current Hinano Street location to the new Manono Street branch, an increase in employees or customers is not expected. Thus, the total number of peak hour trips to/from CU Hawaii FCU is not expected to change. Customer trips will be split between the two (2) proposed driveways at both the Manono and Hinano Street project sites. Currently, the drive-up teller opens at 8:00 AM. Thus, trips to/from the existing branch (476 Hinano Street) prior to 8:00 AM were assumed to be employee trips. The remaining AM peak hour trips were assumed to be customer trips. Since the PM and weekend peak hours occur while the credit union is still open, all PM and weekend peak hour trips to the existing branch were assumed to be customers. All trips to/from the existing employee 16 | P a g e parking lot (494 Hinano Street) were assumed to be employees during the AM, PM and weekend peak hours. As mentioned above, the Project is not expected to add new trips to the network but rather reroute some trips to the new proposed Manono Street driveway, which results in slightly reduced delays at this intersection under Future Year 2030 conditions. The TIAR noted as an example that the exiting Project trips may reroute from the westbound Piilani Street approach to the 533 Manono Street driveway (i.e., Project trips on the westbound approach would decrease). However, some of these rerouted trips would add to the southbound volumes on Manono Drive, which results in only a slight improvement for the westbound approach delay. Additionally, the estimated Project- related trips at this intersection account for roughly 1-3% of total Future Year 2030 traffic projections during the AM, PM and weekend peak hours. During the weekend peak hour, a special event was held at a nearby retail establishment, thus, traffic volumes to/from the retail establishment could have been higher than a typical Saturday. Additionally, there are nearby commercial and recreational uses that were observed to be relatively high trip generators. Since the Project is not expected to add new trips, no improvements are recommended as a result of this Project. And with respect to the County’s concurrency requirements, the findings of the TIAR require no local or area traffic mitigation. The Applicant understands that curb, gutter and sidewalk improvements are typical along roadways within a commercial zoning district. However, this particular area long Manono and Hinano Streets are void of any such shoulder improvements. The Applicant believes that installing such improvements at its final location five (5) feet setback from the current front property boundaries will be largely non-functional as a sidewalk and could actually be a tripping hazard, as past incremental shoulder improvements have demonstrated in other parts of Hilo. The Applicant is willing to pay its pro-rata share for the construction of full shoulder improvements to the subject properties’ Manono and Hinano Street frontages consisting of, but not limited to, pavement widening with concrete curb, gutter and sidewalk, drainage improvements and any required utility relocation. This pro-rata 17 | P a g e share will be payable to the County of Hawaiʻi within 6 months from the date that formal notice is served upon the Applicant, its successors or assigns by the Department of Public Works regarding a program for the installation of curb, gutter and sidewalk improvements along the frontage of Manono and Hinano Streets in direct proximity to the subject properties. 21. Water County water is available to the subject properties as it previously served the single-family dwellings that previously occupied these properties. If required, the Applicant will provide water demand calculations, as prepared by a licensed engineer, to confirm water service to the subject properties and the meter size required. 22. Wastewater The subject properties are serviced by the County’s sewer system, via sewer lines located within both Manono and Hinano Streets. 23. Solid Waste Solid waste will be handled through commercial haulers for proper disposal or transfer at the Hilo Landfill transfer station located nearby. Any construction-related material generated by the new credit union facility will be properly disposed at the Puʻuanahulu landfill in West Hawaii or recycled at appropriate recycling facilities. 24. Essential Utilities and Services Other utilities, such as electrical, cable and telephone services, are available to the subject properties. Being located within the City of Hilo, the subject properties are adequately serviced by various utility services. 25. Public Safety The subject properties, being located within the City of Hilo, are adequately serviced by existing public safety facilities, such as Central Fire Station on Kinoole Street or Fire Station No. 2 on Keaa Street, both located about 1.7 miles away. The main Police Department located about 1.5 miles away. The County’s concurrency requirements regarding civil defense sirens do not apply to the project as it is not proposing commercial or industrial activities equal to or greater than 35,000 square feet of gross floor area or introducing more than 24 residential units [Section 25-2-46(o), Hawaiʻi 18 | P a g e County Code. Hilo Medical Center is located about 3 miles from the subject property, as well as a nearby urgent care facility a few blocks away. E. FINDINGS IN SUPPORT OF CHANGE OF ZONE REQUEST 26. HAWAIʻI COUNTY GENERAL PLAN In order to consider an area for any type of zoning designation, the applicable goals, policies and standards of the General Plan must be adequately addressed. It is only through a comprehensive policy analysis approach that evaluations and decisions can be made to better time or stage developments to achieve quality growth. The implications of these evaluations and decisions must also be considered as they may have an impact on other similar areas in the County. Land use is one of the principal focal points of public concern and policy. The Land Use Element of the General Plan provides the primary basis for direct control and guidance of publicly and privately owned resources. It is also intended to be used as a policy guide for the coordinated growth and development of all sectors of the County. It sets forth goals, policies, standards and courses of action to accommodate growth without congestion, to designate and preserve the lands needed for residential use, commercial and visitor services, industry, agriculture and open space, and to coordinate these uses with the County's service and circulation systems. The overall Land Use goals, policies and standards are set forth to physically plan the lands in the County in the best interest of the island's residents. In addition to its goals, policies and standards, the General Plan also includes the Land Use Pattern Allocation Guide (LUPAG) Map, which is a graphic representation of the document's goals and policies to guide the coordinated growth and development of all sectors of the County by presenting a graphic depiction of the physical relationship among the various land uses. The LUPAG Map establishes the basic urban and non- urban form for areas within the County. The subject properties are designated for Medium Density Urban uses which typically consist of village and neighborhood commercial activities, and single family and multiple family residential use and related functions with a maximum multiple family 19 | P a g e residential unit density of 35 units per acre. Most of the properties along this section of the Waiakea Houselots between Manono, Hinano, Piilani and Hualani Streets are a mixture of various commercial, single and multiple family residential units, and community-based services. There is a specific course of action within the General Plan that that specifies that “Within the Waiakea Houselots ‘medium density’ area, commercial development shall be focused on the major streets---Kekuanaoa, Piilani, Manono, and Lanikaula, while the interior blocks should be zoned primarily for single- and multifamily residential use.” As the subject properties, once consolidated, will have its frontage along Manono Street within the Waiakea House Lots, the requested Neighborhood Commercial (CN-10) zoning complies with this particular course of action. The requested CN-10 zoning is an appropriate land use pattern given the similar zoning pattern extending between the existing CU Hawaii Federal Credit Union branch and Piilani Street, as shown of Figure 5-Current Area Zoning, especially noting such zoning was approved for Parcel 035 back in 1998. While the Applicant’s current branch complex on the adjoining Parcel 043 an other parcels to the north of the subject properties are currently zoned CG-7.5, the requested CN-10 zoning for the subject properties will act as a transitional zoning between the higher intensity commercial uses allowed to the north and the single family residential uses to the south. 27. PUBLIC SERVICES AND UTILITIES Access to the subject properties is provided by Manono and Hinano Streets, both two-lane, County-maintained roadways. The Applicant will agree to a 5-foot future road widening to be dedicated to the County upon consolidation of the subject properties, assisting Manono Street in its effort to maintain its collector standard as a 60-foot wide roadway; and Hinano Street as a 50-foot wide minor street. Sight distances at proposed driveways are good due to the straight alignments of both roadways. The TIAR prepared in support the proposed rezoning does not recommend any local or area traffic mitigation improvements since the proposed new member-facing credit union branch will not result in the increase of both member visits or employees. County water is currently available to both properties as they were once occupied as single-family residential homesites. The Applicant will agree to prepare 20 | P a g e water demand calculations to assess the potable water needs of the proposed new credit union branch facility and determine the proper meter size. Wastewater will be disposed of within the County’s sewerage system with service lines located within both Manono and Hinano Streets. As the subject properties are relatively flat and extensively improved as past single-family residential homesites, there are no severe geological or topographical problems that would render the land unusable for its intended purposes. According to the Flood Insurance Rate Map (FIRM) prepared by the Federal Emergency Management Agency (FEMA), the subject area is within Zone X, an area determined to be outside the 500-year flood plain. The subject properties are located outside of any coastal flooding zone, but is situated within the tsunami evacuation area. The Applicant will prepare an evacuation plan for its employees who can also then inform members during a seismic event that requires evacuation of the premises. This evacuation plan will be prepared for the approval of Civil Defense Agency prior to the issuance of a certificate of occupancy for the new branch facility. Therefore, for the reasons stated above, approval of a time extension to Ordinance No. 09 44 to preserve the existing CN-10 zoning on Parcel 035 and approval of a similar zoning upon the adjoining Parcel 045 will conform to the following goals, policies and standards of the Land Use Element of the General Plan: • Designate and allocate land uses in appropriate proportions and mix and in keeping with the social, cultural and physical environments of the County. • Allocate appropriate requested zoning in accordance with the existing or projected needs of neighborhood, community, region and County. • Encourage the development and maintenance of communities meeting the needs of its residents in balance with the physical and social environment. • Zoning requests shall be reviewed with respect to General Plan designation, district goals, regional plans, State Land Use District, compatibility with adjacent zoned uses, availability of public services and utilities, access, and public need. • Zone urban- types of uses in areas with ease of access to community services and employment centers and with adequate public utilities and facilities. 21 | P a g e 28. COASTAL ZONE MANAGEMENT The requested amendments to Ordinance No 09 44 and the change of zone request to a CN-10 zoning district for Parcel 045 will not be contrary to Chapter 205A, Hawaiʻi Revised Statues, relating to Coastal Zone Management. The subject properties are not situated within the SMA, being located at least 500 feet from any lands that are situated within the SMA. For this reason, the subject properties are not subject to any FEMA coastal hazard nor anticipate to have any adverse impact upon coastal resources. As mentioned earlier, the subject properties are situated within the tsunami evacuation area. The Applicant will prepare an evacuation plan for its employees who can also then inform members during a seismic event that requires evacuation of the premises. This evacuation plan will be prepared for the approval of Civil Defense Agency prior to the issuance of a certificate of occupancy for the new branch facility. There is no record of a designated public access that traverses the subject properties. As the site has been previously cleared and extensively developed as single- family residential homesites, it is not anticipated that the proposed request will have any adverse impact on cultural or historical resources in the area. In view of the Hawaiʻi State Supreme Court's "PASH" and "Ka Paʻakai O KaʻAina" decisions, the issue relative to native Hawaiian gathering and fishing rights must be addressed in terms of the cultural, historical, and natural resources and the associated traditional and customary practices of the site. As the subject properties has been physically altered and extensively improved and landscaped as single-family residential homesites and its related improvements, it is unlikely that there are any valued cultural, historical, and natural resources to be found within the property. For this reason, the Applicant could find no evidence of any possible adverse effects or impairments that will occur to any valued resources should this change of zone request be approved. Should the Applicant inadvertently encounter any remains of historic sites, such as rock walls, terraces, platforms, marine shell concentrations or human burials, the Applicant agree to cease any work in the immediate area and contact the Department of Land and Natural Resources-State Historic Preservation Division (DLNR-HPD), resuming activities only upon securing 22 | P a g e archaeological clearance from DLNR-HPD when it finds that sufficient mitigation measures have been taken. 29. CONCLUSION Based on the discussion above, the Applicant finds that the requested amendments to Ordinance No. 09 44 affecting Parcel 036 and the approval of a Change of Zone request to a Neighborhood Commercial-10,000 square feet minimum lot size (CN-10) zoning district for Parcel 045 will conform to the goals, policies and standards of the General Plan and will not have a significant adverse impact upon coastal resources; and would result in an appropriate land use pattern that will further the public necessity and convenience and the general welfare. STATE OF HAWAI'I 32BILLNO.----""--__09 44ORDINANCENO.-=--_ COUNTY OF HAWAI'I AN ORDINANCE AMENDING SECTION 25-8-33 (CITY OF HILO ZONE MAP), ARTICLE 8,CHAPTER 25 (ZONING CODE)OF THE HAWAl'I COUNTY CODE 1983 (2005 EDITION),BY CHANGING THE DISTRICT CLASSIFICATION FROM SINGLE FAMILY RESIDENTIAL -10,000 SQUARE FEET (RS-I0) TO NEIGHBORHOOD COMMERCIAL - 10,000 SQUARE FEET (CN-IO)AT WAIAKEA HOUSELOTS,WAIAKEA, SOUTH HILO,HAWAl'l,COVERED BY TAX MAP KEY 2-2-034:036. BE IT ORDAINED BY THE COUNCIL OF THE COUNTY OF HAWAI'I: SECTION l.Section 25-8-33,Article 8,Chapter 25 (Zoning Code)of the Hawai'i County Code 1983 (2005 Edition),is amended to change the district classification of property described hereinafter as follows: The district classification ofthe following area situated at Waiakea Houselots, Waiakea,South Hilo,Hawai'j,shall be Neighborhood Commercial-10,000 square feet (CN-IO): Beginning at the southwest comer ofthis parcel ofland,the coordinates ofsaid point ofbeginning referred to Government Survey Triangulation Station "HALAI"being 623.00 feet South and 9,141.00 feet East and running by azimuths measured clockwise from True South: 1.1800 00'100.00 feet along the east side of Manono Street; 2.270°00'225.00 feet along Lot 7,(Grant 8781 to Mrs. Wary Lau On); 3.360°00'100..00 feet along Lot 10 (Grant 8777 to Akira Kazusa); 4.90°00'225.00 feet along Lot II (Grant 8784 to Shozo Murakami)to the point of -1- EXHIBIT A beginning and containing an area of 22,500 square feet. All as shown on the map attached hereto,marked Exhibit"A" and by reference made part hereo f. SECTION 2. In accordance with Section 25-2-44,Hawaii County Code 1983 (2005 Edition),the County Council finds the following conditions are: (I)Necessary to prevent circumstances which may be adverse to the public health,safety and welfare;or (2)Reasonably conceived to fulfill needs directly emanating from the land use proposed with respect to: (A)Protection ofthe public from the potentially deleterious effects of the proposed use, or (B)Fulfillment of the need for public service demands created by the proposed use. A. The applicants,successors or assigns shall be responsible for complying with all ofthe stated conditions ofapproval. B.Ifrequired by the Department ofWater Supply,prior to the issuance of a water commitment,the applicant shall submit the anticipated maximum daily water usage calculations as recommended by a registered engineer,and a water commitment deposit in accordance with the "Water Commitment Guidelines Policy"to the Department ofWater Supply within 180 days from the effective date ofthis ordinance. C.Conversion ofthc existing dwelling to office uses shall be completed within five (5) years from the effective date ofthis ordinance.Prior to conversion and/or construction,the applicant,successors or assigns shall secure Final Plan Approval -2- for the proposed development from the Planning Director in accordance with Section 25-2-70,Chapter 25 (Zoning Code), Hawai' i County Code. D. A five-foot future road widening strip along Manono Street shall be delineated on the plans submitted for Plan Approval review. The five-foot wide future road widening section with roadway improvements shall be subdivided and dedicated to the County within five (5) years from the effective date ofthis ordinance. E. The applicant(s) shall provide improvements to the entire frontage of Manono Street consisting of, but not limited to,pavement widening with concrete curb, gutter and sidewalk, drainage improvements,and any required utility relocation, meeting the requirements ofthe Department ofPublic Works. All roadway improvements to Manono Street shall be completed prior to a Certificate of Occupancy. F. All development-generated runoff shall be disposed ofon site and shall not be directed toward any adjacent properties.A drainage study shall be prepared by a licensed civil engineer and submitted to the Department ofPublic Works prior to issuance ofa construction permit. Any recommended drainage improvements,if required, shall be constructed meeting with the approval ofthe Department of Public Works prior to receipt ofa Certificate ofOccupancy. G. A Solid Waste Management Plan shall be submitted to the Department of Environmental Management for review and approval prior to the issuance ofa Certificate ofOccupancy. H.Ifthe applicants, successors, or assigns develops residential units on the subject property, the applicants shall make their fair share contribution to mitigate the potential regional impacts ofthe property with respect to parks and recreation, -3- fire, police, solid waste disposal facilities and roads. The fair share contribution shall become due and payable prior to receipt ofFinal Plan Approval. The fair share contribution for each lot shall be based on the actual number ofresidential units developed. The fair share contribution in a form of cash, land, facilities or any combination thereofshall be determined by the County Council. The fair share contribution may be adjusted annually beginning three years after the effective date ofthis ordinance,based on the percentage change in the Honolulu Consumer Price Index (HCPI). The fair share contribution shall have a combined value of$7,383.36 per multiple family residential unit ($11,506.13 per single family residential unit). The total amount shall be determined with the actual number ofunits according to the calculation and payment provisions set forth in this condition. The fair share contribution per multiple family residential unit (single family residential unit) shall be allocated as follows: 1.$3,642.00 per multiple family residential unit ($5,548.46 per single family residential unit) to the County to support park and recreational improvements and facilities; 2.$115.11 per multiple family residential unit ($267.66 per single family residential unit) to the County to support police facilities; 3. $354.08 per multiple family residential unit ($528.66 per single family residential unit) to the County to support fire facilities; 4. $157.81 per multiple family residential unit ($231.45 per single family residential unit) to the County to support solid waste facilities; and -4- 5.$3,114.36 per multiple family residential unit ($4,929.90 per single family residential unit) to the County to support road and traffic improvements. In lieu ofpaying the fair share contribution,the applicants may contribute land and/or construct improvements/facilities related to parks and recreation,fire, police, solid waste disposal facilities and roads within the region impacted by the proposed development,subject to the review and recommendation ofthe Planning Director, upon consultation with the appropriate agencies and approval of the County Council L Should the Council adopt a Unified Impact Fees Ordinance setting forth criteria for imposition ofexactions or the assessment of impact fees,conditions included herein shall be credited towards the requirements ofthe Unified Impact Fees Ordinance. J. To ensure that the Goals and Policies of the Housing Element of the General Plan are implemented,the applicant shall comply with the requirements of Chapter II, Article 1,Hawai'i County Code relating to Affordable Housing Policy. This requirement shall be approved by the Administrator of the Office of Housing and Community Development prior to final plan approval. K. The applicants shall comply with all applicable County, State and Federal laws, rules,regulations and requirements. L An initial extension of time for the performance ofconditions within the ordinance may be granted by the Planning Director upon the following circumstances: -5- I. The non-performance is the result ofconditions that could not have been foreseen or are beyond the control ofthe applicant,successors or assigns, and that are not the result oftheir fault or negligence. 2.Granting of the time extension would not be contrary to the General Plan or Zoning Code. 3.Granting of the time extension would not be contrary to the original reasons for the granting ofthe change of zone. 4. The time extension granted shall be for a period not to exceed the period originally granted for performance (i.e., a condition to be performed within one year may be extended for up to one additional year). 5. If the applicant should require an additional extension of time, the Planning Director shall submit the applicant's request to the County Council for appropriate action. Should any ofthe conditions not be met or substantially complied with in a timely fashion, the Director may initiate rezoning of the area to its original or more appropriate designation. SECTION 3.In the event that any portion ofthis ordinance is declared invalid, such invalidity shall not affect the other parts ofthis ordinance. -6- SECTION 4. This ordinance shall take effect upon its approval. INTRODUCED BY: COUNCIL MEMBER,COUNTY OF HAWAI'I Hila Date ofIntroduction: Date of 1st Reading: Date of2nd Reading: Effective Date: March 18,2009 March 18,2009 April 8,2009 April 23,2009 -7- ]4 7 Rl;fl;RENCb Comm.-...._- 1<5-10CG-7.5 r-r--.-----,---,------,---.,-------,---.,------,-----.--.-----,--,--- --~~z,~\~p::t CG-7.5 RS-lO RS-lO HINANO8T CG-7.5 CG-7.5 RS-lO RS-lO RS-lO SINGLE FAMILY RESIDENTIAL -10,000 SQUARE FEET (RS-10)~TO NEIGHBORHOOD COMMERCIAL- 10,000 SQUARE FEET (CN-10)f-. 22,500 SQUARE FEET (/) Z-c RS-7.5 ..J-c f-F/::J(/)k CN-7.5 I z Z RS-lOw::i~/>623.00509,141.00E -a."HALAI"RS-lO CG-7.5 CG-7.5 I RS-7.5f--/ MANONO8T f-- CG-7.5 CG-7.5 RS-lO RS-lO RS-lO '""> CG-7.5 CG-7.5 RS-lO RS-lO RS-IO r"""-_-L._O 150 300 600 900 Feet AMENDMENT TO THE ZONING CODE AMENDING SECTION 25-8-33 (CITY OF HILO ZONE MAP)ARTICLE 8, CHAPTER 25 (ZONING CODE)OF THE HAWAI'I COUNTY CODE 1983 (2005 EDITION), BY CHANGING THE DISTRICT CLASSIFICATION FROM SINGLE FAMILY RESIDENTIAL - 10,000 SQUARE FEET (RS-10) TO NEIGHBORHOOD COMMERCIAL- 10,000 SQUARE FEET (CN-10) AT WAIAKEA HOUSELOTS,WAIAKEA, SOUTH HILO, HAWAI'I TMK:2-2-34:36 MAP PREPARED BY: COUNTY OF HAWAI'I,PLANNING DEPARTMENT DATE: November 7,2008 EXHIBIT "A"(S. Russell and Akiko Oda ~~~~.....,,,,,,,, OFFICE OF THE COUNTY CLERK County of Hawai'i Hila,Hawai'i Introduced By:Donald Ikeda Dale introduced:March 18,2009 l-u-st Reading:March 18,2009 Published:March 27,2009 REMARKS. Second Reading:Apri1 8,2009 To Mayor:April 17,2009 Returned:April 23,2009 [jfeet ive:_Aj2ri 1 -=2:c3=-<-,---=:2:.-0'-'0=-9=----_ Puhlished:_,'U:>ril 30,2009==--=-=-'---="-=-"------- ROLLC~~?,<n.• AYES NOES ABS'I "E>!J IJ.-..-, Enriques X ,'--"'--'Ui .,t',.EFr;(,-"'ji H-"i-1",~ Ford ',-~t}·';;J\,·-dlX Greenwell X Hoffmann X Ikeda X Nacole X Onishi X Yagong X Yoshimoto X DI810 ROLL CALL VOTE AYES NOES ABS EX Enriques X Ford X Greenwell X Hoffmann X i Ikeda X Naeole X i-iOnishiX I IYagongX Yoshimoto X t~6 1 2 i 0 ,J J i DO HEREBY CERTIFY that theforegoing BILL was adopted by the County Council published as indicated above. APPROVED AS TO FO AND LEGAL TY: DEPU Y CORPORATION OUNSEL COUNTY OF HAWNI COUNCIL CHAIRPERSON ,.~Jr- Date i~.DR 22 2009 UJ'fjA WAi 1 COUNTY CLERK Bill No.: Reference: Ord No.: 32 C-147/PC-7 09 44 Ordinances Numbered 09-44, 09-45, 09-46,&09-47 I hereby certify that the following Ordinances passed second and final reading at the meeting ofthe County Council on April 8, 2009, by vote, as listed below: Ordinance 09-44 (Bill 32):An Ordinance Amending Section 25-8-33 (City ofHilo Zone Map),Article 8,Chapter 25 (Zoning Code)ofthe Hawai'i County Code 1983 (2005 Edition), by Changing the District Classification From Single Family Residential • 10,000 Square Feet (RS-10)to Neighborhood Commercial-10,000 Square Feet (CN-IO) at Waiakea Houselots,Waiakea, South Hi10,Hawai'i,Covered by Tax Map Key 2-2- 034:036. AYES: Council Members Enriques, Ford, Greenwell, Ikeda, Onishi, and Chair Yoshimoto - 6; NOES: Council Member Hoffmann - 1; ABSENT: Council Members Naeole and Yagong - 2; EXCUSED: None. Ordinance 09-45 (Bill 33):An Ordinance Amending Section 25-8-33 (City ofHilo Zone Map), Article 8,Chapter 25 (Zoning Code)ofthe Hawai'i County Code 1983 (2005 Edition), by Changing the District Classification From Single Family Residential - 10,000 Square Feet (RS·IO)to Neighborhood Commercial-10,000 Square Feet (CN-IO) at Waiakea Houselots,Waiakea, South Hilo,Hawai'i,Covered by Tax Map Key 2-2- 034:088. AYES:Council Members Enriques, Ford,Greenwell,Ikeda, Onishi, and Chair Yoshimoto - 6;NOES:Council Member Hoffmann - 1; ABSENT: Council Members Naeole and Yagong - 2; EXCUSED: None. Ordinance 09-46 (Bill 38): An Ordinance to Amend Ordinance No. 08-78, as Amended, the Operating Budget for the County ofHawai'i for the Fiscal Year Ending June 30, 2009. AYES: Council Members Enriques, Ford,Greenwell,Hoffmann,Ikeda, Onishi, and Chair Yoshimoto -7;NOES: None; ABSENT: Council Members Naeole and Yagong - 2;EXCUSED:None. Ordinance 09-47 (Bill 52): An Ordinance Amending Ordinance No. 08-79, as Amended, Relating to Public Improvements and Financing Thereoffor the Fiscal Year July 1,2008 to June 30, 2009. AYES: Council Members Enriques,Ford, Greenwell, Hoffmann, Ikeda,Onishi,and Chair Yoshimoto -7;NOES: None; ABSENT: Council Members Naeole and Yagong - 2; EXCUSED: None.-£ I~eth G.GoodenowUCountyClerk (Hawai'i Tribune-Herald - April 30, 2009) (West Hawai'i Today - April 30, 2009) Note: The original Digest/Affidavit is attached to Ordinance 09-44. Austin, Tsutsumi & Associates, Inc. Civil Engineers • Surveyors 501 Sumner Street, Suite 521 Honolulu, Hawaii 96817-5031 Telephone: (808) 533-3646 Facsimile: (808) 526-1267 E-mail: atahnl@atahawaii.com Honolulu • Wailuku, Hawaii TRAFFIC IMPACT ANALYSIS REPORT CU HAWAII FEDERAL CREDIT UNION NEW BRANCH HILO, ISLAND OF HAWAII, HAWAII DRAFT FINAL June 17, 2025 Prepared for: CU Hawaii Federal Credit Union 476 Hinano Street Hilo, HI 96720 EXHIBIT B TRAFFIC IMPACT ANALYSIS REPORT CU HAWAII FEDERAL CREDIT UNION NEW BRANCH Hilo, Island of Hawaii, Hawaii DRAFT FINAL Prepared for CU Hawaii Federal Credit Union 476 Hinano Street Hilo, HI 96720 Prepared by Austin, Tsutsumi & Associates, Inc. Civil Engineers • Surveyors Honolulu • Wailuku, Hawaii June 17, 2025 i TABLE OF CONTENTS Page 1. INTRODUCTION ................................................................................................................ 1 1.1 Project Description ................................................................................................... 1 1.2 Study Methodology ................................................................................................... 2 1.2.1 Analysis Methodology .............................................................................. 2 2. EXISTING CONDITIONS .................................................................................................... 5 2.1 Pedestrian Facilities ................................................................................................. 5 2.2 Bicycle Facilities ....................................................................................................... 5 2.3 Transit Facilities ....................................................................................................... 5 2.4 Roadway System ..................................................................................................... 5 2.5 Existing Traffic Volumes ........................................................................................... 6 2.6 Existing Field Observations ...................................................................................... 6 2.7 Existing Intersection Analysis ................................................................................... 7 3. BASE YEAR TRAFFIC CONDITIONS ...............................................................................12 3.1 Background Projection Methodology .......................................................................12 3.2 Background Developments ......................................................................................12 3.2.1 Trip Generation .......................................................................................12 3.2.2 Trip Distribution & Assignment ................................................................13 3.3 Planned Roadway Improvements ............................................................................13 3.4 Base Year Analysis .................................................................................................15 3.4.1 Base Year 2030 Conditions .....................................................................15 3.4.2 Base Year 2035 Conditions .....................................................................15 3.4.3 Base Year 2045 Conditions .....................................................................15 4. FUTURE YEAR TRAFFIC CONDITIONS ...........................................................................23 4.1 Project Description ..................................................................................................23 4.3 Future Year Analysis ...............................................................................................26 4.3.1 Future Year 2030 ....................................................................................26 4.3.2 Future Year 2035 ....................................................................................26 4.3.3 Future Year 2045 ....................................................................................27 4.3.4 Future Site Access and Circulation ..........................................................27 5. CONCLUSION ...................................................................................................................37 5.1 Existing Conditions ..................................................................................................37 5.2 Base Year Conditions ..............................................................................................38 ii 5.3 Future Year Conditions ............................................................................................38 6. RECOMMENDATIONS ......................................................................................................39 7. REFERENCES ..................................................................................................................40 TABLES 1.1 EXISTING AND PROPOSED USES OF THE PROJECT SITE .......................................... 1 2.1 LOS SUMMARY: EXISTING CONDITIONS ......................................................................11 3.1 BACKGROUND DEVELOPMENT TRIP GENERATION ...................................................13 3.2 LOS SUMMARY: BY 2030, BY 2035, AND BY 2045 .........................................................22 4.1 EXISTING AND PROPOSED USES OF THE PROJECT SITE .........................................23 4.2 LOS SUMMARY: BY 2030 AND FY 2030 .........................................................................30 4.3 LOS SUMMARY: BY 2035 AND FY 2035 .........................................................................33 4.4 LOS SUMMARY: BY 2045 AND FY 2045 .........................................................................36 5.1 EXISTING AND PROPOSED USES OF THE PROJECT SITE .........................................37 FIGURES 1.1 PROJECT LOCATION ....................................................................................................... 3 1.2 PROPOSED SITE PLAN .................................................................................................... 4 2.1 EXISTING PEDESTRIAN, BICYCLE, AND TRANSIT FACILITIES .................................... 8 2.2 EXISTING LANE CONFIGURATIONS, VOLUMES, AND LOS .......................................... 9 3.1 BACKGROUND DEVELOPMENTS .................................................................................14 3.2 BASE YEAR 2030 LANE CONFIGURATIONS, VOLUMES, AND LOS .............................16 3.3 BASE YEAR 2035 LANE CONFIGURATIONS, VOLUMES, AND LOS .............................18 3.4 BASE YEAR 2045 LANE CONFIGURATIONS, VOLUMES, AND LOS .............................20 4.1 PROJECT GENERATED TRIPS .......................................................................................24 4.2 FUTURE YEAR 2030 LANES, VOLUMES, AND LOS .......................................................28 4.3 FUTURE YEAR 2035 LANES, VOLUMES, AND LOS .......................................................31 4.4 FUTURE YEAR 2045 LANES, VOLUMES, AND LOS .......................................................34 TRAFFIC IMPACT ANALYSIS REPORT CU Hawaii Federal Credit Union New Branch Hilo, Island of Hawaii, Hawaii 1. INTRODUCTION This report documents the findings of a traffic study conducted by Austin, Tsutsumi, and Associates, Inc. (ATA) to evaluate the traffic impacts resulting from the proposed CU Hawaii Federal Credit Union (FCU) New Branch Building (hereinafter referred to as the “Project”) in Hilo, Island of Hawaii, Hawaii. 1.1 Project Description The Project proposes to construct a new branch building at 533 Manono Street and 494 Hinano Street, Hilo, Hawaii. The administrative operations of the CU Hawaii FCU will remain at the existing location at 476 Hinano Street. An increase in employees or customers is not expected as a result of the proposed Project. Table 1.1 describes the existing and proposed future uses of each parcel. Table 1.1 Existing and Proposed Uses of the Project Site Lot Existing Use Proposed Future Use 476 Hinano Street Administrative operations and customer-facing banking services Administrative Operations and parking for CU Hawaii Employees 494 Hinano Street Gravel parking lot for CU Hawaii FCU employees Customer-facing banking services including the drive-up teller window, walk-up ATM, and customer parking 533 Manono Street Residential It is our understanding that the 533 Manono Street parcel was rezoned to commercial (CN-10) in 2009, but did not proceed with a commercial development in a timely manner. In lieu of amending the zoning ordinance for a time extension, the current action is to rezone the property to CG-10 to be consistent with existing branch zoning. The 494 Hinano Street parcel is zoned as residential. 2 This Traffic Impact Analysis Report (TIAR) is being prepared to support the rezoning of the proposed Project site at 533 Manono Street and 494 Hinano Street. See Figure 1.1 for the Project location. See Figure 1.2 for the proposed site plan. 1.2 Study Methodology This study will address the following: • Assess existing traffic operating conditions during the weekday morning (AM), weekday afternoon (PM), and Saturday (WE) peak hours of traffic within the study area. • Traffic Projections for Base Years 2030, 2035 and 2045 (without the Project) including traffic generated by other known developments in the vicinity of the Project in addition to an ambient growth rate. These other known developments are projects that are currently under construction or known new/future developments that are anticipated to affect traffic demand and operations within the study area. These study years were selected to align with the Hawaii County Code Section 25-2-46 Concurrency Requirements, which requires the TIAR to evaluate future growth in traffic for a minimum of five, ten, and twenty years. • Trip generation and traffic assignment characteristics for the proposed Project. • Traffic projections for the Project for Future Years 2030, 2035, 2045 (with Project), which includes Base Year traffic volumes in addition to traffic volumes generated by the Project. • Provide recommendations for roadway improvements or other mitigative measures, as appropriate, to reduce or eliminate the adverse impacts resulting from traffic generated by the Project. 1.2.1 Analysis Methodology Level of Service (LOS) is a qualitative measure used to describe the conditions of traffic flow at intersections, with values ranging from free-flow conditions at LOS A to congested conditions at LOS F. The Highway Capacity Manual (HCM), 7th Edition includes methods for calculating volume-to-capacity (v/c) ratios, delays, and corresponding LOS that were used in this study. See Appendix A for LOS Criteria. Analyses for the study intersections were performed using the traffic analysis software Synchro, which is able to prepare reports based on the methodologies described in the HCM. These reports contain control delay results based on intersection lane geometry, signal timing, and hourly traffic volumes. Based on the vehicular delay at each intersection, a LOS is assigned to each approach and intersection movement as a qualitative measure of performance. These results, as confirmed or refined by field observations, constitute the technical analysis that will form the basis of the recommendations outlined in this report. PIILANI ST HUALANI ST MA N O N O S T PA R K R D KA N O E L E H U A A V E HI N A N O S T KA L A N I K O A S T LA U K A P U S T KEKUANAOA ST LEILANI ST HOOLULU PARK CU HAWAII FCU HILO TIAR AustinTsutsumi & A S S O C I A T E S , I N C . Engineers & Surveyors FIGURE 1.1 LOCATION MAP N NOT TO SCALE NOTE: THIS DRAWING IS FOR ILLUSTRATIVE PURPOSES ONLY. DO NOT USE FOR CONSTRUCTION. LOCATION MAP ISLAND OF HAWAI`I N NOT TO SCALE UPOLU PT. HONOKAA LAUPAHOEHOE HILO KUMUKAHI PT KALAPANA HONUAPO KA LAE PT. KEAHOLE PT. KAILUA KAILUA HAWAII NATIONAL PARK PAHALA KEAAU WAIMEA KAWAIHAE PAHOA NORTH KOHALA SOUTH KOHALA NORTH KONA HAMAKUA NORTH HILO SOUTH HILO PUNA KA'U SOUTH KONA HAWI STUDY INTERSECTIONS PIILANI ST. & MANONO ST.1 PIILANI ST. & HINANO ST.2 HUALANI ST. & MANONO ST.3 HUALANI ST. & HINANO ST.4 PROJECT SITE PROJECT LOCATION 1 2 3 4 5 6 HINANO ST. & PROJECT DWY (EGRESS ONLY)5 HINANO ST. & PROJECT DWY (INGRESS ONLY)6 HINANO ST. & PROJECT PARKING LOT7 7 CU HAWAII FCU TIAR AustinTsutsumi & A S S O C I A T E S , I N C . Engineers & Surveyors FIGURE 1.2 PROPOSED SITE PLAN NOTE: THIS DRAWING IS FOR ILLUSTRATIVE PURPOSES ONLY. DO NOT USE FOR CONSTRUCTION. SITE PLAN OBTAINED FROM CU HAWAII FCU. 5 2. EXISTING CONDITIONS 2.1 Pedestrian Facilities There are no paved sidewalks in the immediate vicinity of the Project. There are grassy and gravel shoulders. Vehicles were observed to park in the shoulder along Hinano Street. A crosswalk is provided at the Piilani Street/Manono Street intersection. See Figure 2.1 for the existing pedestrian facilities in the study area. 2.2 Bicycle Facilities The Bike Plan Hawaii Refresh was published in 2022 by the Hawaii Department of Transportation (HDOT) and identifies bicycle facilities that are proposed for future implementation. In the vicinity of the Project, the following bicycle facilities are identified: • Piilani Street – A signed shared road is proposed between Manono Street and Kanoelehua Avenue • Manono Street – Bike Lanes are proposed between E. Kawili Street and Bayfront Highway. See Figure 2.1 for the existing bicycle facilities in the study area. 2.3 Transit Facilities The Hele-On Bus is the public transit bus service provided by the County of Hawaii. Buses in the study area generally run Sunday to Monday with service hours varying by route. The majority of bus routes operate with only two (2) to six (6) round trips per day. In the vicinity of the Project, bus service is provided by the following routes: • Route 1 – Hilo to Kailua-Kona • Route 2 – Blue Line – Hilo to Kailua-Kona • Route 80 – Hilo to South Kohala Resorts See Figure 2.1 for the existing transit facilities in the study area. 2.4 Roadway System The following are brief descriptions of the existing roadways studied within the vicinity of the Project: Manono Street is a two-way roadway that begins to the north at its intersection with Kamehameha Avenue and terminates to the south where it transitions into East Kawili Street. In the vicinity of the Project, Manono Street provides one (1) lane in each direction, on-street parking is prohibited along portions of the roadway, and the posted speed is 35 miles per hour (mph). Piilani Street is a two-way, two-lane roadway that begins to the east at its intersection with Kanoelehua Avenue and terminates to the Wailoa River State Recreation Area. There is no posted speed limit. 6 Hinano Street is a two-way, two-lane roadway that runs parallel to Manono Street. It begins to the north at its intersection with Piilani Street and terminates to the south at its intersection with East Kawili Street. Hinano Street facilitates local traffic to various commercial and residential land uses. There are no parking signs at the driveway entrances to both CU Hawaii FCU and Don’s Grill. The posted speed is 25 mph. Hualani Street is a two-way, two-lane roadway running parallel to Piilani Street. It begins to the east at its intersection with Kanoelehua Avenue and terminates to the west after Mililani Street. There is no posted speed limit. 2.5 Existing Traffic Volumes The following intersections in the vicinity of the Project were evaluated as a part of this study: 1. Piilani Street/Manono Street 2. Piilani Street/Hinano Street 3. Hualani Street/Manono Street 4. Hualani Street/Hinano Street 5. 476 Hinano Street/Project Driveway Egress-Only 6. 476 Hinano Street/Project Driveway Ingress-Only 7. 494 Hinano Street/Project Driveway Parking Lot Traffic count data at the above intersections was collected on Friday, April 11, 2025, and Saturday, April 12, 2025. Based on the traffic count data, the AM, PM, and WE peak hours of traffic occur between 7:30 AM to 8:30 AM, 3:15 PM to 4:15 PM, and 11:00 AM to 12:00 PM, respectively. Traffic count data is provided in Appendix B. 2.6 Existing Field Observations Manono Street and Hinano Street provide access to several commercial uses including Manono Mini Mart, Manono Marketplace, S. Tokunaga Store, and Big Island Candies which were observed to be relatively high trip generators in the study area. Piilani Highway provides access to the Hoolulu Park Complex, which includes the Civic Auditorium, stadium, baseball fields, and swimming pool, and the Wailoa River State Recreation Area. There are also residential uses scattered among the commercial uses in the vicinity of the Project site. During the weekday AM and PM peak hours, vehicles were generally free-flowing at the study intersections, with the exception some vehicle queues observed at the Manono Street/Piilani Street intersection. During the AM peak hour, occasionally a southbound queue of roughly eight (8) to 10 vehicles and a westbound queue of roughly three (3) vehicles was observed and cleared within about three (3) minutes. During the PM peak hour, occasionally a southbound queue of roughly 10-12 vehicles and a westbound queue of roughly five (5) to six (6) vehicles were observed and cleared within about one (1) to two (2) minutes. During the AM peak hour, the maximum vehicle queue observed in the drive-thru lane was two (2) vehicles. During WE observations, the S. Tokunaga Store had a special event, which is assumed to be an infrequent event, with a shuttle service from the overflow parking lot at the Hoolulu Park Complex. 7 Two (2) to three (3) shuttles traveled via Hinano Street, Piilani Street, and Manono Street during the WE peak hour. Customers were observed to wait for a table outside of restaurants in the Manono Marketplace parking lot. The Wailoa River State Recreation Area was also roughly 80% full with multiple pavilions occupied. During the WE peak hour, occasionally the westbound vehicle queue at the Manono Street/Piilani Street intersection was observed to be roughly seven (7) to eight (8) vehicles and cleared within about one (1) minute. 2.7 Existing Intersection Analysis Below are descriptions of the intersection operations during the AM, PM, and WE peak hours of traffic at the time of data collection. [1] Manono Street/Piilani Street All movements at this intersection operate at LOS D or better during the AM, PM, and WE peak hours of traffic, with the exception of the westbound approach operating at LOS E during the WE peak hour. As mentioned above, occasionally the westbound vehicle queue was observed to be roughly seven (7) to eight (8) vehicles but cleared within about one (1) minute. During the WE peak hour, a special event was held at a nearby retail establishment, thus, traffic volumes to/from the retail establishment could have been higher than a typical Saturday. Additionally, there are other nearby commercial and recreational uses that were observed to be relatively high trip generators. All movements at the remaining study intersections operate at LOS C or better during the AM, PM, and WE peak hours of traffic. Figure 2.2 illustrates the existing lane configuration, volumes, and LOS at the study intersections. Table 2.1 shows a summary of the existing delay, v/c ratio, and LOS. LOS worksheets are included in Appendix C. PIILANI ST HUALANI ST MA N O N O S T PA R K R D HI N A N O S T LA U K A P U S T KEKUANAOA ST CU HAWAII FCU HILO TIAR AustinTsutsumi & A S S O C I A T E S , I N C . Engineers & Surveyors FIGURE 2.1 EXISTING PEDESTRIAN, BICYCLE, AND TRANSIT FACILITIES N NOT TO SCALE NOTE: THIS DRAWING IS FOR ILLUSTRATIVE PURPOSES ONLY. DO NOT USE FOR CONSTRUCTION. PROJECT SITE LEGEND EXISTING BUS STOP EXISTING SIDEWALK ROUTES 1, 2, & 80 1 2 3 4 7 6 5 CU HAWAII FCU HILO TIAR AustinTsutsumi & A S S O C I A T E S , I N C . Engineers & Surveyors FIGURE 2.2A EXISTING VOLUMES AND LOS 1 4 5 N NOT TO SCALE 6 X DATE OF COUNTS: FRIDAY, APRIL 11, 2025 SATURDAY, APRIL 12, 2025 AM PEAK HOUR: 7:30 AM - 8:30 AM PM PEAK HOUR: 3:15 PM - 4:15 PM WE PEAK HOUR: 11:00 AM - 12:00 PM NOTE: THIS DRAWING IS FOR ILLUSTRATIVE PURPOSES ONLY. DO NOT USE FOR CONSTRUCTION. LEGEND - UNSIGNALIZED INTERSECTION X ##(##)[##] - AM(PM)[WE] VEHICLE VOLUMES X(X)[X] - AM(PM)[WE] LOS 2 3 MA N O N O S T PIILANI ST PIILANI ST/HINANO ST HI N A N O S T PIILANI ST HUALANI ST/MANONO ST MA N O N O S T HUALANI ST HINANO ST/PROJECT DWY (INGRESS) HI N A N O S T PROJECT DWY (INGRESS) HINANO ST/PROJECT DWY (EGRESS) HI N A N O S T PROJECT DWY (EGRESS) HUALANI ST/HINANO ST HI N A N O S T HUALANI ST [24](20)15 [14](13)10 [22](18)10 [11](12)7 [106](117)81 [29](40)21 [2](7)8 [6](3)1 [11](8)8 [34](13)14 [37](20)12 [67](26)6 [2 4 ] ( 1 9 ) 1 1 [3 5 2 ] ( 3 2 0 ) 2 4 0 [8 8 ] ( 8 9 ) 6 0 [3 5 ] ( 4 5 ) 1 2 [2 3 ] ( 4 ) 4 [3 6 ] ( 3 0 ) 1 6 [1 2 ] ( 2 ) 4 [4 7 3 ] ( 4 1 1 ) 3 0 9 [9 5 ] ( 6 0 ) 3 3 [1 2 ] ( 1 1 ) 3 [5 4 ] ( 6 6 ) 1 9 [7 ] ( 2 2 ) 3 54(72)[78] 29(32)[41] 28(43)[52] 5(18)[2] 93(101)[119] 21(37)[22] 12(28)[17] 2(5)[4] 1(11)[13] 2(0)[4] 5(11)[13] 6(0)[7] 34 ( 4 1 ) [ 5 4 ] 34 4 ( 4 0 5 ) [ 3 7 1 ] 42 ( 6 9 ) [ 4 7 ] 3( 4 ) [ 1 9 ] 3( 1 ) [ 1 0 ] 4( 7 ) [ 1 9 ] 1( 2 ) [ 7 ] 38 0 ( 4 6 3 ) [ 4 3 5 ] 9( 2 8 ) [ 2 9 ] 4( 5 ) [ 8 ] 23 ( 5 5 ) [ 6 0 ] 2( 9 ) [ 1 ] PIILANI ST/MANONO ST [20](36)9 [18](32)6 [7 4 ] ( 4 5 ) 1 8 41 ( 7 0 ) [ 6 2 ] [1 5 ] ( 2 6 ) 1 2 [7 5 ] ( 4 8 ) 1 8 14 ( 3 3 ) [ 1 5 ] 32 ( 6 7 ) [ 6 7 ] [A ] ( A ) A [D](D)C C(D)[E] A( A ) [ A ] [B ] ( B ) A [A](A)A A(A)[A] B( B ) [ B ] [A ] ( A ) A [C](C)B B(C)[C] A( A ) [ A ] [A ] ( A ) A [B](A)A A(B)[B] A( A ) [ A ] [A](A)A [A ] ( A ) A 1 2 3 4 7 6 5 CU HAWAII FCU HILO TIAR AustinTsutsumi & A S S O C I A T E S , I N C . Engineers & Surveyors FIGURE 2.2B EXISTING VOLUMES AND LOS N NOT TO SCALE X DATE OF COUNTS: FRIDAY, APRIL 11, 2025 SATURDAY, APRIL 12, 2025 AM PEAK HOUR: 7:30 AM - 8:30 AM PM PEAK HOUR: 3:15 PM - 4:15 PM SAT PEAK HOUR: 11:00 AM - 12:00 PM NOTE: THIS DRAWING IS FOR ILLUSTRATIVE PURPOSES ONLY. DO NOT USE FOR CONSTRUCTION. LEGEND - UNSIGNALIZED INTERSECTION X ##(##)[##] - AM(PM)[WE] VEHICLE VOLUMES X(X)[X] - AM(PM)[WE] LOS 7 HINANO ST/PARKING LOT HI N A N O S T DRIVEWAY 6( 1 ) [ 1 ] 26 ( 6 6 ) [ 6 7 ] [1](0)1 [0](4)1 [0 ] ( 0 ) 7 [9 1 ] ( 7 4 ) 2 7 [A ] ( A ) A [A](A)A TABLE 2.1: LOS SUMMARY TABLE EXISTING CONDITIONS HCM Delay v/c Ratio LOS HCM Delay v/c Ratio LOS HCM Delay v/c Ratio LOS 1: Manono St & Piilani St 8.2 0.01 A 8.4 0.02 A 8.4 0.02 A 18.2 0.12 C 28.0 0.26 D 28.4 0.30 D 17.6 0.30 C 34.4 0.58 D 40.0 0.66 E 8.0 0.04 A 8.5 0.07 A 8.5 0.05 A 3.4 --6.3 --7.8 -- 2: Hinano St & Piilani St 9.8 0.05 A 11.3 0.13 B 11.3 0.15 B 7.4 0.01 A 7.5 0.01 A 7.5 0.01 A 7.5 0.02 A 7.6 0.03 A 7.6 0.02 A 10.1 0.02 B 10.8 0.02 B 10.9 0.08 B 2.3 --3.4 --4.3 -- 3: Manono St & Hualani St 8.2 0.00 A 8.4 0.00 A 8.4 0.01 A 14.4 0.05 B 19.0 0.07 C 18.0 0.07 C 11.7 0.03 B 17.2 0.14 C 21.7 0.15 C 8.1 0.01 A 8.5 0.03 A 8.9 0.03 A 0.7 --1.3 --1.3 -- 4: Hinano St & Hualani St 7.3 0.00 A 7.4 0.01 A 7.4 0.01 A 9.1 0.04 A 9.8 0.08 A 10.2 0.18 B 9.1 0.02 A 10.3 0.02 B 10.0 0.04 B 7.3 0.00 A 7.4 0.01 A 7.3 0.00 A 4.5 --3.5 --5.7 -- 5: Hinano St & Project Egress 8.8 0.02 A 9.3 0.08 A 9.1 0.05 A 1.8 --3.4 --2.0 -- 6: Hinano St & Project Ingress 7.3 0.01 A 7.5 0.02 A 7.4 0.01 A 1.2 --1.1 --0.6 -- 7: Hinano St & Project Parking Lot 7.3 0.01 A 0.0 0.00 A 0.0 0.00 A 8.7 0.00 A 8.7 0.00 A 9.6 0.00 A 1.0 --0.2 --0.1 -- WE Existing 2025 Conditions OVERALL EB LT/RT NB LT/TH OVERALL NB LT/TH SB LT/TH/RT OVERALL WB LT/TH/RT EB LT/TH/RT NB LT/TH/RT PM Intersection AM EB LT/TH/RT NB LT/TH/RT SB LT/TH/RT WB LT/TH/RT NB LT/TH/RT OVERALL EB LT/TH/RT OVERALL SB LT/TH/RT WB LT/TH/RT NB LT/TH/RT WB LT/TH/RT EB LT/TH/RT SB LT/TH/RT OVERALL EB LT/RT OVERALL 12 3. BASE YEAR TRAFFIC CONDITIONS The Hawaii County Code Concurrency Requirements states, “The TIAR shall include projections for future growth in traffic, for a minimum of five, ten and twenty years, and shall include other approved or proposed development that is expected to impact the project area, with reasonable assumptions about the build-out of such development.” Thus, Years 2030, 2035, and 2045 were studied. Inclusion of other approved of and/or proposed developments is discussed in the following sections. 3.1 Background Projection Methodology Background traffic growth in the study area was determined based on HDOT 24-hour historical traffic volumes. Traffic volumes along Manono Street were relatively consistent between 2013 and 2024. In Year 2013 and 2024, there were roughly 10,400 and 10,800, respectively, vehicles per day along Manono Street. Based on HDOT 24-hour historical traffic volumes, an annual ambient growth rate of 0.5% was applied to the through movements along Manono Street, Hinano Street, Piilani Street, and Hualani Street. 3.2 Background Developments The following background developments were added to existing traffic data to reflect Base Year conditions. Note that the level of completion of background projects and the expected completion year are listed below based on available information at the time of this report. • Talon 1 Properties Self Storage Warehouse – This project proposes to construct a three (3)-floor self-storage warehouse on the northwest corner of the Piilani Street/Manono Street intersection. Each floor includes 88 storage units for a total of 264 storage units. Two (2) driveways are proposed one (1) via Piilani Street and one (1) via Mililani Street (extension). The site plan also includes 28 parking stalls and seven (7) loading zones. Construction is expected to being in Year 2025. It is assumed this project will be completed by Year 2030. • Island Naturals Retail Development – This project proposes to construct a new retail center at the Kekuanaoa Street/Mililani Street intersection. The project includes two (2) buildings; one (1) 40 KSF building will house the new Island Naturals location and one (1) 10-12 KSF building will house other retail businesses. This location will include some green spaces and a site for a drive-thru business. Construction of the project was initially planned for Year 2023 but has been delayed. For the purposes of this study, this project was assumed to be completed by Year 2030. • Civic Center Electric Vehicle Infrastructure – As part of the National Electric Vehicle Infrastructure (NEVI) Hawaii State Plan, a four (4) port electric vehicle charging station is proposed at the Civic Center in Hilo. Due to the expected low trips to/from the new electric vehicle charging station during the peak hours, project volumes were assumed to be included in the background growth rate. See Figure 3.1 for the known developments included in the Base Year scenarios. 3.2.1 Trip Generation The Institute of Transportation Engineers (ITE) publishes a book based on empirical data compiled from a body of more than 4,250 studies submitted by public agencies, developers, consulting firms, and associations. This publication, titled Trip Generation Manual, 11th Edition, 13 provides trip rates and/or formulae based on graphs that correlate vehicular trips with independent variables. The independent variables can range from Dwelling Units (DU) for single-family attached homes to Gross Floor Area (GFA) for commercial or office development. Trip generation for background projects are assumed based on previously accepted TIARs when available. If a TIAR did not generate traffic for the development or if a TIAR was never completed, trips were manually generated using trip generation rates contained in the Trip Generation Manual, 11th Edition as described above. Table 3.1 Background Development Trip Generation Project Land Use (ITE Code) Units Quantity AM Peak Hour PM Peak Hour WE Peak Hour Enter Exit Total Enter Exit Total Enter Exit Total Talon 1 Properties Self Storage Warehouse Manufacturing (140) KSF GFAa 30.0 21 7 28 3 6 9 3 2 5 Fast-Food Restaurant with Drive- Through Window (934) KSF GFAa 1.8 41 39 80 14 13 27b 26 24 50b Island Naturals Retail Development Shopping Plaza 40-150 KSF (821) KSF GFAa 52 114 70 184 249 269 518 265 255 520 Total (Base Year 2030) 176 116 292 266 288 554 294 281 575 a GFA = gross floor area b Includes trip reductions based on the Traffic Impact Analysis Report, July 2022 completed for the proposed project. 3.2.2 Trip Distribution & Assignment Trips generated by the background developments were assigned throughout the study area generally based upon previous traffic studies and/or existing traffic patterns. 3.3 Planned Roadway Improvements The following roadway improvements have been identified in the 2035 Transportation Plan for the District of Hawaii, July 2014, however, since they are currently unfunded they are not included in the Base Year roadway network: • Kanoeleuha Avenue: Provide two (2) additional travel lanes, turn lanes at major intersections, bicycle facilities, and sidewalks. • Kamehameha Avenue/Manono Street: intersection operations improvements. • Kekuanaoa Street: Provide two (2) additional travel lanes with separate turning lanes at major intersections and construct bicycle lanes. PIILANI ST HUALANI ST MA N O N O S T PA R K R D HI N A N O S T LA U K A P U S T KEKUANAOA ST HOOLULU PARK MI L I L A N I S T CU HAWAII FCU HILO TIAR AustinTsutsumi & A S S O C I A T E S , I N C . Engineers & Surveyors FIGURE 3.1 BACKGROUND DEVELOPMENTS N NOT TO SCALE NOTE: THIS DRAWING IS FOR ILLUSTRATIVE PURPOSES ONLY. DO NOT USE FOR CONSTRUCTION. LEGEND TALON 1 PROPERTIES SELF-STORAGE ISLAND NATURALS RETAIL DEVELOPMENT CIVIC CENTER EV INFRASTRUCTURE 1 2 3 1 2 3 PROJECT SITE 15 3.4 Base Year Analysis The Base Year scenarios represent traffic conditions within the study area without the Project. 3.4.1 Base Year 2030 Conditions By Year 2030, volumes throughout the study area are expected to increase by roughly 13% over existing conditions, due to various background developments anticipated within the study area. Intersections with movements that worsen to LOS E or F are discussed below: [1] Manono Street/Piilani Street During the PM and WE peak hours, the westbound and eastbound approaches are expected to operate at LOS E/F. During the WE peak hour, the westbound approach is expected to operate over capacity. As mentioned above, occasionally the westbound vehicle queues were observed, but cleared within about one (1) minute. Additionally, there are other nearby commercial and recreational uses that were observed to be relatively high trip generators. [3] Manono Street/Hualani Street During the WE peak hour, the westbound approach is expected to operate at LOS E, but under capacity. Figure 3.2 shows the Base Year 2030 laneage, volumes, and LOS. Table 3.2 shows a LOS Summary for Base Year 2030 conditions. LOS worksheets are included in Appendix C. 3.4.2 Base Year 2035 Conditions By Year 2035, volumes throughout the study area are expected to increase by roughly 2% over Base Year 2030 projections. Movements at this study intersections are generally expected to operate similar to Base Year 2030. Figure 3.3 shows the Base Year 2035 laneage, volumes, and LOS. Table 3.2 shows a LOS Summary for Base Year 2035 conditions. LOS worksheets are included in Appendix C. 3.4.3 Base Year 2045 Conditions By Year 2045, volumes throughout the study area are expected to increase by roughly 4% over Base Year 2035 projections. Intersections with movements at LOS E or F are discussed below [1] Manono Street/Piilani Street Movements at this study intersection are generally expected to operate similar to Base Year 2035 with the exception of, the westbound approach which is expected to operate at LOS F and over capacity during the PM peak hour. [3] Manono Street/Hualani Street Movements at this study intersection are generally expected to operate similar to Base Year 2035 with the exception of, the eastbound approach which is expected to operate at LOS E, but under capacity during the WE peak hour. Figure 3.4 shows the Base Year 2045 laneage, volumes, and LOS. Table 3.2 shows a LOS Summary for Base Year 2045 conditions. LOS worksheets are included in Appendix C. 1 2 3 4 7 6 5 CU HAWAII FCU HILO TIAR AustinTsutsumi & A S S O C I A T E S , I N C . Engineers & Surveyors FIGURE 3.2A BY 2030 VOLUMES AND LOS 1 4 5 N NOT TO SCALE 6 X NOTE: THIS DRAWING IS FOR ILLUSTRATIVE PURPOSES ONLY. DO NOT USE FOR CONSTRUCTION. LEGEND - UNSIGNALIZED INTERSECTION X ##(##)[##] - AM(PM)[WE] VEHICLE VOLUMES X(X)[X] - AM(PM)[WE] LOS 2 3 MA N O N O S T PIILANI ST PIILANI ST/HINANO ST HI N A N O S T PIILANI ST HUALANI ST/MANONO ST MA N O N O S T HUALANI ST HINANO ST/PROJECT DWY (INGRESS) HI N A N O S T PROJECT DWY (INGRESS) HINANO ST/PROJECT DWY (EGRESS) HI N A N O S T PROJECT DWY (EGRESS) HUALANI ST/HINANO ST HI N A N O S T HUALANI ST [31](25)27 [26](20)27 [29](23)22 [11](12)7 [134](140)104 [29](40)21 [2](7)8 [19](16)5 [11](8)8 [34](13)14 [51](34)16 [67](26)6 [3 3 ] ( 2 4 ) 2 7 [3 9 9 ] ( 3 6 8 ) 2 5 7 [1 0 1 ] ( 1 0 2 ) 6 4 [3 5 ] ( 4 5 ) 1 2 [2 4 ] ( 4 ) 4 [3 6 ] ( 3 0 ) 1 6 [1 2 ] ( 2 ) 4 [5 4 5 ] ( 4 7 9 ) 3 4 8 [9 5 ] ( 6 0 ) 3 3 [1 2 ] ( 1 1 ) 3 [5 5 ] ( 6 8 ) 1 9 [7 ] ( 2 2 ) 3 54(72)[78] 54(39)[52] 34(55)[65] 5(18)[2] 125(122)[145] 21(37)[22] 12(28)[17] 8(17)[17] 1(11)[13] 2(0)[4] 11(23)[26] 6(0)[7] 50 ( 4 5 ) [ 6 4 ] 37 0 ( 4 5 2 ) [ 4 2 0 ] 42 ( 6 9 ) [ 4 7 ] 3( 4 ) [ 1 9 ] 3( 1 ) [ 1 0 ] 4( 7 ) [ 1 9 ] 1( 2 ) [ 7 ] 42 5 ( 5 2 9 ) [ 5 0 6 ] 9( 2 8 ) [ 2 9 ] 4( 5 ) [ 8 ] 24 ( 5 6 ) [ 6 2 ] 2( 9 ) [ 1 ] PIILANI ST/MANONO ST [20](36)9 [18](32)6 [7 6 ] ( 4 6 ) 1 8 42 ( 7 2 ) [ 6 4 ] [1 5 ] ( 2 6 ) 1 2 [7 7 ] ( 4 9 ) 1 8 14 ( 3 3 ) [ 1 5 ] 33 ( 6 9 ) [ 6 9 ] [A ] ( A ) A [F](E)D D(F)[F*] A( A ) [ A ] [B ] ( B ) B [A](A)A A(A)[A] B( B ) [ B ] [A ] ( A ) A [D](D)C B(C)[E] A( A ) [ A ] [A ] ( A ) A [B](B)A A(B)[B] A( A ) [ A ] [A](A)A [A ] ( A ) A 1 2 3 4 7 6 5 CU HAWAII FCU HILO TIAR AustinTsutsumi & A S S O C I A T E S , I N C . Engineers & Surveyors FIGURE 3.2B BY 2030 VOLUMES AND LOS N NOT TO SCALE X NOTE: THIS DRAWING IS FOR ILLUSTRATIVE PURPOSES ONLY. DO NOT USE FOR CONSTRUCTION. LEGEND - UNSIGNALIZED INTERSECTION X ##(##)[##] - AM(PM)[WE] VEHICLE VOLUMES X(X)[X] - AM(PM)[WE] LOS 7 HINANO ST/PARKING LOT HI N A N O S T DRIVEWAY 6( 1 ) [ 1 ] 27 ( 6 8 ) [ 6 9 ] [1](0)1 [0](4)1 [0 ] ( 0 ) 7 [9 3 ] ( 7 6 ) 2 8 [A ] ( A ) A [A](A)A 1 2 3 4 7 6 5 CU HAWAII FCU HILO TIAR AustinTsutsumi & A S S O C I A T E S , I N C . Engineers & Surveyors FIGURE 3.3A BY 2035 VOLUMES AND LOS 1 4 5 N NOT TO SCALE 6 X NOTE: THIS DRAWING IS FOR ILLUSTRATIVE PURPOSES ONLY. DO NOT USE FOR CONSTRUCTION. LEGEND - UNSIGNALIZED INTERSECTION X ##(##)[##] - AM(PM)[WE] VEHICLE VOLUMES X(X)[X] - AM(PM)[WE] LOS 2 3 MA N O N O S T PIILANI ST PIILANI ST/HINANO ST HI N A N O S T PIILANI ST HUALANI ST/MANONO ST MA N O N O S T HUALANI ST HINANO ST/PROJECT DWY (INGRESS) HI N A N O S T PROJECT DWY (INGRESS) HINANO ST/PROJECT DWY (EGRESS) HI N A N O S T PROJECT DWY (EGRESS) HUALANI ST/HINANO ST HI N A N O S T HUALANI ST [31](25)27 [27](21)28 [29](23)22 [11](12)7 [138](144)107 [29](40)21 [2](7)8 [20](17)5 [11](8)8 [34](13)14 [53](35)17 [67](26)6 [3 3 ] ( 2 4 ) 2 7 [4 1 0 ] ( 3 7 9 ) 2 6 4 [1 0 1 ] ( 1 0 2 ) 6 4 [3 5 ] ( 4 5 ) 1 2 [2 4 ] ( 4 ) 4 [3 6 ] ( 3 0 ) 1 6 [1 2 ] ( 2 ) 4 [5 6 1 ] ( 4 9 3 ) 3 5 8 [9 5 ] ( 6 0 ) 3 3 [1 2 ] ( 1 1 ) 3 [5 7 ] ( 6 9 ) 2 0 [7 ] ( 2 2 ) 3 54(72)[78] 56(40)[54] 34(55)[65] 5(18)[2] 129(125)[149] 21(37)[22] 12(28)[17] 8(18)[18] 1(11)[13] 2(0)[4] 12(24)[27] 6(0)[7] 50 ( 4 5 ) [ 6 4 ] 38 0 ( 4 6 5 ) [ 4 3 2 ] 42 ( 6 9 ) [ 4 7 ] 3( 4 ) [ 1 9 ] 3( 1 ) [ 1 1 ] 4( 7 ) [ 1 9 ] 1( 2 ) [ 7 ] 43 7 ( 5 4 4 ) [ 5 2 1 ] 9( 2 8 ) [ 2 9 ] 4( 5 ) [ 8 ] 24 ( 5 8 ) [ 6 3 ] 2( 9 ) [ 1 ] PIILANI ST/MANONO ST [20](36)9 [18](32)6 [7 8 ] ( 4 7 ) 1 9 43 ( 7 4 ) [ 6 5 ] [1 5 ] ( 2 6 ) 1 2 [7 9 ] ( 5 1 ) 1 9 14 ( 3 3 ) [ 1 5 ] 34 ( 7 1 ) [ 7 1 ] [A ] ( A ) A [F](E)D D(F)[F*] A( A ) [ A ] [B ] ( B ) B [A](A)A A(A)[A] B( B ) [ B ] [A ] ( A ) A [D](D)C B(D)[E] A( A ) [ A ] [A ] ( A ) A [B](B)A A(B)[B] A( A ) [ A ] [A](A)A [A ] ( A ) A 1 2 3 4 7 6 5 CU HAWAII FCU HILO TIAR AustinTsutsumi & A S S O C I A T E S , I N C . Engineers & Surveyors FIGURE 3.3B BY 2035 VOLUMES AND LOS N NOT TO SCALE X NOTE: THIS DRAWING IS FOR ILLUSTRATIVE PURPOSES ONLY. DO NOT USE FOR CONSTRUCTION. LEGEND - UNSIGNALIZED INTERSECTION X ##(##)[##] - AM(PM)[WE] VEHICLE VOLUMES X(X)[X] - AM(PM)[WE] LOS 7 HINANO ST/PARKING LOT HI N A N O S T DRIVEWAY 6( 1 ) [ 1 ] 27 ( 6 9 ) [ 7 1 ] [1](0)1 [0](4)1 [0 ] ( 0 ) 7 [9 6 ] ( 7 8 ) 2 8 [A ] ( A ) A [A](A)A 1 2 3 4 7 6 5 CU HAWAII FCU HILO TIAR AustinTsutsumi & A S S O C I A T E S , I N C . Engineers & Surveyors FIGURE 3.4A BY 2045 VOLUMES AND LOS 1 4 5 N NOT TO SCALE 6 X NOTE: THIS DRAWING IS FOR ILLUSTRATIVE PURPOSES ONLY. DO NOT USE FOR CONSTRUCTION. LEGEND - UNSIGNALIZED INTERSECTION X ##(##)[##] - AM(PM)[WE] VEHICLE VOLUMES X(X)[X] - AM(PM)[WE] LOS 2 3 MA N O N O S T PIILANI ST PIILANI ST/HINANO ST HI N A N O S T PIILANI ST HUALANI ST/MANONO ST MA N O N O S T HUALANI ST HINANO ST/PROJECT DWY (INGRESS) HI N A N O S T PROJECT DWY (INGRESS) HINANO ST/PROJECT DWY (EGRESS) HI N A N O S T PROJECT DWY (EGRESS) HUALANI ST/HINANO ST HI N A N O S T HUALANI ST [31](25)27 [29](22)30 [29](23)22 [11](12)7 [145](152)113 [29](40)21 [2](7)8 [21](18)6 [11](8)8 [34](13)14 [56](37)18 [67](26)6 [3 3 ] ( 2 4 ) 2 7 [4 3 3 ] ( 4 0 0 ) 2 7 9 [1 0 1 ] ( 1 0 2 ) 6 4 [3 5 ] ( 4 5 ) 1 2 [2 6 ] ( 4 ) 4 [3 6 ] ( 3 0 ) 1 6 [1 2 ] ( 2 ) 4 [5 9 2 ] ( 5 2 1 ) 3 7 8 [9 5 ] ( 6 0 ) 3 3 [1 2 ] ( 1 1 ) 3 [6 0 ] ( 7 3 ) 2 1 [7 ] ( 2 2 ) 3 54(72)[78] 59(42)[57] 34(55)[65] 5(18)[2] 137(132)[158] 21(37)[22] 12(28)[17] 9(19)[19] 1(11)[13] 2(0)[4] 12(26)[29] 6(0)[7] 50 ( 4 5 ) [ 6 4 ] 40 1 ( 4 9 1 ) [ 4 5 6 ] 42 ( 6 9 ) [ 4 7 ] 3( 4 ) [ 1 9 ] 3( 1 ) [ 1 1 ] 4( 7 ) [ 1 9 ] 1( 2 ) [ 7 ] 46 1 ( 5 7 4 ) [ 5 5 0 ] 9( 2 8 ) [ 2 9 ] 4( 5 ) [ 8 ] 26 ( 6 1 ) [ 6 7 ] 2( 9 ) [ 1 ] PIILANI ST/MANONO ST [20](36)9 [18](32)6 [8 2 ] ( 5 0 ) 2 0 46 ( 7 8 ) [ 6 9 ] [1 5 ] ( 2 6 ) 1 2 [8 3 ] ( 5 3 ) 2 0 14 ( 3 3 ) [ 1 5 ] 36 ( 7 4 ) [ 7 4 ] [A ] ( A ) A [F](F)D D(F*)[F*] A( A ) [ A ] [B ] ( B ) B [A](A)A A(A)[A] B( B ) [ B ] [A ] ( A ) A [E](D)C C(D)[E] A( A ) [ A ] [A ] ( A ) A [B](B)A A(B)[B] A( A ) [ A ] [A](A)A [A ] ( A ) A 1 2 3 4 7 6 5 CU HAWAII FCU HILO TIAR AustinTsutsumi & A S S O C I A T E S , I N C . Engineers & Surveyors FIGURE 3.4B BY 2045 VOLUMES AND LOS N NOT TO SCALE X NOTE: THIS DRAWING IS FOR ILLUSTRATIVE PURPOSES ONLY. DO NOT USE FOR CONSTRUCTION. LEGEND - UNSIGNALIZED INTERSECTION X ##(##)[##] - AM(PM)[WE] VEHICLE VOLUMES X(X)[X] - AM(PM)[WE] LOS 7 HINANO ST/PARKING LOT HI N A N O S T DRIVEWAY 6( 1 ) [ 1 ] 29 ( 7 3 ) [ 7 4 ] [1](0)1 [0](4)1 [0 ] ( 0 ) 7 [1 0 1 ] ( 8 2 ) 3 0 [A ] ( A ) A [A](A)A TABLE 3.2: LOS SUMMARY TABLE BASE YEAR 2030, BASE YEAR 2035, AND BASE YEAR 2045 HCM Delay v/c Ratio LOS HCM Delay v/c Ratio LOS HCM Delay v/c Ratio LOS HCM Delay v/c Ratio LOS HCM Delay v/c Ratio LOS HCM Delay v/c Ratio LOS HCM Delay v/c Ratio LOS HCM Delay v/c Ratio LOS HCM Delay v/c Ratio LOS 1: Manono St & Piilani St 8.4 0.03 A 8.6 0.03 A 8.6 0.03 A 8.4 0.03 A 8.7 0.03 A 8.6 0.04 A 8.5 0.03 A 8.8 0.03 A 8.7 0.04 A 26.2 0.33 D 45.1 0.46 E 56.4 0.59 F 27.6 0.35 D 49.7 0.49 E 64.4 0.64 F 30.8 0.38 D 60.8 0.56 F 87.0 0.74 F 27.3 0.50 D 83.9 0.88 F 125.6 1.05 F*29.1 0.52 D 97.6 0.93 F 148.0 1.11 F*33.1 0.57 D 130.6 1.04 F*200.9 1.24 F* 8.1 0.04 A 8.7 0.07 A 8.7 0.05 A 8.1 0.04 A 8.7 0.07 A 8.7 0.05 A 8.2 0.04 A 8.8 0.07 A 8.8 0.05 A 6.3 --13.8 --22.3 --6.6 --15.6 --25.9 --7.2 --19.8 --34.2 -- 2: Hinano St & Piilani St 10.2 0.05 B 11.8 0.14 B 12.0 0.17 B 10.3 0.05 B 11.9 0.14 B 12.1 0.17 B 10.4 0.05 B 12.1 0.15 B 12.3 0.18 B 7.5 0.01 A 7.5 0.01 A 7.6 0.01 A 7.5 0.01 A 7.6 0.01 A 7.6 0.01 A 7.5 0.01 A 7.6 0.01 A 7.6 0.01 A 7.5 0.02 A 7.7 0.03 A 7.6 0.02 A 7.6 0.02 A 7.7 0.03 A 7.6 0.02 A 7.6 0.02 A 7.7 0.03 A 7.6 0.02 A 10.6 0.02 B 11.2 0.02 B 11.5 0.09 B 10.6 0.02 B 11.3 0.02 B 11.6 0.09 B 10.7 0.02 B 11.4 0.02 B 11.8 0.09 B 2.0 --3.1 --4.0 --1.9 --3.1 --4.0 --1.9 --3.0 --4.0 -- 3: Manono St & Hualani St 8.3 0.00 A 8.6 0.00 A 8.6 0.01 A 8.3 0.00 A 8.7 0.00 A 8.7 0.01 A 8.4 0.00 A 8.8 0.00 A 8.8 0.01 A 16.7 0.07 C 27.9 0.18 D 29.8 0.19 D 17.1 0.07 C 29.6 0.19 D 31.8 0.21 D 18.2 0.08 C 33.1 0.22 D 35.8 0.24 E 14.3 0.06 B 24.8 0.25 C 35.8 0.31 E 14.6 0.06 B 26.4 0.27 D 38.8 0.33 E 15.4 0.07 C 29.7 0.30 D 45.4 0.38 E 8.2 0.01 A 8.8 0.03 A 9.3 0.04 A 8.2 0.01 A 8.8 0.03 A 9.4 0.04 A 8.3 0.01 A 8.9 0.03 A 9.5 0.04 A 0.9 --2.1 --2.4 --0.9 --2.2 --2.5 --0.9 --2.4 --2.8 -- 4: Hinano St & Hualani St 7.3 0.00 A 7.4 0.01 A 7.4 0.01 A 7.3 0.00 A 7.4 0.01 A 7.4 0.01 A 7.3 0.00 A 7.4 0.01 A 7.4 0.01 A 9.2 0.04 A 10.1 0.10 B 10.5 0.20 B 9.3 0.05 A 10.2 0.10 B 10.5 0.21 B 9.3 0.05 A 10.3 0.11 B 10.6 0.21 B 9.3 0.02 A 10.4 0.04 B 10.3 0.06 B 9.3 0.03 A 10.5 0.04 B 10.3 0.06 B 9.3 0.03 A 10.5 0.04 B 10.4 0.06 B 7.3 0.00 A 7.4 0.01 A 7.4 0.00 A 7.3 0.00 A 7.4 0.01 A 7.4 0.00 A 7.3 0.00 A 7.4 0.01 A 7.4 0.00 A 5.0 --4.2 --6.2 --5.0 --4.2 --6.2 --4.9 --4.3 --6.2 -- 5: Hinano St & Project Egress 8.8 0.02 A 9.3 0.08 A 9.2 0.05 A 8.8 0.02 A 9.3 0.08 A 9.2 0.05 A 8.8 0.02 A 9.3 0.08 A 9.2 0.05 A 1.8 --3.3 --2.0 --1.7 --3.3 --1.9 --1.6 --3.2 --1.9 -- 6: Hinano St & Project Ingress 7.3 0.01 A 7.5 0.02 A 7.4 0.01 A 7.3 0.01 A 7.5 0.02 A 7.4 0.01 A 7.3 0.01 A 7.5 0.02 A 7.4 0.01 A 1.1 --1.1 --0.6 --1.1 --1.1 --0.6 --1.1 --1.0 --0.6 -- 7: Hinano St & Project Parking Lot 7.3 0.01 A 0.0 0.00 A 0.0 0.00 A 7.3 0.01 A 0.0 0.00 A 0.0 0.00 A 7.3 0.01 A 0.0 0.00 A 0.0 0.00 A 8.7 0.00 A 8.7 0.00 A 9.4 0.00 A 8.7 0.00 A 8.7 0.00 A 9.5 0.00 A 8.7 0.00 A 8.7 0.00 A 9.5 0.00 A 1.0 --0.2 --0.1 --1.0 --0.2 --0.1 --0.9 --0.2 --0.1 -- * Indicates overcapacity conditions, v/c ≥ 1. Base Year 2030 AM PM WE OVERALL EB LT/RT NB LT/TH OVERALL OVERALL NB LT/TH EB LT/RT SB LT/TH/RT OVERALL WB LT/TH/RT EB LT/TH/RT NB LT/TH/RT OVERALL SB LT/TH/RT WB LT/TH/RT EB LT/TH/RT NB LT/TH/RT SB LT/TH/RT OVERALL WB LT/TH/RT EB LT/TH/RT NB LT/TH/RT OVERALL SB LT/TH/RT WB LT/TH/RT EB LT/TH/RT NB LT/TH/RT Base Year 2045 AM PM WE Intersection Base Year 2035 AM PM WE 23 4. FUTURE YEAR TRAFFIC CONDITIONS The Future Year scenarios represent the traffic conditions within the Project study area with the full build-out of the Project. 4.1 Project Description The Project proposes to construct a new branch building at 533 Manono Street and 494 Hinano Street, Hilo, Hawaii. The administrative operations of the CU Hawaii FCU will remain at the existing location at 476 Hinano Street. An increase in employees or customers is not expected as a result of the proposed Project. Table 4.1 describes the existing and proposed future uses of each parcel. Table 4.1 Existing and Proposed Uses of the Project Site Lot Existing Use Proposed Future Use 476 Hinano Street Administrative operations and customer-facing banking services Administrative Operations and parking for CU Hawaii Employees 494 Hinano Street Gravel parking lot for CU Hawaii FCU employees Customer-facing banking services including the drive-up teller window, walk-up ATM, and customer parking 533 Manono Street Residential 4.2 Trip Generation, Distribution, & Assignment As mentioned above, an increase in employees or customers is not expected as a result of the proposed Project. Thus, the total number of peak hour trips to/from CU Hawaii FCU is not expected to change. However, the travel patterns or routes to/from the CU Hawaii FCU may change as a result of the proposed Project. Employee trips will be rerouted to the existing 476 Hinano Street site. Customer trips will be split between the two (2) proposed driveways at 494 Hinano Street and 533 Manono Street generally based on existing travel patterns. Currently, the drive-up teller opens at 8:00 AM. Thus, trips to/from the existing branch (476 Hinano Street) prior to 8:00 AM were assumed to be employee trips. The remaining AM peak hour trips were assumed to be customer trips. Since the PM and WE peak hours occur while the credit union is still open, all PM and WE peak hour trips to the existing branch were assumed to be customers. All trips to/from the existing employee parking lot (494 Hinano Street) were assumed to be employees during the AM, PM, and WE peak hours. The Project-generated trip distribution is shown in Figure 4.1 1 2 3 4 7 6 5 8 CU HAWAII FCU HILO TIAR AustinTsutsumi & A S S O C I A T E S , I N C . Engineers & Surveyors FIGURE 4.1A PROJECT GENERATED TRIPS 1 4 5 N NOT TO SCALE 6 X NOTE: THIS DRAWING IS FOR ILLUSTRATIVE PURPOSES ONLY. DO NOT USE FOR CONSTRUCTION. LEGEND - UNSIGNALIZED INTERSECTION X ##(##)[##] - AM(PM)[WE] VEHICLE VOLUMES 2 3 MA N O N O S T PIILANI ST PIILANI ST/HINANO ST HI N A N O S T PIILANI ST HUALANI ST/MANONO ST MA N O N O S T HUALANI ST HINANO ST/PROJECT DWY (INGRESS) HI N A N O S T PROJECT DWY (INGRESS) HINANO ST/PROJECT DWY (EGRESS) HI N A N O S T PROJECT DWY (EGRESS) HUALANI ST/HINANO ST HI N A N O S T HUALANI ST [0](0)0 [-1](-1)0 [1](1)0 [0](0)0 [0](0)0 [-9](-17)-3 [0](0)0 [0](0)0 [0](0)0 [-11](-4)-3 [0](0)0 [0](0)0 [2 ] ( 5 ) 1 [3 ] ( 1 0 ) 2 [- 5 ] ( - 9 ) - 2 [- 7 ] ( - 2 1 ) - 4 [0 ] ( 0 ) 0 [0 ] ( 0 ) 0 [0 ] ( 0 ) 0 [1 1 ] ( 4 ) 3 [- 1 1 ] ( - 4 ) - 3 [0 ] ( 0 ) 0 [0 ] ( 0 ) 0 [0 ] ( 0 ) 0 -2(-10)[-3] -1(-5)[-2] -1(-6)[-2] 0(0)[0] 0(0)[0] 0(0)[0] 0(0)[0] 0(0)[0] 0(0)[0] 0(0)[0] 0(0)[0] 0(0)[0] 0( 0 ) [ 0 ] 1( 7 ) [ 3 ] -1 ( - 7 ) [ - 3 ] 0( 0 ) [ 0 ] 0( 0 ) [ 0 ] 0( 0 ) [ 0 ] 0( 0 ) [ 0 ] 0( 0 ) [ 0 ] 0( 0 ) [ 0 ] 0( 0 ) [ 0 ] 1( - 6 ) [ 1 ] 0( 0 ) [ 0 ] PIILANI ST/MANONO ST [-19](-36)-7 [-18](-28)-5 [1 4 ] ( 2 1 ) 4 -3 ( - 1 7 ) [ - 9 ] [- 1 5 ] ( - 2 6 ) - 1 [1 4 ] ( 2 1 ) 4 -1 ( - 3 2 ) [ - 1 4 ] -7 ( - 1 3 ) [ - 1 0 ] 1 2 3 4 7 6 5 8 CU HAWAII FCU HILO TIAR AustinTsutsumi & A S S O C I A T E S , I N C . Engineers & Surveyors FIGURE 4.1B PROJECT GENERATED TRIPS N NOT TO SCALE X NOTE: THIS DRAWING IS FOR ILLUSTRATIVE PURPOSES ONLY. DO NOT USE FOR CONSTRUCTION. LEGEND - UNSIGNALIZED INTERSECTION X ##(##)[##] - AM(PM)[WE] VEHICLE VOLUMES 7 8HINANO ST/PARKING LOT MANONO ST/NEW PROJECT DWY HI N A N O S T DRIVEWAY NEW DRIVEWAY MA N O N O S T -4 ( 1 5 ) [ 5 ] -3 ( - 2 8 ) [ - 1 5 ] [14](21)4 [16](22)4 [4 ] ( 2 2 ) 0 [- 1 5 ] ( - 2 6 ) - 1 [- 5 ] ( - 9 ) - 2 [1 6 ] ( 1 3 ) 5 -1 ( - 6 ) [ - 2 ] 1( 8 ) [ 4 ] 3(15)[5] 1(6)[2] 26 4.3 Future Year Analysis Intersection operations with the Project trips are compared to the corresponding Base Years conditions to assess the Project’s impact to the study area. 4.3.1 Future Year 2030 Movements at the study intersections are generally expected to operate similar to Base Year 2030. [1] Manono Street/Piilani Street As mentioned above, the Project is not expected to add new trips to the network but rather reroute some trips to the new proposed Manono Street driveway, which results in slightly reduced delays at this intersection under Future Year 2030 conditions. For example, exiting Project trips may reroute from the westbound Piilani Street approach to the 533 Manono Street driveway (i.e., Project trips on the westbound approach would decrease). However, some of these rerouted trips would add to the southbound volumes on Manono Drive, which results in only a slight improvement for the westbound approach delay. Additionally, the estimated Project-related trips at this intersection account for roughly 1-3% of total Future Year 2030 traffic projections during the AM, PM, and WE peak hours. During the WE peak hour, a special event was held at a nearby retail establishment, thus, traffic volumes to/from the retail establishment could have been higher than a typical Saturday. Additionally, there are nearby commercial and recreational uses that were observed to be relatively high trip generators. Since the Project is not expected to add new trips, no improvements are recommended as a result of this Project. Figure 4.2 shows the Future Year 2030 laneage, volumes, and LOS. Table 4.2 shows a LOS Summary for Future Year 2030 conditions. LOS worksheets are included in Appendix C. 4.3.2 Future Year 2035 Movements at the study intersections are generally expected to operate similar to Base Year 2035. [1] Manono Street/Piilani Street Similar to Future Year 2030, the Project is not expected to add new trips to the network but rather reroute trips between the Manono Street and Hinano Street driveways, which results in slightly reduced delays at the Manono Street/Piilani Street intersection. Since the Project is not expected to add new trips, no improvements are recommended as a result of this Project. Figure 4.3 shows the Future Year 2035 laneage, volumes, and LOS. Table 4.3 shows a LOS Summary for Future Year 2035 conditions. LOS worksheets are included in Appendix C. 27 4.3.3 Future Year 2045 Movements at the study intersections are generally expected to operate similar to Base Year 2045. [1] Manono Street/Piilani Street Similar to Future Year 2030 and 2035, the Project is not expected to add new trips to the network but rather reroute trips between the Manono Street and Hinano Street driveways, which results in slightly reduced delays at the Manono Street/Piilani Street intersection. Since the Project is not expected to add new trips, no improvements are recommended as a result of this Project. Figure 4.4 shows the Future Year 2045 laneage, volumes, and LOS. Table 4.4 shows a LOS Summary for Future Year 2045 conditions. LOS worksheets are included in Appendix C. 4.3.4 Future Site Access and Circulation As mentioned above, access to the Project site is proposed via Manono Street and Hinano Street. Providing access along both roadways provide internal site flexibility and alternative routes for Project trips to avoid higher volume intersections such as the Manono Street/Piilani Street intersection. The site plan shows 49 parking stalls including three (3) accessible stalls at the new branch location. Note the existing branch site is not expected to change and the existing 56 parking stalls are expected to remain. On the observed Friday and Saturday, maximum parking occupancy was roughly 60% (PM) and 20%, respectively. According to Section 25-4-51 Required number of parking spaces, within the most recent version of the Hawaii County Code, financial institutions carry a requirement of one (1) standard parking stall per 300 square feet (SF) of floor area. The proposed new branch is approximately 8,832 SF. Thus, the LUO requirement would be 30 standard parking stalls for the Project site. The current proposed site plan includes 49 parking stalls. Based on the 2010 ADA Standards for Accessible Design, two (2) accessible spaces would be required at the Project site. As mentioned above, the maximum vehicle queue observed in the drive-thru lane was two (2) vehicles, which equates to roughly 50 feet (assuming 25 feet per vehicle). The new site plan shows one (1) drive-thru throat that opens into two (2) drive-up teller lanes providing roughly 270 feet of total vehicle storage. Thus, the new drive-up teller lanes are expected to provide adequate vehicle queue storage to serve the existing demand. It is uncertain if the existing drive-up ATM at the existing branch will remain open. However, there is roughly 50 feet of vehicle storage between the drive-up ATM and first parking stall. An additional roughly 75 feet of vehicle storage is provided within the parking area. Thus, the existing drive-up ATM is expected to provide adequate vehicle queue storage to serve the existing demand. 1 2 3 4 7 6 5 8 CU HAWAII FCU HILO TIAR AustinTsutsumi & A S S O C I A T E S , I N C . Engineers & Surveyors FIGURE 4.2A FY 2030 VOLUMES AND LOS 1 4 5 N NOT TO SCALE 6 X NOTE: THIS DRAWING IS FOR ILLUSTRATIVE PURPOSES ONLY. DO NOT USE FOR CONSTRUCTION. LEGEND - UNSIGNALIZED INTERSECTION X ##(##)[##] - AM(PM)[WE] VEHICLE VOLUMES X(X)[X] - AM(PM)[WE] LOS 2 3 MA N O N O S T PIILANI ST PIILANI ST/HINANO ST HI N A N O S T PIILANI ST HUALANI ST/MANONO ST MA N O N O S T HUALANI ST HINANO ST/PROJECT DWY (INGRESS) HI N A N O S T PROJECT DWY (INGRESS) HINANO ST/PROJECT DWY (EGRESS) HI N A N O S T PROJECT DWY (EGRESS) HUALANI ST/HINANO ST HI N A N O S T HUALANI ST [31](25)27 [25](19)27 [30](24)22 [11](12)7 [134](140)104 [20](23)18 [2](7)8 [19](16)5 [11](8)8 [23](9)11 [51](34)16 [67](26)6 [3 5 ] ( 2 9 ) 2 8 [4 0 2 ] ( 3 7 8 ) 2 5 9 [9 6 ] ( 9 3 ) 6 2 [2 8 ] ( 2 4 ) 8 [2 4 ] ( 4 ) 4 [3 6 ] ( 3 0 ) 1 6 [1 2 ] ( 2 ) 4 [5 5 6 ] ( 4 8 3 ) 3 5 1 [8 4 ] ( 5 6 ) 3 0 [1 2 ] ( 1 1 ) 3 [5 5 ] ( 6 8 ) 1 9 [7 ] ( 2 2 ) 3 52(62)[75] 53(34)[50] 33(49)[63] 5(18)[2] 125(122)[145] 21(37)[22] 12(28)[17] 8(17)[17] 1(11)[13] 2(0)[4] 11(23)[26] 6(0)[7] 50 ( 4 5 ) [ 6 4 ] 37 1 ( 4 5 9 ) [ 4 2 3 ] 41 ( 6 2 ) [ 4 4 ] 3( 4 ) [ 1 9 ] 3( 1 ) [ 1 0 ] 4( 7 ) [ 1 9 ] 1( 2 ) [ 7 ] 42 5 ( 5 2 9 ) [ 5 0 6 ] 9( 2 8 ) [ 2 9 ] 4( 5 ) [ 8 ] 25 ( 5 0 ) [ 6 3 ] 2( 9 ) [ 1 ] PIILANI ST/MANONO ST [1](0)2 [0](4)1 [9 0 ] ( 6 7 ) 2 2 39 ( 5 5 ) [ 5 5 ] [0 ] ( 0 ) 1 1 [9 1 ] ( 7 0 ) 2 2 13 ( 1 ) [ 1 ] 26 ( 5 6 ) [ 5 9 ] [A ] ( A ) A [F](E)D D(F)[F*] A( A ) [ A ] [B ] ( B ) B [A](A)A A(A)[A] B( B ) [ B ] [A ] ( A ) A [D](D)C B(C)[E] A( A ) [ A ] [A ] ( A ) A [B](B)A A(B)[B] A( A ) [ A ] [A](A)A [A ] ( A ) A 1 2 3 4 7 6 5 8 CU HAWAII FCU HILO TIAR AustinTsutsumi & A S S O C I A T E S , I N C . Engineers & Surveyors FIGURE 4.2B FY 2030 VOLUMES AND LOS N NOT TO SCALE X NOTE: THIS DRAWING IS FOR ILLUSTRATIVE PURPOSES ONLY. DO NOT USE FOR CONSTRUCTION. LEGEND - UNSIGNALIZED INTERSECTION X ##(##)[##] - AM(PM)[WE] VEHICLE VOLUMES X(X)[X] - AM(PM)[WE] LOS 7 8HINANO ST/PARKING LOT MANONO ST/NEW PROJECT DWY HI N A N O S T DRIVEWAY NEW DRIVEWAY MA N O N O S T 2( 1 6 ) [ 6 ] 24 ( 4 0 ) [ 5 4 ] [15](21)5 [16](26)5 [4 ] ( 2 2 ) 7 [7 8 ] ( 5 0 ) 2 7 [5 5 9 ] ( 5 0 5 ) 3 6 6 [1 6 ] ( 1 3 ) 5 42 5 ( 5 2 4 ) [ 5 1 2 ] 1( 8 ) [ 4 ] 3(15)[5] 1(6)[2] [A ] ( A ) A [A](A)A B(C)[C] A( A ) [ A ] TABLE 4.2: LOS SUMMARY TABLE BASE YEAR 2030 AND FUTURE YEAR 2030 HCM Delay v/c Ratio LOS HCM Delay v/c Ratio LOS HCM Delay v/c Ratio LOS HCM Delay v/c Ratio LOS HCM Delay v/c Ratio LOS HCM Delay v/c Ratio LOS 1: Manono St & Piilani St 8.4 0.03 A 8.6 0.03 A 8.6 0.03 A 8.4 0.03 A 8.7 0.03 A 8.6 0.04 A 26.2 0.33 D 45.1 0.46 E 56.4 0.59 F 26.2 0.33 D 42.9 0.44 E 54.2 0.58 F 27.3 0.50 D 83.9 0.88 F 125.6 1.05 F*27.0 0.48 D 67.4 0.78 F 114.5 1.01 F* 8.1 0.04 A 8.7 0.07 A 8.7 0.05 A 8.1 0.04 A 8.7 0.06 A 8.7 0.05 A 6.3 --13.8 --22.3 --6.1 --10.5 --20.1 -- 2: Hinano St & Piilani St 10.2 0.05 B 11.8 0.14 B 12.0 0.17 B 10.0 0.04 B 11.0 0.10 B 11.7 0.15 B 7.5 0.01 A 7.5 0.01 A 7.6 0.01 A 7.5 0.01 A 7.5 0.01 A 7.6 0.01 A 7.5 0.02 A 7.7 0.03 A 7.6 0.02 A 7.5 0.02 A 7.6 0.03 A 7.6 0.02 A 10.6 0.02 B 11.2 0.02 B 11.5 0.09 B 10.6 0.02 B 11.2 0.02 B 11.5 0.09 B 2.0 --3.1 --4.0 --1.9 --2.7 --3.9 -- 3: Manono St & Hualani St 8.3 0.00 A 8.6 0.00 A 8.6 0.01 A 8.3 0.00 A 8.6 0.00 A 8.6 0.01 A 16.7 0.07 C 27.9 0.18 D 29.8 0.19 D 16.7 0.07 C 27.9 0.18 D 29.8 0.19 D 14.3 0.06 B 24.8 0.25 C 35.8 0.31 E 14.3 0.06 B 24.9 0.25 C 36.1 0.31 E 8.2 0.01 A 8.8 0.03 A 9.3 0.04 A 8.2 0.01 A 8.8 0.03 A 9.3 0.04 A 0.9 --2.1 --2.4 --0.9 --2.1 --2.4 -- 4: Hinano St & Hualani St 7.3 0.00 A 7.4 0.01 A 7.4 0.01 A 7.3 0.00 A 7.4 0.01 A 7.4 0.01 A 9.2 0.04 A 10.1 0.10 B 10.5 0.20 B 9.2 0.04 A 10.0 0.10 B 10.3 0.19 B 9.3 0.02 A 10.4 0.04 B 10.3 0.06 B 9.3 0.02 A 10.4 0.04 B 10.3 0.06 B 7.3 0.00 A 7.4 0.01 A 7.4 0.00 A 7.3 0.00 A 7.4 0.01 A 7.4 0.00 A 5.0 --4.2 --6.2 --4.8 --4.2 --6.0 -- 5: Hinano St & Project Egress 8.8 0.02 A 9.3 0.08 A 9.2 0.05 A 8.7 0.00 A 8.6 0.00 A 9.3 0.00 A 1.8 --3.3 --2.0 --0.4 --0.3 --0.1 -- 6: Hinano St & Project Ingress 7.3 0.01 A 7.5 0.02 A 7.4 0.01 A 7.3 0.01 A 0.0 0.00 A 0.0 0.00 A 1.1 --1.1 --0.6 --1.1 --0.0 --0.0 -- 7: Hinano St & Project Parking Lot 7.3 0.01 A 0.0 0.00 A 0.0 0.00 A 7.3 0.01 A 7.4 0.02 A 7.4 0.00 A 8.7 0.00 A 8.7 0.00 A 9.4 0.00 A 8.7 0.01 A 9.1 0.06 A 9.1 0.04 A 1.0 --0.2 --0.1 --2.0 --3.4 --1.8 -- 8: Manono St & New Project Dwy 12.0 0.01 B 15.2 0.06 C 15.4 0.02 C 8.1 0.00 A 8.6 0.01 A 8.8 0.01 A ---------0.1 --0.4 --0.1 -- * Indicates overcapacity conditions, v/c ≥ 1. OVERALL SB LT/TH WB LT/RT OVERALL EB LT/RT NB LT/TH OVERALL NB LT/TH OVERALL EB LT/RT OVERALL SB LT/TH/RT WB LT/TH/RT EB LT/TH/RT NB LT/TH/RT SB LT/TH/RT OVERALL WB LT/TH/RT EB LT/TH/RT NB LT/TH/RT OVERALL SB LT/TH/RT WB LT/TH/RT EB LT/TH/RT NB LT/TH/RT SB LT/TH/RT OVERALL WB LT/TH/RT Future Year 2030 AM PM WE Base Year 2030 AM PM WE This intersection was not analyzed under Existing conditions since there are no existing Project trips using this intersection. Intersection NB LT/TH/RT EB LT/TH/RT 1 2 3 4 7 6 5 8 CU HAWAII FCU HILO TIAR AustinTsutsumi & A S S O C I A T E S , I N C . Engineers & Surveyors FIGURE 4.3A FY 2035 VOLUMES AND LOS 1 4 5 N NOT TO SCALE 6 X NOTE: THIS DRAWING IS FOR ILLUSTRATIVE PURPOSES ONLY. DO NOT USE FOR CONSTRUCTION. LEGEND - UNSIGNALIZED INTERSECTION X ##(##)[##] - AM(PM)[WE] VEHICLE VOLUMES X(X)[X] - AM(PM)[WE] LOS 2 3 MA N O N O S T PIILANI ST PIILANI ST/HINANO ST HI N A N O S T PIILANI ST HUALANI ST/MANONO ST MA N O N O S T HUALANI ST HINANO ST/PROJECT DWY (INGRESS) HI N A N O S T PROJECT DWY (INGRESS) HINANO ST/PROJECT DWY (EGRESS) HI N A N O S T PROJECT DWY (EGRESS) HUALANI ST/HINANO ST HI N A N O S T HUALANI ST [31](25)27 [26](20)28 [30](24)22 [11](12)7 [138](144)107 [20](23)18 [2](7)8 [20](17)5 [11](8)8 [23](9)11 [53](35)17 [67](26)6 [3 5 ] ( 2 9 ) 2 8 [4 1 3 ] ( 3 8 9 ) 2 6 6 [9 6 ] ( 9 3 ) 6 2 [2 8 ] ( 2 4 ) 8 [2 4 ] ( 4 ) 4 [3 6 ] ( 3 0 ) 1 6 [1 2 ] ( 2 ) 4 [5 7 2 ] ( 4 9 7 ) 3 6 1 [8 4 ] ( 5 6 ) 3 0 [1 2 ] ( 1 1 ) 3 [5 7 ] ( 6 9 ) 2 0 [7 ] ( 2 2 ) 3 52(62)[75] 55(35)[52] 33(49)[63] 5(18)[2] 129(125)[149] 21(37)[22] 12(28)[17] 8(18)[18] 1(11)[13] 2(0)[4] 12(24)[27] 6(0)[7] 50 ( 4 5 ) [ 6 4 ] 38 1 ( 4 7 2 ) [ 4 3 5 ] 41 ( 6 2 ) [ 4 4 ] 3( 4 ) [ 1 9 ] 3( 1 ) [ 1 1 ] 4( 7 ) [ 1 9 ] 1( 2 ) [ 7 ] 43 7 ( 5 4 4 ) [ 5 2 1 ] 9( 2 8 ) [ 2 9 ] 4( 5 ) [ 8 ] 25 ( 5 2 ) [ 6 4 ] 2( 9 ) [ 1 ] PIILANI ST/MANONO ST [1](0)2 [0](4)1 [9 2 ] ( 6 8 ) 2 3 40 ( 5 7 ) [ 5 6 ] [0 ] ( 0 ) 1 1 [9 3 ] ( 7 2 ) 2 3 13 ( 1 ) [ 1 ] 27 ( 5 8 ) [ 6 1 ] [A ] ( A ) A [F](E)D D(F)[F*] A( A ) [ A ] [B ] ( B ) B [A](A)A A(A)[A] B( B ) [ B ] [A ] ( A ) A [D](D)C B(D)[E] A( A ) [ A ] [A ] ( A ) A [B](B)A A(B)[B] A( A ) [ A ] [A](A)A [A ] ( A ) A 1 2 3 4 7 6 5 8 CU HAWAII FCU HILO TIAR AustinTsutsumi & A S S O C I A T E S , I N C . Engineers & Surveyors FIGURE 4.3B FY 2035 VOLUMES AND LOS N NOT TO SCALE X NOTE: THIS DRAWING IS FOR ILLUSTRATIVE PURPOSES ONLY. DO NOT USE FOR CONSTRUCTION. LEGEND - UNSIGNALIZED INTERSECTION X ##(##)[##] - AM(PM)[WE] VEHICLE VOLUMES X(X)[X] - AM(PM)[WE] LOS 7 8HINANO ST/PARKING LOT MANONO ST/NEW PROJECT DWY HI N A N O S T DRIVEWAY NEW DRIVEWAY MA N O N O S T 2( 1 6 ) [ 6 ] 24 ( 4 1 ) [ 5 6 ] [15](21)5 [16](26)5 [4 ] ( 2 2 ) 7 [8 1 ] ( 5 2 ) 2 7 [5 7 5 ] ( 5 1 9 ) 3 7 6 [1 6 ] ( 1 3 ) 5 43 5 ( 5 3 7 ) [ 5 2 4 ] 1( 8 ) [ 4 ] 3(15)[5] 1(6)[2] [A ] ( A ) A [A](A)A B(C)[C] A( A ) [ A ] TABLE 4.3: LOS SUMMARY TABLE BASE YEAR 2035 AND FUTURE YEAR 2035 HCM Delay v/c Ratio LOS HCM Delay v/c Ratio LOS HCM Delay v/c Ratio LOS HCM Delay v/c Ratio LOS HCM Delay v/c Ratio LOS HCM Delay v/c Ratio LOS 1: Manono St & Piilani St 8.4 0.03 A 8.7 0.03 A 8.6 0.04 A 8.4 0.03 A 8.7 0.03 A 8.6 0.04 A 27.6 0.35 D 49.7 0.49 E 64.4 0.64 F 27.5 0.35 D 47.0 0.48 E 61.7 0.62 F 29.1 0.52 D 97.6 0.93 F 148.0 1.11 F*28.7 0.51 D 77.4 0.83 F 135.1 1.07 F* 8.1 0.04 A 8.7 0.07 A 8.7 0.05 A 8.1 0.04 A 8.7 0.07 A 8.7 0.05 A 6.6 --15.6 --25.9 --6.4 --11.7 --23.3 -- 2: Hinano St & Piilani St 10.3 0.05 B 11.9 0.14 B 12.1 0.17 B 10.1 0.04 B 11.1 0.10 B 11.8 0.15 B 7.5 0.01 A 7.6 0.01 A 7.6 0.01 A 7.5 0.01 A 7.6 0.01 A 7.6 0.01 A 7.6 0.02 A 7.7 0.03 A 7.6 0.02 A 7.5 0.02 A 7.7 0.03 A 7.6 0.02 A 10.6 0.02 B 11.3 0.02 B 11.6 0.09 B 10.6 0.02 B 11.3 0.02 B 11.6 0.09 B 1.9 --3.1 --4.0 --1.8 --2.7 --3.9 -- 3: Manono St & Hualani St 8.3 0.00 A 8.7 0.00 A 8.7 0.01 A 8.3 0.00 A 8.7 0.00 A 8.7 0.01 A 17.1 0.07 C 29.6 0.19 D 31.8 0.21 D 17.2 0.07 C 29.7 0.19 D 31.9 0.21 D 14.6 0.06 B 26.4 0.27 D 38.8 0.33 E 14.6 0.06 B 26.5 0.27 D 39.3 0.34 E 8.2 0.01 A 8.8 0.03 A 9.4 0.04 A 8.2 0.01 A 8.8 0.03 A 9.4 0.04 A 0.9 --2.2 --2.5 --0.9 --2.2 --2.5 -- 4: Hinano St & Hualani St 7.3 0.00 A 7.4 0.01 A 7.4 0.01 A 7.3 0.00 A 7.4 0.01 A 7.4 0.01 A 9.3 0.05 A 10.2 0.10 B 10.5 0.21 B 9.3 0.04 A 10.1 0.10 B 10.4 0.19 B 9.3 0.03 A 10.5 0.04 B 10.3 0.06 B 9.3 0.03 A 10.4 0.04 B 10.3 0.06 B 7.3 0.00 A 7.4 0.01 A 7.4 0.00 A 7.3 0.00 A 7.4 0.01 A 7.4 0.00 A 5.0 --4.2 --6.2 --4.8 --4.2 --6.0 -- 5: Hinano St & Project Egress 8.8 0.02 A 9.3 0.08 A 9.2 0.05 A 8.7 0.00 A 8.6 0.00 A 9.3 0.00 A 1.7 --3.3 --1.9 --0.4 --0.3 --0.1 -- 6: Hinano St & Project Ingress 7.3 0.01 A 7.5 0.02 A 7.4 0.01 A 7.3 0.01 A 0.0 0.00 A 0.0 0.00 A 1.1 --1.1 --0.6 --1.1 --0.0 --0.0 -- 7: Hinano St & Project Parking Lot 7.3 0.01 A 0.0 0.00 A 0.0 0.00 A 7.3 0.01 A 7.4 0.02 A 7.4 0.00 A 8.7 0.00 A 8.7 0.00 A 9.5 0.00 A 8.7 0.01 A 9.2 0.06 A 9.1 0.04 A 1.0 --0.2 --0.1 --2.0 --3.3 --1.8 -- 8: Manono St & New Project Dwy 12.1 0.01 B 15.5 0.06 C 15.8 0.02 C 8.1 0.00 A 8.6 0.01 A 8.8 0.01 A ---------0.1 --0.4 --0.1 -- * Indicates overcapacity conditions, v/c ≥ 1. Intersection EB LT/TH/RT NB LT/TH/RT WB LT/TH/RT NB LT/TH/RT SB LT/TH/RT OVERALL EB LT/TH/RT SB LT/TH/RT WB LT/TH/RT NB LT/TH/RT OVERALL EB LT/TH/RT SB LT/TH/RT OVERALL WB LT/TH/RT NB LT/TH/RT WB LT/TH/RT EB LT/TH/RT OVERALL SB LT/TH/RT EB LT/RT NB LT/TH OVERALL NB LT/TH OVERALL EB LT/RT OVERALL WB LT/RT OVERALL SB LT/TH This intersection was not analyzed under Existing conditions since there are no existing Project trips using this intersection. Future Year 2035 AM PM WE Base Year 2035 AM PM WE 1 2 3 4 7 6 5 8 CU HAWAII FCU HILO TIAR AustinTsutsumi & A S S O C I A T E S , I N C . Engineers & Surveyors FIGURE 4.4A FY 2045 VOLUMES AND LOS 1 4 5 N NOT TO SCALE 6 X NOTE: THIS DRAWING IS FOR ILLUSTRATIVE PURPOSES ONLY. DO NOT USE FOR CONSTRUCTION. LEGEND - UNSIGNALIZED INTERSECTION X ##(##)[##] - AM(PM)[WE] VEHICLE VOLUMES X(X)[X] - AM(PM)[WE] LOS 2 3 MA N O N O S T PIILANI ST PIILANI ST/HINANO ST HI N A N O S T PIILANI ST HUALANI ST/MANONO ST MA N O N O S T HUALANI ST HINANO ST/PROJECT DWY (INGRESS) HI N A N O S T PROJECT DWY (INGRESS) HINANO ST/PROJECT DWY (EGRESS) HI N A N O S T PROJECT DWY (EGRESS) HUALANI ST/HINANO ST HI N A N O S T HUALANI ST [31](25)27 [28](21)30 [30](24)22 [11](12)7 [145](152)113 [20](23)18 [2](7)8 [21](18)6 [11](8)8 [23](9)11 [56](37)18 [67](26)6 [3 5 ] ( 2 9 ) 2 8 [4 3 6 ] ( 4 1 0 ) 2 8 1 [9 6 ] ( 9 3 ) 6 2 [2 8 ] ( 2 4 ) 8 [2 6 ] ( 4 ) 4 [3 6 ] ( 3 0 ) 1 6 [1 2 ] ( 2 ) 4 [6 0 3 ] ( 5 2 5 ) 3 8 1 [8 4 ] ( 5 6 ) 3 0 [1 2 ] ( 1 1 ) 3 [6 0 ] ( 7 3 ) 2 1 [7 ] ( 2 2 ) 3 52(62)[75] 58(37)[55] 33(49)[63] 5(18)[2] 137(132)[158] 21(37)[22] 12(28)[17] 9(19)[19] 1(11)[13] 2(0)[4] 12(26)[29] 6(0)[7] 50 ( 4 5 ) [ 6 4 ] 40 2 ( 4 9 8 ) [ 4 5 9 ] 41 ( 6 2 ) [ 4 4 ] 3( 4 ) [ 1 9 ] 3( 1 ) [ 1 1 ] 4( 7 ) [ 1 9 ] 1( 2 ) [ 7 ] 46 1 ( 5 7 4 ) [ 5 5 0 ] 9( 2 8 ) [ 2 9 ] 4( 5 ) [ 8 ] 27 ( 5 5 ) [ 6 8 ] 2( 9 ) [ 1 ] PIILANI ST/MANONO ST [1](0)2 [0](4)1 [9 6 ] ( 7 1 ) 2 4 43 ( 6 1 ) [ 6 0 ] [0 ] ( 0 ) 1 1 [9 7 ] ( 7 4 ) 2 4 13 ( 1 ) [ 1 ] 29 ( 6 1 ) [ 6 4 ] [A ] ( A ) A [F](F)D D(F)[F*] A( A ) [ A ] [B ] ( B ) B [A](A)A A(A)[A] B( B ) [ B ] [A ] ( A ) A [E](D)C C(D)[E] A( A ) [ A ] [A ] ( A ) A [B](B)A A(B)[B] A( A ) [ A ] [A](A)A [A ] ( A ) A 1 2 3 4 7 6 5 8 CU HAWAII FCU HILO TIAR AustinTsutsumi & A S S O C I A T E S , I N C . Engineers & Surveyors FIGURE 4.4B FY 2045 VOLUMES AND LOS N NOT TO SCALE X NOTE: THIS DRAWING IS FOR ILLUSTRATIVE PURPOSES ONLY. DO NOT USE FOR CONSTRUCTION. LEGEND - UNSIGNALIZED INTERSECTION X ##(##)[##] - AM(PM)[WE] VEHICLE VOLUMES X(X)[X] - AM(PM)[WE] LOS 7 8HINANO ST/PARKING LOT MANONO ST/NEW PROJECT DWY HI N A N O S T DRIVEWAY NEW DRIVEWAY MA N O N O S T 2( 1 6 ) [ 6 ] 26 ( 4 5 ) [ 5 9 ] [15](21)5 [16](26)5 [4 ] ( 2 2 ) 7 [8 6 ] ( 5 6 ) 2 9 [6 0 6 ] ( 5 4 7 ) 3 9 6 [1 6 ] ( 1 3 ) 5 45 6 ( 5 6 3 ) [ 5 4 8 ] 1( 8 ) [ 4 ] 3(15)[5] 1(6)[2] [A ] ( A ) A [A](A)A B(C)[C] A( A ) [ A ] TABLE 4.4: LOS SUMMARY TABLE BASE YEAR 2045 AND FUTURE YEAR 2045 HCM Delay v/c Ratio LOS HCM Delay v/c Ratio LOS HCM Delay v/c Ratio LOS HCM Delay v/c Ratio LOS HCM Delay v/c Ratio LOS HCM Delay v/c Ratio LOS 1: Manono St & Piilani St 8.5 0.03 A 8.8 0.03 A 8.7 0.04 A 8.5 0.03 A 8.8 0.03 A 8.7 0.04 A 30.8 0.38 D 60.8 0.56 F 87.0 0.74 F 30.8 0.38 D 56.8 0.54 F 82.5 0.73 F 33.1 0.57 D 130.6 1.04 F*200.9 1.24 F*32.6 0.55 D 102.1 0.92 F 184.5 1.20 F* 8.2 0.04 A 8.8 0.07 A 8.8 0.05 A 8.2 0.04 A 8.8 0.07 A 8.8 0.05 A 7.2 --19.8 --34.2 --7.1 --14.7 --30.8 -- 2: Hinano St & Piilani St 10.4 0.05 B 12.1 0.15 B 12.3 0.18 B 10.2 0.04 B 11.2 0.10 B 12.0 0.16 B 7.5 0.01 A 7.6 0.01 A 7.6 0.01 A 7.5 0.01 A 7.6 0.01 A 7.6 0.01 A 7.6 0.02 A 7.7 0.03 A 7.6 0.02 A 7.6 0.02 A 7.7 0.03 A 7.6 0.02 A 10.7 0.02 B 11.4 0.02 B 11.8 0.09 B 10.7 0.02 B 11.4 0.02 B 11.8 0.09 B 1.9 --3.0 --4.0 --1.8 --2.6 --3.8 -- 3: Manono St & Hualani St 8.4 0.00 A 8.8 0.00 A 8.8 0.01 A 8.4 0.00 A 8.8 0.00 A 8.8 0.01 A 18.2 0.08 C 33.1 0.22 D 35.8 0.24 E 18.3 0.08 C 33.2 0.22 D 35.9 0.24 E 15.4 0.07 C 29.7 0.30 D 45.4 0.38 E 15.4 0.07 C 29.8 0.30 D 45.9 0.38 E 8.3 0.01 A 8.9 0.03 A 9.5 0.04 A 8.3 0.01 A 8.9 0.03 A 9.5 0.04 A 0.9 --2.4 --2.8 --0.9 --2.4 --2.8 -- 4: Hinano St & Hualani St 7.3 0.00 A 7.4 0.01 A 7.4 0.01 A 7.3 0.00 A 7.4 0.01 A 7.4 0.01 A 9.3 0.05 A 10.3 0.11 B 10.6 0.21 B 9.3 0.04 A 10.2 0.10 B 10.5 0.20 B 9.3 0.03 A 10.5 0.04 B 10.4 0.06 B 9.3 0.03 A 10.5 0.04 B 10.4 0.06 B 7.3 0.00 A 7.4 0.01 A 7.4 0.00 A 7.3 0.00 A 7.4 0.01 A 7.4 0.00 A 4.9 --4.3 --6.2 --4.8 --4.2 --6.0 -- 5: Hinano St & Project Egress 8.8 0.02 A 9.3 0.08 A 9.2 0.05 A 8.8 0.00 A 8.6 0.00 A 9.4 0.00 A 1.6 --3.2 --1.9 --0.4 --0.2 --0.1 -- 6: Hinano St & Project Ingress 7.3 0.01 A 7.5 0.02 A 7.4 0.01 A 7.3 0.01 A 0.0 0.00 A 0.0 0.00 A 1.1 --1.0 --0.6 --1.0 --0.0 --0.0 -- 7: Hinano St & Project Parking Lot 7.3 0.01 A 0.0 0.00 A 0.0 0.00 A 7.3 0.01 A 7.4 0.02 A 7.4 0.00 A 8.7 0.00 A 8.7 0.00 A 9.5 0.00 A 8.7 0.01 A 9.2 0.06 A 9.2 0.04 A 0.9 --0.2 --0.1 --1.9 --3.2 --1.7 -- 8: Manono St & New Project Dwy 12.4 0.01 B 16.2 0.07 C 16.5 0.02 C 8.2 0.00 A 8.7 0.01 A 9.0 0.01 A ---------0.1 --0.4 --0.1 -- * Indicates overcapacity conditions, v/c ≥ 1. Intersection EB LT/TH/RT NB LT/TH/RT WB LT/TH/RT NB LT/TH/RT SB LT/TH/RT OVERALL EB LT/TH/RT SB LT/TH/RT WB LT/TH/RT NB LT/TH/RT OVERALL EB LT/TH/RT SB LT/TH/RT OVERALL WB LT/TH/RT NB LT/TH/RT WB LT/TH/RT EB LT/TH/RT OVERALL SB LT/TH/RT EB LT/RT NB LT/TH OVERALL NB LT/TH OVERALL EB LT/RT OVERALL WB LT/RT OVERALL SB LT/TH This intersection was not analyzed under Existing conditions since there are no existing Project trips using this intersection. Future Year 2045 AM PM WE Base Year 2045 AM PM WE 37 5. CONCLUSION The Project proposes to construct a new branch building at 533 Manono Street and 494 Hinano Street, Hilo, Hawaii. The administrative operations of the CU Hawaii FCU will remain at the existing location at 476 Hinano Street. An increase in employees or customers is not expected as a result of the proposed Project. Table 5.1 describes the existing and proposed future uses of each parcel. Table 5.1 : Existing and Proposed Uses of the Project Site Lot Existing Use Proposed Future Use 476 Hinano Street Administrative operations and customer-facing banking services Administrative Operations and parking for CU Hawaii Employees 494 Hinano Street Gravel parking lot for CU Hawaii FCU employees Customer-facing banking services including the drive-up teller window, walk-up ATM, and customer parking 533 Manono Street Residential 5.1 Existing Conditions There are several high trip generators within the study area including Manono Mini Mart, Manono Marketplace, S. Tokunaga Store, Big Island Candies, Hoolulu Park Complex, and the Wailoa River State Recreation Area. There are also residential uses scattered among the commercial uses in the vicinity of the Project site. During the weekday AM and PM peak hours, vehicles were generally free-flowing at the study intersections, with the exception vehicle queues observed at the Manono Street/Piilani Street intersection. During the AM and PM peak hours, occasionally there were vehicle queues on the southbound and westbound approaches but cleared within about one (1) to three (3) minutes. During WE observations, the S. Tokunaga Store had a special event that provided shuttle service from the overflow parking lot at the Hoolulu Park Complex. During the WE peak hour, occasionally a westbound vehicle queue was observed at the Manono Street/Piilani Street intersection but cleared within about one (1) minute. All movements at the study intersections operate at LOS D or better during the AM, PM, and WE peak hours of traffic, with the exception of the westbound approach at the Manono Street/Piilani Street intersection operating at LOS E during the WE peak hour. 38 5.2 Base Year Conditions Traffic projections at the study intersections were based on traffic generated from known background developments in the study area. Development timelines for the background projects were based on best available information at the time of this study. In addition, an annual ambient growth rate of 0.5% was applied to the through movements along Manono Street, Hinano Street, Piilani Street, and Hualani Street to account for future growth along the roadways resulting from future population and development changes outside of the immediate study area. By Base Year 2030, the westbound and eastbound approaches at the Manono Street/Piilani Street intersection are expected to operate at LOS E/F and over capacity during the PM and/or WE peak hours of traffic. During the WE peak hour, the westbound approach at the Manono Street/Hualani Street intersection is expected to operate at LOS E, but under capacity. By Base Year 2035 and 2045, all movements at the study intersection area expected to operate similar to Base Year 2030 conditions. 5.3 Future Year Conditions Under Future Year 2030 conditions, all movements at the study intersections are expected to operate similar to Base Year 2030 conditions. The Project is not expected to add new trips to the network but rather reroute some trips to the new proposed Manono Street driveway. Additionally, the estimated Project-related trips at the Manono Street/Piilani Street intersection account for roughly 1-3% of total Future Year 2030 traffic projections during the AM, PM, and WE peak hours. Since the Project is not expected to add new trips, no improvements are recommended as a result of this Project. The site plan shows 49 parking stalls including three (3) accessible stalls at the new branch location, which is more than the Hawaii County Code requirement of 30 parking stalls. Based on existing queues, the drive-up teller vehicle storage (about 270 ft) is expected to provide adequate vehicle queue storage to serve the existing demand (about 2 vehicles or 50 feet). 39 6. RECOMMENDATIONS Since the Project is not expected to add new trips, no improvements are recommended as a result of this Project. 40 7.REFERENCES 1.Transportation Research Board, Highway Capacity Manual, 7th Edition, 2016. 2.Hawaii Department of Transportation, Bike Plan Hawaii Master Plan – Appendix E. Date accessed May 14, 2025. 3.KOA Architects, LLC, Draft Environmental Assessment Talon 1 Properties Self- Storage Warehouse, December 2024. 4.Hawaii Department of Transportation, National Electric Vehicle Infrastructure Hawaii State Plan, August 2024. 5.Institute of Transportation Engineers, Trip Generation Manual, 11th Edition, 2021. 6.Department of Justice, 2010 ADA Standards for Accessible Design, September 15, 2010 From:Daryn Arai To:Andrews, Jessica Cc:Jackson, Maija; Rebecca Choi; Kimberly Graham Subject:Re: CU Hawaii FCU Rezone & Amendment to Ord 09-44 (PL-REZ-2025-000091 / PL-REZ-2025-000090) Date:Friday, November 14, 2025 11:42:08 AM Aloha Mrs. Andrews, Thank you for your questions and giving the Applicant, who is copied on this email, the opportunity to clarify its request which is provided below for your consideration. The requested zoning will allow CU Hawaii Federal Credit Union to begin the detailed financial planning and design processes as they plan to be thoughtful and methodical towards standing up a new member-facing facility. Following are some considerations: 1.The Applicant has the ability to maintain their operations at their current facility (476 Hinano) while they carefully plan for the new facility on the subject properties. Therefore, the Applicant would prefer not to be rushed toward construction of the new facility as they wish to make sure that what is eventually crafted best suits the needs of their membership while adhering to their fiduciary responsibilities as a member-owned credit union. 2.As a non-profit financial institution owned by their members, the Applicant wants to ensure that they can optimize the return on this proposed investment and minimize the overall cost in this expensive building process. Given the uncertainties in costs related to financing and construction, the Applicant prefers flexibility in choosing the optimal time to secure financing and lock-in construction contracts so that they can best manage their overall capital expenditures. The Applicant feels that a 10- year period to complete the proposed development is a reasonable timeframe for completion. 3.The Applicant must plan for contingencies that are internal and external, like not having enough in-house capacity to fast-track the proposed project, especially given that they are going through a core system conversion in the next two years and other operational priorities may pop up in terms of regulatory requirements or potential financial crisis. 4.Finally, the Applicant is not a professional developer nor are they a retail chain store that have systems for replicating buildings. The Applicant intends to customize the design and building processes so that it will be tailored to the nature of their work and the needs of their membership and the surrounding community. The Applicant hopes that you find these as reasonable explanations on why a 10-year timeline to complete the proposed project was presented. This is not a stand-alone project. CU Hawaii Federal Credit Union has been at this location for the past 45 years and is committed to being a part of this neighborhood and broader community for decades to come. With this perspective in mind, we hope that you find that a 10-year timeline to complete this project is not considered excessive. Again, thank you for this opportunity to respond and wishing all of you a safe, and hopefully dry, weekend! Daryn Daryn Arai Land Use Planning Consultant Mobile: (808) 895-3218 From: Andrews, Jessica <Jessica.Andrews@hawaiicounty.gov> Sent: Wednesday, November 12, 2025 4:31 PM To: Daryn.Arai@outlook.com <Daryn.Arai@outlook.com> Cc: Jackson, Maija <Maija.Jackson@hawaiicounty.gov> Subject: CU Hawaii FCU Rezone & Amendment to Ord 09-44 (PL-REZ-2025-000091 / PL-REZ-2025- 000090) Hi Daryn, We have a question about these rezone applications. Can you expand upon the justification for the requested 10-year time frame? Why does the applicant anticipate the proposed project will take 10 years to complete? Thanks, Jessica JOSH GREEN, M.D. KENNETH S. FINK, M.D, MGA, MPH GOVERNOR OF HAWAII DIRECTOR OF HEALTH KE KIA’AINA O KA MOKU’AINA O HAWAI’I KA LUNA HO’OKELE STATE OF HAWAII DEPARTMENT OF HEALTH P.O. BOX 916 HILO, HAWAII 96721-0916 MEMORANDUM DATE: August 28, 2025 TO: Mr. Jeffrey W. Darrow Planning Director, County of Hawaii FROM: Eric Honda District Environmental Health Program Chief SUBJECT: Change of Zone Application (PL- -REZ-2025-000091) Applicant: CU Hawaiʻi Federal Credit Union) Request: Single-Family Residential – 10,000 Square Feet (RS-10) to Neighborhood Commercial – 10,000 Square Feet (CN-10) Tax Map Key: (3) 2-2-034:045, Waiākea, South Hilo, Hawaiʻi In most cases, the District Health Office will no longer provide individual comments to agencies or project owners to expedite the land use review and process. Agencies, project owners, and their agents should apply Department of Health “Standard Comments” regarding land use to their standard project comments in their submittal. Standard comments can be found on the Land Use Planning Review section of the Department of Health website: https://health.hawaii.gov/epo/landuse/. Contact information for each Branch/Office is available on that website. Note: Agencies and project owners are responsible for adhering to all applicable standard comments and obtaining proper and necessary permits before the commencement of any work. General summary comments have been included for your convenience. However, these comments are not all-inclusive and do not substitute for review of and compliance with all applicable standard comments for the various DOH individual programs. Clean Air Branch 1.All project activities shall comply with the Hawaii Administrative Rules (HAR), Chapters 11-59 and 11-60.1. Jeffrey W. Darrow August 28, 2025 Page 2 of 4 2. Control of Fugitive Dust: You must reasonably control the generation of all airborne, visible fugitive dust and comply with the fugitive dust provisions of HAR §11-60.1-33. Note that activities that occur near existing residences, businesses, public areas, and major thoroughfares exacerbate potential dust concerns. It is recommended that a dust control management plan be developed which identifies and mitigates all activities that may generate airborne and visible fugitive dust and that buffer zones be established wherever possible. 3. Standard comments for the Clean Air Branch are at: https://health.hawaii.gov/epo/landuse/ Clean Water Branch 1. All project activities shall comply with the HAR, Chapters 11-53, 11-54, and 11-55. 1. The following Clean Water Branch website contains information for agencies and/or project owners who are seeking comments regarding environmental compliance for their projects with HAR, Chapters 11-53, 11-54, and 11-55: https://health.hawaii.gov/cwb/clean-water-branch-home- page/cwb- standard-comments/. Hazard Evaluation & Emergency Response Office 1. A Phase I Environmental Site Assessment (ESA) and Phase II Site Investigation should be conducted for projects wherever current or former activities on site may have resulted in releases of hazardous substances, including oil or chemicals. Areas of concern include current and former industrial areas, harbors, airports, and formerly and currently zoned agricultural lands used for growing sugar, pineapple or other agricultural products. 2. Standard comments for the Hazard Evaluation & Emergency Response Office are at: https://health.hawaii.gov/epo/landuse/. Indoor and Radiological Health Branch 1. Project activities shall comply with HAR Chapters 11-39, 11-45, 11-46, 11-501, 11-502, 11-503, and 11-504. 2. Noise may be generated during demolition and/or construction. The applicable maximum permissible sound levels, as stated in Title 11, HAR, Chapter 11-46, “Community Noise Control,” shall not be exceeded unless a noise permit is obtained from the Department of Health. 3. Construction/Demolition Involving Asbestos: If the proposed project includes renovation/demolition activities that may involve asbestos, the applicant should contact the Asbestos and Lead Section of the Branch at https://health.hawaii.gov/irhb/asbestos/. Safe Drinking Water Branch Jeffrey W. Darrow August 28, 2025 Page 3 of 4 1. Agencies and/or project owners are responsible for ensuring environmental compliance for their projects in the areas of 1) Public Water Systems; 2) Underground Injection Control; and 3) Groundwater and Source Water Protection in accordance with HAR Chapters 11-19, 11-20, 11-21, 11-23, 11-23A, and 11- 25. They may be responsible for fulfilling additional requirements related to the Safe Drinking Water program: https://health.hawaii.gov/sdwb/. 2. Standard comments for the Safe Drinking Water Branch can be found at: https://health.hawaii.gov/epo/landuse/. Solid & Hazardous Waste Branch 1. Hazardous Waste Program - The state regulations for hazardous waste and used oil are in HAR Chapters 11-260.1 to 11-279.1. These rules apply to the identification, handling, transportation, storage, and disposal of regulated hazardous waste and used oil. 2. Solid Waste Programs - The laws and regulations are contained in HRS Chapters 339D, 342G, 342H, and 342I, and HAR Chapters 11-58.1 and 11-282. Generators and handlers of solid waste shall ensure proper recycling or disposal at DOH-permitted solid waste management facilities. If possible, waste prevention, reuse, and recycling are preferred options over disposal. The Office of Solid Waste Management also oversees the electronic device recycling and recovery law, the glass advanced disposal fee program, and the deposit beverage container program. 3. Underground Storage Tank Program – The state regulations for underground storage tanks are in HAR Chapter 11-280.1. These rules apply to the design, operation, closure, and release response requirements for underground storage tank systems, including unknown underground tanks identified during construction. 4. Standard comments for the Solid & Hazardous Waste Branch can be found at: https://health.hawaii.gov/epo/landuse/. Wastewater Branch For comments, please email the Wastewater Branch at doh.wwb@doh.hawaii.gov. Sanitation / Local DOH Comments: 1. According to HAR §11-26-35, No person, firm, or corporation shall demolish or clear any structure without first ascertaining the presence or absence of rodents that may endanger public health by dispersal from such premises. Should any such inspection reveal the presence of rodents, the rodents shall be eradicated before demolishing or clearing the structure. A demolition permit is required prior to demolition. Jeffrey W. Darrow August 28, 2025 Page 4 of 4 Other 1. CDC - Healthy Places - Healthy Community Design Checklist Toolkit recommends that state and county planning departments, developers, planners, engineers, and other interested parties apply these principles when planning or reviewing new developments or redevelopment projects. 2. If new information is found or changes are made to your submittal, DOH reserves the right to implement appropriate environmental health restrictions as required. Should there be any questions on this matter, please contact the Department of Health, Hawaii District Health Office, at (808) 933-0917. C.Kimo Alameda, Ph.D.Mayor William V. Brilhante Jr. Managing Director Wesley R. Segawa Director Craig Kawaguchi Deputy Director County of Hawai'i DEPARTMENT OF ENVIRONMENTAL MANAGEMENT 345 Kekuanao'a Street, Suite 41 • Hilo, Hawai'i 96720 • cohdem@hawaiicounty.gov Ph: (808) 961-8083 • Fax: (808) 961-8086 MEMORANDUM Date To From Subject October 2, 2025 Jeffrey Darrow, Director Planning Department Wesley R. Segawa, Department of Envi PL-REZ2025-00009 l The Solid Waste Division has reviewed the subject application and offers the following comments and/or recommendations (contact the Solid Waste Division for details): (X)No comments. ( ) Submit Solid Waste Management Plan in accordance with attached guidelines. ( ) Existing Solid Waste Management Plan shall be followed. Provide updates to the department on the status of the project. ( ) Other: __________________________ _ Applicant is reminded of the following requirements/restrictions: (X)Commercial operations, State and Federal agencies, religious entities and non-profit organizationsmay not use any of the 21 transfer stations for disposal. (X)Acceptable construction and demolition waste is allowed only at the West Hawai'i SanitaryLandfill. (X)Green waste is allowed only at the West Hawai'i Organics Facility or East Hawai'i OrganicsFacility, or other suitable diversion programs. (X)Aggregates and any other construction/demolition waste should be responsibly reused to itsfullest extent.(X)Ample and equal room should be provided for rubbish and recycling. The Wastewater Division has reviewed the subject application and offers the following comments and/or recommendations (contact the Wastewater Division for details): IZI No Comments □The proposed subdivision is accessible to a sewer. The applicant is required to connect all existingand proposed structures to the public sewer in accordance with Section 21-6 and Division 2 of theHawaii County Code. Hawai 'i County is an Equal Opportunity Provider and Employer TO: DEPARTMENT OF WATER SUPPLY • COUNTY OF HAWAl'I 345 KEKUANAO'A STREET, SUITE 20 • HILO, HAWAl'I 96720 TELEPHONE (808) 961-8050 • FAX (808) 961-8657 Mr. Jeffrey Darrow, Director Planning Department October 14, 2025 REC'D HAND DELIVERED FROM: Keith K. Okamoto, Manager-Chief Engineer SUBJECT: Change of Zone Application (PL-REZ-2025-000091) Applicant -CU Hawai'i Federal Credit Union Request -Single-Family Residential -10,000 Square Feet (RS-10) to Neighborhood Commercial -10,000 Square Feet (CN-10) Tax Map Key 2-2-034:045 Change of Zone Amendment Application (PL-REZ-2025-000090) Amendment to Change of Zone Ordinance No. 09-44 (Amend REZ-2008-000088) Applicant -CU Hawai'i Federal Credit Union Request -Amendment to Condition C (Complete Project), Condition D (Dedication of Road Widening) to Remove Roadway Improvements, and Deletion of Condition E (Roadway Improvements) to Remove Requirement of Curb, Gutter and Sidewalk Improvements Tax Map Key 2-2-034:036 We have reviewed the subject application and have the following comments and conditions. Please be informed that there is: •an existing 8-inch waterline within Manono Street fronting the subject Parcel 036 with one (1)existing service (Account No. 100-45700),•an existing 6-inch waterline within Hinano Street fronting subject Parcel 045 with two (2) existing services (Account Nos. 100-34200 and 100-34300), and•each of the three (3) services had a 5/8-inch meter connected, which is limited to an averagedaily usage of 400 gallons each for a total of 1,200 gallons. Based upon the applicant's plan to consolidate the two (2) parcels into one (1), the Department has no objection to the proposed Change of Zone application and amendment subject to the applicant understanding and accepting the following conditions: ... Water; Our <J,1ost <Precious <R,§source ... 1{,a Wai }l. 1{,ane ... The Department of Water Supply is an Equal Opportunity provider and employer. Mr. Jeffrey Darrow, Director Page 2 October 14, 2025 1. The Department requests that the applicant submit estimated maximum daily water usage calculations, prepared by a professional engineer licensed in the State of Hawai`i, for review and approval. The water usage calculations should include the estimated peak flow in gallons, per minute, and the total estimated maximum daily water usage in gallons per day, including all irrigation use. 2. Based on the water usage calculations provided above, if a 5/8-inch meter cannot accommodate the estimated demand, a larger or additional meter will need to be installed and remittance of the prevailing facilities charge, which is subject to change, may be required. If a 5/8-inch meter can accommodate the estimated demand,then the applicant may utilize a 5/8-inch meter. 3. Existing service laterals on Hinano Street must be cut and plugged at the main. 4. The proposed zoning will require the installation of a reduced pressure type backflow prevention assembly by a licensed contractor, within five (5) feet of the meter on private property. If a larger or additional meter is required, a backflow prevention assembly will also be required for that meter. The installation of the backflow prevention assembly(s)must be inspected and approved by the Department before commencement of the water service. 5.Subject to other agencies'requirements to construct improvements within the road right-of-way fronting the property affected by the proposed development,the applicant shall be responsible for the relocation and adjustment of the Department's affected water system facilities, should they be necessary. 6. Please be informed that the existing 8-inch water line within Manono Street is looped and therefore adequate to provide 2,000 gallons per minute for fire protection, as required per the Department's Water System Standards. Should there be any questions, please contact Ms. Robyn Matsumoto of our Water Resources and Planning Branch at(808) 961-8070, extension 255. Sincerely yours, V16/(A/04-C Keith K. Okamoto, P.E. Manager-Chief Engineer RM:dfg copy-Ms. Rebecca Choi, CU Hawaii Federal Credit Union Mr. Daryn Arai, Planning Consultant 1 Andrews, Jessica From:Cook, Amy A Sent:Wednesday, November 19, 2025 9:23 AM To:Andrews, Jessica Cc:Vierra, Preston S. Subject:RE: Request for Comments | PL-REZ-2025-000091 | CU Hawaii Federal Credit Union | TMK: (3) 2-2-034:045 Attachments:PL-REZ-2025-000090 Comments_REV.pdf; PL-REZ-2025-000091 Comments_REV.pdf The county has plans to improve that section of Manono, I think it’s slated for STP funding in 2029. Preston Vierra is the engineer on that project, I’ve included him. As far as I know, we’re open to the applicant paying for the improvements fronting their property and the work being done by the county. I’ve revised my comments for both applications, see attached. Amy From: Andrews, Jessica <Jessica.Andrews@hawaiicounty.gov> Sent: Tuesday, November 18, 2025 10:43 AM To: Cook, Amy A <AmyA.Cook@hawaiicounty.gov> Subject: RE: Request for Comments | PL-REZ-2025-000091 | CU Hawaii Federal Credit Union | TMK: (3) 2-2-034:045 One more question for you Amy: Does the County have a planned project to improve the section of Manono St, with curb, gutter, sidewalk, fronting TMK 2-2-034-036? If so, what is the projected date for constructing these improvements? Asking since the applicant asked about providing a pro-rata share of the improvements if the County is doing this project, as an alternative to having the applicant do the improvements themselves. From: Andrews, Jessica <Jessica.Andrews@hawaiicounty.gov> Sent: Tuesday, November 18, 2025 10:11 AM To: Cook, Amy A <AmyA.Cook@hawaiicounty.gov> Subject: RE: Request for Comments | PL-REZ-2025-000091 | CU Hawaii Federal Credit Union | TMK: (3) 2-2-034:045 Hi Amy, Thank you for providing comments on these applications. We’ve noted the recommendation regarding the request to amend ORD 09-44. Does DPW-Eng have any comments on the proposed new change of zone for TMK 2-2-034:045 (PL-REZ-2025- 000091)? Would there be any recommended roadway or shoulder improvements for Hinano Street? Thanks, Jessica From: Cook, Amy A <AmyA.Cook@hawaiicounty.gov> Sent: Monday, November 17, 2025 4:41 PM To: Andrews, Jessica <Jessica.Andrews@hawaiicounty.gov>; Planning Internet Mail <planning@hawaiicounty.gov> 2 Cc: Azevedo, Neil <Neil.Azevedo@hawaiicounty.gov>; Holzman-Escareno, Juliana <Juliana.Holzman- Escareno@hawaiicounty.gov>; Vierra, Preston S. <Preston.Vierra@hawaiicounty.gov> Subject: RE: Request for Comments | PL-REZ-2025-000091 | CU Hawaii Federal Credit Union | TMK: (3) 2-2-034:045 See attached. From: Cook, Amy A Sent: Monday, November 17, 2025 4:23 PM To: Andrews, Jessica <Jessica.Andrews@hawaiicounty.gov>; Planning Internet Mail <planning@hawaiicounty.gov> Cc: Azevedo, Neil <Neil.Azevedo@hawaiicounty.gov>; Holzman-Escareno, Juliana <Juliana.Holzman- Escareno@hawaiicounty.gov>; Vierra, Preston S. <Preston.Vierra@hawaiicounty.gov> Subject: RE: Request for Comments | PL-REZ-2025-000091 | CU Hawaii Federal Credit Union | TMK: (3) 2-2-034:045 See attached. From: Andrews, Jessica <Jessica.Andrews@hawaiicounty.gov> Sent: Monday, November 17, 2025 11:46 AM To: Cook, Amy A <AmyA.Cook@hawaiicounty.gov> Subject: FW: Request for Comments | PL-REZ-2025-000091 | CU Hawaii Federal Credit Union | TMK: (3) 2-2-034:045 Importance: High Hi Amy, Please see below for the second application for the CU Hawaii FCU project. Thanks, Jessica From: Miller, Shantel <Shantel.Miller@hawaiicounty.gov> Sent: Tuesday, August 26, 2025 3:25 PM To: DPW Eng <dpweng@hawaiicounty.gov>; DPW Traffic <dpwtrf@hawaiicounty.gov>; cohdem <cohdem@hawaiicounty.gov>; DLNR - Engineering Division <DLNR.ENGR@hawaii.gov>; DWS (dwsengineeringreview@hawaiidws.org) <dwsengineeringreview@hawaiidws.org>; HPD ONE <HCPDONE@hawaiicounty.gov>; DLNR-Land (dlnr.land@hawaii.gov) <dlnr.land@hawaii.gov>; OHCD Development Section <ohcddev@hawaiicounty.gov>; Baybayan, Clinton <Clinton.Baybayan@hawaiicounty.gov>; Henderson, Royd <Royd.Henderson@hawaiicounty.gov>; Kawasaki, Edward <Edward.Kawasaki@hawaiicounty.gov>; Jo, Keita <Keita.Jo@hawaiicounty.gov>; Miura, Lisa <Lisa.Miura@hawaiicounty.gov>; RPT Mapping <rptmapping@hawaiicounty.gov>; Kato, Norren <Norren.Kato@hawaiicounty.gov>; Santiago, Hans <Hans.Santiago@hawaiicounty.gov>; DOH Wastewater Branch <doh.wwb@doh.hawaii.gov>; Honda, Eric <Eric.Honda@doh.hawaii.gov>; Michael Une <michael.une@doh.hawaii.gov>; Costa, Kehaulani <kcosta@hawaiicounty.gov>; Erickson, Neil C. <NeilC.Erickson@hawaiicounty.gov>; Morrison, Bethany J <Bethany.J.Morrison@hawaiicounty.gov>; Palma, Maryam <Maryam.Palma@hawaiicounty.gov>; Chintan Poudel <chintan.poudel@doh.hawaii.gov>; Dane Hiromasa <dane.hiromasa@doh.hawaii.gov> Cc: Arai, Daryn <daryn.arai@outlook.com>; Andrews, Jessica <Jessica.Andrews@hawaiicounty.gov>; Dacayanan, Melissa <Melissa.Dacayanan@hawaiicounty.gov> Subject: Request for Comments | PL-REZ-2025-000091 | CU Hawaii Federal Credit Union | TMK: (3) 2-2-034:045 Importance: High Good Afternoon, 3 Please see the attached memo requesting your review and comments on the subject matter. No hard copy will be provided. You may also view the application packet at the following link: Application Packet - CU Hawaii Federal Credit Union (PL-REZ-2025-000091).pdf After opening the link, click on the bookmark icon to navigate through the individual documents. We kindly ask that you submit your comments to planning@hawaiicounty.gov by Thursday, September 25, 2025. If you have any questions, please feel free to contact Planner Jessica Andrews (cc’d herein) at (808) 961-8155. Here's the aƩachment as a link for your review: Add your comments and collaborate with others in real Ɵme. You don't need to download Acrobat or sign up to access the file. Mahalo, Shan Shan (Shantel) Miller Planning Division StaƯ County of Hawaii – Planning Department 101 Pauahi Street, Suite 3 Hilo, Hawaii 96720 Direct: (808)961-8148 / Main: (808)961-8288 Email: shantel.miller@hawaiicounty.gov Confidentiality Notice: This e-mail message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and/or privileged information. Any review, use, disclosure, or distribution by unintended recipients is prohibited. If you are not the intended recipient, please contact the sender by reply e-mail and destroy all copies of the original message. Hawaiʻi County is an Equal Opportunity Provider and Employer. County of Hawaii is an Equal Opportunity Provider and Employer DEPARTMENT OF PUBLIC WORKS COUNTY OF HAWAII HILO, HAWAII DATE: November 17, 2025 Memorandum TO: Jeffrey W. Darrow, Planning Director FROM: Department of Public Works, Engineering Division SUBJECT: CHANGE OF ZONE APPLICATION (PL-REZ-2025-000091) Request: Single Family Residential – 10,000 Square Feet (RS-10) to Neighborhood Commercial – 10,000 Square Feet (CN-10) Applicant: CU Hawaii Federal Credit Union TMK: 2-2-034:045 We have reviewed the subject request dated August 8, 2025, and provide the following comments for your consideration: 1.Recommend that the request to delete shoulder improvements requirements bedenied. Multiple properties in the area have built or are in the process of building the same shoulder improvements described in ORD 09-44. The improvements are a reasonable requirement for the proposed use. Questions may be referred to Amy Cook at 961-8695. Daryn Arai Land Use Planning Consultant P.O. BOX 4501, HILO HAWAII 96720 PHONE: (808) 895-3218 EMAIL: DARYN ARAI@OUTLOOK.COM October 28, 2025 Mr. Jeffrey Darrow, Director County of Hawaiʻi Planning Department 101 Pauahi Street, Suite 3 Hilo, HI 96720 Dear Director Darrow: Subject: Response to Agencies’ comments regarding Change of Zone Applications PL-REZ-2025-000090 & 091 Applicant: CU Hawaiʻi Federal Credit Union Tax Map Keys: (3) 2-2-034:036 & 045, Waiākea, South Hilo, Hawaiʻi This letter will respond to comments received, to date, from consulting agencies that have reviewed the above-described requests. Given the similarities of the comments received across both applications and their effect on the proposed project that involves the construction of a new member-facing credit union branch facility across the two affected properties, we hope you accept this consolidated response. Department of Health - memos dated August 28, 2025 The Applicant acknowledges the comments offered by the Department of Health regarding standards and requirements relating to dust control, water quality, mitigating excessive noise and the effects of hazardous substances, wastewater and solid waste. As noted within the applications, the proposed use of the affected properties to accommodate the construction of a new member-facing credit union branch facility and associated parking area will adhere to all applicable requirements of the Department of Health as well as applicable requirements of the County as it relates to proper disposal of solid waste material at appropriate County-managed facilities, connection to the County’s sewer system and installation of any required drainage systems. Given the nature of financial institutions, one can expect reasonable noise levels primarily limited to typical traffic-related sounds and very little operational noises. Hours of operations that will not extend into late evening hours will also mitigate any potential adverse noise effects upon adjoining properties. Mr. Jeffrey Darrow, Director County of Hawaiʻi Planning Department Page 2 of 3 October 28, 2025 Department of Environmental Management - memo dated October 2, 2025 We note that the Wastewater Division had no comments regarding the applications as the proposed project will connect to the County’s sewer system. The Applicant also wishes to emphasize that any solid waste generated during construction, operations and maintenance activities related to the proposed credit union facility will be properly disposed of at the appropriate county waste disposal or recycling facility, as it currently does for its existing branch operations located adjacent to the subject properties. Police Department - memo dated September 2, 2025 The Applicant notes that the Police Department did not anticipate any significant impact to traffic and/or public safety concerns regarding the subject applications. Department of Water Supply – Letter dated October 14, 2025 The Applicant appreciates the Department of Water Supply (DWS) confirming water service to the Manono Street property (Parcel 036) via a 5/8-inch water meter (Account No. 100- 45700) that is connected to an existing 8-inch waterline within Manono Street and two 5/8- inch meters (Account Nos. 100-34200 and 100-34300) servicing the Hinano Street property (Parcel 045) that is connected to an existing 6-inch waterline within Hinano Street, all of which individually limited to an average daily usage of 400 gallons each for a total of 1,200 gallons. The Applicant understands that DWS has no objection to the proposed Change of Zone application for Parcel 045 and the amendment to the existing zoning ordinance affecting Parcel 036 in support of a CN-10 zoning and consolidation of both properties and accepts that the Applicant must: 1.submit for review and approval by DWS of estimated maximum daily water usage calculations prepared by a professional engineer licensed in the State of Hawaiʻi; 2.provide a larger or additional water meter to accommodate the estimated demand if deemed necessary based on the DWS-approved water usage calculations, which may also require remittance of the prevailing facilities charge, which is subject to change; 3.installation of a reduced pressure type backflow prevention assembly by a licensed contractor in a location and in a manner as approved by DWS; and 4.relocate and adjust affected DWS water system facilities, should they be necessary, if they will be affected by any required roadway improvements fronting the affected properties. Mr. Jeffrey Darrow, Director County of Hawaiʻi Planning Department Page 3 of 3 October 28, 2025 The Applicant does request that the two (2) existing service laterals on Hinano Street only be cut and plugged if these services will be abandoned by the Applicant based on the approval by DWS of the estimated water demand calculations that has yet to be prepared by the Applicant. The Applicant wishes to avoid foreclosing any reasonable water system design options by its consulting engineer. We hope that we have adequately responded to comments offered by the respective agencies. Please feel free to contact me should there be any questions or need for additional information. Sincerely, DARYN ARAI Land Use Planning Consultant cc via email: CU Hawaiʻi Federal Credit Union