HomeMy WebLinkAbout2026-04-19 Renee B. Lahti TestimonyFrom:Renee Lahti
To:Planning LPC Testimony
Cc:Renee Lahti
Subject:Written Testimony — PL-SMA-2026-000087 / SMA 07-019 — April 23, 2026 Hearing — Agenda Item No. 2
Date:Sunday, April 19, 2026 8:43:02 PM
Attachments:SiteM_Written_Testimony_19-Apr-2026_FINAL.pdf
Aloha,
Please accept the attached written testimony submitted in lieu of in-person attendance
at the April 23, 2026 Leeward Planning Commission hearing for the following matter:
Application No.: PL-SMA-2026-000087
Permit: SMA Use Permit No. 07-019 (Amendment)
Agenda Item: No. 2
Applicant: DHL Mahi Site M LLC & DHL Mahi PropCo LLC
Submitted by:
Renée B. Lahti
(Full-time resident of Kamuela, Hawai'i)
66-1463 E Ko Uka Place, Kamuela, HI 96743
Owner: Unit #413, The Villages at Mauna Lani
68-1025 North Kaniku Drive, Kamuela, Hawai'i 96743
Email: Renee.Lahti@LineiKokua.com
Attachment: SiteM_Written_Testimony_19-Apr-2026_FINAL.pdf
This testimony addresses Application PL-SMA-2026-000087, the request to amend SMA
Use Permit No. 07-019 for a 10-year time extension to commence construction, reduce
density from 1,207 to 925 units, remove the golf course and conference center, and
construct an emergency evacuation road at the Mauna Lani Resort, South Kohala,
Hawai'i.
All facts cited in the attached document are drawn from public records, the Planning
Department Board Packet for PL-SMA-2026-000087, agency correspondence, contested
case petitions filed with the Planning Department, community discussion, and owner
research.
Please confirm receipt of this email and the attached testimony at your earliest
convenience. I would appreciate written confirmation that this submission has been
received and will be included in the permanent record for Application PL-SMA-2026-
000087.
Mahalo for your time and for the Commission's service to the community.
Respectfully submitted,
Renée
Renée B. Lahti
Owner, Unit #413 | The Villages at Mauna Lani
Kamuela, Hawai'i
Renee.Lahti@LineiKokua.com
Date submitted: April 19, 2026
Principal, Linei Kōkua Advisory LLC
https://linktr.ee/reneeblahti
Advisory Board Centre
Certified Executive Chair Advisor
linkedin.com/in/reneeblahti
This message contains information which may be confidential. Unless you are the addressee (or authorized to
receive for the addressee), you may not use, copy or disclose to anyone the message or any information
contained in the message. If you have received the message in error, please advise the sender by sending a reply
e-mail and delete the message. Linei Kōkua Advisory LLC.
Page 1 of 9
SITE M SMA PERMIT AMENDMENT & 10-YEAR EXTENSION
Written Testimony in Lieu of In-Person Attendance
Submitted by: Renée B. Lahti, Owner, The Villages at Mauna Lani (VML) Unit #413
Leeward Planning Commission Hearing — April 23, 2026
Application No. PL-SMA-2026-000087 | SMA Use Permit No. 07-019
The spirit of this testimony is that doing nothing is as poor an option for the island of Hawaiʻi as
doing something the wrong way. This community deserves development that is worthy of the land
it is built upon.
“He aliʻi ka ʻāina; he kauā ke kanaka.”
“The land is chief; man is its servant.” — Mary Kawena Pukui, ʻŌlelo Noʻeau No. 531
About the Author
Renée B. Lahti has owned VML Unit #413 since 2008 and has been a full-time resident of
Waimea, Hawaiʻi since 2017. A Global Technology Executive with 25+ years of experience
assessing complex systems, risk, and governance, she brings that same analytical lens to
this testimony. She values cultural humility and a strong pay-it-forward mindset—that the
individual, the organization, and the broader community all benefit. She is also an active
CERT (Community Emergency Response Team) member in South Kohala, with firsthand
experience of the district’s emergency response limitations.
I. Position Statement
The 10-year extension of SMA Use Permit No. 07-019 for Site M should not be granted in its
current form. The developer, DHL Mahi Site M LLC (a Special Purpose Vehicle of ProspectHill
Group, San Francisco), has presented no demonstrable evidence that it can bear the fully
loaded cost to implement and operate this project without negative impact on the existing
communities it sits within and depends upon.
The burden of proof rests entirely with the developer. Until that burden is met with current facts,
verified studies, and enforceable conditions—not promises—the Commission should deny the
extension.
A note on development intent: Site M is currently a vacant dry lava field and a fire hazard.
Development, done correctly, is not opposed. The position here is that correct development
requires the project to be, at minimum, neutral in its impact on surrounding communities, and
ideally, in the Hawaiian tradition of stewardship, to leave those communities better than it found
them.
II. Threshold Conditions for Consideration
The following conditions should be satisfied, with current independently verified evidence,
before any extension is considered:
Page 2 of 9
1. All infrastructure studies should be refreshed to 2026 conditions. The original SMA
permit was issued in 2007, nearly 20 years ago. Traffic volumes, water demand, sewer
capacity, environmental conditions, wildfire risk, and emergency evacuation
requirements have all materially changed. Proceeding on stale studies is not consistent
with the intent of HRS §205A.
2. The developer should demonstrate full financial capacity to bear all infrastructure costs.
No infrastructure improvement costs (on-site or off-site) should be passed to the MLRA
or any of its sub-communities. The developer holds a $275 million mortgage from
Goldman Sachs (February 2025) encumbering approximately 750 acres, including state-
leased parcels containing archaeological sites and fishpond buffers. Evidence that this
debt does not constrain the developer’s ability to fund required infrastructure upgrades
would provide meaningful assurance to the Commission.
3. Enforceable project gates should be established as binding permit conditions. Conditions
should be sequenced as construction gates, not aspirational guidelines. Precedent
exists: the original SMA permit required shuttle service as a condition of occupancy
(VML Agreement, Section 8). That model should be applied systematically to all material
conditions, with bonding requirements prior to the first building permit.
III. Factual Context — Issue by Issue
A. Traffic & Circulation
Existing Conditions and the Site M Multiplier Effect
An administrative zoning swap redirected approximately two-thirds of Mauna Lani Resort traffic
onto North Kaniku Drive. This imbalance exists today. Site M amplifies and permanently locks in
this circulation pattern.
• Site M at full build-out adds an estimated 3,660 additional vehicle trips per day (360
hotel rooms x 6 trips/day + 500 residential units x 3 trips/day) directly onto North Kaniku
Drive.
• The primary entrance to The Villages at Mauna Lani sits approximately 80 feet from the
Foodland/shopping center entrance, already one of the most heavily used intersections
in the resort. Increased queuing in this corridor raises the probability of rear-end and
turning collisions.
• Emergency vehicle access to The Villages is affected when the 80-foot corridor between
the shopping center entrance and the primary VML entrance is congested or blocked.
• Pedestrian, cyclist, and golf cart safety on North Kaniku Drive is already constrained.
Higher traffic volumes will further limit non-vehicular use of the road.
• Living on a major arterial reduces residential property values by approximately 10%. For
a typical VML unit, this represents $200,000+ in lost value, or roughly $25 million across
the 130-unit community.
Note: The Planning Director’s Recommendation acknowledges Condition 10 (turn lanes and
traffic signal at North Kaniku/Hoʻohana) but imposes no timeline for completion and requires no
bonding prior to permit issuance. Traffic improvements should be bonded and completed before
the first certificate of occupancy.
Page 3 of 9
Recommendations — Traffic
• Commission consideration of a full independent traffic circulation study reflecting 2026
conditions, rather than the 2007 baseline.
• Disclosure of all traffic studies and trip generation assumptions used to justify the
original zoning swap and SMA approval.
• Evaluation of corrective measures—such as design changes that rebalance traffic
distribution across the roundabout—before any extension is granted.
• Condition 10 traffic improvements should be bonded and substantially completed prior to
first certificate of occupancy.
B. Water Supply
The Mauna Lani Resort area already experiences recurring mandatory and voluntary water
reduction events due to well pump failures. Adding 925 units to a system already under stress
will increase the frequency and severity of these reductions, with costs borne by current
residents rather than the developer.
A critical water allocation timeline exists: the tri-party agreement among Mauna Lani Service,
Inc. (now DHL Mahi PropCo LLC), Mauna Kea Properties, and the County Water Board
provides that all unused water allocations revert to DWS on May 26, 2029. Condition 23 of the
Planning Director’s Recommendation acknowledges this but does not require a formal water
agreement amendment to be in place before the permit is issued.
The water capacity study cited by the Planning Director (Akinaka & Associates, July 2025) was
commissioned by the developer, not by an independent agency. It projects a 0.693 MGD
surplus. This figure would benefit from independent verification before serving as the basis for a
10-year development commitment.
Recommendations — Water
• An independent water capacity study, modeling peak demand scenarios under full Site
M build-out.
• The tri-party water agreement amendment should be in executed form, with Water Board
approval, before the permit becomes effective.
• The developer should fund any required upgrades to water supply infrastructure as a
bonded condition prior to first building permit.
C. Wastewater / Sewer
The Mauna Lani Resort disposes of treated wastewater via Underground Injection Control (UIC)
wells near the coastline. The Planning Director’s Recommendation states that wastewater
infrastructure is adequate based on “planned infrastructure improvements.” HAWC confirmed in
its August 2025 correspondence that filtration capacity upgrades will be required before
additional flows can be accommodated. These upgrades do not currently exist. The
Commission should require these upgrades to be funded and bonded as a condition of permit
issuance rather than deferred to an undefined future stage of development.
Page 4 of 9
Recommendations — Wastewater
• A current wastewater capacity study including peak load scenarios and UIC well
proximity impact assessment.
• An updated drainage study accounting for the removal of the golf course buffer, per HRS
§205A-26(2).
• HAWC filtration upgrades should be funded, designed, and bonded as a condition of
permit issuance.
• The developer should fund all wastewater infrastructure upgrades with no cost passed to
the MLRA or sub-communities.
D. Beach Club & Shared Amenities
The Beach Club parking lot currently operates at or above capacity during peak periods. Adding
approximately 374 hotel guests and 551 residential owners to the Beach Club user pool—a
roughly 75% increase—without a corresponding expansion of parking, shade, and food service
infrastructure warrants careful scrutiny.
The original SMA permit and the VML Agreement (Section 8) required Site M to provide shuttle
service from the hotel to beaches prior to any certificate of occupancy, specifically to mitigate
Beach Club traffic impacts. This condition should be explicitly confirmed, updated to reflect the
revised project scope, and enforced with bonding.
The Nāpua restaurant and Shops at Mauna Lani (including Foodland) are already operating
near capacity during holiday periods. These community-serving facilities were not designed to
absorb a 23%+ increase in resort density.
E. Emergency Services & Regional Infrastructure
Mauna Lani Resort is not a self-contained township. It depends entirely on the broader South
Kohala District for fire, police, medical response, hospital services, evacuation routes, and fuel
supply.
Emergency evacuation from the resort area is already critically constrained. During a 2025
tsunami evacuation, resort residents evacuating to inland areas (e.g., Waimea, which is outside
the tsunami inundation zone) experienced severe road stress on existing evacuation corridors.
This was observed firsthand by the author of this testimony, who serves as a CERT member
deployable in South Kohala.
That evacuation was not a high-impact event, yet it exposed serious systemic gaps. A formal
post-incident debrief was conducted and the lessons learned were documented in a letter sent
on August 3, 2025 to Governor Josh Green, State Senator Tim Richards, and State
Representative David Tarnas. That letter described critical resource shortages, coordination
failures, and infrastructure constraints that materially hampered the ability of emergency
responders to support evacuees effectively. It is essential context that this letter was written and
transmitted before Site M was even under consideration as a source of additional evacuees.
The Commission is being asked to approve 925 new units into a system whose deficiencies
were already formally documented and reported to state leadership.
The proposed emergency evacuation road is listed in the Planning Director’s Recommendation
as a strengthened condition. However, it is not a new benefit—it is a binding requirement of the
original 2008 master plan that the developer has failed to construct in 18 years. Condition 6 of
Page 5 of 9
the amended permit properly requires the road to be constructed before any Site M construction
begins. This sequencing should be confirmed as enforceable and bonded.
Wildfire risk in the South Kohala District has materially increased since 2007. The Mauna Lani
area is surrounded by dry lava fields, including Site M itself. No updated wildfire risk
assessment has been presented.
Recommendations — Emergency & Regional Infrastructure
• Confirm that the emergency evacuation road must be bonded and completed before any
Site M construction begins, as required by Condition 6.
• A current South Kohala emergency services capacity assessment, including fire, police,
medical response, and evacuation route modeling under full Site M build-out.
• A current wildfire risk assessment and mitigation plan for the Site M parcel and adjacent
areas.
• The developer should fund any required upgrades to regional emergency infrastructure
serving the expanded resort population.
F. Archaeological & Environmental Compliance
Archaeological Inventory Surveys for the Site M area date to 2007. The State Historic
Preservation Division (SHPD) has not yet responded to the current amendment application. The
Planning Director’s Recommendation acknowledges this openly, yet recommends approval
anyway. Under HRS §205A-26(2)(4), the Commission must make specific factual findings that
the development will “reasonably protect native Hawaiian rights.” Those findings are not
possible without SHPD’s completed review.
The Ka Paʻakai O Ka ʻĀina analysis prepared by ASM Affiliates (August 2025) acknowledges
that the 2007 Cultural Impact Assessment was incomplete and that the area contains uncharted
lava tubes, potential burials, ancestral trails, and wahi pana that were not documented in earlier
surveys.
The removal of the golf course from the project eliminates a pervious buffer that protected the
Mauna Lani fishponds from stormwater runoff. No updated environmental impact analysis has
been provided for this change.
Recommendations — Archaeological & Environmental
• The extension should not be approved until SHPD has completed its review and
provided a written response to the amendment application.
• Comprehensive supplemental AIS surveys incorporating modern subsurface detection
methods should be completed before any ground disturbance.
• An updated drainage and environmental impact analysis addressing the removal of the
golf course buffer and its effect on the Mauna Lani fishponds.
Page 6 of 9
IV. Developer History and Project Context
DHL Mahi Site M LLC is a Special Purpose Vehicle of ProspectHill Group (San Francisco).
ProspectHill acquired the Mauna Lani Resort in 2017. Its principals are the same development
team responsible for Hualālai and Kūkiʻo. This history provides useful context:
• Makaiwa Bay Moorings (2024): ProspectHill/DHL proposed offshore yacht moorings in
Makaiwa Bay. The Board of Land and Natural Resources deferred the proposal
indefinitely following over 100 pieces of written public testimony. This demonstrates that
public testimony directly influences this developer’s project scope.
• Kūkiʻo Public Access: The development provides 28 public parking stalls as required
under the 1995 PASH ruling, but the operational pass system has been challenged as a
practical barrier to genuine public beach access.
• Hualālai Marine Stewardship: Under pressure from cultural practitioners, this developer
accepted a 10-year fishing ban for local reef areas as a binding condition—establishing
that firm environmental conditions are achievable when the community demands them.
• Non-performance on the original permit: The developer did not build under the original
SMA permit despite having more than adequate time. Any extension granted should
carry substantially stronger and more enforceable conditions than the original permit.
V. MLRA Governance Context
The MLRA (Mauna Lani Resort Association) governs all 17 residential communities within the
resort. Because Auberge/DHL Mahi Opco LLC is the operational entity of the same developer
family seeking the Site M extension, the MLRA may have a structural tension between
representing developer interests and representing residential homeowner interests in this
matter.
All affected residential sub-communities, not just The Villages, would benefit from the
opportunity to be heard independently. A coordinated multi-community position would carry
substantially greater weight before the Planning Commission and the County Council.
VI. Summary of Recommendations to the Commission
In the spirit of constructive engagement rather than outright opposition, the following actions are
respectfully submitted for the Commission’s consideration:
1. Deny the extension in its current form, or defer action pending the completion of
current, independent infrastructure studies and SHPD review.
2. Require independent current studies on: traffic/circulation, water supply, wastewater
capacity, emergency services capacity, wildfire risk, archaeological resources, and
coastal/fishpond environmental impact.
3. Confirm that the emergency evacuation road must be bonded and completed before
any Site M construction begins—it is a pre-existing obligation, not a new benefit.
Page 7 of 9
4. Require financial disclosure: the developer should demonstrate that the $275 million
Goldman Sachs mortgage does not constrain its ability to fund infrastructure
obligations.
5. Establish enforceable construction gates: each infrastructure condition should be
satisfied and bonded before the corresponding permit milestone is reached.
6. Hold approval until SHPD review is complete, as required by HRS §205A-26(2)(4).
7. Ensure that all 17 MLRA residential communities have been properly notified and
given the opportunity to be heard.
VII. Review of the Planning Director’s Recommendation
Having reviewed the Planning Director’s preliminary recommendation (PL-SMA-2026-000087), I
appreciate the care taken to strengthen several permit conditions from the original 2008
approval. This section summarizes where my analysis is aligned with the recommendation and
where I respectfully see important gaps that the Commission should address before acting.
A. Where I Agree with the Planning Director
Points of Alignment
• Condition 6 now requires the emergency evacuation road to be physically constructed
before any Site M construction begins. This is meaningfully stronger than the original permit
language and correctly sequences a long-deferred community safety obligation.
• Condition 10 requires turn lanes and a traffic signal at North Kaniku Drive and Hoʻohana
Street. This directly addresses the most hazardous intersection in the resort corridor and
reflects concerns raised by VML residents.
• Condition 23 triggers a water service amendment requirement if construction does not
commence before May 26, 2029, acknowledging the DWS water allocation reversion
deadline.
• The 23% overall density reduction and elimination of the golf course and conference
center represent a more modest footprint than the original approval, which is a meaningful
improvement.
B. Topics Requiring Further Analysis Before Approval
Critical Gap: SHPD Has Not Responded
The recommendation openly acknowledges that SHPD has not provided a response. Under
HRS §205A-26(2)(4), the Commission must make specific factual findings about the
protection of native Hawaiian rights. Those findings cannot be made without SHPD’s
completed review. Proceeding without that response exposes any approval to legal
challenge.
Page 8 of 9
Topic1: Water -The Developer’s Own Study Is Not Independent Verification
The recommendation relies on a water study prepared by Akinaka & Associates on behalf of the
developer, projecting a 0.693 MGD surplus. I respect the Planning Director’s reliance on
available data, but I believe the Commission should require independent verification of this
figure before treating it as the basis for a decade-long development commitment. The stakes—
for existing resort residents who already experience recurring water restriction events—are too
high to leave to a single developer-commissioned analysis.
Topic 2: Wastewater - “Planned” Capacity Is Not Existing Capacity
The recommendation states that wastewater infrastructure is adequate based on “planned
infrastructure improvements.” HAWC’s own August 2025 correspondence confirms that filtration
upgrades will be required. These upgrades do not exist today. I respectfully suggest the
Commission distinguish between capacity that exists and capacity that is planned—and require
the latter to be funded and bonded before the permit is effective.
Topic 3: Traffic - Condition 10 Needs a Timeline and a Bond
I agree that Condition 10 is the right requirement. My concern is that the recommendation
contains no deadline and no bonding mechanism. Without a performance bond, a condition that
is not met before permitting cannot be enforced after the fact. I would ask the Commission to
add a bonding requirement and a completion deadline tied to the certificate of occupancy.
Topic 4: The Thirty-Year Construction Window Deserves Explanation
The original 2008 permit required completion in 10 years. The proposed conditions allow 10
years to commence plus 20 years to complete—a potential 30-year window. I understand the
rationale for flexibility on a large project, but I believe the Commission should explain on the
record why this extraordinary accommodation is in the community’s interest, and what happens
if the developer does not commence within the 10-year window.
There is a broader principle at stake here. The original 2008 permit granted 10 years to
complete construction. Nearly 18 years later, no construction has commenced. The proposed
amendment responds to that non-performance by granting an additional 10 years to start, plus
20 more years to finish. If approved as written, this sets a concerning precedent: that a
developer who does not act on an entitlement will be rewarded with a longer and more favorable
one. The Commission should address on the record why this outcome serves the public
interest, and what enforceable consequence exists if the developer again fails to commence
within the new window."
Topic 5: No Fair Share Contribution for Regional Infrastructure
Comparable development approvals—including the Xie Trust rezoning on the same
Commission agenda—have included explicit per-unit contributions for parks, roads, police, and
fire services. Site M will add 925 units to a region that already has documented emergency
service gaps. I respectfully ask the Commission to consider whether a fair share infrastructure
contribution should be a condition of this permit.
Page 9 of 9
Topic 6- Critical Conditions Lack Performance Bonds
Conditions 6 and 10—the two most important community safety conditions in the
recommendation—contain no bonding requirements at permit issuance. I recognize the
Planning Director may have intended these as standard compliance conditions, but given the
developer’s 18-year history of non-performance under the original permit, I believe the
Commission should require performance bonds on all material pre-construction conditions as a
safeguard.
C. The Role of the Contested Case Intervenors
Two parties have filed Petitions for Standing that the Commission will address on April 23. Both
provide additional context that supports a thorough review:
• Pacific Resource Partnership (PRP) argues that 18 years of inaction warrants a
supplemental environmental review, citing the Hawaii Supreme Court’s Turtle Bay ruling.
PRP specifically identifies the stale 2007 traffic analysis and the incomplete Ka Paʻakai
cultural assessment as requiring updated scrutiny before any extension is granted.
• The Villages at Mauna Lani Association of Apartment Owners (VML AOAO),
represented by Dentons US LLP, holds contractual rights under a 2008 Settlement
Agreement with the original developer that runs with the land and binds all successors
including DHL Mahi. That agreement includes density limits, traffic mitigation
commitments, a timeshare prohibition, and the emergency evacuation route obligation.
The Commission should ensure that no amended condition inadvertently undercuts
those contractual protections.
These interventions are not obstacles to progress—they are the procedural foundation for
ensuring that any extension granted is durable, legally defensible, and genuinely serves the
community.
This document is submitted as written testimony in lieu of in-person attendance at the April 23, 2026
public hearing before the Leeward Planning Commission for Site M application PL-SMA-2026-000087. All
facts cited are drawn from public records, the Planning Department Board Packet for PL-SMA-2026-
000087, agency correspondence, contested case petitions filed with the Planning Department, community
discussion, and owner research.
Prepared and submitted by: Renée B. Lahti | Full-time resident of Waimea, Hawaiʻi and Owner, VML Unit
#413, Villages at Mauna Lani | Date: April 19, 2026 | Email: Renee.Lahti@LineiKokua.com | This
document was transmitted electronically to LPCtestimony@hawaiicounty.gov on April 19, 2026 as written
testimony for Application PL-SMA-2026-000087, Agenda Item No. 2, Leeward Planning Commission
hearing of April 23, 2026. Receipt confirmation was requested.